Novel power system flexible load regulation and control method and system
Through flexible load aggregation and hierarchical control methods, the problem of high load regulation overhead and error-proneness in new power systems is solved, efficient and accurate load regulation is achieved, and the reliability of the power grid and user experience are improved.
Patent Information
- Application Number
- CN202310350438.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-03-31
AI Technical Summary
Among the existing new power system control methods, load regulation is expensive and error-prone, resulting in low grid-side calculation and control efficiency.
Flexible load aggregation and hierarchical control methods are used to divide flexible loads according to geographical distribution. Each area is equipped with a first-level aggregation layer. Data aggregation and regulation target distribution are carried out through uplink and downlink data models, and are gradually aggregated to the dispatching layer. Formulate control targets based on the grid's power consumption plan to achieve real-time and precise control.
It reduces the data overhead pressure on the grid-side dispatch layer, improves grid control efficiency, improves the control accuracy of flexible loads and the reliability of the grid, and enhances user trust.
Smart Images

Figure CN118739320A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of power control, and in particular relates to a novel power system flexible load control method and system. Background Art
[0002] For traditional power system dispatching, the demand for electricity load must be met at any time, which has a "rigid" characteristic. A new power system has been formed due to the addition of distributed power generation, energy storage, electric vehicles, etc. In the new power system, the load can interact with the power grid and can be flexibly changed within a certain range according to needs. Such loads are called flexible loads. Flexible loads include industrial loads, commercial loads and residential loads among power users, as well as bidirectional controllable loads such as energy storage and electric vehicles, as well as distributed wind and solar power generation parks, microgrids and other production and consumption loads.
[0003] The existing new power system control method is to collect data from all loads, combine it with the grid plan, and formulate a control plan for each load. Due to the large amount of collected data and the large number of control objects, the calculation and control overhead on the grid side is too large, resulting in a high error rate in grid control.
[0004] In summary, the existing technology has the following technical problems: large load control overhead and easy errors. Summary of the invention
[0005] The purpose of the present invention is to provide a novel power system flexible load control method and system to solve the technical problems of large load control overhead and easy error caused by centralized control in the prior art.
[0006] To achieve the above-mentioned purpose, the present invention provides a novel power system flexible load control method and system technical solution:
[0007] A novel power system flexible load control method comprises the following steps: the method adopts a flexible load aggregation and hierarchical control mode, divides the flexible load into control areas according to geographical distribution, and configures a corresponding first-level aggregation layer for the flexible load in each area; the flexible load sends its own state data to the corresponding first-level aggregation layer according to the uplink data model, and receives the control target issued by the corresponding first-level aggregation layer according to the downlink data model; the first-level aggregation layer aggregates the state data, sends the obtained aggregated data to the upper-level aggregation layer or the dispatching layer, receives the control target issued by the upper-level aggregation layer or the dispatching layer, and controls the state data according to the received control target. The target generates the control target of the flexible load according to its own control strategy and sends it to the flexible load; each level of convergence layer in the non-first-level convergence layer converges the convergence data of the next-level convergence layer, sends the obtained convergence data to the upper-level convergence layer or the scheduling layer, and receives the control target sent by the upper-level convergence layer or the scheduling layer, generates the control target according to its own control strategy, and sends it to the lower-level convergence layer; the control target sent is the total power control target; the scheduling layer converges the convergence data of the directly connected convergence layer, combines the obtained convergence data with the power consumption plan of the power grid to formulate the control target, and sends it to the directly connected convergence layer.
[0008] The beneficial effect is that the convergence layer processes and integrates the uplink data of each flexible load to obtain the total performance data and total demand data of the flexible load under the convergence layer, and reports the converged data to the dispatching layer or the upper-level convergence layer. The dispatching layer summarizes the data of multiple convergence layers and proposes control targets for each convergence layer in combination with the performance of the power grid. The flexible loads of the convergence layer are charged, generated or stored according to the targets of the control data, so that the flexible loads included in the entire dispatching layer operate within the plan, which is conducive to improving the reliability of the power grid and increasing the trust of users. By adopting the method of real-time convergence and hierarchical control, the power grid dispatching layer processes the integrated data reported by the convergence layer step by step, reduces the data overhead pressure of the dispatching layer on the power grid side, and improves the efficiency of power grid control.
[0009] As a further improvement, the control strategy of the convergence layer itself is as follows: the first-level convergence layer divides the flexible load into production load, transfer load and consumption load according to the uplink data and performs differentiated control;
[0010] Production load refers to a flexible load with a power generation greater than 0, transfer load refers to a flexible load with a power generation greater than 0 and a load power greater than 0, and consumption load refers to a flexible load with a load power greater than 0;
[0011] The power generation power is set to be positive and the load power is set to be negative, and the regulation target is: total target control power = total target power generation power + total target energy storage power + total target load power.
[0012] Beneficial effects: production loads are loads for power generation, transfer loads are loads for energy storage, and consumption loads are loads for pure electricity consumption. The specific convergence layer calculates the total target power generation, total target energy storage, and total target load power based on the total target control power. The total target power generation is achieved by production loads, the total target energy storage is achieved by transfer loads, and the total target load power is achieved by consumption loads. By dividing the types of flexible loads in detail, the convergence layer can achieve precise control of flexible loads.
[0013] The characteristics of flexible loads are not static, but dynamically changing; the characteristics of flexible loads are not necessarily single, and there may also be loads with mixed characteristics. Therefore, the type of flexible load is determined based on the uplink data. When the power generation power is greater than 0, it means that the load can generate electricity. When the energy storage power is greater than 0, it means that the load can be used to store electrical energy. When the load power is greater than 0, it means that the load is an electrical load. Accurately determine the type of the load based on the data, so that the load can be controlled in a personalized manner according to different load characteristics.
[0014] The scheduling layer or the aggregation layer controls the next level through specific power. The aggregation layer or the flexible load has a total target control power and can respond more specifically to the control of the upper level.
[0015] As a further improvement, the first-level convergence layer also performs differentiated control according to the current power consumption period, such as peak power consumption, trough power consumption, and level power consumption period.
[0016] The beneficial effect is that the flexible load in a certain area will have peak power consumption, trough power consumption and level power consumption. Different power consumption states have different user needs. The power consumption state of the flexible load can be controlled according to the characteristics of the power consumption period, and the goals set are more feasible.
[0017] As a further improvement, the control strategy adopted by the first-level convergence layer is as follows: when the power consumption is at peak, the production-type load inside the flexible load is controlled to maximize the power generation, the consumption-type load is minimized, and the transfer-type load is used to supplement the difference in the total target power; when the power consumption is at low point, the consumption-type load inside the flexible load is controlled to maximize the load power, and when energy storage allows, the transfer-type load optimizes the energy storage power, and the production-type load is used to supplement the difference in the total target power; when the power consumption is at peak, the transfer-type load inside the flexible load is controlled to not use electricity or generate electricity, the consumption-type load uses electricity normally, and the production-type load is used to supplement the difference in the total target power.
[0018] The beneficial effect is that personalized scheduling target implementation methods are formulated according to different time periods of flexible loads, which is conducive to improving users' electricity consumption experience.
[0019] As a further improvement, when the power consumption is at a peak, the total target power generation power is controlled to be the total power generation power + the power that can be increased by power generation; if the energy storage SOC is less than or equal to the minimum allowable SOC limit, the total energy storage power target is controlled to be 0, and the total target load power is controlled to be the total target control power - the total target power generation power; if the energy storage SOC is greater than the minimum allowable SOC limit, the total target load power is controlled to be the total load power - the load power that can be reduced, and the total target energy storage power is controlled to be the total target control power - the total target power generation power - the total target load power, and it is determined whether the total target energy storage power is within the range of (energy storage power - energy storage power that can be reduced) to (energy storage power + energy storage power that can be increased). If not, the total target load power is adjusted to correct it; when the power consumption is at a low point, the total target Load power = total load power + load increase power; determine the energy storage SOC of the transfer load, if the energy storage SOC is greater than or equal to the maximum allowable SOC limit, the total target energy storage power = 0, if the energy storage SOC is less than the maximum allowable SOC limit, the total target energy storage power = optimal energy storage power, the total power generation power target = total target control power - total target energy storage power - total target energy storage power, determine whether the total target energy storage power is within the range of (energy storage power - energy storage reducible power) to (energy storage power + energy storage increase power), if not within the range, adjust the total target energy storage power to correct; when at the peak of power consumption, the total target energy storage power = 0, the total target load power = total load power, the total target power generation power = total target control power - total target load power.
[0020] The beneficial effect is: when the power consumption is at a peak, the power generation power of the production load is maximized, the power consumption of the consumer load is minimized, and the energy storage SOC of the energy storage power of the transfer load is determined. If the storage capacity of the transfer load is small, the energy storage is suspended. If the storage capacity of the transfer load is higher than the minimum storage capacity, the energy storage power can also be corrected. The total target energy storage power is calculated according to the total target control power and the determined total target power generation power and total target load power. If the total target energy storage power is a positive value, charging and energy storage are performed, and if it is a negative value, power generation and energy release are performed. When the power consumption is underestimated, the power consumption of the consumer load is maximized, and the power of the transfer load is maximized for energy storage. The total target power generation power is calculated according to the total target control power and the determined total target energy storage power and total target energy storage power. When the power consumption is at a peak, the power consumption and power generation are in a balanced state. The power of the transfer load is first made equal to 0, that is, neither charging nor discharging.
[0021] The present invention also provides a novel power system flexible load control system, the system includes a dispatching layer and a convergence layer, wherein the convergence layer includes multiple levels, wherein the first-level convergence layer is directly connected to the flexible load, and the first-level convergence layer is in communication connection with the upper-level convergence layer or the dispatching layer; the flexible load sends its own state data to the corresponding first-level convergence layer according to the uplink data model, and receives the control target issued by the corresponding first-level convergence layer according to the downlink data model; the first-level convergence layer converges the state data, sends the obtained converged data to the upper-level convergence layer or the dispatching layer, and receives the control target issued by the upper-level convergence layer or the dispatching layer, and according to the received The control target generates the control target of the flexible load according to its own control strategy and sends it to the flexible load; each level of convergence layer in the non-first-level convergence layer converges the convergence data of the next-level convergence layer, sends the obtained convergence data to the upper-level convergence layer or the scheduling layer, and receives the control target sent by the upper-level convergence layer or the scheduling layer, generates the control target according to its own control strategy, and sends it to the next-level convergence layer; the control target sent is the total power control target; the scheduling layer converges the convergence data of the directly connected convergence layer, combines the obtained convergence data with the power grid power consumption plan to formulate the control target, and sends it to the directly connected convergence layer.
[0022] The beneficial effect is that by adopting the method of real-time aggregation and hierarchical control, the power grid dispatching layer processes the integrated data reported step by step by the aggregation layer, reduces the data overhead pressure of the grid-side dispatching layer, and improves the efficiency of power grid control.
[0023] As a further improvement, the control strategy of the convergence layer itself is: the first-level convergence layer divides the flexible load into production load, transfer load and consumption load according to the uplink data for differentiated control; production load refers to a flexible load with a power generation power greater than 0, transfer load refers to a flexible load with a power generation power greater than 0 and a load power greater than 0, and consumption load refers to a flexible load with a load power greater than 0; the power generation power is set to positive and the load power is negative, and the regulation target is: total target control power = total target power generation power + total target energy storage power + total target load power.
[0024] Beneficial effects: production loads are loads for power generation, transfer loads are loads for energy storage, and consumption loads are loads for pure electricity consumption. The specific convergence layer calculates the total target power generation, total target energy storage, and total target load power based on the total target control power. By dividing the types of flexible loads in detail, the convergence layer can achieve precise control of flexible loads.
[0025] As a further improvement, the first-level convergence layer also performs differentiated control according to the current power consumption period, namely, peak power consumption, valley power consumption, and flat power consumption period.
[0026] The beneficial effect is that the flexible load in a certain area will have peak power consumption, trough power consumption and level power consumption. Different power consumption states have different user needs. The power consumption state of the flexible load can be controlled according to the characteristics of the power consumption period, and the goals set are more feasible.
[0027] As a further improvement, the control strategy adopted by the first-level convergence layer is as follows: when the power consumption is at peak, the production-type load inside the flexible load is controlled to maximize the power generation, the consumption-type load is minimized, and the transfer-type load is used to supplement the difference in the total target power; when the power consumption is at low point, the consumption-type load inside the flexible load is controlled to maximize the load power, and when energy storage allows, the transfer-type load optimizes the energy storage power, and the production-type load is used to supplement the difference in the total target power; when the power consumption is at peak, the transfer-type load inside the flexible load is controlled to not use electricity or generate electricity, the consumption-type load uses electricity normally, and the production-type load is used to supplement the difference in the total target power.
[0028] The beneficial effect is that personalized scheduling target implementation methods are formulated according to different time periods of flexible loads, which is conducive to improving users' electricity consumption experience.
[0029] As a further improvement, the first-level convergence layer is used to process when it is in peak power consumption, controlling the total target power generation power = total power generation power + power generation increase power; if the energy storage SOC is less than or equal to the minimum allowable SOC limit, the total energy storage power target is controlled to be 0, and the total target load power = total target control power - total target power generation power; if the energy storage SOC is greater than the minimum allowable SOC limit, the total target load power is controlled to be total load power - load reduction power, and the total target energy storage power = total target control power - total target power generation power - total target load power, and it is determined whether the total target energy storage power is within the range of (energy storage power - energy storage reduction power) to (energy storage power + energy storage increase power). If not, the total target load power is adjusted to correct it; when it is in the power consumption valley , total target load power = total load power + load increase power; determine the energy storage SOC of the transfer load, if the energy storage SOC is greater than or equal to the maximum allowable SOC limit, the total target energy storage power = 0, if the energy storage SOC is less than the maximum allowable SOC limit, the total target energy storage power = optimal energy storage power, the total power generation power target = total target control power - total target energy storage power - total target energy storage power, determine whether the total target energy storage power is within the range of (energy storage power - energy storage reducible power) to (energy storage power + energy storage increase power), if not within the range, adjust the total target energy storage power to correct; when at the peak of power consumption, the total target energy storage power = 0, the total target load power = total load power, the total target power generation power = total target control power - total target load power.
[0030] The beneficial effect is that personalized scheduling target implementation methods are formulated according to different time periods of flexible loads, which is conducive to improving users' electricity consumption experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A schematic diagram of a novel power system flexible load control method in an embodiment of the present invention;
[0032] Figure 2 It is a flow chart of the method for the convergence layer to calculate according to the control data during the peak power consumption of the present invention;
[0033] Figure 3 It is a flow chart of the method for the convergence layer to calculate according to the control data when the power consumption is low in the present invention;
[0034] Figure 4 This is a flow chart of the method for calculating the convergence layer according to the control data when the level peak is used in the present invention. DETAILED DESCRIPTION
[0035] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.
[0036] New power system flexible load control method embodiment:
[0037] like Figure 1 As shown, the scheduling layer obtains multiple convergence layer data, and the convergence layer obtains multiple flexible load data. The convergence layer is divided according to district-level and city-level administrative regions. It can also be other larger or smaller administrative regions such as township-level, village-level, group-level, etc., or it can be non-administrative regions, such as factories and other areas divided by other methods.
[0038] The aggregation layer directly connected to the scheduling layer can be a primary aggregation layer, or a secondary, tertiary or other multi-level aggregation layer.
[0039] In this embodiment, the area of the power grid dispatching layer is taken as the municipal administrative area as an example. The dispatching layer is directly connected to the county-level aggregation layer and part of the first-level aggregation layer. The county-level aggregation layer is directly connected to the township-level aggregation layer. The township-level aggregation layer is directly connected to the village-level aggregation layer, i.e., the first-level aggregation layer. The village-level aggregation layer is directly connected to all flexible loads within the village-level administrative area. The first-level aggregation layer directly connected to the dispatching layer is directly connected to all flexible loads in Factory A.
[0040] All flexible loads within the village administrative area are configured with a first-level aggregation layer;
[0041] All flexible loads send their own status data to the corresponding first-level convergence layer according to the uplink data model, and receive the control targets sent by the corresponding first-level convergence layer according to the downlink data model.
[0042] The first-level aggregation layer aggregates the status data, sends the obtained aggregated data to the township-level aggregation layer according to the uplink data model, receives the control targets issued by the township-level aggregation layer, generates control targets according to its own control strategy, and sends them to the flexible loads. The first-level aggregation layer is the village-level aggregation layer; the first-level aggregation layer directly connected to the scheduling layer sends data to the scheduling layer, obtains the corresponding control targets, generates control targets according to its own control strategy, and sends them to all flexible loads in Factory A.
[0043] The township-level convergence layer converges the converged data of the first-level convergence layer, sends the obtained converged data to the county-level convergence layer according to the uplink data model, receives the control targets issued by the county-level convergence layer, generates control targets according to its own control strategy, and sends them to the first-level convergence layer.
[0044] The county-level aggregation layer aggregates the aggregation data of the township-level aggregation layer, sends the obtained aggregation data to the scheduling layer according to the uplink data model, receives the control targets issued by the scheduling layer, generates control targets according to its own control strategy, and sends them to the township-level aggregation layer.
[0045] The dispatching layer aggregates the aggregated data of the county-level aggregation layer, combines the aggregated data with the power grid power consumption plan to formulate control targets, and sends them to the county-level aggregation layer. The uplink data model includes the data as shown in Table 1:
[0046] Table 1
[0047]
[0048]
[0049] The downlink data model includes total target power generation, total target energy storage power and total target load power.
[0050] The control target issued by the scheduling layer is the total target control power. The total target control power received by the aggregation layer is distributed to the next-level aggregation layer. When the first-level aggregation layer receives the total target control power, it converts it into the total target power generation power, the total target energy storage power and the total target load power according to its own control strategy and sends it to the flexible load.
[0051] The control strategy of the convergence layer itself is: the convergence layer divides the flexible load into production load, transfer load and consumption load according to the uplink data for differentiated control; production load refers to the flexible load with power generation greater than 0, transfer load refers to the flexible load with energy storage power greater than 0, and consumption load refers to the flexible load with load power greater than 0; power generation is positive, power consumption is negative, and the regulation target is total target control power = total target power generation power + total target energy storage power + total target load power. The total target power generation power is allocated to production load, the total target energy storage power is allocated to transfer load, and the total target load power is allocated to consumer load.
[0052] The specific production load is a load with power supply characteristics. The transfer load is a load that can both release and absorb electric energy, such as a battery. The consumption load is a load that can only absorb electric energy. It can actively or passively participate in the operation and regulation of the power grid through incentive rules such as electricity prices to increase or decrease the amount of consumption. The total target control power is decomposed into the total target power generation power, the total target energy storage power and the total target load power, that is, decomposed into power generation power, energy storage power and power consumption power.
[0053] The convergence layer also performs differentiated control according to the peak, valley, and level power consumption periods during the current power consumption period.
[0054] The control strategy of the aggregation layer itself is to control according to the power consumption period as follows: when it is at the peak of power consumption, the production-type load inside the flexible load is controlled to maximize power generation, the consumption-type load is minimized, and the transfer-type load is used to supplement the difference in the total target value; when it is in the trough of power consumption, the consumption-type load inside the flexible load is controlled to maximize power consumption, and when energy storage allows, the transfer-type load optimizes energy storage, and the production-type load is used to supplement the difference in the total target power; when it is at the peak of power consumption, the transfer-type load inside the flexible load is controlled not to charge or discharge, the consumption-type load uses electricity normally, and the production-type load is used to supplement the difference in the total target power.
[0055] The specific method for calculating the control strategy of the convergence layer itself is as follows: Figure 2 As shown, when the power consumption is at a peak, the total target power generation power = power generation power + power generation power that can be increased, and the energy storage SOC of the transfer load is determined. If the energy storage SOC is less than or equal to the minimum allowable SOC limit, the total energy storage power target = 0, the total target load power = total target control power - total target power generation power, if the energy storage SOC is greater than the minimum allowable SOC limit, the total target load power = total load power - load power that can be reduced, the total target energy storage power = total target control power - total target power generation power - total target load power, and determine whether the total target energy storage power is within the range of (energy storage power - energy storage power that can be reduced) to (energy storage power + energy storage power that can be increased). If not within the range, adjust the total target load power to correct it;
[0056] like Figure 3 As shown, when the power consumption is low, the total target load power = total load power + load increase power, determine the energy storage SOC of the transfer load, if the energy storage SOC is greater than or equal to the maximum allowable SOC limit, the total target energy storage power = 0, if the energy storage SOC is less than the maximum allowable SOC limit, the total target energy storage power = energy storage optimal power, the total power generation power target = total target control power - total target energy storage power - total target energy storage power; determine whether the total target energy storage power is within the range of (energy storage power - energy storage reduction power) to (energy storage power + energy storage increase power), if not within the range, adjust the total target energy storage power to correct;
[0057] like Figure 4 As shown, when the level is at peak, the total target energy storage power = 0, the total target load power = total load power, and the total target power generation power = total target control power - total target load power.
[0058] Through this method, the flexible loads included in the entire dispatching layer can operate within the plan, which is effective in improving the reliability of the power grid and enhancing the trust of users.
[0059] New power system flexible load control system implementation example:
[0060] A novel power system flexible load control system, the system includes a dispatching layer and a convergence layer, wherein the convergence layer includes multiple levels, wherein the first-level convergence layer is directly connected to the flexible load, and the first-level convergence layer is in communication connection with the upper-level convergence layer or the dispatching layer; the flexible load sends its own state data to the corresponding first-level convergence layer according to the uplink data model, and receives the control target issued by the corresponding first-level convergence layer according to the downlink data model; the first-level convergence layer converges the state data, sends the obtained converged data to the upper-level convergence layer or the dispatching layer according to the uplink data model, receives the control target issued by the upper-level convergence layer or the dispatching layer, and sends the control target to the dispatching layer. The control target generates the control target according to its own control strategy and sends it to the flexible load; each level of convergence layer converges the convergence data of the next level of convergence layer, sends the obtained convergence data to the upper level of convergence layer or scheduling layer according to the uplink data model, and receives the control target sent by the upper level of convergence layer or scheduling layer, generates the control target according to its own control strategy, and sends it to the next level of convergence layer of the flexible load; the control target sent is the total power control target; the scheduling layer converges the convergence data of the directly connected convergence layer, combines the obtained convergence data with the power grid power consumption plan to formulate the control target, and sends it to the directly connected convergence layer. The system adopts the method of real-time convergence and hierarchical control, and the grid scheduling layer processes the integrated data reported by the convergence layer step by step, reduces the data overhead pressure of the grid-side scheduling layer, and improves the efficiency of grid control. The embodiments of this system refer to the embodiments of the new power system flexible load control method, which will not be repeated here.
[0061] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments without creative work, or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A new type of flexible load control method for power system, characterized in that: The method comprises the following steps: the method adopts a flexible load aggregation and hierarchical control mode, divides the flexible load into control areas according to geographical distribution, and the flexible load in each area is configured with a corresponding first-level aggregation layer; The flexible load sends its own status data to the corresponding first-level convergence layer according to the uplink data model, and receives the control target issued by the corresponding first-level convergence layer according to the downlink data model; The first-level convergence layer converges the status data, sends the obtained converged data to the upper-level convergence layer or scheduling layer, receives the control target issued by the upper-level convergence layer or scheduling layer, generates the control target of the flexible load according to its own control strategy based on the received control target, and sends it to the flexible load; Each level of convergence layer in the non-first-level convergence layer converges the convergence data of the next-level convergence layer, sends the obtained convergence data to the previous-level convergence layer or scheduling layer, receives the control target issued by the previous-level convergence layer or scheduling layer, generates the control target according to its own control strategy, and sends it to the next-level convergence layer; the control target issued is the total power control target; The dispatching layer aggregates the aggregated data of the directly connected aggregation layer, combines the obtained aggregated data with the power grid power consumption plan to formulate control targets, and sends them to the directly connected aggregation layer.
2. The new power system flexible load control method according to claim 1 is characterized in that: The control strategy of the first-level convergence layer itself is as follows: the first-level convergence layer divides the flexible load into production load, transfer load and consumption load according to the uplink data and performs differentiated control; Production load refers to a flexible load with a power generation greater than 0, transfer load refers to a flexible load with a power generation greater than 0 and a load power greater than 0, and consumption load refers to a flexible load with a load power greater than 0; The power generation power is set to be positive and the load power is set to be negative, and the regulation target is: total target control power = total target power generation power + total target energy storage power + total target load power.
3. The new power system flexible load control method according to claim 2 is characterized in that: The first-level convergence layer also performs differentiated control according to the peak, valley, and level power consumption periods during the current power consumption period.
4. The new power system flexible load control method according to claim 3 is characterized in that: The control strategy adopted by the first-level convergence layer is: When the electricity consumption is at its peak, the flexible load is controlled to maximize the power generation, the consumption load is controlled to minimize the load power, and the transfer load is used to supplement the difference in the total target power. When the electricity consumption is low, the internal consumption load of the flexible load is controlled to maximize the load power. If the energy storage allows, the transfer load is optimized for the energy storage power, and the production load is used to supplement the difference in the total target power. When the power consumption is at peak, the internal transfer load of the flexible load is controlled to not use electricity or generate electricity, the consumption load uses electricity normally, and the production load is used to supplement the difference in total target power.
5. The novel power system flexible load control method according to claim 3 or 4, characterized in that: When the power consumption is at its peak, the total target power generation is controlled to be equal to the total power generation + the power that can be increased by power generation; if the energy storage SOC is less than or equal to the minimum allowable SOC limit, the total energy storage power target is controlled to be equal to 0, and the total target load power is controlled to be equal to the total target control power - the total target power generation; if the energy storage SOC is greater than the minimum allowable SOC limit, the total target load power is controlled to be equal to the total load power - the power that can be reduced by the load, and the total target energy storage power is controlled to be equal to the total target control power - the total target power generation - the total target load power, and it is determined whether the total target energy storage power is within the range of (energy storage power - energy storage power that can be reduced) to (energy storage power + energy storage power that can be increased). If it is not within the range, the total target load power is adjusted to correct it; When the power consumption is at a low point, the total target load power = total load power + load increase power; Determine the energy storage SOC of the transfer load. If the energy storage SOC is greater than or equal to the maximum allowable SOC limit, the total target energy storage power = 0. If the energy storage SOC is less than the maximum allowable SOC limit, the total target energy storage power = optimal energy storage power. The total power generation target = total target control power - total target energy storage power - total target energy storage power. Determine whether the total target energy storage power is within the range of (energy storage power - energy storage power reduction) to (energy storage power + energy storage power increase). If not, adjust the total target energy storage power to correct it. When the level is at peak, the total target energy storage power = 0, the total target load power = total load power, and the total target power generation power = total target control power - total target load power.
6. A new type of power system flexible load control system, characterized in that: The system includes a scheduling layer and a convergence layer, wherein the convergence layer includes multiple levels, wherein the first-level convergence layer is directly connected to the flexible load, and the first-level convergence layer is in communication connection with the upper-level convergence layer or the scheduling layer; The flexible load sends its own status data to the corresponding first-level convergence layer according to the uplink data model, and receives the control target issued by the corresponding first-level convergence layer according to the downlink data model; The first-level convergence layer converges the status data, sends the obtained converged data to the upper-level convergence layer or scheduling layer, receives the control target issued by the upper-level convergence layer or scheduling layer, generates the control target of the flexible load according to its own control strategy based on the received control target, and sends it to the flexible load; Each level of convergence layer in the non-first-level convergence layer converges the convergence data of the next-level convergence layer, sends the obtained convergence data to the previous-level convergence layer or scheduling layer, receives the control target issued by the previous-level convergence layer or scheduling layer, generates the control target according to its own control strategy, and sends it to the next-level convergence layer; the control target issued is the total power control target; The dispatching layer aggregates the aggregated data of the directly connected aggregation layer, combines the obtained aggregated data with the power grid power consumption plan to formulate control targets, and sends them to the directly connected aggregation layer.
7. The new power system flexible load control system according to claim 6 is characterized in that: The control strategy of the first-level convergence layer itself is as follows: the first-level convergence layer divides the flexible load into production load, transfer load and consumption load according to the uplink data and performs differentiated control; Production load refers to a flexible load with a power generation greater than 0, transfer load refers to a flexible load with a power generation greater than 0 and a load power greater than 0, and consumption load refers to a flexible load with a load power greater than 0; The power generation power is set to be positive and the load power is set to be negative, and the regulation target is: total target control power = total target power generation power + total target energy storage power + total target load power.
8. The new power system flexible load control system according to claim 7 is characterized in that: The first-level convergence layer also performs differentiated control according to the peak, valley, and level power consumption periods during the current power consumption period.
9. The new power system flexible load control system according to claim 8 is characterized in that: The control strategy adopted by the first-level convergence layer is: When the electricity consumption is at its peak, the flexible load is controlled to maximize the power generation, the consumption load is controlled to minimize the load power, and the transfer load is used to supplement the difference in the total target power. When the electricity consumption is low, the internal consumption load of the flexible load is controlled to maximize the load power. If the energy storage allows, the transfer load is optimized for the energy storage power, and the production load is used to supplement the difference in the total target power. When the power consumption is at peak, the internal transfer load of the flexible load is controlled to not use electricity or generate electricity, the consumption load uses electricity normally, and the production load is used to supplement the difference in total target power.
10. The new power system flexible load control system according to claim 8 or 9, characterized in that: The first-level convergence layer is used to process when the power consumption is at peak, and the total target power generation is controlled to be total power generation + power generation that can be increased; if the energy storage SOC is less than or equal to the minimum allowable SOC limit, the total energy storage power target is controlled to be 0, and the total target load power is controlled to be total target control power-total target power generation; if the energy storage SOC is greater than the minimum allowable SOC limit, the total target load power is controlled to be total load power-load reduction power, and the total target energy storage power is controlled to be total target control power-total target power generation power-total target load power. It is determined whether the total target energy storage power is within the range of (energy storage power-energy storage reduction power) to (energy storage power + energy storage increase power). If it is not within the range, the total target load power is adjusted to correct it; When the power consumption is at a low point, the total target load power = total load power + load increase power; Determine the energy storage SOC of the transfer load. If the energy storage SOC is greater than or equal to the maximum allowable SOC limit, the total target energy storage power = 0. If the energy storage SOC is less than the maximum allowable SOC limit, the total target energy storage power = optimal energy storage power. The total power generation target = total target control power - total target energy storage power - total target energy storage power. Determine whether the total target energy storage power is within the range of (energy storage power - energy storage power reduction) to (energy storage power + energy storage power increase). If not, adjust the total target energy storage power to correct it. When the level is at peak, the total target energy storage power = 0, the total target load power = total load power, and the total target power generation power = total target control power - total target load power.
Citation Information
Patent Citations
Micro-grid power safety and economic dispatching method and system
CN109787221A
Flexible load regulation and control system and method for users with different comfort levels
CN113555875A
Source-grid-load-storage coordinated regulation and control method for low-voltage transformer area