A pollutant emission analysis method and system based on power generation and consumption data
By conducting comprehensive analysis of the historical power generation data of the power plant and monitoring of purification equipment, evaluating and optimizing the pollutant emissions of the power plant, the problems of accuracy of pollutant emission analysis and low purification treatment efficiency in the existing technology are solved, and the problem of Effective pollutant control.
Patent Information
- Application Number
- CN202411171677.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-26
AI Technical Summary
The existing technology is difficult to accurately analyze and optimize pollutant emissions in power plants, resulting in low purification and treatment efficiency and difficulty in data sorting, and the inability to effectively implement pollutant control measures.
By obtaining historical power generation data of power plants, comprehensively analyzing power generation efficiency and pollution emissions, assessing energy conversion levels and pollutant emissions, optimizing power generation process and purification equipment, monitoring the purification status of purification equipment, analyzing the working efficiency of purification equipment, and Equipment maintenance and consumable replacement are carried out based on the evaluation results.
Accurate analysis and optimization of pollutant emissions in power plants, improve purification and treatment efficiency, and ensure the effectiveness of pollutant control measures.
Smart Images

Figure CN118690974B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of pollutant emission analysis, and specifically relates to a pollutant emission analysis method and system based on power generation and consumption data. Background Art
[0002] As the core facility of energy supply, power plants play a vital role. Pollutants emitted during power generation include carbon dioxide (CO2), sulfur dioxide (SO2), nitrogen oxides (NOx), particulate matter (PM), etc. By collecting and analyzing the power generation, fuel type, combustion efficiency and pollutant emission data of power plants, we can evaluate the pollutant emission levels of different fuel types and reveal the spatial distribution and trend of emissions, which can provide an important basis for formulating pollutant control strategies and environmental policies.
[0003] Under the current technological background, the power generation forms of power plants tend to be diversified and compatible. Therefore, due to the existence of multiple power generation methods, different power generation raw materials and by-products produced by different power generation raw materials in the same power plant, the monitoring and analysis process of pollutant emissions needs to face a large number of monitoring data of various types, which leads to the adverse effect on the work efficiency of pollutant purification and treatment work. At the same time, it is also impossible to effectively organize the data and then take corresponding pollutant control measures. For this reason, we propose a pollutant emission analysis method and system based on power generation and consumption data. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention aims to provide a pollutant emission analysis method and system based on power generation and consumption data.
[0005] The technical problems to be solved by the present invention are:
[0006] How to accurately analyze and adapt the pollutant emissions of power plants based on power generation and consumption data.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] A pollutant emission analysis method based on power generation and consumption data, the pollutant emission analysis method comprising the following steps:
[0009] Step S100, obtaining historical power generation data of the power plant;
[0010] Step S200, comprehensively analyzing the power generation efficiency of the power plant to obtain the energy conversion coefficient and pollution emission coefficient of the power plant;
[0011] Step S300, evaluating the pollutant emission of the power plant to obtain the energy conversion level of the power plant and the pollutant emission of the power plant;
[0012] Step S400, optimizing the power generation process and pollutant emission of the power plant;
[0013] Step S500, monitoring the purification status of the pollutant treatment equipment to obtain purification process data of the power plant;
[0014] Step S600: Analyze the working efficiency of the purification equipment in the power plant to obtain the purification evaluation result of the power plant, and perform equipment maintenance and consumables replacement on the purification equipment in the power plant according to the purification evaluation result.
[0015] Furthermore, the historical power generation data includes the historical power generation of the power plant, the type of power generation raw materials and the historical raw material usage corresponding to the power generation raw material type, the historical concentration of pollutants and the historical emissions of pollutants.
[0016] Furthermore, the comprehensive analysis process of power generation efficiency in step S200 is specifically as follows:
[0017] Obtain the power generation raw material type of the power plant, and obtain the raw material conversion efficiency ZHr of the corresponding power generation raw material according to the power generation raw material type, where r is the power generation raw material type serial number, r corresponds to the power generation raw material type one by one, and R is the upper limit value of r and its value is equal to the total number of power generation raw material types of the power plant;
[0018] Obtain the historical power generation LDi and power generation raw material type of the power plant and the historical raw material consumption LYir corresponding to the power generation raw material type, and calculate the historical conversion coefficient LZi of the power plant according to the formula, where i is the date serial number and i is a non-zero natural number. The specific formula is as follows:
[0019] ;
[0020] The energy conversion coefficient of the power plant is calculated by adding up the historical conversion coefficients and taking the average value;
[0021] Obtain the historical pollutant concentration LNi and historical pollutant emission LPi of the power plant, and calculate the historical emission coefficient LWi of the power plant according to the formula. The specific formula is as follows:
[0022] ;
[0023] Among them, s1 and s2 are weight coefficients, the values of s1 and s2 are both greater than zero and s1+s2=1, s1 is the pollutant concentration weight, and s2 is the pollutant emission weight;
[0024] Traverse and compare the historical emission coefficients of the power plant and take the maximum value as the pollution emission coefficient of the power plant.
[0025] Furthermore, the evaluation process of the pollutant emission of the power plant in step S300 is specifically as follows:
[0026] Obtaining the energy conversion coefficient of the power plant and comparing it with the standard conversion coefficient, and determining whether the energy conversion level of the power plant is the first energy conversion level, the second energy conversion level, or the third energy conversion level;
[0027] According to the energy conversion level, the critical emission coefficient corresponding to the power plant is obtained, and the pollution emission coefficient of the power plant is compared with the corresponding critical emission coefficient;
[0028] If the value of the pollution emission coefficient is less than the critical emission coefficient, the pollutant emission of the power plant is judged to be normal;
[0029] If the value of the pollution emission coefficient is greater than or equal to the critical emission coefficient, the pollutant emission of the power plant is judged to be abnormal.
[0030] Further, the power generation efficiency of the first energy conversion level is lower than the power generation efficiency of the second energy conversion level, and the power generation efficiency of the second energy conversion level is lower than the power generation efficiency of the third energy conversion level;
[0031] The critical emission coefficient corresponding to the first energy conversion level is smaller than the critical emission coefficient corresponding to the second energy conversion level, and the critical emission coefficient corresponding to the second energy conversion level is smaller than the critical emission coefficient corresponding to the third energy conversion level.
[0032] Furthermore, the optimization process in step S400 is specifically as follows:
[0033] Obtain the energy conversion level of the power plant. If the energy conversion level of the power plant is the first energy conversion level, upgrade or optimize the process technology of the work process of the power generation facilities in the power plant. If the energy conversion level of the power plant is the first energy conversion level, upgrade or optimize the process technology of the work process of the power generation facilities in the power plant. If the energy conversion level of the power plant is the second energy conversion level or the third energy conversion level, no additional process technology optimization is required.
[0034] Then, the pollutant emission situation of the power plant is obtained. If the pollutant emission situation of the power plant is normal, there is no need to optimize the pollutant treatment process. If the pollutant emission situation of the power plant is abnormal, the pollutant treatment equipment in the power plant is upgraded or the process is optimized.
[0035] Furthermore, the monitoring process of the purification situation in step S500 is specifically as follows:
[0036] The power generation facility is connected to three sets of purification equipment: exhaust, drainage and waste treatment;
[0037] Gas sensors are respectively arranged at the air inlet and air outlet of the exhaust device to monitor the exhaust gas concentration at the air inlet and air outlet of the purification equipment; water quality detectors are respectively arranged at the water inlet and water outlet of the drainage device to monitor the solute concentration at the water inlet and water outlet of the purification equipment; sulfur content and nitrogen content are respectively measured on the solid waste before and after treatment in the waste treatment device to obtain the sulfur content before desulfurization, the nitrogen content before desulfurization, the sulfur content after desulfurization, and the nitrogen content after desulfurization of the purification equipment;
[0038] The exhaust gas concentration at the air inlet end, the exhaust gas concentration at the air outlet end, the solute concentration at the water inlet end, the solute concentration at the water outlet end, the sulfur content before removal, the nitrogen content before removal, the sulfur content after removal and the nitrogen content after removal of the purification equipment are integrated to obtain the purification process data of the power plant.
[0039] Furthermore, the analysis process of the purification evaluation result in step S600 is specifically as follows:
[0040] Obtain the exhaust gas concentration JQt at the inlet end and the exhaust gas concentration CQt at the outlet end of the purification equipment, where t is the time sequence number, and calculate the exhaust gas purification rate QLt of the purification equipment according to the formula. The specific formula is as follows:
[0041] QLt=(JQt-CQt) / JQt;
[0042] Similarly, the solute concentration JRt at the inlet end and the solute concentration CRt at the outlet end of the purification equipment are obtained, and the solute removal rate RLt of the purification equipment is calculated according to the formula. The specific formula is as follows:
[0043] RLt=(JRt-CRt) / JRt;
[0044] Obtain the sulfur content BSt before desulfurization, the nitrogen content BNt before desulfurization, the sulfur content ASt after desulfurization, and the nitrogen content ANt after desulfurization of the purification equipment, and calculate the waste removal rate TCt of the purification equipment according to the formula. The specific formula is as follows:
[0045] TCt=[(BSt-ASt) / BSt]×c1+[(BNt-ANt) / BNt]×c2;
[0046] Among them, c1 and c2 are weight coefficients, the values of c1 and c2 are both greater than zero and c1+c2=1, c1 is the sulfur removal weight, and c2 is the nitrogen removal weight;
[0047] Traverse and compare the exhaust gas purification rate, solute filtration rate and waste removal rate of the purification equipment in the power plant at each time, and take the maximum value of the corresponding values as QLmax, RLmax and TCmax respectively;
[0048] The purification energy efficiency value NX of the power plant is calculated according to the formula, and the specific formula is as follows:
[0049] NX=N1+N2+N3;
[0050] ;
[0051] ;
[0052] ;
[0053] Among them, a1 and a2 are proportional coefficients, the values of a1 and a2 are both greater than zero, T is the upper limit of t, PJQ is the average value of several groups of exhaust gas purification rates, PRL is the average value of several groups of solute removal rates, and PTC is the average value of several groups of waste removal rates;
[0054] Compare the purification energy efficiency value of the power plant with the purification energy efficiency threshold;
[0055] If the purification energy efficiency value of the power plant is less than or equal to the purification energy efficiency threshold, the purification evaluation result of the power plant is judged to be unqualified;
[0056] If the purification energy efficiency value of the power plant is greater than the purification energy efficiency threshold, the purification evaluation result of the power plant is determined to be qualified.
[0057] Furthermore, the working process of equipment maintenance and consumables replacement in step S600 is specifically as follows:
[0058] If the power plant's purification assessment results are satisfactory, no additional operations will be performed;
[0059] If the purification assessment result of the power plant is unqualified, staff will be arranged to replace the consumables in the purification equipment and perform emergency maintenance on the equipment body.
[0060] The present invention also proposes a pollutant emission analysis system based on power generation and consumption data, comprising a server and a data acquisition module, an efficiency analysis module, an emission assessment module, a process monitoring module, a purification analysis module and a monitoring terminal connected to the server;
[0061] A data acquisition module is used to acquire the historical power generation data of the power plant and send it to the server, and the server sends the historical power generation data of the power plant to the efficiency analysis module;
[0062] The efficiency analysis module is used to conduct a comprehensive analysis of the power generation efficiency of the power plant, and the energy conversion coefficient and pollution emission coefficient of the power plant obtained by the analysis are sent to the server, and the server sends the energy conversion coefficient and pollution emission coefficient of the power plant to the emission assessment module;
[0063] The emission assessment module is used to assess the pollutant emissions of the power plant. The energy conversion level and pollutant emissions of the power plant obtained by the assessment are sent to the server, and the server sends the pollutant emissions of the power plant to the supervision terminal;
[0064] Monitoring terminal, used to optimize the power generation process and pollutant emissions of power plants;
[0065] The process monitoring module is used to monitor the purification status of the pollutant treatment equipment, obtain the purification process data of the power plant and send it to the server, and the server sends the purification process data of the power plant to the purification analysis module;
[0066] The purification analysis module is used to analyze the working efficiency of the purification equipment in the power plant, and the purification evaluation results of the power plant obtained by the analysis are sent to the server, and the server sends the purification evaluation results of the power plant to the supervision terminal;
[0067] The monitoring terminal is also used to perform equipment maintenance and replace consumables for purification equipment in power plants based on purification assessment results.
[0068] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0069] 1. The present invention first obtains the historical power generation data of the power plant, conducts a comprehensive analysis of the power generation efficiency of the power plant based on the historical power generation data, obtains the energy conversion coefficient and the pollution emission coefficient of the power plant through analysis, and then evaluates the pollutant emission of the power plant to obtain the energy conversion level and the pollutant emission of the power plant. Based on the evaluation results, the power generation process and pollutant emission of the power plant are optimized. The present invention combines the power generation and consumption data to accurately analyze the pollutant emission of the power plant;
[0070] 2. The present invention also monitors the purification status of the optimized pollutant treatment equipment to obtain the purification process data of the power plant, analyzes the working efficiency of the purification equipment in the power plant based on the purification process data, obtains the purification evaluation results of the power plant through analysis, and performs equipment maintenance and consumable material replacement on the purification equipment in the power plant based on the purification evaluation results. The present invention implements corresponding purification work on the power plant based on the analysis results of pollutant emissions. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0072] Figure 1 is a flow chart of the method of the present invention;
[0073] Figure 2 is the overall system block diagram of the present invention;
[0074] Figure 3 It is a connection diagram of the process monitoring module in the present invention. DETAILED DESCRIPTION
[0075] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0076] Example 1: Please refer to Figure 1-Figure 3 The technical solution provided by the present invention is: a pollutant emission analysis method based on power generation and consumption data, which is used to monitor the power generation and consumption data related to the power plant, wherein the power plant is composed of power generation facilities and supporting facilities of the power generation facilities, and the power generation facilities include a generator set composed of a number of generator equipment. In the actual working process, the power generation types of the generator set include diesel power generation, gas power generation, gasoline power generation, wind power generation, solar power generation, hydropower generation and coal-fired power generation, etc. The same power generation facility can be compatible with multiple power generation types. For example, the power generation facility can complete daily power generation work through solar power generation and gas power generation at the same time. The supporting facilities of the power generation equipment include raw material transportation equipment, energy storage equipment and auxiliary operation equipment, wherein the raw material transportation equipment is used to receive and transport raw materials for power generation and auxiliary materials for power generation. For example, the raw material for power generation in gas-fired power generation is natural gas, and the auxiliary materials for power generation are combustion-supporting gases such as oxygen. The energy storage equipment includes a flywheel energy storage system or an electromagnetic energy storage system. The auxiliary operation equipment includes a cooling tower and drainage and sewage equipment equipped in the power plant;
[0077] In this embodiment, the pollutant emission analysis method includes the following steps:
[0078] Step S100, obtaining historical power generation data of the power plant;
[0079] It should be specifically noted that historical power generation data includes the historical power generation of power plants, power generation raw material types and historical raw material usage corresponding to power generation raw material types, historical pollutant concentrations and historical pollutant emissions;
[0080] Among them, the historical power generation is the total power generation of the power generation facility on each working day, the power generation raw material type is the energy type required for the power generation facility to generate electricity, the historical raw material usage is the consumption of the corresponding power generation raw material type on each working day, for example, the unit of measurement for natural gas is m³, the unit of measurement for fuel oil is L, and the unit of measurement for coal is kg, the historical pollutant concentration is the maximum value of the pollutant concentration of the power plant on each working day, in this embodiment, the pollutant concentration is only applicable to gaseous pollutants or liquid pollutants, and the historical pollutant emissions are the total pollutant emissions of the power plant on each working day;
[0081] In this embodiment, the pollutant concentration of the power generation facility is obtained by a gas concentration meter and a solution concentration meter, the emission of gaseous pollutants is obtained by a flow meter, the emission of liquid pollutants is obtained by a flow meter, and the emission of solid pollutants is obtained by a weighing device such as a platform scale.
[0082] Step S200, comprehensively analyzing the power generation efficiency of the power plant to obtain the energy conversion coefficient and pollution emission coefficient of the power plant;
[0083] In step S200, the comprehensive analysis process of power generation efficiency is as follows:
[0084] Obtain the type of power generation raw material of the power plant, and obtain the raw material conversion efficiency ZHr of the corresponding power generation raw material according to the power generation raw material type, wherein r is the serial number of the power generation raw material type, r corresponds to the power generation raw material type one by one, R is the upper limit of r and the value is equal to the total number of types of power generation raw materials in the power plant. In this embodiment, the raw material conversion efficiency of the power generation raw material is the existing technology and can be obtained through the chemical property table of the power generation raw material. The raw material conversion efficiency reflects the effective utilization rate of the power generation raw material. For example, the corresponding power generation raw material type of gas-fired power generation is natural gas, and the corresponding raw material conversion efficiency is the combustion efficiency of natural gas. The larger the value of the combustion efficiency, the more complete the combustion of natural gas in the power generation process;
[0085] Obtain the historical power generation LDi and power generation raw material type of the power plant and the historical raw material consumption LYir corresponding to the power generation raw material type, and calculate the historical conversion coefficient LZi of the power plant according to the formula, where i is the date serial number and i is a non-zero natural number. The specific formula is as follows:
[0086] ;
[0087] The energy conversion coefficient of the power plant is calculated by adding up the historical conversion coefficients and taking the average value;
[0088] Obtain the historical pollutant concentration LNi and historical pollutant emission LPi of the power plant, and calculate the historical emission coefficient LWi of the power plant according to the formula. The specific formula is as follows:
[0089] ;
[0090] Among them, s1 and s2 are weight coefficients, the values of s1 and s2 are both greater than zero and s1+s2=1, s1 is the pollutant concentration weight, s2 is the pollutant emission weight, and the unit emission index of the power plant is calculated by dividing the historical pollutant emission by the historical power generation. Under the condition of the same power generation, the larger the value of the unit emission index, the greater the pollutant emission of the power plant;
[0091] Traverse and compare the historical emission coefficients of the power plant and take the maximum value as the pollution emission coefficient of the power plant.
[0092] Step S300, evaluating the pollutant emission of the power plant to obtain the energy conversion level of the power plant and the pollutant emission of the power plant;
[0093] In step S300, the evaluation process of pollutant emissions of the power plant is as follows:
[0094] Obtain the energy conversion factor of the power plant and compare it with the standard conversion factor;
[0095] If the energy conversion coefficient is less than or equal to the first standard conversion coefficient, the energy conversion level of the power plant is determined to be the first energy conversion level;
[0096] If the energy conversion coefficient is greater than the first standard conversion coefficient and less than or equal to the second standard conversion coefficient, the energy conversion level of the power plant is determined to be the second energy conversion level;
[0097] If the energy conversion coefficient is greater than the second standard conversion coefficient, the energy conversion level of the power plant is determined to be the third energy conversion level;
[0098] Wherein, the values of the first standard conversion coefficient and the second standard conversion coefficient are both greater than zero, the first standard conversion coefficient is less than the second standard conversion coefficient, the power generation efficiency of the first energy conversion level is lower than the power generation efficiency of the second energy conversion level, and the power generation efficiency of the second energy conversion level is lower than the power generation efficiency of the third energy conversion level;
[0099] According to the energy conversion level, the critical emission coefficient corresponding to the power plant is obtained, and the pollution emission coefficient of the power plant is compared with the corresponding critical emission coefficient;
[0100] If the value of the pollution emission coefficient is less than the critical emission coefficient, the pollutant emission of the power plant is judged to be normal;
[0101] If the value of the pollution emission coefficient is greater than or equal to the critical emission coefficient, the pollutant emission of the power plant is judged to be abnormal;
[0102] Among them, the corresponding relationship between the critical emission coefficient and the energy conversion level is that if the energy conversion level of the power plant is the first energy conversion level, the value of the critical emission coefficient is p1, if the energy conversion level of the power plant is the second energy conversion level, the value of the critical emission coefficient is p2, if the energy conversion level of the power plant is the third energy conversion level, the value of the critical emission coefficient is p3, 0<p1<p2<p3.
[0103] Step S400, optimizing the power generation process and pollutant emission of the power plant;
[0104] In step S400, the optimization process is as follows:
[0105] Get the energy conversion level of the power plant;
[0106] If the energy conversion level of the power plant is the first energy conversion level, the process technology of the power generation facilities in the power plant is upgraded or optimized;
[0107] If the energy conversion level of the power plant is the first energy conversion level, the process technology of the power generation facilities in the power plant is upgraded or optimized;
[0108] If the power plant's energy conversion level is the second or third energy conversion level, no additional process technology optimization is required;
[0109] Obtain information on pollutant emissions from power plants;
[0110] If the pollutant emissions of the power plant are normal, there is no need to optimize the pollutant treatment process;
[0111] If the pollutant emissions from a power plant are abnormal, the pollutant treatment equipment in the power plant will be upgraded or the process optimized. For example, ultrasonic dust removal equipment can be added to the exhaust gas outlet, harmful pollutants can be neutralized with chemical reagents before wastewater is discharged, and waste materials can be harmlessly treated before being dumped or landfilled.
[0112] As a further solution of the present invention, after completing the process optimization of power generation facilities and pollutant treatment equipment;
[0113] Step S500, monitoring the purification status of the pollutant treatment equipment to obtain purification process data of the power plant;
[0114] In step S500, the monitoring process of the purification situation is as follows:
[0115] In this embodiment, the power generation facility is connected to purification equipment such as an exhaust device, a drainage device and a waste treatment device. The exhaust device is composed of an exhaust pipe connected to a gas purification device, the drainage device is composed of a drainage pipe connected to a water purification device, and the waste treatment device is composed of a waste collection chamber and a waste treatment chamber. The solid waste generated by the power generation facility during the power generation process will be collected in the waste collection chamber and then transported to the waste treatment chamber for harmless treatment;
[0116] like Figure 3As shown, gas sensors are respectively arranged at the air inlet and air outlet of the exhaust device to monitor the exhaust gas concentration at the air inlet and the exhaust gas concentration at the air outlet of the purification device, and water quality detectors are respectively arranged at the water inlet and the water outlet of the drainage device to monitor the solute concentration at the water inlet and the solute concentration at the water outlet of the purification device. The sulfur content and nitrogen content of the solid waste before and after treatment are respectively measured in the waste treatment device to obtain the sulfur content before desulfurization, the nitrogen content before desulfurization, the sulfur content after desulfurization and the nitrogen content after denitration of the purification device. In this embodiment, the sulfide in the solid waste is removed by the desulfurization device, and the nitride in the solid waste is removed by the denitration device;
[0117] The exhaust gas concentration at the air inlet end, the exhaust gas concentration at the air outlet end, the solute concentration at the water inlet end, the solute concentration at the water outlet end, the sulfur content before removal, the nitrogen content before removal, the sulfur content after removal and the nitrogen content after removal of the purification equipment are integrated to obtain the purification process data of the power plant.
[0118] Step S600, analyzing the working efficiency of the purification equipment in the power plant, obtaining the purification evaluation result of the power plant through the analysis, and performing equipment maintenance and consumable replacement of the purification equipment in the power plant according to the purification evaluation result;
[0119] In step S600, the analysis process of the purification evaluation result is as follows:
[0120] Obtain the exhaust gas concentration JQt at the inlet end and the exhaust gas concentration CQt at the outlet end of the purification equipment, where t is the time sequence number, and calculate the exhaust gas purification rate QLt of the purification equipment according to the formula. The specific formula is as follows:
[0121] QLt=(JQt-CQt) / JQt;
[0122] Similarly, the solute concentration JRt at the inlet end and the solute concentration CRt at the outlet end of the purification equipment are obtained, and the solute removal rate RLt of the purification equipment is calculated according to the formula. The specific formula is as follows:
[0123] RLt=(JRt-CRt) / JRt;
[0124] Obtain the sulfur content BSt before desulfurization, the nitrogen content BNt before desulfurization, the sulfur content ASt after desulfurization, and the nitrogen content ANt after desulfurization of the purification equipment, and calculate the waste removal rate TCt of the purification equipment according to the formula. The specific formula is as follows:
[0125] TCt=[(BSt-ASt) / BSt]×c1+[(BNt-ANt) / BNt]×c2;
[0126] Among them, c1 and c2 are weight coefficients, the values of c1 and c2 are both greater than zero and c1+c2=1, c1 is the sulfur removal weight, and c2 is the nitrogen removal weight;
[0127] Traverse and compare the exhaust gas purification rate, solute filtration rate and waste removal rate of the purification equipment in the power plant at each time, and take the maximum value of the corresponding values as QLmax, RLmax and TCmax respectively;
[0128] The purification energy efficiency value NX of the power plant is calculated according to the formula, and the specific formula is as follows:
[0129] NX=N1+N2+N3;
[0130] ;
[0131] ;
[0132] ;
[0133] Among them, a1 and a2 are proportional coefficients, the values of a1 and a2 are both greater than zero, a1 is the proportional coefficient corresponding to the exhaust gas purification rate, solute filtration rate and waste removal rate, a2 is the proportional coefficient of the stable purification efficiency, T is the upper limit of t, PJQ is the average value of several groups of exhaust gas purification rates, PRL is the average value of several groups of solute filtration rates, and PTC is the average value of several groups of waste removal rates;
[0134] Compare the purification energy efficiency value of the power plant with the purification energy efficiency threshold;
[0135] If the purification energy efficiency value of the power plant is less than or equal to the purification energy efficiency threshold, the purification evaluation result of the power plant is judged to be unqualified;
[0136] If the purification energy efficiency value of the power plant is greater than the purification energy efficiency threshold, the purification evaluation result of the power plant is determined to be qualified;
[0137] In step S600, the working process of equipment maintenance and consumables replacement is specifically as follows:
[0138] If the power plant's purification assessment results are satisfactory, no additional operations will be performed;
[0139] If the purification assessment result of the power plant is unqualified, staff will be arranged to replace the consumables in the purification equipment and perform emergency maintenance on the equipment body.
[0140] In this application, if corresponding calculation formulas appear, the above calculation formulas are all dimensionless and take their numerical calculations. The weight coefficients, proportional coefficients and other coefficients in the formulas are set to a result value obtained by quantifying each parameter. The size of the weight coefficient and the proportional coefficient can be determined as long as it does not affect the proportional relationship between the parameter and the result value.
[0141] Embodiment 2: Based on another conception of the same invention, Figure 2As shown, a pollutant emission analysis system based on power generation and consumption data is proposed, including a server and a data acquisition module connected to the server, an efficiency analysis module, an emission evaluation module, a process monitoring module, a purification analysis module and a supervision terminal;
[0142] A data acquisition module is used to acquire the historical power generation data of the power plant and send it to the server, and the server sends the historical power generation data of the power plant to the efficiency analysis module;
[0143] The efficiency analysis module is used to conduct a comprehensive analysis of the power generation efficiency of the power plant, and the energy conversion coefficient and pollution emission coefficient of the power plant obtained by the analysis are sent to the server, and the server sends the energy conversion coefficient and pollution emission coefficient of the power plant to the emission assessment module;
[0144] The emission assessment module is used to assess the pollutant emissions of the power plant. The energy conversion level and pollutant emissions of the power plant obtained by the assessment are sent to the server, and the server sends the pollutant emissions of the power plant to the supervision terminal;
[0145] Monitoring terminal, used to optimize the power generation process and pollutant emissions of power plants;
[0146] Furthermore, after completing the process optimization of power generation facilities and pollutant treatment equipment;
[0147] The process monitoring module is used to monitor the purification status of the pollutant treatment equipment, obtain the purification process data of the power plant and send it to the server, and the server sends the purification process data of the power plant to the purification analysis module;
[0148] The purification analysis module is used to analyze the working efficiency of the purification equipment in the power plant, and the purification evaluation results of the power plant obtained by the analysis are sent to the server, and the server sends the purification evaluation results of the power plant to the supervision terminal;
[0149] The monitoring terminal is also used to perform equipment maintenance and replace consumables for purification equipment in power plants based on purification assessment results.
[0150] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A pollutant emission analysis method based on power generation and consumption data, characterized in that: The pollutant emission analysis method includes the following steps: Step S100, obtaining historical power generation data of the power plant; The historical power generation data include the historical power generation of the power plant, the type of power generation raw materials and the historical raw material usage corresponding to the power generation raw material type, the historical concentration of pollutants and the historical emission of pollutants; Step S200, comprehensively analyzing the power generation efficiency of the power plant to obtain the energy conversion coefficient and pollution emission coefficient of the power plant; The comprehensive analysis process of power generation efficiency in step S200 is specifically as follows: Obtain the power generation raw material type of the power plant, and obtain the raw material conversion efficiency ZHr of the corresponding power generation raw material according to the power generation raw material type, where r is the power generation raw material type serial number, R is the upper limit value of r and the value is equal to the total number of power generation raw material types of the power plant; Obtain the historical power generation LDi and power generation raw material type of the power plant and the historical raw material consumption LYir corresponding to the power generation raw material type, and calculate the historical conversion coefficient LZi of the power plant according to the formula, where i is the date serial number and i is a non-zero natural number. The specific formula is as follows: ; The energy conversion coefficient of the power plant is calculated by adding up the historical conversion coefficients and taking the average value; Obtain the historical pollutant concentration LNi and historical pollutant emission LPi of the power plant, and calculate the historical emission coefficient LWi of the power plant according to the formula. The specific formula is as follows: ; Among them, s1 and s2 are weight coefficients, the values of s1 and s2 are both greater than zero and s1+s2=1, s1 is the pollutant concentration weight, and s2 is the pollutant emission weight; Traverse and compare the historical emission coefficients of the power plant and take the maximum value as the pollution emission coefficient of the power plant; Step S300, determining the energy conversion level of the power plant based on the energy conversion coefficient, obtaining the critical emission coefficient of the power plant in combination with the energy conversion level, and comparing the pollution emission coefficient with the critical emission coefficient to obtain the pollutant emission of the power plant; The specific process of evaluating the pollutant emission of the power plant in step S300 is as follows: Obtaining the energy conversion coefficient of the power plant and comparing it with the standard conversion coefficient, and determining whether the energy conversion level of the power plant is the first energy conversion level, the second energy conversion level, or the third energy conversion level; According to the energy conversion level, the critical emission coefficient corresponding to the power plant is obtained, and the pollution emission coefficient of the power plant is compared with the corresponding critical emission coefficient; If the value of the pollution emission coefficient is less than the critical emission coefficient, the pollutant emission of the power plant is judged to be normal; If the value of the pollution emission coefficient is greater than or equal to the critical emission coefficient, the pollutant emission of the power plant is judged to be abnormal; Step S400, optimizing the power generation process and pollutant emission of the power plant; The optimization process in step S400 is specifically as follows: Obtain the energy conversion level of the power plant. If the energy conversion level of the power plant is the first energy conversion level, the process technology of the power generation facilities in the power plant is upgraded or optimized. If the energy conversion level of the power plant is the second energy conversion level or the third energy conversion level, no additional process technology optimization is required. Then, the pollutant emission situation of the power plant is obtained. If the pollutant emission situation of the power plant is normal, there is no need to optimize the pollutant treatment process. If the pollutant emission situation of the power plant is abnormal, the pollutant treatment equipment in the power plant is upgraded or the process is optimized; Step S500, monitoring the purification status of the pollutant treatment equipment to obtain purification process data of the power plant; The monitoring process of the purification situation in step S500 is specifically as follows: The power generation facility is connected to three sets of purification equipment: exhaust, drainage and waste treatment; Gas sensors are respectively arranged at the air inlet and air outlet of the exhaust device to monitor the exhaust gas concentration at the air inlet and air outlet of the purification equipment; water quality detectors are respectively arranged at the water inlet and water outlet of the drainage device to monitor the solute concentration at the water inlet and water outlet of the purification equipment; sulfur content and nitrogen content are respectively measured on the solid waste before and after treatment in the waste treatment device to obtain the sulfur content before desulfurization, the nitrogen content before desulfurization, the sulfur content after desulfurization, and the nitrogen content after desulfurization of the purification equipment; The exhaust gas concentration at the air inlet end, the exhaust gas concentration at the air outlet end, the solute concentration at the water inlet end, the solute concentration at the water outlet end, the sulfur content before desulfurization, the nitrogen content before desulfurization, the sulfur content after desulfurization and the nitrogen content after desulfurization of the purification equipment are integrated to obtain the purification process data of the power plant; Step S600, analyzing the working efficiency of the purification equipment in the power plant, obtaining the purification evaluation result of the power plant through the analysis, and performing equipment maintenance and consumable replacement of the purification equipment in the power plant according to the purification evaluation result; The analysis process of the purification evaluation result in step S600 is specifically as follows: Obtain the exhaust gas concentration JQt at the air inlet and CQt at the air outlet of the purification equipment, where t is the time sequence number, and calculate the exhaust gas purification rate QLt of the purification equipment according to the formula QLt=(JQt-CQt) / JQt; Similarly, obtain the solute concentration JRt at the inlet end and the solute concentration CRt at the outlet end of the purification equipment, and calculate the solute removal rate RLt of the purification equipment according to the formula RLt= (JRt-CRt) / JRt; Then, the sulfur content BSt before desulfurization, the nitrogen content BNt before desulfurization, the sulfur content ASt after desulfurization and the nitrogen content ANt after desulfurization of the purification equipment are obtained, and the waste removal rate TCt of the purification equipment is calculated according to the formula. The specific formula is as follows: TCt=[(BSt-ASt) / BSt]×c1+[(BNt-ANt) / BNt]×c2; Among them, c1 and c2 are weight coefficients, the values of c1 and c2 are both greater than zero and c1+c2=1, c1 is the sulfur removal weight, and c2 is the nitrogen removal weight; Traverse and compare the exhaust gas purification rate, solute filtration rate and waste removal rate of the purification equipment in the power plant at each time, and take the maximum value of the corresponding values as QLmax, RLmax and TCmax respectively; The purification energy efficiency value NX of the power plant is calculated according to the formula, which is as follows: NX=N1+N2+N3; ; ; ; Among them, a1 and a2 are proportional coefficients, the values of a1 and a2 are both greater than zero, a1 is the proportional coefficient corresponding to the exhaust gas purification rate, solute filtration rate and waste removal rate, a2 is the proportional coefficient of the stable purification efficiency, T is the upper limit of t, PJQ is the average value of several groups of exhaust gas purification rates, PRL is the average value of several groups of solute filtration rates, and PTC is the average value of several groups of waste removal rates; Compare the purification energy efficiency value of the power plant with the purification energy efficiency threshold; If the purification energy efficiency value of the power plant is less than or equal to the purification energy efficiency threshold, the purification evaluation result of the power plant is judged to be unqualified; If the purification energy efficiency value of the power plant is greater than the purification energy efficiency threshold, the purification evaluation result of the power plant is determined to be qualified.
2. A pollutant emission analysis method based on power generation and consumption data according to claim 1, characterized in that: The power generation efficiency of the first energy conversion level is lower than the power generation efficiency of the second energy conversion level, and the power generation efficiency of the second energy conversion level is lower than the power generation efficiency of the third energy conversion level; The critical emission coefficient corresponding to the first energy conversion level is smaller than the critical emission coefficient corresponding to the second energy conversion level, and the critical emission coefficient corresponding to the second energy conversion level is smaller than the critical emission coefficient corresponding to the third energy conversion level.
3. The pollutant emission analysis method based on power generation and consumption data according to claim 1 is characterized in that: The working process of equipment maintenance and consumables replacement in step S600 is specifically as follows: If the power plant's purification assessment results are satisfactory, no additional operations will be performed; If the purification assessment result of the power plant is unqualified, staff will be arranged to replace the consumables in the purification equipment and perform emergency maintenance on the equipment body.
4. A pollutant emission analysis system based on power generation and consumption data, characterized in that: A pollutant emission analysis method based on power generation and consumption data according to any one of claims 1 to 3, comprising a server and a data acquisition module, an efficiency analysis module, an emission assessment module, a process monitoring module, a purification analysis module and a supervision terminal connected to the server; A data acquisition module is used to acquire the historical power generation data of the power plant and send it to the server, and the server sends the historical power generation data of the power plant to the efficiency analysis module; The efficiency analysis module is used to conduct a comprehensive analysis of the power generation efficiency of the power plant, and the energy conversion coefficient and pollution emission coefficient of the power plant obtained by the analysis are sent to the server, and the server sends the energy conversion coefficient and pollution emission coefficient of the power plant to the emission assessment module; The emission assessment module is used to assess the pollutant emissions of the power plant. The energy conversion level and pollutant emissions of the power plant obtained by the assessment are sent to the server, and the server sends the pollutant emissions of the power plant to the supervision terminal; Monitoring terminal, used to optimize the power generation process and pollutant emissions of power plants; The process monitoring module is used to monitor the purification status of the pollutant treatment equipment, obtain the purification process data of the power plant and send it to the server, and the server sends the purification process data of the power plant to the purification analysis module; The purification analysis module is used to analyze the working efficiency of the purification equipment in the power plant, and the purification evaluation results of the power plant obtained by the analysis are sent to the server, and the server sends the purification evaluation results of the power plant to the supervision terminal; The monitoring terminal is also used to perform equipment maintenance and replace consumables for purification equipment in power plants based on purification assessment results.