Mountainous area earth-rock mixed filling high embankment filling construction device and method

By using a construction device that combines composite reinforcement structures and slope reinforcement in the construction of high embankments filled with earth and rock in mountainous areas, the problems of subsidence subsidence and slope sliding are solved, efficient filling of earth and rock materials is achieved, and the stability of the embankment is improved, simplifying The construction process improves operational safety.

CN118745692APending Publication Date: 2024-10-08CCCC THIRD HIGHWAY ENG CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410895397.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

High embankments filled with earth and rock in mountainous areas are prone to problems such as subsidence, slope sliding, and low material transportation efficiency during the construction process, resulting in unstable road operations and long construction periods.

Method used

A construction device that combines composite reinforcement structures and slope reinforcement is used to realize layer-by-layer filling and leveling of earth and stone materials through moving mechanisms and feeding mechanisms, which reduces the need for dump truck transportation, improves filling efficiency, and uses water Construction facilities and reinforcement structures improve the stability and anti-seepage performance of the embankment.

Benefits of technology

It improves the safety and stability of high embankments filled with earth and rock, reduces the construction period, improves the filling efficiency of earth and rock materials, and avoids quality accidents after opening to traffic.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745692A_ABST
    Figure CN118745692A_ABST
Patent Text Reader

Abstract

The invention provides a mountainous area earth-rock mixed filling high embankment filling construction device which comprises two moving mechanisms, each moving mechanism comprises a bottom plate, a fixing box is fixedly arranged at the bottom of the bottom plate, a driving mechanism is arranged in the fixing box, a supporting plate is fixedly arranged at the top of the bottom plate, and the supporting plate is fixedly arranged on the bottom plate. A storage box is fixedly arranged between the top ends of the supporting plates on the two sides, and feeding mechanisms are arranged in the supporting plates. The high embankment is convenient to reinforce through the combination of the composite reinforcing structure and slope reinforcement, the safety and stability of the mountainous area earth-rock mixed filling high embankment are improved, earth-rock materials are conveniently filled and leveled layer by layer through the filling construction equipment, and the filling efficiency of the earth-rock materials can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of soil-rock mixed filling of high embankments, and in particular to a soil-rock mixed filling high embankment filling construction device and method in mountainous areas. Background Art

[0002] Earth-rock mixed high embankment is a construction method that fills earth-rock materials into the embankment area to reinforce and raise the road. It is environmentally friendly, flexible in construction, highly stable, has a short construction period and is economical and applicable. High-fill roadbeds are prone to overall subsidence, slope roadbed sliding, roadbed cracking and other problems, which seriously affect the normal operation of the road and people's normal production and life. In the process of building roads at the bottom of existing mountainous areas, there have been cases of high-fill embankments becoming unstable due to different geology and landforms; and earth-rock materials need to be transported by scrapers or dump trucks, and the efficiency of transporting and leveling earth-rock materials is low.

[0003] To this end, the present invention provides a soil-rock mixed high embankment filling construction device and method in mountainous area. Summary of the invention

[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a filling construction device and method for high embankments in mountainous areas with a mixture of earth and rock, so as to solve the problems raised in the above-mentioned background technology. The present invention facilitates the reinforcement of high embankments by combining composite reinforcement structures and slope reinforcement, thereby improving the safety and stability of high embankments in mountainous areas with a mixture of earth and rock, and facilitates the filling and leveling of earth and stone materials layer by layer through filling construction equipment, thereby improving the filling efficiency of earth and stone materials.

[0005] In order to achieve the above-mentioned purpose, the present invention is implemented through the following technical scheme: a construction device for high embankment filling with mixed earth and stone in mountainous area, comprising two moving mechanisms, the two moving mechanisms comprising a base plate, a fixed box is fixedly arranged at the bottom of the base plate, a driving mechanism is arranged inside the fixed box, a support plate is fixedly arranged on the top of the base plate, a storage box is fixedly arranged between the top ends of the support plates on both sides, a feeding mechanism is arranged inside the support plate, the feeding mechanism comprises an inner cavity, a spiral feeder is rotatably arranged inside the inner cavity, telescopic tubes are fixedly arranged at equidistant intervals on the bottom of the storage box, a screed is fixedly installed on the bottom end of the telescopic tube, the shape of the screed is "L"-shaped, and the shape of the other end of the screed is arc-shaped, an adjustment plate is arranged on one side of the support plate through an adjustment mechanism, and the adjustment plate is arranged on both sides of the screed.

[0006] Furthermore, the inner cavity is opened inside the support plates on both sides, a connecting passage is opened between the top of the inner cavity and the storage box, and a feed port is opened on the outer wall of the bottom end of the support plate.

[0007] Furthermore, a material discharge box is fixedly installed on the outer wall of the support plate corresponding to one side of the feed port, and a servo motor is fixedly installed inside the bottom end of the support plate, and the output shaft of the servo motor is fixedly connected to the bottom end of the screw feeder.

[0008] Furthermore, through holes are equidistantly opened inside one end of the screed plate, the bottom end of the telescopic tube is fixedly arranged inside the through hole, a second hydraulic cylinder is fixedly arranged inside the storage box, and the output shaft of the second hydraulic cylinder is fixedly connected to the top of the screed plate.

[0009] Furthermore, the driving mechanism includes a reduction motor, which is fixedly installed inside a fixed box, and the output shaft of the reduction motor is fixedly connected to the central axis of the wheel. The adjustment mechanism includes a first hydraulic cylinder, which is fixedly installed inside a base plate, and the output rod of the first hydraulic cylinder is movably connected to the bottom end of an adjustment plate through a pivot. A fixing plate is fixedly provided on the inner wall of the support plate, and one end of the fixing plate is movably connected to the top end of the adjustment plate through a pivot.

[0010] A construction method for high embankment filling in mountainous areas, comprising the following steps:

[0011] S1: Construction preparation:

[0012] 1) Post-investigation measurement: Investigate and measure the construction site, formulate construction plans and schedules, and determine the preparation of machinery, equipment and materials.

[0013] 2) Excavation: According to the design requirements of the high embankment and the geographical conditions, excavation and development are carried out, and debris is cleared to ensure smooth construction and sufficient space.

[0014] 3) Material processing: Select suitable soil and stone materials and process them, such as crushing, screening, cleaning, etc., to improve their quality and stability.

[0015] S2: Filling construction: Use construction equipment to fill soil and stone materials layer by layer according to a certain layer thickness and uniformity, and use machinery and manual labor to compact and level the materials in layers.

[0016] S3: Installation of hydraulic facilities: Drainage pipes and other hydraulic facilities are installed during the filling process to ensure the drainage and anti-seepage performance of the high embankment.

[0017] S4: Composite reinforcement structure construction: According to the design requirements, the construction of reinforced soil, reinforced concrete, etc. is gradually carried out;

[0018] S5: High embankment settlement observation: stability monitoring of locations where high embankments have potential hazards.

[0019] Furthermore, the excavation in step S1 includes backfilling the location where settlement exists and compacting the location using a roller.

[0020] Furthermore, the machines in step S1 include excavators, crushers, compactors, mixers and composite reinforcement structure construction equipment.

[0021] Furthermore, the construction of the composite reinforcement structure in step S4 includes reinforcing the high embankment slope, setting up a retaining reinforcement project on the slope, and using block stone masonry for high embankment slope protection, using a "filling first and then masonry" process.

[0022] Furthermore, the layered compaction and leveling in step S2 is to first level the filled earth and stone materials, and then use a road roller to compact the earth and stone materials, and first press the two sides of the embankment and then press the middle position.

[0023] Beneficial effects of the invention: The invention provides a device and method for constructing a soil-rock mixed high embankment in a mountainous area.

[0024] 1. The soil-rock mixed high embankment construction device and method in mountainous area backfills and compacts the earth at the settlement position on the route to form a highly stable roadbed. The drainage pipes and other hydraulic facilities can be installed to drain water and improve the anti-seepage performance of the high embankment. The composite reinforcement structure and slope reinforcement treatment can improve the safety and stability of the soil-rock mixed high embankment in mountainous area. By observing the settlement of the high embankment, its specific settlement index during construction can be found to guide the next step of construction. At the same time, hidden dangers can be discovered early to avoid serious quality accidents after the road is opened to traffic.

[0025] 2. The soil-rock mixed high embankment filling construction device and method in mountainous area can move the filling construction device through moving mechanisms such as a fixed box, a driving mechanism and wheels, and can transport the soil and rock materials to the interior of the storage box through a discharge box, a feed port, a servo motor and a screw feeder. The lifting and lowering adjustment of the flat plate by the second hydraulic cylinder facilitates the adjustment of the bottom end height of the telescopic tube, thereby facilitating the filling of the soil and rock materials layer by layer. There is no need to use dump trucks to transport the soil and rock materials to high places, and the filling efficiency of the soil and rock materials can be improved.

[0026] 3. The soil-rock mixed filling high embankment construction device and method in mountainous areas can be designed according to the slope angle of the high embankment. The vertical angle of the adjusting plate is adjusted by the adjusting mechanism, so that the adjusting plate can block the filling soil and stone materials to prevent the soil and stone materials from rolling down the slope; the filling soil and stone materials can be flattened by the set leveling plate, thereby improving the efficiency of flattening the soil and stone materials and facilitating the soil-rock mixed filling construction of the high embankment. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1It is a structural diagram of a soil-rock mixed high embankment filling construction device in mountainous areas according to the present invention;

[0028] Figure 2 It is a front cross-sectional view of a soil-rock mixed high embankment filling construction device in mountainous areas according to the present invention;

[0029] Figure 3 The present invention is a mountain soil-rock mixed high embankment filling construction device Figure 2 Enlarged view of point A in the middle;

[0030] Figure 4 This is a structural diagram of a screed plate for a soil-rock mixed high embankment filling construction device in a mountainous area according to the present invention;

[0031] Figure 5 This is a structural diagram of the mobile mechanism of a soil-rock mixed high embankment filling construction device in mountainous areas according to the present invention;

[0032] Figure 6 It is a flow chart of a construction method for a soil-rock mixed high embankment in a mountainous area according to the present invention;

[0033] In the figure: 1. bottom plate; 2. fixed box; 3. wheels; 4. support plate; 5. storage box; 6. discharge box; 7. adjustment plate; 8. telescopic tube; 9. leveling plate; 10. first hydraulic cylinder; 11. fixed plate; 12. inner cavity; 13. screw feeder; 14. connecting channel; 15. second hydraulic cylinder; 16. servo motor; 17. feed port; 18. through hole. DETAILED DESCRIPTION

[0034] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0035] See also Figures 1 to 6The present invention provides a technical solution: a construction device for a high embankment filled with soil and rock in a mountainous area, comprising two moving mechanisms, the two moving mechanisms comprising a bottom plate 1, a fixed box 2 is fixedly arranged at the bottom of the bottom plate 1, a driving mechanism is arranged inside the fixed box 2, a support plate 4 is fixedly arranged on the top of the bottom plate 1, a storage box 5 is fixedly arranged between the top ends of the support plates 4 on both sides, a feeding mechanism is arranged inside the support plate 4, the feeding mechanism comprises an inner cavity 12, a spiral feeder 13 is rotatably arranged inside the inner cavity 12, and the bottom of the storage box 5 is equidistant from the top. A telescopic tube 8 is fixedly installed, and a screed plate 9 is fixedly installed at the bottom end of the telescopic tube 8. The shape of the screed plate 9 is "L"-shaped, and the shape of the other end of the screed plate 9 is arc-shaped. An adjusting plate 7 is provided on one side of the support plate 4 through an adjusting mechanism. The adjusting plates 7 are arranged on both sides of the screed plate 9. The filling construction device is moved by a moving mechanism, so that the earth and stone materials inside the storage box 5 can be discharged downward through the telescopic tube 8, and the earth and stone materials can be filled layer by layer. The set screed plate 9 can level the discharged earth and stone materials, thereby improving the filling efficiency of the earth and stone materials.

[0036] In this embodiment, the inner cavity 12 is opened inside the support plates 4 on both sides, a connecting channel 14 is opened between the top of the inner cavity 12 and the storage box 5, a feed port 17 is opened on the outer wall of the bottom end of the support plate 4, and a discharge box 6 is fixedly installed on the outer wall of the support plate 4 on one side of the feed port 17. A servo motor 16 is fixedly installed inside the bottom end of the support plate 4, and the output shaft of the servo motor 16 is fixedly connected to the bottom end of the screw feeder 13. The servo motor 16 drives the screw feeder 13 to rotate, which is convenient for conveying the earth and stone materials to the inside of the storage box 5. There is no need for dump trucks to transport earth and stone materials to the high embankment, which is easy to use.

[0037] In this embodiment, through holes 18 are equidistantly opened inside one end of the screed plate 9, the bottom end of the telescopic tube 8 is fixedly arranged inside the through hole 18, and a second hydraulic cylinder 15 is fixedly arranged inside the storage box 5. The output shaft of the second hydraulic cylinder 15 is fixedly connected to the top of the screed plate 9. The screed plate 9 is driven by the second hydraulic cylinder 15 to be raised and lowered, which facilitates the layer-by-layer filling of earth and stone materials, and the screed plate 9 can also level the earth and stone materials, thereby improving the filling efficiency of the earth and stone materials.

[0038] In this embodiment, the driving mechanism includes a reduction motor, which is fixedly installed inside the fixed box 2, and the output shaft of the reduction motor is fixedly connected to the central axis of the wheel 3. The adjusting mechanism includes a first hydraulic cylinder 10, which is fixedly installed inside the base plate 1, and the output rod of the first hydraulic cylinder 10 is movably connected to the bottom end of the adjusting plate 7 through a pivot. A fixed plate 11 is fixedly provided on the inner wall of the support plate 4, and one end of the fixed plate 11 is movably connected to the top of the adjusting plate 7 through a pivot. The reduction motor and the wheel 3 can drive the filling construction device to move along the construction route, and the inclination angle of the adjusting plate 7 can be adjusted through the action of the first hydraulic cylinder 10 and the fixed plate 11, so that the adjusting plate 7 can be blocked at the slope position of the high embankment, which can prevent the earth and stone materials from rolling down and facilitate the construction of the high embankment.

[0039] The present invention provides another technical solution: a construction method for high embankment filling with soil and rock in mountainous areas, comprising the following steps:

[0040] S1: Construction preparation: including 1) Post-investigation measurement: Investigate and measure the construction site, formulate construction plans and schedules, and determine the preparation of machinery, equipment and materials.

[0041] 4) Excavation: According to the design requirements of the high embankment and the geographical conditions, excavation and development are carried out, and debris is cleared to ensure smooth construction and sufficient space.

[0042] 5) Material processing: Select suitable soil and stone materials and process them, such as crushing, screening, cleaning, etc., to improve their quality and stability.

[0043] S2: Filling construction: Use construction equipment to fill soil and stone materials layer by layer according to a certain layer thickness and uniformity, and use machinery and manual labor to compact and level the materials in layers.

[0044] S3: Installation of hydraulic facilities: Drainage pipes and other hydraulic facilities are installed during the filling process to ensure the drainage and anti-seepage performance of the high embankment.

[0045] S4: Composite reinforcement structure construction: According to the design requirements, the construction of reinforced soil, reinforced concrete, etc. is gradually carried out;

[0046] S5: High embankment settlement observation: stability monitoring of locations where high embankments have potential hazards.

[0047] In this embodiment, the excavation of earth in step S1 includes backfilling earth at the location where settlement exists, and compacting it with a roller. The machines in step S1 include excavators, crushers, compactors, mixers and composite reinforcement structure construction equipment. The composite reinforcement structure construction in step S4 includes reinforcing the high embankment slope, setting up a retaining reinforcement project on the slope, and protecting the high embankment slope with block stone masonry, using a "filling first and then masonry" process. By backfilling and compacting the settlement location, and reinforcing and protecting the high embankment slope, the safety and stability of the embankment can be improved.

[0048] In this embodiment, the layered compaction and leveling in step S2 is to first level the filled earth and stone materials, and then use a road roller to compact the earth and stone materials, and first compact the two sides of the high embankment and then compact the middle position. By compacting the earth and stone materials, the stability between the earth and stone materials can be improved, thereby ensuring the engineering quality of the high embankment.

[0049] When using the soil-rock mixed high embankment construction device and method in mountainous areas, the construction site is surveyed and measured, construction plans and schedules are formulated, preparations for machinery, equipment and materials are determined, and the route is excavated and developed, debris is cleared, sufficient construction space and flatness are ensured, earth is backfilled in the settled area and compacted using a road roller, and then soil and rock materials are collected and transported, and the soil and rock materials are crushed, mixed and stirred. According to the design requirements of the high embankment, the first hydraulic cylinder 10 is started, and the first hydraulic cylinder 10 pushes and pulls the adjustment plate 7, and the adjustment plate 7 rotates at one end of the fixed plate 11, so that the inclination angle of the adjustment plate 7 can be adjusted so that the inclination angle of the adjustment plate 7 is the same as the slope angle of the high embankment, and the mixed soil and rock materials are placed in the discharge box 6, and the screw feeder 13 is driven to rotate by the servo motor 16 to discharge the soil and rock materials into the storage box 5 through the inner cavity 12 and the connecting channel 14, and the second hydraulic cylinder is started. 15. The second hydraulic cylinder 15 drives the screed plate 9 to rise and fall, and the screed plate 9 drives the telescopic tube 8 to extend and retract, and the height of the screed plate 9 and the telescopic tube 8 is adjusted to fill the earth and stone materials layer by layer. The wheel 3 is driven to rotate by the driving mechanism, so that the filling construction device is driven to move along the construction route by the moving mechanism. The earth and stone materials in the storage box 5 are discharged through the telescopic tube 8 and filled. The screed plate 9 moves with the filling construction device, and the filled earth and stone materials can be leveled. The set adjustment plate 7 can block the earth and stone materials on both sides to prevent the earth and stone materials from rolling down to the two sides of the high embankment, which can improve the filling construction efficiency of the earth and stone materials. After leveling, the filled earth and stone materials are compacted layer by layer by a roller, etc. During the filling process, the drainage pipe and other hydraulic equipment are installed inside the earth and stone materials, which can ensure the drainage and anti-seepage performance of the high embankment. After the filling construction is completed, the slope of the high embankment is reinforced, which can improve the safety and stability of the high embankment.

[0050] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0051] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A construction device for high embankment filling in mountainous areas, comprising two moving mechanisms, characterized in that: The two moving mechanisms include a base plate, a fixed box is fixedly arranged at the bottom of the base plate, a driving mechanism is arranged inside the fixed box, a support plate is fixedly arranged on the top of the base plate, a storage box is fixedly arranged between the top ends of the support plates on both sides, a feeding mechanism is arranged inside the support plate, the feeding mechanism includes an inner cavity, a spiral feeder is rotatably arranged inside the inner cavity, telescopic tubes are fixedly arranged at equidistant intervals at the bottom of the storage box, a screed is fixedly installed at the bottom end of the telescopic tube, the shape of the screed is "L" type, and the shape of the other end of the screed is arc-shaped, an adjustment plate is arranged on one side of the support plate through an adjustment mechanism, and the adjustment plate is arranged on both sides of the screed.

2. The device for constructing a high embankment in a mountainous area according to claim 1, characterized in that: The inner cavity is opened inside the support plates at both sides, a connecting passage is opened between the top of the inner cavity and the storage box, and a feed port is opened on the outer wall of the bottom end of the support plate.

3. The device for constructing a high embankment in a mountainous area with mixed earth and rock filling according to claim 2, characterized in that: A material discharge box is fixedly installed on the outer wall of the support plate corresponding to one side of the feed port, and a servo motor is fixedly installed inside the bottom end of the support plate, and the output shaft of the servo motor is fixedly connected to the bottom end of the screw feeder.

4. The device for constructing a high embankment in a mountainous area according to claim 1, characterized in that: Through holes are equidistantly provided inside one end of the screed plate, the bottom end of the telescopic tube is fixedly arranged inside the through hole, a second hydraulic cylinder is fixedly arranged inside the storage box, and the output shaft of the second hydraulic cylinder is fixedly connected to the top of the screed plate.

5. The device for constructing a high embankment in a mountainous area according to claim 1, characterized in that: The driving mechanism includes a reduction motor, which is fixedly installed inside a fixed box. The output shaft of the reduction motor is fixedly connected to the central axis of the wheel. The adjustment mechanism includes a first hydraulic cylinder, which is fixedly installed inside a base plate. The output rod of the first hydraulic cylinder is movably connected to the bottom end of an adjustment plate through a pivot. A fixing plate is fixedly provided on the inner wall of the support plate, and one end of the fixing plate is movably connected to the top end of the adjustment plate through a pivot.

6. A method for constructing a high embankment filled with soil and rock in a mountainous area, comprising the following steps: S1: Construction preparation: including 1) Post-investigation measurement: Investigate and measure the construction site, formulate construction plans and schedules, and determine the preparation of machinery, equipment and materials. 2) Excavation: According to the design requirements of the high embankment and the geographical conditions, excavation and development are carried out, and debris is cleared to ensure smooth construction and sufficient space. 3) Material processing: Select suitable soil and stone materials and process them, such as crushing, screening, cleaning, etc., to improve their quality and stability. S2: Filling construction: Use construction equipment to fill soil and stone materials layer by layer according to a certain layer thickness and uniformity, and use machinery and manual labor to compact and level the materials in layers. S3: Installation of hydraulic facilities: Drainage pipes and other hydraulic facilities are installed during the filling process to ensure the drainage and anti-seepage performance of the high embankment. S4: Composite reinforcement structure construction: According to the design requirements, the construction of reinforced soil, reinforced concrete, etc. is gradually carried out; S5: High embankment settlement observation: stability monitoring of locations where high embankments have potential hazards.

7. The method for constructing a high embankment in a mountainous area according to claim 6, characterized in that: The excavation of earth in step S1 includes backfilling earth at locations where settlement exists and compacting the earth using a roller.

8. The method for constructing a high embankment in a mountainous area according to claim 6, characterized in that: The machines and tools in step S1 include excavators, crushers, compactors, mixers and composite reinforcement structure construction equipment.

9. The method for constructing a high embankment in a mountainous area according to claim 6, characterized in that: The construction of the composite reinforcement structure in step S4 includes reinforcing the high embankment slope, setting up a retaining reinforcement project on the slope, and using block stone masonry for high embankment slope protection, using a "filling first and then masonry" process.

10. The method for constructing a high embankment in a mountainous area according to claim 6, characterized in that: The layered compaction and leveling in step S2 is to first level the filled earth and stone materials, and then use a road roller to compact the earth and stone materials, and first press the two sides of the embankment and then press the middle position.

Citation Information

Patent Citations

  • Filling and compacting construction method of soil-rock mixture high-fill subgrade

    CN110777588A

  • Construction method of soil-stone mixed filling roadbed

    CN116043627A

  • Construction method for filling high-fill roadbed of mountain road

    CN116377780A

  • Spiral material distributing device with vibration function

    CN215366662U

  • A material converyor apparatus fo re-surfacing roadways and pavements

    GB202105940D0