By constructing a meteorological field model and grouping optimization processing, the problem of insufficient efficiency and accuracy in grouping meteorological field monitoring points has been solved, a more efficient and reasonable grouping of monitoring points has been achieved, and the accuracy of deformation monitoring of water conservancy projects has been improved.
Patent Information
- Application Number
- CN202410762526.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2024-10-01
AI Technical Summary
In the existing technology, the efficiency and accuracy of the grouping method of meteorological field monitoring points are insufficient, which affects the deformation monitoring results of water conservancy projects.
A meteorological field model is constructed by obtaining the coordinates and data of the weather station, determining the meteorological data based on the coordinates of the monitoring points, and using grouping optimization processing to obtain a reasonable combination of monitoring points and improve the flexibility and accuracy of the grouping.
It achieves a more efficient and reasonable grouping of monitoring points, improves the accuracy and flexibility of monitoring results, and ensures the accuracy of deformation monitoring of water conservancy projects.
Smart Images

Figure CN118735044A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical fields of data processing and engineering measurement, and in particular to a monitoring point grouping optimization method and a device applicable to a meteorological field. Background Art
[0002] Deformation monitoring in reservoir hub areas can help better understand the status of water conservancy projects, ensure their safe and stable operation, and provide useful data for engineering design and environmental protection. In related technologies, deformation monitoring requires the deployment of several surface deformation monitoring points on the dam surface, high slope surface and other important areas, and the selection of a certain number of measuring stations as observation base points in deformation-stable areas. By regularly observing the monitoring points, the deformation of the hub area can be analyzed.
[0003] Due to the large number of monitoring points, it is usually necessary to adopt a grouping method for observation. The grouping of monitoring points will have a certain impact on the monitoring results. Therefore, how to group the monitoring points of the meteorological field more efficiently and reasonably and improve the flexibility and accuracy of the monitoring point grouping has become one of the important research directions. Summary of the invention
[0004] The present disclosure aims to solve one of the technical problems in the related art at least to a certain extent. To this end, one purpose of the present disclosure is to propose a monitoring point grouping optimization method applicable to a meteorological field.
[0005] The second objective of the present disclosure is to provide a monitoring point grouping optimization device suitable for a meteorological field.
[0006] A third objective of the present disclosure is to provide an electronic device.
[0007] A fourth object of the present disclosure is to provide a non-transitory computer-readable storage medium.
[0008] A fifth object of the present disclosure is to provide a computer program product.
[0009] To achieve the above-mentioned purpose, the first embodiment of the present disclosure proposes a monitoring point grouping optimization method applicable to a meteorological field, comprising:
[0010] Acquire first coordinates and first meteorological data of multiple meteorological stations, and construct a meteorological field model based on the first coordinates and first meteorological data of each meteorological station;
[0011] Acquire the second coordinates of a plurality of preset monitoring points, and determine the second meteorological data of each monitoring point on the meteorological field model according to the second coordinate of each monitoring point;
[0012] The monitoring points are grouped according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and the N groups of monitoring points are continuously optimized to obtain M groups of monitoring points, where M and N are positive integers.
[0013] In the disclosed embodiment, the second coordinates of multiple preset monitoring points are obtained, and the second meteorological data of each monitoring point is determined on the meteorological field model according to the second coordinates of each monitoring point, the monitoring points are grouped according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and the N groups of monitoring points are further optimized to obtain M groups of monitoring points. Through the grouping optimization processing, the monitoring points of the meteorological field can be grouped more efficiently and reasonably, and the flexibility and accuracy of the monitoring point grouping can be improved.
[0014] To achieve the above-mentioned purpose, the second aspect of the present disclosure provides a monitoring point grouping optimization device applicable to a meteorological field, comprising:
[0015] A construction module, used to obtain first coordinates and first meteorological data of multiple meteorological stations, and to construct a meteorological field model based on the first coordinates and first meteorological data of each meteorological station;
[0016] A determination module, used to obtain second coordinates of a plurality of preset monitoring points, and determine second meteorological data of each monitoring point on a meteorological field model according to the second coordinates of each monitoring point;
[0017] The grouping optimization module is used to group the monitoring points according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and continue to optimize the N groups of monitoring points to obtain M groups of monitoring points, where M and N are positive integers.
[0018] To achieve the above-mentioned purpose, a third aspect of the present disclosure provides an electronic device, including:
[0019] at least one processor; and
[0020] a memory communicatively connected to at least one processor; wherein,
[0021] The memory stores instructions that can be executed by at least one processor, and the instructions are executed by at least one processor so that the at least one processor can execute the monitoring point grouping optimization method applicable to the meteorological field provided in the embodiment of the first aspect of the present disclosure.
[0022] To achieve the above-mentioned purpose, the fourth aspect embodiment of the present disclosure proposes a computer-readable storage medium on which computer instructions are stored, wherein the computer instructions are used to enable a computer to execute the monitoring point grouping optimization method applicable to a meteorological field provided in the first aspect embodiment of the present disclosure.
[0023] To achieve the above-mentioned purpose, the fifth aspect embodiment of the present disclosure proposes a computer program product, including a computer program, which, when executed by a processor, implements the monitoring point grouping optimization method applicable to meteorological fields provided in the first aspect embodiment of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is a flow chart of a monitoring point grouping optimization method applicable to a meteorological field according to an embodiment of the present disclosure;
[0025] Figure 2 is a schematic diagram of the plan distribution of multiple meteorological stations within a monitoring area according to an embodiment of the present disclosure;
[0026] Figure 3 This is a schematic diagram of the plan distribution of a measuring station and its corresponding monitoring points according to an embodiment of the present disclosure;
[0027] Figure 4 is a flow chart of a monitoring point grouping optimization method applicable to a meteorological field according to an embodiment of the present disclosure;
[0028] Figure 5 is a schematic diagram of a meteorological field model according to an embodiment of the present disclosure;
[0029] Figure 6 is a schematic diagram of a measuring station, a monitoring point and a temperature field model according to an embodiment of the present disclosure;
[0030] Figure 7 is a flow chart of a monitoring point grouping optimization method applicable to a meteorological field according to an embodiment of the present disclosure;
[0031] Figure 8 is a schematic diagram of a temperature line graph of multiple monitoring points according to an embodiment of the present disclosure;
[0032] Fig. 9 It is a structural block diagram of a monitoring point grouping optimization device applicable to a meteorological field according to an embodiment of the present disclosure;
[0033] Fig.10 It is a schematic diagram of the structure of an electronic device according to an embodiment of the present disclosure. DETAILED DESCRIPTION
[0034] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present disclosure, and should not be construed as limiting the present disclosure.
[0035] For ease of understanding, the terms in the embodiments of the present disclosure are explained below:
[0036] Spatial interpolation is the process of inferring and estimating values at other locations using known spatial data points. This is very common in fields such as geographic information systems (GIS), geology, meteorology, and environmental science. By interpolating spatial data, a continuous surface can be generated for visualization and analysis.
[0037] Kriging is a spatial interpolation method that estimates values at unknown locations using the values of known points while taking into account the spatial relationships and variability between locations.
[0038] The following describes the monitoring point grouping optimization method and device applicable to a meteorological field according to an embodiment of the present disclosure in conjunction with the accompanying drawings.
[0039] Figure 1 is a flow chart of a monitoring point grouping optimization method applicable to a meteorological field according to an embodiment of the present disclosure. Figure 1 As shown, the method comprises the following steps:
[0040] S101, obtaining first coordinates and first meteorological data of multiple meteorological stations, and constructing a meteorological field model based on the first coordinates and first meteorological data of each meteorological station.
[0041] Figure 2 is a schematic diagram of the planar distribution of multiple meteorological stations within a monitoring area according to an embodiment of the present disclosure, such as Figure 2 As shown, in the embodiment of the present disclosure, the weather stations are multiple weather stations pre-deployed in a preset monitoring area.
[0042] In some implementations, the first coordinates and the first meteorological data of a plurality of meteorological stations are directly obtained from a preset database.
[0043] In some implementations, the first coordinates of the weather station may be acquired based on a total station, and first weather data sent by the weather station may be received.
[0044] Optionally, interpolation processing may be performed based on the first coordinates and first meteorological data of each meteorological station to construct a meteorological field model of the monitoring area.
[0045] Optionally, in the embodiment of the present disclosure, the meteorological data may be temperature data. In other implementations, the meteorological data may also be humidity, wind speed, and other data, which are not limited in the embodiment of the present disclosure.
[0046] S102, obtaining second coordinates of a plurality of preset monitoring points, and determining second meteorological data of each monitoring point on a meteorological field model according to the second coordinate of each monitoring point.
[0047] The detection area includes multiple monitoring points. Optionally, the locations of the monitoring points and the weather stations may be the same or different, which is not limited in the embodiments of the present application.
[0048] like Figure 3 As shown, optionally, the second coordinates of each monitoring point can be obtained based on the total station of the preset measuring station, and the meteorological data corresponding to the second coordinates on the meteorological field model can be obtained as the second meteorological data of the monitoring point.
[0049] In some embodiments, for example, the detection areas are located at the same altitude, the first coordinate and the second coordinate may be two-dimensional coordinates. In some embodiments, for example, the relative height difference within the detection area is large, in order to improve the accuracy of the data, the first coordinate and the second coordinate may be three-dimensional coordinates.
[0050] S103, grouping the monitoring points according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and continuing to optimize the N groups of monitoring points to obtain M groups of monitoring points.
[0051] Wherein, M and N are positive integers.
[0052] In the embodiment of the present disclosure, the monitoring points are first grouped according to the range of the second meteorological data of each monitoring point to obtain N groups of monitoring points. Furthermore, the N groups of monitoring points can be further optimized based on the number of monitoring points in each group to obtain M groups of monitoring points.
[0053] In the disclosed embodiment, the second coordinates of multiple preset monitoring points are obtained, and the second meteorological data of each monitoring point is determined on the meteorological field model according to the second coordinates of each monitoring point, the monitoring points are grouped according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and the N groups of monitoring points are further optimized to obtain M groups of monitoring points. Through the grouping optimization processing, the monitoring points of the meteorological field can be grouped more efficiently and reasonably, and the flexibility and accuracy of the monitoring point grouping can be improved.
[0054] Figure 4 is a flow chart of a monitoring point grouping optimization method applicable to a meteorological field according to an embodiment of the present disclosure. Figure 4 As shown, the method comprises the following steps:
[0055] S401, obtaining the three-dimensional coordinates of each weather station as the first coordinates of the weather station.
[0056] In the embodiment of the present disclosure, the first coordinate and the second coordinate are both three-dimensional coordinates. In some embodiments, several locations can be evenly selected in the monitoring area to deploy weather stations, and the three-dimensional coordinates of each weather station are collected as the first coordinates of the weather station.
[0057] S402, obtaining initial meteorological data of each meteorological station within a preset time range.
[0058] The meteorological data of each meteorological station is recorded within a preset time range, for example, the preset time range may be from 19:00 to 23:00, and the meteorological data of each meteorological station is observed and recorded as initial meteorological data.
[0059] S403: taking the mean value of the initial meteorological data of each meteorological data as the first meteorological data of the meteorological station.
[0060] For a single meteorological station, the average of the initial meteorological data within the time range is taken as the first meteorological data of the meteorological station.
[0061] S404: Perform spatial interpolation according to the three-dimensional coordinates of each meteorological station and the first meteorological data to construct a meteorological field model.
[0062] In the embodiment of the present disclosure, the spatial interpolation can adopt a three-dimensional Kriging interpolation method, such as Figure 5 As shown, after spatial interpolation, the meteorological data of continuous locations in the monitoring area, that is, the meteorological field model, can be obtained for subsequent analysis.
[0063] S405, obtaining second coordinates of a plurality of preset monitoring points, and determining second meteorological data of each monitoring point on the meteorological field model according to the second coordinate of each monitoring point.
[0064] like Figure 6 As shown, the meteorological field model is retrieved based on the second coordinates of each monitoring point to determine the second meteorological data corresponding to each monitoring point on the meteorological field model.
[0065] S406, grouping the monitoring points according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and continuing to optimize the N groups of monitoring points to obtain M groups of monitoring points.
[0066] For the introduction of step S406, please refer to the relevant content in the above embodiment, which will not be repeated here.
[0067] In the disclosed embodiment, the mean of the initial meteorological data of each meteorological data is used as the first meteorological data of the meteorological station, and spatial interpolation is performed according to the three-dimensional coordinates of each meteorological station and the first meteorological data to construct a meteorological field model, obtain the second coordinates of multiple preset monitoring points, and determine the second meteorological data of each monitoring point on the meteorological field model according to the second coordinates of each monitoring point. This can improve the efficiency and accuracy of obtaining the meteorological data of the monitoring points, so as to facilitate the subsequent more efficient and reasonable grouping of the monitoring points of the meteorological field.
[0068] Figure 7is a flow chart of a monitoring point grouping optimization method applicable to a meteorological field according to an embodiment of the present disclosure. Figure 7 As shown, the method comprises the following steps:
[0069] S701, obtaining first coordinates and first meteorological data of multiple meteorological stations, and constructing a meteorological field model based on the first coordinates and first meteorological data of each meteorological station.
[0070] S702, obtaining second coordinates of a plurality of preset monitoring points, and determining second meteorological data of each monitoring point on a meteorological field model according to the second coordinate of each monitoring point.
[0071] For the introduction of step S701 to step S702, reference may be made to the relevant contents in the above embodiment, which will not be repeated here.
[0072] S703, rounding down the minimum value in the second meteorological data to obtain the minimum meteorological data, and rounding up the maximum value in the second meteorological data to obtain the maximum meteorological data.
[0073] Taking the meteorological data as temperature data as an example, the second meteorological data of multiple monitoring points can form a temperature line graph, such as Figure 8 As shown, in the second meteorological data of multiple monitoring points, the minimum temperature is 29.4°C, the maximum temperature is 32.9°C, and the temperature difference is 3.5°C.
[0074] Optionally, find the minimum value of the second meteorological data of each monitoring point and round it down to get the minimum meteorological data T0, where T0 is 29°C, find the maximum value and round it up to get the maximum meteorological data T M , where T M is 33℃.
[0075] S704, determining a meteorological data range according to the minimum meteorological data and the maximum meteorological data, and dividing the meteorological data range into a plurality of meteorological data sub-ranges according to a preset segmentation threshold.
[0076] Optionally, d represents the preset segmentation threshold, and the meteorological data is divided into n segments, and the n meteorological data sub-ranges include [T0, T0+d), [T0+d, T0+2d), ..., [T0+(n-1)d, T0+nd]. Optionally, n is calculated according to the following formula and rounded up:
[0077] n=(T M -T0) / d
[0078] In the embodiment of the present disclosure, d = 0.5°C, based on the minimum meteorological data T0 and the maximum meteorological data T MFor example, the meteorological data range is determined to be [29, 33]. The first group of meteorological data sub-ranges includes [29, 29.5), the second group of temperature intervals is [29.5, 30), the third group of temperature intervals is [30, 30.5), the fourth group of temperature intervals is [30.5, 31), the fifth group of temperature intervals is [31, 31.5), the sixth group of temperature intervals is [31.5, 32), the seventh group of temperature intervals is [32, 32.5), and the eighth group of temperature intervals is [32.5, 33].
[0079] In the disclosed embodiment, n is 8.
[0080] S705: Group the monitoring points according to the meteorological data sub-range to which the second meteorological data of each monitoring point belongs, to obtain N groups of monitoring points.
[0081] For example, the embodiment of the present disclosure includes 8 groups, the first temperature interval is [29, 29.5), including 1 monitoring point; the second temperature interval is [29.5, 30), including 8 monitoring points; the third temperature interval is [30, 30.5), including 39 monitoring points; the fourth temperature interval is [30.5, 31), including 59 monitoring points; the fifth temperature interval is [31, 31.5), including 16 monitoring points; the sixth temperature interval is [31.5, 32), including 3 monitoring points; the seventh temperature interval is [32, 32.5), including 1 monitoring point; the eighth temperature interval is [32.5, 33], including 3 monitoring points.
[0082] S706, obtaining a minimum number threshold and a maximum number threshold of monitoring points, wherein the minimum number threshold is smaller than the maximum number threshold.
[0083] Optionally, the maximum number of monitoring points in a single group is set to K, the minimum number of monitoring points is set to L, and N groups of monitoring points are traversed.
[0084] S707, optimizing the N groups of monitoring points based on the minimum number threshold, the maximum number threshold, and the number of monitoring points in each group, and obtaining the optimized number of monitoring points in each group.
[0085] In some implementations, N groups of monitoring points are traversed, and for the i-th group of monitoring points currently traversed, the first number of the i-th group of monitoring points is obtained. In response to the first number of the i-th group of monitoring points being less than a minimum number threshold, the i-th group of monitoring points is merged into the i-1-th group of monitoring points, or merged into the i+1-th group of monitoring points. In response to the first number of the i-th group of monitoring points being greater than a maximum number threshold, the i-th group of monitoring points is split into two or more groups of monitoring points.
[0086] Take the maximum number of monitoring points K = 11 and the minimum number of monitoring points L = 7 as an example. If the number of monitoring points in a group is less than L, then merge the group into the adjacent (for example, the left neighbor) monitoring point group until the number of monitoring points in all monitoring point groups is not less than L. Let the monitoring point group at this time be N1. Here, the first group and the second group are merged to obtain a new first group with a temperature range of [29, 30) and 9 monitoring points; the sixth and seventh groups are merged to obtain a new fifth group with a temperature range of [31.5, 33.5) and 4 monitoring points. At this time, the number of monitoring point groups is 6. Traverse the N1 group of monitoring points. If the number of monitoring points in a group is greater than K, split the group into several groups.
[0087] For example, the new second group (temperature interval is [30, 30.5), including 39 monitoring points) is sorted by temperature from small to large, and split into 4 groups, including 10, 10, 10, and 9 monitoring points respectively; the new third group (temperature interval is [30.5, 31), including 59 monitoring points) is split into 6 groups, including 10, 10, 10, 10, 10, and 9 monitoring points respectively; the new fourth group (temperature interval is [31, 31.5), including 16 monitoring points) is split into 2 groups, including 8 and 8 monitoring points respectively. At this time, the number of monitoring point groups is 15.
[0088] After optimization, the first group contains 9 monitoring points, and the maximum temperature difference within the group is 0.5℃; the second group contains 10 monitoring points, and the maximum temperature difference within the group is 0.1℃; the third group contains 10 monitoring points, and the maximum temperature difference within the group is 0.1℃; the fourth group contains 10 monitoring points, and the maximum temperature difference within the group is 0.15℃; the fifth group contains 9 monitoring points, and the maximum temperature difference within the group is 0.06℃; the sixth group contains 10 monitoring points, and the maximum temperature difference within the group is 0.1℃; the seventh group contains 10 monitoring points, and the maximum temperature difference within the group is 0.07℃; the eighth group contains 10 monitoring points, and the maximum temperature difference within the group is 0. The maximum temperature difference within the group is 0.08℃; the ninth group contains 10 monitoring points, and the maximum temperature difference within the group is 0.06℃; the tenth group contains 10 monitoring points, and the maximum temperature difference within the group is 0.05℃; the eleventh group contains 9 monitoring points, and the maximum temperature difference within the group is 0.09℃; the twelfth group contains 8 monitoring points, and the maximum temperature difference within the group is 0.1℃; the thirteenth group contains 8 monitoring points, and the maximum temperature difference within the group is 0.28℃; the fourteenth group contains 4 monitoring points, and the maximum temperature difference within the group is 0.75℃; the fifteenth group contains 3 monitoring points, and the maximum temperature difference within the group is 0.45℃.
[0089] S708, if the number of each group of monitoring points after optimization is greater than the minimum number threshold and less than the maximum number threshold, it is determined that M groups of monitoring points are obtained, otherwise the N groups of monitoring points are optimized based on the minimum number threshold, the maximum number threshold, and the number of each group of monitoring points until the number of each group of monitoring points after optimization is greater than the minimum number threshold and less than the maximum number threshold, and M groups of monitoring points are obtained.
[0090] In the disclosed embodiment, the number of monitoring points in each group after splitting is not less than the minimum number threshold and not greater than the maximum number threshold. After optimizing the grouping of monitoring points, the temperature difference in most groups is within 0.15°C, which has little impact on the monitoring results.
[0091] In the disclosed embodiment, the temperature difference within the same group is small, and the measurement data is less affected by temperature. The accuracy of the results of the monitoring points in the same group can be guaranteed through group optimization processing, the deformation analysis of the hub area is more accurate, and the monitoring points of the meteorological field can be grouped more efficiently and reasonably.
[0092] Fig. 9 is a structural block diagram of a monitoring point grouping optimization device applicable to a meteorological field according to an embodiment of the present disclosure, such as Fig. 9 As shown, the monitoring point grouping optimization device 900 applicable to the meteorological field includes:
[0093] A construction module 910 is used to obtain first coordinates and first meteorological data of multiple meteorological stations, and to construct a meteorological field model based on the first coordinates and first meteorological data of each meteorological station;
[0094] The determination module 920 is used to obtain the second coordinates of a plurality of preset monitoring points, and determine the second meteorological data of each monitoring point on the meteorological field model according to the second coordinates of each monitoring point;
[0095] The grouping optimization module 930 is used to group the monitoring points according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and continue to optimize the N groups of monitoring points to obtain M groups of monitoring points, where M and N are positive integers.
[0096] In some embodiments, the construction module 910 is further configured to:
[0097] Obtain the three-dimensional coordinates of each weather station as the first coordinates of the weather station;
[0098] Obtain initial meteorological data for each weather station within a preset time range;
[0099] The mean of the initial meteorological data of each meteorological data is taken as the first meteorological data of the meteorological station;
[0100] Spatial interpolation is performed according to the three-dimensional coordinates of each meteorological station and the first meteorological data to construct a meteorological field model.
[0101] In some implementations, the spatial interpolation uses three-dimensional Kriging interpolation.
[0102] In some implementations, the grouping optimization module 930 is further configured to:
[0103] The minimum value in the second meteorological data is rounded down to obtain the minimum meteorological data, and the maximum value in the second meteorological data is rounded up to obtain the maximum meteorological data;
[0104] Determine the meteorological data range according to the minimum meteorological data and the maximum meteorological data, and divide the meteorological data range into a plurality of meteorological data sub-ranges according to a preset segmentation threshold;
[0105] The monitoring points are grouped according to the meteorological data sub-range to which the second meteorological data of each monitoring point belongs, to obtain N groups of monitoring points.
[0106] In some implementations, the grouping optimization module 930 is further configured to:
[0107] Obtain the minimum number threshold and maximum number threshold of monitoring points, where the minimum number threshold is smaller than the maximum number threshold;
[0108] Optimize N groups of monitoring points based on a minimum number threshold, a maximum number threshold, and the number of monitoring points in each group, and obtain the optimized number of monitoring points in each group;
[0109] If the number of monitoring points in each group after optimization is greater than the minimum number threshold and less than the maximum number threshold, it is determined that M groups of monitoring points are obtained. Otherwise, the N groups of monitoring points are optimized based on the minimum number threshold, the maximum number threshold, and the number of monitoring points in each group until the number of monitoring points in each group after optimization is greater than the minimum number threshold and less than the maximum number threshold, and M groups of monitoring points are obtained.
[0110] In some implementations, the grouping optimization module 930 is further configured to:
[0111] Traversing N groups of monitoring points, for the i-th group of monitoring points currently traversed, obtaining the first number of the i-th group of monitoring points;
[0112] In response to a first number of the i-th group of monitoring points being less than a minimum number threshold, merging the i-th group of monitoring points into the i-1-th group of monitoring points, or merging into the i+1-th group of monitoring points;
[0113] In response to a first number of the i-th group of monitoring points being greater than a maximum number threshold, the i-th group of monitoring points is divided into two or more groups of monitoring points.
[0114] In the disclosed embodiment, the temperature difference within the same group is small, and the measurement data is less affected by temperature. The accuracy of the results of the monitoring points in the same group can be guaranteed through group optimization processing, and the deformation analysis of the hub area is more accurate. The monitoring points of the meteorological field can be grouped more efficiently and reasonably, thereby improving the flexibility of the monitoring point grouping.
[0115] The acquisition, transmission, storage, use, and processing of data in the technical solution disclosed in this disclosure are in compliance with the relevant provisions of national laws and regulations.
[0116] It should be noted that in the embodiments of the present disclosure, certain software, components, models and other existing solutions in the industry may be mentioned, which should be regarded as exemplary. Their purpose is only to illustrate the feasibility of implementing the technical solution of the present application, but it does not mean that the applicant has or will necessarily use the solution.
[0117] Fig.10 It is a schematic diagram of the structure of an electronic device according to an embodiment of the present disclosure.
[0118] like Fig.10 As shown, the electronic device 1000 includes:
[0119] The memory 1001 and the processor 1002, a bus 1003 connecting different components (including the memory 1001 and the processor 1002), the memory 1001 stores a computer program, and when the processor 1002 executes the program, the monitoring point grouping optimization method applicable to the meteorological field of the embodiment of the present disclosure is implemented.
[0120] Bus 1003 represents one or more of several types of bus structures, including a memory bus or memory controller, a peripheral bus, an accelerated graphics port, a processor or a local bus using any of a variety of bus structures. For example, these architectures include but are not limited to Industry Standard Architecture (ISA) bus, Micro Channel Architecture (MAC) bus, Enhanced ISA bus, Video Electronics Standards Association (VESA) local bus and Peripheral Component Interconnect (PCI) bus.
[0121] The electronic device 1000 typically includes a variety of electronic device readable media. These media can be any available media that can be accessed by the electronic device 1000, including volatile and non-volatile media, removable and non-removable media.
[0122] The memory 1001 may also include computer system readable media in the form of volatile memory, such as random access memory (RAM) 1004 and / or cache memory 1005. The electronic device 1000 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, the storage system 1006 may be used to read and write non-removable, non-volatile magnetic media ( Fig.10 not shown, usually called a "hard drive"). Although Fig.10 Not shown in the figure, a disk drive for reading and writing to a removable non-volatile disk (e.g., a "floppy disk"), and an optical disk drive for reading and writing to a removable non-volatile optical disk (e.g., a CD-ROM, a DVD-ROM, or other optical media) may be provided. In these cases, each drive may be connected to the bus 1003 via one or more data medium interfaces. The memory 1001 may include at least one program product having a set (e.g., at least one) of program modules that are configured to perform the functions of the various embodiments of the present disclosure.
[0123] A program / utility 1008 having a set (at least one) of program modules 1007 may be stored, for example, in the memory 1001, such program modules 1007 including but not limited to an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment. The program modules 1007 generally perform the functions and / or methods of the embodiments described in the present disclosure.
[0124] The electronic device 1000 may also communicate with one or more external devices 1009 (e.g., keyboard, pointing device, display 1011, etc.), one or more devices that enable a user to interact with the electronic device 1000, and / or any device that enables the electronic device 1000 to communicate with one or more other computing devices (e.g., network card, modem, etc.). Such communication may be performed through an input / output (I / O) interface 1012. Furthermore, the electronic device 1000 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) through a network adapter 1013. Fig.10 As shown, the network adapter 1013 communicates with other modules of the electronic device 1000 via the bus 1003. It should be understood that, although not shown in the figure, other hardware and / or software modules can be used in conjunction with the electronic device 1000, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0125] The processor 1002 executes various functional applications and data processing by running the programs stored in the memory 1001 .
[0126] It should be noted that the implementation process and technical principles of the electronic device of this embodiment refer to the aforementioned explanation of the monitoring point grouping optimization method applicable to the meteorological field in the embodiment of the present disclosure, and will not be repeated here.
[0127] In order to implement the above embodiments, the present disclosure also proposes a computer-readable storage medium.
[0128] When the instructions in the computer-readable storage medium are executed by the processor of the electronic device, the electronic device can execute the above-mentioned monitoring point grouping optimization method applicable to the meteorological field. Optionally, the computer-readable storage medium can be a ROM, a random access memory (RAM), a CD-ROM, a magnetic tape, a floppy disk, an optical data storage device, etc.
[0129] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. The present disclosure is intended to cover any variations, uses or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The description and examples are to be considered exemplary only, and the true scope and spirit of the present disclosure are indicated by the following claims.
[0130] It should be understood that the present disclosure is not limited to the exact structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.
Claims
1. A monitoring point grouping optimization method applicable to a meteorological field, characterized in that: include: Acquire first coordinates and first meteorological data of a plurality of meteorological stations, and construct a meteorological field model based on the first coordinates and the first meteorological data of each of the meteorological stations; Acquire second coordinates of a plurality of preset monitoring points, and determine second meteorological data of each of the monitoring points on the meteorological field model according to the second coordinates of each of the monitoring points; The monitoring points are grouped according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and the N groups of monitoring points are continuously optimized to obtain M groups of monitoring points, where M and N are positive integers.
2. The method according to claim 1, characterized in that The step of acquiring first coordinates and first meteorological data of a plurality of meteorological stations, and constructing a meteorological field model based on the first coordinates and the first meteorological data of each of the meteorological stations, comprises: Acquire the three-dimensional coordinates of each of the meteorological stations as the first coordinates of the meteorological station; Obtaining initial meteorological data of each of the meteorological stations within a preset time range; Taking the mean of the initial meteorological data of each meteorological data as the first meteorological data of the meteorological station; Spatial interpolation is performed according to the three-dimensional coordinates of each of the meteorological stations and the first meteorological data to construct a meteorological field model.
3. The method according to claim 2, characterized in that The spatial interpolation adopts three-dimensional Kriging interpolation.
4. The method according to claim 1, characterized in that: The step of grouping the monitoring points according to the second meteorological data of each monitoring point to obtain N groups of monitoring points includes: The minimum value in the second meteorological data is rounded down to obtain the minimum meteorological data, and the maximum value in the second meteorological data is rounded up to obtain the maximum meteorological data; Determine a meteorological data range according to the minimum meteorological data and the maximum meteorological data, and divide the meteorological data range into a plurality of meteorological data sub-ranges according to a preset segmentation threshold; The monitoring points are grouped according to the meteorological data sub-range to which the second meteorological data of each monitoring point belongs, to obtain N groups of monitoring points.
5. The method according to any one of claims 1 to 4, characterized in that: The step of optimizing the N groups of monitoring points to obtain the M groups of monitoring points includes: Acquire a minimum number threshold and a maximum number threshold of the monitoring points, wherein the minimum number threshold is smaller than the maximum number threshold; Optimizing the N groups of monitoring points based on the minimum number threshold, the maximum number threshold, and the number of monitoring points in each group, and obtaining the optimized number of monitoring points in each group; If the number of monitoring points in each group after optimization is greater than the minimum number threshold and less than the maximum number threshold, it is determined that the M groups of monitoring points are obtained; otherwise, the N groups of monitoring points are optimized based on the minimum number threshold, the maximum number threshold, and the number of monitoring points in each group until the number of monitoring points in each group after optimization is greater than the minimum number threshold and less than the maximum number threshold, and the M groups of monitoring points are obtained.
6. The method according to claim 5, characterized in that The optimizing the N groups of monitoring points based on the minimum number threshold, the maximum number threshold, and the number of monitoring points in each group includes: Traversing the N groups of monitoring points, and for the i-th group of monitoring points currently traversed, obtaining a first number of the i-th group of monitoring points; In response to the first number of the i-th group of monitoring points being less than the minimum number threshold, merging the i-th group of monitoring points into the i-1-th group of monitoring points, or merging into the i+1-th group of monitoring points; In response to a first number of the i-th group of monitoring points being greater than the maximum number threshold, the i-th group of monitoring points is divided into two or more groups of monitoring points.
7. A monitoring point grouping optimization device suitable for a meteorological field, characterized in that: include: A construction module, used for acquiring first coordinates and first meteorological data of a plurality of meteorological stations, and constructing a meteorological field model based on the first coordinates and the first meteorological data of each of the meteorological stations; A determination module, used for acquiring second coordinates of a plurality of preset monitoring points, and determining second meteorological data of each of the monitoring points on the meteorological field model according to the second coordinates of each of the monitoring points; The grouping optimization module is used to group the monitoring points according to the second meteorological data of each monitoring point to obtain N groups of monitoring points, and continue to optimize the N groups of monitoring points to obtain M groups of monitoring points, where M and N are positive integers.
8. An electronic device, comprising: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 6.
9. A non-transitory computer-readable storage medium storing computer instructions, wherein: The computer instructions are used to cause the computer to execute the steps of the method according to any one of claims 1-6.
10. A computer program product, comprising a computer program, which, when executed by a processor, implements the method according to any one of claims 1 to 6.