Scheduling method, device and equipment for multi-interest subject to participate in electricity market, and medium
By building a virtual power plant trading platform and the asymmetric Nash bargaining method, the problem of revenue guarantee for user-side resources in power transactions in the traditional power market has been solved, and a fair and reasonable distribution of internal benefits of the virtual power plant and scientific management of power allocation have been achieved.
Patent Information
- Application Number
- CN202410760314.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2024-10-01
AI Technical Summary
In the traditional power market transaction model, since the main network transfers the interests of buyers to sellers through price control, it is difficult for user-side resources such as distributed power supplies, flexible loads, and energy storage systems to guarantee profits in power transactions, and virtual power plants are in complex environments. How to determine the differences in individual contributions and distribute fair and reasonable benefits is still an unresolved problem.
Build a virtual power plant trading platform, use the virtual power plant as the main body to perform optimized dispatch simulations, calculate the income of each sub-user based on expected income and contribution, and distribute income through the asymmetric Nash bargaining method until the income of each sub-user meets the preset conditions , realize power dispatching and revenue sharing.
It achieves scientific management of user-side resources in virtual power plants, reduces conflicts of interest, ensures the benefits of different stakeholders, and achieves fairness and rationality in power allocation and improved efficiency.
Smart Images

Figure CN118735175A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field related to programming, and in particular to a scheduling method, device, equipment and medium for multiple stakeholders to participate in an electricity market. Background Art
[0002] In the traditional electricity market transaction model, since the main grid can transfer the buyer's interests to the seller by controlling the price, the transaction process generally presents a situation of competitive monopoly by the seller and perfect competition by the buyer. Therefore, when user-side resources such as distributed power sources, flexible loads, and energy storage systems conduct electricity transactions with the main grid as a stakeholder, it is difficult to guarantee their profits. Summary of the invention
[0003] In view of this, the embodiments of the present application are directed to providing a scheduling method, apparatus, device and medium for multiple stakeholders to participate in the power market.
[0004] This application provides a dispatching method for multiple stakeholders to participate in the electricity market, including:
[0005] Build a virtual power plant trading platform;
[0006] Determine an initial cluster; wherein each initial cluster includes multiple sub-users; and the sub-users under the same initial cluster constitute a virtual power plant;
[0007] A virtual power plant trading platform, taking virtual power plants as the main body, performs simulation of optimized dispatching, and calculates the expected revenue of each virtual power plant based on the simulation results; wherein the transaction is used to characterize the dispatching of electricity;
[0008] Based on the expected benefits, the benefits of each sub-user in the virtual power plant are calculated based on the contribution degree;
[0009] Re-execute the steps to determine the initial cluster until the income of each sub-user meets the preset conditions;
[0010] Perform power dispatch based on the simulation results obtained from the last simulation;
[0011] Based on the actual power dispatch situation, profits are distributed to each sub-user.
[0012] In some embodiments, the virtual power plant trading platform, taking the virtual power plant as the main body, performs simulation of optimized scheduling, including:
[0013] The virtual power plant formulates trading strategies and output plans of internal members based on maximizing economic benefits;
[0014] The virtual power plant trading platform simulates optimal scheduling based on the virtual power plant's trading strategies and output plans.
[0015] In some embodiments, when the virtual power plant regulates the output of its internal members, it should adjust the flexible load to ensure that the load during high-price periods is transferred to low-price periods to improve the overall economic benefits.
[0016] In some embodiments, the virtual power plant is used to maximize economic benefits to formulate trading strategies and output plans of internal members, including:
[0017] The objective function is constructed to maximize the overall benefits of the virtual power plant, and the scheduling optimization within the virtual power plant is performed under preset constraints.
[0018] In some embodiments, the preset constraints include: power balance constraints and unit self constraints;
[0019] The unit's own constraints include: new energy unit constraints, energy storage constraints and flexible load constraints.
[0020] In some embodiments, the calculation of the income of each sub-user in the virtual power plant based on the expected income and taking the contribution as the standard includes:
[0021] Based on the expected benefits, an asymmetric Nash bargaining allocation mechanism is adopted to calculate the benefits of each sub-user in the virtual power plant.
[0022] In some embodiments, including:
[0023] If there are sub-users who are not satisfied with the current income, the income of each sub-user does not meet the preset conditions, otherwise the income of each sub-user does not meet the preset conditions.
[0024] The present application also provides a dispatching device for multiple stakeholders to participate in the power market, including:
[0025] Build a module for building a virtual power plant trading platform;
[0026] A determination module is used to determine an initial cluster; wherein each initial cluster includes a plurality of sub-users; and the sub-users under the same initial cluster constitute a virtual power plant;
[0027] The simulation module, the virtual power plant trading platform, takes the virtual power plant as the main body, performs simulation of optimized scheduling, and calculates the expected benefits of each virtual power plant based on the simulation results; wherein the transaction is used to characterize the scheduling of electricity;
[0028] A calculation module, used to calculate the income of each sub-user in the virtual power plant based on the expected income and the contribution degree;
[0029] A loop module, used for re-executing the steps to determine the initial cluster until the income of each sub-user meets the preset conditions;
[0030] A dispatching module, used for performing power dispatching based on the simulation results obtained from the last simulation;
[0031] The allocation module is used to allocate revenue to each sub-user based on the actual power dispatch situation.
[0032] The present application also provides an electronic device, including:
[0033] A processor, and a memory for storing a program executable by the processor;
[0034] The processor is used to implement the above-mentioned scheduling method for multiple stakeholders to participate in the power market by running the program in the memory.
[0035] The present application also provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the processor is enabled to execute the scheduling method for multiple stakeholders to participate in the electricity market as described above.
[0036] The present application provides a method for dispatching a power market in which multiple stakeholders participate, including: building a virtual power plant trading platform; determining an initial cluster; wherein each initial cluster includes multiple sub-users; the sub-users under the same initial cluster constitute a virtual power plant; the virtual power plant trading platform, taking the virtual power plant as the main body, simulates the optimization dispatching, and calculates the expected benefits of each virtual power plant based on the simulation results; wherein the transaction is used to characterize the dispatching of power; based on the expected benefits, the benefits of each sub-user in the virtual power plant are calculated based on the contribution degree; re-execute the steps to determine the initial cluster until the benefits of each sub-user meet the preset conditions; dispatch power based on the simulation results obtained from the last simulation; and distribute benefits to each sub-user based on the actual dispatching of power. In the scheme provided by the present application, the benefits of each participant are reasonably distributed based on the contribution degree, and a virtual power plant user-side trading platform is built to provide auxiliary decision-making references for the participants, so as to realize the scientific management of the user-side resources of the virtual power plant, ensure the benefits of different stakeholders, and realize more reasonable allocation of power. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] By describing the embodiments of the present application in more detail in conjunction with the accompanying drawings, the above and other purposes, features and advantages of the present application will become more apparent. The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the present application and do not constitute a limitation of the present application. In the accompanying drawings, the same reference numerals generally represent the same components or steps.
[0038] Figure 1It is a flowchart of a method for dispatching multiple stakeholders to participate in the electricity market provided by an embodiment of the present application.
[0039] Figure 2 This is a schematic diagram of a virtual power plant user-side trading platform provided by an embodiment of the present application.
[0040] Figure 3 It is a schematic diagram of the structure of a dispatching device for multiple stakeholders participating in the power market provided by an embodiment of the present application.
[0041] Figure 4 It is a schematic diagram of the structure of an electronic device provided by an embodiment of the present application. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] Application Overview
[0044] At present, in the traditional electricity market transaction model, since the main grid can transfer the buyer's interests to the seller by controlling the price, the transaction process generally presents a situation of competitive monopoly by the seller and perfect competition by the buyer. Therefore, when user-side resources such as distributed power sources, flexible loads, and energy storage systems trade electricity with the main grid as a stakeholder, it is difficult to guarantee their benefits. In order to break this situation, these user-side resources are aggregated into virtual power plants with multiple stakeholders by relying on various new data-driven technologies, and electric energy is shared among the internal stakeholders. However, there are many stakeholders on the user side, and there will be inevitable conflicts of interest, so a fair and reasonable trading mechanism needs to be designed.
[0045] Specifically, user-side resources such as distributed power sources, energy storage systems, and flexible loads can be aggregated into virtual power plants based on various new data-driven technologies. However, such user-side resources are often small in scale, weak in market competitiveness, and insufficient in risk resistance. Under the oligopoly of the supply side such as the upper power grid and energy suppliers, they can often only participate in market competition as price takers, which will greatly lose the utility of the user side and is not conducive to the stable operation of the power grid. As virtual power plants have been greatly expanded in recent years, a new form of interaction with the supply side has emerged. Multiple types of user-side stakeholders have reached cooperation to participate in market competition in a cluster manner, and electric energy is shared among members. However, there are many different user-side stakeholders, and there are inevitable conflicts of interest. It is necessary to design a fair and reasonable profit sharing strategy. Most domestic and foreign scholars use game models such as Stackelberg game, Nash negotiation, and Shapley value method to deal with such problems. However, in a complex virtual power plant environment, how to determine the difference in individual contribution in the cluster and distribute profits based on this is still an unresolved problem.
[0046] The present application provides a solution. First, a virtual power plant trading platform is built to help virtual power plants conduct power purchase and sale transactions with upper-level power grids and participate in the power retail market. Then, different user-side resources are freely aggregated to form an initial cluster, that is, a virtual power plant, which submits "volume quotation-quotation" information to the trading platform as a whole. Next, the platform calculates the expected benefits of the virtual power plant participating in the power market based on the latest cluster status, and distributes the benefits of the joint operation of each stakeholder based on the contribution degree based on the asymmetric Nash bargaining method. Each stakeholder considers whether to change the alliance strategy based on the above expected distribution. Through mutual game, a stable alliance state is finally reached. Finally, the virtual power plant coordinates and dispatches internal resources to participate in power market transactions and share the benefits. The present invention can achieve fair and reasonable sharing of benefits of virtual power plants participating in the power market, and reduce the conflicts of interest of resource subjects within the virtual power plant. The present invention uses the contribution degree as the standard, adopts the asymmetric Nash method to reasonably distribute the benefits of each participating subject, and at the same time builds a virtual power plant user-side trading platform to provide auxiliary decision-making references for participating subjects. This method helps to achieve scientific management of user-side resources of virtual power plants and ensure the benefits of different stakeholders.
[0047] After introducing the basic principles of the present application, various non-limiting embodiments of the present application will be described in detail with reference to the accompanying drawings.
[0048] Exemplary Methods
[0049] Figure 1 FIG. 1 is a flow chart of a method for dispatching a power market in which multiple stakeholders participate, provided by an embodiment of the present application. Figure 1 As shown, the method includes the following contents.
[0050] S101, building a virtual power plant trading platform;
[0051] Specifically, the platform helps all virtual power plants to purchase and sell electricity with the upper-level power grid, energy suppliers and other supply-side parties, and participate in the electricity retail market. It is equivalent to a decision-maker, issuing power purchase and sales strategies and regulating the resources of various entities. Specific responsibilities include predicting electricity market prices, load-side demand, renewable energy unit output, etc., and requiring all participating entities to publicly disclose power consumption parameters, quotations and other information. The specific architecture is as follows: Figure 2 shown.
[0052] S102, determining an initial cluster; wherein each initial cluster includes a plurality of sub-users; and the sub-users under the same initial cluster constitute a virtual power plant;
[0053] Specifically, different user-side resources are freely aggregated to form an initial cluster, namely a virtual power plant.
[0054] The cluster coordinates the electric energy within the cluster based on the complementary characteristics of the internal user-side resource load, unit parameters, distributed power output, etc., and submits the "report quantity-quote" information to the trading platform as a whole. Before the declaration deadline, each user-side stakeholder can change the cooperation partner at any time, or withdraw from the cooperation. Once a new initial cluster is formed, the cluster needs to update the filing information on the trading platform.
[0055] S103, a virtual power plant trading platform, taking the virtual power plant as the main body, performs simulation of optimized scheduling, and calculates the expected revenue of each virtual power plant based on the simulation results; wherein the transaction is used to characterize the scheduling of electricity;
[0056] S104, based on the expected income and taking contribution as a standard, calculating the income of each sub-user in the virtual power plant;
[0057] S105, re-execute the step of determining the initial cluster until the income of each sub-user meets the preset conditions;
[0058] It should be noted that, in actual applications, the income of each sub-user may be sent to the sub-user, so that the sub-user can determine whether he is satisfied with the current income. If not, "the income of each sub-user does not meet the preset conditions", and the initial cluster is reallocated (the actual wishes of the sub-user may be referred to during the allocation).
[0059] S106, performing power dispatch based on the simulation result obtained from the last simulation;
[0060] S107: Distribute revenue to each sub-user based on actual power dispatching conditions.
[0061] In the solution provided in this application, the interests of each participating entity are reasonably distributed based on the degree of contribution. At the same time, a virtual power plant user-side trading platform is built to provide auxiliary decision-making references for the participating entities, so as to realize the scientific management of the user-side resources of the virtual power plant, ensure the benefits of different stakeholders, and achieve more reasonable allocation of electricity.
[0062] Specifically, the virtual power plant trading platform, with the virtual power plant as the main body, simulates the optimization scheduling, including: the virtual power plant formulates trading strategies and output plans of internal members based on the maximization of economic benefits; the virtual power plant trading platform simulates the optimization scheduling based on the trading strategies and output plans of the virtual power plant. When the virtual power plant regulates the output of its internal members, it should adjust the flexible load to ensure that the load in the high-price period is transferred to the low-price period to improve the overall economic benefits.
[0063] Specifically, the platform calculates the expected benefits of the virtual power plant participating in the electricity market based on the latest cluster status. The virtual power plant can exchange power with the upper-level power grid to purchase or sell electricity. In the game in which various stakeholders aggregate to form a virtual power plant to jointly participate in the electricity market, the present invention considers the game of three types of user-side stakeholders, namely distributed generators, user-side energy storage, and flexible loads. First, the game behavior within the cluster is not considered, and all user-side stakeholders are considered as a whole for global optimization. Therefore, the virtual power plant control unit formulates trading strategies and output plans of internal members based on maximizing economic benefits. When the virtual power plant regulates the output of internal members, the flexible load should be adjusted to ensure that the load in the high-price period is transferred to the low-price period, thereby improving the overall economic benefits.
[0064] In practical applications, the virtual power plant is used to maximize economic benefits to formulate trading strategies and output plans of internal members, including:
[0065] The objective function is constructed to maximize the overall benefits of the virtual power plant, and the internal optimization scheduling of the virtual power plant is carried out under the preset constraints. The preset constraints include: power balance constraints and unit constraints; the unit constraints include: new energy unit constraints, energy storage constraints and flexible load constraints
[0066] Specifically, the objective function is as follows:
[0067] When optimizing the scheduling of virtual power plants, the objective function is to maximize the overall benefits of the virtual power plants, as shown in formula (1):
[0068]
[0069]
[0070]
[0071] In the formula, is the overall economic benefit of the i-th virtual power plant; is the trading profit of the i-th virtual power plant participating in the electricity market; are the purchase and sale prices of electricity of the ith virtual power plant in period t; is the power purchased and sold by the i-th virtual power plant in period t; is the operating cost of the virtual power plant, They are respectively the penalty costs of wind power and photovoltaic power, the operating cost of energy storage, and the compensation cost of flexible load in the i-th virtual power plant.
[0072] Among them, the penalty costs of wind power and photovoltaic power are due to the uncertainty of wind and solar power output. The scheduling of energy storage needs to consider the cost, and the virtual power plant needs to give corresponding compensation when adjusting the flexible load. The main compensation can reduce the load, as shown in equations (4) to (7):
[0073]
[0074]
[0075]
[0076]
[0077] In the formula, are the penalty unit prices of wind power and photovoltaic units in period t, are the output deviations of wind power and photovoltaic units in period t respectively; is the energy storage cost coefficient, It is the energy storage charging and discharging power. When it is positive, it indicates discharging, and when it is negative, it indicates charging. is the compensation price for flexible load, is the reduction of flexible load in period t.
[0078] (2) Constraints
[0079] 1) Power balance constraints
[0080]
[0081]
[0082]
[0083]
[0084] In the formula, is the predicted value of the load of the i-th virtual power plant in period t; is the transaction power amount and its upper limit; μ is a logical variable, when its value is 1, it indicates that the i-th virtual power plant sells electricity, and when its value is 0, it indicates that it purchases electricity.
[0085] 2) Unit’s own constraints
[0086] ① Constraints on new energy units
[0087]
[0088]
[0089] In the formula, are the predicted output values of wind power and photovoltaic units in period t respectively.
[0090] ②Energy storage constraints
[0091]
[0092]
[0093]
[0094] In the formula, is the state of charge of the energy storage, E i,max Indicates the upper limit of energy storage capacity.
[0095] ③Flexible load constraints
[0096]
[0097]
[0098]
[0099] In the formula, is the transfer amount of transferable load in period t, is the reduction amount of interruptible load in period t.
[0100] In some embodiments, the calculation of the income of each sub-user in the virtual power plant based on the expected income and taking contribution as the standard includes: based on the expected income, using an asymmetric Nash bargaining allocation mechanism to calculate the income of each sub-user in the virtual power plant.
[0101] Each stakeholder in the virtual power plant responds to price signals through cooperation to achieve the goal of maximizing overall benefits. However, the members of the cooperative game cluster belong to different entities. Therefore, it is necessary to ensure that the interests of each member will not be harmed during the cooperation process. Therefore, after globally optimizing the cluster as a whole, some scholars and experts use Nash bargaining to characterize the internal game behavior of the virtual power plant. However, since Nash bargaining ignores the difference in contribution within the multi-agent cooperative alliance, it can only obtain the result of equal distribution of additional benefits. Therefore, the present invention distributes the benefits of joint operation based on the asymmetric Nash bargaining method.
[0102] First, the contribution index is introduced. This index is measured according to the output power of each stakeholder in the virtual power plant, based on the distribution principle of "whoever benefits pays", and is calculated as follows:
[0103]
[0104] Where P i,t , are the net output power of interest entity i and virtual power plant in period t, respectively. i When it is positive, it means that one party of the interest subject and the virtual power plant has sufficient electricity, while the other party does not. At this time, the electricity output by the interest subject has a positive effect on the virtual power plant. i When it is negative, both the stakeholder and the virtual power plant are in a state of full or insufficient electricity. At this time, the electricity output by the stakeholder has a negative effect on the virtual power plant.
[0105] Formula (21) is the Cobb-Douglas utility function of the virtual power plant.
[0106]
[0107]
[0108]
[0109] Where: The cost of each stakeholder independently operating and participating in the electricity market, is the income allocated to stakeholder i. Formula (12) and (13) ensure that the income distribution plan satisfies the decision rationality of all stakeholders, and the income allocated to each stakeholder satisfies the capital balance constraint.
[0110] Since the revenue distribution problem (21) to (23) is a nonlinear optimization problem, taking the logarithm of the objective function will not change the optimal solution point. Its closed-form solution can be derived through the KKT (Karush Kuhn-Tucker, KKT) condition of the problem:
[0111]
[0112] Where: C is the reduced operating cost after the user-side stakeholders jointly participate in the operation of the electricity market.
[0113] This method effectively reduces the computational complexity of the profit distribution stage, while also ensuring that all stakeholders increase their profits when participating in the cluster, thereby encouraging electricity sharing within the cluster.
[0114] In actual applications, according to the above expected distribution, each stakeholder considers whether to change the alliance strategy. Through mutual game, a stable alliance state is finally reached (that is: if there are sub-users who are not satisfied with the current benefits, the benefits of each sub-user do not meet the preset conditions, otherwise the benefits of each sub-user do not meet the preset conditions). At the same time, as more and more stakeholders submit information, the platform can simulate a stable cluster state and publicize it to provide auxiliary decision-making for each stakeholder. The alliance in the stable cluster state forms a virtual power plant, and then the virtual power plant coordinates and dispatches internal resources to participate in electricity market transactions. The winning cluster participates in the electricity market to obtain bidding benefits. The virtual power plant user-side trading platform adopts an asymmetric Nash bargaining distribution mechanism based on contribution and distributes it to each stakeholder in the cluster.
[0115] To sum up, in the solution provided in this application, a virtual power plant user-side trading platform is constructed, and the virtual power plant participating in the electricity market is optimized based on the platform, and the asymmetric Nash bargaining method is used to distribute the benefits of the joint operation of various stakeholders in the virtual power plant.
[0116] If there are sub-users who are not satisfied with the current income, the income of each sub-user does not meet the preset conditions, otherwise the income of each sub-user does not meet the preset conditions.
[0117] Exemplary Devices
[0118] The device embodiments of the present application can be used to execute the method embodiments of the present application. For details not disclosed in the device embodiments of the present application, please refer to the method embodiments of the present application.
[0119] Figure 3 The block diagram of a dispatching device for multiple stakeholders participating in the power market provided by an embodiment of the present application is shown. Figure 3 As shown, the dispatching device of the multi-stakeholder participation in the electricity market includes:
[0120] Building module 31, used to build a virtual power plant trading platform;
[0121] The determination module 32 is used to determine an initial cluster; wherein each initial cluster includes a plurality of sub-users; and the sub-users under the same initial cluster constitute a virtual power plant;
[0122] The simulation module 34, the virtual power plant trading platform, takes the virtual power plant as the main body, performs simulation of optimized scheduling, and calculates the expected benefits of each virtual power plant based on the simulation results; wherein the transaction is used to characterize the scheduling of electricity;
[0123] A calculation module 35 is used to calculate the income of each sub-user in the virtual power plant based on the expected income and the contribution degree;
[0124] A loop module 36, configured to re-execute the step of determining the initial cluster until the income of each sub-user meets a preset condition;
[0125] A dispatching module 37, used for performing power dispatching based on the simulation result obtained from the last simulation;
[0126] The allocation module 38 is used to allocate revenue to each sub-user based on the actual power dispatch situation.
[0127] Exemplary Electronic Devices
[0128] Below, reference Figure 4 To describe an electronic device according to an embodiment of the present application. Figure 4 A block diagram of an electronic device according to an embodiment of the present application is illustrated.
[0129] like Figure 4 As shown, electronic device 400 includes one or more processors 410 and memory 420 .
[0130] The processor 410 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device 400 to perform desired functions.
[0131] The memory 420 may include one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 410 may execute the program instructions to implement the multi-stakeholder participation in the power market scheduling method of the various embodiments of the present application described above and / or other desired functions. Various contents such as category correspondences may also be stored in the computer-readable storage medium.
[0132] In one example, the electronic device 400 may further include: an input device 430 and an output device 440 , and these components are interconnected via a bus system and / or other forms of connection mechanisms (not shown).
[0133] In addition, the input device 430 may also include, for example, a keyboard, a mouse, an interface, etc. The output device 440 may output various information to the outside, including analysis results, etc. The output device 440 may include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto, etc.
[0134] Of course, to simplify, Figure 4 Only some of the components in the electronic device related to the present application are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, the electronic device may further include any other appropriate components according to specific application conditions.
[0135] Exemplary computer program products and computer-readable storage media
[0136] In addition to the above-mentioned methods and devices, an embodiment of the present application may also be a computer program product, which includes computer program instructions, which, when executed by a processor, enable the processor to execute the steps of the scheduling method for multi-stakeholder participation in the electricity market according to various embodiments of the present application described in the above "Exemplary Method" section of this specification.
[0137] The computer program product may be written in any combination of one or more programming languages to write program codes for performing the operations of the embodiments of the present application, including object-oriented programming languages, such as Java, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as an independent software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.
[0138] In addition, an embodiment of the present application may also be a computer-readable storage medium having computer program instructions stored thereon, and when the computer program instructions are executed by a processor, the processor executes the steps of the method for dispatching multiple stakeholders participating in the electricity market according to various embodiments of the present application described in the above “Exemplary Method” section of this specification.
[0139] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0140] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present application to the forms disclosed herein. Although multiple example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.
Claims
1. A dispatching method for multiple stakeholders to participate in the power market, characterized in that: include: Build a virtual power plant trading platform; Determine an initial cluster; wherein each initial cluster includes multiple sub-users; and the sub-users under the same initial cluster constitute a virtual power plant; A virtual power plant trading platform, taking virtual power plants as the main body, performs simulation of optimized dispatching, and calculates the expected revenue of each virtual power plant based on the simulation results; wherein the transaction is used to characterize the dispatching of electricity; Based on the expected benefits, the benefits of each sub-user in the virtual power plant are calculated based on the contribution degree; Re-execute the steps to determine the initial cluster until the income of each sub-user meets the preset conditions; Perform power dispatch based on the simulation results obtained from the last simulation; Based on the actual power dispatch situation, profits are distributed to each sub-user.
2. The method for dispatching a power market in which multiple stakeholders participate according to claim 1, characterized in that: The virtual power plant trading platform, with the virtual power plant as the main body, performs simulation of optimized scheduling, including: The virtual power plant formulates trading strategies and output plans of internal members based on maximizing economic benefits; The virtual power plant trading platform simulates optimal scheduling based on the virtual power plant's trading strategies and output plans.
3. The method for dispatching a power market in which multiple stakeholders participate according to claim 2, characterized in that: When a virtual power plant regulates the output of its internal members, it should adjust the flexible load to ensure that the load during high-price periods is transferred to low-price periods to improve the overall economic benefits.
4. The method for dispatching a power market in which multiple stakeholders participate according to claim 3 is characterized in that: The virtual power plant is used to maximize economic benefits to formulate trading strategies and output plans of internal members, including: The objective function is constructed to maximize the overall benefits of the virtual power plant, and the scheduling optimization within the virtual power plant is performed under preset constraints.
5. The method for dispatching a power market in which multiple stakeholders participate according to claim 2, characterized in that: The preset constraints include: power balance constraints and unit self constraints; The unit's own constraints include: new energy unit constraints, energy storage constraints and flexible load constraints.
6. The method for dispatching a power market with multiple stakeholders according to claim 1, characterized in that: The calculation of the income of each sub-user in the virtual power plant based on the expected income and taking the contribution as the standard includes: Based on the expected benefits, an asymmetric Nash bargaining allocation mechanism is adopted to calculate the benefits of each sub-user in the virtual power plant.
7. The method for dispatching a power market in which multiple stakeholders participate according to claim 1, characterized in that: include: If there are sub-users who are not satisfied with the current income, the income of each sub-user does not meet the preset conditions, otherwise the income of each sub-user does not meet the preset conditions.
8. A dispatching device for multiple stakeholders to participate in the power market, characterized in that: include: Build a module for building a virtual power plant trading platform; A determination module is used to determine an initial cluster; wherein each initial cluster includes a plurality of sub-users; and the sub-users under the same initial cluster constitute a virtual power plant; The simulation module, the virtual power plant trading platform, takes the virtual power plant as the main body, performs simulation of optimized scheduling, and calculates the expected benefits of each virtual power plant based on the simulation results; wherein the transaction is used to characterize the scheduling of electricity; A calculation module, used to calculate the income of each sub-user in the virtual power plant based on the expected income and the contribution degree; A loop module, used for re-executing the steps to determine the initial cluster until the income of each sub-user meets the preset conditions; A dispatching module, used for performing power dispatching based on the simulation results obtained from the last simulation; The allocation module is used to allocate revenue to each sub-user based on the actual power dispatch situation.
9. An electronic device, characterized in that: include: A processor, and a memory for storing a program executable by the processor; The processor is configured to implement the scheduling method for multiple stakeholders to participate in the power market according to any one of claims 1 to 7 by running the program in the memory.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which, when executed by a processor, enables the processor to execute the scheduling method for multi-stakeholder participation in an electricity market according to any one of claims 1 to 7.
Citation Information
Cited By
User income determination method and device for virtual power plant, equipment, medium and product
CN120338919A
Method, device, equipment, medium and product for determining user benefits of virtual power plant
CN120338919B