Material chemical composition verification system and method for verifying material chemical composition

By using a Fourier transform infrared spectroscopy system and machine learning models to monitor the chemical composition of unconsolidated composite materials in real time, the problem of not being able to quickly identify and correct substandard parts in existing technologies has been solved, thereby improving production efficiency and material quality.

CN118730955APending Publication Date: 2024-10-01THE BOEING CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410374574.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-01-18
Filing Date
2024-03-29
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing technologies cannot quickly and accurately identify and correct non-consolidated composite materials that do not meet quality standards, resulting in low production efficiency and material waste.

Method used

The chemical composition of unconsolidated composite materials is monitored in real time using a Fourier transform infrared spectroscopy system and machine learning models. Material properties are predicted through sensor data, and manufacturing parameters are adjusted in real time to ensure that the quality meets the standards.

Benefits of technology

It improves the efficiency and quality control of the production process of unconsolidated composite materials, reduces material waste, and enables real-time identification and correction of non-conforming parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730955A_ABST
    Figure CN118730955A_ABST
Patent Text Reader

Abstract

The invention relates to a material chemistry verification system and a method for verifying material chemistry. A method of verifying a chemical composition (3026) of a material. A Fourier transform infrared scan (3073) of a segment (3027) of an unconsolidated composite material (3024) is received in real time during manufacture of the unconsolidated composite material (3024) by a composite material manufacturing system (3023). Using a Fourier transform infrared scan map (3073) and a scan map classifier (3032, 3305), verification is performed in real time as to whether a material chemistry (3026) of a segment (3027) of an unconsolidated composite material (3024) is correct during manufacture of the unconsolidated composite material (3024) by a composite material manufacturing system (3023).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates generally to manufacturing composite materials, and in particular to manufacturing uncured composite materials. More particularly, the present disclosure relates to methods, apparatus, systems, and computer program products for predicting properties of uncured composite materials during their manufacture. Background Art

[0002] Aircraft are designed and manufactured with an increasing percentage of composite materials. Composite materials are used in aircraft to reduce aircraft weight and improve aerodynamic efficiency through design. This reduced weight improves performance characteristics, such as increased payload capacity and fuel efficiency. In addition, composite materials provide longer service life for various components in aircraft.

[0003] Composite materials are tough, lightweight materials created by combining two or more functional components. For example, a composite material may include reinforcing fibers bound in a polymer resin matrix. The fibers may be unidirectional or may take the form of a woven cloth or fabric. The fibers and resin are arranged and cured to form a composite material.

[0004] In addition, the use of composite materials to create aerospace composite structures potentially allows multiple parts of an aircraft to be manufactured as larger parts or segments. For example, the fuselage in an aircraft can be created in the form of multiple cylindrical segments and then assembled to form the fuselage of the aircraft. Other examples include, but are not limited to, wing segments connected to form wings or stabilizer segments connected to form stabilizers.

[0005] When making a composite structure, multiple composite layers are usually laid on a tool. These layers can be made of fibers in sheet form. These sheets can take the form of fabrics, tapes, tows or other suitable forms. In some cases, resins can be impregnated or pre-impregnated into the sheets. These types of sheets are commonly referred to as prepregs. Prepregs can be made in the form of long sheets that are stored in rolls until the prepregs are used to make the composite structure.

[0006] Different prepreg layers can be laid up in different orientations and different numbers of layers can be used, depending on the thickness of the composite structure being manufactured. The layers can be laid up manually or using automated lamination equipment such as a tape laminator or fiber placement system.

[0007] After the different composite layers have been laid up on the tool, the composite layers may consolidate and cure when exposed to temperature and pressure to form the final composite structure.

[0008] The quality of the final composite structure can be determined using testing, including non-destructive testing. In addition, components used to manufacture the composite structure can also be monitored and tested for quality purposes. Maintaining the desired quality of the composite parts can improve the quality of the final composite structure. For example, a prepreg can be inspected to determine whether the thickness is within specified tolerances. Quality testing of composite parts (e.g., prepreg parts) can be more time consuming than desired.

[0009] Therefore, it is desirable to have a method and apparatus that takes into account at least some of the above problems and other possible problems.For example, it is desirable to have a method, apparatus, system and computer program product that overcome the technical problems of quality testing of prepreg parts. Summary of the invention

[0010] An embodiment of the present disclosure provides a material chemical composition verification system, which includes a computer system, a Fourier transform infrared spectroscopy system, a scan image classifier, and an analyzer located in the computer system. The Fourier transform infrared spectroscopy system is configured to generate a Fourier transform infrared scan image of the absorbed infrared energy of an unconsolidated composite material, and the absorbed infrared energy has an infrared spectrum frequency. The scan image classifier is configured to use the Fourier transform infrared scan image of the unconsolidated composite material to classify the material chemical composition in the unconsolidated composite material. The analyzer is configured to: control the Fourier transform infrared spectroscopy system to generate a Fourier transform infrared scan image of a fragment of an unconsolidated composite material in real time during the manufacture of the unconsolidated composite material by the composite material manufacturing system. The analyzer is configured to: use the Fourier transform infrared scan image and the scan image classifier to verify in real time whether the material chemical composition of the fragment of the unconsolidated composite material is correct during the manufacture of the unconsolidated composite material by the composite material manufacturing system.

[0011] Another embodiment of the present disclosure provides a material chemical composition verification system, which includes a computer system, a scan image classifier, and an analyzer located in the computer system. The scan image classifier is configured to use the Fourier transform infrared scan image of the unconsolidated composite material to classify the material chemical composition in the unconsolidated composite material. The analyzer is configured to receive the Fourier transform infrared scan image of the fragment of the unconsolidated composite material in real time during the composite material manufacturing system manufacturing the unconsolidated composite material. The analyzer is configured to: use the Fourier transform infrared scan image and the scan image classifier to verify in real time whether the material chemical composition of the fragment of the unconsolidated composite material is correct during the composite material manufacturing system manufacturing the unconsolidated composite material.

[0012] Another embodiment of the present disclosure provides a material chemical composition verification system, which includes a computer system, a scan image classifier, and an analyzer located in the computer system. The scan image classifier is configured to classify the material chemical composition in the unconsolidated composite material using the electromagnetic scan image of the unconsolidated composite material. The analyzer is configured to receive the electromagnetic scan image of the fragment of the unconsolidated composite material in real time during the composite material manufacturing system manufacturing the unconsolidated composite material. The analyzer is configured to: use the electromagnetic scan image and the scan image classifier to verify in real time whether the material chemical composition of the fragment of the unconsolidated composite material is correct during the composite material manufacturing system manufacturing the unconsolidated composite material.

[0013] Another embodiment of the present disclosure provides a method for verifying the chemical composition of a material. A Fourier transform infrared scan of a fragment of an unconsolidated composite material is received in real time during the manufacturing of the unconsolidated composite material by the composite material manufacturing system. The Fourier transform infrared scan and the scan classifier are used to verify in real time whether the chemical composition of the fragment of the unconsolidated composite material is correct during the manufacturing of the unconsolidated composite material by the composite material manufacturing system.

[0014] These features and functions can be achieved independently in various embodiments of the present disclosure or may be combined in yet other embodiments in which further details can be seen with reference to the following description and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The novel features believed characteristic of the illustrative embodiments are set forth in the appended claims. However, the illustrative embodiments and their preferred modes of use, further objects and features will be best understood by reference to the following detailed description of illustrative embodiments of the disclosure when read in conjunction with the accompanying drawings, in which:

[0016] Figure 1 is a pictorial representation of a network of data processing systems in which the illustrative embodiments may be implemented;

[0017] Figure 2 is a block diagram of a composite material manufacturing environment according to an illustrative embodiment;

[0018] Figure 3 is an illustration of a block diagram of actions that may be taken using predicted properties of portions of uncured composite material in accordance with an illustrative embodiment;

[0019] Figure 4 is a diagram of a manufacturing process flow for manufacturing an unconsolidated composite material according to an illustrative embodiment;

[0020] Figure 5 is an illustration of a composite material manufacturing system configured to perform a film forming process according to an illustrative embodiment;

[0021] Figure 6 is an illustration of a composite material manufacturing system configured to perform a prepreg production process according to an illustrative embodiment;

[0022] Figure 7 is an illustration of a block diagram of sensor locations in a composite material manufacturing system according to an illustrative embodiment;

[0023] Figure 8 is an illustration of a side view of a portion of a composite material manufacturing system according to an illustrative embodiment;

[0024] Fig. 9 is an illustration of a top view of a portion of a composite material manufacturing system according to an illustrative embodiment;

[0025] Fig.10 is an illustration of a flow chart of a process for identifying quality levels of multiple portions of unconsolidated composite material in accordance with an illustrative embodiment;

[0026] Fig.11 is an illustration of a flow chart of a process for marking unconsolidated composite materials according to an illustrative embodiment;

[0027] Fig.12 is an illustration of a flow chart of a process for marking out-of-tolerance portions of uncured composite material as unusable in accordance with an illustrative embodiment;

[0028] Fig.13 is an illustration of a flow chart of a process for marking an within-tolerance portion of an uncured composite material as usable in accordance with an illustrative embodiment;

[0029] Fig.14 is an illustration of a flow chart of a process for marking a quality level of a portion of an uncured composite material in accordance with an illustrative embodiment;

[0030] Fig.15 is an illustration of a flow chart of a process for recording a quality level of a portion of unconsolidated composite material in accordance with an illustrative embodiment;

[0031] Fig.16 is an illustration of a flow chart of a process for determining predicted properties of a plurality of portions of an unconsolidated composite material in accordance with an illustrative embodiment;

[0032] Fig.17 is an illustration of a flow chart of a process for training a machine learning model to predict properties of an unconsolidated composite material prior to completing fabrication of the unconsolidated composite material in accordance with an illustrative embodiment;

[0033] Fig.18 is an illustration of a flow chart of a process for performing corrective actions for multiple portions of uncured composite material in accordance with an illustrative embodiment;

[0034] Fig.19 is an illustration of a flow chart of a process for performing corrective actions for out-of-tolerance portions of uncured composite material in accordance with an illustrative embodiment;

[0035] Fig. 20 is an illustration of a flow chart of a process for adjusting parameters for out-of-tolerance portions of an uncured composite material in accordance with an illustrative embodiment;

[0036] Fig.21 is an illustration of a flow chart of a process for adjusting parameters for a plurality of portions of an uncured composite material within tolerances in accordance with an illustrative embodiment;

[0037] Fig. 22 is an illustration of a flow chart of a process for adjusting parameters so that a portion of uncured composite material is within tolerance in accordance with an illustrative embodiment;

[0038] Fig.23 is an illustration of a flow chart of a process for adjusting parameters for a subsequent portion of an unconsolidated composite material in accordance with an illustrative embodiment;

[0039] Fig.24 is an illustration of a flow chart of a process for changing raw materials according to an illustrative embodiment;

[0040] Fig.25 is an illustration of a flow chart of a process for determining a predicted property of an unconsolidated composite material in accordance with an illustrative embodiment;

[0041] Fig.26 is an illustration of a block diagram of a data processing system according to an illustrative embodiment;

[0042] Fig. 27 is a diagram of an aircraft manufacturing and service method according to an illustrative embodiment;

[0043] Fig.28 is an illustration of a block diagram of an aircraft in which the illustrative embodiments may be implemented;

[0044] Fig.29 is an illustration of a block diagram of a product management system according to an illustrative embodiment;

[0045] Fig.30 is an illustration of a block diagram of a material verification system according to an illustrative embodiment;

[0046] Fig.31 is an illustration of a block diagram of a scan graph classifier according to an illustrative embodiment;

[0047] Fig.32 is an illustration of a block diagram for training a machine learning model according to an illustrative embodiment;

[0048] Fig.33 is an illustration of a block diagram for creating and validating a material chemical composition using criteria of a machine learning model in accordance with an illustrative embodiment;

[0049] Fig.34 is an illustration of a flow chart of a process for verifying the chemical composition of a material according to an illustrative embodiment;

[0050] Fig.35 is an illustration of a flow chart of a process for controlling a Fourier transform infrared spectroscopy system according to an illustrative embodiment;

[0051] Fig.36 is an illustration of a flow chart of a process for controlling a Fourier transform infrared spectroscopy system according to an illustrative embodiment;

[0052] Fig.37 is an illustration of a flow chart of a process for training a machine learning model system to verify material chemistry of an unconsolidated composite material in accordance with an illustrative embodiment; and

[0053] Fig.38 is an illustration of a flow chart of a process for training a machine learning model system to verify material chemistry of an unconsolidated composite material in accordance with an illustrative embodiment. DETAILED DESCRIPTION

[0054] The illustrative embodiments recognize and take into account one or more considerations as described below. For example, current testing of unconsolidated composite parts (e.g., prepreg rolls manufactured by a carbon fiber prepreg coating line) can be performed using samples from prepreg rolls. If the sample does not meet the desired quality level, the entire prepreg roll is discarded or recycled. However, not the entire prepreg roll may have an undesirable quality level. Only a portion of the prepreg roll may not meet the tolerance for the desired quality level. Current technology cannot identify which portions of the prepreg roll may have properties that are out of tolerance without testing multiple portions of the entire prepreg roll. Testing multiple portions of the entire prepreg roll is time consuming and inefficient.

[0055] Moreover, it is currently not possible to determine the reason why the prepreg roll has the property of an undesirable quality level during the manufacturing process. Instead, analysis is performed after the prepreg roll is manufactured, and a sample of the tested prepreg roll shows that the sample does not have the desired quality level. In addition, when the cause can be determined, the carbon fiber prepreg coating line can be adjusted to ensure that future prepreg rolls have the desired quality level. It may be impossible to determine the required time before more prepreg rolls have been completed and one or more prepreg rolls have been determined to not have the desired quality level. Therefore, one solution is to stop the manufacture of prepreg rolls (which uses the carbon fiber prepreg coating line that manufactured the prepreg rolls) until the cause can be determined and the carbon fiber prepreg coating line can be adjusted. This unavailability of the carbon fiber prepreg coating line reduces the production volume of manufacturing prepreg rolls.

[0056] The illustrative embodiments further recognize and take into account the desire to have the ability to determine the properties of prepreg materials. The manufacturing process can be at least one of resin mixing, resin film forming, resin bath operation, or other operations performed during the manufacturing process to manufacture prepreg while manufacturing prepreg. Different types of sensor data obtained in real time from different positions in the carbon fiber prepreg coating line can be used to predict the properties of the prepreg while still manufacturing the prepreg. This information can be used to determine which parts of the prepreg roll have properties within tolerance, while other parts of the prepreg roll have properties outside tolerance. This type of property determination of the parts of the prepreg being manufactured can be carried out in real time in a manner that allows marking or recording which parts are within or beyond tolerance. As a result, when some parts of the prepreg roll exceed tolerance, the recorded or marked parts will not be used, while other parts of the prepreg roll can still be used. As a result, the amount of discarded or recycled prepreg can be reduced.

[0057] Referring now to the drawings, and in particular to Figure 1 , shows a pictorial representation of a network of data processing systems in which the illustrative embodiments may be implemented. Network data processing system 100 is a network of computers in which the illustrative embodiments may be implemented. Network data processing system 100 contains network 102, which is a medium for providing communications links between various devices and computers connected together within network data processing system 100. Network 102 may include connections such as wire, wireless communication links, or fiber optic cables.

[0058] In the example shown, server computer 104 and server computer 106 are connected to network 102 together with storage unit 108. In addition, client device 110 is connected to network 102. As shown, client device 110 includes client computer 112, client computer 114 and client computer 116. Client device 110 can be, for example, a computer, a workstation or a network computer. In the example shown, server computer 104 provides information to client device 110, such as boot files, operating system images and applications. In addition, client device 110 can also include other types of client devices, such as prepreg system 118, tablet computer 120 and smart glasses 122. In this illustrative example, server computer 104, server computer 106, storage unit 108 and client device 110 are network devices connected to network 102, wherein network 102 is a communication medium for these network devices. Some or all client devices 110 can form an Internet of Things (IoT), wherein these physical devices can be connected to network 102 and exchange information with each other through network 102.

[0059] In this example, client device 110 is a client to server computer 104. Network data processing system 100 may include additional server computers, client computers, and other devices not shown. Client device 110 connects to network 102 using at least one of a wired, fiber optic, or wireless connection.

[0060] Program instructions located in network data processing system 100 may be stored on a computer recordable storage medium and downloaded to the data processing system or other devices for use. For example, program instructions may be stored on a computer recordable storage medium on server computer 104 and downloaded to client device 110 via network 102 for use on client device 110.

[0061] In the illustrated example, the network data processing system 100 is the Internet with a network 102, which represents a global collection of networks and gateways that use the Transmission Control Protocol / Internet Protocol (TCP / IP) protocol suite to communicate with each other. The core of the Internet is a backbone of high-speed data communication lines between master nodes or host computers, which are composed of thousands of commercial, government, educational and other computer systems that transmit data and messages. Of course, the network data processing system 100 can also be implemented using multiple different types of networks. For example, the network 102 can include at least one of the Internet, an intranet, a local area network (LAN), a metropolitan area network (MAN), or a wide area network (WAN). Figure 1 This is intended as an example and not as an architectural limitation to the different illustrative embodiments.

[0062] As used herein, when used with reference to an item, "plurality" refers to one or more items. For example, "plurality of different types of networks" is one or more different types of networks.

[0063] Furthermore, when used with a list of items, the phrase "at least one of..." means that different combinations of one or more of the listed items may be used, and only one of each item in the list may be required. In other words, "at least one of..." refers to any combination of items and numbers of items that can be used from the list, but not all items in the list are required. The item may be a specific object, thing, or category.

[0064] For example, but not limited to, "at least one of item A, item B, or item C" may include: item A; item A and item B; or item B. This example may also include: item A, item B, and item C; or item B and item C. Of course, there may be any combination of these items. In some illustrative examples, "at least one of..." may be, for example, but not limited to: two items A; one item B; ten items C; four items B and seven items C; or other suitable combinations.

[0065] In this example, the prepreg system 118 is located in a composite material manufacturing facility 130. The location uses the prepreg system 118 to manufacture unconsolidated composite materials, such as prepregs. As shown, a composite material manager 132 at the server computer 104 can communicate with the prepreg system 118 at the composite material manufacturing facility 130. The communication can include an exchange of information selected from at least one of sensor data 134, commands 136, or other types of information that can be sent over the network 102.

[0066] In this example, composite material manager 132 may receive sensor data 134 from a sensor system for prepreg system 118. The sensor system may be located in at least one of prepreg system 118 or another location in composite material manufacturing facility 130.

[0067] In this illustrative example, sensor data 134 is received in real-time from prepreg system 118. In other words, receiving sensor data 134 in real-time means receiving sensor data 134 while prepreg system 118 is operating to manufacture prepreg. When sensor data 134 is sent in real-time, sensor data 134 is sent as quickly as possible without potential delays. In analyzing sensor data 134 in real-time, composite material manager 132 may process and analyze sensor data 134 as it is received.

[0068] As shown, sensor data 134 can be analyzed by composite material manager 132 to determine a prediction of the properties of the prepreg when the manufacture of the prepreg is completed. This prediction of the properties is made while the prepreg is being manufactured by prepreg system 118. The predicted properties are the properties of multiple parts of the prepreg being manufactured in prepreg system 118. These properties may include, for example, the prepreg thickness, area weight and other properties of the completed prepreg. In other words, composite material manager 132 can make real-time predictions of the properties of the prepreg being manufactured by prepreg system 118 before the manufacture of the prepreg has been completed. Based on the predicted properties, composite material manager 132 can identify which parts of the prepreg are within tolerance for use in manufacturing composite parts. Based on the set properties predicted for the prepreg, composite material manager 132 can record one or more parts within tolerance and parts that may be outside tolerance, which are used in manufacturing composite parts. In addition, composite material manager 132 can determine how long these parts will remain within tolerance. In some cases, the uncured composite material may have a shelf life that may vary depending on the properties predicted for the prepreg.

[0069] Additionally, knowing the predicted properties of a portion of the prepreg, the composite material manager 132 performs corrective action based on a quality level determined for the portion of the unconsolidated composite material, the quality level being determined based on a prediction of the properties of the unconsolidated composite material when the portion is a finished product in the unconsolidated composite material but before manufacturing operations are completed.

[0070] For example, composite material manager 132 may determine what adjustments need to be made to prepreg system 118 so that further processing of the portion of prepreg results in the portion being within tolerance or having a desired level of quality. In the event of this determination, composite material manager 132 may send command 136 to prepreg system 118 to make the adjustments.

[0071] Using commands 136, these adjustments may be made by composite material manager 132 while portions of prepreg are still being manufactured. These adjustments may be made to portions of prepreg system 118 that have not yet processed portions of prepreg. With these adjustments, additional sensor data may be received to determine whether the actions performed have changed the portion of prepreg material to have a desired quality level. In this manner, composite material manager 132 may manage the manufacture of unconsolidated composite material in a manner that may increase portions of unconsolidated composite material that will meet a desired quality level and reduce discarded portions of unconsolidated composite material.

[0072] In this illustrative example, the prediction may be made using machine learning model 138. In this example, machine learning model 138 has been trained using historical sensor data generated by previous manufacture of prepreg system 118.

[0073] Figure 1 The illustration of network data processing system 100 in FIG. 1 is not meant to limit the manner in which other illustrative examples may be implemented. For example, composite material manager 132 may be located at another location other than server computer 104. For example, composite material manager 132 may be located at client computer 112, prepreg system 118, or another computer located at composite material manufacturing facility 130. In other illustrative examples, additional prepreg systems may be located at composite material manufacturing facility 130 or at other locations that may be managed by composite material manager 132.

[0074] Reference now Figure 2 , a block diagram of a composite material manufacturing environment according to an illustrative embodiment is shown. In this illustrative example, the composite material manufacturing environment 200 includes a plurality of components that can be implemented on hardware (e.g., Figure 1 Components implemented in the hardware shown in the network data processing system 100 in .

[0075] In this illustrative example, composite material management system 202 operates to manage the manufacturing of unconsolidated composite material 204 for use in manufacturing composite part 205 .

[0076] Unconsolidated composite material 204 is a composite material that has not yet been processed to form composite part 205. For example, a process such as at least one of pressure, heating, or curing has not yet been applied to unconsolidated composite material 204. In other words, unconsolidated composite material 204 has not yet been processed in a manner to form a final composite part.

[0077] Unconsolidated composite material 204 may be selected from at least one of the following: prepreg, aerospace grade prepreg, thermoset prepreg, thermoplastic prepreg, woven fabric prepreg, fiber tow prepreg, tow prepreg, unidirectional tape prepreg, resin coated film, wrinkle-free fabric, resin mixture or other suitable unconsolidated composite material. The fibers in unconsolidated composite material 204 may take a variety of different forms. For example, unconsolidated composite material 204 (such as fibers and fabrics) may be selected from at least one of glass fiber, carbon fiber, Kevlar fiber, para-aramid fiber, hybrid fiber, carbon fabric with glass filaments, carbon fiber fabric with interwoven filaments, borosilicate fiber or other suitable types of materials. Composite part 205 may be, for example, a fuselage segment, a skin panel, a wing, a rib, a door or other suitable type of part.

[0078] In another example, the unconsolidated composite material 204 can be used to make another unconsolidated composite material. For example, the unconsolidated composite material 204 can be a film paper. Such a film paper can be used to make another unconsolidated composite material, such as a prepreg.

[0079] For example, the composite material management system 202 can control the operation of the composite material manufacturing system 208 to manufacture the unconsolidated composite material 204. As shown, the composite material manufacturing system 208 can take a variety of forms. For example, the composite material manufacturing system 208 can be selected from at least one of a carbon fiber prepreg coating line, a reinforcement fiber resin impregnation production line, a resin mixing processing system, a resin film forming production line, a prepreg system, a cutting processing system, and other suitable types of composite material manufacturing systems.

[0080] As shown, composite material management system 202 includes computer system 210 and composite material manager 212. Composite material manager 212 is located in computer system 210.

[0081] Composite manager 212 may be implemented in software, hardware, firmware, or a combination thereof. When software is used, the operations performed by composite manager 212 may be implemented in program instructions configured to run on hardware (e.g., a processor unit). When firmware is used, the operations performed by composite manager 212 may be implemented in program instructions and data and stored in a persistent memory to run on a processor unit. When hardware is used, the hardware may include circuitry for performing the operations in composite manager 212.

[0082] In an illustrative example, the hardware may take the form of at least one selected from the following: a circuit system; an integrated circuit; an application specific integrated circuit (ASIC); a programmable logic device; or some other suitable type of hardware configured to perform several operations. In the case of a programmable logic device, the device may be configured to perform multiple operations. The device may be reconfigured at a later time, or may be permanently configured to perform multiple operations. Programmable logic devices include, for example, programmable logic arrays, programmable array logic, field programmable logic arrays, field programmable gate arrays, and other suitable hardware devices. In addition, the process may be implemented in organic components integrated with inorganic components, and may be composed entirely of organic components other than humans. For example, the process may be implemented as a circuit in an organic semiconductor.

[0083] The computer system 210 is a physical hardware system and includes one or more data processing systems. When there are more than one data processing systems in the computer system 210, these data processing systems communicate with each other using a communication medium. The communication medium may be a network. The data processing system may be selected from at least one of a computer, a server computer, a tablet computer, or some other suitable data processing system.

[0084] As shown, computer system 210 includes multiple processor units 214 capable of executing program instructions 216, and program instructions 216 implement the process in the illustrative example. As used herein, the processor unit in multiple processor units 214 is a hardware device, and includes hardware circuits such as on an integrated circuit, and the hardware circuit responds and processes the instructions and program codes of the operating computer. When multiple processor units 214 execute program instructions 216 for a process, multiple processor units 214 are one or more processor units that can be on the same computer or on different computers. In other words, the process can be distributed between processor units on the same or different computers in the computer system. In addition, the multiple processor units 214 can be processor units of the same type or different types. For example, multiple processor units can be selected from at least one of a single-core processor, a dual-core processor, a multi-processor core, a general-purpose central processing unit (CPU), a graphics processing unit (GPU), a digital signal processor (DSP) or some other types of processor units.

[0085] In this illustrative example, composite material manager 212 is configured to receive sensor data 218 from sensor system 220 for composite material manufacturing system 208. Sensor data 218 may take a number of different forms. For example, sensor data 218 may include at least one of: part temperature; unconsolidated composite material temperature; ambient temperature; humidity; roller speed; speed of the unconsolidated composite material; pressure between a pair of rollers; gap between the pair of rollers; unconsolidated composite material thickness; Fourier transform infrared (FTIR) spectroscopy; Raman spectroscopy data; spectral data; material width; fiber web width; material area weight; fiber area weight; resin viscosity; electrical measurements of dimensions of the unconsolidated composite material; voltages of dimensions of the unconsolidated composite material; electromagnetic measurements of dimensions of the unconsolidated composite material; acoustic measurements of dimensions of the unconsolidated composite material; tension; or an image of a prepreg at a location in the composite material manufacturing system.

[0086] In this illustrative example, sensor system 220 for composite material manufacturing system 208 may be considered part of composite material management system 202, composite material manufacturing system 208, or both. Sensor system 220 may be operable to generate sensor data 218 regarding at least one of unconsolidated composite material 204 or composite material manufacturing system 208 during operation of composite material manufacturing system 208. Sensor data 218 may be information regarding unconsolidated composite material 204 being manufactured by composite material manufacturing system 208. Sensor data 218 is received during the manufacturing of unconsolidated composite material 204 by composite material manufacturing system 208. Sensor data 218 is generated by sensor system 220 in real time and sent to composite material manager 212 in real time.

[0087] Sensor system 220 includes sensor 222. As shown, sensor 222 is located at location 209 relative to composite material manufacturing system 208. Location 209 can be on, in, or near composite material manufacturing system 208. In this example, sensor 222 can be selected from at least one of the following: temperature sensor; camera; infrared camera; thermal camera; line scan camera; tension sensor; density sensor; drop gauge; infrared sensor; non-contact laser distance sensor; beta meter; speed sensing; Fourier transform infrared (FTIR) spectrometer; Raman spectrometer; force detector; linear variable differential transformer (LVDT) sensor; rotary third differential transformer (RVDT) sensor; thickness sensor; gap width sensor; viscometer; light reflection sensor; conductivity sensor; resistance sensor; capacitance sensor; electromagnetic sensor; acoustic sensor; humidity sensor; laser Doppler sensor; or other suitable sensor.

[0088] As depicted, composite material manager 212 uses sensor data 218 to determine set of predicted properties 224 for portions 226 of unconsolidated composite material 204 that are manufactured by composite material manufacturing system 208 .

[0089] Plurality 226 of unconsolidated composite material 204 may be a portion or all of portions 226 of unconsolidated composite material 204. In the illustrated example, unconsolidated composite material 204 that is manufactured by composite material manufacturing system 208 forms finished product 255 that can be used to manufacture composite part 205. Plurality 226 may be segments of unconsolidated composite material 204. For example, plurality 226 may be prepreg sheets or segments that form a prepreg roll. The segments may have the same or different lengths.

[0090] In this example, composite material manager 212 may predict set of properties 228 that portion 226 of uncured composite material 204 will have when manufacturing of uncured composite material 204 is complete. In other words, the prediction is made while portion 226 of uncured composite material 204 is still being manufactured. Different ones of portion 226 may be at different states or stages of manufacturing in composite material manufacturing system 208.

[0091] The set of characteristics 228 can take a variety of different forms. For example, the set of properties 228 includes at least one of the following: prepreg fiber areal weight; prepreg resin content; prepreg thickness; prepreg penetration level; prepreg tack level; resin film areal weight; resin film thickness; release liner areal weight; release liner thickness; or laminate structure properties.

[0092] Composite material manager 212 identifies quality level 230 for portions 226 of unconsolidated composite material 204 based on set of predicted properties 224 for portions 226 of unconsolidated composite material 204. This identification of quality level 230 is predicted quality level 232. In other words, quality level 230 is determined using predicted properties 224. Actual testing of portions 226 may be performed to determine actual properties for determining the actual quality level.

[0093] In this illustrative example, determination of set of predicted properties 224 may be made by composite material manager 212 using set of models 233. Set of models 233 may include at least one of: set of machine learning models 234; set of physical models 235; set of hybrid models 237; or other suitable types of models. In this illustrative example, any combination of models 233 may be used to predict property 228.

[0094] When a set of machine learning models 234 is used, the set of machine learning models 234 can be trained to predict the properties 228 of a particular type of unconsolidated composite material 204 using sensor data 218. A machine learning model is an artificial intelligence model and is a data-driven model that can learn without being explicitly programmed. The machine learning model can learn based on training data input into the machine learning model. The machine learning model can learn using various types of machine learning algorithms. The machine learning algorithm includes at least one of the following: supervised learning; unsupervised learning; feature learning; sparse dictionary learning; anomaly detection; reinforcement learning; recommendation learning; or other types of learning algorithms.

[0095] Examples of machine learning models include artificial neural networks, decision trees, support vector machines, random forest machine learning models, regression machine learning models, classification machine learning models, Bayesian networks, and other types of models. These machine learning models can be trained using data and process additional data to provide the desired output.

[0096] For example, the machine learning model 236 can be trained using the training data set 240 to determine the predicted properties 224 of the unconsolidated composite material 204 (e.g., prepreg). The training data set 240 can be created using historical sensor data 242 received from the composite material manufacturing system 208, which is used to manufacture the unconsolidated composite material 204 in the form of prepreg. The training data set 240 can include labels in the form of historical properties 244. The historical properties 244 can be determined from measurements of the unconsolidated composite material 204 at different locations in the composite material manufacturing system 208. In other words, the historical properties 244 can include the properties 228 of the unconsolidated composite material 204 when the manufacturing of the unconsolidated composite material 204 has been completed.

[0097] In addition, the training data set 240 may also include historical upstream information 245. The historical upstream information 245 may be associated with the historical sensor data 242 generated when manufacturing the unconsolidated composite material, wherein the manufacturing process includes the historical upstream information. The historical upstream information 245 may include information about components or settings used in manufacturing the unconsolidated composite material. For example, the historical upstream information 245 may be selected from at least one of the following: reinforcement information; fiber information; reinforcement sizing information; resin information; release liner information; resin film information; or other suitable information that can be measured to generate the historical sensor data 242.

[0098] The property of interest 228 may take a number of different forms depending on the type of uncured composite material 204. For example, when the uncured composite material 204 is a prepreg, the property 228 may include at least one of the following: thickness; fiber area weight (FAW); resin weight content (RC); prepreg area weight (PAW); water absorption; tack; shrinkage; or other relevant properties of the uncured composite material 204 in prepreg form.

[0099] In the case where machine learning model 236 is used to determine predicted properties 224, composite material manager 212 may predict these properties before completing the fabrication of unconsolidated composite material 204. In other words, predicted properties 224 of unconsolidated composite material 204 in a finished or fabricated state may be performed at different times and locations during the fabrication of unconsolidated composite material 204.

[0100] In another example, a set of physical models 235 can be used to determine predicted properties 224 of unconsolidated composite material 204. In this example, physical model 239 in set of physical models 235 is a mathematical model that includes equations that can describe the effects of actions performed on the material to manufacture the unconsolidated composite material based at least on the mathematical equations. These actions can be, for example, in response to parameters in sensor data 218, such as heat, tension, pressure, force, or other parameters.

[0101] The set of physical models 235 can take a variety of different forms. For example, the set of physical models can be selected from at least one of: a thermal and mechanical model of machine dynamics; a resin penetration model; a Darcy penetration model including viscosity; a resin flow model; a curing kinetics model; a finite element analysis (FEA) model of penetration; a finite element analysis (FEA) model of layup; and other suitable types of physics-based models.

[0102] The set of hybrid models 237 is a hybrid physics-based and data-driven model that uses both physical and machine learning components. In this example, the hybrid model 237 combines physics (real-time software) or measurement data with learned / predicted data into a single model so that the distribution / noise of the sensor is embedded in the prediction along with other items being evaluated.

[0103] Statistical model 243 may also be present in model 233. Statistical model 243 may be selected from at least one of the following: a Kalman filter; an extended Kalman filter; an unscented Kalman filter; or other suitable statistical models. For example, a Kalman filter may be used together with noise data to estimate the property of the system being measured to increase the accuracy of the estimate of the property being measured.

[0104] When determining predicted properties 224 for portions 226 of unconsolidated composite material 204, composite material manager 212 may determine quality levels 230 for portions 226 of unconsolidated composite material 204 using set of predicted properties 224 determined for portions 226 of unconsolidated composite material 204. In this illustrative example, different portions in portions 226 may have different quality levels than other portions.

[0105] Having identified quality level 230, composite material manager 212 may perform number of actions 241. Depending on the quality level 230 identified for each part in number of parts 226, a different one of actions 241 may be performed for the part.

[0106] Furthermore, other information may be used in addition to sensor data 218 to determine predicted properties 224 for portions 226 of unconsolidated composite material 204. For example, composite material manager 212 may use upstream information 246 with sensor data 218 to determine predicted properties 224 for portions 226. Upstream information 246 may be selected from at least one of the following: reinforcement information; fiber information; reinforcement sizing information; resin information; release liner information; resin film information; or other suitable information that may be used with sensor data 218 to determine predicted properties 224 for portions 226 of unconsolidated composite material 204.

[0107] Model 233 may operate as digital twin 203 and may be used by composite material manager 212 to determine predicted properties 224 of plurality of portions 226 of unconsolidated composite material 204. As a result, placement of sensors 222 in sensor system 220 in locations 209 of composite material manufacturing system 208 may provide sensor data 218 used by model 233 for digital twin 203 to predict plurality of properties 228 of plurality of portions 226 of unconsolidated composite material 204. Use of model 233 as digital twin 203 enables real-time inspection and certification of plurality of portions 226 of unconsolidated composite material 204 that can identify properties 228 of plurality of portions 226 of unconsolidated composite material 204 without having to sample plurality of portions 226 of unconsolidated composite material 204. If actual testing is required, identification of portions 226 of unconsolidated composite material 204 may be tested to verify the predictions, if desired.

[0108] Additionally, any combination of different types of models 233 may be used to provide increased accuracy of predicted properties 224. For example, a first set of initial predicted properties 251 may be determined for a portion of unconsolidated composite material 204 from machine learning model 236 generated using sensor data 218. A second set of initial predicted properties 251 may be determined for the same portion of unconsolidated composite material 204 from physical model 239 generated using sensor data 218. A set of predicted properties 224 for the portion of unconsolidated composite material 204 may be determined from a fusion of the first set of initial predicted properties and the second set of initial predicted properties.

[0109] Having determined the set of predicted properties, composite material manager 212 can use set of predicted properties 224 to determine quality level 230 for portions 226 of unconsolidated composite material 204. Quality level 230 is predicted quality level 232, i.e., a quality level that portions 226 of unconsolidated composite material 204 are predicted or expected to have when manufacturing of portions 226 is complete and portions 226 of unconsolidated composite material 204 are formed into finished product 227.

[0110] Composite material manager 212 may perform number of actions 241 based on quality level 230 predicted for number of portions 226 of unconsolidated composite material 204. In this example, quality level 230 is determined using number of predicted properties 224 for number of portions 226 of unconsolidated composite material 204. For example, number of actions 241 may include corrective action 291. Composite material manager 212 may perform corrective action 291 based on quality level 230 for number of portions 226 of unconsolidated composite material 204.

[0111] In this illustrated example, corrective action 291 may be performed before completing manufacturing of portions 226 of uncured composite material 204 to form finished product 227. In this illustrative example, manufacturing of portions 226 of uncured composite material 204 may be completed before or after other portions in portions 226 of uncured composite material 204. In other words, portions 226 of uncured composite material 204 may be finished product 227 while other portions are not yet finished product 227 and are still being processed within composite material manufacturing system 208.

[0112] As a result, when corrective action 291 is performed, an increased number of portions 226 of unconsolidated composite material 204 may be used to fabricate composite part 205. For example, by performing corrective action 291 before completing fabrication of portions 226 of unconsolidated composite material 204, at least one of discarding, reprocessing, or recycling portions 226 may be avoided.

[0113] Next reference Figure 3 , an illustration of a block diagram of actions that can be taken using predicted properties of a portion of an unconsolidated composite material according to an illustrative embodiment. In illustrative examples, the same reference numeral may be used in more than one figure. Repeated use of reference numerals in different figures represents the same element in the different figures.

[0114] As shown, act 241 can take a number of different forms. For example, act 241 can be performed on number of portions 226 of uncured composite material 204 as fabrication of number of portions 226 is completed.

[0115] Act 241 can include labeling act 300. As shown, labeling act 300 can include labeling portion 302 of uncured composite material 204 in plurality of portions 226 as unusable 304, usable 306, quality level 308, and composite part type 310.

[0116] In this example, unusable 304 is an action by composite material manager 212 marking portion 302 of unconsolidated composite material 204 as unusable based on quality level 230 of portion 302 of unconsolidated composite material 204 in portions 226 of unconsolidated composite material 204 exceeding tolerance 312. In this example, tolerance 312 may be a range or threshold value that is considered acceptable or tolerable for one or more properties 228 of portion 302. The one or more properties of interest within tolerance 312 may be used to determine whether quality level 308 of portion 302 is acceptable.

[0117] As shown, available 306 is an action in which composite material manager 212 marks portion 302 of uncured composite material 204 in portions 226 of uncured composite material 204 as available based on quality level 230 of portion 302 of uncured composite material 204 within tolerance 312. Quality level 308 is an action in which composite material manager 212 marks portion 302 of uncured composite material 204 in portions 226 of uncured composite material 204 as a quality level identified for portion 302.

[0118] As another example, the composite part type is an action in which composite material manager 212 labels portion 302 of unconsolidated composite material 204 in portions 226 of unconsolidated composite material 204 with an identification of a type of composite part that portion 302 can be used to manufacture. For example, the quality level may make portion 302 unsuitable for use in an intended type of composite part. However, the quality level may make portion 302 usable for use in manufacturing another type of composite part. As a result, portion 302 may still be used instead of being discarded or recycled.

[0119] The identification of these actions can be marked on portion 302 using a marker 314. Marker 314 can be an identifier, such as a radio frequency (RFID) identifier, a microdot, a set of quantum dots, an ink mark, a barcode, a quick response (QR) code, or some other suitable type of marker. Marker 314 can identify the action. Marking act 300 can also include: using marker 314 to record information 316 about portion 302. For example, the information can include the length of portion 302, the position of portion 302 in unconsolidated composite material 204, the quality level, predicted properties 224, a shelf life, or other information about portion 302. Information 316 can be determined from the predicted properties 224 of portion 302. Marker 314 and marking act 300 also include: recording the position on the roll or recording information 316 about portion 302 in a location such as Fig.262606, so as to later associate the quality of the portion 302 with the location on the roll. An example of such use is to print out location information specifying the quality on the roll at a particular location on the roll. In other words, in addition to or in lieu of actually marking the portion 302 itself, marking can include at least one of: indicating or recording information about the quality in a record or log. As a result, the result of marking can also be a printout or thumbnail that appears with each roll as "marked".

[0120] In this illustrative example, actions 241 may also include corrective actions 301. Corrective actions 301 are actions 241 that may be performed for number of parts 226 including part 302. In this illustrative example, corrective action 291 in set of corrective actions 301 may be performed by composite material manager 212 in response to set of predicted properties 224 for number of parts 226 exceeding tolerance 312 specified for unconsolidated composite material 204.

[0121] These corrective actions may be performed to attempt to change set of predicted properties 224 for number of portions 226 so that set of predicted properties 224 are within tolerances 312 for number of portions 226 when manufacturing of number of portions 226 of uncured composite material 204 is completed to form finished product 227 .

[0122] As shown, corrective action 301 may take a variety of different forms. For example, corrective action 301 may include at least one of the following: adjustment action 303; change action 305; or some other suitable corrective action.

[0123] For example, when corrective action 291 in corrective action 301 takes the form of adjustment action 303, composite material manager 212 may adjust a set of parameters 307 in composite material manufacturing system 208 in response to set of predicted properties 224 for plurality of portions 226 exceeding tolerance 312 specified for unconsolidated composite material 204, thereby changing the set of predicted properties for plurality of portions of unconsolidated composite material.

[0124] In the example shown, a set of parameters for composite material manufacturing system 208 can take a variety of different forms. For example, set of parameters 307 can be selected from at least one of: speed; torque; voltage; current; gap; nip gap; force; tension; thickness at a location; pressure; or other suitable parameters that can be set in composite material manufacturing system 208.

[0125] For example, corrective action 291 may adjust set of parameters 307 in composite material manufacturing system 208 . Adjustment of set of parameters 307 may cause set of predicted properties 224 for portions 226 of uncured composite material 204 to be within tolerances 312 for uncured composite material 204 .

[0126] In yet another example, the adjustment may not cause the set of predicted properties 224 to fall within the tolerance 312 for the portions 226 of the unconsolidated composite material 204 to meet the tolerance 312 for a particular use of the unconsolidated composite material 204. In the illustrated example, the set of predicted properties 224 for the portions 226 of the unconsolidated composite material 204 is outside of the first tolerance 309 for the first use 311 of the unconsolidated composite material 204.

[0127] In this case, performing corrective action 291 based on quality level 230 of multiple portions 226 of unconsolidated composite material 204 includes adjusting a set of parameters 307 in composite material manufacturing system 208 so that the set of predicted properties 224 of multiple portions 226 of unconsolidated composite material 204 is within a second tolerance 313 for a second use 315 of unconsolidated composite material 204.

[0128] For example, the first use 311 may use the uncured composite material 204 in a skin panel. The second use 315 may use the uncured composite material 204 in a building within an aircraft.

[0129] This type of corrective action 291 may also be performed to produce some portions of the uncured composite material 204 for the second use 315 instead of for the first use 311. In other words, the action may be performed even when the set of predicted properties 224 is within the tolerances 312. As a result, some of the uncured composite material 204 produced for the first use 311 may be diverted to the second use 315 when the need to use the uncured composite material 204 for the second use 315 arises.

[0130] In another illustrative example, corrective action 291 may include, in response to set of predicted properties 224 for number of portions 226 of unconsolidated composite material 204 exceeding tolerance 312 specified for unconsolidated composite material 204, adjusting set of parameters 307 in composite material manufacturing system 208 such that set of predicted properties 224 for subsequent portion 317 of unconsolidated composite material 204 is within second tolerance 313 of unconsolidated composite material 204. This type of corrective action may be performed when changing parameters 307 does not result in number of portions 226 of unconsolidated composite material 204 having set of predicted properties 224 that fall within tolerance 312. However, this corrective action may be used to cause the subsequent portion of unconsolidated composite material 204 to have set of predicted properties 224 that fall within tolerance 312. As a result, a marking action is still performed on number of portions 226 in this example.

[0131] In another illustrative example, corrective action 291 may be a changing action in changing action 305. For example, corrective action 291 may be changing number of raw materials 319 used to form unconsolidated composite material 204. In response to set of predicted properties 224 for number of parts 226 being outside of tolerance 312 specified for unconsolidated composite material 204, number of raw materials 319 is changed such that set of predicted properties 224 for subsequent parts may be within tolerance 312 for unconsolidated composite material 204.

[0132] In this illustrative example, raw materials in raw materials 319 may be any material used by composite material manufacturing system 208 to manufacture unconsolidated composite material 204. For example, raw materials 319 may be selected from at least one of: resin; paper; film; fabric; tow; unrolled tow fabric; fiber type; tow size; fiber size; or other material used to manufacture unconsolidated composite material 204.

[0133] In some illustrative examples, multiple corrective actions may be taken. For example, both an adjustment action and a change action may be performed.

[0134] In one illustrative example, there are one or more solutions that overcome the problem of not being able to determine the properties of an unconsolidated composite material as quickly as desired. One or more illustrative examples enable prediction of the properties of different parts of the unconsolidated composite material before the fabrication of the parts has been completed. With this type of prediction, actions such as marking different parts or performing other actions can be performed more quickly than testing the sample after the fabrication of the unconsolidated composite material is completed.

[0135] The computer system 210 can be configured to perform at least one of the steps, operations, or actions described in the different illustrative examples using software, hardware, firmware, or a combination thereof. As a result, the computer system 210 operates as a special-purpose computer system, wherein the composite material manager 212 in the computer system 210 enables the properties of the unconsolidated composite material to be predicted during the manufacture of the unconsolidated composite material before the manufacture of the unconsolidated composite material is completed. The use of real-time data about the unconsolidated composite material during the manufacture of the unconsolidated composite material enables the predicted properties of the unconsolidated composite material to be determined during the manufacture of the unconsolidated composite material. In addition, the use of a machine learning model enables the predicted properties of the unconsolidated composite material to be determined before the manufacture of the unconsolidated composite material is completed. In other words, the determination of the predicted properties does not require sampling and testing the unconsolidated composite material after the manufacture of the unconsolidated composite material is completed. In addition, such a determination cannot be performed quickly enough by an operator to obtain a prediction of the properties of the unconsolidated composite material before the manufacture of the unconsolidated composite material is completed.

[0136] Specifically, composite material manager 212 transforms computer system 210 into a special purpose computer system, as compared to currently available general purpose computer systems that do not have composite material manager 212 .

[0137] In the illustrative example, the use of composite material manager 212 in computer system 210 integrates a process into a practical application for manufacturing uncured composite materials, which improves the performance of computer system 210 in predicting properties 228 of portion 226 of uncured composite material 204. In other words, composite material manager 212 in computer system 210 is directed to a practical application of a process integrated into composite material manager 212 in computer system 210 that generates predictions of properties 228 of uncured composite material 204 in real time so that actions 241 can be taken more quickly with respect to uncured composite material 204. The process (which uses composite material manager 212 to generate predicted properties 224 from sensor data 218 received in real time using model 233) can be performed in real time to obtain predicted properties 224 before manufacturing of uncured composite material 204 is completed, which is not possible for an operator to manually analyze sensor data 218.

[0138] In this illustrative example, composite material manager 212 in computer system 210 enables prediction of properties of uncured composite materials, such as prepregs or resin coated films, before fabrication of the uncured composite materials is completed. As a result, actions may be performed on the parts as fabrication of the parts is being completed.

[0139] For example, different portions of the unconsolidated composite material may be marked as the different portions are completed to indicate the suitability or quality of those portions of the unconsolidated composite material. Using sensor data 218 obtained from different locations in locations 209 of composite material manufacturing system 208, composite material manager 212 provides a practical application for managing the unconsolidated composite material as it is manufactured. Predicted properties 224 may be used to mark portions 226 of unconsolidated composite material 204. Marking may be performed based on predicted quality level 232 using predicted properties 224.

[0140] This type of management is in contrast to current techniques, which may sample the prepreg material in a roll to determine the quality of the entire roll. Composite material manager 212 provides an improvement in that determinations may be made for different portions of a prepreg roll, and may be performed while the prepreg roll is being manufactured. As a result, using composite material manager 212 to predict the quality level of portions of unconsolidated composite material achieves a reduction in the amount of time required to manufacture the unconsolidated composite material.

[0141] Next reference Figure 4 , a diagram of a manufacturing process flow for manufacturing an unconsolidated composite material according to an illustrative embodiment is shown. In this example, the manufacturing process flow 400 begins with inputting unconsolidated composite material production process inputs 402 into an unconsolidated composite material production entity plant 404 and data preprocessing 406. These inputs in the unconsolidated composite material production process inputs 402 include materials and settings 408. In this example, the materials and settings 408 are information identifying the materials to be used in manufacturing the unconsolidated composite material 204. When the unconsolidated composite material 204 is a prepreg, the material can be, for example, fiber type, fiber size, resin film specification, reinforcement information, fiber information, reinforcement sizing information, resin information, release liner information, resin film information, or other suitable information about the material used to manufacture the prepreg.

[0142] Settings can be information such as temperature, pressure, tension, and other information that can be used to set up or configure a composite material manufacturing system in unconsolidated composite material production entity factory 404 to manufacture prepreg. Materials and settings 408 can be part of upstream information 246.

[0143] With materials and settings 408 as input, the unconsolidated composite material production entity factory 404 can perform manufacturing operations to produce unconsolidated composite material production process output 410 in the form of unconsolidated composite material 204. These operations can be performed using equipment (such as a composite material manufacturing system in a factory). In this example, as the manufacturing of the portion of the unconsolidated composite material 204 is completed, the portion of the unconsolidated composite material 204 can be output as the unconsolidated composite material production process output 410.

[0144] Data preprocessing 406 can be a component located in computer system 210 that processes unconsolidated composite material production process input 402 for use by plurality of models 233 to determine predicted properties 224. For example, data preprocessing 406 can process materials and settings 408 to form upstream information 246 that is input into plurality of models 233.

[0145] Sensors 222 monitor the manufacture of unconsolidated composite material 204 in real time as unconsolidated composite material 204 is being manufactured and send sensor data to composite material manager 212 in real time as unconsolidated composite material 204 is being manufactured. Composite material manager 212 acquires sensor data from sensors 222 and sends the sensor data to plurality of models 233.

[0146] In this example, the sensor data may be sent to a single model in models 233 or multiple models in models 233. When multiple models 233 is a single model, the model may be a machine learning model. When multiple models 233 is multiple models, the models may be, for example, two machine learning models (a machine learning model and a physical model) or some combination of models. When more than one model in models 233 is used, the outputs of the models may be compared to identify the best prediction for predicted property 224, or the outputs of the models may be combined or fused to form predicted property 224.

[0147] Model 233 generates predicted properties 224. The prediction is performed in real time before the fabrication of unconsolidated composite material 204 is completed. For example, predicted properties 224 may be predicted properties of a portion of unfinished fabrication of unconsolidated composite material 204. In other words, predicted properties 224 of the portion of unconsolidated composite material 204 may be determined before the portion is output as a finished product. The finished product may be used to fabricate composite part 205.

[0148] In this example, predicted properties 224 may be used to perform the action in action 241 in the form of real-time quality record 412. This record may be used to track portions of unconsolidated composite material 204 to perform additional manufacturing operations used to manufacture other unconsolidated composite materials or composite parts.

[0149] Figures 2 to 4 The illustration of composite material manufacturing environment 200 in the illustrative embodiment is not meant to imply physical or architectural limitations on the manner in which the illustrative embodiments may be implemented. Other components may be used in addition to or in place of the components shown. Some components may be unnecessary. In addition, these blocks are provided to illustrate some functional components. When implemented in the illustrative embodiments, one or more of these blocks may be combined, split, or combined and split into different blocks.

[0150] For example, composite material manager 212 may be used to predict properties of one or more unconsolidated composite materials other than unconsolidated composite material 204. These other unconsolidated composite materials may be manufactured using other composite material manufacturing systems in addition to composite material manufacturing system 208. Furthermore, the additional unconsolidated composite materials manufactured using the composite material manufacturing system may be different types of unconsolidated composite materials manufactured using different types of composite material manufacturing systems.

[0151] Figure 5 and Figure 6 It can be used to implement Figure 2 Examples of composite material manufacturing systems are shown in FIG. 208 of the composite material manufacturing system 208. Sensor systems may be added to these composite material manufacturing systems, or existing sensor systems may be augmented to include one or more sensors in a configuration that may generate sensor data needed to predict properties of unconsolidated composite materials as they are being manufactured by these composite material manufacturing systems.

[0152] Reference now Figure 5 , shows a diagram of a composite material manufacturing system configured to perform a film forming process according to an illustrative embodiment. Figure 2 A composite material manufacturing system 500 is shown in block form.

[0153] As shown, the composite material manufacturing system 500 is configured to perform a film forming process in which a resin is applied to a coating paper.

[0154] In this example, an uncoated paper roll 501 feeds paper 503 into a nip 502. The nip includes a pair of rollers with a gap between them. As shown, the nip 502 includes a roller 504 and a roller 506 with a gap 508 between the rollers 504 and 506. The gap can be fixed or variable to provide a constant pressure.

[0155] The resin 505 is heated and located in the resin dam 510 disposed on the rollers 504 and 506. The resin dam 510 supplies the resin 505 into the gap 508 while the paper 503 is pulled by the paper rewinder 512 through the gap 508 and onto the coating paper roll 511. When the resin 505 from the resin dam 510 coats the paper 503 at the gap 508, the paper 503 becomes the coating paper 514. The coating paper 514 is collected on the coating paper roll 511.

[0156] In this illustrative example, sensor data generated by a sensor system for composite material manufacturing system 500 can be used to predict properties of coated paper 514. For example, the sensor system can measure the tension on paper 503, the speed at which paper 503 moves, the gap width of gap 508, the resin viscosity of resin 505 in resin dam 510, the basis weight / area weight, and other parameters. The gap width of gap 508 and the resin viscosity of the resin in resin dam 510 can affect how much resin is applied to paper 503 to form coated paper 514. Resin viscosity is the thickness of the liquid resin, typically measured in centipoise (cP).

[0157] The resin viscosity of the resin 505 in the resin dam 510 can be measured using a sensor 520 in the resin dam 510. The sensor 520 can be a viscometer. The measurement of the resin viscosity and the gap width of the gap 508 can be used to predict the thickness of the resin 505 on the film-forming paper 514. As another example, the resin viscosity can be determined using a dielectric measurement. For example, the sensor 520 can apply an oscillating voltage to the resin 505 in the resin dam 510 and measure the current. This type of measurement can also be performed by a sensor 522 located just after the gap 508, wherein the sensor 522 applies an oscillating voltage and measures the current. This measurement can be used to predict the amount of resin present on the film-forming paper 514 collected on the film-forming paper roll 511.

[0158] When creating a training data set, the sensor data can be marked with actual measurements of the resin on the coated paper 514. For example, the paper from each roll can be pre-measured at the beginning, i.e., at the uncoated paper roll 501, and at the end, i.e., at the coated paper roll 511. The weight of the two rolls can be subtracted to obtain the weight difference, thereby determining the amount of resin. This measurement provides overall resin on all coated papers 514 rather than on multiple parts of the coated paper 514. Multiple parts can be sampled, wherein, for different parts, a fixed area of ​​paper is cut out and weighed. The weight of the paper is known, and the weight of the sample can be measured by subtracting this weight to determine the weight of the resin. The difference between the paper and the resin can be identified, thereby obtaining the amount of resin on the sample.

[0159] Go to Figure 6 , shows a diagram of a composite material manufacturing system configured to perform a prepreg production process according to an illustrative embodiment. In this example, the composite material manufacturing system 600 is Figure 2 Another example of an implementation of a composite material manufacturing system 208 is shown in block form in FIG. The composite material manufacturing system 600 is configured to manufacture an unconsolidated composite material in the form of a prepreg. The prepreg may be manufactured using a hot melt prepreg process or a solvent-based prepreg process.

[0160] As shown, the composite material manufacturing system 600 has two coating rolls: a first coating roll 602 and a second coating roll 604. The coating papers on these rolls are papers with resin. For example, the first coating roll 602 is the source of coating paper 603, and the second coating roll 604 is the source of coating paper 605. Figure 5 The composite material manufacturing system 500 is used to manufacture these film coating rolls.

[0161] In this example, composite material manufacturing system 600 has four nips. First nip 606 has roller 608 and roller 610 with a first nip gap 612 therebetween. Second nip 614 has roller 616 and roller 618 with a second nip gap 620 therebetween. Third nip 622 has roller 624 and roller 626 with a third nip gap 628 therebetween. Fourth nip 630 has roller 632 and roller 634 with a fourth nip gap 636 therebetween. In this illustrative example, these nips operate as pinch points where pressure can be applied to the material traveling through the nips.

[0162] As shown, hot plate 640 and hot plate 642 are present in composite material manufacturing system 600. The system also has cold plate 644.

[0163] In this illustrative example, first nip 606, second nip 614, third nip 622, fourth nip 630, heat plate 640, and heat plate 642 are maintained at set temperatures. The temperature of each of these components can be set separately from the other components. In other words, the temperature of first nip 606 can be set to a different temperature than second nip 614.

[0164] In this illustrative example, fiber creel 637 is the source of fibers 638. These fibers are fed through comb 639 and onto spreading bar 641 before being moved into first nip 606.

[0165] As shown, both laminating paper 603 and laminating paper 605 move from first laminating roll 602 and second laminating roll 604 to first nip 606. Brake 645 on first laminating roll 602 maintains tension on laminating paper 603 and brake 646 on second laminating roll 604 maintains tension on laminating paper 605, so that prepreg 648 does not relax.

[0166] The side of the coated paper 603 with resin and the side of the coated paper 605 with resin face the fiber 638. In this example, temperature and pressure are applied through the first nip 606 to allow the resin to penetrate into the fiber 638 from the coated paper 603 and the coated paper 605 at the first nip 606.

[0167] For example, the width of the first nip gap 612 in the first nip 606 is selected to apply pressure to the fibers 638 sandwiched between the resin on the laminating paper 603 and the laminating paper 605. In addition, the rollers 608 and 610 of the first nip 606 have temperatures selected to heat the fibers 638 and the resin on the laminating paper 603 and the laminating paper 605. When the fibers 638, the laminating paper 603, and the laminating paper 605 leave the first nip 606, at least one of the heat or the pressure causes the resin to penetrate the fibers 638 to form the prepreg 648.

[0168] The other nip zones (second nip zone 614, third nip zone 622 and fourth nip zone 630) may have a nip zone gap and a roller temperature that is set to provide a desired amount of pressure and heating when the prepreg 648 travels to the prepreg roll 650 in the composite material manufacturing system 600. The nip zone gap and roller temperature can change the viscosity of the resin, thereby changing the speed of the infiltration process. The hot plate 640 is located between the first nip zone 606 and the second nip zone 614, and the hot plate 642 is located between the second nip zone 614 and the third nip zone 622. When the prepreg 648 moves between the nip zones, the hot plate heats the prepreg 648. The cold plate 644 is located after the third nip zone 622 and before the fourth nip zone 630. The cold plate can reduce the temperature of the prepreg 648. The cold plate 644 can reduce the temperature that increases the viscosity of the resin to reduce or stop the infiltration process of the resin into the fiber.

[0169] The width of the prepreg 648 can be set by a slitter 656 before removing the laminating paper 605. At roller 652, the laminating paper 605 is removed and wound onto a roll 654. The prepreg 648 now consists of fibers 638 impregnated with resin from the laminating paper 603 and wound onto a prepreg roll 650.

[0170] In this illustrative example, sensors may be located at various locations between points in composite material manufacturing system 600. In this illustrative example, these points may be processing points where actions may be performed to manufacture prepreg 648. These processing points may be, for example, first nip 606, second nip 614, third nip 622, or fourth nip 630. Other processing points may be hot plate 640, hot plate 642, or cold plate 644, where heat or cold is applied to prepreg 648 to heat or cool prepreg 648.

[0171] As prepreg 648 is manufactured, these processing points may change the properties of prepreg 648 until prepreg 648 is in its final form at prepreg roll 650. Sensors may be located between these points and may be used to predict the properties of finished prepreg 648 as prepreg 648 is manufactured at prepreg roll 650. In other words, using sensor data from sensors between these processing points, predicted properties of prepreg 648 at prepreg roll 650 may be determined from other locations in composite material manufacturing system 600 prior to prepreg roll 650.

[0172] For example, sensor location 660 is located between first nip 606 and second nip 614. As another example, sensor location 662 is located between second nip 614 and third nip 622, and sensor location 664 is located between third nip 622 and hot plate 640. As yet another example, sensor location 666 is located between second nip 614 and hot plate 642. As yet another example, sensor location 667 is located between third nip 622 and cold plate 644.

[0173] In this example, another sensor location (sensor location 671) can be located between the first laminating roll 602 and the first nip 606. As another example, sensor location 669 is located between the fourth nip 630 and the prepreg roll 650. The sensor location is an example of a sensor location that can be used even if the location is not between two processing points. Sensor data about the laminating paper 603 can be used to predict the properties of the prepreg 648 at the prepreg roll 650.

[0174] In this example, the composite material manufacturing system 600 is a hot melt film prepreg system. This exemplary prepreg system is not meant to limit the type of prepreg system that can be used. Other examples may include those other types of prepreg systems that utilize a bath, slurry, spray, or other mechanism to apply resin to the carrier fibers.

[0175] Next reference Figure 7 , a block diagram of sensor locations in a composite material manufacturing system is shown in accordance with an illustrative embodiment. In this illustrative example, a portion 700 of uncured composite material 702 travels from a first point 704 to a second point 706 in a composite material manufacturing system 708 in the direction of arrow 707 .

[0176] In this illustrative example, when portion 700 of uncured composite material 702 passes through first point 704, set of actions 710 may be performed on portion 700 of uncured composite material 702 at first point 704. Set of actions 710 may be one or more actions performed in manufacturing uncured composite material 702. In this example, set of actions 710 may be selected from at least one of: applying heat; applying pressure; applying tension; applying force; applying cold; changing viscosity; or other suitable actions.

[0177] For example, when the unconsolidated composite material 702 is a prepreg 712 and the first point 704 is a positioning feature such as a nip with rollers, the set of actions 710 may be applying pressure and heat to the portion 700. The set of actions 710 results in a set of properties 714 existing after the first point 704. The set of properties 714 may be changed from the properties existing before the set of actions 710 were performed on the portion 700 at the first point 704.

[0178] The set of properties 714 of portion 700 may differ from properties that existed before the set of actions performed on portion 700 at first point 704. In other words, the set of actions performed at first point 704 may change the set of properties 714 of portion 700 of uncured composite material 702.

[0179] The set of properties 714 present after performing the set of actions 710 on the portion 700 of the unconsolidated composite material 702 can be detected using a set of sensors 716 at sensor locations 718. The set of sensors 716 can generate sensor data 722. The sensor data 722 can include measurements 723 and metadata 725. When metadata 725 is present in the sensor data 722. For example, the metadata 725 can include at least one of: a timestamp; a sensor location; a sensor identifier; or other suitable information about the measurements 723.

[0180] When the uncured composite material 702 is a prepreg 712, the measurements 723 in the sensor data 722 can be used to determine the amount of resin present in an area, such as the portion 700. For example, the measurements 723 in the sensor data 722 can be the area weight. The current amount of resin present can be used to predict the amount of resin that will be present before the manufacturing process of the portion 700 of the uncured composite material 702 is completed.

[0181] The sensor data may be used to predict properties 714 that portion 700 of uncured composite material 702 will have when fabrication of portion 700 of uncured composite material 702 is complete. Set of sensors 716 may be one or more sensors 222 in sensor system 220 for composite material fabrication system 208 .

[0182] In this illustrative example, sensor location 718 is located after first point 704 and before second point 706. Sensor location 718 may be selected as a particular location near first point 704 so that a change in property 714 caused by performing action 710 at first point 704 may be measured by sensor 716 to generate sensor data 722.

[0183] In this example, second point 706 is a location in composite material manufacturing system 708 at which another set of actions 720 may be performed on portion 700 of uncured composite material 702. Set of actions 720 performed at second point 706 may change property 714.

[0184] As a result, the set of sensors 716 at the sensor location 718 between the first point 704 and the second point 706 can measure a property 714 that exists after the action 710 is performed on the portion 700 at the first point 704. The measurements can be made at time intervals 715. For example, a measurement can be made once per second. Knowing the speed at which the unconsolidated composite material 702 is moving, the properties of a particular portion 719 (e.g., portion 700) can be identified. The set of sensors 716 can generate sensor data 722 from those measurements of the set of properties 714 for determining a predicted property of the portion 700 of the unconsolidated composite material 702 that will exist when the fabrication of the portion 700 of the unconsolidated composite material 702 has been completed.

[0185] Reference now Figure 8 , shows an illustration of a side view of a portion of a composite material manufacturing system according to an illustrative embodiment. In this illustrative example, a first point 800 and a second point 802 are Figure 7 804 and the second point 802.

[0186] Unconsolidated composite material in the form of prepreg 807 moves from first point 800 to second point 802 in the direction of arrow 809. The speed of movement is distance / time, such as feet / second. Knowing the speed at which prepreg 807 moves enables the length and position of part 824 to be known as it moves within the composite manufacturing system.

[0187] In this example, sensor 808 and sensor 810 are located at sensor location 812. At sensor location 812, sensor 808 is located at top side 814 of prepreg 807. Sensor 810 is located at bottom side 816 of prepreg 807.

[0188] In this example, there is tension 820 at the first point 800, and there is tension 822 at the second point 802. In addition, as the prepreg 807 travels on the roller 804, the roller 804 applies heat and pressure to the prepreg 807. Sensors 808 and 810 can measure the thickness and reflectivity of a portion 824 of the prepreg 807 at the sensor position 812 in real time to generate sensor data, the thickness and reflectivity resulting from the application of tension, heat, and pressure to the prepreg 807.

[0189] Go to Fig. 9 , shows an illustration of a top view of a portion of a composite material manufacturing system according to an illustrative embodiment. Figure 8 Compared to the example in FIG. 1 , there is a different positioning of the sensors. As shown in the top view, the sensor 900 is located at the first side 902 of the prepreg 807 at the sensor location 812. The sensor 904 is located at the second side 906 of the prepreg 807 opposite the first side 902 at the sensor location 812.

[0190] In this example, there is tension 820 at the first point 800, and there is tension 822 at the second point 802. Additionally, rollers 804 apply heat and pressure to prepreg 807 as it travels over rollers 804.

[0191] As shown, sensors 900 and 904 can measure in real time the width, conductance, and capacitance of portion 824 of prepreg 807 to generate sensor data. The electrically measured sensor data can be used to determine properties of portion 824 of prepreg 807, such as the amount and width of resin absorption.

[0192] Using sensor data from at least one of the sensor locations 812 or other sensor locations, when fabrication of the portion 824 of the prepreg 807 is complete, such as when the portion 824 of the prepreg 807 is wound onto a prepreg roll, a prediction of properties of the portion 824 of the prepreg 807 may be made for the portion 824. For example, the sensor data may be used to predict properties that the portion 824 of the prepreg 807 will have, such as fiber area weight (FAW) and water absorption.

[0193] The illustration of these points, sensor locations, and sensors is provided as an example of one implementation and is not meant to limit the manner in which other illustrative examples may be implemented. For example, in another illustrative example, there may be only a single sensor, or there may be three or more sensors. Additionally, an additional sensor may be at sensor location 812 or at another sensor location between first point 800 and second point 802.

[0194] As yet another example, the first point 800 and the second point 802 may be locations of other components that perform actions on the prepreg 807 in addition to the rollers 804 and 806. For example, a collar, a spreading rod, a comb, a collar, a nip, a rewinder, or other components may be at the first point 800 and the second point 802.

[0195] Go to Fig.10 , an illustration of a flowchart of a process for identifying quality levels of multiple portions of unconsolidated composite material in accordance with an illustrative embodiment. Fig.10 The processes in the embodiment may be implemented in hardware, software, or both. When implemented in software, the processes may take the form of program code executed by one or more processor units in one or more hardware devices in one or more computer systems. For example, the processes may be implemented in Figure 2 The composite material manager 212 is implemented in the computer system 210.

[0196] As shown, the process begins by receiving sensor data from a sensor system for a composite material manufacturing system, wherein the sensor data is received during the composite material manufacturing system manufacturing an unconsolidated composite material (operation 1000). The process uses the sensor data to determine a set of predicted properties of multiple parts of the unconsolidated composite material manufactured by the composite material manufacturing system (operation 1002). The process identifies a quality level of the multiple parts of the unconsolidated composite material based on the set of predicted properties of the multiple parts of the unconsolidated composite material (operation 1004). The process terminates thereafter.

[0197] Fig.11 , shows an illustration of a flow chart of a method for marking an unconsolidated composite material according to an illustrative embodiment. The operations in this figure may be Fig.10 Examples of additional operations used within an operation in a procedure.

[0198] As shown, the process performs a marking action based on the quality levels identified for the plurality of portions of the unconsolidated composite material (operation 1100 ). The process terminates thereafter.

[0199] Next in Fig.12 In FIG. 1 , an illustration of a flow chart of a process for marking out-of-tolerance portions of an uncured composite material as unusable is shown in accordance with an illustrative embodiment. The operations in the diagram are Fig.11 An example of an implementation of operation 1100 in FIG.

[0200] The process marks a number of portions of uncured composite material in the number of portions of uncured composite material as unusable based on a quality level of the number of portions of uncured composite material being outside of tolerance (operation 1200 ). The process terminates thereafter.

[0201] Next reference Fig.13 , shows an illustration of a flow chart of a process for marking a portion of an uncured composite material within tolerance as usable in accordance with an illustrative embodiment. The operations in this figure are Fig.11 An example of an implementation of operation 1100 in FIG.

[0202] The process marks a number of portions of the uncured composite material in the number of portions of the uncured composite material as usable based on the quality level of the portion within the tolerance (operation 1300 ). The process terminates thereafter.

[0203] Go to Fig.14 , shows an illustration of a flow chart of a process for marking quality levels for a plurality of portions of unconsolidated composite material in accordance with an illustrative embodiment. The operations in this figure are Fig.11 An example of an implementation of operation 1100 in FIG.

[0204] The process labels a portion of the uncured composite material in the plurality of portions of the uncured composite material with a quality level (operation 1400). The process terminates thereafter.

[0205] Reference now Fig.15 , shows an illustration of a flow chart of a process for recording quality levels of multiple portions of unconsolidated composite material in accordance with an illustrative embodiment. The operations in this figure are Fig.11 An example of an implementation of operation 1100 in FIG.

[0206] The process records the quality levels of the portions of the unconsolidated composite material (operation 1500). The process terminates thereafter.

[0207] refer to Fig.16 , shows an illustration of a flow chart of a process for determining a predicted property of a portion of an unconsolidated composite material in accordance with an illustrative embodiment. The operations in this figure are Fig.10 An example of an implementation of operation 1002 in .

[0208] As shown, the process begins by determining a first set of initial predicted properties of the portion of the unconsolidated composite material from a machine learning model generated using sensor data (operation 1600). The process determines a second set of initial predicted properties of the portion of the unconsolidated composite material from a physical model generated using the sensor data (operation 1602). The process determines the set of predicted properties of the portion of the unconsolidated composite material from a fusion of the first set of initial predicted properties and the second set of initial predicted properties (operation 1604). The process terminates thereafter.

[0209] Next go to Fig.17, an illustration of a flowchart of a process for training a machine learning model to predict properties of an unconsolidated composite material before manufacturing of the unconsolidated composite material is completed in accordance with an illustrative embodiment. Fig.17 The processes in may be implemented in hardware, software, or both. When implemented in software, the processes may take the form of program code executed by one or more processor units in one or more hardware devices in one or more computer systems. For example, the processes may be implemented in Figure 2 The composite material manager 212 is implemented in the computer system 210.

[0210] The process begins by setting a scope for data collection (operation 1700). In operation 1700, the scope is set so that data is repeatedly collected with sufficient resolution for training and validating the test model.

[0211] The process collects data (operation 1702). In this operation, historical data is collected from the manufacture of the unconsolidated composite material. The data may include sensor data, upstream data, and inspection data. Inspection data is generated by performing sample testing on the manufactured unconsolidated composite material to determine the properties of interest. These properties of interest are used to evaluate the quality of the unconsolidated composite material and whether it is suitable for a specific purpose.

[0212] The process trains a set of machine learning models (operation 1704). In operation 1704, one or more model types can be selected for training. When more than one type of model is selected, an evaluation can be performed to see which machine learning model provides the most accurate prediction.

[0213] In operation 1704, properties and parameters are selected for use in training. These properties are properties of the unconsolidated composite material that are of interest in determining the quality and suitability of the unconsolidated composite material for use. These parameters are selected as parameters that have a correlation or influence on the selected properties. In other words, when the parameters vary, these variations have an influence on the properties of the resulting unconsolidated composite material.

[0214] Operation 1704 may also include hyperparameter optimization, wherein hyperparameters in the model may be set to parameters or variables that are set prior to actually optimizing the parameters or variables selected for training the model. Hyperparameters may include, for example, model selection.

[0215] The process determines an error in the property estimate (operation 1706). In operation 1706, validation data may be used to determine an error that occurred in the predicted property.

[0216] The process then determines whether the selected machine learning model has the desired level of accuracy (operation 1708). The desired level of accuracy can be tested using a portion of the historical data that is divided into test data. If the level of accuracy does not exist, the process uses an experimental design (DOE) to generate a test data set (operation 1710). The process then returns to operation 1702 to collect data using a data generation method generated by the experimental design. Experimental design is a statistical method that guides the execution of experiments to generate training.

[0217] With reference again to operation 1708, if the selected machine learning model has the desired level of accuracy, the process predicts properties of the plurality of portions of the unconsolidated composite material in real time, wherein the properties of the plurality of portions are predicted before fabrication of the plurality of portions of the unconsolidated composite material is completed (operation 1712). The process terminates thereafter.

[0218] Go to Fig.18 , an illustration of a flowchart of a process for performing corrective actions for multiple portions of uncured composite material is shown in accordance with an illustrative embodiment. Fig.18 The processes in may be implemented in hardware, software, or both. When implemented in software, the processes may take the form of program code executed by one or more processor units in one or more hardware devices in one or more computer systems. For example, the processes may be implemented in Figure 2 The composite material manager 212 is implemented in the computer system 210.

[0219] As shown, the process begins by receiving sensor data from a sensor system for a composite material manufacturing system, wherein the sensor data is received during the composite material manufacturing system manufacturing an unconsolidated composite material (operation 1800). The process uses the sensor data to determine a set of predicted properties of multiple parts of the unconsolidated composite material, wherein the set of predicted properties is a predicted property of the multiple parts of the unconsolidated composite material as a finished product (operation 1802). The process performs a corrective action based on the quality level of the multiple parts of the unconsolidated composite material (operation 1804). The process terminates thereafter.

[0220] Go to Fig.19 , shows an illustration of a flow chart of a process for performing corrective actions for out-of-tolerance portions of an uncured composite material in accordance with an illustrative embodiment. The operations in this figure are Fig.18 An example of an implementation of operation 1804 in .

[0221] As shown, the process performs corrective actions in response to the set of predicted properties of the plurality of parts being outside of tolerances specified for the unconsolidated composite material (operation 1900). The process terminates thereafter.

[0222] Next go to Fig. 20 , shows an illustration of a flow chart of a process for adjusting parameters for out-of-tolerance portions of an unconsolidated composite material in accordance with an illustrative embodiment. The operations in this figure are Fig.18 An example of an implementation of operation 1804 in .

[0223] As shown, the process adjusts a set of parameters in a composite material manufacturing system to change the set of predicted properties of the plurality of portions of the unconsolidated composite material in response to the set of predicted properties of the plurality of portions of the unconsolidated composite material exceeding a tolerance specified for the unconsolidated composite material (operation 2000). The process terminates thereafter.

[0224] refer to Fig.21 , shows an illustration of a flow chart of a process for adjusting parameters for a plurality of portions within tolerance of an unconsolidated composite material in accordance with an illustrative embodiment. The operations in this figure are Fig.18 An example of an implementation of operation 1804 in .

[0225] As shown, the process adjusts a set of parameters in the composite material manufacturing system such that the set of predicted properties of the plurality of portions of the uncured composite material are within tolerances of the uncured composite material (operation 2100 ). The process terminates thereafter.

[0226] Next go to Fig. 22 , shows an illustration of a flow chart of a process for adjusting parameters so that multiple portions of unconsolidated composite material are within tolerances in accordance with an illustrative embodiment. The operations in this figure are Fig.18 An example of an implementation of operation 1804 in .

[0227] As shown, the process adjusts a set of parameters in the composite material manufacturing system such that the set of predicted properties of the plurality of portions of the uncured composite material are within second tolerances for a second use of the uncured composite material (operation 2200 ). The process terminates thereafter.

[0228] refer to Fig.23 , shows an illustration of a flow chart of a process for adjusting parameters for a subsequent portion of an unconsolidated composite material in accordance with an illustrative embodiment. The operations in this figure are Fig.18 An example of an implementation of operation 1804 in .

[0229] As shown, in response to the set of predicted properties of the plurality of portions of the unconsolidated composite material exceeding a tolerance specified for the unconsolidated composite material, the process adjusts a set of parameters in a composite material manufacturing system such that the set of predicted properties of subsequent portions of the plurality of portions are within the tolerance of the unconsolidated composite material (operation 2300). The process terminates thereafter.

[0230] Go to Fig.24 , shows an illustration of a flow chart of a process for changing raw materials according to an illustrative embodiment. The operations in this figure are Fig.18 An example of an implementation of operation 1804 in .

[0231] As shown, the process changes a plurality of raw materials used to form the unconsolidated composite material in response to the set of predicted properties of the plurality of portions of the unconsolidated composite material exceeding a tolerance specified for the unconsolidated composite material so that the set of predicted properties of subsequent portions of the plurality of portions are within the tolerance of the unconsolidated composite material (operation 2400). The process terminates thereafter.

[0232] Next go to Fig.25 , shows an illustration of a flow chart of a process for determining predicted properties of an unconsolidated composite material in accordance with an illustrative embodiment. The operations in this figure may be Fig.18 Examples of additional operations used within an operation in a procedure.

[0233] As shown, the process determines the set of predicted properties for portions of the unconsolidated composite material using the sensor data, the machine learning model, and the physical model (operation 2500 ). The process terminates thereafter.

[0234] The flowcharts and block diagrams in the different embodiments shown show the architecture, functions and operations of some possible implementations of the devices and methods in the illustrative embodiments. In this regard, each box in the flowchart or block diagram can represent at least one of the following: a module; a fragment; a function; or a part of an operation or step. For example, one or more boxes can be implemented as a combination of program code, hardware, or program code and hardware. When implemented in hardware, the hardware can, for example, take the form of an integrated circuit that is manufactured or configured to perform one or more operations in the flowchart or block diagram. When implemented as a combination of program code and hardware, the implementation can take the form of firmware. Each box in the flowchart or block diagram can be implemented using a combination of a dedicated hardware system or dedicated hardware and a program code run by dedicated hardware, and the dedicated hardware system performs different operations.

[0235] In some alternative implementations of the illustrative embodiments, one or more functions indicated in the blocks may not occur in the order indicated in the figure. For example, in some cases, two blocks shown in succession may be performed substantially simultaneously, or the blocks may sometimes be performed in reverse order, depending on the functions involved. In addition, other blocks may be added in addition to the blocks shown in the flowchart or block diagram.

[0236] Now go to Fig.26 , which shows a diagram of a block diagram of a data processing system according to an illustrative embodiment. The data processing system 2600 may be used to implement Figure 1The data processing system 2600 may also be used to implement the server computer 104, the server computer 106, or the client device 110. Figure 2 2600. In this illustrative example, data processing system 2600 includes communications framework 2602, which provides communications between processor unit 2604, memory 2606, persistent storage 2608, communications unit 2610, input / output (I / O) unit 2612, and display 2614. In this example, communications framework 2602 takes the form of a bus system.

[0237] Processor unit 2604 is used to execute instructions of software that can be loaded into memory 2606. Processor unit 2604 includes one or more processors. For example, processor unit 2604 can be selected from at least one of the following: a multi-core processor; a central processing unit (CPU); a graphics processing unit (GPU); a physical processing unit (PPU); a digital signal processor (DSP); a network processor; or some other suitable type of processor. In addition, processor unit 2604 can be implemented using one or more heterogeneous processor systems in which a main processor and an auxiliary processor are present on a single chip. As another illustrative example, processor unit 2604 may be a symmetric multi-processor system that includes multiple processors of the same type on a single chip.

[0238] Memory 2606 and permanent storage 2608 are examples of storage devices 2616. A storage device is any hardware capable of storing information, such as, but not limited to, at least one of data, program code in functional form, or other suitable information, on a temporary basis, a permanent basis, or both a temporary basis and a permanent basis. In these illustrative examples, storage devices 2616 may also be referred to as computer-readable storage devices. In these examples, memory 2606 may be, for example, a random access memory or any other suitable volatile or non-volatile storage device. Persistent storage 2608 may take various forms, depending on the specific implementation.

[0239] For example, permanent storage 2608 may include one or more components or devices. For example, permanent storage 2608 may be a hard drive, a solid state drive (SSD), flash memory, a rewritable optical disk, a rewritable magnetic tape, or some combination thereof. The medium used by permanent storage 2608 may also be removable. For example, a removable hard drive may be used for permanent storage 2608.

[0240] In these illustrative examples, communications unit 2610 provides for communications with other data processing systems or devices. In these illustrative examples, communications unit 2610 is a network interface card.

[0241] Input / output unit 2612 allows for input and output of data with other devices that may be connected to data processing system 2600. For example, input / output unit 2612 may provide a connection for user input through at least one of a keyboard, a mouse, or some other suitable input device. Additionally, input / output unit 2612 may send output to a printer. Display 2614 provides a mechanism for displaying information to a user.

[0242] Instructions for at least one of an operating system, applications, or programs may be located in storage devices 2616, which are in communication with processor unit 2604 through communications framework 2602. The processes of the different embodiments may be performed by processor unit 2604 using computer-implemented instructions, which may be located in a memory, such as memory 2606.

[0243] These instructions are program instructions and are also referred to as program code, computer usable program code, or computer readable program code that can be read and executed by a processor in processor unit 2604. The program code in different embodiments may be embodied on different physical or computer readable storage media, such as memory 2606 or persistent storage 2608.

[0244] Program instructions 2618 are located in functional form on computer readable medium 2620 (computer readable medium 2620 is optionally removable) and can be loaded onto or transferred to data processing system 2600 for execution by processor unit 2604. Program instructions 2618 and computer readable medium 2620 form computer program product 2622 in these illustrative examples. In the illustrative examples, computer readable medium 2620 is computer readable storage medium 2624.

[0245] The computer-readable storage medium 2624 is a physical or tangible storage device for storing the program instructions 2618, rather than a medium that propagates or transmits the program instructions 2618. As used herein, the computer-readable storage medium 2624 should not be interpreted as a transient signal per se, such as a radio wave or other freely propagating electromagnetic wave, an electromagnetic wave propagating through a waveguide or other transmission medium (e.g., a light pulse through a fiber optic cable), or an electrical signal transmitted through wires.

[0246] Alternatively, the program instructions 2618 may be transferred to the data processing system 2600 using a computer readable signal medium. A computer readable signal medium is a signal, and may be, for example, a propagated data signal containing the program instructions 2618. For example, a computer readable signal medium may be at least one of an electromagnetic signal, an optical signal, or any other suitable type of signal. These signals may be transmitted over a connection such as a wireless connection, an optical cable, a coaxial cable, an electrical wire, or any other suitable type of connection.

[0247] In addition, as used herein, "computer-readable medium 2620" may be singular or plural. For example, program instructions 2618 may be located in a computer-readable medium 2620 in the form of a single storage device or system. In another example, program instructions 2618 may be located in a computer-readable medium 2620 distributed in multiple data processing systems. In other words, some instructions in program instructions 2618 may be located in one data processing system, while other instructions in program instructions 2618 may be located in multiple data processing systems. For example, a portion of program instructions 2618 may be located in a computer-readable medium 2620 in a server computer, while another portion of program instructions 2618 may be located in a computer-readable medium 2620 located in a group of client computers.

[0248] The different components shown for data processing system 2600 are not meant to provide architectural limitations to the manner in which different embodiments may be implemented. In some illustrative examples, one or more components may be incorporated into or otherwise form part of another component. For example, in some illustrative examples, memory 2606 or portions thereof may be incorporated into processor unit 2604. The different illustrative embodiments may be implemented in a data processing system that includes components in addition to or in place of those shown for data processing system 2600. Fig.26 Other components shown in may be varied from the illustrative examples shown. The different embodiments may be implemented using any hardware device or system capable of running program instructions 2618.

[0249] Illustrative embodiments of the present disclosure may be used in Fig. 27 Aircraft manufacturing and service method 2700 and as shown Fig.28 The aircraft 2800 is shown in the context of FIG. Fig. 27 , shows a diagram of an aircraft manufacturing and service method according to an illustrative embodiment. During pre-production, aircraft manufacturing and service method 2700 may include Fig.28 Specification and design 2702 of aircraft 2800 and procurement of materials 2704.

[0250] During production, Fig.28 Component and subassembly manufacturing 2706 and system integration 2708 of aircraft 2800. Thereafter, Fig.28 The aircraft 2800 in the can be certified and delivered 2710 to enter service 2712. Fig.28 When aircraft 2800 is placed into service 2712 by a customer, it is scheduled for routine maintenance and repair 2714, which may include modification, reconfiguration, refurbishment, and other maintenance or repair.

[0251] Each process of aircraft manufacturing and maintenance method 2700 can be performed or carried out by a system integrator, a third party, an operator, or some combination thereof. In these examples, the operator can be a customer. For the purposes of this specification, a system integrator can include, but is not limited to, any number of aircraft manufacturers and main system subcontractors; a third party can include, but is not limited to, any number of sellers, subcontractors, and suppliers; an operator can be an airline, a leasing company, a military entity, a service organization, etc.

[0252] Reference now Fig.28 , shows a diagram of an aircraft in which an illustrative embodiment may be implemented. In this example, aircraft 2800 is passing Fig. 27 Aircraft manufacturing and service method 2700 is produced in the embodiment of the present invention and may include airframe 2802 having multiple systems 2804 and interior 2806. Examples of systems 2804 include one or more of propulsion system 2808, electrical system 2810, hydraulic system 2812, and environmental system 2814. Any number of other systems may be included. Although an aerospace example is shown, different illustrative embodiments may be applied to other industries, such as the automotive industry.

[0253] Can be Fig. 27 Apparatus and methods embodied herein are employed during at least one of the stages of aircraft manufacturing and service method 2700.

[0254] In an illustrative example, in Fig. 27 The parts or subassemblies produced in parts and subassembly manufacturing 2706 may be manufactured in a manner similar to that of aircraft 2800. Fig. 27 2712. As another example, the components or subassemblies produced when the components or subassemblies are put into service in the 2712 may be produced or manufactured in a similar manner. Fig. 27 One or more apparatus embodiments, method embodiments, or a combination thereof may be utilized during the production phases of component and subassembly manufacturing 2706 and system integration 2708 in the aircraft 2800. One or more apparatus embodiments, method embodiments, or a combination thereof may be utilized during the production phases of component and subassembly manufacturing 2706 and system integration 2708 in the aircraft 2800. Fig. 27 The use of the plurality of different illustrative embodiments may substantially speed up assembly of aircraft 2800, reduce the cost of aircraft 2800, or both. The increased quality in manufacturing the unconsolidated composite material during at least one of component and subassembly manufacturing 2706 or maintenance and repair 2714 may reduce at least one of the amount of time or cost required in manufacturing the unconsolidated composite material. By the ability to determine which portions of the unconsolidated composite material meet a desired quality level, less discarding or reworking of the unconsolidated composite material may occur.

[0255] Now go to Fig.29 , shows an illustration of a block diagram of a product management system according to an illustrative embodiment. Product management system 2900 is a physical hardware system. In this illustrative example, product management system 2900 includes at least one of a manufacturing system 2902 or a maintenance system 2904.

[0256] Manufacturing system 2902 is configured to manufacture products, such as Fig.28 2800 in the aircraft. As shown, manufacturing system 2902 includes manufacturing equipment 2906. Manufacturing equipment 2906 includes at least one of production equipment 2908 or assembly equipment 2910.

[0257] Production equipment 2908 is used to produce Fig.28 Equipment for producing parts of aircraft 2800 in the embodiment of the present invention. For example, production equipment 2908 may include machines and tools. These machines and tools may be at least one of a drill, a hydraulic press, a furnace, an autoclave, a mold, a composite tape laying machine, an automatic fiber placement (AFP) machine, a vacuum system, a robotic pick and place system, a flatbed cutting machine, a laser cutting machine, a computer numerical control (CNC) cutting machine, a lathe, or other suitable types of equipment. Production equipment 2908 may be used to produce at least one of a metal part, a composite part, a semiconductor, a circuit, a fastener, a rib, a skin panel, a wing spar, an antenna, or other suitable types of parts.

[0258] Assembly equipment 2910 is used to assemble parts to form Fig.28 In particular, assembly equipment 2910 is used to assemble parts to form Fig.28 The assembly equipment 2910 may also include machines and tools. These machines and tools may be at least one of a robotic arm, a crawler, a rapid installation system, a track-based drilling system, or a robot. The assembly equipment 2910 may be used to assemble parts such as seats, horizontal stabilizers, wings, engines, engine casings, parts of landing gear systems, and Fig.28 2800 other parts of the aircraft.

[0259] In this illustrative example, maintenance system 2904 includes maintenance equipment 2912. Maintenance equipment 2912 may include Fig.28 Any equipment required to perform maintenance on aircraft 2800. Maintenance equipment 2912 may include equipment for Fig.28 The operations may include at least one of: disassembling a part, refurbishing a part, inspecting a part, reworking a part, manufacturing a replacement part, or performing various operations on a part of an aircraft 2800. Fig.28Other operations for maintenance of the aircraft 2800. These operations may be for routine maintenance, inspections, upgrades, refurbishments, or other types of maintenance operations.

[0260] In the illustrative example, maintenance equipment 2912 may include ultrasonic inspection devices, x-ray imaging systems, visual systems, drills, crawler traction devices, and other suitable devices. In some cases, maintenance equipment 2912 may include production equipment 2908, assembly equipment 2910, or both to produce and assemble parts required for maintenance.

[0261] The product management system 2900 also includes a control system 2914. The control system 2914 is a hardware system and may also include software or other types of components. The control system 2914 is configured to control the operation of at least one of the manufacturing system 2902 or the maintenance system 2904. In particular, the control system 2914 may control the operation of at least one of the production equipment 2908, the assembly equipment 2910, or the maintenance equipment 2912.

[0262] The hardware in control system 2914 may be implemented using hardware including computers, circuits, networks, and other types of equipment. Control may take the form of direct control of manufacturing equipment 2906. For example, robots, computer-controlled machines, and other equipment may be controlled by control system 2914. In other illustrative examples, control system 2914 may manage operations performed by operators 2916 when manufacturing aircraft 2800 or performing maintenance on aircraft 2800. For example, control system 2914 may assign tasks, provide instructions, display models, or perform other operations to manage operations performed by operators 2916. In these illustrative examples, Figure 2 The composite material manager 212 in the control system 2914 can be implemented to manage the composite material manager 212 used for Fig.28 The unconsolidated composite material is used to manufacture at least one of the unconsolidated composite materials used in the manufacture or maintenance of the aircraft 2800. The unconsolidated composite material can be used to manufacture composite parts or in Fig.28 The composite part is reprocessed during at least one of manufacturing or maintenance of the aircraft 2800.

[0263] In different illustrative examples, operator 2916 can operate or interact with at least one of manufacturing equipment 2906, maintenance equipment 2912, or control system 2914. This interaction can occur in manufacturing Fig.28 There are 2800 aircraft in the fleet.

[0264] Of course, the product management system 2900 can be configured to manage Fig.28Although product management system 2900 has been described with respect to manufacturing in the aerospace industry, product management system 2900 can be configured to manage products for other industries. For example, product management system 2900 can be configured to manufacture products for the automotive industry and any other suitable industry.

[0265] Some features of the illustrative examples are described in the following clauses. These clauses are examples of features and are not intended to limit other illustrative examples.

[0266] Article 1

[0267] A composite material management system, the review material management system comprising:

[0268] Computer systems;

[0269] The composite material manager in the computer system, wherein the composite material manager is configured to:

[0270] receiving sensor data from a sensor system for a composite material manufacturing system, wherein the sensor data is received during manufacturing of an unconsolidated composite material by the composite material manufacturing system;

[0271] using the sensor data to determine a set of predicted properties of portions of the uncured composite material manufactured by the composite material manufacturing system; and

[0272] A quality level of the plurality of portions of the uncured composite material is identified based on the set of predicted properties of the plurality of portions of the uncured composite material.

[0273] Article 2

[0274] The composite material management system of clause 1, wherein the composite material manager is configured to:

[0275] A marking action is performed based on the quality levels identified for the plurality of portions of the uncured composite material.

[0276] Article 3

[0277] A composite material management system according to clause 2, wherein, in performing the marking action based on the quality levels identified for the plurality of portions of the uncured composite material, the composite material manager is configured to:

[0278] Portions of the uncured composite material are marked as unusable based on quality levels of the portions being out of tolerance.

[0279] Article 4

[0280] A composite material management system according to either of clauses 2 or 3, wherein, when performing the marking action based on the quality levels identified for the plurality of portions of the unconsolidated composite material, the composite material manager is configured to:

[0281] The plurality of portions of the uncured composite material are marked as usable based on the quality levels of the portions being within tolerances.

[0282] Article 5

[0283] A composite material management system according to any one of clauses 2, 3 or 4, wherein, when performing the marking action based on the quality levels identified for the plurality of portions of the unconsolidated composite material, the composite material manager is configured to:

[0284] Portions of the uncured composite material are marked with the quality level.

[0285] Article 6

[0286] A composite material management system according to any one of clauses 2, 3, 4 or 5, wherein, when performing the marking action based on the quality levels identified for the plurality of portions of the unconsolidated composite material, the composite material manager is configured to:

[0287] At least one of the quality levels of the plurality of portions of the uncured composite material is recorded.

[0288] Article 7

[0289] A composite material management system according to any one of clauses 1, 2, 3, 4, 5 or 6, further comprising:

[0290] Composite manufacturing systems.

[0291] Article 8

[0292] A composite material management system according to one of clauses 3, 4, 5, 6 or 7, wherein the composite material manufacturing system is at least one of a carbon fiber prepreg coating line, a reinforcing fiber resin impregnation production line, a resin mixing processing system, a resin film forming production line, a prepreg system and a cutting processing system.

[0293] Article 9

[0294] A composite material management system according to any one of clauses 1, 2, 3, 4, 5, 6, 7 or 8, wherein a set of sensors in the sensor system are at a sensor position between a first point and a second point in the composite material manufacturing system, and wherein the first point is a point at which a set of actions are performed on a portion of the unconsolidated composite material when the portion passes through the first point.

[0295] Article 10

[0296] A composite material management system according to any one of clauses 1, 2, 3, 4, 5, 6, 7, 8 or 9, further comprising:

[0297] A machine learning model is provided wherein the composite material manager uses the sensor data and the machine learning model to determine the set of predicted properties of a portion of the uncured composite material.

[0298] Article 11

[0299] A composite material management system according to any one of clauses 1, 2, 3, 4, 5, 6, 7, 8, 9 or 10, further comprising:

[0300] Machine learning models; and

[0301] A physical model wherein the composite material manager uses the sensor data, the machine learning model, and the physical model to determine the set of predicted properties of a portion of the unconsolidated composite material.

[0302] Article 12

[0303] A composite material management system as claimed in clause 11, wherein in determining the set of predicted properties of a portion of the unconsolidated composite material, the composite material manager is configured to:

[0304] determining a first set of initial predicted properties of the portion of the unconsolidated composite material from the machine learning model generated using the sensor data;

[0305] determining a second set of initial predicted properties of the portion of the unconsolidated composite material from the physical model generated using the sensor data; and

[0306] The set of predicted properties for the portion of the unconsolidated composite material is determined from a fusion of the first set of initial predicted properties and the second set of initial predicted properties.

[0307] Article 13

[0308] A composite material management system according to any one of clauses 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 or 12, wherein the unconsolidated composite material is selected from at least one of the following: prepreg, aerospace grade prepreg, thermoset prepreg, thermoplastic prepreg, woven fabric prepreg, fiber tow prepreg, tow prepreg, unidirectional tape prepreg, resin coated film, wrinkle-free fabric or resin mixture.

[0309] Article 14

[0310] A composite material management system according to one of clauses 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 or 13, wherein the sensor data includes at least one of: part temperature, unconsolidated composite temperature, ambient temperature, humidity, roller speed, speed of the unconsolidated composite, pressure between a pair of rollers, gap between the pair of rollers, unconsolidated composite thickness, Fourier transform infrared (FTIR) spectrum, spectroscopic data, material width, fiber web width, material area weight, fiber area weight, resin viscosity, electrical measurements of dimensions of the unconsolidated composite, voltages of dimensions of the unconsolidated composite, electromagnetic measurements of dimensions of the unconsolidated composite, acoustic measurements of dimensions of the unconsolidated composite, tension, or an image of a prepreg at a location in a composite material manufacturing system.

[0311] Article 15

[0312] A composite material management system according to one of clauses 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 or 14, wherein the composite material manager is configured to receive upstream information selected from at least one of the following: reinforcement information; fiber information; reinforcement sizing information; resin information; release liner information; or resin film information.

[0313] Article 16

[0314] A composite material management system according to any one of clauses 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14 or 15, wherein the group of properties includes at least one of: prepreg fiber area weight; prepreg resin content; prepreg thickness; prepreg penetration level; prepreg tack level; resin film area weight; resin film thickness; release liner area weight; release liner thickness; or laminate structure properties.

[0315] Article 17

[0316] A composite material management system, the composite material management system comprising:

[0317] a carbon fiber prepreg coating line operating to manufacture a section of prepreg from fibers and a resin coating film;

[0318] A sensor system, wherein: the sensor system is operable to generate sensor data for a carbon fiber prepreg coating line during operation of the carbon fiber prepreg coating line;

[0319] A composite material manager, which is configured to:

[0320] receiving the sensor data from the sensor system for a composite material manufacturing system, wherein the sensor data is received during manufacturing of an unconsolidated composite material by the composite material manufacturing system;

[0321] using the sensor data to determine a set of predicted properties of portions of the prepreg material completed by fabrication by the composite material manufacturing system; and

[0322] A quality level of the plurality of portions of the prepreg is identified based on the set of predicted properties of the plurality of portions of the unconsolidated composite material.

[0323] Article 18

[0324] A composite material management system as claimed in clause 17, wherein, in identifying the quality level of the plurality of portions of prepreg material based on the set of predicted properties of the plurality of portions of unconsolidated composite material, the composite material manager is configured to:

[0325] Based on a quality level of a portion of the prepreg among the plurality of portions of the prepreg being out of tolerance, the portion is marked as unusable.

[0326] Article 19

[0327] A composite material management system according to clause 17 or 18, wherein, in identifying the quality level of the plurality of portions of the unconsolidated composite material based on the set of predicted properties of the plurality of portions of the unconsolidated composite material, the composite material manager is configured to:

[0328] Portions of prepreg are marked as usable based on the quality level of the portion being within tolerance.

[0329] Article 20

[0330] A composite material management system as claimed in clause 17, 18 or 19, wherein, in identifying the quality level of the plurality of portions of the prepreg material based on the set of predicted properties of the plurality of portions of the prepreg material, the composite material manager is configured to:

[0331] A portion of the prepreg in the plurality of portions of prepreg is marked with the quality level.

[0332] Article 21

[0333] A composite material management system according to clause 17, 18, 19 or 20, wherein the fibres are in a form selected from tow, tape and woven fabric, and wherein the resin coated film is a resin coated paper.

[0334] Article 22

[0335] A method for producing an unconsolidated composite material, the method comprising:

[0336] receiving sensor data from a sensor system for a composite material manufacturing system, wherein the sensor data is received during manufacturing of the unconsolidated composite material by the composite material manufacturing system;

[0337] using the sensor data to determine a set of predicted properties of portions of the uncured composite material manufactured by the composite material manufacturing system; and

[0338] A quality level of the plurality of portions of the uncured composite material is identified based on the set of predicted properties of the plurality of portions of the uncured composite material.

[0339] Article 23

[0340] A method according to clause 22, further comprising:

[0341] A marking action is performed based on the quality levels identified for the plurality of portions of the uncured composite material.

[0342] Article 24

[0343] The method of clause 23, wherein performing the act of marking based on the quality levels identified for the plurality of portions of the unconsolidated composite material comprises:

[0344] A portion of the uncured composite material among the plurality of portions of the uncured composite material is marked as unusable based on the quality level of the portion being outside of tolerance.

[0345] Article 25

[0346] A method according to clause 23 or 24, wherein performing the act of marking based on the quality levels identified for the plurality of portions of the unconsolidated composite material comprises:

[0347] A portion of the uncured composite material among the plurality of portions of the uncured composite material is marked as usable based on the quality level of the portion being within a tolerance.

[0348] Article 26

[0349] A method according to clause 23, 24 or 25, wherein performing the act of marking based on the quality levels identified for the plurality of portions of the unconsolidated composite material comprises:

[0350] A portion of the uncured composite material among the plurality of portions of the uncured composite material is marked with the quality level.

[0351] Article 27

[0352] A method according to clause 23, 24, 25 or 26, wherein performing the act of marking based on the quality levels identified for the plurality of portions of the unconsolidated composite material comprises:

[0353] At least one of the quality levels of the plurality of portions of the uncured composite material is recorded.

[0354] Article 28

[0355] A method according to clause 22, 23, 24, 25, 26 or 27, wherein the set of predicted properties of a portion of the unconsolidated composite material is determined using the sensor data, the machine learning model and the physical model.

[0356] Article 29

[0357] A method according to clause 22, 23, 24, 25, 26, 27 or 28, wherein determining the set of predicted properties of the plurality of portions of the unconsolidated composite material comprises:

[0358] determining a first set of initial predicted properties of a portion of the unconsolidated composite material from a machine learning model generated using the sensor data;

[0359] determining a second set of initial predicted properties of the portion of the unconsolidated composite material from a physical model generated using the sensor data; and

[0360] The set of predicted properties for the portion of the unconsolidated composite material is determined from a fusion of the first set of initial predicted properties and the second set of initial predicted properties.

[0361] Article 30

[0362] A method according to clause 22, 23, 24, 25, 26, 27, 28 or 29, wherein the set of predicted properties of a portion of the unconsolidated composite material is determined using sensor data and a machine learning model.

[0363] Article 31

[0364] A method according to clause 22, 23, 24, 25, 26, 27, 28, 29 or 30, wherein the composite material manufacturing system is a carbon fiber prepreg coating line.

[0365] Article 32

[0366] A method according to clause 22, 23, 24, 25, 26, 27, 28, 29, 30 or 31, wherein the unconsolidated composite material is selected from at least one of the following: a prepreg, a thermoset prepreg, a woven fabric prepreg, a fiber tow prepreg, a unidirectional tape, a prepreg or a resin coated film.

[0367] Article 33

[0368] A method as described in clauses 22, 23, 24, 25, 26, 27, 28, 29, 30, 31 or 32, wherein the sensor data includes at least one of: part temperature, unconsolidated composite temperature, ambient temperature, humidity, roller speed, speed of the unconsolidated composite, gap between a pair of rollers, unconsolidated composite thickness, Fourier transform infrared (FTIR) spectrum, fiber web width, fiber area weight, resin viscosity, voltage in a dimension of the unconsolidated composite, electrical measurement in a dimension of the unconsolidated composite, electromagnetic measurement in a dimension of the unconsolidated composite, acoustic measurement in a dimension of the unconsolidated composite, tension, or an image of a prepreg at a location in a composite manufacturing system.

[0369] Article 34

[0370] A computer program product for manufacturing an unconsolidated composite material, the computer program product comprising a computer readable storage medium having program instructions contained therein, the program instructions being executable by a computer system to cause the computer system to perform the following method:

[0371] receiving sensor data from a sensor system for a composite material manufacturing system, wherein the sensor data is received during manufacturing of the unconsolidated composite material by the composite material manufacturing system;

[0372] using the sensor data to determine a set of predicted properties of portions of the uncured composite material manufactured by the composite material manufacturing system; and

[0373] A quality level of the plurality of portions of the uncured composite material is identified based on the set of predicted properties of the plurality of portions of the uncured composite material.

[0374] Thus, the illustrative examples provide a method, apparatus, system, and computer program product for predicting, while the manufacturing process is ongoing, the properties that an unconsolidated composite material will have when the manufacturing of the unconsolidated composite material is completed. In addition, the illustrative examples can also use these predictions to perform corrective actions to change the properties that the unconsolidated composite material will have when the unconsolidated composite material is manufactured to form a finished product.

[0375] In a different illustrative example, the composite material manager performs operations to determine a set of predicted properties for the plurality of portions of uncured composite material that have been manufactured. In other words, the predictions are for the plurality of portions of uncured composite material when manufacturing of the plurality of portions of uncured composite material is completed to form a finished product.

[0376] As a result, using composite material manager 212 to predict the quality level of multiple portions of unconsolidated composite material can achieve at least one of a reduction in the cost or amount of time required to manufacture the unconsolidated composite material. In addition, the above reduction can be achieved by performing corrective operations during the manufacture of the unconsolidated composite material so that an additional amount of unconsolidated material within tolerance occurs. As a result, additional manufacturing, reprocessing, or discarding of unconsolidated composite material can be reduced.

[0377] In one illustrative example, composite material manufacturing system 208 can be managed by composite material management system 202 with greater efficiency by enabling real-time verification of the material chemistry of the unconsolidated composite material during manufacturing of the unconsolidated composite material. In the case of real-time verification of the material chemistry of the unconsolidated composite material, a number of actions can be taken. For example, an alert generated to a person or user can prevent approval or use of an unconsolidated composite material that does not have a material chemistry specified for the material. As another example, production of the unconsolidated composite material can be stopped.

[0378] In these examples, a Fourier transform sensor, such as a Fourier transform infrared (FTIR) spectrometer, can be used to perform the material verification. The sensor can be used in conjunction with a computer system that employs a scan map classifier program that uses a database or information library for verifying the chemical composition of the material. In some illustrative examples, the scan map classifier can be a machine learning model to verify the material chemical composition of the unconsolidated composite material. Before completing the manufacture of the unconsolidated composite material, the material verification can be performed on the unconsolidated composite material in its complete form or at another location. In other words, material positioning can be performed at different stages of manufacturing the unconsolidated composite material.

[0379] Reference now Fig.30 , a diagram of a block diagram of a material verification system is shown in accordance with an illustrative embodiment. In this example, material chemical composition verification system 3000 may verify material chemical composition 3026 of unconsolidated composite material 3024 manufactured by composite material manufacturing system 3023.

[0380] In this illustrative example, material chemistry 3026 for unconsolidated composite material 3024 consists of the ingredients that make up unconsolidated composite material 3024. The ingredients are the chemicals that make up the different materials in unconsolidated composite material 3024. Material chemistry 3026 may also include a recipe that identifies unconsolidated composite material 3024. The recipe may include the chemical composition and structure of the materials in unconsolidated composite material 3024.

[0381] For example, the material chemistry 3026 of the unconsolidated composite material 3024 can have a formulation in the form of a resin formulation. For example, the resin formulation can be a base resin plus other items. These other items can be, for example, therapeutic chemicals and additives. The additives can be, for example, particles, flame retardants, and other items. These additives can enhance the properties of the unconsolidated composite material 3024.

[0382] Verifying material chemistry 3026 is important because material chemistry 3026 that is outside the specifications of uncured composite material 3024 may not function as intended. For example, if the flame retardant is greater than a specified amount, material chemistry 3026 is incorrect for uncured composite material 3024. Due to the incorrect amount of flame retardant, improvement in flame retardant properties may not occur. However, the manufacturing time of uncured composite material 3024 may be greater than required. As another example, if the hardener is greater than specified, material chemistry 3026 is incorrect for uncured composite material 3024. In this case, the excessive hardener may result in a failure to harden or cure uncured composite material 3024.

[0383] In this illustrative example, unconsolidated composite material 3024 may be selected from at least one of the following: a prepreg, an aerospace grade prepreg, a thermoset prepreg, a thermoplastic prepreg, a woven fabric prepreg, a fiber tow prepreg, a tow prepreg, a unidirectional tape prepreg, a resin coated film, a wrinkle-free fabric, a resin mixture, or other suitable composite material. In other words, unconsolidated composite material 3024 may be one or more of these and other types of composite materials.

[0384] Composite Materials Manufacturing Systems 3023 is Figure 2 The composite material manufacturing system 3023 is an example of a composite material manufacturing system 208 in the embodiment of the present invention, and can take many different forms. For example, the composite material manufacturing system 3023 can be a carbon fiber prepreg coating line, a reinforcing fiber resin impregnation line, a resin mixing processing system, a resin film forming production line, a prepreg system, a cutting processing system, and other types of manufacturing systems for manufacturing unconsolidated composite materials 3024.

[0385] In this illustrative example, the material chemical composition verification system 3000 includes a computer system 3012 and an analyzer 3014. As shown, the analyzer 3014 is located in the computer system 3012 and can be implemented with software, hardware, firmware, or a combination thereof. When software is used, the operations performed by the analyzer 3014 can be implemented in program instructions configured to run on hardware such as a processor unit. When firmware is used, the operations performed by the analyzer 3014 can be implemented in program instructions, and the data is stored in a permanent memory to run on a processor unit. When hardware is used, the hardware may include circuits for performing the operations in the analyzer 3014.

[0386] In an illustrative example, the hardware may take the form of at least one selected from the following: a circuit system, an integrated circuit, an application specific integrated circuit (ASIC), a programmable logic device, or some other suitable type of hardware configured to perform several operations. In the case of a programmable logic device, the device may be configured to perform multiple operations. The device may be reconfigured at a later time, or may be permanently configured to perform multiple operations. Programmable logic devices include, for example, programmable logic arrays, programmable array logic, field programmable logic arrays, field programmable gate arrays, and other suitable hardware devices. In addition, the method may be implemented in an organic component integrated with an inorganic component, and may be composed entirely of organic components other than humans. For example, the process may be implemented as a circuit in an organic semiconductor.

[0387] As used herein, when used with reference to an item, "plurality" refers to one or more items. For example, "plurality of operations" is one or more operations.

[0388] In addition, when used with a list of items, the phrase "at least one of..." means that different combinations of one or more of the listed items can be used, and only one of each item in the list may be required. In other words, "at least one of..." refers to any combination of items and numbers of items that can be used from the list, but not all items in the list are required. The item can be a specific object, thing, or category.

[0389] For example, but not limited to, "at least one of item A, item B, or item C" may include: item A; item A and item B; or item B. This example may also include: item A; item B and item C; or item B and item C. Of course, there may be any combination of these items. In some illustrative examples, "at least one of..." may be, for example, but not limited to: two items A; one item B; ten items C; four items B and seven items C; or other suitable combinations.

[0390] Computer system 3012 is a physical hardware system and includes one or more data processing systems. When there are more than one data processing systems in computer system 3012, these data processing systems communicate with each other using a communication medium. The communication medium may be a network. The data processing system may be selected from at least one of a computer, a server computer, a tablet computer, or some other suitable data processing system.

[0391] As shown, computer system 3012 includes multiple processor units 3016 capable of executing program instructions 3018 that implement the processes in the illustrative example. In other words, program instructions 3018 are computer-readable program instructions.

[0392] As used herein, a processor unit in multiple processor units 3016 is a hardware device and includes hardware circuits (such as hardware circuits on an integrated circuit) that respond to and process instructions and program codes for operating a computer. When multiple processor units 3016 execute program instructions 3018 for a process, multiple processor units 3016 can be one or more processor units located in the same computer or in different computers. In other words, the process can be distributed between processor units 3016 on the same or different computers in computer system 3012.

[0393] In addition, the plurality of processor units 3016 may be processor units of the same type or of different types. For example, the plurality of processor units 3016 may be selected from at least one of the following: a single-core processor, a dual-core processor, a multi-processor core, a general-purpose central processing unit (CPU), a graphics processing unit (GPU), a digital signal processor (DSP), or some other type of processor unit.

[0394] In this illustrative example, analyzer 3014 receives sensor data 3021 in real time from sensor 3081 in sensor system 3031 for composite material manufacturing system 3023 during manufacturing of unconsolidated composite material 3024 by composite material manufacturing system 3023. In this example, sensor data 3021 includes electromagnetic scan 3070 generated by spectroscopy system 3071.

[0395] In this example, analyzer 3014 is configured to control the operation of spectroscopic system 3071 and sensor 3081. Analyzer 3014 may control spectroscopic system 3071 to generate electromagnetic scan 3070 of segment 3027 of unconsolidated composite material 3024 in real time during manufacturing of unconsolidated composite material 3024 by composite material manufacturing system 3023.

[0396] In this example, spectroscopy system 3071 is configured to emit electromagnetic radiation toward unconsolidated composite material 3024 and detect the electromagnetic radiation emitted toward unconsolidated composite material 3024 to form time domain data. Spectroscopy system 3071 may also perform a Fourier transform that converts the time domain data into frequency domain data to form a Fourier transform infrared scan 3073 of absorbed electromagnetic radiation of unconsolidated composite material 3024, the absorbed electromagnetic radiation having electromagnetic spectrum frequencies. Such a Fourier transform infrared scan may also be referred to as an FTIR scan.

[0397] Analyzer 3014 receives electromagnetic scan 3070 of segment 3027 of unconsolidated composite material 3024 in real time during manufacturing of unconsolidated composite material 3024 by composite material manufacturing system 3023. Analyzer 3014 uses electromagnetic scan 3070 and scan classifier 3032 to determine whether material chemical composition 3026 of segment 3027 of unconsolidated composite material 3024 is correct in real time during manufacturing of unconsolidated composite material 3024 by composite material manufacturing system 3023.

[0398] In this example, scan classifier 3032 is software that uses an electromagnetic scan of the unconsolidated composite material to verify material chemistry 3026 of the unconsolidated composite material. For example, material chemistry 3026 of unconsolidated composite material 3024 is analyzed by scan classifier 3032 to determine whether the material chemistry is correct for unconsolidated composite material 3024.

[0399] In one illustrative example, spectroscopy system 3071 may take the form of Fourier transform infrared spectroscopy system 3072. In this example, Fourier transform infrared spectroscopy system 3072 is configured to generate a Fourier transform infrared scan of absorbed infrared energy of the unconsolidated composite material, the absorbed infrared energy having infrared spectral frequencies.

[0400] In this example, electromagnetic scan 3070 takes the form of Fourier transform infrared scan 3073. Analyzer 3014 controls Fourier transform infrared spectroscopy system 3072 to generate Fourier transform infrared scan 3073 of segment 3027 of unconsolidated composite material 3024 in real time during manufacturing of unconsolidated composite material 3024 by composite material manufacturing system 3023. Analyzer 3014 uses Fourier transform infrared scan 3073 and scan classifier 3032 to determine whether material chemical composition 3026 of segment 3027 of unconsolidated composite material 3024 is correct in real time during manufacturing of unconsolidated composite material 3024 by composite material manufacturing system 3023.

[0401] In this illustrative example, material chemistry 3026 for segment 3027 of unconsolidated composite material 3024 is correct when material chemistry 3026 is expected material chemistry 3003. The expected material chemistry may be defined by at least one of a specification, a manufacturing specification, a material data sheet, an industry standard, a government standard, a government regulation, or other sources.

[0402] In this illustrative example, analyzer 3014 may perform number of actions 3040 in response to determining that material chemistry 3026 of segment 3027 of unconsolidated composite material 3024 is incorrect. Number of actions may be at least one of: generating an alarm; tracking the segment of unconsolidated composite material; marking the segment of unconsolidated composite material; recording the presence of unverified material chemistry in the segment of unconsolidated composite material; suspending production of unconsolidated composite material; or other suitable actions. In this example, marking the presence of unverified material chemistry may also include material chemistry 3026 of segment 3027.

[0403] Additionally, in one illustrative example, spectroscopy system 3071 can include spectroscopy devices at different locations 3037 in composite material manufacturing system 3023. In one example, Fourier transform infrared spectroscopy system 3772 can be comprised of Fourier transform infrared spectroscopy devices 3035 at different locations 3037 in composite material manufacturing system 3023. During the manufacturing of unconsolidated composite material 3024 by composite material manufacturing system 3023, Fourier transform infrared spectroscopy devices 3035 generate Fourier transform infrared scans 3074 of segments 3027 of unconsolidated composite material 3024 at different locations 3037 in real time. These scans are sent to analyzer 3014 for analysis.

[0404] The analysis may determine whether material chemistry 3026 of segment 3027 is correct at a particular location. If material chemistry 3026 is correct, material chemistry 3026 of segment 3027 of uncured composite material 3024 is verified at the particular location. In these illustrative examples, material chemistry 3026 of segment 3027 may change as segment 3027 moves through different locations 3037 during the manufacture of uncured composite material 3024.

[0405] For example, adding a flame retardant to segment 3027 of unconsolidated composite material 3024 will change material chemistry 3026 compared to material chemistry 3026 at a previous location before adding the flame retardant. By verifying material chemistry 3026 at different locations 3037, actions 3040 may be performed during manufacturing of unconsolidated composite material 3024. These actions may reduce the amount of unconsolidated composite material 3024 that may be discarded. Additionally, settings or inputs to composite material manufacturing system 3023 may be changed to avoid failure to verify material chemistry 3026 for other segments of unconsolidated composite material 3024.

[0406] Computer system 3012 may be configured to perform at least one of the steps, operations, or actions described in the different illustrative examples using software, hardware, firmware, or a combination thereof. As a result, computer system 3012 operates as a special-purpose computer system, wherein analyzer 3014 in computer system 3012 is capable of verifying the material chemical composition of the unconsolidated composite material. In particular, analyzer 3014 converts computer system 3012 into a special-purpose computer system compared to currently available general-purpose computer systems that do not have analyzer 3014.

[0407] In the illustrative example, the analyzer 3014 is used in the computer system 3012 to integrate the process into a practical application for verifying the material chemistry of the unconsolidated composite material. In addition, the analyzer can also perform steps in response to the material chemistry of the unconsolidated composite material being incorrect. These actions can be used to provide an identification of a predetermined component in the material chemistry at a location in the unconsolidated composite material. In addition, these actions can also be used to identify a solution to change the material chemistry to the correct one. For example, the analyzer 3014 can be used with Figure 2 Composite Material Manager 212 is used to manage Figure 2 In this example, analyzer 3014 may be a component in communication with composite material manager 212, or may be Figure 2 Components within the composite material manager 212 in .

[0408] Fig.30 The illustration of the material chemical composition verification system 3000 in the illustrative embodiment is not meant to imply physical or architectural limitations on the manner in which the illustrative embodiments may be implemented. Other components may be used in addition to or in place of the components shown. Some components may be unnecessary. In addition, these blocks are provided to illustrate some functional components. When implemented in the illustrative embodiments, one or more of these blocks may be combined, segmented, or combined and segmented into different blocks.

[0409] For example, although shown as a component separate from the material chemical composition verification system 3000, in other illustrative examples, the spectral system 3071 can be considered as a component in the material chemical composition verification system 3000. As another example, in addition to or instead of the infrared spectrum, the spectral system 3071 can generate scans in other spectra. For example, near infrared, ultraviolet and other frequencies of electromagnetic energy can be used for scanning. In these illustrative examples, the spectral system 3071 can be selected from the following group, which includes an infrared spectral system, an ultraviolet spectral system, a visible light spectral system, a nuclear magnetic resonance system, and a mass spectrometry system.

[0410] refer to Fig.31, shows an illustration of a block diagram of a scan image classifier according to an illustrative embodiment. In this illustrative example, the classification process of the scan image classifier 3032 can be one of the classification process 3101 and the machine learning model system 3102.

[0411] In this example, the classification process 3101 uses standardized Fourier transform infrared scans 3110. In this example, the standardized Fourier transform infrared scans are the desired results obtained by scanning an unconsolidated composite material having a desired material chemistry. The process can compare these scans with Fourier transform infrared scans 3073 to verify the material chemistry 3026 of the unconsolidated composite material 3024. In this illustrative example, the verification process takes into account the amount of deviation from the material chemistry that is acceptable to verify that the material chemistry is correct. The deviation can be defined within the standardized Fourier transform infrared scan 3110, or defined from another source.

[0412] In this example, the scan image classifier 3032 can also take the form of a machine learning model system 3102. In this example, the machine learning model system 3102 is a plurality of machine learning models 3103. A machine learning model is an artificial intelligence model that can learn without explicit programming. The machine learning model can learn the training data input into the machine learning model. The machine learning model can learn using various types of machine learning algorithms. The machine learning algorithm includes at least one of the following: supervised learning; unsupervised learning; feature learning; sparse dictionary learning; anomaly detection; reinforcement learning; recommendation learning; or other types of learning algorithms. Examples of machine learning models include artificial neural networks, convolutional neural networks, decision trees, support vector machines, regression machine learning models, classification machine learning models, random forest learning models, Bayesian networks, genetic algorithms, and other types of models. These machine learning models can be trained using data and additional data processed to provide desired outputs.

[0413] The illustration of scan classifier 3032 is provided as an illustrative example and is not meant to limit the manner in which other illustrative examples may be implemented. For example, other classification processes may use other types of electromagnetic scans in addition to or in place of standardized Fourier transform infrared scans 3110. For example, the scans may be near infrared scans, ultraviolet scans, and scans using other frequencies of electromagnetic energy, for example.

[0414] Next go to Fig.32, shows an illustration of a block diagram for training a machine learning model according to an illustrative embodiment. In an illustrative example, a scan classifier 3032 may be trained by a machine learning model trainer 3233 to verify the material chemistry of an unconsolidated composite material. For example, a machine learning model 3201 may be trained to classify an electromagnetic scan to indicate whether the material chemistry of the unconsolidated composite material is correct. In this example, the machine learning model 3201 is Fig.31 An example of a machine learning model in the machine learning model system 3102.

[0415] In this example, training is described with reference to verifying material chemistry of an unconsolidated composite material using Fourier transform infrared scans 3206 generated by a plurality of Fourier transform infrared spectroscopy systems. The systems may be located in composite material manufacturing system 3023 or other composite material manufacturing systems.

[0416] As shown, training data set 3200 consists of Fourier transform infrared scans 3206 of unconsolidated composite materials and labels 3207. In this example, label 3207 indicates that Fourier transform infrared scan 3206 has the correct material chemistry or does not have the correct material chemistry. For example, label 3207 identifies Fourier transform infrared scans 3206 of unconsolidated composite materials having a material chemistry that is a desired material chemistry. Label 3207 identifies Fourier transform infrared scans 3206 of unconsolidated composite materials having a material chemistry that does not have the desired material chemistry.

[0417] The illustration of training a scan classifier 3032 for verifying the material chemical composition of an unconsolidated composite material is an example of one manner in which training may be performed and is not meant to limit the manner in which other illustrative examples may be implemented. For example, training may be performed using a training data set 3200 that includes other types of electromagnetic scans in addition to or in place of Fourier transform infrared scans 3206.

[0418] Reference Fig.33 , shows an illustration of a block diagram for creating and verifying a material chemical composition using a standard of a machine learning model according to an illustrative embodiment. The data flow in this example can be composed of Fig.32 Machine learning model trainer 3233 and Fig.30 For example, the machine learning model trainer 3233 can be used in the creation phase 3300 to generate an established standard 3391, which is used to create a scan image classifier 3305 used in the verification phase 3301.

[0419] Creation of the scan classifier 3305 involves extracting a prepreg sample (block 3310). For example, samples may be obtained from multiple locations in a finished prepreg roll. FTIR scans are generated using the prepreg samples (block 3312). In block 3312, Fourier transform infrared (FTIR) spectroscopy is performed on the prepreg samples to produce FTIR scans. These scans may be generated using a Fourier transform infrared (FTIR) spectroscopy system, such as Fig.30 Fourier transform infrared spectroscopy system 3072.

[0420] In this illustrative example, the prepreg sample can also be selected to have the correct material chemistry for a specific part in the prepreg sample. For example, the prepreg sample can have correct and incorrect resins. In this way, the resin can be verified. For other parts (such as membranes), the sample can also have correct and incorrect chemical compositions.

[0421] The FTIR scan is subjected to data preprocessing (block 3314). In block 3314, data preprocessing may be performed to remove bias trends that may have been introduced during the generation of the FTIR scan in block 3312. Such preprocessing may include at least one of baseline correction of the FTIR scan of the sample, normalization of the FTIR scan, or application of dimensionality reduction techniques. Such dimensionality reduction techniques may include at least one of principal component analysis (PCA), multidimensional scaling (MDS), linear discriminant analysis (LDA), or other suitable techniques.

[0422] In this box, labels can be added to the FTIR scans to identify scans with incorrect and correct material chemistries in prepreg samples. Labels can also identify specific parts such as resins, films, or other parts with direct or indirect material chemistries.

[0423] An average of the FTIR scans is generated (block 3307). In block 3315, the processed FTIR scans from block 3314 are used to determine the average in block 3307. In this embodiment, the average is the average of the processed FTIR scans of the prepreg samples from block 3310.

[0424] In this example, correlations of each scan with the average are generated in box 3306. In this box, correlations of each scan with the average are generated. In this example, correlations are made between each FTIR scan and the average of the FTIR scans.

[0425] A check is made to see if any correlation is less than a threshold value (box 3311). In box 3311, the threshold value selected depends on the desired acceptance level for validating samples with different similarity levels. For example, a higher threshold value such as 0.98-0.99 corresponds to a conservative level. This threshold value means that a mean rejection occurs for small differences between the mean and individual samples. A lower threshold value tends to verify that the scan is correct relative to the standard even if there is a considerable difference between the mean and the individual FTIR scans.

[0426] If any correlation of the individual scans is less than the threshold, the FTIR scan with the lowest correlation is removed (block 3313). Then, an average of the remaining FTIR scans is generated (block 3307). In block 3307, the average changes as the FTIR scans are removed. This process is repeated until all correlations are greater than the threshold.

[0427] If all scans of a prepreg sample have a correlation above the threshold, the average of the sample becomes the established standard 3391 for material chemical composition verification.

[0428] The established standard 3391 may be used to generate a scan classifier 3305 for use in the validation phase 3301. For example, the established standard may be a standardized Fourier transform infrared scan for a particular type of prepreg. In another example, the standard may be used as part of a training data set to generate a machine learning model for the scan classifier 3305.

[0429] The scan classifier 3305 is sent to the computer system 3390 for use in the verification stage 3301. In the verification stage 3301, material verification of the prepreg 3317 occurs in real time during the manufacturing of the prepreg 3017 by the prepreg manufacturing machine 3303. As shown, the prepreg 3317 in finished or completed form is stored on a roll 3319.

[0430] As shown, FTIR spectroscopy 3340 generates a scan of prepreg 3317 during the manufacturing of prepreg 3317 by prepreg maker 3303. In this example, FTIR spectroscopy 3340 may be performed at a number of different locations in prepreg maker 3303.

[0431] In this illustrative example, FTIR spectroscopy 3340 of prepreg 3317 is performed on segment 3371 at location 3321 between roller 3322 and roller 3323 in prepreg manufacturing machine 3303. In this example, location 3321 is near the end of the production line in prepreg manufacturing machine 3303, before prepreg 3317 becomes a finished product on roll 3319. Another location where FTIR spectroscopy 3340 may occur includes a film roll, before impregnation of fibers in a film in the film roll.

[0432] In this example, FTIR spectroscopy analysis 3340 results in the generation of a raw FTIR scan 3345. In this example, a pre-processed FTIR scan 3341 may be performed on the raw FTIR scan 3345 before the scan is sent to computer system 3390 for analysis of FTIR scan 3347, which is sent to computer system 3390. FTIR scan 3347 is analyzed using scan classifier 3305 in computer system 3390 using scan classifier 3305. The analysis verifies whether the material chemistry of prepreg 3317 in segment 3371 is correct.

[0433] This verification is performed in real time while prepreg 3317 is being manufactured by prepreg manufacturing machine 3303. In other words, scan classifier 3305 can classify segment 3371 to determine whether the material chemistry identified in FTIR scan 3347 is correct for prepreg 3317. In one example, scan classifier 3305 can be Fig.31 The classification process 3101 in FIG. 1 and comparing the FTIR scan 3347 with the expected scan (eg Fig.31 3321) is compared to a normalized Fourier transform (FTIR) scan 3110 in FIG. 3322 , which is an expected scan with respect to the expected material chemistry of the prepreg 3317 at location 3321. In another example, the scan classifier 3305 may be Fig.31 A machine learning model 3103 in is trained to verify material chemical composition and uses FTIR scan 3347 as input.

[0434] Furthermore, in addition to determining whether the material chemistry is correct, scan classifier 3305 may also classify segments 3371 to identify the material chemistry of prepreg 3317. This information may be useful when prepreg 3317 does not have the correct material chemistry. For example, this information may be used to determine what changes to make to prepreg maker 3303 or the inputs to prepreg maker 3303 to obtain the correct material chemistry for prepreg 3317.

[0435] In this example, computer system 3390 performs a number of actions. For example, computer system 3390 may output correlation metric 3360 as part of the validation process. In this example, correlation metric 3360 is information indicating the correlation of the material chemistry identified from FTIR scan 3347 to the expected or desired material chemistry of prepreg 3317. In other words, information indicating how close the material chemistry of prepreg 3317 is to the expected material chemistry may be included. This information may include the amount of components, the ratio of components, and other information, such as chemicals, additives, particles, or other components in prepreg 3317.

[0436] Based on the correlation metric 3360, a number of different actions may be performed. For example, if the correlation metric 3360 is below a specified threshold, the process may be stopped in block 3361. In another example, a warning may be issued. In these examples, the verification of the material chemistry of the prepreg 3317 is automatic and does not require user input for intervention.

[0437] In addition, by using different locations to scan the same segment of prepreg 3017 as it moves through the prepreg manufacturing machine 3303, the source or cause of the incorrect material chemistry can be determined. For example, if the correct material chemistry is detected at one location in the production line instead of a previous location, the source or cause of the incorrect material chemistry may be between these two locations in the prepreg manufacturing machine 3303. For example, before the flame retardant is added, the material chemistry may be correct for the prepreg 3017. For example, the material chemistry of the resin may be correct at this location. After the flame retardant is added, the material chemistry may be incorrect. For the incorrect type of flame retardant, the amount of the flame retardant may be incorrect. In these examples, the scan map classifier 3032 can be configured to detect the correct material chemistry of the segment 3027 at different locations 3037 in the composite material manufacturing system 3023.

[0438] In the illustration of the data flow in this figure, the use of FIR scans to create established standards 3391 for generating scan classifiers 3305 for verifying the chemical composition of materials is provided as one example of an implementation and is not meant to limit the manner in which other illustrative examples may be implemented. For example, in other illustrative examples, other types of electromagnetic scans may be used. Furthermore, when creating scan classifiers 3305, other samples may be used in addition to or in place of the prepreg samples in box 3310. For example, established standards 3391 may be created from other types of unconsolidated composite materials (e.g., membranes).

[0439] Next go to Fig.34, shows an illustration of a flow chart of a process for verifying the chemical composition of a material in accordance with an illustrative embodiment. Fig.34 The processes in the can be implemented in hardware, software, or both. When implemented in software, the process may take the form of program instructions executed by one or more processor units in one or more hardware devices located in one or more computer systems. For example, the process may be implemented in hardware, software, or both. When implemented in software, the process may take the form of program instructions executed by one or more processor units in one or more hardware devices located in one or more computer systems. Fig.30 The analyzer 3014 in the computer system 3012 is implemented.

[0440] The process begins by receiving a Fourier transform infrared scan of a segment of an unconsolidated composite material in real time during fabrication of the unconsolidated composite material by a composite material manufacturing system (operation 3400). In operation 3400, a Fourier transform infrared scan may be received from a Fourier transform infrared spectroscopy system.

[0441] The process verifies in real time whether a material chemistry of a segment of an unconsolidated composite material is correct using a Fourier transform infrared scan and a scan classifier during manufacturing of the unconsolidated composite material by a composite material manufacturing system (operation 3402 ). The process terminates thereafter.

[0442] In this example, the Fourier transform infrared spectroscopy system includes Fourier transform infrared spectroscopy devices at different locations in the composite material manufacturing system. During the composite material manufacturing system manufacturing an unconsolidated composite material, the Fourier transform infrared spectroscopy device can generate Fourier transform infrared scans of segments at the unconsolidated composite material at different locations in real time. The Fourier transform infrared scan is generated from one of the locations.

[0443] Next go to Fig.35 , shows an illustration of a flow chart of a process for controlling a Fourier transform infrared spectroscopy system according to an illustrative embodiment. The process in this figure can be used Fig.34 An example of additional operations performed by the operations in .

[0444] The process controls the Fourier transform infrared spectroscopy system to generate a Fourier transform infrared scan of a segment of an unconsolidated composite material in real time while the composite material manufacturing system is manufacturing the unconsolidated composite material (operation 3500). The process terminates thereafter.

[0445] exist Fig.36 In FIG. 1 , a diagram of a flow chart of a process for controlling a Fourier transform infrared spectroscopy system according to an illustrative embodiment is shown. The flow chart is Fig.35 An example of an implementation of operation 3500 in .

[0446] The process controls a Fourier transform infrared spectroscopy system to emit infrared energy in real time toward a segment of an unconsolidated composite material during fabrication of the unconsolidated composite material by the composite material manufacturing system; detects the infrared energy emitted toward the unconsolidated composite material to form time domain data; and performs a Fourier transform that converts the time domain data into frequency domain data to form a Fourier transform infrared scan of absorbed infrared energy of the unconsolidated composite material, the absorbed infrared energy having infrared spectral frequencies (operation 3600). The process terminates thereafter.

[0447] Reference now Fig.37 , shows a flow chart of a process for training a machine learning model system to verify the material chemical composition of an unconsolidated composite material according to an illustrative embodiment. The process in this example can be implemented in hardware, software, or both. When implemented in software, the process can take the form of program instructions executed by one or more processor units in one or more hardware devices located in one or more computer systems. For example, the process can be in Fig.32 Implemented in the machine learning model trainer 3233 in .

[0448] The process identifies a sample profile of the sample material (operation 3700). The process calculates an average of the sample Fourier transform infrared scans (operation 3702). The process determines a correlation of the sample Fourier transform infrared scans with the average (operation 3704). In operation 3704, the correlation of each individual sample Fourier transform infrared scan with the average calculated in operation 3702 is determined.

[0449] The process removes a sample Fourier transformed infrared scan having a lowest correlation with the average value selected from the Fourier transformed infrared scans in response to the plurality of sample Fourier transformed infrared scans having a correlation less than a threshold value (operation 3706).

[0450] The process repeats: calculating the average, determining the correlation, and in response to multiple sample Fourier transform infrared scans having a correlation less than a threshold, removing the sample Fourier transform infrared scan (operation 3708). In operation 3708, each time the average is calculated after removing the selected sample Fourier transform infrared scan, the average changes.

[0451] The process, in response to the remaining sample Fourier transform infrared scans having a correlation greater than a threshold, uses the remaining sample Fourier transform infrared scans to train the machine learning model system, wherein the remaining sample Fourier transform infrared scans are standardized Fourier transform infrared scans (operation 3710). The process terminates thereafter. In operation 3710, the remaining Fourier transform infrared scans can be standardized Fourier transform infrared scans. When the scan classifier takes the form of a classification process rather than a machine learning model system, the scan can be used in the classification process rather than as part of a training data set.

[0452] Next reference Fig.38 , shows an illustration of a flow chart of a process for training a machine learning model system to verify the material chemical composition of an unconsolidated composite material according to an illustrative embodiment. The process in this example can be implemented in hardware, software, or both. When implemented in software, the process can take the form of program instructions executed by one or more processor units in one or more hardware devices located in one or more computer systems. For example, the process can be in Fig.32 Implemented in the machine learning model trainer 3233 in .

[0453] The method identifies Fourier transform infrared scans of infrared energy absorbed in unconsolidated composite samples having different material chemistries (operation 3800). In this example, different material chemistries may be used for unconsolidated composite samples having correct material chemistries and those samples having incorrect material chemistries. Additionally, the unconsolidated composite samples may have material chemistries within different ranges that are considered to be correct material chemistries.

[0454] The process generates a training data set using the Fourier transform infrared scans (operation 3802). In operation 3802, the training data set may include Fourier transform infrared scans of unconsolidated composite materials. In this example, labels may be associated with the scans, the labels identifying which Fourier transform infrared scans have correct material chemistry and which Fourier transform infrared scans have incorrect material chemistry.

[0455] The process trains the machine learning model system using the training data set (operation 3804). The process then terminates.

[0456] The flowcharts and block diagrams in the different illustrated embodiments illustrate the architecture, functions and operations of some possible implementations of the devices and methods in the illustrative embodiments. In this regard, each box in the flowchart or block diagram may represent at least one of the following: a module; a fragment; a function; or a part of an operation or step. For example, one or more boxes may be implemented as a combination of program instructions, hardware, or program instructions and hardware. When implemented in hardware, the hardware may, for example, take the form of an integrated circuit that is manufactured or configured to perform one or more operations in the flowchart or block diagram. When implemented as a combination of program instructions and hardware, the implementation may take the form of firmware. Each box in the flowchart or block diagram may be implemented using a combination of a dedicated hardware system or dedicated hardware that performs different operations and a program instruction run by the dedicated hardware.

[0457] In some alternative implementations of the illustrative embodiments, one or more functions marked in the blocks may not occur in the order indicated in the figure. For example, in some cases, two blocks shown in succession may be performed substantially simultaneously, or the blocks may sometimes be performed in reverse order, depending on the functions involved. In addition, other blocks may be added in addition to the blocks shown in the flowchart or block diagram.

[0458] For example, other types of spectroscopic systems may be used in addition to or in place of a Fourier transform infrared spectroscopy system to perform the various operations described. In other words, other types of electromagnetic scans may be used in place of or in addition to a Fourier transform infrared scan.

[0459] Some features of the illustrative examples are described in the following clauses. These clauses are examples of features and are not intended to limit other illustrative examples.

[0460] Article 1

[0461] A material chemical composition verification system, the material chemical composition verification system comprising:

[0462] Computer systems;

[0463] a Fourier transform infrared spectroscopy system configured to generate a Fourier transform infrared scan of absorbed infrared energy of the unconsolidated composite material, the absorbed infrared energy having infrared spectral frequencies;

[0464] a scan classifier configured to classify a chemical composition of a material in the unconsolidated composite material using a Fourier transform infrared scan of the unconsolidated composite material; and

[0465] The analyzer is configured to:

[0466] controlling the Fourier transform infrared spectroscopy system to generate a Fourier transform infrared scan of a segment of an unconsolidated composite material in real time during fabrication of the unconsolidated composite material by the composite material fabrication system; and

[0467] Using the Fourier transform infrared scan and the scan classifier, whether the material chemical composition of the fragment of the unconsolidated composite material is correct is verified in real time during the manufacturing of the unconsolidated composite material by the composite material manufacturing system.

[0468] Article 2

[0469] The material chemistry verification system of clause 1, wherein the analyzer is configured to perform a plurality of actions in response to determining that the material chemistry in the segment is incorrect.

[0470] Article 3

[0471] The material chemical composition verification system according to clause 2, wherein the plurality of actions are selected from at least one of the following:

[0472] Generate alerts;

[0473] tracking segments of the unconsolidated composite material;

[0474] marking segments of the unconsolidated composite material;

[0475] recording the presence of an unverified material chemistry in the fragment of the unconsolidated composite material; and

[0476] Production of the unconsolidated composite material is stopped.

[0477] Article 4

[0478] A material chemical composition verification system according to any one of clauses 1, 2 or 3, wherein, when generating the Fourier transform infrared scanning image, the Fourier transform infrared spectroscopy system is configured to:

[0479] emitting infrared energy toward the uncured composite material;

[0480] detecting infrared energy emitted toward the uncured composite material to form time domain data; and

[0481] A Fourier transform is performed that converts the time domain data to frequency domain data to form a Fourier transformed infrared scan of absorbed infrared energy of the unconsolidated composite material, the absorbed infrared energy having infrared spectral frequencies.

[0482] Article 5

[0483] A material chemical composition verification system according to any one of clauses 1, 2, 3 or 4, wherein the Fourier transform infrared spectroscopy system comprises:

[0484] Fourier transform infrared spectroscopy equipment is provided at different positions in the composite material manufacturing system, wherein, during the manufacturing of the unconsolidated composite material by the composite material manufacturing system, the Fourier transform infrared spectroscopy equipment generates Fourier transform infrared scans of fragments of the unconsolidated composite material at the different positions in real time.

[0485] Article 6

[0486] A material chemical composition verification system according to any one of clauses 1, 2, 3, 4 or 5, wherein the scan image classifier is a classification process using a standardized Fourier transform infrared scan image.

[0487] Article 7

[0488] A material chemical composition verification system according to one of clauses 1, 2, 3, 4, 5 or 6, wherein the scan image classifier is a machine learning model system that is trained to use the Fourier transform infrared scan image of the unconsolidated composite material to classify the material chemical composition in the unconsolidated composite material.

[0489] Article 8

[0490] The material chemical composition verification system according to clause 7, the material chemical composition verification system comprising:

[0491] A machine learning model trainer, the machine learning model trainer being configured to:

[0492] Fourier transform infrared scan of the sample to identify the sample material;

[0493] Calculating an average value of the Fourier transform infrared scan of the sample;

[0494] determining a correlation between the sample Fourier transform infrared scan and the average value;

[0495] In response to a plurality of sample Fourier transform infrared scans having a correlation less than a threshold, removing a sample Fourier transform infrared scan selected from the sample Fourier transform infrared scans having a lowest correlation with the average value;

[0496] Repeating the steps of: calculating the average; determining the correlation; and removing selected sample Fourier transform infrared scans in response to multiple sample Fourier transform infrared scans having a correlation less than a threshold value; and

[0497] In response to the remaining sample Fourier transform infrared scans having a correlation greater than a threshold, the remaining sample Fourier transform infrared scans are used to train the machine learning model system, wherein the remaining sample Fourier transform infrared scans are standardized Fourier transform infrared scans.

[0498] Article 9

[0499] According to the material chemical composition verification system of clause 7, the material chemical composition verification system also includes:

[0500] A machine learning model trainer, the machine learning model trainer being configured to:

[0501] Fourier transform infrared scans identifying absorbed infrared energy in unconsolidated composite samples having different material chemistries;

[0502] Generate a training dataset using Fourier transform infrared scans; and

[0503] Use the training dataset to train the machine learning model system.

[0504] Article 10

[0505] A material chemical composition verification system according to one of clauses 1, 2, 3, 4, 5, 6, 7, 8 or 9, wherein the composite material manufacturing system is a carbon fiber prepreg coating line, a reinforcing fiber resin impregnation production line, a resin mixing processing system, a resin film forming production line, a prepreg system and a cutting processing system.

[0506] Article 11

[0507] A material chemical composition verification system according to any one of clauses 1, 2, 3, 4, 5, 6, 7, 8, 9 or 10, wherein the unconsolidated composite material is selected from at least one of the following: prepreg, aerospace grade prepreg, thermoset prepreg, thermoplastic prepreg, woven fabric prepreg, fiber tow prepreg, tow prepreg, unidirectional tape prepreg, resin coated film, wrinkle-free fabric or resin mixture.

[0508] Article 12

[0509] A material chemical composition verification system, the material chemical composition verification system comprising:

[0510] Computer systems;

[0511] a scan classifier configured to classify a chemical composition of a material in an unconsolidated composite material using a Fourier transform infrared scan of the unconsolidated composite material; and

[0512] The analyzer in the computer system, wherein the analyzer is configured to:

[0513] receiving a Fourier transform infrared scan of a segment of an unconsolidated composite material in real time during fabrication of the unconsolidated composite material by the composite material fabrication system; and

[0514] Using the Fourier transform infrared scan and the scan classifier, whether the material chemical composition of the fragment of the unconsolidated composite material is correct is verified in real time during the manufacturing of the unconsolidated composite material by the composite material manufacturing system.

[0515] Article 13

[0516] A material chemical composition verification system according to clause 12, wherein the Fourier transform infrared scan image is received from a Fourier transform infrared spectroscopy system.

[0517] Article 14

[0518] The material chemical composition verification system of clause 13, wherein the analyzer is configured to:

[0519] The Fourier transform infrared spectroscopy system is controlled to generate a Fourier transform infrared scan of a segment of the unconsolidated composite material in real time during fabrication of the unconsolidated composite material by the composite material fabrication system.

[0520] Article 15

[0521] A material chemical composition verification system according to clause 14, wherein, when controlling the Fourier transform infrared spectroscopy system, the analyzer is configured to control the Fourier transform infrared spectroscopy system to:

[0522] emitting infrared energy in real time toward a segment of the unconsolidated composite material while the composite material manufacturing system is manufacturing the unconsolidated composite material;

[0523] detecting infrared energy emitted toward the unconsolidated composite material to form time domain data; and

[0524] A Fourier transform is performed that converts the time domain data to frequency domain data to form a Fourier transformed infrared scan of absorbed infrared energy of the unconsolidated composite material, the absorbed infrared energy having infrared spectral frequencies.

[0525] Article 16

[0526] A material chemical composition verification system according to any one of clauses 13, 14 or 15, wherein the Fourier transform infrared spectroscopy system comprises:

[0527] Fourier transform infrared spectroscopy equipment is provided at different positions in the composite material manufacturing system, wherein, during the manufacturing of the unconsolidated composite material by the composite material manufacturing system, the Fourier transform infrared spectroscopy equipment generates Fourier transform infrared scans of fragments of the unconsolidated composite material at the different positions in real time.

[0528] Article 17

[0529] A material chemical composition verification system according to any one of clauses 12, 13, 14, 15 or 16, wherein the scan image classifier is a classification process using a standardized Fourier transform infrared scan image.

[0530] Article 18

[0531] A material chemical composition verification system according to one of clauses 12, 13, 14, 15, 16 or 17, wherein the scan image classifier is a machine learning model system that is trained to use the Fourier transform infrared scan image of the unconsolidated composite material to classify the material chemical composition in the unconsolidated composite material.

[0532] Article 19

[0533] The material chemical composition verification system according to clause 18, the material chemical composition verification system comprising:

[0534] A machine learning model trainer, the machine learning model trainer being configured to:

[0535] Fourier transform infrared scan of the sample to identify the sample material;

[0536] Calculating an average value of the Fourier transform infrared scan of the sample;

[0537] determining a correlation between the sample Fourier transform infrared scan and the average value;

[0538] In response to a plurality of sample Fourier transform infrared scans having a correlation less than a threshold, removing a sample Fourier transform infrared scan selected from the sample Fourier transform infrared scans having a lowest correlation with the average value;

[0539] Repeating the steps of: calculating the average; determining the correlation; and removing selected sample Fourier transform infrared scans in response to multiple sample Fourier transform infrared scans having a correlation less than a threshold value; and

[0540] In response to the remaining sample Fourier transform infrared scans having a correlation greater than a threshold, the remaining sample Fourier transform infrared scans are used to train the machine learning model system, wherein the remaining sample Fourier transform infrared scans are standardized Fourier transform infrared scans.

[0541] Article 20

[0542] A material chemical composition verification system according to one of clauses 12, 13, 14, 15, 16, 17, 18 or 19, wherein the composite material manufacturing system is a carbon fiber prepreg coating line, a reinforcing fiber resin impregnation production line, a resin mixing processing system, a resin film forming production line, a prepreg system and a cutting processing system.

[0543] Article 21

[0544] A material chemical composition verification system according to any one of clauses 12, 13, 14, 15, 16, 17, 18, 19 or 20, wherein the unconsolidated composite material is selected from at least one of the following: a prepreg, an aerospace grade prepreg, a thermoset prepreg, a thermoplastic prepreg, a woven fabric prepreg, a fiber tow prepreg, a tow prepreg, a unidirectional tape prepreg, a resin coated film, a wrinkle-free fabric or a resin mixture.

[0545] Article 22

[0546] A material chemical composition verification system, the material chemical composition verification system comprising:

[0547] Computer systems;

[0548] a scan classifier configured to classify a chemical composition of a material in an unconsolidated composite material using an electromagnetic scan of the unconsolidated composite material;

[0549] The analyzer in the computer system, wherein the analyzer is configured to:

[0550] receiving an electromagnetic scan of a segment of an unconsolidated composite material in real time during fabrication of the unconsolidated composite material by the composite material fabrication system; and

[0551] Using the electromagnetic scan and the scan classifier, whether the material chemical composition of the segments of the unconsolidated composite material is correct is verified in real time during the manufacturing of the unconsolidated composite material by the composite material manufacturing system.

[0552] Article 23

[0553] A method for verifying the chemical composition of a material, the method comprising:

[0554] receiving a Fourier transform infrared scan of a segment of an unconsolidated composite material in real time during fabrication of the unconsolidated composite material by the composite material fabrication system; and

[0555] Using the Fourier transform infrared scan and the scan classifier, whether the material chemical composition of the fragment of the unconsolidated composite material is correct is verified in real time during the manufacturing of the unconsolidated composite material by the composite material manufacturing system.

[0556] Article 24

[0557] A method according to clause 23, wherein the Fourier transform infrared scan is received from a Fourier transform infrared spectroscopy system.

[0558] Article 25

[0559] A method according to clause 24, further comprising:

[0560] The Fourier transform infrared spectroscopy system is controlled to generate a Fourier transform infrared scan of a segment of the unconsolidated composite material in real time during fabrication of the unconsolidated composite material by the composite material fabrication system.

[0561] Article 26

[0562] The method of clause 25, wherein controlling the Fourier transform infrared spectroscopy system comprises:

[0563] The Fourier transform infrared spectroscopy system is controlled to:

[0564] emitting infrared energy to segments of the unconsolidated composite material in real time during manufacturing of the unconsolidated composite material by the composite material manufacturing system;

[0565] detecting infrared energy emitted toward the unconsolidated composite material to form time domain data; and

[0566] A Fourier transform is performed that converts the time domain data to frequency domain data to form a Fourier transformed infrared scan of absorbed infrared energy of the unconsolidated composite material, the absorbed infrared energy having infrared spectral frequencies.

[0567] Article 27

[0568] A method according to any one of clauses 24, 25 or 26, wherein the Fourier transform infrared spectroscopy system includes Fourier transform infrared spectroscopy devices at different locations in the composite material manufacturing system, wherein during the manufacturing of the unconsolidated composite material by the composite material manufacturing system, the Fourier transform infrared spectroscopy devices generate Fourier transform infrared scans of fragments of the unconsolidated composite material at the different locations in real time, and wherein the Fourier transform infrared scan is generated from one of the locations.

[0569] Article 28

[0570] A method according to any one of clauses 23, 24, 25, 26 or 27, wherein the scan classifier is a classification process using a normalized Fourier Transform Infrared scan.

[0571] Article 29

[0572] A method according to one of clauses 23, 24, 25, 26, 27 or 28, wherein the scan image classifier is a machine learning model system that is trained to use a Fourier transform infrared scan image of the unconsolidated composite material to classify the material chemical composition in the unconsolidated composite material.

[0573] Article 30

[0574] A method according to clause 29, further comprising:

[0575] Fourier transform infrared scan of the sample to identify the sample material;

[0576] Calculating an average value of the Fourier transform infrared scan of the sample;

[0577] determining a correlation between the sample Fourier transform infrared scan and the average value;

[0578] In response to a plurality of sample Fourier transform infrared scans having a correlation less than a threshold, removing a sample Fourier transform infrared scan selected from the sample Fourier transform infrared scans having a lowest correlation with the average value;

[0579] Repeating the steps of: calculating the average; determining the correlation; and removing selected sample Fourier transform infrared scans in response to multiple sample Fourier transform infrared scans having a correlation less than a threshold value; and

[0580] In response to the remaining sample Fourier transform infrared scans having a correlation greater than a threshold, the remaining sample Fourier transform infrared scans are used to train the machine learning model system, wherein the remaining sample Fourier transform infrared scans are standardized Fourier transform infrared scans.

[0581] Article 31

[0582] A method according to clause 29, comprising:

[0583] Fourier transform infrared scans identifying absorbed infrared energy in unconsolidated composite samples having different material chemistries;

[0584] Generate a training data set using the Fourier transform infrared scan image; and

[0585] The training dataset is used to train a machine learning model system.

[0586] Article 32

[0587] A method according to any one of clauses 23, 24, 25, 26, 27, 28, 29, 30 or 31, wherein the composite material manufacturing system is a carbon fiber prepreg coating line, a reinforcing fiber resin impregnation production line, a resin mixing process system, a resin film forming production line, a prepreg system and a cutting processing system.

[0588] 33. A method according to any one of clauses 23, 24, 25, 26, 27, 28, 29, 30, 31 or 32, wherein the unconsolidated composite material is selected from at least one of the following: a prepreg, an aerospace grade prepreg, a thermoset prepreg, a thermoplastic prepreg, a woven fabric prepreg, a fiber tow prepreg, a tow prepreg, a unidirectional tape prepreg, a resin coated film, a wrinkle-free fabric or a resin mixture.

[0589] Descriptions of different illustrative embodiments have been given for the purpose of illustration and description, and these descriptions are not intended to be exhaustive or limited to the embodiments of the disclosed forms. Different illustrative examples describe components that perform actions or operations. In illustrative embodiments, components may be configured to perform the described actions or operations. For example, the component may have a structure of the following configuration or design, which provides the component with the ability to perform the actions or operations described as being performed by the component in the illustrative examples. In addition, with respect to the terms "include", "comprise", "have", "contain" and variations thereof used herein, these terms are intended to be inclusive in a manner similar to the term "include" as an open transition word, without excluding any additional or other elements.

[0590] Many modifications and variations will be apparent to those of ordinary skill in the art. In addition, different illustrative embodiments may provide different features than other desired embodiments. The selected one or more embodiments are selected and described in order to best explain the principles of the embodiments, the practical application, and to enable others of ordinary skill in the art to understand the disclosure of various embodiments with various modifications suitable for the intended specific use.

[0591] CROSS-REFERENCE TO RELATED APPLICATIONS

[0592] This application claims priority to U.S. Provisional Patent Application No. 63 / 493,134, filed on March 30, 2023, entitled “Unconsolidated Composite Part Verification via Non-Contact Chemical Sensing,” the entire contents of which are incorporated herein by reference.

[0593] This application is a continuation-in-part (CIP) of and claims the benefit of U.S. patent application No. 17 / 811,433, filed on July 8, 2022, entitled “Prediction of Properties of Unconsolidated Composite Materials,” the entire contents of which are incorporated herein by reference.

[0594] This application is related to the following U.S. patent applications: U.S. patent application No. 18 / 416,467, attorney docket number 22-0421-US-CIP, filed on the same date as this application, entitled “REAL-TIME PROPERTY PREDICTION OF UNCONSOLIDATED COMPOSITE MANUFACTURE”; U.S. patent application No. 18 / 416,615, attorney docket number 22-0421-US-CIP[2], filed on the same date as this application, entitled “REAL-TIME INCONSISTENCY DETECTION DURING COMPOSITE MANUFACTURE”; and U.S. patent application No. 18 / 416,653, attorney docket number 22-0421-US-CIP[3], filed on the same date as this application, entitled “REAL-TIME CONTAMINANT IDENTIFICATION VIA NON-CONTACT CHEMICAL SENSING DURING COMPOSITE MANUFACTURE”; the entire contents of these U.S. patent applications are incorporated herein by reference.

Claims

1. A material chemical composition (3026) verification system (3000), the material chemical composition verification system comprising: Computer Systems (3012); a Fourier transform infrared spectroscopy system (3071) configured to generate a Fourier transform infrared scan (3074) of absorbed infrared energy of the unconsolidated composite material, the absorbed infrared energy having infrared spectral frequencies; a scan classifier (3032, 3305) configured to classify a chemical composition of a material in the unconsolidated composite material using a Fourier transform infrared scan (3074) of the unconsolidated composite material; and An analyzer (3014), the analyzer being configured to: controlling the Fourier transform infrared spectroscopy system (3071) to generate a Fourier transform infrared scan (3073) of a segment (3027) of the unconsolidated composite material (3024) in real time during the composite material manufacturing system (3023) manufacturing the unconsolidated composite material (3024); and Using the Fourier transform infrared scan image (3073) and the scan image classifier (3032, 3305), whether the material chemical composition (3026) of the fragment (3027) of the unconsolidated composite material (3024) is correct is verified in real time during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023).

2. The material chemical composition (3026) verification system (3000) according to claim 1, wherein: The analyzer (3014) is configured to perform a plurality of actions (3040) in response to determining that the chemical composition (3026) of the material in the segment (3027) is incorrect.

3. The material chemical composition (3026) verification system (3000) according to claim 2, wherein: The plurality of actions (3040) are selected from at least one of the following: Generate alerts; Tracking a segment (3027) of the unconsolidated composite material (3024); marking a segment (3027) of the unconsolidated composite material (3024); recording the presence of an unverified material chemistry (3026) in the segment (3027) of the unconsolidated composite material (3024); and The production of the unconsolidated composite material (3024) is stopped.

4. The material chemical composition (3026) verification system (3000) according to claim 1, wherein: When generating the Fourier transform infrared scan image (3073), the Fourier transform infrared spectroscopy system is configured to: emitting infrared energy toward the unconsolidated composite material (3024); detecting infrared energy emitted toward the unconsolidated composite material (3024) to form time domain data; as well as A Fourier transform is performed that converts the time domain data into frequency domain data to form a Fourier transformed infrared scan (3073) of absorbed infrared energy of the unconsolidated composite material (3024), the absorbed infrared energy having infrared spectral frequencies.

5. The material chemical composition (3026) verification system (3000) according to claim 1, wherein: The Fourier transform infrared spectroscopy system (3071) comprises: A Fourier transform infrared spectroscopy device (3035) is provided at different positions (3037) in the composite material manufacturing system (3023), wherein during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023), the Fourier transform infrared spectroscopy device (3035) generates a Fourier transform infrared scan image (3074) of a fragment (3027) of the unconsolidated composite material (3024) at the different positions (3037) in real time.

6. The material chemical composition (3026) verification system (3000) according to claim 1, wherein: The scan image classifier (3032, 3305) is a classification process (3101) using a standardized Fourier transform infrared scan image (3110).

7. The material chemical composition (3026) verification system (3000) according to claim 1, wherein: The scan image classifier (3032, 3305) is a machine learning model system (3102) that is trained to classify the material chemical composition in the unconsolidated composite material using the Fourier transform infrared scan image (3074) of the unconsolidated composite material.

8. A material chemical composition (3026) verification system (3000), the material chemical composition verification system comprising: Computer Systems (3012); a scan classifier (3032, 3305) configured to classify a chemical composition of a material in an unconsolidated composite material using a Fourier transform infrared scan (3074) of the unconsolidated composite material; and The analyzer (3014) in the computer system (3012), wherein the analyzer (3014) is configured to: Receiving a Fourier transform infrared scan (3073) of a segment (3027) of an unconsolidated composite material (3024) in real time during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023); and Using the Fourier transform infrared scan image (3073) and the scan image classifier (3032, 3305), whether the material chemical composition (3026) of the fragment (3027) of the unconsolidated composite material (3024) is correct is verified in real time during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023).

9. The material chemical composition (3026) verification system (3000) according to claim 8, wherein: The Fourier transform infrared scan image (3073) is received from the Fourier transform infrared spectroscopy system (3071).

10. The material chemical composition (3026) verification system (3000) according to claim 9, wherein: The analyzer (3014) is configured to: The Fourier transform infrared spectroscopy system (3071) is controlled to generate a Fourier transform infrared scan image (3073) of a segment (3027) of the unconsolidated composite material (3024) in real time during the composite material manufacturing system (3023) manufacturing the unconsolidated composite material (3024).

11. The material chemical composition (3026) verification system (3000) according to claim 10, wherein: When controlling the Fourier transform infrared spectroscopy system (3071), the analyzer (3014) is configured to control the Fourier transform infrared spectroscopy system (3071) to: emitting infrared energy in real time to a segment (3027) of the unconsolidated composite material (3024) during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023); detecting infrared energy emitted toward the unconsolidated composite material (3024) to form time domain data; as well as A Fourier transform is performed that converts the time domain data into frequency domain data to form a Fourier transformed infrared scan (3073) of absorbed infrared energy of the unconsolidated composite material (3024), the absorbed infrared energy having infrared spectral frequencies.

12. The material chemical composition (3026) verification system (3000) according to claim 9, wherein: The Fourier transform infrared spectroscopy system (3071) comprises: A Fourier transform infrared spectroscopy device (3035) is provided at different positions (3037) in the composite material manufacturing system (3023), wherein during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023), the Fourier transform infrared spectroscopy device (3035) generates a Fourier transform infrared scan image (3074) of a fragment (3027) of the unconsolidated composite material (3024) at the different positions (3037) in real time.

13. The material chemical composition (3026) verification system (3000) according to claim 8, wherein: The scan image classifier (3032, 3305) is a classification process (3101) using a standardized Fourier transform infrared scan image (3110).

14. The material chemical composition (3026) verification system (3000) according to claim 8, wherein: The scan image classifier (3032, 3305) is a machine learning model system (3102) that is trained to classify the material chemical composition in the unconsolidated composite material using the Fourier transform infrared scan image (3074) of the unconsolidated composite material.

15. A material chemical composition (3026) verification system (3000), the material chemical composition verification system comprising: Computer Systems (3012); a scan classifier (3032, 3305) configured to classify a chemical composition of a material in an unconsolidated composite material using an electromagnetic scan of the unconsolidated composite material; The analyzer (3014) in the computer system (3012), wherein the analyzer (3014) is configured to: receiving an electromagnetic scan of a segment (3027) of an unconsolidated composite material (3024) in real time during the manufacturing of the unconsolidated composite material (3024) by a composite material manufacturing system (3023); as well as Using the electromagnetic scan image and the scan image classifier (3032, 3305), whether the material chemical composition (3026) of the fragment (3027) of the unconsolidated composite material (3024) is correct is verified in real time during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023).

16. A method (3026) for verifying the chemical composition of a material, the method comprising: Receiving (3400) a Fourier transform infrared scan (3073) of a segment (3027) of an unconsolidated composite material (3024) in real time during the manufacturing of the unconsolidated composite material (3024) by a composite material manufacturing system (3023); and Using the Fourier transform infrared scan image (3073) and the scan image classifier (3032, 3305), it is verified (3042) in real time whether the material chemical composition (3026) of the fragment (3027) of the unconsolidated composite material (3024) is correct during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023).

17. The method according to claim 16, wherein: The Fourier transform infrared scan image (3073) is received from the Fourier transform infrared spectroscopy system (3071).

18. The method according to claim 17, further comprising: The Fourier transform infrared spectroscopy system (3071) is controlled (3500) to generate a Fourier transform infrared scan image (3073) of a segment (3027) of the unconsolidated composite material (3024) in real time during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023).

19. The method according to claim 18, wherein: Controlling the Fourier transform infrared spectroscopy system (3071) comprises: The Fourier transform infrared spectroscopy system (3071) is controlled (3600) to: emitting infrared energy in real time to a segment (3027) of the unconsolidated composite material (3024) during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023); detecting infrared energy emitted toward the uncured composite material (3024) to form time domain data; and A Fourier transform is performed that converts the time domain data into frequency domain data to form a Fourier transformed infrared scan (3073) of absorbed infrared energy of the unconsolidated composite material (3024), the absorbed infrared energy having infrared spectral frequencies.

20. The method according to claim 17, wherein: The Fourier transform infrared spectroscopy system (3071) includes Fourier transform infrared spectroscopy devices (3035) at different positions (3037) in the composite material manufacturing system (3023), wherein, during the manufacturing of the unconsolidated composite material (3024) by the composite material manufacturing system (3023), the Fourier transform infrared spectroscopy device (3035) generates a Fourier transform infrared scan image (3074) of a fragment (3027) of the unconsolidated composite material (3024) at the different positions (3037) in real time, and wherein the Fourier transform infrared scan image (3073) is generated from one of the positions.