Distributed power supply regulation and control method based on distribution automation system

By constructing a distribution network system model and optimizing the position of tie switches, real-time monitoring and adjustment of distributed power output and reactive power solves the problem of distributed power monitoring and control in the distribution network, and achieves safe and economical operation of the distribution network.

CN118739592APending Publication Date: 2024-10-01NANJING SIFANG EPOWER ELECTRIC POWER AUTOMATION
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410855766.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing technology makes it difficult to perform panoramic and unified monitoring and control of all distributed power sources in the distribution network, making it difficult to effectively manage safe operation risks such as islands, power flow overruns, and voltage anomalies caused by the operation of distributed power sources.

Method used

By constructing a distribution network system model containing panoramic information about distributed power sources, optimizing the position of tie switches, monitoring and adjusting the output and reactive power of distributed power sources in real time, and using the existing distribution automation system to carry out panoramic unified monitoring and control of distributed power sources. , reduce system complexity and cost.

Benefits of technology

It achieves comprehensive monitoring and operation control of distributed power sources in the distribution network, reduces safe operation risks, and improves the safe and economical operation capabilities of the distribution network without the need for new hardware equipment and low cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739592A_ABST
    Figure CN118739592A_ABST
Patent Text Reader

Abstract

The invention discloses a distributed power supply regulation and control method based on a power distribution automation system, and belongs to the technical field of power generation, power transformation or power distribution. The method comprises the following steps: constructing a power distribution network system model containing distributed power supply panoramic information; a representative operation scene is determined based on historical data classification and aggregation of the power distribution network, and the contact operation mode of the power distribution network is optimized and adjusted by taking the minimum network loss and the minimum power flow out-of-limit risk as targets; according to the real-time operation data of the power distribution network, identifying the operation condition of a charged island, giving an alarm and generating an off-network control operation sequence suggestion; the power flow out-of-limit condition of key equipment is monitored in real time and quickly adjusted, controlled and eliminated; and the abnormal voltage condition is monitored in real time, and the voltage of the power distribution network is corrected and controlled in a deployment cooperation mode. According to the invention, the large-scale accessed distributed power supply can be regulated and controlled in a convenient and low-cost manner.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to power distribution network automation technology, and in particular discloses a distributed power supply control method based on a power distribution automation system, belonging to the technical field of power generation, power transformation or power distribution. Background Art

[0002] As the cost of photovoltaic power generation continues to decrease, a large number of distributed power sources, mainly distributed photovoltaics, are connected to the distribution network system. The intermittent and volatile power generation of distributed power sources poses a challenge to the safe operation of the distribution network, requiring the power grid to have a certain degree of regulation and control capabilities for distributed power sources when necessary to reduce the safety risks of power grid operation.

[0003] At present, medium-voltage distributed power sources are generally implemented by multiple systems to collect data from different distributed power sources and some control functions, and cannot perform panoramic and unified monitoring and control of all distributed power sources in the distribution network. For example, medium-voltage distributed power sources are connected to the dispatching automation system through real-time direct acquisition, and the power generation data of low-voltage distributed power sources are sent to the power consumption collection information system through smart meters. Through the intelligent fusion terminal, real-time monitoring of low-voltage distributed power sources connected to the public transformer area can be achieved, and relevant data are sent to the distribution Internet of Things platform.

[0004] At present, the electricity market operation mechanism has not been fully established. Under current conditions, it will take a long time and high cost to promote the regulation of massive distributed power sources based on virtual power plants and other related technologies, and it is difficult to achieve full coverage.

[0005] Some existing technologies related to distributed power supply regulation mainly focus on the research of devices and methods for precise regulation and control of distributed power supply active output, as well as technologies such as safe and fast transmission technology of distributed power supply data, or, based on the operation prediction information in a given future period, network reconstruction and distributed power supply cluster control technology are used to optimize and regulate distributed resources for the purpose of improving the absorption capacity of distributed power supply. However, these solutions for optimizing and regulating distributed resources using distributed power supply cluster control technology require the use of new equipment communication technology applications, new local distributed power supply control devices, or the need to accurately predict data information, etc., through hierarchical control of distributed power supplies. The system structure is relatively complex and faces problems such as high cost and long construction period.

[0006] Therefore, the present invention aims to propose a distributed power supply control method based on a distribution automation system to overcome the above-mentioned defects. Summary of the invention

[0007] The purpose of the present invention is to address the deficiencies of the above-mentioned background technology and provide a distributed power supply control method based on a distribution automation system. When a large number of distributed power sources are connected to the distribution network, there are risks such as energized island operation, current over-limit, and voltage anomaly brought to the power grid due to the uncertainty of the operation of distributed power sources. The purpose of the present invention is to achieve panoramic and unified monitoring and control of the distribution network containing a large number of distributed power sources, improve the ability of the distribution network to operate safely and economically, and solve the technical problems of comprehensive monitoring and operation control of distributed power sources in the distribution network.

[0008] The present invention adopts the following technical solutions to achieve the above-mentioned invention object:

[0009] A distributed power supply control method based on a distribution automation system comprises the following steps:

[0010] Step 1, constructing a distribution network system model including panoramic information of distributed power sources;

[0011] Step 2: Extract representative operation scenarios of the distribution network based on the historical operation data of the distribution network, and optimize the location of the tie switch in the distribution network system model containing the panoramic information of the distributed generation under the constraints of the distribution network flow balance and the uniqueness of the tie switch, with the goal of minimizing the risk of power flow over-limit and minimizing the comprehensive network loss of the distribution network under all representative operation scenarios of the distribution network;

[0012] Step 3: According to the real-time operation data of the distribution network, the powered island is analyzed and judged. When the distribution network automation system operates in an unplanned island condition, the distributed power source that meets the off-grid operation conditions is searched in the topology of the distribution network system model containing the panoramic information of the distributed power source, and an off-grid control instruction is issued to the distributed power source that meets the off-grid operation conditions;

[0013] Step 4: monitor the power flow of key equipment in real time. When the power of key equipment exceeds the limit, eliminate the power limit through load transfer technology. For the power limit that cannot be eliminated by load transfer technology, search for distributed power sources within the range of the over-limit key equipment in the topology of the distribution network system model containing the panoramic information of distributed power sources, and adjust the output of the searched distributed power sources with the over-limit power adjustment amount after load transfer as the control target;

[0014] Step 5: monitor the voltage exceeding the limit in the distribution automation system in real time. After detecting the voltage abnormality, search for the distributed power sources participating in reactive power regulation in the topology of the distribution network system model containing the panoramic information of the distributed power sources, and issue reactive power regulation control instructions to the distributed power sources participating in reactive power regulation.

[0015] As a further optimization scheme of the distributed power control method based on the distribution automation system, the specific method of step 1 to construct a distribution network system model containing panoramic information of distributed power sources is:

[0016] Calling the medium voltage distributed power model established according to the plant station, establishing the medium voltage distributed power model as a distributed power distribution station under the feeder, generating an equivalent distributed power object of the medium voltage distributed power grid-connected equipment, and associating the equivalent distributed power object with the switch model of the medium voltage distribution network in the distribution automation system;

[0017] According to the low-voltage distributed power user ledger information, a low-voltage distributed power object model is established for each user, and the low-voltage distributed power object model is associated with the distribution transformer model or the power user model in the distribution automation system through the unique identifier of the substation.

[0018] As a further optimization scheme of the distributed power control method based on the distribution automation system, the specific method of step 2 for extracting representative operation scenarios of the distribution network according to the historical operation data of the distribution network is:

[0019] Construct historical operation scenario data based on the historical operation data of the distribution network including distributed power generation output data, load power consumption data, and equipment over-limit information data;

[0020] According to the principle that the output data of distributed power sources and the power consumption data of loads are similar, the K-Means clustering algorithm is used to classify and aggregate the historical operation data of the distribution network. Then, according to the equipment over-limit information data, each type of distribution network operation scenario after aggregation is divided into an over-limit distribution network operation scenario and a non-over-limit distribution network operation scenario.

[0021] The number of original scenarios in each distribution network operation scenario classification is counted, and the scenario with the smallest Euclidean distance to each cluster center is taken as the representative distribution network operation scenario in the corresponding distribution network operation scenario classification.

[0022] As a further optimization scheme of the distributed power control method based on the distribution automation system, step 2 aims to minimize the risk of power flow over-limit and minimize the comprehensive network loss of the distribution network under all representative operation scenarios of the distribution network. The expression of the objective function is: Wherein, f is the comprehensive network loss of the distribution network under all representative operation scenarios of the distribution network, c is the c-th distribution network operation scenario, c = 1, 2, ..., n, n is the total number of categories of distribution network operation scenarios; M c is the number of original scenarios under the c-th classification distribution network operation scenario, l is the branch in the distribution network, i = 1, 2, ..., l, l is the total number of branches, Ploss ci is the active power loss of the ith branch in the cth distribution network operation scenario, Pover ci Ploss is the over-limit power of the equipment on the i-th branch in the c-th distribution network operation scenario. ci 、Pover ciis a function of the optimized control variables, where the optimized control variables are the states of the switches in the feeder interconnection lines.

[0023] As a further optimization scheme of the distributed power control method based on the distribution automation system, in step 3,

[0024] When the distributed power source that meets the off-grid operation conditions is a medium-voltage distributed power source, the dispatching automation system sends an off-grid control command to the closing and opening operating mechanism of the medium-voltage distributed power source;

[0025] When the distributed power source that meets the off-grid operation conditions is a low-voltage distributed power source, the off-grid control command is sent to the closing and opening operating mechanism of the low-voltage distributed power source through the power distribution Internet of Things platform.

[0026] As a further optimization scheme of the distributed power control method based on the distribution automation system, in step 4, the specific method of adjusting the output of the searched distributed power source with the over-limit power adjustment amount after load transfer as the control target is:

[0027] Aggregate the distributed power sources within the range of the over-limit key equipment according to the types of distributed power sources to obtain virtual equivalent units, and determine the distribution order of the power regulation amount of each virtual equivalent unit according to the adjustment direction of the over-limit power regulation amount after the load transfer;

[0028] The power regulation amount allocated to the current virtual equivalent group is equally divided among the distributed power sources within the virtual equivalent group, and a control instruction containing the power regulation demand of each distributed power source is issued to each distributed power source. When at least one distributed power source fails to reach its power regulation demand after adjusting its output, the regulated power shortfall is reallocated to other distributed power sources within the same virtual equivalent group.

[0029] As a further optimization scheme of the distributed power control method based on the distribution automation system, step 5 is specifically as follows:

[0030] Step 5.1, real-time monitoring of the voltage value of the medium-voltage busbar of the substation distribution network, the voltage value of the switch in the feeder, and the voltage value of the low-voltage side of the distribution transformer area. When the voltage of the medium-voltage busbar of the substation distribution network exceeds the limit, step 5.2 is entered; when the voltage of the switch in the feeder exceeds the limit, step 5.3 is entered; when the voltage of the low-voltage side of the distribution transformer area exceeds the limit, step 5.4 is entered;

[0031] Step 5.2, calling the automatic voltage control system in the dispatching automation system for adjustment. When the voltage of the medium-voltage busbar of the substation distribution network still exceeds the limit after adjustment by the automatic voltage control system, searching the topology of the distribution network system model containing the panoramic information of the distributed power source, and determining the distributed power sources topologically connected under the medium-voltage busbar of the substation distribution network where the voltage still exceeds the limit to participate in reactive power adjustment;

[0032] Step 5.3, taking each feeder under the bus as a unit, generate a regulation strategy for each voltage limit point in the order from near to far from the power supply bus: search the topology of the distribution network system model containing the panoramic information of the distributed power source, and select the distributed power source for reactive power regulation according to the voltage sensitivity to the current voltage limit point from high to low;

[0033] Step 5.4, search for the topology of the distribution network system model containing the panoramic information of the distributed power source, and adjust the reactive power in the order of the reactive power of the low-voltage distributed power source under the distribution transformer and the adjustable tap of the distribution transformer. If the distribution transformer voltage still exceeds the limit after the sequential adjustment, select the nearest medium-voltage distributed power source in the same line according to the sensitivity for reactive power adjustment;

[0034] Step 5.5: For the reactive power regulation strategy generated from step 5.2 to step 5.4, the voltage of the voltage-over-limit node after regulation is verified by using distribution network flow calculation to avoid the reactive power regulation strategy from causing a new voltage-over-limit situation.

[0035] As a further optimization scheme of the distributed power control method based on the distribution automation system, the order of power regulation amount allocation of each virtual equivalent unit is determined according to the adjustment direction of the over-limit power regulation amount after load transfer, specifically:

[0036] When the adjustment direction of the over-limit power regulation amount after load transfer is to reduce output, the order of power regulation amount allocation of each virtual unit is determined according to the order of conventional power supply power reduction, energy storage charging, and new energy power restriction;

[0037] When the adjustment direction of the over-limit power regulation amount after load transfer is to increase output, the order of power regulation amount allocation of each virtual unit is determined according to the order of increasing output of the restricted new energy, discharging energy storage, and increasing output of conventional power sources.

[0038] As a further optimization scheme of the distributed power supply control method based on the distribution automation system, the key equipment includes but is not present for the substation main transformer and distribution network feeder.

[0039] As a further optimization scheme of the distributed power supply control method based on the distribution automation system, in step 5.2, the medium-voltage photovoltaic topologically connected under the medium-voltage bus of the substation distribution network whose voltage is still out of limit is preferentially determined to participate in reactive power regulation.

[0040] The present invention adopts the above technical solution and has the following beneficial effects:

[0041] (1) The present invention proposes a distributed power supply panoramic modeling method, which uses the existing information of the dispatching automation system and the procurement system to associate the medium-voltage distributed power supply model, the low-voltage distributed model and the distribution network system model, and realizes the comprehensive access management of the low-voltage distributed power supply model and operation data, providing a model basis for solving the safety operation problems brought by the operation of distributed power supplies to the distribution network, such as island energized operation, equipment bidirectional power flow exceeding the limit, and voltage exceeding the limit.

[0042] (2) The present invention proposes a distribution network interconnection operation optimization method, which determines representative operation scenarios based on the classification and aggregation of distribution network historical data, and optimizes the interconnection switch positions of a distribution network system model associated with a distributed power supply model under the representative operation scenarios. By simplifying multiple scenarios, the number of scenarios that need to be optimized is reduced, thereby reducing the amount of subsequent optimization calculations.

[0043] (3) The present invention proposes a method for analyzing and judging powered islands, which identifies the powered island operation of the distribution network caused by the failure of distributed power sources to be disconnected from the grid in time and issues an alarm, and generates off-grid control operation sequence suggestions based on the distribution network system model associated with the distributed power source model.

[0044] (4) The present invention proposes a power flow over-limit control method, which monitors the power flow over-limit situation of key equipment in real time, and classifies and aggregates the distributed power sources under the over-limit equipment in multiple dimensions according to the distribution network system model of the associated distributed power source model, optimizes and controls the aggregated distributed equivalent virtual machine group, and quickly feedbacks and executes the optimized control strategy, so as to achieve the purpose of quickly eliminating the power flow over-limit of the equipment.

[0045] (5) The present invention proposes a voltage anomaly correction method, which monitors the voltage anomaly of the distribution automation system in real time, adjusts the distributed power supply to participate in reactive power control according to the distribution network system model of the associated distributed power supply model, and realizes the correction control of the distribution network voltage through the coordination between the feeder area voltage control, the single substation area voltage control and the AVC in the dispatching automation system.

[0046] (6) The distributed power control method proposed in the present invention does not require the addition or modification of terminal hardware equipment and communication methods. It can achieve observable, adjustable and controllable distributed power sources by simply expanding the functions of the existing distribution automation system appropriately, so that the distribution automation system has the ability to cope with the operational safety risks brought to the distribution network after the large-scale distributed power sources are connected. It can reduce the safety risks such as personal safety, overload of power grid operating equipment, overvoltage, etc. caused by the large-scale connection of distributed power sources to the distribution network, and improve the distribution network's ability to absorb new energy. It has the advantages of easy implementation and obvious effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1This is a diagram of the distributed power supply control architecture based on the distribution automation system proposed in the present invention.

[0048] Figure 2 The present invention provides a flow chart for optimizing the feeder interconnection operation mode.

[0049] Figure 3 This is a flow chart of the equipment power flow over-limit control of the present invention.

[0050] Figure 4 This is a flow chart of abnormal voltage control according to the present invention. DETAILED DESCRIPTION

[0051] The specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. The embodiments described in the present invention are only embodiments of a part of the present invention, rather than all embodiments. Based on the spirit of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the protection scope of the present invention.

[0052] In view of the current situation that the current distribution network automation technology cannot perform panoramic and unified monitoring and control of all distributed power sources in the distribution network, the present invention considers carrying out corresponding functional expansion based on the existing distribution automation system conditions. Through the integration of existing multi-system information data and the use of existing remote control functions, it is possible to achieve reasonable regulation of distributed power sources at the necessary time in a more convenient and low-cost manner, focusing on solving the safety operation problems of isolated island live operation, equipment bidirectional power flow over-limit, voltage over-limit, etc. caused by the operation of distributed power sources to the distribution network, and can realize the optimization setting of network operation mode in a long period of time based on historical operation data, thereby improving the economic and safe operation capabilities of distribution networks containing a large number of distributed power sources.

[0053] like Figure 1 The distributed power control architecture based on the distribution automation system shown in the figure reveals the associated system data interactions and functional modules included in the method proposed in the present invention, among which the panoramic modeling and access of distributed power sources to achieve the observability of distributed power sources is the basic prerequisite for realizing this method. On the basis of achieving the observability of distributed power sources, the communication mode during the normal operation of the distribution network is optimized, as well as the related monitoring and identification and strategy control related methods in the operation of the distribution network under the conditions of energized islands, current exceeding the limit, voltage anomalies, etc.

[0054] The method proposed in the present invention mainly includes the following five steps, and steps 2 to 5 can be executed serially or in parallel.

[0055] Step 1: Distributed power generation panoramic modeling and data access

[0056] Distributed power supply panoramic modeling and data access, including: medium-voltage distributed power supply modeling and data access, and low-voltage distributed power supply modeling and data access, to achieve the establishment of medium-voltage distributed power supply and low-voltage distributed power supply panoramic model information in the distribution automation system.

[0057] In the dispatching automation system, the medium-voltage distributed power source is modeled according to the conventional plant station, and the distribution automation system obtains the medium-voltage distributed power source model from the dispatching automation system; the medium-voltage distributed power source plant station is modeled as a distributed power distribution station under the feeder; for each medium-voltage distributed power source grid-connected switch or access busbar device, the corresponding equivalent distributed power source object is generated, and the equivalent distributed power source object corresponding to the distributed power source grid-connected device is associated with the switch model of the medium-voltage distribution network in the distribution automation system through the name matching of the grid-connected switch or access busbar device and the manual selection of the association splicing method, forming the grid-connected switch of the distributed power source in the medium-voltage system, thereby realizing the association between the medium-voltage distributed power source and the distribution network system model. The remote terminal device in the distributed power source plant station can collect the operation data of the medium-voltage distributed power source in real time and send it to the dispatching automation system. The distribution automation system obtains the real-time operation data of the medium-voltage distributed power source through the real-time data network communication channel established between the dispatching automation system, and realizes the real-time data acquisition of the medium-voltage distributed power source in seconds. The real-time data mainly include: the operation data of the medium-voltage distributed power supply, the active power, reactive power, voltage, current, etc. of the medium-voltage distributed power supply grid-connected switches or bus-connected equipment.

[0058] For the low-voltage distributed power sources that can participate in regulation, a corresponding low-voltage distributed power source object model is established for each user based on the low-voltage distributed power source user ledger information established in the marketing and procurement system, the quasi-real-time data collected by the smart meter, and the access substation information. The low-voltage distributed power source object model is associated with the distribution transformer model (public transformer) or the user model (special transformer) in the distribution automation system through the unique identifier of the substation, thereby establishing a model for the low-voltage distributed power source access to the distribution network system.

[0059] For low-voltage distributed power sources that do not participate in regulation, their quasi-real-time data is collected through smart meters and sent to the user-collection system to provide data for building a distribution network system model with panoramic information of distributed power sources.

[0060] At this point, the panoramic modeling and data access of distributed power sources are completed, and the distribution network system model containing the panoramic information of distributed power sources is constructed. The construction of the distribution network system model containing the panoramic information of distributed power sources is realized through the multi-source distributed power source comprehensive access management module, which is used to uniformly manage the models of various distributed power sources with multi-source access, and realize the topological relationship splicing of distributed power sources and distribution networks according to each access device; the multi-source distributed power source comprehensive access management module communicates data with the dispatching automation system through file transfer service and 104 protocol, and can obtain the model and real-time operation data information of medium-voltage distributed power sources; through file exchange, it can obtain low-voltage distributed power users and electric energy collection data information from the user system; through KAFKA messages, it can communicate with the Internet of Things platform to obtain the real-time operation information of the distributed power sources under the public transformer.

[0061] Step 2: Optimization of distribution network interconnection operation mode based on multiple representative scenarios

[0062] According to the historical operation data of the distribution network, the output of distributed power sources, load power data, and equipment over-limit information are extracted and analyzed, and the K-Means clustering algorithm is used to generate representative operation scenarios and scenario weights of the distribution network. Based on the representative operation scenarios of the distribution network, the goal is to minimize the comprehensive network loss of the distribution network, and the equipment flow over-limit power is used as the penalty function. The layout of the interconnection switches between feeders during the daily operation of the distribution network is optimized, and the interconnection switch adjustment plan is obtained for reference by the power grid dispatching and operation personnel. This method is used to reconstruct the distribution network, avoiding the problem of frequently adjusting the distribution network operation mode when only the optimal plan is generated for a single operating condition.

[0063] The main processes for optimizing the distribution network interconnection operation mode based on multiple representative scenarios are as follows: Figure 2 As shown, it specifically includes steps 2.1 to 2.4.

[0064] Step 2.1: Obtain the historical operation data information of the distribution network in the past month, including distributed power output data, load power consumption data, and equipment over-limit information data, and establish corresponding historical operation scenario data with a cycle of 15 minutes.

[0065] Step 2.2: Use the K-Means clustering algorithm to classify and divide each historical operation scenario. First, classify according to the distributed power output and load power consumption data, classify and aggregate the distribution network operation scenarios with similar distributed power output and load power consumption data, and then further split each type of distribution network operation scenario into two categories: with over-limit and without over-limit according to the equipment over-limit information data.

[0066] Step 2.3: Count the number of original scenarios in each distribution network operation scenario classification, and take the scenario with the smallest Euclidean distance to the cluster center as the representative distribution network operation scenario in this distribution network operation scenario classification. The corresponding number of original scenarios is used as the weight of the representative distribution network operation scenario in this classification of distribution network operation scenarios.

[0067] Step 2.4: The optimization objective is to minimize the comprehensive weighted active power loss of the distribution network under each representative operation scenario of the distribution network. The objective function includes a penalty function for equipment exceeding the limit. The penalty function for equipment exceeding the limit means that if the active power of a device exceeds the limit, the exceeding power is directly equal to the system power loss and added to the objective function. The objective function is as follows:

[0068]

[0069] Wherein, c represents the c-th classified distribution network operation scenario, c = 1, 2, ..., n, n is the total number of categories of distribution network operation scenarios; M c represents the number of original scenarios under the c-class distribution network operation scenario, corresponding to the weight of the representative operation scenario of the distribution network in the c-class distribution network operation scenario; l is the branch in the distribution network, including transformer windings and distribution lines, i = 1, 2, ..., l, l is the total number of branches; Ploss ci Pover is the active power loss of the ith branch in the cth distribution network operation scenario; ci It is the over-limit power of the equipment on the i-th branch in the c-th classification distribution network operation scenario. The over-limit judgment of the maximum and minimum values ​​allowed by the branch is performed on the power of the equipment on the branch. If there is no over-limit, the value is 0. If there is an over-limit, the value is the absolute value exceeding the maximum or minimum allowable value.

[0070] Ploss ci 、Pover ci is a function of the optimal control variable, where the optimal control variable is the state of each switch in the feeder interconnection line, and each switch state can take the value of 0 representing the open state and 1 representing the closed state.

[0071] The constraints considered include the following two aspects:

[0072] Distribution network power flow balance constraint: The distribution network DIST forward and backward method is used to calculate the power flow of each distribution network representative operation scenario, calculate the head and end power of each branch, and calculate the active power loss of the branch based on the active power at the head and end of the branch;

[0073] Uniqueness constraint on the open state of the tie switch: For any two feeders that can be topologically connected, there is only one switch in the open state between their connection paths, and the other switches are in the closed state. This constraint ensures that all distribution network equipment is in the power supply state and no electromagnetic loop network is formed between substations.

[0074] Step 2.5: To solve the optimization control variables, the traditional combinatorial planning method or the heuristic optimization algorithm can be used. The combinatorial planning method can be the branch and bound method, and the heuristic optimization algorithm can be the particle swarm algorithm. The above optimization problem is solved by the corresponding solver to obtain the status of each switch in the interconnection line between feeders, and the optimal interconnection switch position is obtained in combination with the uniqueness constraint of the interconnection switch opening state. The optimal interconnection switch position indicates that the operation mode of the distribution network is adjusted to the new interconnection operation mode, and the switch opening and closing operation sequence to be executed is given. After manual confirmation, the operation mode of the distribution network can be switched to the optimized state through sequence control, so that the distribution network operation is maintained in a safer and more economical operation state.

[0075] Step 2 Pass Figure 1 The distribution network interconnection operation optimization module shown in the figure interacts with the multi-source distributed power integrated access management module, calls the distribution network system model containing the panoramic information of the distributed power source, calculates the optimization result of the optimal position of the interconnection switch, and feeds back the distributed power control command to the multi-source distributed power integrated access management module to realize the optimization of the distribution network interconnection operation mode.

[0076] Step 3: Analysis and control of live islands

[0077] By real-time detection of switch displacement, the active power, reactive power, current, voltage and other data of the medium-voltage distributed power grid-connected equipment and the low-voltage distributed power access substation in the area that is dead island according to the real-time topological analysis, that is, the non-energized area, are checked. If the voltage of the medium-voltage distributed power grid-connected equipment and the low-voltage distributed power access substation equipment exceeds a certain percentage of the rated voltage, it is determined that there is voltage in the dead island area. If the current or active power and reactive power of the medium-voltage distributed power grid-connected equipment and / or the low-voltage distributed power access substation equipment exceed a certain limit, it is determined that there is flow in the dead island area. For the case where there is voltage and flow in the dead island area identified as dead island area, it is determined that there is a energized island, and it is compared with the planned island in the corresponding historical maintenance information. If it is determined to be an unplanned island, a corresponding prompt alarm information is given, and the topology of the distribution network system model containing the panoramic information of the distributed power source is automatically searched, and the corresponding list of grid-connected switches that can be disconnected to realize the off-grid operation of the distributed power source is obtained for manual confirmation and remote control disconnection operation. For medium-voltage distributed power sources, off-grid control instructions are sent to the remote terminal through the dispatching automation system, and the remote terminal will disconnect and isolate the corresponding grid-connected switches of the subordinate medium-voltage distributed power sources; for low-voltage distributed power sources, off-grid control instructions can be sent to the intelligent fusion terminal corresponding to the low-voltage distributed power sources, and the intelligent fusion terminal will disconnect and isolate the corresponding grid-connected switches of the subordinate low-voltage distributed power sources.

[0078] Step 3 Pass Figure 1 The powered island analysis module shown in the figure interacts with the multi-source distributed power integrated access management module, calls the distribution network system model containing the panoramic information of the distributed power, generates the distributed power off-grid control instruction according to the distributed power off-grid control operation sequence suggestion, and feeds back the distributed power off-grid control instruction to the multi-source distributed power integrated access management module to realize the isolation of unplanned powered islands.

[0079] Step 4: Control the over-limit of power flow of key equipment.

[0080] Real-time monitoring of the power flow of key equipment such as substation main transformers and distribution network feeders in the distribution network. If it is found that the key equipment is overloaded or the power is not allowed to be reversed, the power value that exceeds the limit is calculated, and load transfer is given priority to eliminate the corresponding limit. If the limit is still exceeded, a corresponding alarm is given, and a comprehensive use is made of methods such as adjusting the output of distributed power sources, controlling the distribution network switches to implement precise load shedding, and sending power adjustment targets to the intelligent terminals in the substation area to achieve the goal of eliminating equipment power limit violations.

[0081] The main process of key equipment power flow over-limit control is as follows Figure 3 As shown, the details include steps 4.1 to 4.5.

[0082] Step 4.1: Monitor the critical equipment for over-limit situations and call the load transfer function, mainly including:

[0083] Step 4.1.1: Check whether the power of the 10kV outgoing line switch of the substation exceeds the limit. If the power exceeds the limit, calculate the power exceeding the limit;

[0084] Step 4.1.2: Check whether the power of the low-voltage winding of the main transformer of the substation exceeds the limit. If the power exceeds the limit, calculate the power exceeding the limit;

[0085] Step 4.1.3: Determine whether the over-limit power can be eliminated through load transfer. If so, the over-limit power can be eliminated by load transfer through the distribution network. For over-limit situations that cannot be eliminated by load transfer, proceed to the subsequent steps to eliminate the relevant over-limit power through distributed power supply regulation.

[0086] Step 4.2: Calculate the over-limit power adjustment amount after load transfer. For the over-limit power adjustment amount after load transfer, priority is given to eliminating the over-limit by adjusting the corresponding output of distributed resources. If the distributed resource adjustment means are insufficient, the corresponding load or machine cutting can be performed directly by operating the distribution network medium-voltage switch for adjustment and control.

[0087] Step 4.3: According to the distribution network system model topology containing the panoramic information of distributed power sources, search for distributed power sources within the range of the over-limit equipment to aggregate distributed power sources, and aggregate a large number of distributed power sources into a small number of virtual equivalent units, so as to facilitate the summary management of virtual equivalent units with similar regulation characteristics and coordinate virtual equivalent units with different regulation characteristics to participate in control. Distributed resources can be classified and aggregated according to resource types such as energy storage, photovoltaic, small hydropower, and charging piles to form corresponding equivalent energy storage units, equivalent photovoltaic units, equivalent hydropower units, equivalent charging piles, etc.

[0088] Step 4.4: Formulate power regulation strategy for equal-value virtual machine groups. Objective: According to the regulation direction of the total distributed generation power over-limit, the required regulated power is allocated to different virtual machine groups in the aggregate according to the control priority of each equal-value virtual machine group. The virtual machine group with high priority participates in the allocation of regulated power as much as possible. Specifically:

[0089] When the adjustment direction of the total demand distributed power generation exceeding the limit is to reduce the output, the corresponding virtual unit adjustment control is carried out in the order of conventional power reduction, energy storage charging, and new energy power restriction. Conventional power sources include but are not limited to small hydropower, and new energy sources include but are not limited to photovoltaic and wind power;

[0090] When the adjustment direction of the total distributed power generation exceeding the power limit is to increase the output, the corresponding virtual machine unit adjustment control is carried out in the order of increasing the output of the restricted new energy, discharging the energy storage, and increasing the output of the conventional power source. The restricted energy sources include photovoltaic power and wind power.

[0091] Step 4.5: Perform fast real-time feedback control on multiple distributed power sources within the same virtual machine group. According to the adjustment capability of each adjustable resource, the power adjustment amount allocated to the same equivalent virtual machine group is proportionally distributed to each distributed power source, reflecting a certain principle of fairness. The relevant control instructions including the power adjustment demand allocated to each distributed power source are sent to each distributed power source at the same time in a multi-threaded task mode, and the corresponding adjustment effect is checked according to the response speed of different adjustment resources. By comparing the difference between the change before and after the adjustment and the adjustment demand, it is judged whether the adjustment resource has reached the control target. If the control target is not reached, the corresponding adjustment power shortage can be reallocated and issued by other adjustable resources in the virtual machine group, forming a similar PID feedback control to ensure that the final adjustment amount is as close as possible to the target adjustment amount required by the control strategy.

[0092] Step 4 Pass Figure 1 The power flow over-limit control module shown in the figure interacts with the multi-source distributed power integrated access management module, calls the distribution network system model containing the panoramic information of the distributed power source, calculates the power regulation demand of each distributed power source, generates distributed power control instructions according to the power regulation demand of each distributed power source, and feeds back the distributed power control instructions to the multi-source distributed power integrated access management module to realize the control of power flow over-limit of key equipment in the distribution network.

[0093] Step 5: Monitor the voltage value of the medium-voltage busbar of the substation distribution network, the voltage value of the switch in the feeder, and the voltage value of the low-voltage side of the distribution transformer area, identify the over-limit status of each voltage, and give corresponding regulation and control strategies for various voltage over-limit conditions. The main process is as follows: Figure 4 As shown, including steps 5.1 to 5.5.

[0094] Step 5.1, monitor the voltage value of the medium-voltage busbar of the substation distribution network, the voltage value of the switch in the feeder, and the voltage value of the low-voltage side of the distribution transformer area. All voltages are within the limit and do not need to be adjusted; when the medium-voltage busbar voltage of the substation distribution network exceeds the limit, the corresponding over-limit equipment statistics are performed according to the busbar over-limit, switch over-limit, and distribution transformer over-limit, and the corresponding strategy is formulated according to the priority order of the busbar, switch, and distribution transformer; when the medium-voltage busbar voltage of the substation distribution network exceeds the limit, go to step 5.2, when the switch voltage in the feeder exceeds the limit, go to step 5.3, and when the low-voltage side voltage of the distribution transformer area exceeds the limit, go to step 5.4.

[0095] Step 5.2, when the voltage of the medium-voltage busbar of the substation distribution network exceeds the limit, the automatic voltage control system in the dispatching automation system shall be given priority to adjust it. When the strategies in the dispatching automation system are exhausted and the medium-voltage busbar voltage still exceeds the limit, the dispatching automation system shall issue a corresponding reactive power adjustment quantity request, search the topology of the distribution network system model containing the panoramic information of distributed power sources, and determine that the distributed power sources topologically connected under the medium-voltage busbar whose voltage still exceeds the limit participate in reactive power adjustment. The corresponding reactive power compensation is achieved by adjusting the reactive power of the distributed power sources topologically connected under the corresponding medium-voltage busbar, and priority is given to the reactive power output capacity of the medium-voltage photovoltaic in the system.

[0096] Step 5.3, when there is a switch voltage exceeding the limit in the feeder, the regulation strategy is generated for each voltage exceeding limit point one by one in the order from near to far from the power supply bus, taking each feeder under the bus as a unit. For each voltage exceeding limit point, the topology of the distribution network system model containing the panoramic information of the distributed power source is searched, and the corresponding adjustable distributed power source is selected for reactive power regulation according to the voltage sensitivity of the voltage exceeding limit point from high to low. If the regulation means are exhausted, the power grid dispatching automation system is considered to make corresponding adjustments to the medium-voltage bus voltage. At this time, the distribution automation system sends a medium-voltage bus voltage regulation request instruction to the dispatching automation system, and the dispatching automation system performs a moderate increase in the corresponding medium-voltage bus voltage.

[0097] Step 5.4, when the distribution transformer voltage exceeds the limit, the topology of the distribution network system model containing the panoramic information of the distributed power source is searched, and the reactive power of the low-voltage distributed power source under the distribution transformer and the adjustable tap of the distribution transformer are adjusted in sequence. If the relevant adjustment measures are exhausted, the medium-voltage distributed power source nearby in the same line can be selected according to the sensitivity to adjust the reactive power.

[0098] Step 5.5: for various voltage and reactive power regulation strategies generated, the distribution network flow calculation is used to adjust the voltage of the relevant nodes after adjustment, and the regulation strategy that causes new voltage exceeding the limit is locked.

[0099] Step 5 Pass Figure 1 The voltage anomaly correction module shown in the figure interacts with the multi-source distributed power integrated access management module, calls the distribution network system model containing the panoramic information of the distributed power source, generates a reactive power regulation strategy for voltage exceeding the limit, generates distributed power control instructions according to the reactive power regulation strategy, and feeds back the distributed power control instructions to the multi-source distributed power integrated access management module to realize the correction of voltage anomalies at important nodes of the distribution network.

[0100] When the corresponding control instructions involved in the above steps are issued and executed, the respective control instructions can be issued according to the different control control methods of different distributed power sources. The medium-voltage distributed power supply adjustment instructions are sent by the distribution automation system to the dispatching automation system, and then sent by the dispatching automation system to the medium-voltage distributed power supply. The adjustment instructions of the low-voltage distributed power supply are forwarded by the distribution automation system to the intelligent terminal device in the substation through the Internet of Things platform, and then the intelligent terminal device in the substation further decomposes the instructions and sends them to each low-voltage distributed power supply.

[0101] The above is only an implementation case of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A distributed power supply control method based on a distribution automation system, characterized in that: The steps include: Step 1, constructing a distribution network system model including panoramic information of distributed power sources; Step 2: extract representative operation scenarios of the distribution network according to the historical operation data of the distribution network, with the goal of minimizing the risk of power flow over-limit and minimizing the comprehensive network loss of the distribution network under all representative operation scenarios of the distribution network, and optimize the position of the tie switch in the distribution network system model containing the panoramic information of the distributed power source under the constraints of the power flow balance of the distribution network and the uniqueness of the tie switch; Step 3, judging the powered island according to the real-time operation data of the distribution network, when the distribution network automation system operates in an unplanned island condition, searching for a distributed power source that meets the off-grid operation conditions in the topology of the distribution network system model containing the panoramic information of the distributed power source, and issuing an off-grid control instruction to the distributed power source that meets the off-grid operation conditions; Step 4: monitor the power flow of key equipment in real time. When the power of key equipment exceeds the limit, eliminate the power limit through load transfer technology. For the power limit that cannot be eliminated by load transfer technology, search for distributed power sources within the range of the over-limit key equipment in the topology of the distribution network system model containing the panoramic information of distributed power sources, and adjust the output of the searched distributed power sources with the over-limit power adjustment amount after load transfer as the control target; Step 5: monitor the voltage exceeding the limit in the distribution automation system in real time. After detecting the voltage abnormality, search for the distributed power sources participating in reactive power regulation in the topology of the distribution network system model containing the panoramic information of the distributed power sources, and issue reactive power regulation control instructions to the distributed power sources participating in reactive power regulation.

2. According to claim 1, a distributed power supply control method based on a distribution automation system is characterized in that: The specific method of step 1 to construct a distribution network system model containing panoramic information of distributed power sources is: Calling the medium-voltage distributed power model established according to the plant station, establishing the medium-voltage distributed power model as a distributed power distribution station under the feeder, generating an equivalent distributed power object of the medium-voltage distributed power grid-connected equipment, and associating the equivalent distributed power object with the switch model of the medium-voltage distribution network in the distribution automation system; According to the low-voltage distributed power user ledger information, a low-voltage distributed power object model is established for each user, and the low-voltage distributed power object model is associated with the distribution transformer model or the power user model in the distribution automation system through the unique identifier of the substation.

3. According to claim 2, a distributed power supply control method based on a distribution automation system is characterized in that: The specific method of step 2 for extracting representative operation scenarios of the distribution network based on the historical operation data of the distribution network is: Construct historical operation scenario data based on the historical operation data of the distribution network including distributed power generation output data, load power consumption data, and equipment over-limit information data; According to the principle that the output data of distributed power sources and the power consumption data of loads are similar, the K-Means clustering algorithm is used to classify and aggregate the historical operation data of the distribution network. Then, according to the equipment over-limit information data, each type of distribution network operation scenario after aggregation is divided into an over-limit distribution network operation scenario and a non-over-limit distribution network operation scenario. The number of original scenarios in each distribution network operation scenario classification is counted, and the scenario with the smallest Euclidean distance to each cluster center is taken as the representative distribution network operation scenario in the corresponding distribution network operation scenario classification.

4. The distributed power supply control method based on the distribution automation system according to claim 3 is characterized in that: The step 2 aims to minimize the risk of power flow over-limit and minimize the comprehensive network loss of the distribution network under all representative operation scenarios of the distribution network. The expression of the objective function is: Wherein, f is the comprehensive network loss of the distribution network under all representative operation scenarios of the distribution network, c is the c-th distribution network operation scenario, c = 1, 2, ..., n, n is the total number of categories of distribution network operation scenarios; M c is the number of original scenarios under the c-th classification distribution network operation scenario, l is the branch in the distribution network, i = 1, 2, ..., l, l is the total number of branches, Ploss ci is the active power loss of the ith branch in the cth distribution network operation scenario, Pover ci Ploss is the over-limit power of the equipment on the i-th branch in the c-th distribution network operation scenario. ci 、Pover ci is a function of an optimized control variable, wherein the optimized control variable is the state of each switch in the feeder interconnection line.

5. A distributed power supply control method based on a distribution automation system according to claim 4, characterized in that: In step 3, When the distributed power source that meets the off-grid operation conditions is a medium-voltage distributed power source, an off-grid control instruction is issued to the closing and opening operating mechanism of the medium-voltage distributed power source through the dispatching automation system; When the distributed power source that meets the off-grid operation conditions is a low-voltage distributed power source, an off-grid control instruction is sent to the closing and opening operating mechanism of the low-voltage distributed power source through the power distribution Internet of Things platform.

6. The distributed power supply control method based on the distribution automation system according to claim 5 is characterized in that: In step 4, the specific method of adjusting the output of the searched distributed power source by taking the over-limit power adjustment amount after load transfer as the control target is: Aggregate the distributed power sources within the range of the over-limit key equipment according to the types of distributed power sources to obtain virtual equivalent units, and determine the distribution order of the power regulation amount of each virtual equivalent unit according to the adjustment direction of the over-limit power regulation amount after the load transfer; The power regulation amount allocated to the current virtual equivalent group is equally divided among the distributed power sources within the virtual equivalent group, and a control instruction containing the power regulation demand of each distributed power source is issued to each distributed power source. When at least one distributed power source fails to reach its power regulation demand after adjusting its output, the regulated power shortfall is reallocated to other distributed power sources within the same virtual equivalent group.

7. A distributed power supply control method based on a distribution automation system according to claim 6, characterized in that: The step 5 is specifically as follows: Step 5.1, real-time monitoring of the voltage value of the medium-voltage busbar of the substation distribution network, the voltage value of the switch in the feeder, and the voltage value of the low-voltage side of the distribution transformer area. When the voltage of the medium-voltage busbar of the substation distribution network exceeds the limit, step 5.2 is entered; when the voltage of the switch in the feeder exceeds the limit, step 5.3 is entered; when the voltage of the low-voltage side of the distribution transformer area exceeds the limit, step 5.4 is entered; Step 5.2, calling the automatic voltage control system in the dispatching automation system for adjustment. When the voltage of the medium-voltage busbar of the substation distribution network still exceeds the limit after adjustment by the automatic voltage control system, searching the topology of the distribution network system model containing the panoramic information of the distributed power source, and determining the distributed power sources topologically connected under the medium-voltage busbar of the substation distribution network where the voltage still exceeds the limit to participate in reactive power adjustment; Step 5.3, taking each feeder under the bus as a unit, generate a regulation strategy for each voltage limit point in the order from near to far from the power supply bus: search the topology of the distribution network system model containing the panoramic information of the distributed power source, and select the distributed power source for reactive power regulation according to the voltage sensitivity to the current voltage limit point from high to low; Step 5.4, search for the topology of the distribution network system model containing the panoramic information of the distributed power source, and adjust the reactive power in the order of the reactive power of the low-voltage distributed power source under the distribution transformer and the adjustable tap of the distribution transformer. If the distribution transformer voltage still exceeds the limit after the sequential adjustment, select the nearest medium-voltage distributed power source in the same line according to the sensitivity for reactive power adjustment; Step 5.5, for the reactive power regulation strategy generated from step 5.2 to step 5.4, the voltage of the voltage-over-limit node after regulation is verified by using distribution network flow calculation to avoid the reactive power regulation strategy from causing a new voltage-over-limit situation.

8. The distributed power supply control method based on the distribution automation system according to claim 6 is characterized in that: The order of allocating the power regulation amount of each virtual equivalent unit is determined according to the adjustment direction of the over-limit power regulation amount after load transfer, specifically: When the adjustment direction of the over-limit power regulation amount after load transfer is to reduce output, the order of power regulation amount allocation of each virtual unit is determined according to the order of conventional power supply power reduction, energy storage charging, and new energy power restriction; When the adjustment direction of the over-limit power regulation amount after load transfer is to increase output, the order of power regulation amount allocation of each virtual unit is determined according to the order of increasing output of the restricted new energy, discharging energy storage, and increasing output of conventional power sources.

9. The distributed power supply control method based on the distribution automation system according to claim 6 is characterized in that: The key equipment includes but is not present for the main transformer of the substation and the feeder of the distribution network.

10. The distributed power supply control method based on the distribution automation system according to claim 7, characterized in that: In the step 5.2, the medium-voltage photovoltaic topologically connected under the medium-voltage bus of the substation distribution network whose voltage is still out of limit is preferentially determined to participate in reactive power regulation.

Citation Information

Cited By

  • Voltage out-of-limit risk assessment method and device for low-voltage distribution area

    CN120896167A

  • Small generator grid-connected management method and device based on multiple parameters

    CN122338768A