A power line sag monitoring and early warning system based on Beidou positioning technology

Using Beidou positioning technology to divide and monitor power grid lines, combined with signal feature analysis, the problem of incomplete sag detection of power grid lines is solved, high-precision sag early warning and safety monitoring of power grid lines are realized, and the overall monitoring efficiency and safety of the power grid are improved. sex.

CN118675305BActive Publication Date: 2024-10-18STATE GRID WUWEI POWER SUPPLY CO
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411154344.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-10-18
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

Existing technology cannot perform classification, positioning, monitoring and early warning on power grid lines, resulting in incomplete sag detection and reducing the accuracy and safety of inspections.

Method used

The power grid line sag monitoring and early warning system based on Beidou positioning technology is used to divide the power grid lines through the line positioning monitoring unit, set sensors for monitoring, and combine the signal characteristic analysis unit to perform sag detection and early warning on risky line sections.

Benefits of technology

It realizes segmented positioning monitoring and sag early warning of power grid lines, improves the timeliness and safety of detection, reduces the intensity of manual inspections, and ensures the stability and security of power grid supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118675305B_ABST
    Figure CN118675305B_ABST
Patent Text Reader

Abstract

The invention discloses a power line sag monitoring and early warning system based on Beidou positioning technology, relates to the technical field of power line sag monitoring and early warning, solves the technical problems in the prior art that when the power line is sag monitored, the line cannot be classified and positioning monitoring and early warning can be performed after classification, and sag early warning cannot be performed based on real-time position analysis. Specifically, the power line sag detection and analysis is performed based on the real-time line location in combination with positioning technology, which improves the timeliness of sag detection of lines in the power grid coverage area and avoids sag-induced decrease in power line supply efficiency. In the power grid construction environment, the mobility of personnel is very large, and the complex and dangerous construction environment plus a large number of construction personnel result in a large number of safety hazards in the construction process. Through a high-precision positioning device based on Beidou, the location information of the construction personnel is monitored in real time and an early warning is issued when there is a risk of contacting a dangerous area, thereby ensuring operation safety and reducing potential risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power line sag monitoring and early warning, and in particular to a power line sag monitoring and early warning system based on Beidou positioning technology. Background Art

[0002] The research on the line sag online monitoring device is an important work to meet the technical needs of high-voltage line sag monitoring in power systems. This research is committed to developing an online monitoring device that can provide effective support and guarantee for the operation and maintenance of power systems by real-time monitoring and analyzing the state of high-voltage line sag.

[0003] However, in the prior art, when performing sag monitoring on power grid lines, it is impossible to classify the lines and perform positioning monitoring and early warning after classification. It is impossible to perform sag warning based on real-time position analysis, which reduces the accuracy of inspection. At the same time, it is impossible to perform signal feature analysis on the lines, and it is impossible to perform sag early warning analysis when the position is not affected, resulting in incomplete sag detection.

[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention

[0005] The purpose of the present invention is to solve the above-mentioned problems and to propose a power grid line sag monitoring and early warning system based on Beidou positioning technology.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A power grid line sag monitoring and early warning system based on Beidou positioning technology includes a power grid monitoring and early warning platform, and the power grid monitoring and early warning platform is connected to:

[0008] The line positioning monitoring unit is used to set the line length threshold and divide the various power grid lines in the current area according to the line length threshold, and mark the divided power grid lines as line monitoring sections, set sensors and monitor the line monitoring sections through the sensors, set the line positioning monitoring period, collect the power grid line monitoring information, and calculate the line monitoring section positioning monitoring coefficient through the formula after normalizing the information; divide the line monitoring section into risky line sections and safe line sections according to the coefficient comparison;

[0009] The line sag detection unit is used to perform sag detection on the risk line section, collect the start and end time points of the line positioning monitoring period and obtain the line horizontality of the risk line section according to the start and end time points, and set the horizontal ground of the current risk line section as the horizontal axis of the coordinate according to the positioning technology; collect the real-time positions of the two ends of the risk line section at the start and end time points and mark them as the start position, the end position, the end position and the end position respectively, and perform sag detection analysis according to different position types;

[0010] The signal characteristic analysis unit is used to perform signal characteristic analysis on risky line sections.

[0011] As a preferred embodiment of the present invention, the power grid line monitoring information includes the span value of the resistance value of the corresponding line monitoring section that increases simultaneously when the conductor length of each line monitoring section floats during the line positioning monitoring period, the controllable amount of the transmission current reduction span when the current transmission is controlled only from the transmission current end during the resistance rise process during the line positioning monitoring period, and the overlapping time length of the corresponding conductor spacing reduction period and the reactance reduction period between the conductors of the line monitoring section at the same position during the line positioning monitoring period.

[0012] As a preferred implementation of the present invention, if the positioning monitoring coefficient of the line monitoring section within the line positioning monitoring period exceeds the positioning monitoring coefficient threshold, the current line monitoring section is marked as a risky line section; if the positioning monitoring coefficient of the line monitoring section within the line positioning monitoring period does not exceed the positioning monitoring coefficient threshold, the current line monitoring section is marked as a safe line section.

[0013] As a preferred embodiment of the present invention, the sag detection and analysis process is as follows:

[0014] The vertical points of the corresponding power grid lines between the starting position and the ending position are collected, and the vertical point positions are set and divided based on the interval distances between the vertical point and the starting position and the ending position. That is, when the starting position is taken as the coordinate zero point, the lateral distance and vertical distance of the vertical point from the starting position are the starting coordinates of the vertical point; when the ending position is taken as the coordinate zero point, the lateral distance and vertical distance of the vertical point from the starting position are the ending coordinates of the vertical point.

[0015] As a preferred embodiment of the present invention, when the start position and the end position move, and the start position and the end position do not move, the vertical point start coordinates of the vertical point are compared, and the difference calculation is performed on the vertical point start coordinates corresponding to the start and end time points, and the line track movement direction and the displacement generated by the line movement track are obtained according to the difference calculation, and marked as sag data, and the line track movement direction and the displacement generated by the line movement track are obtained according to the start position and the end position, and marked as the start endpoint data;

[0016] If the line trajectory movement direction of the sag data is inconsistent with the line trajectory movement direction of the starting and ending point data, or the displacement generated by the line movement trajectory of the sag data is inconsistent with the displacement generated by the line movement trajectory of the starting and ending point data, a sag starting point high impact signal is generated and the sag starting point high impact signal is sent to the power grid monitoring and early warning platform; otherwise, a sag starting point low impact signal is generated and the sag starting point low impact signal is sent to the power grid monitoring and early warning platform.

[0017] As a preferred embodiment of the present invention, when there is no positional movement between the start position and the end position, and there is positional movement between the start position and the end position, the vertical point tail coordinates of the vertical point are compared, and the difference between the vertical point tail coordinates corresponding to the start and end time points is calculated to obtain the sag data, and the line track movement direction and the displacement generated by the line movement track are obtained according to the start and end positions and the end positions and marked as the end point data;

[0018] If the line trajectory movement direction of the sag data is inconsistent with the line trajectory movement direction of the end point data, or the displacement generated by the line movement trajectory of the sag data is inconsistent with the displacement generated by the line movement trajectory of the end point data, a sag end point high impact signal is generated and sent to the power grid monitoring and early warning platform; otherwise, a sag end point low impact signal is generated and sent to the power grid monitoring and early warning platform. After the power grid monitoring and early warning platform receives the sag end point low impact signal, the inspection personnel control the end point position according to the risk line section.

[0019] As a preferred embodiment of the present invention, when there is a position shift between the starting position and the ending position, and when there is a position shift between the starting position and the ending position, an endpoint danger signal is generated and sent to the power grid monitoring and early warning platform. After receiving the signal, the power grid monitoring and early warning platform restores the endpoint position of the risky line segment.

[0020] As a preferred embodiment of the present invention, the signal feature analysis process is as follows:

[0021] When obtaining static quota supply during the operation of the risk line section, the span value ratio of the reduction span threshold of the supply speed affected by real-time temperature data to the reduction span value of the line supply speed at the current moment; at the same time, when obtaining dynamic increase supply during the operation of the risk line section, the peak value ratio of the peak threshold of the supply loss affected by temperature at any moment to the peak value of the line supply loss at the corresponding moment.

[0022] As a preferred embodiment of the present invention, if during the operation of the risk line section, during static quota supply, the span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment exceeds the span value ratio threshold, or during the operation of the risk line section, during dynamic quota supply, the peak value ratio of the supply loss amount peak value threshold affected by the temperature at any moment to the peak value of the line supply loss amount peak value at the corresponding moment exceeds the peak value ratio threshold, then an endpoint timely recovery signal is generated;

[0023] If during the operation of the risk line section, during static quota supply, the span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment does not exceed the span value ratio threshold, and during the operation of the risk line section, during dynamic increase supply, the peak value ratio of the supply loss peak threshold affected by the temperature at any moment to the peak value of the line supply loss peak at the corresponding moment does not exceed the peak value ratio threshold, then a sag warning maintenance signal is generated.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] 1. In the present invention, the power grid lines are segmented for positioning and monitoring, and line warnings are performed on the segmented wires. Sensor technology and Beidou high-precision positioning technology are used to analyze and detect each section of the wires, thereby reducing the workload of manual inspections and avoiding the situation where manual inspections cannot meet actual needs when the power grid lines are distributed over a large span, resulting in a decrease in inspection efforts and affecting the overall monitoring efficiency of the power grid lines. In the power grid construction environment, the mobility of personnel is very large, and the complex and dangerous construction environment plus a large number of construction personnel result in a large number of safety hazards during the construction process. Through a high-precision positioning device based on Beidou, the location information of the construction personnel is monitored in real time and warnings are issued when there is a risk of contacting a dangerous area, thereby ensuring operational safety and reducing potential risks.

[0026] 2. In the present invention, grid line sag detection and analysis is performed based on the location of the risk line segment in combination with positioning technology, which improves the timeliness of sag detection of lines in the grid coverage area and avoids sag causing a decrease in grid line supply efficiency. At the same time, sag warnings cannot be given in time, resulting in increased grid line supply risks and increased safety hazards. Signal characteristic analysis of the risk line segment is used to infer whether there is an abnormality in the current operation of the risk line segment, so as to facilitate detection and analysis of the sag of the risk line segment, ensuring that sag protection can be carried out in time after a sag warning occurs in the risk line segment, reducing the impact of sag on the grid supply line and ensuring the stability of the grid supply. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0028] Figure 1 This is a principle block diagram of Embodiment 1 of the present invention;

[0029] Figure 2 This is a principle block diagram of the second embodiment of the present invention. DETAILED DESCRIPTION

[0030] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0032] Embodiment 1

[0033] See also Figure 1 As shown, a power line sag monitoring and early warning system based on Beidou positioning technology includes a power line monitoring and early warning platform, wherein the power line monitoring and early warning platform is communicatively connected to a line positioning monitoring unit, a line sag detection unit, and a signal feature analysis unit;

[0034] The power grid monitoring and early warning platform generates a line positioning monitoring signal and sends it to the line positioning monitoring unit. After receiving the line positioning monitoring signal, the line positioning monitoring unit performs segmented positioning monitoring on the power grid line and issues line early warning for the segmented power lines. Through sensor technology and Beidou high-precision positioning technology, each section of the power line is analyzed and detected, which reduces the workload of manual inspections and avoids the situation where manual inspections cannot meet actual needs when the power grid lines are distributed over a large span, resulting in a decrease in inspection efforts and affecting the overall monitoring efficiency of the power grid lines.

[0035] Set a line length threshold and divide the power grid lines in the current area according to the line length threshold, and mark the divided power grid lines as line monitoring sections. Set sensors and monitor the line monitoring sections through sensors, and the sensor monitoring data can monitor the data of the entire line monitoring section in real time, where the sensors are sensors required for line monitoring, such as voltage sensors, current sensors or temperature sensors, etc.; In the power grid construction environment, the mobility of personnel is very large, and the complex and dangerous construction environment plus a large number of construction personnel make a lot of safety hazards in the construction process. Through the high-precision positioning device based on Beidou, the location information of the construction personnel is monitored in real time and early warning is issued when there is a risk of contacting dangerous areas, ensuring the safety of operations and reducing potential risks;

[0036] Set the line positioning monitoring period, obtain the span value of the resistance value of the corresponding line monitoring section when the conductor length of each line monitoring section floats within the line positioning monitoring period, and the controllable amount of the transmission current reduction span when the current transmission control is performed only from the transmission current end during the resistance rising process within the line positioning monitoring period, and mark the span value of the resistance value of the corresponding line monitoring section when the conductor length of each line monitoring section floats within the line positioning monitoring period, and the controllable amount of the transmission current reduction span when the current transmission control is performed only from the transmission current end during the resistance rising process within the line positioning monitoring period as SSK and KKZ respectively;

[0037] Obtain the overlapping time length of the wire spacing reduction period and the reactance reduction period between the wires corresponding to the line monitoring section at the same position in the line positioning monitoring period, and mark the overlapping time length of the wire spacing reduction period and the reactance reduction period between the wires corresponding to the line monitoring section at the same position in the line positioning monitoring period as CDS;

[0038] The above collected data are uniformly marked as power line monitoring information, and substituted into the formula to obtain the line monitoring section positioning monitoring coefficient G within the line positioning monitoring period. The specific formula is:

[0039] , where mk1, mk2 and mk3 are respectively the preset proportional coefficients of the resistance value rising span value, the controllable amount of the transmission current reducing span value, and the overlapping time length of the reactance reduction period, and α is used as the error correction factor, and the value is 1.09;

[0040] Compare the line monitoring section positioning monitoring coefficient G within the line positioning monitoring period with the positioning monitoring coefficient threshold:

[0041] If the line monitoring section positioning monitoring coefficient G exceeds the positioning monitoring coefficient threshold during the line positioning monitoring period, the line monitoring section positioning monitoring during the line positioning monitoring period is determined to be abnormal, the current line monitoring section is marked as a risky line section, and a line risk signal is generated and sent together with the line risk signal and the risky line section number to the power grid monitoring and early warning platform;

[0042] If the line monitoring section positioning monitoring coefficient G does not exceed the positioning monitoring coefficient threshold value during the line positioning monitoring period, it is determined that the line monitoring section positioning monitoring during the line positioning monitoring period is normal, the current line monitoring section is marked as a safe line section, and a line safety signal is generated and sent together with the line safety signal and the safe line section number to the power grid monitoring and early warning platform;

[0043] At the same time, a line sag detection signal is generated and sent to a line sag detection unit. After receiving the line sag detection signal, the line sag detection unit performs grid line sag detection on the risk line section, and performs grid line sag detection and analysis based on the location of the risk line section combined with positioning technology, thereby improving the timeliness of sag detection of lines in the grid coverage area, avoiding sag-induced decrease in grid line supply efficiency, and failing to provide sag warning in a timely manner, resulting in increased grid line supply risks and increased safety hazards;

[0044] Perform sag detection on the risk line section, collect the start and end time points of the line positioning monitoring period, and obtain the line levelness of the risk line section based on the start and end time points. Set the horizontal ground of the current risk line section as the horizontal axis of the coordinate according to the positioning technology. When the horizontal ground is uneven, the impact of the uneven ground is ignored after the height exceeds a certain threshold. Collect the real-time positions of both ends of the risk line section at the start and end time points and mark them as the start position, the end position, the end position, and the end position respectively.

[0045] The vertical points of the corresponding power lines between the starting position and the ending position are collected, and the vertical point positions are set and divided in combination with the interval distances between the vertical point and the starting position and the ending position. That is, when the starting position is taken as the coordinate zero point, the horizontal distance and vertical distance of the vertical point from the starting position are the starting coordinates of the vertical point; when the ending position is taken as the coordinate zero point, the horizontal distance and vertical distance of the vertical point from the starting position are the ending coordinates of the vertical point;

[0046] When there is a position shift between the start position and the end position, and there is no position shift between the start position and the end position, the vertical point start coordinates are compared, and the difference calculation is performed on the vertical point start coordinates corresponding to the start and end time points. The line trajectory movement direction and the displacement generated by the line movement trajectory are obtained according to the difference calculation, and marked as sag data, wherein the displacement is expressed as a lateral displacement and a longitudinal displacement; the line trajectory movement direction and the displacement generated by the line movement trajectory are obtained according to the start position and the end position, and are marked as the start endpoint data. If the line trajectory movement direction of the sag data is inconsistent with the line trajectory movement direction of the start endpoint data, or the displacement generated by the line movement trajectory of the sag data is inconsistent with the displacement generated by the line movement trajectory of the start endpoint data, then a sag start point height impact signal is generated and the sag start point height impact signal is It is sent to the power grid monitoring and early warning platform. The power grid monitoring and early warning platform receives the high impact signal of the starting point of sag and performs sag early warning control on the risk line section, that is, the positioning of the risk line section is sent to the inspection personnel. The inspection personnel first adjust the position of the line, move the vertical point of the real-time risk line section to the starting coordinate of the vertical point, and then control the position of the starting end point of the risk line section; on the contrary, if the line trajectory movement direction of the sag data is consistent with the line trajectory movement direction of the starting end point data, and the displacement generated by the line movement trajectory of the sag data is consistent with the displacement generated by the line movement trajectory of the starting end point data, then a sag starting point low impact signal is generated and sent to the power grid monitoring and early warning platform. The power grid monitoring and early warning platform receives the low impact signal of the starting point of sag, and the inspection personnel control the starting end point position according to the risk line section;

[0047] Similarly, when there is no positional movement between the start position and the end position, and there is positional movement between the start position and the end position, the vertical point tail coordinates of the vertical point are compared, and the difference between the vertical point tail coordinates corresponding to the start and end time points is calculated to obtain the sag data. The line trajectory movement direction and the displacement generated by the line movement trajectory are obtained according to the start and end positions and the end positions and marked as the end point data. The line trajectory movement direction of the sag data is inconsistent with the line trajectory movement direction of the end point data, or the displacement generated by the line movement trajectory of the sag data is inconsistent with the displacement generated by the line movement trajectory of the end point data. If they are consistent, a high-impact signal of the sag end point is generated and sent to the power grid monitoring and early warning platform. When the power grid monitoring and early warning platform receives the high-impact signal of the sag end point, the inspection personnel first adjust the position of the line, move the vertical point of the real-time risk line segment to the vertical point tail coordinate, and then control the position of the starting and ending points of the risk line segment; otherwise, a low-impact signal of the sag end point is generated and sent to the power grid monitoring and early warning platform. When the power grid monitoring and early warning platform receives the low-impact signal of the sag end point, the inspection personnel control the position of the end point according to the risk line segment;

[0048] When the start position and the end position move, and the start position and the end position move, an endpoint danger signal is generated and sent to the power grid monitoring and early warning platform. After receiving the signal, the power grid monitoring and early warning platform restores the endpoint position of the risk line segment.

[0049] When there is no positional movement between the beginning position and the end position, and there is no positional movement between the beginning position and the end position, a signal characteristic analysis signal is generated and sent to the signal characteristic analysis unit. After receiving the signal characteristic analysis signal, the signal characteristic analysis unit performs a signal characteristic analysis on the risk line segment, and infers whether there is an abnormality in the operation of the current risk line segment based on the signal characteristic analysis of the risk line segment, so as to facilitate the detection and analysis of the sag of the risk line segment, ensure that the sag protection can be carried out in time after the sag warning occurs in the risk line segment, reduce the impact of the sag on the power grid supply line, and ensure the stability of the power grid supply;

[0050] When obtaining static quota supply during the operation of the risk line section, the span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment is obtained; at the same time, when obtaining dynamic incremental supply during the operation of the risk line section, the peak value ratio of the supply loss amount peak value at any moment affected by the temperature to the peak value of the line supply loss at the corresponding moment is obtained; among which, the reduction span threshold of the supply speed affected by the real-time temperature data of the static quota supply and the peak value threshold of the supply loss amount affected by the temperature at any moment during the dynamic incremental supply are both the thresholds of the impact caused by the temperature under the current task intensity according to the line specifications of the risk line section, and are thresholds set through the collection of historical operation data;

[0051] The span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment during the static quota supply during the operation of the risk line section, and the peak value ratio of the supply loss peak threshold affected by the temperature at any moment to the line supply loss peak at the corresponding moment during the dynamic increase supply during the operation of the risk line section are compared with the span value ratio threshold and the peak value ratio threshold respectively:

[0052] If during the operation of the risk line segment, during static quota supply, the span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment exceeds the span value ratio threshold, or during the operation of the risk line segment, during dynamic increase supply, the peak value ratio of the supply loss amount peak threshold of the temperature at any moment to the peak value of the line supply loss amount peak at the corresponding moment exceeds the peak value ratio threshold, then it is determined that the sag effect of the risk line segment is small, and an endpoint timely recovery signal is generated and sent to the power grid monitoring and early warning platform. After receiving the endpoint timely recovery signal, the power grid monitoring and early warning platform restores the endpoint position of the risk line segment;

[0053] If during the operation of the risk line section, during static quota supply, the span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment does not exceed the span value ratio threshold, and during the operation of the risk line section, during dynamic increase supply, the peak value ratio of the supply loss peak threshold of the temperature at any moment to the peak value of the line supply loss peak at the corresponding moment does not exceed the peak value ratio threshold, then it is determined that the sag impact of the risk line section is large, and a sag warning maintenance signal is generated and sent to the power grid monitoring and early warning platform. After receiving the sag warning maintenance signal, the power grid monitoring and early warning platform performs line sag control on the risk line section and after the endpoint position is restored, performs vertical point position analysis on the real-time sag. If the vertical point position is still displaced, the risk line section is re-planned, specifically by setting the terminal height and length of the wire.

[0054] Embodiment 2

[0055] The previous embodiment performs sag detection and analysis on the power grid line. This embodiment is based on the previous embodiment and combines external influences during sag detection. Figure 2 As shown, the power grid monitoring and early warning platform generates an external impact analysis signal and sends the external impact analysis signal to the external impact analysis unit. After receiving the external impact analysis signal, the external impact analysis unit performs an external impact analysis on the risk line section, and infers whether there is an external impact at the current line location through the external impact analysis, so as to facilitate external impact control when the sag impact is large, so as to avoid the continuous sag abnormality of the line caused by the external impact, thereby reducing the supply efficiency of the power grid line;

[0056] The maximum span value of the reciprocating floating amplitude of the line monitoring section during the period when the wind force at the location of the line monitoring section exceeds the set threshold during the operation of the power grid is obtained, and at the same time, the numerical ratio of the average snowfall during the snowfall period at the location of the line monitoring section during the operation of the power grid to the snow cover of the line monitoring section is obtained. The maximum span value of the reciprocating floating amplitude of the line monitoring section during the period when the wind force at the location of the line monitoring section exceeds the set threshold during the operation of the power grid, and the numerical ratio of the average snowfall during the snowfall period at the location of the line monitoring section during the operation of the power grid to the snow cover of the line monitoring section are compared with the maximum span value threshold and the snow value ratio threshold respectively:

[0057] If the wind force at the location of the line monitoring section during the operation of the power grid exceeds the set threshold value, the maximum span value of the reciprocating floating amplitude of the line monitoring section during the period exceeds the maximum span value threshold, or the ratio of the average snowfall amount during the snowfall period at the location of the line monitoring section during the operation of the power grid to the snow cover amount of the line monitoring section does not exceed the snow amount ratio threshold, then it is determined that the external influence of the line monitoring section during the operation of the power grid is abnormal, and an external protection signal is generated and sent to the power grid monitoring and early warning platform. After receiving the external protection signal, the power grid monitoring and early warning platform performs external influence protection on the line monitoring section, that is, during the external influence period, such as windy and snowy, the position detection and adjustment of the line monitoring section is performed, and the workload of the current period is controlled;

[0058] If the wind force at the location of the line monitoring section during the operation of the power grid exceeds the set threshold value, the maximum span value of the reciprocating floating amplitude of the line monitoring section within the period does not exceed the maximum span value threshold, and the ratio of the average snowfall amount during the snowfall period at the location of the line monitoring section during the operation of the power grid to the snow cover amount of the line monitoring section exceeds the snow amount ratio threshold, then it is determined that the external influence of the line monitoring section during the operation of the power grid is normal, and an external low influence signal is generated and sent to the power grid monitoring and early warning platform. In this embodiment, the external influence analysis is only based on the two parameters of wind force value and snow amount. In actual operation scenarios, other parameters such as rain and hail are applicable to this embodiment;

[0059] The above formulas are obtained by collecting a large amount of data and performing software simulation, and a formula close to the actual value is selected. The coefficients in the formula are set by technicians in this field according to actual conditions;

[0060] When the present invention is in use, the line positioning monitoring unit sets a line length threshold and divides the various power grid lines in the current area according to the line length threshold, and the power grid lines after the division are marked as line monitoring sections, a sensor is set and the line monitoring section is monitored by the sensor, the line positioning monitoring period is set, the power grid line monitoring information is collected, and the information is normalized and then the positioning monitoring coefficient of the line monitoring section is calculated by a formula; the line monitoring section is divided into a risk line section and a safe line section according to the coefficient comparison; the line sag detection unit performs sag detection on the risk line section, collects the start and end time points of the line positioning monitoring period, and obtains the line horizontality of the risk line section according to the start and end time points, and sets the horizontal ground of the current risk line section as the coordinate horizontal axis according to the positioning technology; the real-time positions of the two ends of the risk line section at the start and end time points are collected and marked as the start position, the start position, the end position and the end position respectively, and sag detection analysis is performed according to different position types; the signal feature analysis unit performs signal feature analysis on the risk line section.

[0061] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A power line sag monitoring and early warning system based on Beidou positioning technology, characterized in that: Including power grid monitoring and early warning platform, the communication connections of power grid monitoring and early warning platform are: The line positioning monitoring unit is used to set the line length threshold and divide the various power grid lines in the current area according to the line length threshold, and mark the divided power grid lines as line monitoring segments, set sensors and monitor the line monitoring segments through sensors, set the line positioning monitoring period, collect the power grid line monitoring information, and normalize the information through the formula Calculate and obtain the line monitoring section positioning monitoring coefficient; According to the coefficient comparison, the line monitoring section is divided into a risk line section and a safe line section; in the formula, mk1, mk2 and mk3 are respectively the preset proportional coefficients of the resistance value rising span value, the controllable amount of the transmission current reduction span, and the overlapping time length of the reactance reduction period, and the resistance value rising span value, the controllable amount of the transmission current reduction span, and the overlapping time length of the reactance reduction period are respectively labeled SSK, KKZ, and CDS, and α is used as an error correction factor, and the value is 1.09; The line sag detection unit is used to perform sag detection on the risk line section, collect the start and end time points of the line positioning monitoring period, and obtain the line level of the risk line section according to the start and end time points, and set the horizontal ground of the current risk line section as the horizontal axis of the coordinate according to the positioning technology; The real-time positions of both ends of the risk line section at the start and end time points are collected and marked as the start position, the end position, the end position and the end position respectively, and sag detection and analysis are performed according to different position types; the sag detection and analysis process is as follows: The vertical points of the corresponding power lines between the starting position and the ending position are collected, and the vertical point positions are set and divided in combination with the interval distances between the vertical point and the starting position and the ending position. That is, when the starting position is taken as the coordinate zero point, the horizontal distance and vertical distance of the vertical point from the starting position are the starting coordinates of the vertical point; when the ending position is taken as the coordinate zero point, the horizontal distance and vertical distance of the vertical point from the starting position are the ending coordinates of the vertical point; When the start position and the end position move, and the start position and the end position do not move, the vertical point start coordinates are compared, and the difference between the vertical point start coordinates corresponding to the start and end time points is calculated. The moving direction of the line track and the displacement of the line moving track are obtained according to the difference calculation, and marked as sag data. The moving direction of the line track and the displacement of the line moving track are obtained according to the start position and the end position, and marked as the start endpoint data; If the line trajectory movement direction of the sag data is inconsistent with the line trajectory movement direction of the starting endpoint data, or the displacement generated by the line movement trajectory of the sag data is inconsistent with the displacement generated by the line movement trajectory of the starting endpoint data, a sag start point high impact signal is generated and the sag start point high impact signal is sent to the power grid monitoring and early warning platform; otherwise, a sag start point low impact signal is generated and the sag start point low impact signal is sent to the power grid monitoring and early warning platform; A signal characteristic analysis unit, used for performing signal characteristic analysis on risk line sections; Signal The characteristic analysis process is as follows: when obtaining the static quota supply during the operation of the risk line section, the span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment; at the same time, when obtaining the dynamic increase supply during the operation of the risk line section, the peak value ratio of the supply loss peak threshold affected by the temperature at any moment to the peak value of the line supply loss at the corresponding moment.

2. The power line sag monitoring and early warning system based on Beidou positioning technology according to claim 1 is characterized in that: If the positioning monitoring coefficient of the line monitoring section exceeds the positioning monitoring coefficient threshold during the line positioning monitoring period, the current line monitoring section will be marked as a risky line section; if the positioning monitoring coefficient of the line monitoring section does not exceed the positioning monitoring coefficient threshold during the line positioning monitoring period, the current line monitoring section will be marked as a safe line section.

3. The power line sag monitoring and early warning system based on Beidou positioning technology according to claim 1 is characterized in that: When there is no positional movement between the start position and the end position, and there is positional movement between the start position and the end position, the vertical point tail coordinates of the vertical point are compared, and the difference between the vertical point tail coordinates corresponding to the start and end time points is calculated to obtain the sag data. According to the start position and the end position, the moving direction of the line track and the displacement of the line moving track are obtained and marked as the end point data; If the line trajectory movement direction of the sag data is inconsistent with the line trajectory movement direction of the end point data, or the displacement generated by the line movement trajectory of the sag data is inconsistent with the displacement generated by the line movement trajectory of the end point data, a sag end point high impact signal is generated and sent to the power grid monitoring and early warning platform; otherwise, a sag end point low impact signal is generated and sent to the power grid monitoring and early warning platform. After the power grid monitoring and early warning platform receives the sag end point low impact signal, the inspection personnel control the end point position according to the risk line section.

4. The power line sag monitoring and early warning system based on Beidou positioning technology according to claim 1 is characterized in that: When there is positional movement between the start position and the end position, and when there is positional movement between the start position and the end position, an endpoint danger signal is generated and sent to the power grid monitoring and early warning platform. After receiving the signal, the power grid monitoring and early warning platform restores the endpoint position of the risky line section.

5. The power line sag monitoring and early warning system based on Beidou positioning technology according to claim 1 is characterized in that: If during the operation of the risk line section, during static quota supply, the span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment exceeds the span value ratio threshold, or during the operation of the risk line section, during dynamic quota supply at any moment, the peak value ratio of the supply loss amount peak value threshold affected by the temperature to the line supply loss amount peak value at the corresponding moment exceeds the peak value ratio threshold, then an endpoint timely recovery signal is generated; If during the operation of the risk line section, during static quota supply, the span value ratio of the reduction span threshold of the supply speed affected by the real-time temperature data to the reduction span value of the line supply speed at the current moment does not exceed the span value ratio threshold, and during the operation of the risk line section, during dynamic increase supply, the peak value ratio of the supply loss peak threshold affected by the temperature at any moment to the peak value of the line supply loss peak at the corresponding moment does not exceed the peak value ratio threshold, then a sag warning maintenance signal is generated.

Citation Information

Patent Citations

  • Online monitoring and early warning system for galloping of power transmission line

    CN107796434A

  • Ground wire electromagnetic signal-based sag monitoring method and device during capacity increase of power transmission line

    CN114396860A