Enterprise digital management method, system and equipment
Through the digital management method of enterprise, monitoring the production tasks of receiving information and managing production equipment based on this, solving the problem of poor real -time problems in the management of information updates and decision -making in traditional enterprise management, and improving management efficiency and flexibility.
Patent Information
- Application Number
- CN202411157016.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2044-08-22
AI Technical Summary
Traditional enterprise management relies on manual operations, regular reports or manual inspections, resulting in poor real-time information updates and decision-making, thereby reducing management efficiency.
Provide a digital management method of enterprise, which reflects the operating status and production parameters of production equipment and adjustment of production parameters by monitoring information. Based on the production tasks of receiving information management production equipment, dynamically adjust management tasks to adapt to market changes or cope with emergency orders.
Real -time status monitoring and parameter adjustment of production equipment have been realized, management efficiency and flexibility are improved, and market changes and emergency orders can be quickly responded to.
Smart Images

Figure CN118674250B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of enterprise management technology, and in particular, relates to an enterprise digital management method, system and equipment. Background Art
[0002] Enterprise management refers to the management of a series of activities such as planning, designing, operating, maintaining and updating the production equipment, facilities and production lines of an enterprise. This link plays a key role in ensuring production efficiency, product quality, cost control, safety and environmental protection.
[0003] The traditional enterprise management process relies on manual operations, regular reports or manual inspections, resulting in poor real-time information updates and decision-making (for example, it is impossible to instantly understand equipment status, production parameters or production conditions, etc.), thereby reducing management efficiency. Summary of the invention
[0004] The embodiments of the present application provide a method, system and device for digital management of an enterprise, which can solve the problem that in the traditional enterprise management process, reliance on manual operations, regular reports or manual inspections leads to poor real-time information updating and decision-making, thereby reducing management efficiency.
[0005] In a first aspect, an embodiment of the present application provides an enterprise digital management method, including:
[0006] Monitoring received information; wherein the received information is used to reflect the reception of the first operation; the first operation is a management operation on the production equipment input on the interactive interface of the enterprise digital management device, and the management operation is used to instruct the enterprise digital management device to adjust the production parameters of the production equipment;
[0007] The production tasks of the production equipment are managed based on the received information.
[0008] The above technical solutions in the embodiments of the present application have at least the following technical effects:
[0009] The enterprise digital management method provided by the present application, first of all, by monitoring the received information used to reflect the reception of the first operation, the operating status of the production equipment and the adjustment of the production parameters can be reflected in real time. This real-time and feedback mechanism is faster and more accurate than the traditional manual monitoring and reporting methods, which helps to improve management efficiency. Finally, based on the production tasks of the production equipment managed by the received information, the management tasks can be dynamically adjusted according to the current production situation, such as increasing or decreasing the production batches, adjusting the production cycle, to adapt to market changes or respond to emergency orders, and improve the flexibility of management. For example, if the first operation is not received, the historical management method can be used for management, and if the first operation is received, the method in the first operation can be used for management. This flexible management method can flexibly use the management method in different situations, which helps to more efficiently allocate enterprise resources and thus improve management efficiency.
[0010] In a possible implementation manner of the first aspect, the production equipment includes a first production device, the enterprise digital management device stores historical management data of the first production device, and managing the production task of the production equipment based on the received information includes:
[0011] In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains the production signal sent by the first production device, the enterprise digital management device manages the first production device based on the historical management data; wherein the production signal is used to indicate to the enterprise digital management device that the production device is ready to start production; the historical management data includes first management data for monitoring and managing the first production device using a monitoring management method in a preset management method when the enterprise digital management device does not receive the first operation;
[0012] When the enterprise digital management device receives the first operation, the enterprise digital management device establishes a management channel with the first production device; wherein the management channel includes a data synchronization channel and a remote control channel;
[0013] The enterprise digital management device manages the production tasks of the first production device based on the management channel.
[0014] In a possible implementation manner of the first aspect, the production equipment further includes a second production device, and the method further includes:
[0015] In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the first production device, the enterprise digital management device monitors and manages the first production device using a method with a low monitoring and management frequency among the preset management methods;
[0016] When the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains a production signal sent by a second production device with a high level of urgency in the production device list, the enterprise digital management device establishes a management channel with the second production device with a high level of urgency in the production device list; wherein the production device list is a list of devices that have not completed production tasks.
[0017] In a possible implementation manner of the first aspect, the enterprise digital management device manages the production tasks of the first production device based on the management channel, including:
[0018] In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the second production device, and the enterprise digital management device obtains the first signal sent by the first production device, then the enterprise digital management device monitors and manages the second production device using a method with a low monitoring and management frequency among the preset management methods, and the enterprise digital management device preferentially establishes the management channel with the first production device; wherein the first signal is used to indicate that the first production device has an unfinished production task or to indicate priority management of the first production device;
[0019] The enterprise digital management device manages the production tasks of the first production device based on the management channel.
[0020] In a possible implementation manner of the first aspect, the method further includes:
[0021] When the enterprise digital management device monitors the second signal for establishing the data synchronization channel created by the first production device, and the enterprise digital management device fails to create the management channel with the first production device within a first time period, the enterprise digital management device creates the data synchronization channel and the remote control channel with the first production device after the first time period.
[0022] In a possible implementation manner of the first aspect, the production equipment further includes a third production device, and after the enterprise digital management device receives the first operation, the method further includes:
[0023] The enterprise digital management device does not perform the first operation within a second time period after receiving the first operation; wherein the second time period is set according to the time period required for an operator to perform a change management operation on the first operation using the interactive interface of the enterprise digital management device;
[0024] In the case that no change service is monitored within the second time period, and multiple management signals are obtained within the second time period, at the end of the second time period, respond to the first operation, and identify whether the first management signal with less remaining completion time for the production task among the multiple management signals is a management task for controlling the enterprise digital management device to suspend the third production device corresponding to the first management signal; wherein the management signal is a signal sent to the enterprise digital management device when the production device activates or starts a production task;
[0025] If the first management signal is to control the enterprise digital management device to suspend the management task of the third production device corresponding to the first management signal, respond to the first instruction; wherein the first instruction is used to trigger the enterprise digital management device to suspend the management task of the third production device when the management task of the third production device is completed;
[0026] If the first management signal is not to control the enterprise digital management device to suspend the management task of the third production device corresponding to the first management signal, then the first instruction is not responded;
[0027] In a case where a change service is monitored within a second time period and a plurality of management signals are not acquired within the second time period, at the end of the second time period, a change operation after changing the first operation is responded to.
[0028] In a possible implementation manner of the first aspect, monitoring the service change includes:
[0029] Monitoring the operator's modification of the business on the interactive interface of the enterprise digital management device; wherein the modification of the business is the business of modifying the management parameters of the first operation.
[0030] In a possible implementation manner of the first aspect, the method further includes:
[0031] If no service change is detected within the second time period and if no multiple management signals are acquired within the second time period, respond to the first operation at the end of the second time period.
[0032] In a possible implementation manner of the first aspect, the method further includes:
[0033] When a change in business is monitored within a second time period and multiple management signals are obtained within the second time period, at the end of the second time period, respond to the change operation after changing the first operation, and identify whether the first management signal with the least remaining task completion time among the multiple management signals is a management task for controlling the enterprise digital management equipment to suspend the third production device corresponding to the first management signal.
[0034] In a second aspect, an embodiment of the present application provides an enterprise digital management system, which is applied to an enterprise digital management device, wherein the enterprise digital management device is electrically connected to a production device, and the enterprise digital management system includes:
[0035] A monitoring unit, used for monitoring received information; wherein the received information is used to reflect the reception of a first operation; the first operation is a management operation on the production equipment input on the interactive interface of the enterprise digital management device, and the management operation is used to instruct the enterprise digital management device to adjust the production parameters of the production equipment;
[0036] A management unit is used to manage the production tasks of the production equipment based on the received information.
[0037] In a third aspect, an embodiment of the present application provides an enterprise digital management device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the enterprise digital management method described in any one of the first aspects above is implemented.
[0038] It can be understood that the beneficial effects of the second to third aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0040] Figure 1 It is a flowchart of an enterprise digital management method provided by an embodiment of the present application;
[0041] Figure 2 It is a schematic diagram of the implementation process of step S200 in the enterprise digital management method provided in one embodiment of the present application;
[0042] Figure 3It is a flowchart of an enterprise digital management method provided by another embodiment of the present application;
[0043] Figure 4 It is a schematic diagram of the implementation process of step S230 in the enterprise digital management method provided in one embodiment of the present application;
[0044] Figure 5 This is a schematic diagram of the implementation process after step S220 in the enterprise digital management method provided in one embodiment of the present application;
[0045] Figure 6 It is a structural diagram of the enterprise digital management system provided by the embodiment of the present application;
[0046] Figure 7 It is a structural diagram of the enterprise digital management device provided in the embodiment of the present application. DETAILED DESCRIPTION
[0047] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0048] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0049] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0050] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting" depending on the context. Similarly, the phrase "if it is determined" or "if the described condition or event is detected" can be interpreted as meaning "uponce determined" or "in response to determining" or "uponce the described condition or event is detected" or "in response to detecting the described condition or event" depending on the context.
[0051] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0052] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0053] In related technologies, enterprise management refers to the management of a series of activities such as planning, designing, operating, maintaining, and updating the production equipment, facilities, and production lines of an enterprise. This link plays a key role in ensuring production efficiency, product quality, cost control, safety, and environmental protection.
[0054] The traditional enterprise management process relies on manual operations, regular reports or manual inspections, resulting in poor real-time information updates and decision-making (for example, it is impossible to instantly understand equipment status, production parameters or production conditions, etc.), thereby reducing management efficiency.
[0055] To solve the above problems, the embodiments of the present application provide an enterprise digital management method, system and device.
[0056] In this method, first, by monitoring the received information used to reflect the reception of the first operation, the operating status of the production equipment and the adjustment of the production parameters can be reflected in real time. This real-time and feedback mechanism is faster and more accurate than the traditional manual monitoring and reporting method, which helps to improve management efficiency. Finally, based on the received information to manage the production tasks of the production equipment, the management tasks can be dynamically adjusted according to the current production situation, such as increasing or decreasing production batches, adjusting the production cycle, to adapt to market changes or respond to emergency orders, and improve management flexibility. For example, if the first operation is not received, the historical management method can be used for management, and if the first operation is received, the method in the first operation can be used for management. This flexible management method can flexibly use management methods in different situations, which helps to more efficiently allocate enterprise resources and thus improve management efficiency.
[0057] The enterprise digital management method provided in the embodiment of the present application can be applied to an enterprise digital management device. In this case, the enterprise digital management device is the executor of the enterprise digital management method provided in the embodiment of the present application. The embodiment of the present application does not impose any restrictions on the specific type of the enterprise digital management device.
[0058] For example, the enterprise digital management equipment may include an enterprise digital management device and a control device electrically connected to the enterprise digital management device. The enterprise digital management device may include a sensor, an interactive device with an interactive interface, and an enterprise digital management system installed in the enterprise digital management device. The sensor is used to collect data such as production process, inventory status, device operation, etc. to achieve real-time monitoring. For example, the sensor may be a temperature sensor, a pressure sensor, a vibration sensor, etc. The interactive device with an interactive interface is used for human-computer interaction, allowing operators to communicate and operate with the system or equipment in an intuitive and direct manner. For example, the interactive device with an interactive interface may be a touch screen, a smart tablet, etc. The enterprise digital management system installed in the enterprise digital management device is used to monitor and manage production activities in the manufacturing process. For example, the production plan and scheduling can be optimized by analyzing the real-time data obtained by the sensor to ensure the reasonable allocation of production tasks.
[0059] For example, the control device can be a single chip microcomputer, a mobile phone, a tablet computer, a notebook computer, an ultra-mobile personal computer (UMPC), a netbook, a desktop computer, a computing device or a computer connected to a wireless modem, a laptop computer, a handheld communication device, a handheld computing device, etc.
[0060] In order to better understand the enterprise digital management method provided in the embodiment of the present application, the specific implementation process of the enterprise digital management method provided in the embodiment of the present application is exemplarily introduced below.
[0061] Figure 1 A schematic flow chart of an enterprise digital management method provided in an embodiment of the present application is shown, and the enterprise digital management method includes:
[0062] S100, monitoring received information. The received information is used to reflect the reception of the first operation. The first operation is a management operation on the production equipment input on the interactive interface of the enterprise digital management device, and the management operation is used to instruct the enterprise digital management device to adjust the production parameters of the production equipment.
[0063] It can be understood that on the interactive interface of the enterprise digital management system, the logic of receiving information is defined. For example, if the first operation is received, it is defined as the first operation being monitored; otherwise, it is defined as not monitoring the first operation. For example, an event listener can be set in the enterprise digital management device to identify the first operation (such as key, slide, click, etc.), and the first operation can be to adjust the production parameters of the production equipment. After receiving the first operation, the first operation can be parsed to understand the operator's intention. For example, identify the type of parameter that the operator wants to adjust (such as temperature, pressure, speed, etc.) and the direction of adjustment (increase or decrease).
[0064] With this setting, by monitoring and receiving information, the operating status of production equipment and production parameter adjustments can be reflected instantly. This real-time and feedback mechanism is faster and more accurate than traditional manual monitoring and reporting methods, and helps to improve management efficiency.
[0065] S200, managing production tasks of production equipment based on received information.
[0066] For example, when the received information is defined as monitoring the first operation, the corresponding parameters can be adjusted according to the content of the first operation, such as adjusting the temperature or pressure of the equipment. For example, if a certain equipment fails or operates abnormally, the production task is adjusted according to the first operation, and the production task of the failed equipment is reallocated to the non-faulty equipment or the production sequence is adjusted. When the received information is defined as not monitoring the first operation, historical management methods can be used for management. For example, historical data shows that type A products have a high priority, type B products have a low priority and need to be produced using specific equipment. Therefore, historical management methods (such as using historical production parameters) can be used to give priority to the production of type A products, and use specific equipment to produce type B products.
[0067] For example, during the production process, the enterprise digital management equipment can save the parameters of the products that have been produced. If there are no new products to be produced and the products currently being produced have been produced in the historical production process, the saved historical data can be used for production. Therefore, if the first operation is not received, it can be considered that there are no new products to be produced, there is no need to modify the production parameters, there is no need to adjust the production sequence (such as the first operation can include adjusting the production priority level), and there is no need to replace the production equipment (such as previously needing to use specific equipment to produce type B products, and then introducing new equipment 1 can also produce type B products. At this time, equipment 1 can also be used to produce type B products, so the first operation can include the adjustment operation of replacing the production equipment).
[0068] In this way, the production tasks of production equipment can be managed based on the received information, and the management tasks can be dynamically adjusted according to the current production situation, such as increasing or decreasing the production batches, adjusting the production cycle, to adapt to market changes or respond to urgent orders, and improve the flexibility of management. For example, if the first operation is not received, the historical management method can be used for management, and if the first operation is received, the method in the first operation can be used for management. This flexible management method can flexibly use management methods in different situations, which helps to allocate enterprise resources more efficiently and thus improve management efficiency.
[0069] In one possible implementation, see Figure 2 The production equipment includes a first production device, and the enterprise digital management device stores historical management data of the first production device. S200 manages the production tasks of the production equipment based on the received information.
[0070] S210, when the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains the production signal sent by the first production device, the enterprise digital management device manages the first production device based on the historical management data. The production signal is used to indicate to the enterprise digital management device that the production device is ready to start production. The historical management data includes the first management data for monitoring and managing the first production device using the monitoring management method in the preset management method when the enterprise digital management device does not receive the first operation.
[0071] It can be understood that when the enterprise digital management device does not receive the first operation, it can indicate that no new instructions (for example, controlling the production device to use a new production process) or operation to adjust the production parameters or start the production task of the new product have been received, and the enterprise digital management device can continue to operate according to the previously set management mode and historical data. When the first production device is ready to start production, it will send a production signal to the enterprise digital management device, and the production signal can inform the enterprise digital management device that the production device is about to run. After receiving the production signal, the enterprise digital management device will use the saved historical management data to manage the first production device. The historical data may include relevant information for monitoring and management with a preset management method. For example, the enterprise digital management device adjusts the monitoring frequency according to the previously set strategies and standards, such as frequently monitoring the key parameters of the production device and monitoring the non-critical parameters of the production device at a low frequency. The first management data may include setting the key indicators of the production process of the production device with historical data, such as temperature, pressure, speed, etc.
[0072] With such a configuration, when the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains the production signal sent by the first production device, the enterprise digital management device will manage the first production device based on the historical management data, thereby ensuring that production capacity and production continuity can be maintained when the operator is not present or cannot respond immediately, thereby helping to improve management efficiency.
[0073] S220: When the enterprise digital management device receives the first operation, the enterprise digital management device establishes a management channel with the first production device, wherein the management channel includes a data synchronization channel and a remote control channel.
[0074] It can be understood that when the enterprise digital management device receives the first operation (such as the operator's command, adjusting parameters, starting or stopping equipment, etc.), the meaning of the first operation can be analyzed first. For example, the first operation can be to adjust the production priority or production equipment (such as previously needing to use a specific device 2 to produce type B products, and then introducing a new device 1 that can also produce type B products. At this time, device 1 can also be used to produce type B products, so the first operation can be an operation of using device 2 and device 1 to produce type B products). Then, the enterprise digital management device establishes a management channel with the first production device. For example, the enterprise digital management device can be connected to the first production device via a cable to ensure that real-time data can be transmitted between the enterprise digital management device and the production device. The data synchronization channel is used for real-time data exchange, including but not limited to production status, equipment parameters, warning information, etc. Similarly, the enterprise digital management device can establish a network protocol with the first production device to allow operators to remotely control the production device, which can be achieved by sending instructions, adjusting parameters, etc.
[0075] With such a configuration, when the enterprise digital management device receives the first operation, the enterprise digital management device establishes a management channel with the first production device, which helps to remotely operate and control the first production device, such as adjusting and controlling the operation of the production device. This capability greatly improves the response speed and flexibility, thereby helping to improve management efficiency.
[0076] S230, the enterprise digital management device manages the production tasks of the first production device based on the management channel.
[0077] It can be understood that when the enterprise digital management device receives the first operation, it can parse the detailed requirements of the first operation (such as production quantity, specifications, time schedule, production parameters, etc.), and use the data synchronization channel to convert the parsed detailed requirements into a format that the first production device can understand. For example, the detailed requirements are sent to the equipment configuration parameters of the production device to adjust the production parameters of the first production device, such as setting production speed, temperature, pressure and other conditions. The real-time data of the first production device is continuously received by using the data synchronization channel, including production status, equipment operation status, product quality, etc., and the production process is monitored in real time. Based on the real-time monitored data, if an abnormality or non-expected situation is found in the production process, the enterprise digital management device can adjust the parameters or perform intervention measures in real time through the remote control channel to optimize the production process and ensure the timely completion of the task. The production task of managing the first production device may include managing the production quantity of the first production device, managing the production parameters of the first production device, managing the production sequence of the first production device, etc.
[0078] For example, if the first operation is to use equipment 2 and equipment 1 to produce type B products, then the enterprise digital management device can reduce the number of type B products required to be produced by the first production device by half based on management channel management, and transfer the reduced number of type B products to equipment 1 for production. If the first operation is to adjust the production priority, for example, the priority of type A products was low before, and then the priority of type A products was changed from low to high according to production needs, then the enterprise digital management device can prioritize the production of type A products required by the first production device based on management channel management.
[0079] With this arrangement, the enterprise's digital management equipment manages the production tasks of the first production unit based on the management channel, and can remotely monitor the production status in real time, which helps to quickly discover anomalies or problems in production, take timely measures to make adjustments, avoid production interruptions or quality problems, and thus help improve management efficiency.
[0080] In one possible implementation, see Figure 3 , enterprise digital management methods also include:
[0081] S300, when the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the first production device, the enterprise digital management device monitors and manages the first production device using a method with a low monitoring and management frequency in a preset management method.
[0082] It is understandable that a scheduled polling frequency can be pre-set to periodically send a request to the first production device to obtain a production signal. For example, a polling operation is performed at regular intervals (such as every minute or every hour) to ensure that the real-time data of the first production device can be regularly obtained. In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the first production device, it means that the current first production device has neither the task of producing a new product nor is in a state of preparing for production. Therefore, the enterprise digital management device monitors and manages the first production device using a method with a low monitoring and management frequency in the preset management method, for example, the production status of the first production device is monitored at a low frequency.
[0083] For example, when the production status of a production unit is monitored at a low frequency, if it is obtained that the first production unit is about to prepare for production and the enterprise digital management device has not received the first operation, then the monitoring and management method of the first production unit can be changed, for example, the monitoring frequency can be adjusted according to previously set strategies and standards, such as frequently monitoring the key parameters of the production unit, monitoring the non-critical parameters of the production unit at a low frequency, and using the saved historical management data to manage the first production unit (for example, using historical data to set key indicators in the production process of the production unit, such as temperature, pressure, speed, etc.).
[0084] For example, when the production status of a production device is monitored at a low frequency, if it is obtained that the first production device is about to prepare for production, and the enterprise digital management device receives a first operation, it means that the first production device currently has the task of producing a new product, needs to adjust production parameters or adjust the production priority, etc., then the production task of the first production device can be managed according to the specific content of the first operation.
[0085] With such a configuration, when the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the first production device, the enterprise digital management device monitors and manages the first production device using a method with a low monitoring and management frequency in the preset management method, which helps to pay attention to the status and operation of the first production device and to promptly discover potential problems or production needs, thereby helping to more flexibly respond to emergencies or changing production needs, and thereby helping to improve management efficiency.
[0086] S400, when the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains a production signal sent by a second production device with a high degree of urgency in the production device list, the enterprise digital management device establishes a management channel with the second production device with a high degree of urgency in the production device list. The production device list is a list of devices that have not completed production tasks.
[0087] It can be understood that a production device list can be set to indicate the production status of each device and the urgency of the production task, and the production device list can be updated in real time. For example, if the production task of device 3 is completed and there is no subsequent production task, then device 3 can be removed from the production device list. When device 3 has a production task or a new production task, then device 3 can be moved into the production device list, and the urgency of the production task of device 3 is marked. The evaluation of the urgency can prioritize the tasks according to the current production plan and demand. The production devices corresponding to high-priority tasks have higher urgency, or a certain device has a more critical impact on the entire production process, and its failure or shutdown will have a significant impact on the production progress, so its urgency will increase accordingly, or some tasks will have a higher urgency because they require specific equipment or processes. In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains the production signal sent by the second production device with a high urgency in the production device list, it means that it is necessary to start processing the production task of the second production device first, so the enterprise digital management device establishes a management channel with the second production device with a high urgency in the production device list.
[0088] With such a configuration, when the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains a production signal sent by a second production device with a high level of urgency in the production device list, the enterprise digital management device will establish a management channel with the second production device with a high level of urgency in the production device list, which will help to quickly respond to emergencies, reduce cost losses caused by production delays, and help improve management efficiency.
[0089] In one possible implementation, see Figure 4 , S230, the enterprise digital management device manages the production tasks of the first production device based on the management channel, including:
[0090] S231, when the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the second production device, and the enterprise digital management device obtains the first signal sent by the first production device, the enterprise digital management device monitors and manages the second production device using a method with a low monitoring and management frequency in the preset management method, and the enterprise digital management device preferentially establishes a management channel with the first production device. The first signal is used to indicate that the first production device has an unfinished production task or to indicate that the first production device is managed preferentially.
[0091] It can be understood that a signal recognition program is designed to distinguish signals from different production devices, and to assign priorities according to the signal content (such as the status of the production task, the urgency, etc.), wherein the first signal (used to indicate that the first production device has an unfinished production task or to indicate that the first production device is managed first) should be identified as a high priority signal. In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the second production device, and the enterprise digital management device obtains the first signal sent by the first production device, it means that the second production device currently has neither the task of producing a new product nor is in a state of preparing for production, and the first production device has a high-priority production task, so the enterprise digital management device monitors and manages the second production device with a method with a low monitoring and management frequency in the preset management method, for example, the production status of the second production device is monitored at a low frequency, and the preset priority processing process is immediately started to ensure that the enterprise digital management device establishes a management channel with the first production device first, and ensures that the subsequent production tasks of the first production device are managed and executed with priority, including but not limited to resource allocation, monitoring adjustment, etc.
[0092] With such a configuration, when the enterprise digital management device has not received the first operation, if the enterprise digital management device has not obtained the production signal sent by the second production device, and the enterprise digital management device has obtained the first signal sent by the first production device, then the enterprise digital management device monitors and manages the second production device using a preset management method with a low monitoring and management frequency, and the enterprise digital management device prioritizes establishing a management channel with the first production device, which can more effectively allocate and utilize production resources, help maximize the utilization of production resources, and thus improve management efficiency.
[0093] S232, the enterprise digital management device manages the production tasks of the first production device based on the management channel.
[0094] It can be understood that the enterprise digital management equipment can use the data synchronization channel to send historical data to the equipment configuration parameters of the production device to adjust the production parameters of the first production device, such as setting the production speed, temperature, pressure and other conditions, and adjust the priority of the first production device so that the first production device can be produced first. The data synchronization channel can also be used to continuously receive the real-time data of the first production device, including production status, equipment operation status, product quality, etc., to monitor the production process in real time. Based on the real-time monitored data, if an abnormality or unexpected situation is found in the production process, the enterprise digital management equipment can adjust the parameters or perform intervention measures in real time through the remote control channel to optimize the production process and ensure the completion of the task on time. The production task of managing the first production device can include managing the production quantity of the first production device, managing the production parameters of the first production device, managing the production sequence of the first production device, etc.
[0095] With this arrangement, the enterprise's digital management equipment manages the production tasks of the first production unit based on the management channel, and can remotely monitor the production status in real time, which helps to quickly discover anomalies or problems in production, take timely measures to make adjustments, avoid production interruptions or quality problems, and thus help improve management efficiency.
[0096] In a possible implementation, the enterprise digital management method further includes:
[0097] When the enterprise digital management device monitors the second signal for establishing a data synchronization channel created by the first production device, and the enterprise digital management device fails to create a management channel with the first production device within a first period of time, the enterprise digital management device creates a data synchronization channel and a remote control channel with the first production device after the first period of time.
[0098] It can be understood that when the enterprise digital management device monitors the second signal, it can analyze the signal to confirm that the second signal is indeed from the first production device, and the second signal is sent to the enterprise digital management device when the first production device establishes a data synchronization channel. After receiving the second signal, the enterprise digital management device can check the current management channel status between the first production device and the first production device, including checking whether there is a valid data synchronization channel or remote control channel, and the status of these channels (whether online, connection delay, data transmission rate, etc.). For example, the first production device can only feedback real-time production data to the enterprise digital management device through the management channel, and the enterprise digital management device cannot send control instructions to the first production device through the management channel, that is, it is an invalid management channel at this time. If the establishment of a valid data synchronization channel or remote control channel with the first production device is not found within a short time (i.e., within the first time length), the channel creation process is started. This process can be to initiate a channel establishment request to the first production device to establish the required data synchronization channel and remote control channel.
[0099] With such a configuration, when the enterprise digital management device monitors the second signal for establishing a data synchronization channel created by the first production device, and the enterprise digital management device fails to create a management channel with the first production device within a first period of time, the enterprise digital management device creates a data synchronization channel and a remote control channel with the first production device after the first period of time, which helps to quickly establish the data synchronization channel and the remote control channel. This real-time performance can help to quickly adjust and optimize operations during the production process, thereby improving management efficiency and flexibility.
[0100] In one possible implementation, see Figure 5 The production equipment further includes a third production device. S220: after the enterprise digital management device receives the first operation, the enterprise digital management method further includes:
[0101] S221, the enterprise digital management device does not perform the first operation within a second time period after receiving the first operation, wherein the second time period is set according to the time period required for the operator to perform a change management operation on the first operation using the interactive interface of the enterprise digital management device.
[0102] It can be understood that when the operator performs a change management operation on the first operation through the interactive interface, the enterprise digital management device needs to receive these change requests, which can be achieved through the change button, slider, text input, etc. in the user interface (UI). For example, in the user interface, a verification mechanism is set to ensure that the time entered by the user (i.e., the second duration) meets all necessary conditions and format requirements to verify whether the input is a valid number or whether it is within a reasonable range. For another example, a second duration can be set as a reserved duration for the operator when certain parameters in the first operation need to be changed. At the same time, the enterprise digital management device contains a time delay mechanism or timer inside, which is used to block or suspend the execution of the first operation within the second duration after receiving the first operation. In addition, the second duration can dynamically adjust the time point for executing the first operation according to the time set by the user in the interface. For example, if the second duration set by the user is 5 minutes, the device will remain silent for 5 minutes after receiving the first operation, and will not execute the first operation until this time point passes. When the second duration expires, the enterprise digital management device will execute the first operation.
[0103] With this setting, the enterprise digital management device will not execute the first operation within the second time period after receiving the first operation, allowing the operator to have sufficient time to review instructions, consider consequences or fine-tune goals before setting the first operation, thereby improving the quality and efficiency of decision-making and helping to improve management efficiency.
[0104] S222, when no change service is monitored within the second time period, and multiple management signals are obtained within the second time period, at the end of the second time period, respond to the first operation, and identify whether the first management signal with the least remaining completion time for the production task among the multiple management signals is a management task for controlling the enterprise digital management device to suspend the third production device corresponding to the first management signal. The management signal is a signal sent to the enterprise digital management device when the production device activates or starts a production task.
[0105] It can be understood that a signal receiving unit is designed to receive management signals (signals for activating production equipment or starting production tasks). Each management signal should contain: a signal ID, which is used to identify a specific production task or equipment operation; remaining completion time, which is the difference between the estimated completion time of the task and the current time; and whether the production equipment needs to perform the production task again after the production task is completed. No change in the business was monitored within the second time period, indicating that the operator did not change certain parameters in the first operation, so the first operation was responded to at the end of the second time period. At the same time, at the end of the second time period, all management signals in the queue need to be processed, for example, to calculate the remaining completion time: for each signal, calculate its remaining completion time, and compare the remaining completion times: find the management signal with the least remaining completion time. With respect to the first management signal with the shortest remaining completion time, determine whether it is for controlling the enterprise's digital management equipment to suspend the management task of the third production device corresponding to the first management signal. For example, if the first management signal reflects that the current third production device does not need to perform production tasks again after the production task is completed, then the management task of the third production device corresponding to the first management signal can be suspended; if the first management signal reflects that the current third production device needs to perform production tasks again after the production task is completed, then the management task of the third production device corresponding to the first management signal can be maintained. The management tasks may include setting production parameters of the production device, real-time feedback on the production status of the production device, etc.
[0106] With such a configuration, if no business change is detected within the second time period and multiple management signals are obtained within the second time period, at the end of the second time period, in response to the first operation, and identifying whether the first management signal with the least remaining completion time for the production task among the multiple management signals is the management task for controlling the enterprise's digital management equipment to suspend the third production device corresponding to the first management signal, the production device that is about to complete the production task can be managed in a timely manner, which helps to improve management efficiency.
[0107] S223, if the first management signal is to control the enterprise digital management device to suspend the management task of the third production device corresponding to the first management signal, respond to the first instruction. The first instruction is used to trigger the enterprise digital management device to suspend the management task of the third production device when the current management task of the third production device is completed.
[0108] It can be understood that the first management signal should contain clear instructions, such as "pause the management task of the third production device". At the same time, it is necessary to check the current management task status of the third production device. The task log, task execution status, etc. can be queried to confirm whether the current task is being executed and whether it can be suspended. If the first management signal indicates to suspend the management task of the third production device, and the current task status meets the suspension condition (for example, the task is completed), the enterprise digital management device will perform the suspension operation. After executing the suspension operation, it should be confirmed whether the operation is successful. The response of the third production device can be monitored or verified through feedback information to ensure that the operation is executed correctly and avoid misoperation. At the same time, the suspension event can be notified to the relevant operators or managers through appropriate means (such as email, SMS, internal system notification, etc.), explaining the reason for the operation, the current status and subsequent plans. All operations (including receiving management signals, identifying task status, executing operations, confirming results, notifying relevant personnel, etc.) are recorded in detail to ensure the traceability and auditability of the operation. The record content should include key information such as time, operator, operation content, and operation results.
[0109] In this way, if the first management signal is to control the enterprise's digital management equipment to suspend the management task of the third production device corresponding to the first management signal, then in response to the first instruction, the task can be suspended under specific circumstances, such as no production tasks, equipment maintenance, etc., to ensure that the equipment is in the best condition and avoid performance degradation or failure due to continuous operation, thereby improving the flexibility of the entire production process.
[0110] S224: If the first management signal is not to control the enterprise digital management device to suspend the management task of the third production device corresponding to the first management signal, then the first instruction is not responded to.
[0111] It can be understood that when analyzing the first management signal, the first management signal should contain clear instructions, such as "do not suspend the management task for the third production device". At the same time, it is necessary to check the current management task status of the third production device, and the task log, task execution status, etc. can be queried to confirm whether the current task is being executed and whether it can be suspended. If the first management signal indicates that the management task for the third production device is not suspended, and the current task status does not meet the suspension condition (for example, the task is not completed), the enterprise digital management device will not perform the suspension operation.
[0112] In this way, if the first management signal is not to control the enterprise's digital management equipment to suspend the management task of the third production device corresponding to the first management signal, it will not respond to the first instruction and can continue to operate according to the normal production plan and process. This continuity and stability are crucial to ensuring uninterrupted production and help improve management efficiency.
[0113] S225, when a change service is monitored within the second time period and a plurality of management signals are not obtained within the second time period, respond to a change operation after changing the first operation at the end of the second time period.
[0114] It can be understood that if the change service is monitored within the second time period, it means that the operator has changed certain parameters in the first operation. If multiple management signals are not obtained within the second time period, it means that there is no need to manage the production equipment corresponding to the management signal. Therefore, at the end of the second time period, it is only necessary to respond to the change operation after changing the first operation.
[0115] With such a setting, when the changed business is monitored within the second time period and no multiple management signals are obtained within the second time period, at the end of the second time period, responding to the changed operation after changing the first operation helps to respond quickly and complete the necessary adjustments, thereby helping to reduce delays in the management process and improve management efficiency.
[0116] In a possible implementation, S225, monitoring a service change includes:
[0117] Monitoring the operator's modification of the business on the interactive interface of the enterprise digital management device, wherein the modification of the business is the business of modifying the management parameters of the first operation.
[0118] It can be understood that when an operator performs modification operations on the interactive interface, such as adjusting parameters, clicking buttons, entering text, etc., the corresponding events will be triggered. The operator's specific operation data can be obtained through the event listener, which may include the type of operation (such as click, input, etc.), the elements of the operation (such as buttons, text boxes, etc.), and the parameters of the operation (such as input values, selected options, etc.).
[0119] With this setting, monitoring the business changes made by operators on the interactive interface of the enterprise's digital management equipment can help to respond quickly and complete necessary adjustments, which in turn helps to reduce delays in the management process and improve management efficiency.
[0120] In a possible implementation, the enterprise digital management method further includes:
[0121] If no service change is detected within the second time period and no multiple management signals are acquired within the second time period, respond to the first operation at the end of the second time period.
[0122] It can be understood that if no business changes are detected within the second time period, it means that the operator has not changed certain parameters in the first operation, and if multiple management signals are not obtained within the second time period, it means that there is no need to manage the production equipment corresponding to the management signal. Therefore, at the end of the second time period, only the first operation needs to be responded to.
[0123] With such a setting, if no service change is detected within the second time period and no multiple management signals are obtained within the second time period, responding to the first operation at the end of the second time period helps to respond quickly and complete necessary adjustments, thereby helping to reduce delays in the management process and improve management efficiency.
[0124] In a possible implementation, the enterprise digital management method further includes:
[0125] When a change in business is monitored within the second time period and multiple management signals are obtained within the second time period, at the end of the second time period, respond to the change operation after changing the first operation, and identify whether the first management signal with the least remaining task completion time among the multiple management signals is a management task for controlling the enterprise's digital management equipment to suspend the third production device corresponding to the first management signal.
[0126] It can be understood that the monitoring of the change business within the second time period indicates that the operator has changed some parameters in the first operation, and the acquisition of multiple management signals within the second time period indicates that the production device corresponding to the management signal needs to be managed. Therefore, at the end of the second time period, in response to the change operation after the first operation is changed, all management signals in the queue need to be processed at the same time, for example, the remaining completion time is calculated: for each signal, its remaining completion time is calculated, and the remaining completion time is compared: find the management signal with the least remaining completion time. For the first management signal with the least remaining completion time, it is determined whether it is a control enterprise digital management device to suspend the management task of the third production device corresponding to the first management signal. For example, the first management signal reflects that the production task of the current third production device does not need to be performed again after the production task is completed, then the management task of the third production device corresponding to the first management signal can be suspended; the first management signal reflects that the production task of the current third production device needs to be performed again after the production task is completed, then the management task of the third production device corresponding to the first management signal can be maintained, and the management task may include setting the production parameters of the production device, real-time feedback of the production status of the production device, etc.
[0127] With such a configuration, when a change in business is monitored within the second time period and multiple management signals are obtained within the second time period, at the end of the second time period, a response is given to the change operation after the first operation is changed, and it is identified whether the first management signal with the least remaining completion time for the task among the multiple management signals is a management task for controlling the enterprise's digital management equipment to suspend the third production device corresponding to the first management signal. This can ensure that limited resources are used in the most effective and efficient way, avoid over-allocation of resources to tasks that are about to be completed or no longer require management resources, and thus improve management efficiency.
[0128] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0129] Corresponding to the enterprise digital management method described in the above embodiment, the embodiment of the present application also provides an enterprise digital management system, and each unit of the system can implement each step of the enterprise digital management method. Figure 6 A structural block diagram of an enterprise digital management system provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.
[0130] Reference Figure 6 , the enterprise digital management system includes:
[0131] The monitoring unit is used to monitor the received information. The received information is used to reflect the reception of the first operation. The first operation is a management operation of the production equipment input on the interactive interface of the enterprise digital management device, and the management operation is used to instruct the enterprise digital management device to adjust the production parameters of the production equipment.
[0132] The management unit is used to manage the production tasks of the production equipment based on the received information.
[0133] It should be noted that the information interaction, execution process, etc. between the above-mentioned systems / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0134] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units is used as an example for illustration. In practical applications, the above-mentioned functions can be assigned to different functional units as needed, that is, the internal structure of the system can be divided into different functional units to complete all or part of the functions described above. The functional units in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0135] The present application also provides a digital management device for an enterprise. Figure 7 This is a schematic diagram of the structure of an enterprise digital management device provided in one embodiment of the present application. Figure 7As shown, the enterprise digital management device 6 of this embodiment includes: at least one processor 60 ( Figure 7 Only one is shown), at least one memory 61 ( Figure 7 Only one is shown) and a computer program 62 stored in the at least one memory 61 and executable on the at least one processor 60. When the processor 60 executes the computer program 62, the enterprise digital management device 6 implements the steps in any of the above-mentioned enterprise digital management method embodiments, or implements the functions of each unit in the above-mentioned system embodiments.
[0136] Exemplarily, the computer program 62 may be divided into one or more units, which are stored in the memory 61 and executed by the processor 60 to complete the present application. The one or more units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 62 in the enterprise digital management device 6.
[0137] For example, the enterprise digital management device 6 may include an enterprise digital management device and a control device electrically connected to the enterprise digital management device. The enterprise digital management device may include a sensor, an interactive device with an interactive interface, and an enterprise digital management system installed in the enterprise digital management device. The sensor is used to collect data such as production process, inventory status, device operation, etc. to achieve real-time monitoring. For example, the sensor may be a temperature sensor, a pressure sensor, a vibration sensor, etc. The interactive device with an interactive interface is used for human-computer interaction, allowing operators to communicate and operate with the system or equipment in an intuitive and direct manner. For example, the interactive device with an interactive interface may be a touch screen, a smart tablet, etc. The enterprise digital management system installed in the enterprise digital management device is used to monitor and manage production activities in the manufacturing process. For example, the production plan and scheduling can be optimized by analyzing the real-time data obtained by the sensor to ensure the reasonable allocation of production tasks. The enterprise digital management device 6 may include, but is not limited to, a processor 60 and a memory 61. Those skilled in the art will understand that Figure 7 It is only an example of the enterprise digital management device 6 and does not constitute a limitation of the enterprise digital management device 6. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, buses, etc.
[0138] The processor 60 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0139] In some embodiments, the memory 61 may be an internal storage unit of the enterprise digital management device 6, such as a hard disk or memory of the enterprise digital management device 6. In other embodiments, the memory 61 may also be an external storage device of the enterprise digital management device 6, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the enterprise digital management device 6. Further, the memory 61 may also include both an internal storage unit and an external storage device of the enterprise digital management device 6. The memory 61 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory 61 may also be used to temporarily store data that has been output or is to be output.
[0140] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.
[0141] An embodiment of the present application provides a computer program product. When the computer program product runs on an enterprise digital management device, the enterprise digital management device implements the steps in any of the above method embodiments.
[0142] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned various method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the enterprise digital management equipment, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.
[0143] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0144] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0145] In the embodiments provided in the present application, it should be understood that the disclosed enterprise digital management system, equipment, and enterprise digital management method can be implemented in other ways. For example, the enterprise digital management equipment and enterprise digital management system embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0146] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0147] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A digital management method for an enterprise, characterized in that: Applied to an enterprise digital management device, the enterprise digital management device is electrically connected to a production device, and the method includes: Monitoring received information; wherein the received information is used to reflect the reception of the first operation; the first operation is a management operation on the production equipment input on the interactive interface of the enterprise digital management device, and the management operation is used to instruct the enterprise digital management device to adjust the production parameters of the production equipment; managing the production tasks of the production equipment based on the received information; The production equipment includes a first production device, the enterprise digital management device stores historical management data of the first production device, and the production task of the production equipment is managed based on the received information, including: In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains the production signal sent by the first production device, the enterprise digital management device manages the first production device based on the historical management data; wherein the production signal is used to indicate to the enterprise digital management device that the production device is ready to start production; the historical management data includes first management data for monitoring and managing the first production device using a monitoring management method in a preset management method when the enterprise digital management device does not receive the first operation; When the enterprise digital management device receives the first operation, the enterprise digital management device establishes a management channel with the first production device; wherein the management channel includes a data synchronization channel and a remote control channel; The enterprise digital management device manages the production tasks of the first production device based on the management channel; The production equipment further includes a second production device, and the method further includes: In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the first production device, the enterprise digital management device monitors and manages the first production device using a method with a low monitoring and management frequency among the preset management methods; In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device obtains a production signal sent by a second production device with a high degree of urgency in the production device list, the enterprise digital management device establishes a management channel with the second production device with a high degree of urgency in the production device list; wherein the production device list is a list of devices that have not completed production tasks; The enterprise digital management device manages the production tasks of the first production device based on the management channel, including: In the case where the enterprise digital management device does not receive the first operation, if the enterprise digital management device does not obtain the production signal sent by the second production device, and the enterprise digital management device obtains the first signal sent by the first production device, then the enterprise digital management device monitors and manages the second production device using a method with a low monitoring and management frequency among the preset management methods, and the enterprise digital management device preferentially establishes the management channel with the first production device; wherein the first signal is used to indicate that the first production device has an unfinished production task or to indicate priority management of the first production device; The enterprise digital management device manages the production tasks of the first production device based on the management channel; The method further comprises: When the enterprise digital management device monitors the second signal created by the first production device to establish the data synchronization channel, and the enterprise digital management device does not create the management channel with the first production device within a first time period, after the first time period, the enterprise digital management device creates the data synchronization channel and the remote control channel with the first production device; The production equipment further includes a third production device. After the enterprise digital management device receives the first operation, the method further includes: The enterprise digital management device does not perform the first operation within a second time period after receiving the first operation; wherein the second time period is set according to the time period required for an operator to perform a change management operation on the first operation using the interactive interface of the enterprise digital management device; In the case that no change service is monitored within the second time period, and multiple management signals are obtained within the second time period, at the end of the second time period, respond to the first operation, and identify whether the first management signal with less remaining completion time for the production task among the multiple management signals is a management task for controlling the enterprise digital management device to suspend the third production device corresponding to the first management signal; wherein the management signal is a signal sent to the enterprise digital management device when the production device activates or starts a production task; If the first management signal is to control the enterprise digital management device to suspend the management task of the third production device corresponding to the first management signal, respond to the first instruction; wherein the first instruction is used to trigger the enterprise digital management device to suspend the management task of the third production device when the management task of the third production device is completed; If the first management signal is not to control the enterprise digital management device to suspend the management task of the third production device corresponding to the first management signal, then the first instruction is not responded; In a case where a change service is monitored within a second time period and a plurality of management signals are not acquired within the second time period, at the end of the second time period, a change operation after changing the first operation is responded to.
2. The enterprise digital management method according to claim 1, characterized in that: The method further comprises: If no service change is detected within the second time period and if no multiple management signals are acquired within the second time period, respond to the first operation at the end of the second time period.
3. The enterprise digital management method according to claim 1, characterized in that: The method further comprises: When a change in business is monitored within a second time period and multiple management signals are obtained within the second time period, at the end of the second time period, respond to the change operation after changing the first operation, and identify whether the first management signal with the least remaining task completion time among the multiple management signals is a management task for controlling the enterprise digital management equipment to suspend the third production device corresponding to the first management signal.
4. An enterprise digital management system, characterized in that: Used to implement the enterprise digital management method according to any one of claims 1 to 3, the enterprise digital management system is applied to an enterprise digital management device, the enterprise digital management device is electrically connected to the production equipment, and the enterprise digital management system includes: A monitoring unit, configured to monitor received information; wherein the received information is used to reflect the reception of a first operation; the first operation is a management operation on the production equipment input on the interactive interface of the enterprise digital management device, and the management operation is used to instruct the enterprise digital management device to adjust the production parameters of the production equipment; A management unit is used to manage the production tasks of the production equipment based on the received information.
5. An enterprise digital management device, characterized in that: The method comprises a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method according to any one of claims 1 to 3 when executing the computer program.
Citation Information
Patent Citations
MES (Manufacturing Execution System) based on RFID (Radio Frequency Identification)
CN106779406A
Enterprise management method and related equipment
CN115619331A