A drilling device for ground source heat pump survey and construction

By introducing transition joints and elastic connections into the ground source heat pump drilling rig, the high-pressure air distribution and transmission are dynamically adjusted, solving the problems of low drilling efficiency and energy waste, achieving a more efficient drilling process and extending the life of the drill bit.

CN118653788BActive Publication Date: 2024-10-18SHANDONG YIMEIKE ENERGY SAVING SERVICE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411131706.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-18
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

During the drilling process of existing ground source heat pump drilling rigs, improper distribution of high-pressure air and rigid connection between the drill pipe and the drill bit lead to low drilling efficiency, waste of energy and shortened drill bit life.

Method used

By introducing transition joints and elastic connections in drilling equipment, the distribution and transmission mode of high-pressure wind is dynamically adjusted, and spiral blades and compression springs are used to achieve flexible distribution of air volume and elastic connections of drill bits, thereby improving the transfer efficiency of soil and rock debris. And optimize the wind conduction state in hard rock and soft rock formations to improve drilling efficiency.

Benefits of technology

It effectively improves the drilling efficiency of the drilling rig, reduces the consumption of high-pressure air, extends the service life of the drill bit, and meets the needs of ground source heat pump construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118653788B_ABST
    Figure CN118653788B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of ground source heat pump drilling equipment, and discloses a drilling equipment for ground source heat pump exploration and construction, including a transition joint, the upper end of which is connected to a hollow drill rod through a threaded connection, and the drilling rig power head is connected through the hollow drill rod, the lower end of which is fixedly connected to a hollow shaft, a spiral blade is arranged on the outside of the hollow shaft, a piston shaft is arranged inside the hollow shaft, the piston shaft includes an upper chamber, a lower chamber, and a ventilation pipe group arranged between the upper chamber and the lower chamber, a compression spring is arranged in the upper chamber, a support sleeve is arranged between the compression spring and the transition joint, and the piston shaft is connected to a drill bit through a thread arranged on the inner wall of the lower chamber. The present invention can reasonably distribute the air volume of high pressure wind at and above the drill bit according to different geological conditions in the drilling area, improve the transfer speed of associated materials such as soil and rock debris near the drill bit, and thus improve the drilling efficiency of the drilling rig.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of ground source heat pump drilling equipment, and in particular relates to a drilling equipment for ground source heat pump survey and construction. Background Art

[0002] As one of the most efficient home heating and cooling systems today, ground source heat pumps will surely have broad applications and development prospects in China. The principle of ground source heat pumps is to obtain low-grade heat from the air, water or soil in nature, and output usable high-grade thermal energy through electric work. Therefore, ground source heat pumps are mainly carried out underground, and heat transfer can only be carried out after wells are dug. In order to ensure the construction needs of wells, a large number of ground source heat pump well construction equipment have appeared on the market.

[0003] When the existing ground source heat pump drilling rig is drilling, the air supply volume of high-pressure air reaching the drill bit is fixed. Since the geological conditions of the drilling area change at any time, in hard rock formations, the drilling speed is slow and less soil and rock debris are produced. At this time, the high-pressure air only needs to cool the drill bit and discharge a small amount of soil and rock debris to the ground. The excess high-pressure air causes energy waste. In soft rock formations, the drilling speed is fast and more soil and rock debris are produced. Due to the accumulation caused by the high friction between the soil and rock debris and the auger structure near the drill bit, the transfer efficiency of associated materials such as soil and rock debris is very limited, and the powder cannot be effectively discharged near the drill bit, causing the drill powder to sinter into blocks under the high temperature baking of the drill bit, affecting the drilling efficiency of the drill bit and reducing the service life of the drill bit. In addition, the drill rod and the drill bit are completely rigidly connected, and the drill bit cannot have an impact and crushing drilling effect on the rock, which is not conducive to improving the drilling efficiency. Therefore, there is an urgent need to further improve the drill bit of the ground source heat pump drilling rig to improve the working efficiency of the ground source heat pump drilling rig and meet the construction needs of the ground source heat pump drilling project. Summary of the invention

[0004] In view of the technical problem that the existing ground-source heat pump well drilling rigs described in the background technology need to be further improved to improve the drilling efficiency of the drill bit, the present invention provides a drilling equipment for ground-source heat pump survey and construction, which can reasonably distribute the air volume of high-pressure air at the drill bit and above the drill bit according to the different geological conditions of the drilling area, thereby improving the transfer efficiency of associated materials such as soil and rock fragments near the drill bit. At the same time, the drill rod is elastically connected to the drill bit, so that the drill bit has an impact and crushing effect on the rock, thereby improving the drilling efficiency of the drilling rig from two aspects and meeting the construction needs of the ground-source heat pump.

[0005] The present invention achieves the above-mentioned invention object through the following technical scheme: a drilling device for ground source heat pump survey and construction is provided, including a transition joint, the upper end of the transition joint is connected to the hollow drill rod through a thread, and the drilling rig power head is connected through the hollow drill rod; the lower end of the transition joint is fixedly connected to a hollow shaft, spiral blades are arranged on the outside of the hollow shaft, and a piston shaft is arranged inside the hollow shaft, the piston shaft includes an upper chamber, a lower chamber, and a ventilation pipe group arranged between the upper chamber and the lower chamber, a compression spring is arranged in the upper chamber, and a support sleeve is arranged between the compression spring and the transition joint, the piston shaft is connected to a drill bit through a thread arranged on the inner wall of the lower chamber; an internal spline is arranged on the inner wall of the hollow shaft, and an external spline is arranged on the outer wall of the piston shaft, The hollow shaft is connected to the piston shaft by a spline pair; the ventilation pipe group includes a main ventilation pipe and a plurality of auxiliary ventilation pipes arranged around the main ventilation pipe, the upper end of the main ventilation pipe is connected to the upper chamber, the lower end of the main ventilation pipe is connected to the lower chamber and is connected to the air hole on the drill bit through the lower chamber; the upper end of the auxiliary ventilation pipe is connected to the upper chamber, the lower end of the auxiliary ventilation pipe is closed when the compression spring is in a compressed state and the piston shaft moves upward relative to the hollow shaft, and the lower end is connected to the first air flow channel surrounded by the outer surface of the piston shaft and the inner surface of the hollow shaft when the compression spring is in an extended state and the piston shaft moves downward relative to the hollow shaft, the lower end of the hollow shaft is provided with a plurality of first purge holes penetrating the tube wall, the inner port of the first purge hole is connected to the first air flow channel, and the outer port faces the spiral blade outside the hollow shaft.

[0006] Furthermore, a plurality of second air flow channels are provided in the upper chamber of the piston shaft, and a plurality of second purge holes are correspondingly provided at the upper end of the hollow shaft; when the compression spring is in a compressed state and the piston shaft moves upward relative to the hollow shaft, the second air flow channels and the second purge holes are not connected; when the compression spring is in an extended state and the piston shaft moves downward relative to the hollow shaft, the second air flow channels and the second purge holes are connected.

[0007] Furthermore, a first flange is provided at the lower end of the transition joint, and a second flange is provided at the upper end of the hollow shaft. The transition joint and the hollow shaft are fixedly connected via the first flange and the second flange.

[0008] Furthermore, the upper end of the support sleeve is installed in the mounting hole of the transition joint, and the lower end of the support sleeve penetrates into the upper chamber of the piston shaft and contacts the upper end surface of the compression spring.

[0009] Furthermore, a support plate is included, which is arranged at the bottom of the upper chamber of the piston shaft, and the upper surface of the support plate contacts the lower end surface of the compression spring.

[0010] Furthermore, the drill bit includes a drill shank, a fixing ring, a wing, an alloy body, and a chip removal channel. The air hole on the drill bit passes through the drill shank, and there is an alloy body at the bottom of the drill bit. Three winglets are provided, and the three winglets are welded to the air hole and the fixing ring. The three winglets are 120 degrees apart. The alloy bodies on the winglets are evenly distributed, and each winglet includes at least two alloy bodies. Three chip removal channels are formed at the connection between the fixing ring and the three winglets. A thread is provided on the drill shank, and the drill shank is connected to the chamber under the piston shaft through a thread pair.

[0011] As an optimization, a small threaded hole is provided on the side wall of the bottom end of the drill shank, and a corresponding small threaded through hole is provided on the lower chamber of the piston shaft. The drill shank and the lower chamber are further fixed by a set screw when they are tightly connected through a threaded pair.

[0012] As an optimization, the present invention also includes a pressure plate, which includes an inner ring, an outer ring, and a reinforcing rib plate connecting the inner ring and the outer ring, the inner ring is fixedly connected to the outer surface of the bottom end of the hollow shaft, and the outer ring is the same size as the fixing ring of the drill bit.

[0013] As an optimization, two auxiliary ventilation pipes are provided, and the two auxiliary ventilation pipes are symmetrically distributed on both sides of the main ventilation pipe.

[0014] As an optimization, two first purge holes are provided, and the two first purge holes are symmetrically arranged on both sides of the hollow shaft.

[0015] As an optimization, the first purge hole and the second purge hole are both arranged obliquely, and the inner port is lower than the outer port.

[0016] As an optimization, a serration is provided at the starting end of the spiral blade.

[0017] In the present invention, the hollow drill rod and the drill bit transmit torsional power through a spline connection, and transmit longitudinal feed pressure through an elastic connection of a compression spring. The high-pressure air channel and the first purge hole and the second purge hole have two working states of conduction and blocking according to the hardness of the rock encountered by the drill bit, that is, blocking when encountering hard rock and conducting when encountering soft rock. When encountering hard rock, the high-pressure air channel is not connected to the first purge hole and the second purge hole, and the pressure of the high-pressure air on the drill bit is enhanced. Together with the drilling working pressure provided by the compression spring to the drill bit, it can ensure that the drill bit has a strong working breaking pressure on the rock, which is conducive to the crushing of the rock. At this time, the high-pressure air provided by the main ventilation pipe is used to cool the drill bit and remove dust near the drill bit, maintaining the basic need of the drill bit for high-pressure air. Therefore, the drill bit can play an impact crushing drilling effect on the rock, which is conducive to improving the drilling efficiency, reducing the consumption of high-pressure air, and saving energy. When encountering soft rock, the high-pressure air channel is connected with the first purge hole and the second purge hole, the driving force of the high-pressure air on the drill bit is reduced, and the lifting force on the soil and rock debris is enhanced, which is conducive to removing a large amount of soil and rock debris. At this time, the compression spring mainly provides the drilling working pressure to the drill bit; one path of high-pressure air enters the air hole of the drill bit through the main ventilation pipe, and directly blows the soil and rock debris cut off by the alloy body out of the drill bit, so that the rock debris reaches the spiral blade above the drill bit, and cools the drill bit at the same time; the other path of high-pressure air passes through the auxiliary ventilation pipe, the first air flow channel, and the first purge hole to reach the spiral blade, and the rock debris above the drill bit continues to be blown upward along the spiral blade, thereby avoiding the accumulation caused by the high friction between the rock debris and the auger structure near the drill bit, that is, the spiral blade, and improving the transfer speed of the associated materials such as soil and rock debris, so that the powder near the drill bit can be quickly and effectively discharged, and the drill powder is prevented from sintering into blocks under the high temperature baking of the drill bit, thereby improving the drilling efficiency of the drill bit and reducing the loss of the drill bit.

[0018] Beneficial Effects

[0019] The present invention can reasonably distribute the air volume of high-pressure air at the drill bit and above the drill bit according to the different geological conditions of the drilling area, increase the transfer speed of associated materials such as soil and rock debris near the drill bit, thereby avoiding sintering of drill powder into blocks under the high temperature baking of the drill bit, improving drilling efficiency, and reducing drill bit wear. At the same time, the drill rod and the drill bit are elastically connected, so that the drill bit has an impact and crushing drilling effect on the rock. The present invention improves the ground source heat pump well drilling rig in the prior art from two aspects: the high-pressure air powder discharge method and the drill bit rock crushing method, thereby improving the drilling efficiency of the drilling rig and meeting the construction needs of the ground source heat pump project. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 is a schematic diagram of the overall structure of the embodiment of the present invention when the compression spring is in an extended state;

[0021] Figure 2 yes Figure 1 Enlarged view at A in the middle;

[0022] Figure 3 yes Figure 1 Enlarged view at B in the middle;

[0023] Figure 4 is a schematic diagram of the overall structure of an embodiment of the present invention when the compression spring is in a compressed state;

[0024] Figure 5 yes Figure 4 Enlarged view at center C;

[0025] Figure 6 yes Figure 4 Enlarged view at D in the middle;

[0026] Figure 7 is a schematic diagram of the transition joint structure of an embodiment of the present invention;

[0027] Figure 8 Schematic diagram of the hollow shaft structure of an embodiment of the present invention;

[0028] Fig. 9 is a schematic diagram of the piston shaft structure of an embodiment of the present invention;

[0029] Fig.10 is a diagram of the piston shaft of an embodiment of the present invention;

[0030] Fig.11 yes Fig.10 Middle E-direction view;

[0031] Fig.12 Schematic diagram of the support sleeve structure of an embodiment of the present invention, wherein (a) is a front view of the support sleeve, and (b) is a top view of the support sleeve;

[0032] Fig.13 Schematic diagram of the support plate structure of an embodiment of the present invention, wherein (c) is a front view of the support plate, and (d) is a top view of the support plate;

[0033] Fig.14 is a schematic diagram of the drill bit structure of an embodiment of the present invention;

[0034] Fig.15 yes Fig.14 Middle F direction view;

[0035] Fig.16 It is a schematic diagram of the structure of a pressure plate according to an embodiment of the present invention;

[0036] In the figure: 1. transition joint, 2. hollow shaft, 3. spiral blade, 4. piston shaft, 5. upper chamber, 6. lower chamber, 7. ventilation pipe group, 8. compression spring, 9. support sleeve, 10. drill bit, 11. internal spline, 12. external spline, 13. main ventilation pipe, 14. auxiliary ventilation pipe, 15. air hole, 16. first air flow channel, 17. first purge hole, 18. second air flow channel, 19. second purge hole, 20. first flange, 21. second flange, 22. support plate, 23. drill shank, 24. fixing ring, 25. wing, 26. alloy body, 27. chip removal channel, 28. small threaded hole, 29. small threaded through hole, 30. set screw, 31. pressure plate, 32. inner ring, 33. outer ring, 34. reinforcing rib plate, 35. serrated piece. DETAILED DESCRIPTION

[0037] To illustrate the features of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0038] Example 1, please check Figures 1 to 16 , a drilling device for ground source heat pump survey and construction according to embodiment 1 of the present invention comprises a transition joint 1, the upper end of the transition joint 1 is connected to a hollow drill rod through a thread, and is connected to a drilling rig power head (not shown in the figure) through the hollow drill rod; a hollow shaft 2 is fixedly connected to the lower end of the transition joint 1, a spiral blade 3 is arranged on the outside of the hollow shaft 2, a piston shaft 4 is arranged inside the hollow shaft 2, the piston shaft 4 comprises an upper chamber 5, a lower chamber 6, and a ventilation pipe group 7 arranged between the upper chamber 5 and the lower chamber 6, a compression spring 8 is arranged in the upper chamber 5, a support sleeve 9 is arranged between the compression spring 8 and the transition joint 1, and the piston shaft 4 is connected to a drill bit 10 through a thread arranged on the inner wall of the lower chamber 6; an inner spline 11 is arranged on the inner wall of the hollow shaft 2, an outer spline 12 is arranged on the outer wall of the piston shaft 4, and the hollow shaft 2 and the piston shaft 4 are connected through a spline pair The ventilation pipe group 7 includes a main ventilation pipe 13 and a plurality of auxiliary ventilation pipes 14 arranged around the main ventilation pipe 13, the upper end of the main ventilation pipe 13 is connected to the upper chamber 5, the lower end of the main ventilation pipe 13 is connected to the lower chamber 6 and is connected to the air hole 15 on the drill bit 10 through the lower chamber 6; the upper end of the auxiliary ventilation pipe 14 is connected to the upper chamber 5, the lower end of the auxiliary ventilation pipe 14 is closed when the compression spring 8 is in a compressed state and the piston shaft 4 moves upward relative to the hollow shaft 2, and the lower end of the auxiliary ventilation pipe 14 is connected to a first air flow channel 16 surrounded by the outer surface of the piston shaft 4 and the inner surface of the hollow shaft 2 when the compression spring 8 is in an extended state and the piston shaft 4 moves downward relative to the hollow shaft 2, and the lower end of the auxiliary ventilation pipe 14 is connected to a first air flow channel 16 surrounded by the outer surface of the piston shaft 4 and the inner surface of the hollow shaft 2, and the lower end of the hollow shaft 2 is provided with a plurality of first purge holes 17 penetrating the pipe wall, the inner port of the first purge hole 17 is connected to the first air flow channel 16, and the outer port faces the spiral blade 3 outside the hollow shaft 2.

[0039] The upper end of the transition joint 1 is connected to the hollow drill rod through a thread. Driven by the drilling rig power head, the hollow drill rod transmits the rotation torque and longitudinal pressure to the transition joint 1. Since the transition joint 1 is connected to the hollow shaft 2 through a flange, the hollow shaft 2 is connected to the piston shaft 4 through a spline, and the piston shaft 4 is connected to the drill shank 23 of the drill bit 10 through a threaded pair, the rotation torque of the drilling rig power head can be directly transmitted to the drill bit 10. On the other hand, during the drilling process, the transition joint 1 presses down the support sleeve 9, and the support sleeve 9 transmits the pressure to the compression spring 8, and the compression spring 8 then transmits the pressure to the piston shaft 4 and the drill bit 10. Since the piston shaft 4 and the hollow shaft 2 are splined, the piston shaft 4 and the hollow shaft 2 can achieve longitudinal relative sliding within a certain range. Therefore, while the torque is rigidly continuously transmitted between the hollow shaft 2 and the piston shaft 4, the longitudinal pressure can be elastically transmitted through the compression spring 8, that is, rigid torque transmission and longitudinal elastic pressure transmission can be simultaneously achieved between the hollow drill rod and the drill bit 10.

[0040] Please inquire Figures 1 to 6 ,as well as Figures 8 to 11 , a plurality of second airflow channels 18 are provided in the upper chamber 5 of the piston shaft 4, and a plurality of second purge holes 19 are provided at the upper end of the hollow shaft 2 correspondingly; when the compression spring 8 is in a compressed state and the piston shaft 4 moves upward relative to the hollow shaft 2, the second airflow channel 18 and the second purge holes 19 are not connected; when the compression spring 8 is in an extended state and the piston shaft 4 moves downward relative to the hollow shaft 2, the second airflow channel 18 and the second purge holes 19 are connected. The connection between the second airflow channel 18 and the second purge holes 19 can further accelerate the transfer speed of associated materials such as soil and rock debris.

[0041] Please inquire Figure 1 , Figure 7 A first flange 20 is provided at the lower end of the transition joint 1 , and a second flange 21 is provided at the upper end of the hollow shaft 2 . The transition joint 1 and the hollow shaft 2 are fixedly connected via the first flange 20 and the second flange 21 .

[0042] Please inquire Figure 1 , Figure 4 , Figure 7 ,as well as Fig.12 The upper end of the support sleeve 9 is installed in the mounting hole of the transition joint 1, and the lower end of the support sleeve 9 penetrates into the upper chamber 5 of the piston shaft 4 and contacts the upper end surface of the compression spring 8.

[0043] Please inquire Figure 2 , Figure 5 ,as well as Fig.13, Embodiment 1 of the present invention further includes a support plate 22, which is disposed at the bottom of the upper chamber 5 of the piston shaft 4, and the upper surface of the support plate 22 contacts the lower end surface of the compression spring 8. The arrangement of the support plate 22 is conducive to improving the stability of the compression spring 8 and reducing the resistance of the high-pressure wind entering the ventilation pipe group 7.

[0044] Please inquire Figure 1 , Fig.14 ,as well as Fig.15 The drill bit 10 of embodiment 1 of the present invention includes a drill shank 23, a fixing ring 24, a wing 25, an alloy body 26, and a chip removal channel 27. The air hole 15 on the drill bit 10 passes through the drill shank 23, and an alloy body 26 is provided at the bottom of the drill bit 10; three winglets 25 are provided, and the three winglets 25 are welded on the air hole 15 and the fixing ring 24. The three winglets 25 are 120 degrees apart to ensure that the air volume of the high-pressure air coming out of the air hole 15 is uniform between the three winglets 25; the alloy bodies 26 on the winglets 25 are evenly distributed, and each winglet 25 includes at least two alloy bodies 26; the fixing ring 24 plays a role in stabilizing the drill bit 10 and ensuring the verticality of drilling during drilling. Three chip removal channels 27 are formed at the connection between the fixing ring 24 and the three winglets 25, and the rock debris cut off by the alloy body 26 can be conveniently and directly discharged; a thread is provided on the drill shank 23, and the drill shank 23 is connected to the lower chamber 6 of the piston shaft 4 through the thread.

[0045] Please inquire Figure 1 , Figure 3 , Fig. 9 , Fig.10 ,as well as Fig.14 A small threaded hole 28 is provided on the side wall at the bottom end of the drill handle 23, and a small threaded through hole 29 is provided on the corresponding lower chamber 6 of the piston shaft 4. The drill handle 23 and the lower chamber 6 are further fixed by a set screw 30 in a tightly connected state through a threaded pair. The setting of the set screw 30 increases the reliability of the connection between the drill handle 23 and the piston shaft 4, so that the drill bit 10 will not fall off the piston shaft 4 during the drilling process; the set screw 30 is arranged at the bottom end of the drill handle 23, which is conducive to the disassembly and installation between the drill bit 10 and the piston shaft 4. When disassembling, lift the hollow drill rod, the compression spring 8 is in an extended state, the piston shaft 4 moves downward relative to the hollow shaft 2, and the set screw 30 is located below the hollow shaft 2. Remove the set screw 30 with an inner hexagonal wrench, and then unscrew the drill bit, and the piston shaft 4 can be disengaged from the upper end of the hollow shaft 2. When installing, just follow the steps of disassembly in reverse.

[0046] Please inquire Figure 1 , Figure 4 ,as well as Fig.16, Embodiment 1 of the present invention further includes a pressure plate 31, the pressure plate 31 includes an inner ring 32, an outer ring 33, and a reinforcing rib plate 34 connecting the inner ring 32 and the outer ring 33, the inner ring 32 is fixedly connected to the outer surface of the bottom end of the hollow shaft 2, and the outer ring 33 is the same size as the fixing ring 24 of the drill bit 10. The setting of the pressure plate 31 is conducive to the hollow shaft 2 applying the drilling pressure transmitted by the hollow drill rod to the fixing ring 24 through the outer ring 33 when drilling in a hard rock area, mainly replacing the drilling pressure applied by the piston shaft 4 to the drill bit 10, and improving the stability of the drill bit 10 in drilling on hard rocks.

[0047] Please inquire Fig. 9 In the first embodiment of the present invention, two auxiliary ventilation pipes 14 are provided, and the two auxiliary ventilation pipes 14 are symmetrically distributed on both sides of the main ventilation pipe 13 .

[0048] Please inquire Figure 8 In embodiment 1 of the present invention, two first purge holes 17 are provided, and the two first purge holes 17 are symmetrically arranged on both sides of the hollow shaft 2.

[0049] Please inquire Figure 8 The first purge hole 17 and the second purge hole 19 of Example 1 of the present invention are both inclined, and the inner port is lower than the outer port. This arrangement is conducive to the high-pressure wind transferring the associated materials such as soil and rock fragments along the inclined surface of the spiral blade 3 to the top of the drill bit 10, thereby increasing the transfer speed of the soil and rock fragments.

[0050] Please inquire Figure 1 , Figure 3 In the embodiment 1 of the present invention, a sawtooth piece 35 is provided at the starting end of the spiral blade 3. The setting of the sawtooth piece 35 is conducive to reducing the rotation resistance of the spiral blade 3, and is also conducive to large rock particles entering the spiral blade 3 and being removed in time.

[0051] Working process of Example 1 of the present invention: When the drilling equipment of Example 1 drills in a soft rock formation, the drilling speed is fast and a lot of soil and rock debris are generated. At this time, the feed speed of the drill bit 10 is controlled, or when the feed speed of the hollow drill rod is constant, the compression spring 8 will overcome the resistance of the drill bit 10 and stretch out, and the piston shaft 4 moves downward relative to the hollow shaft 2. The auxiliary ventilation pipe 14 is connected to the first air flow channel 16 surrounded by the outer surface of the piston shaft 4 and the inner surface of the hollow shaft 2, and is connected to the first purge hole 17 through the first air flow channel 16. The high-pressure wind from the hollow drill rod reaches the transition joint 1, the support sleeve 9, and the piston shaft 4 in turn. One high-pressure wind enters the air hole 15 of the drill bit 10 through the main ventilation pipe 13, and directly blows out the rock fragments cut off by the alloy body 26, so that the rock fragments reach the spiral blade 3 above the drill bit 10, and cools the drill bit 10 at the same time; the other high-pressure wind passes through the auxiliary ventilation pipe 14, the first air flow channel 16, and the first purge hole 17, and reaches the spiral blade 3, and blows the soil and rock fragments above the drill bit 10 upward along the spiral blade 3, thereby avoiding the soil and rock fragments from contacting with the vicinity of the drill bit 10. The accumulation caused by the high friction between the spiral blades 3 in the auger structure increases the transfer speed of associated materials such as soil and rock fragments, so that the powder can be discharged quickly and effectively near the drill bit 10, avoiding the sintering of drill powder into blocks under the high temperature baking of the drill bit 10, thereby improving the drilling efficiency of the drill bit 10 and reducing the wear of the drill bit; when the compression spring 8 is in an extended state, the piston shaft 4 moves downward relative to the hollow shaft 2, and the second air flow channel 18 and the second purge hole 19 are also connected, further accelerating the transfer efficiency of associated materials such as soil and rock fragments.

[0052] When the drilling equipment of the present embodiment 1 is drilling in a hard rock formation, the drilling speed is slow, and less soil and rock debris are generated. At this time, the reverse force of the rock on the drill bit 10 is relatively large, and the compression spring 8 is in a contracted state under the reverse pressure of the drill bit 10. The piston shaft 4 moves upward relative to the hollow shaft 2, and the lower end of the auxiliary ventilation pipe 14 is not connected to the first air flow channel 16 and the first purge hole 17, and the second air flow channel 18 is not connected to the second purge hole 19. The high-pressure air only enters the air hole 15 of the drill bit 10 through the main ventilation pipe 13, and a small amount of rock debris cut off by the alloy body 26 is directly blown out of the drill bit 10, and the drill bit 10 is cooled. At this time, the problem of cooling the drill bit 10 and timely discharging a small amount of rock debris is solved, and the consumption of high-pressure air can be saved, saving energy.

[0053] Since both rigid torque transmission and longitudinal elastic pressure transmission can be achieved between the hollow drill rod and the drill bit 10, in the mixed hardness rock formation working area, the compression spring 8 is alternately in a contracted and extended state, and the pressure of the high-pressure wind is fluctuating. When drilling in a hard rock area, the pressure is high, which is suitable for pressurized crushing of rocks. When drilling in a soft rock area, the pressure is released and the exhaust volume is large, which is also suitable for the working conditions in the soft rock area where the high-pressure air volume demand is large and the crushing pressure demand is small. The high-pressure wind and the compression spring 8 work together to enable the drill bit 10 to have an impact crushing drilling effect on the rock, which is beneficial to improving the drilling efficiency.

[0054] The above embodiments and drawings are only used to illustrate the technical solutions of the present invention, and are not intended to limit the present invention. The present invention is described in detail with reference to the preferred embodiments. It should be understood by those skilled in the art that any changes, modifications, additions or substitutions made by those skilled in the art within the essential scope of the present invention do not deviate from the purpose of the present invention and should also fall within the scope of protection of the claims of the present invention. Other related technical structures not fully disclosed in the present invention are prior art in the art.

Claims

1. A drilling device for ground source heat pump survey and construction, comprising a transition joint, the upper end of which is connected to a hollow drill rod through a thread, and is connected to a drilling rig power head through the hollow drill rod, characterized in that: The lower end of the transition joint is fixedly connected with a hollow shaft, a spiral blade is arranged on the outside of the hollow shaft, a piston shaft is arranged inside the hollow shaft, the piston shaft includes an upper chamber, a lower chamber, and a ventilation pipe group arranged between the upper chamber and the lower chamber, a compression spring is arranged in the upper chamber, a support sleeve is arranged between the compression spring and the transition joint, and the piston shaft is connected with a drill bit through a thread arranged on the inner wall of the lower chamber; an internal spline is arranged on the inner wall of the hollow shaft, and an external spline is arranged on the outer wall of the piston shaft, and the hollow shaft and the piston shaft are connected through a spline pair; the ventilation pipe group includes a main ventilation pipe and multiple ventilation pipes arranged around the main ventilation pipe. A secondary ventilation pipe, the upper end of the main ventilation pipe is connected to the upper chamber, and the lower end of the main ventilation pipe is connected to the lower chamber and connected to the air hole on the drill bit through the lower chamber; the upper end of the secondary ventilation pipe is connected to the upper chamber, and the lower end of the secondary ventilation pipe is closed when the compression spring is in a compressed state and the piston shaft moves upward relative to the hollow shaft, and is connected to a first airflow channel surrounded by the outer surface of the piston shaft and the inner surface of the hollow shaft when the compression spring is in an extended state and the piston shaft moves downward relative to the hollow shaft; a plurality of first purge holes penetrating the tube wall are provided at the lower end of the hollow shaft, the inner port of the first purge hole is connected to the first airflow channel, and the outer port faces the spiral blades on the outside of the hollow shaft.

2. The drilling equipment for ground source heat pump survey and construction according to claim 1, characterized in that: A plurality of second air flow channels are arranged in the upper chamber of the piston shaft, and a plurality of second purge holes are correspondingly arranged at the upper end of the hollow shaft; when the compression spring is in a compressed state and the piston shaft moves upward relative to the hollow shaft, the second air flow channels and the second purge holes are not connected; when the compression spring is in an extended state and the piston shaft moves downward relative to the hollow shaft, the second air flow channels and the second purge holes are connected.

3. The drilling equipment for ground source heat pump survey and construction according to claim 1, characterized in that: A first flange is provided at the lower end of the transition joint, and a second flange is provided at the upper end of the hollow shaft. The transition joint and the hollow shaft are fixedly connected via the first flange and the second flange.

4. The drilling equipment for ground source heat pump survey and construction according to claim 1, characterized in that: The upper end of the support sleeve is installed in the installation hole of the transition joint, and the lower end of the support sleeve penetrates into the upper chamber of the piston shaft and contacts with the upper end surface of the compression spring.

5. The drilling equipment for ground source heat pump survey and construction according to claim 1, characterized in that: It also includes a support plate, which is arranged at the bottom of the upper chamber of the piston shaft, and the upper surface of the support plate contacts the lower end surface of the compression spring.

6. The drilling equipment for ground source heat pump survey and construction according to claim 1, characterized in that: The drill bit includes a drill shank, a fixing ring, wings, an alloy body, and a chip removal channel. The air hole on the drill bit passes through the drill shank, and there is an alloy body at the bottom of the drill bit. Three wings are provided, and the three wings are welded to the air hole and the fixing ring. The three wings are 120 degrees apart. The alloy bodies on the wings are evenly distributed, and each wing includes at least two alloy bodies. Three chip removal channels are formed at the connection between the fixing ring and the three wings. The drill shank is provided with a thread, and the drill shank is connected to the lower chamber of the piston shaft through a thread pair.

7. The drilling equipment for ground source heat pump survey and construction according to claim 6, characterized in that: A small threaded hole is arranged on the side wall at the bottom end of the drill shank, and a small threaded through hole is arranged on the corresponding lower chamber of the piston shaft. The drill shank and the lower chamber are further fixed by a set screw in a tightly connected state through a threaded pair.

8. The drilling equipment for ground source heat pump survey and construction according to claim 6, characterized in that: It also includes a pressure plate, which includes an inner ring, an outer ring, and a reinforcing rib plate connecting the inner ring and the outer ring. The inner ring is fixedly connected to the outer surface of the bottom end of the hollow shaft, and the outer ring is the same size as the fixing ring of the drill bit.

9. The drilling equipment for ground source heat pump survey and construction according to claim 2, characterized in that: The first purge hole and the second purge hole are both arranged obliquely, and the inner port is lower than the outer port.

10. The drilling equipment for ground source heat pump survey and construction according to claim 1, characterized in that: The starting end of the spiral blade is provided with a sawtooth piece.