Cooperative ship unloading operation method and system for grab ship unloader and gantry crane
Through the whole ship point cloud model and laser scanning technology, the automatic collaborative operation path planning of the gantry crane and grab ship unloader is realized, which solves the problem of manual operation dependence, improves the efficiency and safety of ship unloading, and avoids collision accidents.
Patent Information
- Application Number
- CN202410889867.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-08
AI Technical Summary
The operating efficiency and safety of existing dock unloading equipment depends on the proficiency of drivers and commanders. With the development of intelligent docks, manual operations cannot meet the efficient unloading and safety requirements, especially for portal cranes and grabs. Collisions are prone to occur when ship unloaders work together.
The whole ship point cloud model is used for path planning and collaborative control of the gantry crane and grab ship unloader. The laser scanning sensor is used to obtain point cloud data, and the unloading operation strategy and path are automatically generated by combining registration, fitting and splicing algorithms. Realize automatic collaborative operation of multiple types of equipment to avoid collisions and improve ship unloading efficiency.
It improves the collaborative efficiency of the gantry crane and the ship unloader in operation and path planning, reduces the risk of collision accidents, meets the requirements for efficient unloading and safety, and realizes the automated collaborative operation of multiple types of equipment.
Smart Images

Figure CN118744932A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of dock ship unloading control, and in particular to a method and system for coordinated ship unloading operation of a grab ship unloader and a portal crane. Background Art
[0002] At present, the bulk cargo unloading process at the terminal is mostly done by manually operating the unloading equipment, which includes gantry cranes and grab unloaders. During the unloading operation, the operating range of the unloading equipment and the movement of each mechanism of the unloading equipment are controlled by the driver through the operating console. The operating efficiency and safety of the operation are entirely dependent on the proficiency of the driver and the commander.
[0003] When the terminal uses gantry cranes and grab ship unloaders to unload ships at the same time, the unloading efficiency is higher, but the risk is also higher. The coordination between gantry cranes, grab ship unloaders and bulk carriers is very important, otherwise collision accidents are likely to occur. Especially with the development of intelligent terminals, manual operation can no longer meet the unloading needs and safety. Summary of the invention
[0004] In view of this, it is necessary to propose a method and system for collaborative ship unloading between a grab ship unloader and a gantry crane to address the above-mentioned problems, so as to overcome some shortcomings in the above-mentioned background technology and solve the following technical problems: How to improve the collaborative efficiency of the gantry crane and the grab ship unloader in operation and path planning through the point cloud model of the entire ship, thereby improving the ship unloading efficiency.
[0005] To achieve the above object, the present invention adopts the following technical solutions:
[0006] The present invention provides a method for cooperative ship unloading operation of a grab ship unloader and a portal crane, comprising:
[0007] Step S1: Scan the entire hull to be unloaded to obtain point cloud data;
[0008] Step S2: registering, fitting and splicing the point cloud data obtained in step S1 to establish a point cloud model of the entire ship;
[0009] Step S3: planning the operating hatches and initial positions of the corresponding grab ship unloader and portal crane according to the full-ship point cloud model obtained in step S2, and controlling the corresponding grab ship unloader and portal crane to move to the initial positions;
[0010] Step S4: According to the ship unloading task and the point cloud model of the whole ship, the ship unloading operation strategy is automatically generated, the operation path of the grab ship unloader and the gantry crane is planned, and the corresponding grab ship unloader and gantry crane are controlled to perform unloading operations on their corresponding operation cabins;
[0011] Step S5: Based on the workload statistics obtained during the unloading operation, a coordinated analysis is performed in combination with the ship unloading operation strategy, and some grab ship unloaders and gantry cranes are controlled to automatically change cabins, and the gantry crane is controlled to take over the adjacent grab ship unloaders to perform cabin clearing operations.
[0012] Furthermore, in step S1, a laser scanning sensor on a grab ship unloader and / or a gantry crane is used to perform laser 3D scanning and positioning of the contours of the hull and the materials in the cabin to be unloaded, thereby obtaining point cloud data;
[0013] In step S2, the point cloud registration algorithm, voxel filtering algorithm, RANSAC plane fitting algorithm, Euclidean clustering segmentation algorithm and feature point extraction algorithm are combined for processing, so as to realize the recognition and positioning of the hatch position, deck and cover position and material position information of the whole ship.
[0014] Furthermore, in step S2, in the point cloud data, a coordinate system is defined as the X-axis parallel to the shoreline, the Y-axis facing the sea side, the Z-axis vertically upward, the origin at the slewing center of the gantry crane, and the ground height is 0; all information obtained based on this coordinate system serves as the coordinate basis for subsequent multi-machine collaborative unloading operations.
[0015] Furthermore, step S5 includes the following sub-steps:
[0016] Step S51, decomposing the loading or unloading task of a ship by cabin, and each cabin task carries task priority information and task quantity information;
[0017] Step S52, each cabin task is assigned to a multi-machine equipment, wherein the multi-machine equipment includes a plurality of grab ship unloaders and / or a plurality of gantry cranes;
[0018] Step S53, calculating the completion time of each aircraft type to complete the task based on the operation data of each aircraft type, wherein the completion time includes the time to avoid conflicts between multiple aircraft types, and calculating the comprehensive evaluation index based on the completion time and the task priority;
[0019] Step S54, using an enumeration method to obtain multiple schemes for allocating cabin tasks to multiple aircraft types, calculating the completion time of each allocation scheme, and calculating an evaluation index based on the completion time;
[0020] Step S55: Select the solution with the highest evaluation index as the task allocation solution.
[0021] Furthermore, step S5 also includes sub-steps performed after step S55:
[0022] Step S56, reading status information of multiple types of devices;
[0023] Step S57, calculating the optimal positions of the multi-machine equipment and the operating hopper according to the material grabbing and releasing positions, and planning the multi-machine operation path in combination with anti-sway and anti-collision factors;
[0024] Step S58, sending control instructions to multiple types of equipment and multiple operating consoles, thereby realizing automatic collaborative operation of multiple types of equipment.
[0025] The present invention further proposes a grab ship unloader and a portal crane cooperative ship unloading operation system, comprising:
[0026] Collaborative ship unloading operation control unit: used to issue ship unloading operation control instructions and ship unloading operation strategies;
[0027] Data acquisition module: It is installed on the grab ship unloader and the gantry crane to collect point cloud data of the grab ship unloader, the gantry crane and the hull to be unloaded;
[0028] Client program module: It is installed on the remote control console of grab ship unloader and portal crane, and is the interface for users to interact with the system, allowing users to observe the operating status of the equipment and manage the equipment;
[0029] Gantry crane automation control module: used to receive and control the movement of the gantry crane according to the unloading operation control instructions and unloading operation strategies of the coordinated unloading operation control unit;
[0030] Grab bucket ship unloader automation control module: used to receive and control the action of the grab bucket ship unloader according to the ship unloading operation control instructions and ship unloading operation strategy of the coordinated ship unloading operation control unit;
[0031] Multi-machine equipment adapter module: used to provide real-time data of multi-machine equipment; the multi-machine equipment includes a plurality of grab ship unloaders and / or a plurality of portal cranes;
[0032] Control service program module: used to receive and process requests from client program modules, receive and process real-time device data sent by the multi-device adapter program module, control the multi-device adapter program module to write data to multi-devices, receive and process alarm data, control job execution of multi-devices and record log information in real time;
[0033] Multi-machine collaborative operation module: used to realize the collaborative operation of multiple gantry cranes on the same ship.
[0034] Furthermore, the multi-machine collaborative operation module is provided with a multi-machine collaborative fully automatic operation system, which includes a multi-machine equipment collaborative fully automatic operation strategy, a multi-machine equipment collaborative fully automatic operation algorithm and a multi-machine equipment collaborative fully automatic operation path planning algorithm. The multi-machine equipment collaborative fully automatic operation system is used to realize intelligent scheduling, overall operation path planning and intelligent cabin change operation when multiple gantry cranes collaborate on the same ship;
[0035] The intelligent scheduling, overall operation path planning and intelligent cabin change operation process includes steps ① to ②:
[0036] Step 1: Plan the path in advance: Combine the improved AI algorithm and point cloud data to plan the operation paths of multiple models;
[0037] Step ②, control the grab ship unloader to avoid obstacles: when formulating the multi-machine coordination strategy and performing multi-machine coordinated operations, use the data acquisition module to collect the posture information of each mechanism of the multi-machine equipment in coordinated operation, establish a multi-machine motion model through the multi-machine coordinated operation module, and predict the operation trend of each mechanism of the multi-machine equipment. Predict whether there is a possibility of collision between adjacent equipment mechanisms through the established multi-machine motion model, and automatically revise the operation path to achieve the function of intelligent collision avoidance between the multi-machine equipment in the operation area.
[0038] Furthermore, the data acquisition module also includes a plurality of peripheral sensing devices arranged on the grab ship unloader and the gantry crane, and the peripheral sensing devices are used to collect position and posture information of each mechanism of the grab ship unloader and each mechanism of the gantry crane.
[0039] The present invention further proposes a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps of the method for coordinated ship unloading operation of a grab ship unloader and a gantry crane as described in any of the above items are implemented.
[0040] The present invention further proposes an electronic device, comprising a storage device, a processor, and a computer program stored in the storage device and executable by the processor. When the processor executes the computer program, the steps of the method for collaborative ship unloading of a grab ship unloader and a gantry crane as described in any one of the above items are implemented.
[0041] The beneficial effects of the present invention are:
[0042] The present invention improves the coordination efficiency of the gantry crane and the grab ship unloader in operation and path planning, as well as the ship unloading efficiency; the present invention can control multiple types of equipment to position, and can control multiple types of equipment to operate in designated cabins respectively, and uniformly dispatch and plan the operation path, so as to avoid downtime and waiting due to anti-collision protection, and maximize the operation efficiency; the present invention reduces the risk of collision accidents, and can meet the needs of efficient unloading and safety requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 The present invention is a schematic diagram of the structural principle of a grab ship unloader and a gantry crane cooperative ship unloading operation system. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be further clearly and completely described in combination with the embodiments of the present invention. It should be noted that the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0045] It should be understood that the directions or positional relationships indicated by terms such as "upper", "lower", "front", "back", "left", and "right" are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limitations on the present invention.
[0046] The terms "first", "second", "third", "fourth", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the definition of "first", "second", "third", "fourth" features may explicitly or implicitly include one or more of the features.
[0047] Example 1
[0048] This embodiment provides a method for cooperative ship unloading operation of a grab ship unloader and a gantry crane, comprising:
[0049] Step S1: perform a full-ship scan on the hull to be unloaded, thereby obtaining point cloud data; then execute step S2;
[0050] Step S2: register, fit and splice the point cloud data obtained in step S1 to establish a point cloud model of the entire ship; then execute step S3;
[0051] Step S3: planning the operating hatches and initial positions of the corresponding grab ship unloader and portal crane according to the full-ship point cloud model obtained in step S2, and controlling the corresponding grab ship unloader and portal crane to move to the initial positions; then executing step S4;
[0052] Step S4: According to the ship unloading task and the point cloud model of the whole ship, the ship unloading operation strategy is automatically generated, the operation path of the grab ship unloader and the gantry crane is planned, and the corresponding grab ship unloader and gantry crane are controlled to perform unloading operations on their respective operating cabins; then step S5 is executed;
[0053] Step S5: Based on the workload statistics obtained during the unloading operation, a coordinated analysis is performed in combination with the ship unloading operation strategy, and some grab ship unloaders and gantry cranes are controlled to automatically change cabins, and the gantry crane is controlled to take over the adjacent grab ship unloaders to perform cabin clearing operations.
[0054] Optimally, in step S1, a laser scanning sensor on a grab ship unloader and / or a gantry crane is used to perform laser 3D scanning and positioning of the contours of the hull and the materials in the cabin to be unloaded, thereby obtaining point cloud data;
[0055] In step S2, the point cloud registration algorithm, voxel filtering algorithm, RANSAC plane fitting algorithm, Euclidean clustering segmentation algorithm and feature point extraction algorithm are combined for processing, so as to realize the recognition and positioning of the hatch position, deck and cover position and material position information of the whole ship.
[0056] Optimally, in step S2, in the point cloud data, the coordinate system is defined as the X-axis parallel to the shoreline, the Y-axis facing the sea side, the Z-axis vertically upward, the origin at the slewing center of the gantry crane, and the ground height is 0; all the information obtained based on this coordinate system serves as the coordinate basis for subsequent multi-machine collaborative unloading operations.
[0057] Optimally, step S5 includes the following sub-steps:
[0058] Step S51, decomposing the loading or unloading task of a ship by cabin, each cabin task carries task priority information and task quantity information; then executing step S52;
[0059] Step S52, each cabin task is assigned to a multi-machine equipment, wherein the multi-machine equipment includes a plurality of grab ship unloaders and / or a plurality of portal cranes; then step S53 is executed;
[0060] Step S53, calculating the completion time of each machine type to complete the task according to the operation data of each machine type, wherein the completion time includes the time to avoid conflicts between multiple machine types, and calculating the comprehensive evaluation index according to the completion time and the task priority; then executing step S54;
[0061] Step S54, using an enumeration method to obtain multiple schemes for allocating cabin tasks to multiple aircraft types, calculating the completion time of each allocation scheme, and calculating an evaluation index based on the completion time; then executing step S55;
[0062] Step S55: Select the solution with the highest evaluation index as the task allocation solution.
[0063] Optimally, step S5 further includes the following sub-steps performed after step S55:
[0064] Step S56, reading the status information of the multi-type devices; then executing step S57;
[0065] Step S57, calculate the optimal position of the multi-machine equipment and the working hopper according to the material grabbing and releasing position, and plan the multi-machine operation path in combination with anti-sway and anti-collision factors; then execute step S58;
[0066] Step S58, sending control instructions to multiple types of equipment and multiple operating consoles, thereby realizing automatic collaborative operation of multiple types of equipment.
[0067] Example 2
[0068] like Figure 1 As shown:
[0069] This embodiment provides a grab ship unloader and a gantry crane cooperative ship unloading operation system, comprising:
[0070] Collaborative ship unloading operation control unit: used to issue ship unloading operation control instructions and ship unloading operation strategies;
[0071] Data acquisition module: It is installed on the grab ship unloader and the gantry crane to collect point cloud data of the grab ship unloader, the gantry crane and the hull to be unloaded;
[0072] Client program module: It is installed on the remote control console of grab ship unloader and portal crane, and is the interface for users to interact with the system, allowing users to observe the operating status of the equipment and manage the equipment;
[0073] Gantry crane automation control module: used to receive and control the movement of the gantry crane according to the unloading operation control instructions and unloading operation strategies of the coordinated unloading operation control unit;
[0074] Grab bucket ship unloader automation control module: used to receive and control the action of the grab bucket ship unloader according to the ship unloading operation control instructions and ship unloading operation strategy of the coordinated ship unloading operation control unit;
[0075] Multi-machine equipment adapter module: used to provide real-time data of multi-machine equipment; the multi-machine equipment includes a plurality of grab ship unloaders and / or a plurality of portal cranes;
[0076] Control service program module: used to receive and process requests from client program modules, receive and process real-time device data sent by the multi-device adapter program module, control the multi-device adapter program module to write data to multi-devices, receive and process alarm data, control job execution of multi-devices and record log information in real time;
[0077] Multi-machine collaborative operation module: used to realize the collaborative operation of multiple gantry cranes on the same ship.
[0078] Optimally, the multi-machine collaborative operation module is equipped with a multi-machine collaborative fully automatic operation system, which includes a multi-machine equipment collaborative fully automatic operation strategy, a multi-machine equipment collaborative fully automatic operation algorithm and a multi-machine equipment collaborative fully automatic operation path planning algorithm. The multi-machine equipment collaborative fully automatic operation system realizes intelligent scheduling, overall operation path planning and intelligent cabin change operation when multiple gantry cranes work together on the same ship;
[0079] The intelligent scheduling, overall operation path planning and intelligent cabin change operation process includes steps ① to ②:
[0080] Step ①, perform path planning in advance: combine the improved AI algorithm and point cloud data to plan the operation paths of multiple models; then execute step ②;
[0081] Step ②, control the grab ship unloader to avoid obstacles: when formulating the multi-machine coordination strategy and performing multi-machine coordinated operations, use the data acquisition module to collect the posture information of each mechanism of the multi-machine equipment in coordinated operation, establish a multi-machine motion model through the multi-machine coordinated operation module, and predict the operation trend of each mechanism of the multi-machine equipment. Predict whether there is a possibility of collision between adjacent equipment mechanisms through the established multi-machine motion model, and automatically revise the operation path to achieve the function of intelligent collision avoidance between the multi-machine equipment in the operation area.
[0082] Optimally, the data acquisition module also includes a plurality of peripheral sensing devices arranged on the grab ship unloader and the gantry crane, and the peripheral sensing devices are used to collect the position and posture information of each mechanism of the grab ship unloader and each mechanism of the gantry crane.
[0083] Example 3
[0084] Embodiment 3 is a further optimization of Embodiment 1;
[0085] This embodiment proposes a computer-readable storage medium, which stores a computer program, characterized in that when the computer program is executed by a processor, the steps of the method for collaborative ship unloading operation of a grab ship unloader and a gantry crane as described in any one of Embodiment 1 are implemented.
[0086] Example 4
[0087] Embodiment 4 is a further optimization of Embodiment 1;
[0088] The present embodiment provides an electronic device, comprising a storage device, a processor, and a computer program stored in the storage device and executable by the processor. When the processor executes the computer program, the steps of the method for coordinated ship unloading operation of a grab ship unloader and a gantry crane as described in any one of Embodiment 1 are implemented.
[0089] Example 5
[0090] Embodiment 5 is a further optimization of embodiment 1;
[0091] The grab ship unloader and gantry crane collaborative ship unloading operation method of this embodiment establishes a full ship point cloud model of the hull to be unloaded (such as a bulk carrier), obtains the position of each cabin of the bulk carrier, and then plans the position of the gantry crane (referred to as the gantry crane) and the grab ship unloader (referred to as the ship unloader), so that the gantry crane and the ship unloader can operate simultaneously, and formulates the operation strategy of the gantry crane and the ship unloader to prevent the gantry crane and the ship unloader from interfering with each other during operation, thereby realizing the collaborative ship unloading operation of multiple types of equipment;
[0092] The method for cooperating a grab ship unloader with a gantry crane to unload a ship comprises the following steps:
[0093] Step 1: Start the ship scanning and modeling function with one click, scan the dry bulk carrier through the peripheral sensing devices on the ship unloader and gantry crane to obtain point cloud data; then proceed to step 2;
[0094] Specifically, by acquiring multiple laser 3D point cloud data on multiple models of equipment, and then combining point cloud registration, voxel filtering, RANSAC plane fitting, Euclidean clustering segmentation and feature point extraction and other related algorithm processing, the information such as the position of the entire ship's hatch, the position of the deck and cover, and the position of materials can be identified and located; the operating ship type and the outline of the materials in the cabin can be scanned and located;
[0095] Step 2: align, fit and splice the point cloud data to establish a point cloud model of the entire ship; then proceed to step 3;
[0096] Specifically, according to the actual working conditions, when scanning is needed, the scanner on each operating machine is started to perform a 3D scan of the entire ship, obtain the point cloud map corresponding to each machine, and then complete the splicing of the point cloud of the entire ship through point cloud registration. In this point cloud, the coordinate system is defined as parallel to the shoreline as the X-axis, facing the sea side as the Y-axis, vertically upward as the Z-axis, the origin is at the gantry crane rotation center, and the ground height is 0; all information obtained based on this coordinate system is the coordinate basis for subsequent multi-machine equipment collaborative unloading operations;
[0097] Step 3: Plan the operating hatches and initial positions of the ship unloader and gantry crane according to the point cloud model of the entire ship, and control each host to move to the initial position; then execute step 4;
[0098] Specifically, bulk carriers have multiple cabins, and the positions of the gantry cranes and ship unloaders need to be arranged reasonably. Through the multi-machine collaborative automatic operation strategy, multi-machine collaborative automatic operation algorithm and multi-machine automatic operation path planning algorithm, reasonable positions are planned in advance to ensure that there will be no downtime due to interference from neighboring machines, thereby ensuring overall operation efficiency;
[0099] Step 4: According to the operation task and point cloud model, the ship unloading operation strategy is automatically generated, and the operation paths of the ship unloader and the gantry crane are planned, so that the ship unloader and the gantry crane can perform unloading operations relative to their respective operation cabins; then execute step 5;
[0100] Specifically, the multi-machine collaborative fully automatic operation system includes a multi-machine collaborative fully automatic operation strategy, a multi-machine collaborative fully automatic operation algorithm and a multi-machine collaborative fully automatic operation path planning algorithm. Through the multi-machine collaborative fully automatic operation system, the gantry crane and the ship unloader can realize intelligent scheduling, overall operation path planning and intelligent cabin change operation when they work together on the same ship.
[0101] Step 5: After the point cloud model of the whole ship is established, the operation tasks of the cabin can be calculated. Since the operation capacity of the ship unloader is about twice that of the gantry crane, according to the statistical data of the operation volume and the coordinated unloading operation strategy, some ship unloaders and gantry cranes automatically change cabins, and the gantry cranes take over the adjacent ship unloaders to clear the cabins, and the ship unloaders take over the adjacent gantry cranes to speed up the unloading progress, ensuring the balance of the ship's loading and improving the unloading efficiency;
[0102] In step five, the allocation scheme of the collaborative unloading operation tasks of multiple types of equipment will have a direct impact on the task execution effect. Therefore, the loading or unloading tasks of a ship are decomposed into cabins, and each cabin task carries task priority information and task volume information; each cabin task is allocated to multiple types of equipment; according to the operating data of each model, the completion time of each model to complete the task is calculated, where the completion time includes the time to avoid conflicts between multiple types of equipment, and the comprehensive evaluation index is calculated based on the completion time and task priority; the enumeration method is used to obtain multiple schemes for allocating cabin tasks to multiple types of equipment, the completion time of each allocation scheme is calculated, and the evaluation index is calculated based on the completion time; the scheme with the highest evaluation index is selected as the task allocation scheme.
[0103] Specifically, in the above-mentioned method of coordinated ship unloading operation of grab ship unloader and gantry crane, the status information of the multi-model equipment is read through the fully automatic control system of the multi-model equipment, the optimal position of the multi-model equipment and the operating hopper is calculated according to the grabbing and releasing position, and the operation path planning of the multi-model equipment is carried out in combination with anti-sway, anti-collision and other factors, and control instructions are sent to the multi-model equipment and multiple operating consoles to realize fully automatic coordinated operation of the multi-model equipment.
[0104] This embodiment uses real-time laser scanning technology of various gantry cranes and ship unloaders to establish a spatial three-dimensional model of the hull, materials, and onshore facilities, and combines accurate detection of the position information of each mechanism, anti-sway and scheduling, and path planning algorithms to control the positioning of multiple types of equipment. When multiple types of equipment work on the same ship, the multi-machine collaborative operation algorithm and strategy are used to control the multiple types of equipment to work on designated cabins separately, with unified scheduling and unified planning of operation paths to avoid downtime and waiting due to anti-collision protection, thereby maximizing operation efficiency.
[0105] Example 6
[0106] Example 6 is a further optimization of Example 2;
[0107] Specifically, the data acquisition module includes a 3D laser scanner arranged on the gantry crane and the ship unloader, the 3D laser scanner is used to scan the bulk ship to obtain point cloud data, and also includes a plurality of peripheral sensing devices arranged on the gantry crane and the ship unloader, the peripheral sensing devices are used to collect the position information of each mechanism of the gantry crane and the ship unloader; the peripheral sensing devices can be an absolute value encoder, an inclination sensor, a proximity switch, an RFID magnetic nail device, a multi-line laser scanner and a radar sensor, so as to detect the posture and movement speed of each mechanism, so as to conveniently know the status of the gantry crane and the ship unloader; and each mechanism is equipped with at least two sensors with different detection modes for positioning detection of the mechanism, the data of one of the sensors is used as the main data, and the data of the remaining sensors is used as verification. Once the data deviation is found to be too large, an alarm signal is generated to remind manual intervention to troubleshoot the fault; in order to realize the fully automatic operation of multi-machine collaboration, the data acquisition module needs to analyze the data obtained by the front-end sensor, obtain the key position information required for the automated operation, and accurately dispatch the actuator through the control system, so as to realize the precise positioning, grabbing, unloading and other operations during the automated operation of the whole ship.
[0108] Specifically, the gantry crane automation control module is used to receive instructions and unloading operation strategies issued by the collaborative unloading operation control unit, move the gantry crane to the station position according to the instructions, decompose the gantry crane operation tasks into operating instructions for each mechanism of the gantry crane, so that the gantry crane can operate fully automatically and perform the unloading task according to the optimal operation path.
[0109] Specifically, the grab ship unloader automation control module is used to receive instructions and ship unloading operation strategies issued by the collaborative ship unloading operation control unit, move the ship unloader to the station position according to the instructions, and decompose the ship unloader operation tasks into operation instructions of each mechanism of the ship unloader, so that the ship unloader can operate fully automatically and perform the operation tasks according to the optimal operation path.
[0110] Specifically, relying on the peripheral sensing devices of the data acquisition module, both the gantry crane and the ship unloader can accurately control the movement of each mechanism, thereby avoiding interference between gantry cranes and gantry cranes, and between gantry cranes and ship unloaders.
[0111] Specifically, the control service program module receives and processes client requests, receives and processes real-time device data sent by the multi-model device adapter program module, writes data to the device through the multi-model device adapter program module, receives and processes alarm data sent by the monitoring alarm forwarding program, receives and processes real-time data from other devices sent by the OPC adapter program, controls the execution of multi-model jobs, records log information in real time, etc.
[0112] Specifically, path planning is carried out in advance, and the operation paths of multiple models are planned in combination with improved AI algorithms and 3D point cloud data. This not only prevents the grab from colliding with objects such as the ship's side, cranes, ship covers, other gantry cranes, and enables multiple models to reach their destination smoothly, but also optimizes the efficiency of multiple models in performing tasks.
[0113] The grab ship unloader and gantry crane collaborative ship unloading operation system of this embodiment has formulated a multi-machine collaborative strategy. When the multiple machines are working collaboratively, the data acquisition module is used to collect the position information of each mechanism of the multiple machine types working collaboratively, and the motion model of each multi-machine type is established through the intelligent control module, and the operation trend of each mechanism of the multiple machine types is predicted. The established motion model is used to predict the possibility of collision between adjacent machines, and the operation path is automatically revised to realize the function of intelligent collision avoidance between the multiple machine types in the operation area.
[0114] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. A method for coordinating ship unloading operations using a grab ship unloader and a portal crane, characterized in that: include: Step S1: Scan the entire hull to be unloaded to obtain point cloud data; Step S2: registering, fitting and splicing the point cloud data obtained in step S1 to establish a point cloud model of the entire ship; Step S3: planning the operating hatches and initial positions of the corresponding grab ship unloader and portal crane according to the full-ship point cloud model obtained in step S2, and controlling the corresponding grab ship unloader and portal crane to move to the initial positions; Step S4: According to the ship unloading task and the point cloud model of the whole ship, the ship unloading operation strategy is automatically generated, the operation path of the grab ship unloader and the gantry crane is planned, and the corresponding grab ship unloader and gantry crane are controlled to perform unloading operations on their corresponding operation cabins; Step S5: Based on the workload statistics obtained during the unloading operation, a coordinated analysis is performed in combination with the ship unloading operation strategy, and some grab ship unloaders and gantry cranes are controlled to automatically change cabins, and the gantry crane is controlled to take over the adjacent grab ship unloaders to perform cabin clearing operations.
2. The method for cooperative ship unloading operation of grab ship unloader and portal crane according to claim 1 is characterized in that: In step S1, a laser scanning sensor on a grab ship unloader and / or a gantry crane is used to perform laser 3D scanning and positioning of the contours of the hull and the materials in the cabin to be unloaded, thereby obtaining point cloud data; In step S2, the point cloud registration algorithm, voxel filtering algorithm, RANSAC plane fitting algorithm, Euclidean clustering segmentation algorithm and feature point extraction algorithm are combined for processing, so as to realize the recognition and positioning of the hatch position, deck and cover position and material position information of the whole ship.
3. The method for cooperative ship unloading operation of grab ship unloader and portal crane according to claim 2 is characterized in that: In step S2, in the point cloud data, a coordinate system is defined as the X-axis parallel to the shoreline, the Y-axis facing the sea side, the Z-axis vertically upward, the origin at the slewing center of the gantry crane, and the ground height is 0; all information obtained based on this coordinate system serves as the coordinate basis for subsequent multi-machine collaborative unloading operations.
4. The method for cooperative ship unloading operation of grab ship unloader and portal crane according to claim 1 is characterized in that: Step S5 includes the following sub-steps: Step S51, decomposing the loading or unloading task of a ship by cabin, and each cabin task carries task priority information and task quantity information; Step S52, each cabin task is assigned to a multi-machine equipment, wherein the multi-machine equipment includes a plurality of grab ship unloaders and / or a plurality of gantry cranes; Step S53, calculating the completion time of each aircraft type to complete the task based on the operation data of each aircraft type, wherein the completion time includes the time to avoid conflicts between multiple aircraft types, and calculating the comprehensive evaluation index based on the completion time and the task priority; Step S54, using an enumeration method to obtain multiple schemes for allocating cabin tasks to multiple aircraft types, calculating the completion time of each allocation scheme, and calculating an evaluation index based on the completion time; Step S55: Select the solution with the highest evaluation index as the task allocation solution.
5. The method for cooperative ship unloading operation of grab ship unloader and portal crane according to claim 4 is characterized in that: Step S5 also includes the following sub-steps performed after step S55: Step S56, reading status information of multiple types of devices; Step S57, calculating the optimal positions of the multi-machine equipment and the operating hopper according to the material grabbing and releasing positions, and planning the multi-machine operation path in combination with anti-sway and anti-collision factors; Step S58, sending control instructions to multiple types of equipment and multiple operating consoles, thereby realizing automatic collaborative operation of multiple types of equipment.
6. A grab ship unloader and portal crane coordinated ship unloading operation system, characterized in that: include: Collaborative ship unloading operation control unit: used to issue ship unloading operation control instructions and ship unloading operation strategies; Data acquisition module: It is installed on the grab ship unloader and the gantry crane to collect point cloud data of the grab ship unloader, the gantry crane and the hull to be unloaded; Client program module: It is installed on the remote control console of grab ship unloader and portal crane, and is the interface for users to interact with the system, allowing users to observe the operating status of the equipment and manage the equipment; Gantry crane automation control module: used to receive and control the movement of the gantry crane according to the unloading operation control instructions and unloading operation strategies of the coordinated unloading operation control unit; Grab bucket ship unloader automation control module: used to receive and control the action of the grab bucket ship unloader according to the ship unloading operation control instructions and ship unloading operation strategy of the coordinated ship unloading operation control unit; Multi-machine equipment adapter module: used to provide real-time data of multi-machine equipment; the multi-machine equipment includes a plurality of grab ship unloaders and / or a plurality of portal cranes; Control service program module: used to receive and process requests from client program modules, receive and process real-time device data sent by the multi-device adapter program module, control the multi-device adapter program module to write data to multi-devices, receive and process alarm data, control job execution of multi-devices and record log information in real time; Multi-machine collaborative operation module: used to realize the collaborative operation of multiple gantry cranes on the same ship.
7. The grab ship unloader and portal crane cooperative ship unloading operation system according to claim 6 is characterized in that: The multi-machine collaborative operation module is equipped with a multi-machine collaborative fully automatic operation system, which includes a multi-machine equipment collaborative fully automatic operation strategy, a multi-machine equipment collaborative fully automatic operation algorithm and a multi-machine equipment collaborative fully automatic operation path planning algorithm. The multi-machine equipment collaborative fully automatic operation system can realize intelligent scheduling, overall operation path planning and intelligent cabin change operation when multiple gantry cranes work together on the same ship; The intelligent scheduling, overall operation path planning and intelligent cabin change operation process includes steps ① to ②: Step 1: Plan the path in advance: Combine the improved AI algorithm and point cloud data to plan the operation paths of multiple models; Step ②, control the grab ship unloader to avoid obstacles: when formulating the multi-machine coordination strategy and performing multi-machine coordinated operations, use the data acquisition module to collect the posture information of each mechanism of the multi-machine equipment in coordinated operation, establish a multi-machine motion model through the multi-machine coordinated operation module, and predict the operation trend of each mechanism of the multi-machine equipment. Predict whether there is a possibility of collision between adjacent equipment mechanisms through the established multi-machine motion model, and automatically revise the operation path to achieve the function of intelligent collision avoidance between the multi-machine equipment in the operation area.
8. The grab ship unloader and portal crane coordinated ship unloading system according to claim 6 is characterized in that: The data acquisition module also includes a plurality of peripheral sensing devices arranged on the grab ship unloader and the portal crane, and the peripheral sensing devices are used to collect the position and posture information of each mechanism of the grab ship unloader and each mechanism of the portal crane.
9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by the processor, the steps of the method for cooperative ship unloading operation of a grab ship unloader and a gantry crane are implemented as described in any one of claims 1 to 5.
10. An electronic device, characterized in that: The method comprises a storage device, a processor and a computer program stored in the storage device and executable by the processor. When the processor executes the computer program, the steps of the method for cooperative ship unloading operation of a grab ship unloader and a gantry crane are implemented as described in any one of claims 1 to 5.
Citation Information
Cited By
Intelligent control system and control device for grab bucket of ship unloader
CN119439852A
Remote full-automatic multi-machine cooperative intelligent control system based on ship unloader
CN119991052A
Training method and device of ship unloader path generation model
CN120256821A
Construction engineering multi-work-type collaborative operation system driven by intelligent construction platform
CN120562771A
Smart construction platform driven building engineering multi-job coordination operation system
CN120562771B