Method for operating electronic circuit breaker, electronic circuit breaker and electrical system having electronic circuit breaker

By using voltage and current measuring devices in the semiconductor circuit breaker to calculate the line impedance and estimate the maximum short-circuit current, the problem of difficulty in accurately judging the maximum short-circuit current in the existing technology is solved, ensuring the safe cutting of the circuit breaker in the event of a short circuit, and improving electrical efficiency. System security.

CN118743124APending Publication Date: 2024-10-01SIEMENS AG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380023394.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-02-25
Filing Date
2023-01-31
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

It is difficult to accurately determine or estimate the actual expected maximum short-circuit current with existing technology, especially in modern semiconductor circuit breakers, which may result in failure to cut off the circuit in time in the event of a short circuit, affecting the safety of the electrical system.

Method used

By using voltage and current measuring devices in semiconductor circuit breakers, combined with control elements, the line impedance of the power supply line is calculated and measured, the short-circuit current is determined, and fast-switching electronic switching elements are used for interruption, ensuring that the interruption time is short and does not damage the load. Then estimate the maximum short-circuit current, and determine whether to enter safe mode based on this value.

Benefits of technology

It achieves accurate estimation of the maximum short-circuit current under short-circuit conditions, ensures that the circuit breaker can safely cut off the circuit, improves the safety and reliability of the electrical system, and avoids faults caused by excessive short-circuit current.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118743124A_ABST
    Figure CN118743124A_ABST
Patent Text Reader

Abstract

The invention relates to a method for operating a circuit breaker (100) which couples a load circuit (200) to be protected to a power supply circuit (300). The circuit breaker (100) has a mechanical switching element (110) and an electronic switching element (120) connected in series therewith. In a method step, the load circuit (200) is switched off by means of an electronic switching element (120). Then, at least two temporally spaced-apart current measurements (i1, i2) of the current (i) flowing through the circuit breaker are determined. Furthermore, at least two temporally spaced-apart voltage values (u10, u11, u12) of the voltage attached to the supply-side terminals (101, 102) of the circuit breaker (100) are determined, at least one of which is after the switching-off. The circuit (200) is re-switched on by means of an electronic switching element (120), the duration between the switch-off and the re-switch-on being selected such that a load (230) powered by the load circuit is not compromised by a power interruption. Finally, the line impedance (L1) of the supply line of the supply circuit (300) is calculated from the voltage values (u10, u11, u12) and the current measurement values (i1, i2) and their time intervals.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for operating an electronic circuit breaker, an electronic circuit breaker and an electrical system having an electronic circuit breaker. Background Art

[0002] Modern semiconductor circuit breakers (English: Semiconductor Circuit Breaker, abbreviated as SCCB, sometimes also called Solid State Circuit Breaker (solid-state circuit breaker), abbreviated as SSCB; the abbreviation SCCB is used below) can disconnect the circuit much faster than conventional circuit breakers (Miniature Circuit Breaker, abbreviated as MCB) in the event of a short circuit. Here, the SCCB also has a nominal switching capacity or short-circuit switching capacity. This involves the following current values, at which the MCB or SCCB can still be safely disconnected in the event of a short circuit. For 230 / 400V household installations, this current value is, for example, between 3kA and 15kA. German energy supply companies require a short-circuit switching capacity of at least 6kA.

[0003] As is known, the short-circuit switching current or the nominal switching capacity is a multiple of the nominal current of the MCB or SCCB. Common nominal currents in consumer circuits in the case of 230 / 400V domestic installations are, for example, 10A, 16A or 32A. Summary of the invention

[0004] The object of the present invention is to specify a method by which the actually expected maximum short-circuit current can be determined or at least estimated.

[0005] This object is achieved by a method having the features of independent patent claim 1 , by an electronic circuit breaker having a device for carrying out the method according to the invention, and by an electrical system having such a circuit breaker.

[0006] Advantageous embodiments of the invention are described in the dependent claims.

[0007] The invention has the advantage that the circuit breaker according to the invention, in particular the semiconductor circuit breaker SCCB, determines current and voltage measured values ​​for calculating or at least estimating the line impedance of the supply line of the supply circuit by interrupting the supply of the load circuit just long enough to detect a sufficient number of measured values ​​without the interruption damaging the load. In this case, use is made of the fact that loads designed in accordance with the relevant standards tolerate brief interruptions without load failure. Preferably, the interruption lasts no longer than 20 ms, particularly preferably no longer than 10 ms, but can also be limited to 2 ms.

[0008] The calculation of the line impedance is preferably performed by a processing unit which is present in any modern SCCB. Alternatively, the measured values ​​are transmitted to a superordinate device for evaluation.

[0009] Advantageously, components which are present in modern circuit breakers in general, in particular in SCCBs, are used, such as electronic switching elements of the SCCB which switch faster than mechanical switching elements, one or more voltage measuring devices and one or more current measuring devices, i.e., apart from a control device or a processing unit which can be implemented, for example, in software or firmware, preferably no adjustments are required on the SCCB.

[0010] The determined line impedance can be displayed to the operator or installer, who can then compare the line impedance with a target value and take corresponding measures if the deviation is intolerable. The display can be realized by a display unit of the SCCB itself and / or by a display on a device that is wirelessly or wiredly coupled to the SCCB. The device can be, for example, a fixedly installed device of the electrical system or a portable device, such as a portable diagnostic device, or a smart phone.

[0011] Based on the determined or estimated value of the line impedance, the operator or installer can determine the expected maximum short-circuit current. In an embodiment, this step can be part of an automated method according to the invention in that the SCCB and / or a superordinate device determines the maximum expected current increase in the event of a short circuit in the load circuit based on the line impedance and displays this maximum expected current increase to the operator or installer instead of and / or in addition to the line impedance.

[0012] If the maximum prospective current increase when a short circuit occurs in the load circuit exceeds the short-circuit switching capacity of the SCCB or a threshold value derived therefrom, for example 80% of the short-circuit switching capacity, the load circuit can be placed in a safe mode, such as cut off, and the fault can be output accordingly to the operator or installer. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Hereinafter, embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

[0014] in:

[0015] Figure 1 shows a principle circuit diagram of a circuit breaker according to an embodiment of the present invention;

[0016] Figure 2 An equivalent circuit diagram of a circuit having a circuit breaker according to an embodiment of the present invention is shown;

[0017] Figure 3AShown in accordance with Figure 2 A simplified equivalent circuit diagram of the power supply side of the circuit;

[0018] Figure 3B Shows about Figure 3A Further simplification of

[0019] Figure 4 a simplified flow chart showing an embodiment of a method according to the invention; and

[0020] Figure 5 An exemplary course of current and voltage of a circuit breaker is shown when an exemplary embodiment of the method according to the invention is carried out. DETAILED DESCRIPTION

[0021] Figure 1 The schematic circuit diagram of a circuit breaker 100, in particular a semiconductor circuit breaker SCCB, according to an embodiment of the present invention is shown. The SCCB 100 has power supply side or supply side terminals 101 and 102 and load side terminals 103 and 104. Here, without limiting the generality, the N conductor of the exemplary alternating current system extends between the terminals 102 and 104, and the L conductor extends between the terminals 101 and 103.

[0022] The SCCB 100 has at least one mechanical switch contact. In the example shown, the SCCB 100 has two mechanical switch contacts 111, 112, which can galvanically isolate the input terminals 101, 102 from the output terminals 103, 104 for two conductor paths L and N. In the example shown, the two switch contacts 111, 112 are coupled and combined to form a two-pole mechanical isolating switch 110.

[0023] In addition to the (electromechanical) mechanical switching element 110 , the SCCB 100 has an electronic switching element or power semiconductor element 120 which is preferably arranged in an L conductor path and has a source-side pole 121 , a load-side pole 122 and a control input 123 .

[0024] The electronic switch element 120 is controlled by the control element 130 via the control input 123 via the signal line 134, in particular switched on and off according to the operating state specified by the control element 130. The control element 130 can be, for example, a microcontroller. In an embodiment of the invention, it can also be provided that the microcontroller 130 also controls the mechanical switch element 110 (not shown). In other embodiments, it can be provided that the mechanical switch element 110 is controlled by a separate electronic or electromechanical control element (not shown), which in turn can be coupled to the control element 130.

[0025] The control element 130 receives signals or measurements from sensors or measuring devices of the SCCB 100. Figure 1 This is indicated in the diagram by arrows 131, 132, 133. For the sake of greater clarity, a representation of any necessary signal conversions has been omitted, since the corresponding mechanisms are known to the responsible experts.

[0026] In the exemplary embodiment shown, the SCCB 100 has means 140 for determining the (alternating) voltage u1 present at the source-side terminals 101 , 102 , from which values ​​representing the time-dependent voltage u1 are provided to the control element 130 via the relation 131 .

[0027] Furthermore, the SCCB 100 preferably has means 150 for determining the voltage u2 dropped across the electronic switching element 120. By these means, a value representing the time-dependent voltage u2 is provided to the control element 130 via the relation 132. In a preferred embodiment, the control element 130 can determine the time-dependent voltage u3 at the output terminals 103, 104 by simple signed addition or subtraction of the values ​​of u1 and u2. Expressed in the form of an equation, for the embodiment shown: u3=u1-u2.

[0028] In other exemplary embodiments, the voltage u3 can be determined directly by means of corresponding measuring devices arranged at the output terminals (not shown), wherein the device 140 or 150 can then be omitted as the case may be.

[0029] Finally, the exemplary SCCB 100 has means 160 for determining the current i flowing through the SCCB 100, which are preferably arranged in the conductor tracks L switched by the power semiconductors 120. These means 160 provide the control element 130 with a value representing the time-dependent current i via the relation 133.

[0030] In the following, combined Figure 4 and Figure 5 The remaining working principle of the controller 130 is described in more detail.

[0031] Figure 2 A very simplified equivalent circuit is shown with a consumer or load circuit 200, which is connected to a supply circuit 300 by means of an SCCB 100. The representation of the SCCB 100 is also greatly simplified and reduced to the representation of the supply-side terminals 101, 102, the load-side terminals 103, 104 and the switching devices 120, 111 in the L path. For greater clarity, the already mentioned voltages u1, u2 and u3 and the current i are also shown. The supply voltage u0 is also shown.

[0032] Starting from the load-side L terminal 103 of the SCCB 100, the consumer circuit 200 has the following elements: a first ohmic circuit component 211 with a value of R3 / 2; a first inductive circuit component 221 with a value of L2 / 2; a load 230 with a value of R2; a second inductive circuit component 222 with a value of L2 / 2; and a second ohmic circuit component 212 with a value of R3 / 2.

[0033] The power supply circuit 300 has a power supply side voltage source 330, which supplies power to the Figure 2 The device shown in FIG. 1 is fed with power. In the L path, the power supply line has: a first ohmic line component 311 with a value of R1 / 2; and a first inductive line component 321 with a value of L1 / 2. The N path has: a second inductive line component 322 with a value of L1 / 2; and a second ohmic line component 312 with a value of R1 / 2.

[0034] Here, for further simplification (see Figure 3), it has been simplified to assume that the ohmic components 311, 312 and the inductive components 321, 322 used for the forward line and the return line in the power supply circuit 300 are respectively approximately the same, and therefore respectively correspond approximately to half of the total line resistance R1 and the total line inductance L1 between the power-side terminals 101, 102 of the SCCB 100 and the power-side voltage source 330.

[0035] exist Figure 3A , a further simplified equivalent circuit diagram of the power supply circuit 300 between the power supply side terminals 101, 102 of the SCCB 100 and the power supply 330 is shown. Figure 2 The ohmic and inductive circuit components 311, 312, 321, 322 shown in FIG. 1 are combined into an ohmic circuit component 310 having a value of R1 and an inductive circuit component 320 having a value of L1. Therefore, for further consideration, the ohmic circuit component R1, the inductive circuit component L1 and the power supply 330 form a simplified power supply circuit 300 through which the current i flows. The power supply 330 provides a time-dependent voltage u0, and the time-dependent voltage u1 is applied to the power supply side terminals 101, 102 of the SCCB 100. The time-dependent voltages u4 and u5 are dropped on the components R1 and L1. Expressed in the form of an equation, it is obtained that: u0 = u4 + u5 + u1.

[0036] For further consideration, Figure 3A The simplified equivalent circuit diagram in is further simplified, see Figure 3B In this case, the voltages u0 and u1 are combined to form ux, wherein the following apply: ux=u0-u1 and ux=u4+u5.

[0037] in accordance with Figure 4, an advantageous embodiment of the method according to the invention is explained below. If the following prerequisites exist: the electronic switching element 120 of the SCCB 100 is switched on and the mechanical switching element 110 is closed, i.e. the load circuit 200 is switched on and there is no fault (e.g. short circuit or overload) in the load circuit 200, then in step 410, for example in response to a request generated by an operator, the method starts.

[0038] In step 420, it is waited until the time-dependent current i has reached a minimum value, because the higher this current is at the time of the intended switch-off (see step 430), the better the method works. For example, this current i can be measured over a plurality of periods of the input alternating voltage in order to determine the current maximum flowing current, and if at least 80% of the maximum current is flowing, a transition is made to step 430. If no current is currently flowing, for example because there is no active load on the consumer circuit, and / or if the peak value of the current is below a definable threshold value, for example below 1 A, the method is terminated, i.e. step 425, and a corresponding (error) message is output to the operator. The operator can, for example, be requested to connect the smallest load to the consumer circuit and then restart the method.

[0039] In an exemplary embodiment, in particular when the (estimated) value of the line impedance is not immediately required, but a suitably high current can be expected, the method stops at step 420 until such a current event occurs, such as a switch-on process (inrush) of a capacitive load. Additionally or alternatively, the operator can be requested in step 420 to connect or (briefly) activate such a load.

[0040] If a sufficiently high current value is reached in step 420, the electronic switching element 120 of the SCCB is turned off in step 430. Figure 5 , this is the time point t0.

[0041] In step 440 (in Figure 5 At a time point t1 in FIG. 1 ), the current value i1 of the current i flowing in the power supply circuit 300 is determined, and preferably simultaneously or at least approximately simultaneously, the voltage value u11 of the voltage u1 attached to the input side of the SCCB 100 is determined. These values ​​u11 and i1 are stored in a memory (not shown). Figure 1 The SCCB 100 shown in the example, by means of the above combined Figure 1 The described measuring device determines the respective instantaneous values ​​of u1 and i at the time t1.

[0042] In the embodiment of the invention, u1 and i can also be detected at different points in time. This is suitable, for example, when the SCCB 100 has a (single) voltage measuring device, which is first connected to the lines L and N to determine the instantaneous value of u1, and then connected to the terminals of a measuring resistor or shunt (not shown) integrated into the path L to determine the voltage drop across the measuring resistor, and then, for example, the controller 130 calculates the instantaneous value of the current i based on this.

[0043] In step 450, it is checked whether the time since the electronic switching element 120 of the SCCB was switched off in step 430 is still less than a configurable maximum time tmax. The configurable time is selected such that it is less than or equal to the short power interruption tolerated by a load designed according to the standard, i.e., for example, tmax=20 ms, preferably tmax=10 ms, and in special designs also tmax=2 ms. If the aforementioned condition is violated, i.e., the time since the switch-off is greater than tmax, the method is continued with step 470. If the aforementioned condition is met, i.e., the time since the switch-off is less than or equal to tmax, the method is continued with step 460.

[0044] Instead of checking in step 450 whether the time since the electronic switching element 120 of the SCCB was switched off in step 430 is still less than a configurable maximum time tmax, it is also possible to

[0045] In step 460, a check is performed to determine whether a predeterminable number of values ​​for u1 and i has been determined. In this case, in a preferred embodiment, the minimum number of values ​​is respectively 2 values ​​for i and one value for u1. In other embodiments, in particular for i, but also for u1, for example 3, 4, 5, 6, 7 or 8 values ​​can be used. In general, the higher the processing speed of the control unit, the more values ​​can be detected, which in calculation step 470 then enables a plausibility check of these values ​​and / or filtering such as smoothing and / or interpolation at a specific point in time and / or a fading of transient processes.

[0046] In an embodiment of the invention, instead of checking in step 450 whether the time since the electronic switching element 120 of the SCCB was switched off in step 430 is still less than a configurable maximum time tmax, the specifiable number of values ​​of i and the measuring time period can be selected such that the product of the number and the measuring time period is less than tmax. For example, in the case of tmax=10 ms, up to 9 measured values ​​can be detected with a measuring time period of 1 ms without having to worry about exceeding tmax while taking into account the safety margin.

[0047] If the prescribable number of values ​​has not been reached, a jump is made back to step 440 and a redetermination of the instantaneous value of i and optionally u1 is performed. Figure 5 This is exemplarily outlined in : At time t2, the value i2 is determined as described above for i1. Optionally, a further value u12 is also determined for u1.

[0048] In the exemplary embodiment of the present invention, it is simplified to assume that u1 changes immediately after the switch-off and then remains constant, while the current i decreases. Based on this simplified assumption, it is sufficient to determine only one value of u1 as long as the current i has not yet dropped to zero. It is possible, but not necessary, to determine this value simultaneously with one of the current measurements.

[0049] If the predefinable number of value pairs has been reached and / or the maximum time tmax for switching off the electronic switching element 120 has been reached, the repetition is terminated and step 470 is continued.

[0050] In step 470, the electronic switching element 120 of the SCCB 100 is switched on, if this is not prevented by a process running in parallel for safety reasons, for example because a short circuit is detected in the consumer circuit 200 at the same time. Figure 5 , the electronic switching element 120 is turned on at time t4.

[0051] For the calculations described below, the measured value of u1 is also required, which allows the supply voltage u0 to be determined (see Figure 3A ). If a short or very short time period (microseconds to a few milliseconds at most) immediately before the shutdown in step 430 is considered, a quasi-steady state can be assumed, i.e. u0 and i are considered constant and u5 is close to zero (due to i being constant). It is assumed that R1 is small and u4 is therefore considered negligible, so that u1≈u0 applies just before the shutdown in step 430. This means that a voltage measurement value u10 which corresponds approximately to the supply voltage u0 can be determined shortly before the shutdown in step 430, for example as a substep of step 430 before the shutdown.

[0052] Alternatively, if a steady state is reached after the switch-off, this steady state is characterized by i=0, see Figure 5 For example, at time t3, u10 can be determined. Here, a better approximation of u0 can be determined, since, due to i=0, u4=0 is also possible. However, it is possible that within tmax, the current i does not drop to zero, so that there is no time t3 at which i=0.

[0053] Thus, in an embodiment, it can be carried out as follows: In step 430, before the switch-off, the value of u1 is first measured, which is then stored as an approximation u10 of u0. The method is then carried out with steps 430, 440, 450, 460, and in one of these steps it is checked whether the current i has dropped to zero without reaching tmax. As soon as i=0 is reached, or shortly thereafter, a new measurement of u1 is carried out and, instead of the previously determined approximation, a new value for u10 is used as the basis for the further method. In other words, before the switch-off, an approximation for u10 is determined, which is then used if the current has not dropped to zero, and which is replaced by a better measured value if the current has dropped to zero within tmax.

[0054] Then, in step 470, the line impedance L1 of the supply or power line between the circuit breaker 100 and the (imaginary) grid voltage source 330 is at least approximately calculated based on the voltage values ​​u10, u11, u12 (or the average values ​​of u11 and u12 and other voltage values) and the current measurement values ​​i1, i2 and their time interval Δt=t2-t1. In a preferred embodiment, for this purpose, Δi=i2-i1 and ux=u11-u10 are first calculated. Then, based on the calculation according to Figure 3B The simplified equivalent circuit diagram of , with the help of the relation di / dt=Δi / Δt, determines the approximate value of di / dt, and finally with the help of the relation L1=ux / (di / dt), determines the approximate value of L sought. Here again, the voltage dropped across R1 is considered negligible.

[0055] By expressing the values ​​i1, i2 and the values ​​u10 and u11 determined by executing step 440 a plurality of times, here twice, the following equation is obtained for the preferred embodiment:

[0056] L1=(u11-u10) / ((i2-i1) / (t2-t1))

[0057] Next, with the help of L1 and the peak value u0,max of the supply voltage, the maximum expected current increase in the event of a short circuit on the load side can be determined:

[0058] di / dt=u0,max / L1

[0059] Now, from this current increase di / dt, the maximum current reached before the SCCB safely switches off can be determined. To do this, it is only necessary to multiply the constant dt,SCCB known in advance for the respective SCCB type by the current increase di / dt. Expressed in the form of an equation:

[0060] imax=di / dt*dt,SCCB

[0061] Expressed using the value determined for L1, we obtain:

[0062] imax=u0,max / L1*dt,SCCB

[0063] The constant dt,SCCB is composed of the time the SCCB needs to detect a short circuit (and, for example, distinguish it from a switch-on process) and the time it needs to then switch off the semiconductor switch 120 and is typically 0.2 to 2 μs.

[0064] This calculation can also be performed by the SCCB and / or a higher-level device and displayed to the operator qualitatively (e.g. as a red / green color display after comparison with limit values ​​determined by standards or other means, such as the short-circuit switching capacity of 6 kA mentioned at the beginning) and / or quantitatively.

[0065] After the parameters L1 and / or di / dt and / or imax have been calculated and output or provided, the method ends with step 480. Of course, it is possible to restart the method according to the corresponding operator input. In an embodiment, it is possible to automatically run the method several times in succession and average the parameters before outputting them in order to obtain a better estimate.

[0066] Optionally, the described method can be supplemented or modified in order to detect the capacitance C in the power supply network (see Figure 2 ). Figure 5 , in the presence of the capacitor C, the drop in the current i after the switch-off at time t0 will be significantly flatter, ie the term resulting from the two measured values ​​of i:

[0067] ((i2-i1) / (t2-t1))

[0068] In value, it will be significantly greater than the value due to the (usually very low) line inductance L1. In the calculation step 470, it can optionally be checked whether this term exceeds a threshold value, for example a maximum expected value for a supply line with a maximum length and a maximum inductance per unit length value, and a decision can be made in step 470 that L1 cannot be calculated. This is reported to the operator or provided for reporting to the operator, if necessary together with an indication of the presence of capacitances in the supply circuit 300. The operator can then check whether these capacitances are as expected or not.

[0069] As already explained, in a modification of the above method, it is of course possible to improve the reliability of the estimate by other value pairs. This estimate is essentially based on the assumption that the reduction of the current i after the switch-off t0 in the considered very short time interval runs linearly and that the voltage u0 does not change or at least does not change significantly during this time (i.e., the alternating current system 100, 200, 300 is quasi-steady-state, i.e., can be regarded as a DC voltage system with tolerance for small errors). Subsequently, the evaluation of other measured values ​​of i and / or u1 allows the following measured values ​​to be excluded from the consideration, for which the above preconditions prove to be unsuitable by comparison with other value pairs or interpolated values, for example, in the case of transient processes or interference coupled into the line.

[0070] As already mentioned, it is possible to have the above method executed completely by the controller 130, for example a microcontroller, of a modern SCCB 100 and to transmit the results to a display device of the operator via a wireless or wired interface. The display device can be, for example, a mobile device, such as a smartphone, which can be coupled to the SCCB 100 by means of Bluetooth or other near-field radio technologies. In this case, the software running on the mobile device can be designed so that the operator only starts the method by a user input, which is then transmitted to the SCCB 100. Alternatively, it can be provided that the SCCB 100 only transmits the measured values ​​and the mobile device performs the calculations.

Claims

1. A method for operating an electronic circuit breaker (100), the electronic circuit breaker coupling a load circuit (200) to be protected to a power supply circuit (300), and having a mechanical switching element (110) and an electronic switching element (120) connected in series therewith, the method comprising the following steps: a) shutting down the load circuit (200) by means of the electronic switching element (120); b) after said switching off, detecting at least two temporally spaced current measurement values ​​(i1, i2) of the current (i) flowing through said circuit breaker; c) detecting at least two voltage values ​​(u10, u11, u12) separated in time from each other of the voltage on the supply side terminals (101, 102) of the circuit breaker (100), at least one of which is detected after the disconnection; d) reconnecting the load circuit (200) by means of the electronic switch element (120), wherein: The duration between the switching off and the switching on again is selected so that a load (230) powered by the load circuit is not damaged by the power interruption; e) calculating the line impedance (L1) of the power supply line of the power supply circuit (300) and / or calculating the value of the maximum expected current increase when a circuit occurs in the load circuit based on the voltage values ​​(u10, u11, u12) and the current measurement values ​​(i1, i2) and their time intervals.

2. The method according to claim 1, wherein: f) placing the circuit breaker in a safe mode if the line impedance (L1) is below a threshold value and / or the maximum prospective current increase in the event of a short circuit in the load circuit exceeds the short circuit switching capability of the circuit breaker or a threshold value derived from the short circuit switching capability.

3. A method according to any one of the preceding claims, wherein: g) determining whether the power supply circuit has a capacitive component (C) based on the voltage values ​​(u10, u11, u12) and the current measurement values ​​(i1, i2).

4. A method according to any one of the preceding claims, wherein: Steps b) and c) are performed simultaneously or almost simultaneously and respectively detect pairs of current measurement values ​​and voltage values.

5. A method according to any one of the preceding claims, wherein: Some or all of the calculation steps e), f) and / or g) are performed by the electronic circuit breaker (100).

6. The method according to any one of claims 1 to 4, wherein: Some or all of the calculation steps e), f) and / or g) are performed by a superior device, wherein the current measurement values ​​and / or voltage values ​​required for the corresponding calculations are transmitted wirelessly or by wire from the circuit breaker (100) to the superior device.

7. A method according to any one of the preceding claims, wherein: Said switching off is performed if the instantaneous value (i) of the current flowing through said circuit breaker exceeds a threshold value, preferably corresponding to a peak value of said current.

8. A method according to any one of the preceding claims, wherein: One of the determined voltage values ​​is an instantaneous value (u10) of a voltage (u1) applied to power supply side terminals (101, 102) of the circuit breaker (100) at the time of the shutdown.

9. A method according to any one of the preceding claims, wherein: The shutdown takes place during a switch-on process of the load with a high switch-on current.

10. A method according to any one of the preceding claims, wherein: The switching back on takes place no later than 20 ms, preferably no later than 10 ms, in particular no later than 2 ms after the switching off.

11. An electronic circuit breaker (100) comprising: a voltage measuring device (140, 150), a current measuring device (160), and a processing unit (130), the processing unit being programmed to execute the method according to any one of the preceding claims.

12. An electrical system comprising: one or more circuit breakers (100) according to claim 11; and a device capable of wirelessly or wired connection with one or more of the circuit breakers (100) for determining and / or displaying a maximum expected current increase when a short circuit occurs in the load circuit (200).

13. The electrical system according to claim 12, being designed such that a method for determining a maximum prospective current increase when a short circuit occurs in the load circuit (200) is initiated by the device.