Multi-AGV path planning method based on combination of time window and improved A star algorithm
By combining the time window and the improved A-star algorithm, AGV path planning is optimized, solving the problems of the shortest path and the fewest turns in multi-AGV path planning, and significantly improving the efficiency and conflict avoidance capabilities of AGV path planning.
Patent Information
- Application Number
- CN202411230364.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing multi-AGV path planning methods fail to effectively combine the problems of shortest path, minimum number of turns and conflict resolution. Especially in complex warehouse environments, traditional methods are difficult to optimize the AGV handling process.
Adopting a method based on time window and improved A-star algorithm, by adjusting the heuristic function and prediction function of the A-star algorithm, increasing the turning factor and weight parameters, optimizing the AGV path planning, and using the time window strategy to avoid AGV conflicts and ensure the path Shortest and least number of turns.
It effectively reduces the number of AGV turns and improves the efficiency of AGV path planning. Through simulation verification, it significantly improves the superiority of multi-AGV path planning in avoiding conflicts.
Smart Images

Figure CN118732691A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of path planning, and in particular is a multi-AGV path planning method based on the combination of a time window and an improved A-star algorithm. Background Art
[0002] Warehouses are important transit platforms for production and logistics transportation. The rational use of warehouse systems is increasingly becoming a focus of attention for manufacturing and logistics companies. As an important part of industrial production logistics and modern logistics technology, intelligent warehouses use computer technology and artificial intelligence technology to optimize the entire logistics and handling process, which can improve work efficiency and reduce labor costs. Automated Guided Vehicles (AGVs), as the main tool for warehouse systems to complete handling tasks, play a decisive role in the operation of the entire warehouse system, transforming the "people to goods" model in traditional warehouse systems into a "goods to people" model, and improving the operating efficiency of intelligent warehousing systems.
[0003] Many scholars at home and abroad have conducted research on the task allocation and path planning of AGVs in warehouse systems. However, as the scale of warehouses increases, the number of AGVs and shelves increases, and the path network becomes complex, it is necessary to further study the AGV task allocation and path planning problems in warehouse systems. Patent [202010567994.0] proposes a path planning method for multiple AGVs in an intelligent garage, which takes into account turns and conflicts and uses time window postponement or delay to resolve conflicts, but it does not consider the long section conflict problem that cannot be resolved by time window postponement or delay. Patent [202210269477.4] proposes a multi-AGV path planning method based on time windows and improved A* algorithm, which takes into account the AGV path conflict problem, but does not consider the additional energy consumption and time cost caused by turning. Patent [202210260353.X] proposes a path optimization method for real-time scheduling of multiple AGVs based on time windows, which achieves conflict resolution by setting obstacle avoidance points, but does not consider the problem of the shortest path and the least number of turns. Patent [202110789546.X] proposes a multi-AGV path planning and a method for joint scheduling of AGVs and machines in a multi-AGV intelligent production line, which solves the conflict problem, but still does not comprehensively consider the realization of the two goals of the shortest path and the number of turns. It can be seen that most of the current research on multi-AGV path planning focuses on how to avoid AGV conflicts, but does not comprehensively consider the fewer turns, the shortest path, and conflict resolution. Even if turns are taken into account, more complex replanning situations still need to be considered. Therefore, it is necessary to further study an AGV path planning method that can achieve a more optimized handling process. Summary of the invention
[0004] To solve the above problems, the present invention provides a multi-AGV path planning method based on a combination of a time window and an improved A-star algorithm, which mainly considers a single AGV path planning algorithm with the shortest path as the optimization goal when static obstacles are determined; and a multi-AGV path planning method that combines a collision avoidance method with a single AGV path planning method, considering the collisions and conflicts that may occur when multiple AGVs complete handling tasks in an intelligent warehousing system.
[0005] In order to achieve the above-mentioned invention object, the technical solution provided by this application is as follows: The multi-AGV path planning method based on the time window and the improved A-star algorithm includes the following steps: Step (1). Determine whether the AGV queue is empty: After the task allocation is completed, if each AGV has its own task string, the AGV queue is not empty. All AGVs with handling tasks form an AGV queue to execute the next step. If there is an empty AGV queue, the planning is terminated. Step (2). Sort all AGVs according to the priority of the task, select the first AGV according to the sorting, call the improved A-star algorithm for path planning, calculate the path time, determine the time window, and clearly define the number and time of each grid occupied; Step (3). Select the next AGV and calculate the path time; Step (4). Based on the time window algorithm, determine whether the time window overlaps with the first AGV. If so, determine whether the conflict can be avoided by moving the time window of the next AGV to the conflict point backwards, so that the next AGV waits for the first AGV to pass in the grid before the conflict node. If the conflict can be avoided, push the time window back to find an idle time period and insert it. If not, re-plan the entire running path for the next AGV. If there is no conflict, register the grid number and occupied time of the AGV, and delete the AGV from the queue. Step (5). Determine whether the AGV queue is empty, that is, all AGVs have planned paths. If not, return to step (3) and initialize the next AGV as the first AGV; Step (6). If the AGV queue is empty, output the multi-AGV path planning solution.
[0006] Furthermore, in step (2), the improved A-star algorithm adds a turning factor as a penalty function based on the original heuristic function of the A-star algorithm. When the AGV drives to the position of each grid, it will determine whether it needs to turn. If the grid selected for continuing to go straight is a free-pass grid, then the grid is selected to keep going straight instead of turning, ensuring that the priority of the straight grid is greater than the priority of the turning grid.
[0007] Furthermore, in step (2), the improved A-star algorithm adds a weight parameter before the estimation function h(n) of the original heuristic function of the A-star algorithm. , thereby changing the weight of the heuristic function; by adjusting the ratio of the actual cost to the estimated cost, the number of searched nodes can be effectively reduced and the search speed can be improved.
[0008] Furthermore, in step (2), the heuristic function of the improved A-star algorithm is as follows: ; In the formula, It represents the overall estimate from the starting point to the target end point; Indicates the actual cost from the starting point to the current node n; is a weight parameter used to adjust the ratio of actual cost to estimated cost and reduce the number of search nodes; Indicates the current node n The estimated cost to the end point after traversing all intermediate nodes; k is a constant; r is the number of turns.
[0009] Furthermore, the time window in step (4) refers to the time that the AGV spends performing a specific action, which constitutes the time set of this process.
[0010] Furthermore, assuming that n AGV has a time windows, where the time windows are represented by , where the subscript of t represents the number of time windows, which are sorted in the order of the time windows, and the end time of the previous time window is greater than the start time of the next time window. The movement time of the AGV is solved by the following formula: ; In the formula represents the length of the AGV itself, L represents the distance from the starting point to the end point, and v represents the speed of the AGV.
[0011] Furthermore, in order to facilitate the subsequent verification of the algorithm, the following assumptions are made on the formed time window to control additional variables: a). Assume that the AGV is a point mass and no longer consider the size of the AGV itself. Each AGV will occupy a grid when traveling; b). Each grid is set as a two-way single channel. Only one AGV can pass through a grid, but the grid is bidirectional. The AGV can move in four directions through the grid; c).AGV is moving in a straight line at a constant speed. , without considering acceleration and deceleration and the waiting time required to move goods to the shelf, when turning, it is considered to pass through three grids at a uniform speed; d). When the AGV passes through a grid, the grid is immediately released to idle state; The following two formulas are used as the original time window and time point parameters of each task in the AGV path planning process and are input into the above method. First, the above parameters are updated after the path planning is completed, and then the updated time window and time point parameters are sent to each AGV to perform the task: ; ; In the above formula, It represents the time window of the path planned when the mth AGV completes the handling task; and is the time point when the AGV reaches the kth and k+1th grids in the path; is the distance between the i-th and i+1-th grids in the AGV path.
[0012] The beneficial effects of the present invention are: 1. According to the characteristics of AGV operation in actual warehousing environment, this method proposes an improved A-star algorithm based on the A-star algorithm for single AGV path planning in warehousing system. Aiming at the problem of "the planned path of AGV movement may have too many turns" in the traditional A-star algorithm, the heuristic function of the A-star algorithm is improved to reduce the number of AGV turns.
[0013] 2. This method analyzes the types of multi-AGV conflicts and resolution strategies, and proposes a hybrid adjustment strategy based on the combination of time window and improved A-star algorithm for multi-AGV path planning. Simulation experiments also prove that the proposed multi-AGV path planning method is superior to the AGV path planning method without adjustment strategy in avoiding AGV conflicts. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 Schematic diagram of the overall flow chart of this method.
[0015] Figure 2 This is a simulation experiment map.
[0016] Figure 3 is the time window of multiple AGV paths (no adjustment strategy is adopted).
[0017] Figure 4 It is the time window of multiple AGV paths (adjustment strategy is adopted). DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is to explain the present invention rather than to limit the present invention. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0019] The specific implementation method of the present invention is described below with reference to the accompanying drawings and examples, but the present invention is not limited to this embodiment.
[0020] Example 1 like Figure 1 As shown in FIG. 1 , the multi-AGV path planning method based on the combination of time window and improved A-star algorithm includes the following steps: Step (1). Determine whether the AGV queue is empty: After the task allocation is completed, if each AGV has its own task string (combined handling task), the AGV queue is not empty. All AGVs with handling tasks form an AGV queue to execute the next step. If there is an empty AGV queue, the planning ends; Step (2). Sort all AGVs according to the priority of the task, select the first AGV according to the sorting, call the improved A-star algorithm for path planning, calculate the path time, determine the time window, and clearly define the number and time of each grid occupied; Step (3). Select the next AGV and calculate the path time; Step (4). Based on the time window algorithm, determine whether the time window overlaps with the first AGV. If so, determine whether the conflict can be avoided by moving the time window of the next AGV to the conflict point backwards, so that the next AGV waits for the first AGV to pass in the grid before the conflict node. If the conflict can be avoided, push the time window back to find an idle time period and insert it. If not, re-plan the entire running path for the next AGV. If there is no conflict, register the grid number and occupied time of the AGV, and delete the AGV from the queue. Step (5). Determine whether the AGV queue is empty, that is, all AGVs have planned paths. If not, return to step (3) and initialize the next AGV as the first AGV; Step (6). If the AGV queue is empty, output the multi-AGV path planning solution.
[0021] According to the characteristics of AGV operation in actual warehouse environment, this method proposes an improved A-star algorithm based on the A-star algorithm for single AGV path planning in warehouse system. Aiming at the problem of "too many turns in the planned path of AGV movement" in the traditional A-star algorithm, the heuristic function of the A-star algorithm is improved to reduce the number of AGV turns. This method analyzes the types of multi-AGV conflicts and solution strategies, and proposes a hybrid adjustment strategy based on time window and improved A-star algorithm for multi-AGV path planning. The simulation experiment proves the superiority of the proposed multi-AGV path planning method in avoiding AGV conflicts compared with the AGV path planning method without adjustment strategy.
[0022] Example 2 like Figure 1 As shown in FIG. 1 , the multi-AGV path planning method based on the combination of time window and improved A-star algorithm includes the following steps: Step (1). Determine whether the AGV queue is empty: After the task allocation is completed, if each AGV has its own task string (combined handling task), the AGV queue is not empty. All AGVs with handling tasks form an AGV queue to execute the next step. If there is an empty AGV queue, the planning ends; Step (2). Sort all AGVs according to the priority of the task, select the first AGV according to the sorting, call the improved A-star algorithm for path planning, calculate the path time, determine the time window, and clearly define the number and time of each grid occupied; Step (3). Select the next AGV and calculate the path time; Step (4). Based on the time window algorithm, determine whether the time window overlaps with the first AGV. If so, determine whether the conflict can be avoided by moving the time window of the next AGV to the conflict point backwards, so that the next AGV waits for the first AGV to pass in the grid before the conflict node. If the conflict can be avoided, push the time window back to find an idle time period and insert it. If not, re-plan the entire running path for the next AGV. If there is no conflict, register the grid number and occupied time of the AGV, and delete the AGV from the queue. Step (5). Determine whether the AGV queue is empty, that is, all AGVs have planned paths. If not, return to step (3) and initialize the next AGV as the first AGV; Step (6). If the AGV queue is empty, output the multi-AGV path planning solution.
[0023] In step (2), the improved A-star algorithm aims to improve the problem of "the path planned by the AGV may have too many turns" in the traditional A-star algorithm. The specific method is as follows: on the basis of the original heuristic function of the A-star algorithm, a turning factor is added as a penalty function. When the AGV reaches the position of each grid, it will determine whether it needs to turn. If the grid selected for continuing to go straight is a free-pass grid, then the grid is selected to keep going straight instead of turning, ensuring that the priority of the straight grid is greater than the priority of the turning grid. By reducing the selection of turning nodes, the AGV is allowed to keep walking in a straight line as much as possible in the warehouse system.
[0024] In step (2), the improved A-star algorithm aims to improve the problem of "the slow search efficiency of the A-star algorithm in the warehouse environment" existing in the traditional A-star algorithm. The specific method is as follows: add a weight parameter before the estimation function h(n) of the original heuristic function of the A-star algorithm , thereby changing the weight of the heuristic function; by adjusting the ratio of the actual cost to the estimated cost, the number of searched nodes can be effectively reduced and the search speed can be improved.
[0025] In step (2), the improved A-star algorithm mainly improves the problems of the traditional A-star algorithm, such as "the path planned by the AGV may have too many turns" and "the low search efficiency of the A-star algorithm in the warehouse environment". The heuristic function of the improved A-star algorithm is as follows: ; In the formula, Indicates the overall estimate from the starting point to the target end point; Indicates the actual cost from the starting point to the current node n; is a weight parameter used to adjust the ratio of actual cost to estimated cost and reduce the number of search nodes; Indicates the current node n The estimated cost to the end point after traversing all intermediate nodes; k is a constant; r is the number of turns.
[0026] The time window in step (4) refers to the time that the AGV spends performing a specific action (for the AGV in the warehouse system, it is the process from receiving the command from the central control system and starting from the standby point in the docking area to the target shelf until completing the entire handling task and returning to the standby point), which constitutes the time set of this process.
[0027] Assume n AGV has a time windows, where the time windows are represented as , where the subscript of t represents the number of time windows, which are sorted in the order of the time windows, and the end time of the previous time window is greater than the start time of the next time window. The movement time of the AGV is solved by the following formula:
[0028] In the formula represents the length of the AGV itself, L represents the distance from the starting point to the end point, and v represents the speed of the AGV.
[0029] In order to facilitate the subsequent verification of the algorithm, the following assumptions are made on the formed time window to control additional variables for comparison: a). Assume that the AGV is a point mass and no longer consider the size of the AGV itself. Each AGV will occupy a grid when traveling; b). Each grid is set as a two-way single channel. Only one AGV can pass through a grid, but the grid is bidirectional. The AGV can move in four directions through the grid; c).AGV is moving in a straight line at a constant speed. , without considering acceleration and deceleration and the waiting time required to move goods to the shelf, when turning, it is considered to pass through three grids at a uniform speed; d). When the AGV passes through a grid, the grid is immediately released to idle state; The following two formulas are used as the original time window and time point parameters of each task in the AGV path planning process and are input into the above method. First, the above parameters are updated after the path planning is completed, and then the updated time window and time point parameters are sent to each AGV to perform the task: ; ; In the above formula, It represents the time window of the path planned when the mth AGV completes the handling task; and is the time point when the AGV reaches the kth and k+1th grids in the path; is the distance between the i-th and i+1-th grids in the AGV path.
[0030] Example 3 The specific scenario targeted by the present invention is to plan the paths of multiple AGVs in a warehouse environment. To verify the correctness of the method of the present invention, a 10×10 grid environment is set in the matlab software, where each grid represents 5m, and the AGV speed is 1m / s, that is, the time it takes for the AGV to pass through a grid is 5s. Two AGVs are set, and the starting point of the AGV and the target shelf to which the AGV is going are randomly generated. The two AGVs set off at the same time. Figure 2 As shown, the horizontal grid 21 and the dot grid 7 represent two AGV starting points respectively, the oblique grid represents the shelf, the small square grid 25 represents a faulty AGV, and the solid line segment and the dotted line segment represent the planned path.
[0031] See also Figure 1 , which shows a flowchart of a multi-AGV path planning method based on a time window and an improved A-star algorithm proposed in the present invention, the method comprising the following steps: Step 1: According to the handling tasks assigned to the two AGVs, their respective task strings are formed. After completing the task assignment, the two form an AGV queue.
[0032] Step 2: Sort the AGVs according to task priority, call the improved A-star algorithm to plan the path for the first AGV, calculate the path time, and determine the time window based on the path time.
[0033] Specifically, the improved A-star algorithm heuristic function is as follows:
[0034] In the formula, is the actual cost value, is the heuristic cost function, k is a constant; r is the number of turns, is the weight coefficient.
[0035] Specifically, the heuristic cost function is calculated using the Euclidean distance as follows:
[0036] In the formula, is the X-axis coordinate value of the starting point, is the X-axis coordinate value of the target point, is the Y-axis coordinate value of the starting point, The Y-axis coordinate value of the starting point.
[0037] Specifically, the meaning of the time window is to combine the time that the AGV performs a specific action (for the warehouse system AGV, it is the process from receiving the command from the central control system to starting from the standby point in the docking area to the target shelf until completing the entire handling task and returning to the standby point), forming the time set of this process, which is expressed as The movement time of AGV is usually solved by the following formula:
[0038] In the formula Represents the length of the AGV itself, road represents the distance from the starting point to the end point, and v represents the speed of the AGV.
[0039] The present invention makes the following assumptions about the time window: a) Assuming that the AGV is a particle, the size of the AGV itself is no longer considered. Each AGV occupies a grid when it travels.
[0040] b) Each grid is set as a two-way single channel, that is, a grid can only allow one AGV to pass through, but the grid is bidirectional, and the AGV can move in four directions through the grid.
[0041] c) AGV is moving in a straight line at a constant speed. , without considering acceleration and deceleration and the waiting time required to move goods to the shelf, the turning is regarded as passing through the three grids at a constant speed.
[0042] d) When the AGV passes through a grid, the grid status is immediately released to idle.
[0043] ; ; In the above formula, It represents the time window of the path planned when the mth AGV completes the handling task; and is the time point when the AGV reaches the kth and k+1th grids in the path; is the distance between the i-th and i+1-th grids in the AGV path.
[0044] Step 3: Traverse the AGV queue and select the next AGV, that is, the second AGV.
[0045] Step 4: Call the improved A-star algorithm to plan the path for the second AGV, calculate the path time, and determine the time window based on the path time. Based on the time window algorithm, determine whether the time window overlaps with the first AGV. Use a collision avoidance strategy for the overlapping AGVs, and continue to judge the subsequent AGVs until the AGV queue is empty, and output a multi-AGV path planning solution.
[0046] Specifically, if there is overlap, determine whether the time window for the second AGV to arrive at the conflict point should be moved back, that is, let the second AGV wait for the first AGV to pass in the grid before the conflict node to avoid the conflict. If the conflict can be avoided, adopt the waiting strategy. If not, re-plan the entire operation path for the second AGV. If there is no conflict, register the grid number and occupied time of the AGV.
[0047] Step 5: At this time, the AGV queue is judged to be empty, and a multi-AGV path planning solution is output.
[0048] Only the improved A-star algorithm is used without conflict resolution strategy to plan the time window of the two AGVs in completing the handling task. The horizontal axis of the two figures represents the time (time window) experienced by the AGV movement, and the vertical axis represents the grid occupied by different time periods. Figure 3 As shown, it can be seen that at 20-25 seconds, the two collided in grid 14.
[0049] Based on the hybrid adjustment strategy of time window and improved A-star algorithm, the time window for two AGVs to complete the handling task is planned, as shown in the attached figure. Figure 4 It can be seen that, in the same task, the improved method proposed by the present invention avoids the conflict phenomenon.
[0050] The above experiments verify the feasibility of this method in solving node conflicts among multiple AGVs.
[0051] To sum up, based on the A-star strategy, the present invention incorporates factors such as the number of turns and search efficiency into the original strategy to implement an improved A-star algorithm, which effectively realizes the path planning of a single AGV in a warehousing system; at the same time, a hybrid adjustment strategy collision avoidance method based on a combination of a time window and an improved A-star algorithm is used to realize the path planning of multiple AGVs in a warehousing environment.
Claims
1. A multi-AGV path planning method based on a time window and an improved A-star algorithm, characterized in that: The following steps are involved: Step 1. Determine whether the AGV queue is empty: After the task allocation is completed, if each AGV has its own task string, the AGV queue is not empty. All AGVs with handling tasks form an AGV queue to execute the next step. If there is an empty AGV queue, the planning ends; Step 2. Sort all AGVs according to the priority of the task, select the first AGV according to the sorting, call the improved A-star algorithm for path planning, calculate the path time, determine the time window, and clearly specify the number and time of each grid occupied; Step 3. Select the next AGV and calculate the path time; Step 4. Based on the time window algorithm, determine whether the time window overlaps with the first AGV. If so, determine whether the conflict can be avoided by moving the time window of the next AGV to the conflict point backward and letting the next AGV wait for the first AGV to pass in the grid before the conflict node. If the conflict can be avoided, push the time window back to find an idle time period and insert it. If not, re-plan the entire running path for the next AGV. If there is no conflict, register the grid number and occupied time of the AGV and delete the AGV from the queue. Step 5. Determine whether the AGV queue is empty, that is, all AGVs have planned paths. If not, return to step 3 and initialize the next AGV as the first AGV; Step 6. If the AGV queue is empty, output the multi-AGV path planning solution.
2. The multi-AGV path planning method based on the combination of time window and improved A-star algorithm according to claim 1 is characterized in that: In step 2, the improved A-star algorithm adds a turning factor as a penalty function based on the original heuristic function of the A-star algorithm. When the AGV drives to the location of each grid, it will determine whether it needs to turn. If the grid selected for continuing to go straight is a free-pass grid, then the grid is selected to keep going straight instead of turning, ensuring that the priority of the straight grid is greater than the priority of the turning grid.
3. The multi-AGV path planning method based on the combination of time window and improved A-star algorithm according to claim 1 is characterized in that: In step 2, the improved A-star algorithm adds a weight parameter before the estimation function h(n) of the original heuristic function of the A-star algorithm. , thereby changing the weight of the heuristic function; By adjusting the ratio of actual cost to estimated cost, the number of nodes to be searched is reduced.
4. The multi-AGV path planning method based on the combination of time window and improved A-star algorithm according to claim 1 is characterized in that: In step 2, the heuristic function of the improved A-star algorithm is as follows: ; In the formula, It represents the overall estimate from the starting point to the target end point; Indicates the actual cost from the starting point to the current node n; is a weight parameter used to adjust the ratio of actual cost to estimated cost and reduce the number of search nodes; Indicates the current node n The estimated cost to the end point after traversing all intermediate nodes; k is a constant; r is the number of turns.
5. The multi-AGV path planning method based on the combination of time window and improved A-star algorithm according to claim 1 is characterized in that: The time window in step 4 refers to the time that the AGV spends performing a certain action, which constitutes the time set of this process.
6. The multi-AGV path planning method based on the combination of time window and improved A-star algorithm according to claim 5 is characterized in that: Assume n AGV has a time windows, where the time windows are represented as , where the subscript of t represents the number of time windows, which are sorted in the order of the time windows, and the end time of the previous time window is greater than the start time of the next time window. The movement time of the AGV is solved by the following formula: ; In the formula represents the length of the AGV itself, L represents the distance from the starting point to the end point, and v represents the speed of the AGV.
7. The multi-AGV path planning method based on the combination of time window and improved A-star algorithm according to claim 1 is characterized in that: In order to facilitate the subsequent verification of the algorithm, the following assumptions are made on the formed time window to control additional variables: a). Assume that the AGV is a point mass and no longer consider the size of the AGV itself. Each AGV will occupy a grid when traveling; b). Each grid is set as a two-way single channel. Only one AGV can pass through a grid, but the grid is bidirectional. The AGV can move in four directions through the grid; c).AGV is moving in a straight line at a constant speed. , without considering acceleration and deceleration and the waiting time required to move goods to the shelf, when turning, it is considered to pass through three grids at a uniform speed; d). When the AGV passes through a grid, the grid status is immediately released to idle.
8. The multi-AGV path planning method based on the combination of time window and improved A-star algorithm according to claim 7 is characterized in that: The following two formulas are used as the original time window and time point parameters of each task in the AGV path planning process and are input into the above method. First, the time window and time point parameters are updated after the path planning is completed, and then the updated time window and time point parameters are sent to each AGV to perform the task: ; ; In the above formula, It represents the time window of the path planned when the mth AGV completes the handling task; and is the time point when the AGV reaches the kth and k+1th grids in the path; is the distance between the i-th and i+1-th grids in the AGV path.
Citation Information
Patent Citations
Multi-AGV path planning method for intelligent garage
CN111721297A
Multi-AGV warehouse management system and method based on traditional Chinese medicine pharmacy
CN112000113A
Multi-AGV path planning method and system based on time window and improved A* algorithm
CN114924558A