Accumulated material detection method, electronic equipment, mixer truck and computer readable storage medium

By analyzing the torque and concrete volume data of the mixer truck, a corresponding relationship is established, and the accumulation of material in the mixing drum is accurately detected, which solves the problem of inconvenient detection in the existing technology and improves user experience and transportation efficiency.

CN118744481APending Publication Date: 2024-10-08ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411048750.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The existing technology cannot accurately and conveniently detect the material accumulation value of the mixing drum, resulting in a decrease in the quality of the mixing drum and affecting the transportation efficiency and user experience of the mixer truck.

Method used

By obtaining the transport torque of the mixer truck, the concrete volume and the torque data after unloading, a corresponding relationship is established to determine the target accumulation value, and the calibrated torque and historical data are used to calculate and predict the accumulation, and output a cleaning prompt message.

Benefits of technology

It achieves accurate detection of the accumulated material in the mixing drum, improves user experience, avoids the influence of concrete proportion factors, and ensures the cleanliness and transportation efficiency of the mixing drum.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118744481A_ABST
    Figure CN118744481A_ABST
Patent Text Reader

Abstract

The invention discloses an accumulated material detection method, electronic equipment, a mixer truck and a computer readable storage medium. The accumulated material detection method comprises the steps that the corresponding transportation torque, the transported concrete volume and the first torque after discharging of a mixing drum of the mixer truck in the current period and the corresponding second torque after discharging in the last period are obtained; according to the transportation torque, the concrete volume and the second torque, the corresponding relation between the concrete of the unit volume transported by the mixing drum in the current period and the torque is determined; determining a target material accumulation value of the mixing drum in the current period according to the calibration torque, the first torque and the corresponding relation between the concrete of the unit volume transported by the mixing drum in the current period and the torque; the calibration torque is used for indicating the corresponding torque when the mixing drum is in an empty drum state. Therefore, the influence of factors such as concrete proportion on accumulated material calculation can be effectively avoided, the accumulated material value of the mixing drum can be accurately and conveniently detected, and the user experience is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering machinery, and in particular to a material accumulation detection method, electronic equipment, a mixer truck and a computer-readable storage medium. Background Art

[0002] With the continuous development of society, more and more infrastructure such as roads and bridges are being built. In the construction of infrastructure, mixer trucks are an indispensable engineering machinery. After the mixer truck unloads, the inside of the mixing drum will be cleaned to prevent the un-unloaded concrete from accumulating in the mixing drum. However, in the long-term use process, it cannot be guaranteed to be cleaned every time. In the long run, it will cause material accumulation in the mixing drum, increase the quality of the mixing drum, and reduce the capacity of the mixing drum.

[0003] In the existing related technologies, whether there is material accumulation in the mixing drum is usually detected by means of vehicle weighing, working current of the driving motor, etc. However, the above methods can only judge whether there is material accumulation in the mixing drum, and the judgment logic is simple, and it is impossible to accurately and conveniently detect the material accumulation value of the mixing drum. Summary of the invention

[0004] The purpose of the present application is to provide a material accumulation detection method, an electronic device, a mixer truck and a computer-readable storage medium, which can accurately and conveniently detect the material accumulation value of the mixing drum and improve the user experience.

[0005] To achieve the above objectives:

[0006] In a first aspect, an embodiment of the present application provides a material accumulation detection method, comprising:

[0007] Obtain the transport torque, the transported concrete volume and the first torque after unloading of the mixer drum of the mixer truck in the current cycle and the second torque after unloading corresponding to the previous cycle; wherein, one cycle is from the mixer truck entering the station to load to the completion of unloading;

[0008] Determine, according to the transport torque, the concrete volume and the second torque, a corresponding relationship between the torque and the unit volume of concrete transported by the mixing drum in the current cycle;

[0009] According to the calibrated torque, the first torque and the correspondence between the unit cubic volume of concrete transported by the mixing drum in the current cycle and the torque, the target material accumulation value of the mixing drum in the current cycle is determined; the calibrated torque is used to indicate the torque corresponding to when the mixing drum is in an empty drum state.

[0010] Optionally, determining the correspondence between the unit volume of concrete transported by the mixing drum in the current cycle and the torque according to the transport torque, the concrete volume and the second torque includes:

[0011] obtaining a difference between the transport torque and the second torque;

[0012] Based on the ratio of the concrete volume to the difference, a corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque is determined.

[0013] Optionally, the method further comprises:

[0014] Detecting whether the difference between the first torque and the calibrated torque is greater than or equal to a preset torque value;

[0015] If so, the target material accumulation value of the mixing drum in the current cycle is determined according to the calibrated torque, the first torque, and the corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque.

[0016] Optionally, determining a target material accumulation value of the mixing drum in the current cycle according to the calibrated torque, the first torque, and a correspondence between a unit volume of concrete transported by the mixing drum in the current cycle and the torque includes:

[0017] According to the calibrated torque, the first torque and the corresponding relationship between the concrete unit volume transported by the mixing drum in the current cycle and the torque, the calculated accumulation value of the mixing drum in the current cycle is obtained.

[0018] Based on a preset analysis model and the first torque, a predicted material accumulation value of the mixing drum in the current cycle is obtained; the preset analysis model is generated based on historical torque data and historical material accumulation values ​​of the mixing drum in historical cycles;

[0019] A target material accumulation value of the mixing drum in the current cycle is determined based on the predicted material accumulation value and the calculated material accumulation value.

[0020] Optionally, the method further comprises:

[0021] The preset analysis model is modified based on the target accumulation value.

[0022] Optionally, the method further comprises:

[0023] After determining the calculated accumulation value of the mixing drum in the current cycle, the calibrated torque is replaced by the first torque.

[0024] Optionally, the method further comprises:

[0025] Determine the accumulated material value corresponding to the mixing drum according to the target accumulated material value and the accumulated material value of the mixing drum in the historical period;

[0026] When the accumulated material value is greater than or equal to the preset accumulated material value, a drum cleaning prompt message is output.

[0027] Optionally, the method further comprises:

[0028] Output the material accumulation value of the mixing drum in the current cycle and the corresponding concrete volume.

[0029] In a second aspect, an embodiment of the present application provides an electronic device, comprising: a processor and a memory storing a computer program, wherein when the processor runs the computer program, the above-mentioned material accumulation detection method is implemented.

[0030] In a third aspect, an embodiment of the present application provides a mixer truck, comprising the electronic device as described in the second aspect.

[0031] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the above-mentioned material accumulation detection method is implemented.

[0032] The material accumulation detection method, electronic device and computer-readable storage medium provided by the embodiment of the present application include: obtaining the transportation torque, the volume of concrete transported and the first torque after unloading corresponding to the mixing drum of the mixer truck in the current cycle, and the second torque after unloading corresponding to the mixing drum of the mixer truck; wherein, one cycle is from the mixer truck entering the station to loading to the completion of unloading; according to the transportation torque, the volume of concrete and the second torque, determining the corresponding relationship between the concrete transported per unit volume and the torque of the mixing drum in the current cycle; according to the calibration torque, the first torque and the corresponding relationship between the concrete transported per unit volume and the torque of the mixing drum in the current cycle, determining the target material accumulation value of the mixing drum in the current cycle; the calibration torque is used to indicate the torque corresponding to the mixing drum when it is in an empty drum state. In this way, by analyzing the torque data corresponding to the mixing drum of the mixer truck in different cycles and the volume of concrete transported, obtaining the corresponding relationship between the concrete transported per unit volume and the torque of the mixing drum in different cycles, and then determining the material accumulation value of the mixing drum in different cycles based on the corresponding relationship, the influence of factors such as concrete ratio on the material accumulation calculation can be effectively avoided, and the material accumulation value of the mixing drum can be accurately and conveniently detected, which improves the user experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A schematic flow chart of a material accumulation detection method provided in an embodiment of the present invention;

[0034] Figure 2 A schematic diagram of the structure of a material accumulation detection system provided by an embodiment of the present invention;

[0035] Figure 3A schematic diagram of the data transmission flow in an embodiment of the present invention;

[0036] Figure 4 A schematic diagram of a specific process of a material accumulation detection method provided by an embodiment of the present invention;

[0037] Figure 5 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0038] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0039] It should be noted that, in this article, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element. In addition, components, features, and elements with the same name in different embodiments of the present application may have the same meaning or different meanings, and their specific meanings need to be determined by their explanation in the specific embodiment or further combined with the context of the specific embodiment.

[0040] It should be understood that, although the terms first, second, third, etc. may be used to describe various information in this article, these information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this article, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein can be interpreted as "at the time of..." or "when..." or "in response to determination". Furthermore, as used in this article, the singular forms "one", "one" and "the" are intended to also include plural forms, unless there is an opposite indication in the context. It should be further understood that the terms "comprising", "including" indicate that there are described features, steps, operations, elements, components, projects, kinds, and / or groups, but do not exclude the existence, occurrence or addition of one or more other features, steps, operations, elements, components, projects, kinds, and / or groups. The terms "or" and "and / or" used herein are interpreted as inclusive, or mean any one or any combination. Thus, “A, B, or C” or “A, B and / or C” means “any of the following: A; B; C; A and B; A and C; B and C; A, B, and C.” An exception to this definition will occur only when a combination of elements, functions, steps, or operations are inherently mutually exclusive in some manner.

[0041] It should be understood that, although the various steps in the flowchart in the embodiment of the present application are displayed in sequence according to the indication of the arrows, these steps are not necessarily performed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and it can be performed in other orders. Moreover, at least a portion of the steps in the figure may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and their execution order is not necessarily performed in sequence, but can be performed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.

[0042] It should be noted that, in this article, step codes such as S101, S102, etc. are used for the purpose of expressing the corresponding content more clearly and concisely, and do not constitute a substantial limitation on the sequence. When implementing the step, those skilled in the art may execute S102 first and then S101, etc., but these should all be within the scope of protection of this application.

[0043] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0044] In the subsequent description, the suffixes such as "module", "component" or "unit" used to represent elements are only used to facilitate the description of the present application, and have no specific meanings. Therefore, "module", "component" or "unit" can be used in a mixed manner.

[0045] See also Figure 1 , is a material accumulation detection method provided in an embodiment of the present application. The material accumulation detection method can be executed by a material accumulation detection device provided in an embodiment of the present application. The material accumulation detection device can be implemented in software and / or hardware, such as an electronic device such as a controller or a server. In this embodiment, the execution subject of the material accumulation detection method is a mixer truck as an example. The material accumulation detection method provided in this embodiment includes:

[0046] Step S101: obtaining the transport torque, the transported concrete volume and the first torque after unloading of the mixing drum of the mixer truck in the current cycle and the second torque after unloading in the previous cycle.

[0047] Among them, in order to facilitate the statistics of the material accumulation of the mixing drum of the mixer truck at different times, in this embodiment, the period from the mixer truck entering the station to load to the completion of unloading is determined as one cycle. The transportation torque is used to characterize the torque used to maintain the rotation of the mixing drum during the normal transportation of the concrete loaded by the mixing drum by the mixer truck. The transportation torque is considered to be constant within a cycle, and the transportation torque can be obtained by detecting information such as the torque of the drive motor that drives the mixing drum to rotate. The transported concrete volume refers to the amount of concrete loaded in the mixing drum, which can be obtained specifically through the data uploaded by the mixing station, such as obtaining the volume of concrete loaded by the mixer truck uploaded by the mixing station from the Internet of Things platform. In actual applications, the mixing station can package the vehicle code of the mixer truck with the concrete data including information such as the concrete volume and upload them to the Internet of Things platform, and then send the corresponding concrete data to the mixer truck through the Internet of Things platform. Among them, the first torque after unloading refers to the torque used to maintain the rotation of the mixing drum of the mixer truck after all the concrete transported in the current cycle is unloaded. The second torque after unloading corresponding to the previous cycle refers to the torque used to maintain the rotation of the mixing drum of the mixer truck after all the concrete transported in the previous cycle has been unloaded.

[0048] Step S102: Determine the corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque according to the transport torque, the concrete volume and the second torque.

[0049] It can be understood that, according to the transportation torque corresponding to the mixing drum in the current cycle and the second torque after unloading corresponding to the previous cycle, the torque used to transport the concrete volume in the current cycle can be known, and then the corresponding relationship between the concrete volume transported by the mixing drum in the current cycle and the torque can be determined in combination with the concrete volume. Among them, the corresponding relationship can be used to characterize the torque used to transport the concrete volume in the current cycle.

[0050] In one embodiment, determining the correspondence between the concrete volume transported by the mixing drum in the current cycle and the torque according to the transport torque, the concrete volume and the second torque includes:

[0051] Obtaining a difference between the transport torque and the second torque;

[0052] Based on the ratio of the concrete volume to the difference, the corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque is determined.

[0053] Specifically, the transport torque corresponding to the mixing drum in the current cycle and the second torque after unloading corresponding to the previous cycle are calculated to obtain the difference between the transport torque and the second torque; the ratio of the volume of concrete transported by the mixing drum in the current cycle to the difference is calculated, and the corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque is determined based on the ratio, for example, the ratio is determined as the corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque, or the product of the ratio and a preset coefficient is determined as the corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque.

[0054] It can be understood that the difference between the transport torque and the second torque can be determined as the torque used to maintain the rotation of the mixing drum when the mixing drum contains the concrete volume transported in the current cycle and the historical accumulation. Since the mixing drum only contains the concrete volume transported in the current cycle and the historical accumulation, and the difference between the transport torque and the second torque is associated with the concrete volume, the corresponding relationship between the concrete volume transported by the mixing drum in the current cycle and the torque can be determined based on the ratio of the concrete volume transported by the mixing drum in the current cycle to the difference. For example, assuming that the corresponding transport torque of the mixing drum of the mixer truck in the current cycle is N1, the concrete volume transported is A, and the corresponding second torque after unloading in the previous cycle is N2, then A / (N1-N2) can be used as the corresponding relationship between the concrete volume transported by the mixing drum in the current cycle and the torque. In this way, the corresponding relationship between the concrete volume transported by the mixing drum in each cycle and the torque can be quickly obtained, which is convenient for accurately detecting the accumulation value.

[0055] Step S103: Determine the target material accumulation value of the mixing drum in the current cycle according to the calibrated torque, the first torque and the correspondence between the concrete unit volume transported by the mixing drum in the current cycle and the torque; the calibrated torque is used to indicate the torque corresponding to when the mixing drum is in an empty drum state.

[0056] Specifically, according to the correspondence between the calibrated torque, the first torque and the unit cubic volume of concrete transported by the mixing drum in the current cycle and the torque, the calculated material accumulation value of the mixing drum in the current cycle is obtained; based on the preset analysis model and the first torque, the predicted material accumulation value of the mixing drum in the current cycle is obtained; the preset analysis model is generated based on the historical torque data and historical material accumulation values ​​of the mixing drum in historical cycles; according to the predicted material accumulation value and the calculated material accumulation value, the target material accumulation value of the mixing drum in the current cycle is determined.

[0057] It can be understood that since the first torque after unloading can characterize the torque used to maintain the rotation of the mixing drum of the mixer truck after all the concrete transported in the current cycle is unloaded, and the corresponding torque when the mixing drum is in an empty drum state, that is, the calibrated torque, and the corresponding relationship between the concrete transported per cubic meter by the mixing drum in the current cycle and the torque, the calculated material accumulation value of the mixing drum in the current cycle can be obtained. For example, the difference between the first torque and the calibrated torque can be calculated first, and then the product of the obtained difference and the corresponding relationship can be calculated to obtain the calculated material accumulation value of the mixing drum in the current cycle. It should be noted that in this embodiment, the mixing drum being in an empty drum state means that the concrete in the mixing drum has been unloaded, but there may still be a state of accumulation.

[0058] Here, based on the torque data (including the first torque, etc.) and the accumulation value of the mixing drum in different historical cycles, a preset analysis model for predicting accumulation can be pre-generated in combination with statistical methods. After obtaining the first torque of the mixing drum after unloading in the current cycle, the accumulation value of the mixing drum in the current cycle can be predicted based on the preset analysis model to obtain the predicted accumulation value of the mixing drum in the current cycle. At the same time, considering the influence of the calculation error, the target accumulation value of the mixing drum in the current cycle can be determined based on the predicted accumulation value of the mixing drum in the current cycle predicted by the preset analysis model and the calculated accumulation value of the mixing drum in the current cycle obtained by the above calculation, such as taking the average of the predicted accumulation value and the calculated accumulation value of the mixing drum in the current cycle as the target accumulation value of the mixing drum in the current cycle, or multiplying the predicted accumulation value and the calculated accumulation value of the mixing drum in the current cycle by the corresponding preset weights, and determining the sum of the two as the target accumulation value of the mixing drum in the current cycle, etc. In this way, the target material accumulation value of the mixing drum in the current cycle is determined by combining the calculated material accumulation value with the material accumulation value predicted by the analysis model, thereby further improving the detection accuracy of the material accumulation value of the mixing drum.

[0059] In summary, in the material accumulation detection method provided in the above embodiment, by analyzing the torque data corresponding to the mixing drum of the mixer truck in different cycles and the volume of transported concrete, the correspondence between the unit volume of concrete transported by the mixing drum in different cycles and the torque is obtained, and then the material accumulation value of the mixing drum in different cycles is determined based on the corresponding relationship. This can effectively avoid the influence of factors such as concrete mix ratio on the material accumulation calculation, can accurately and conveniently detect the material accumulation value of the mixing drum, and improve the user experience.

[0060] In one embodiment, the method further comprises:

[0061] Detecting whether the difference between the first torque and the calibrated torque is greater than or equal to a preset torque value;

[0062] If so, the calculated material accumulation value of the mixing drum in the current cycle is determined according to the calibrated torque, the first torque, and the corresponding relationship between the unit cubic volume of concrete transported by the mixing drum in the current cycle and the torque.

[0063] It can be understood that in order to reduce the number of calculations or unnecessary calculation operations, it can be first detected whether the difference between the first torque and the calibrated torque is greater than or equal to the preset torque value. If the difference between the first torque and the calibrated torque is greater than or equal to the preset torque value, it means that the mixing drum may have a lot of accumulated materials in the current cycle, and then the calculation of the accumulated materials value of the mixing drum in the current cycle is determined according to the correspondence between the calibrated torque, the first torque and the concrete transported per cubic meter by the mixing drum in the current cycle and the torque. If the difference between the first torque and the calibrated torque is less than the preset torque value, it means that the accumulated materials of the mixing drum in the current cycle may be less or negligible, and then the calculation of the accumulated materials value of the mixing drum in the current cycle is not determined according to the correspondence between the calibrated torque, the first torque and the concrete transported per cubic meter by the mixing drum in the current cycle and the torque. Among them, the preset torque value can be set according to the actual needs, for example, it can be set to 100N, etc. In this way, the number of calculations or unnecessary calculation operations can be reduced, and the efficiency of material accumulation detection can be improved.

[0064] In one embodiment, the method further comprises:

[0065] After determining the material accumulation value of the mixing drum in the current cycle, the calibrated torque is replaced by the first torque.

[0066] Specifically, after determining the material accumulation value of the mixer drum in the current cycle, the calibrated torque is replaced by the first torque of the mixer drum of the mixer truck after unloading in the current cycle, so as to continue to detect the calculated material accumulation value in the next cycle.

[0067] In one embodiment, the method further comprises:

[0068] Determine the corresponding accumulated material value of the mixing drum according to the target accumulated material value and the accumulated material value of the mixing drum in the historical period;

[0069] When the accumulated material value is greater than or equal to the preset accumulated material value, a drum cleaning prompt message is output.

[0070] Specifically, when the material accumulation value of the mixing drum in the historical period is known, combined with the target material accumulation value of the mixing drum in the current period, the corresponding cumulative material accumulation value of the mixing drum can be determined, and then it is detected whether the cumulative material accumulation value is greater than or equal to the preset material accumulation value. If the cumulative material accumulation value is greater than or equal to the preset material accumulation value, it means that there is a lot of material accumulation in the mixing drum and it needs to be cleaned in time, and a drum cleaning prompt message is output; if the cumulative material accumulation value is less than the preset material accumulation value, it means that there is less material accumulation in the mixing drum, and the material accumulation detection operation continues.

[0071] Among them, the drum cleaning reminder message can be output through voice or text. In addition, the drum cleaning reminder message can be output through the speaker or display screen on the mixer truck, or the drum cleaning reminder message can be sent to a mobile terminal bound to the mixer truck, so that the mobile terminal outputs the drum cleaning reminder message. In addition, before outputting the drum cleaning reminder message, it is also possible to detect whether the drum cleaning operation has been performed on the mixer drum, such as detecting whether the torque of the mixer drum has changed, etc. If it is detected that the drum cleaning operation has been performed on the mixer drum, the drum cleaning reminder message may not be output. In this way, when the accumulated material value is greater than or equal to the preset material accumulation value, the drum cleaning reminder message is output in time to facilitate the user to clean up the accumulated material in the mixer drum in time, thereby improving the user experience.

[0072] In one embodiment, the method further comprises:

[0073] The preset analysis model is modified based on the target accumulation value.

[0074] Here, since the target accumulation value is closer to the actual accumulation value in the mixing drum, the preset analysis model can be corrected in combination with the target accumulation value. For example, based on the difference between the predicted accumulation value and the target accumulation value of the mixing drum in the current cycle, the parameters of the preset analysis model are adjusted so that the difference between the predicted accumulation value predicted by the preset analysis model and the target accumulation value of the mixing drum in the current cycle is less than the preset accumulation threshold value. In this way, by timely correcting the preset analysis model, the prediction accuracy of the preset analysis model can be further improved, thereby further improving the detection accuracy of the accumulation of the mixing drum.

[0075] In one embodiment, the method further comprises:

[0076] Output the material accumulation value of the mixing drum in the current cycle and the corresponding concrete volume.

[0077] Here, the material accumulation value of the mixing drum in the current cycle and the corresponding concrete volume can be output through voice or text, so that the user can easily know the material accumulation information in each cycle, thereby improving the user experience.

[0078] Based on the same inventive concept as the above-mentioned embodiment, the above-mentioned embodiment is described in detail below through a specific example, which is taken as an example in this embodiment.

[0079] In this embodiment, a material accumulation detection system is provided which integrates data transmission, internal intelligent calculation, self-learning function assistance, and customer terminal display function. Figure 2 As shown, in order to realize the material accumulation detection of the mixer truck, the main functions or operations of the material accumulation detection system provided in this embodiment are described below:

[0080] 1. Data transmission

[0081] Data transmission starts from the moment the mixer truck enters the station to load materials and ends at the construction site where the materials are unloaded. Figure 3 , which is a schematic diagram of the data transmission flow. Among them, the card reader installed on the mixer truck or mixing station reads the vehicle information card containing the whole vehicle information, and encapsulates the read information data and uploads it to the Internet of Things platform. At the same time, the mixing station can extract the concrete information of the mixer truck and upload it to the Internet of Things platform. The Internet of Things platform sends the above information to the mixer truck, so that the mixer truck calculates the accumulated material value based on the above information, and uploads the calculated accumulated material value to the Internet of Things platform.

[0082] 2. Internal intelligent computing

[0083] The internal intelligent calculation is based on the established mathematical model, which takes the accumulated material value of each cycle into account. Specifically, according to the torque value collected by the mixer truck in different cycles, the intelligent analysis and calculation are performed according to the following formula:

[0084] ΔF i =ΔT i *C i

[0085]

[0086] Among them, C i is a special coefficient (used to express the corresponding relationship between the concrete volume transported by the mixing drum in the current cycle i and the torque), ΔT i is the special torque (used to indicate the torque difference after unloading in the current cycle i), the obtained ΔF i It is the calculated accumulated material value obtained in the current cycle i, where i = 1, 2, 3...n.

[0087] Here, before calculating the accumulated material value of the current cycle, the torque after unloading corresponding to the current cycle can be compared with a calibrated torque. If the difference between the torque after unloading and the calibrated torque is less than the preset torque value, the accumulated material calculation may not be performed, and it is assumed that there is no accumulated material this time and the data is eliminated; if the difference between the torque after unloading and the calibrated torque is greater than or equal to the preset torque value, the accumulated material calculation is performed, and the torque after unloading is used as the calibrated torque for the next comparison calculation.

[0088] 3. Self-learning function assistance

[0089] The self-learning function assists the process of torque X n Perform the following calculations:

[0090] Deviation: A = |X1-X 平均 |+|X2-X 平均 |+...+|X n -X 平均 |

[0091] variance:

[0092] Standard Deviation:

[0093] Here, through big data analysis, the data uniformity can be analyzed to form a data discretization empirical equation. Then, based on the predicted accumulation value calculated by the data discretization empirical equation and the calculated accumulation value calculated by the mathematical model, the final accumulation value is obtained, and the data discretization empirical equation is corrected based on the final accumulation value feedback.

[0094] 4. Customer terminal display

[0095] The calculated material accumulation value and other data are not only displayed on the mixer truck's onboard display screen, but can also be uploaded to the Internet of Things for data archiving. At the same time, the data can also be transmitted to the customer terminal to display the material accumulation of the corresponding mixer truck and the corresponding material transportation data displayed by time or document number.

[0096] See also Figure 4 The material accumulation detection method provided in this embodiment mainly includes the following steps:

[0097] Step S201, collecting mixer truck data.

[0098] Here, the mixer truck data may include the transport torque of the mixer drum corresponding to the current cycle, the volume of concrete transported, the torque after unloading, and the torque after unloading corresponding to the previous cycle, etc.

[0099] Step S202: Detect whether to unload based on the mixer truck data. If so, execute step S203; otherwise, execute step S201.

[0100] Step S203, check whether the mixer truck data meets the requirements, if so, execute step S204, otherwise execute step S208.

[0101] Step S204: Obtain the calculated material accumulation value of the current cycle calculated by the mathematical model.

[0102] Here, the establishment of the mathematical model can refer to the above description and will not be repeated here.

[0103] Step S205: Obtain the predicted material accumulation value of the current period calculated by the data discretization empirical equation.

[0104] Here, the data discretization empirical equation is established based on the statistical method, combined with the torque and material accumulation data of the mixer truck in the historical period.

[0105] Step S206: Determine the target material accumulation value of the current cycle based on the calculated material accumulation value and the predicted material accumulation value.

[0106] Step S207: modifying the data discretization empirical equation based on the target material accumulation value.

[0107] Step S208: Eliminate the mixer truck data and determine that there is no material accumulation in the current cycle.

[0108] In summary, the material accumulation detection method provided in this embodiment has the following technical effects: 1) The wireless interconnection identification function between the mixer truck and the mixing station is adopted to break through the information barriers of different devices, as well as the integration of the mixer truck-Internet of Things-client, coordinate and calculate data, and present the material accumulation status to the customer in real time, which is more intelligent. 2) After the material accumulation value after each unloading is obtained through the mathematical model, the amount of material accumulation during transportation is calculated by the accumulation method. When the amount of material accumulation reaches the set value, the user is reminded, and the vehicle controller can be self-checked to determine whether the customer has performed the barrel cleaning operation. In addition, by using the method of mathematical model, the material accumulation value is calculated using special torque as a benchmark, which can avoid the influence of factors such as concrete ratio on the calculation, and is more accurate than the traditional habitual judgment using the material accumulation curve. 3) By performing self-learning auxiliary analysis and verification on the data discretization empirical equation, the calculation results can be made more and more accurate, and the automatic iteration of the upgrade can be completed. 3) According to the amount of material accumulation, the barrel cleaning prompt is fed back on the integrated display and control screen of the whole vehicle, and the administrator can also call or send a text message to remind the customer, which increases the customer's adhesion.

[0109] Based on the same inventive concept as the above embodiments, an embodiment of the present invention provides an electronic device, such as Figure 5As shown, the electronic device includes: a processor 310 and a memory 311 storing a computer program; wherein, Figure 5 The processor 310 shown in the figure is not used to indicate that the number of the processor 310 is one, but is only used to indicate the positional relationship of the processor 310 relative to other devices. In actual applications, the number of the processor 310 may be one or more; similarly, Figure 5 The memory 311 shown in the figure has the same meaning, that is, it is only used to refer to the position relationship of the memory 311 relative to other devices. In practical applications, the number of memories 311 can be one or more. When the processor 310 runs the computer program, the above-mentioned material accumulation detection method is implemented.

[0110] The electronic device may also include: at least one network interface 312. The various components in the electronic device are coupled together via a bus system 313. It is understood that the bus system 313 is used to achieve connection and communication between these components. In addition to the data bus, the bus system 313 also includes a power bus, a control bus, and a status signal bus. However, for the sake of clarity, the bus system 313 is not used in the following examples. Figure 5 Various buses are labeled as bus system 313.

[0111] The memory 311 may be a volatile memory or a nonvolatile memory, or may include both volatile and nonvolatile memories. The nonvolatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a magnetic random access memory (FRAM), a flash memory, a magnetic surface memory, an optical disk, or a compact disc read-only memory (CD-ROM); the magnetic surface memory may be a disk memory or a tape memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static random access memory (SRAM), synchronous static random access memory (SSRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDRSDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM, SyncLink Dynamic Random Access Memory), and direct RAM bus random access memory (DRRAM, Direct Rambus Random Access Memory).The memory 311 described in the embodiments of the present invention is intended to include but is not limited to these and any other suitable types of memories.

[0112] The memory 311 in the embodiment of the present invention is used to store various types of data to support the operation of the electronic device. Examples of these data include: any computer program used to operate on the electronic device, such as an operating system and an application; contact data; phone book data; messages; pictures; videos, etc. Among them, the operating system includes various system programs, such as a framework layer, a core library layer, a driver layer, etc., which are used to implement various basic services and process hardware-based tasks. The application program may include various applications, such as a media player (Media Player), a browser (Browser), etc., which are used to implement various application services. Here, the program that implements the method of the embodiment of the present invention may be included in the application program.

[0113] Based on the same inventive concept as the aforementioned embodiment, this embodiment further provides a mixer truck, comprising the electronic device as described above.

[0114] Based on the same inventive concept as the above-mentioned embodiment, this embodiment further provides a computer storage medium, in which a computer program is stored. The computer storage medium may be a ferromagnetic random access memory (FRAM), a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a flash memory, a magnetic surface memory, an optical disc, or a compact disc read-only memory (CD-ROM); it may also be various devices including one or any combination of the above-mentioned memories, such as a mobile phone, a computer, a tablet device, a personal digital assistant, etc. When the computer program stored in the computer storage medium is executed by the processor, the above-mentioned material accumulation detection method is implemented. For the specific steps implemented when the computer program is executed by the processor, please refer to Figure 1 The description of the illustrated embodiment will not be repeated here.

[0115] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0116] In this document, the terms "comprises," "comprising," or any other variations thereof, are intended to cover a non-exclusive inclusion of elements other than those listed and may also include additional elements not expressly listed.

[0117] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A method for detecting material accumulation, It is characterized in that The method comprises: Obtain the transport torque, the transported concrete volume and the first torque after unloading of the mixer drum of the mixer truck in the current cycle and the second torque after unloading corresponding to the previous cycle; wherein, one cycle is from the mixer truck entering the station to load to the completion of unloading; Determine, according to the transport torque, the concrete volume and the second torque, a corresponding relationship between the torque and the unit volume of concrete transported by the mixing drum in the current cycle; According to the calibrated torque, the first torque and the correspondence between the unit cubic volume of concrete transported by the mixing drum in the current cycle and the torque, the target material accumulation value of the mixing drum in the current cycle is determined; the calibrated torque is used to indicate the torque corresponding to when the mixing drum is in an empty drum state.

2. The method according to claim 1, It is characterized in that The determining, according to the transport torque, the concrete volume and the second torque, a corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque, comprises: obtaining a difference between the transport torque and the second torque; Based on the ratio of the concrete volume to the difference, a corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque is determined.

3. The method according to claim 1, It is characterized in that The method further comprises: Detecting whether the difference between the first torque and the calibrated torque is greater than or equal to a preset torque value; If so, the target material accumulation value of the mixing drum in the current cycle is determined according to the calibrated torque, the first torque, and the corresponding relationship between the unit volume of concrete transported by the mixing drum in the current cycle and the torque.

4. The method according to any one of claims 1 to 3, It is characterized in that The step of determining a target material accumulation value of the mixing drum in the current cycle according to the calibrated torque, the first torque, and a corresponding relationship between the concrete unit volume transported by the mixing drum in the current cycle and the torque comprises: Obtaining a calculated material accumulation value of the mixing drum in the current cycle according to the calibrated torque, the first torque, and a corresponding relationship between the concrete unit volume transported by the mixing drum in the current cycle and the torque; Based on a preset analysis model and the first torque, a predicted material accumulation value of the mixing drum in the current cycle is obtained; the preset analysis model is generated based on historical torque data and historical material accumulation values ​​of the mixing drum in historical cycles; A target material accumulation value of the mixing drum in the current cycle is determined based on the predicted material accumulation value and the calculated material accumulation value.

5. The method according to claim 4, It is characterized in that The method further comprises: The preset analysis model is modified based on the target accumulation value.

6. The method according to claim 4, It is characterized in that The method further comprises: After determining the calculated accumulation value of the mixing drum in the current cycle, the calibrated torque is replaced by the first torque.

7. The method according to claim 1, It is characterized in that The method further comprises: Determine the accumulated material value corresponding to the mixing drum according to the target accumulated material value and the accumulated material value of the mixing drum in the historical period; When the accumulated material value is greater than or equal to the preset accumulated material value, a drum cleaning prompt message is output.

8. An electronic device, It is characterized in that include: A processor and a memory storing a computer program, wherein when the processor runs the computer program, the material accumulation detection method according to any one of claims 1 to 7 is implemented.

9. A mixer truck, It is characterized in that The electronic device comprises the electronic device according to any one of claims 1 to 7.

10. A computer-readable storage medium, It is characterized in that A computer program is stored, and when the computer program is executed by a processor, the material accumulation detection method according to any one of claims 1 to 7 is implemented.