Rotatable material crystallization process experimental device and experimental method
By designing a rotatable material crystallization process experimental device to simulate the metal crystallization process under different production conditions, the problem of difficulty in controlling the crystal structure of metal materials in the existing technology has been solved, and the quality of the crystal structure of the material has been reliably improved.
Patent Information
- Application Number
- CN202410908231.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-10-08
AI Technical Summary
In the production process of metal materials, especially in the continuous casting process of steel materials, it is difficult to effectively control the crystallographic structure of the material with existing technology, and the impact of different combinations of rotation angles and production parameters on the crystallographic structure of the material is unclear, resulting in the production of high-quality metal Products face challenges.
A rotatable material crystallization process experimental device is designed, including a simulation controller, a central thermometer, an inductor and a multi-power generator. It simulates different production conditions through the rotation of the simulation controller and magnetic field heating, and simulates equivalent strong cooling. and weak cold water volume, simulating the production speed and the height of the electromagnetic stirring device to simulate the metal crystallization process.
By simulating the metal crystallization process, the crystal structure of the material is truly restored, which provides a reliable basis for adjusting the process parameters of the production process and improves the quality of the material crystal structure.
Smart Images

Figure CN118746595A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of material crystallization, and more specifically, to a rotatable material crystallization process experimental device and an experimental method. Background Art
[0002] Metal materials dominate structural materials and are an important part of national economic construction. With the improvement of resource, energy and environmental awareness, in order to produce high-quality metal materials, people have put forward higher requirements for the control of process parameters in the production process of metal materials. Among them, continuous casting process is the main way to produce metal materials, especially steel materials. Refining the crystal structure of materials is the most effective way to improve product quality. However, the production environment of metal materials belongs to a special environment of high temperature, changeable and opaque. At present, people have no effective method to regulate the crystal structure of materials during the production process. In addition to considering the general parameters in the production process, such as rotation speed, production section, production speed, length and curvature of production equipment, and cooling water volume during production, other process parameters such as production auxiliary technology need to be controlled within a reasonable range. Although the adjustment of these parameters plays a key role in the quality of the final product, people have no way of knowing how much influence the adjustment of metal crystallization process and production parameters at different rotation angles have on the crystal structure of materials. Therefore, the combined application of these parameters is difficult and the key to manufacturing high-quality metal products. If the crystal structure of materials under multi-parameter conditions can be rotatably simulated and restored by simulation, it will undoubtedly provide strong support for the production of high-quality metal products and related scientific research. Summary of the invention
[0003] In view of the above problems, the present invention provides a rotatable material crystallization process experimental device and an experimental method to simulate and restore the material crystal structure under different parameter conditions.
[0004] In order to achieve these purposes and other advantages according to the present invention, a rotatable material crystallization process experimental device is provided, comprising:
[0005] The analog controller is hollow inside and has two openings at both ends. The two ends of the analog controller are respectively connected to a water cooling mechanism and a rotation drive mechanism, and a fire-resistant insulation pad is provided between the rotation drive mechanism and the analog controller. The rotation drive mechanism drives the analog controller to rotate in a vertical plane.
[0006] A central temperature measuring instrument, the measuring end of which extends into the analog controller;
[0007] A sensor, which is mounted outside the analog controller;
[0008] a multi-power generator electrically connected to the inductor to control the inductor to generate an induction heating magnetic field, an EMS magnetic field or a PMO magnetic field;
[0009] A control mechanism is electrically connected to the water cooling mechanism, the rotary drive mechanism, the central temperature measuring instrument and the multi-power generator respectively.
[0010] Furthermore, in the rotatable material crystallization process experimental device, the multi-power generator includes:
[0011] The induction heating module, the EMS module and the PMO module are all electrically connected to the controller and the sensor.
[0012] The present invention also provides a method for simulating the crystal structure of a material, which uses the above-mentioned rotatable device for simulating the crystal structure of a material, and comprises the following steps:
[0013] S1. Place the sample in the simulation controller and fill insulation cotton between the simulation controller and the sensor. The rotation drive mechanism drives the simulation controller to rotate vertically. At this time, the distance between the sample and the water cooling mechanism is not less than 0.1 m.
[0014] S2. Calculate the simulated equivalent strong cooling water volume and the simulated equivalent weak cooling water volume of the water cooling mechanism according to the actual strong cooling water volume and the actual weak cooling water volume of the on-site continuous casting equipment to be simulated;
[0015] S3, the multi-power generator controls the sensor to generate an induction heating magnetic field to heat the sample in the analog controller, and obtains the central temperature of the sample in the analog controller through the central temperature measuring instrument;
[0016] S4. When the center temperature of the sample exceeds its liquidus temperature, the multi-power generator controls the inductor to stop generating the induction heating magnetic field, and the rotary drive mechanism drives the analog controller to rotate until the melted sample contacts the water cooling mechanism and then stops working. At this time, the water cooling mechanism operates with a simulated equivalent amount of strong cold water, and the multi-power generator controls the inductor to generate an EMS magnetic field and a PMO magnetic field.
[0017] S5. According to the actual production speed of the on-site continuous casting equipment and the height of the electromagnetic stirring device, the water volume switching time of the water cooling mechanism is calculated. After the water cooling mechanism runs at a simulated equivalent strong cooling water volume for the water volume switching time, the water cooling mechanism switches to a simulated equivalent weak cooling water volume operation;
[0018] S6. When the center temperature of the sample exceeds its solidus temperature, the water cooling mechanism stops working.
[0019] Furthermore, in the method for simulating the crystal structure of a material, in S2:
[0020] The calculation method of simulated equivalent strong cooling water volume is as follows:
[0021] Ψ=Aл
[0022] Among them, Ψ is the simulated equivalent strong cooling water volume; л is the actual strong cooling water volume of the on-site continuous casting equipment; A is the equivalent strong cooling water volume coefficient, and its value range is 1354-1987;
[0023] The calculation method of simulated equivalent weak cooling water volume is as follows:
[0024]
[0025] Among them, K is the simulated equivalent weak cooling water volume; is the actual weak cooling water volume of the on-site continuous casting equipment; B is the equivalent weak cooling water volume coefficient, and its value range is 346-512.
[0026] Furthermore, in the method for simulating the crystal structure of a material, the interval time for the central temperature measuring instrument in S3 to obtain the temperature measurement is 0.1s-2min.
[0027] Furthermore, in the method for simulating the crystal structure of a material, the method for calculating the angular velocity of the simulation controller when rotating in S4 is as follows:
[0028] FR=α / {(AL / PRS)×60}
[0029] Wherein, FR is the angular velocity of the analog controller when rotating, ° / s; α is the angle of rotation of the analog controller, α≤90°; AL is the arc segment length of the on-site continuous casting equipment; PRS is the actual production speed of the on-site continuous casting equipment;
[0030] The calculation method of the time required for the analog controller to rotate from vertical to horizontal is as follows:
[0031]
[0032] in, It is the time required for the simulation controller to rotate from vertical to horizontal.
[0033] Furthermore, in the method for simulating the crystal structure of a material, the calculation method of the water volume switching time of the water cooling mechanism in S5 is as follows:
[0034] T=60×PRS / θ
[0035] Wherein, T is the water volume switching time of the water cooling mechanism, s; θ is the height of the 1#M-EMS device in the on-site continuous casting equipment.
[0036] Further, in the method for simulating the crystal structure of a material, after the rotation drive mechanism in S4 stops working, the simulation controller first controls the sensor to generate a 1#EMS magnetic field, and then controls the sensor to generate a 2#EMS magnetic field, starting with the rotation drive mechanism stopping working:
[0037] The calculation method of the start time of the 1#EMS magnetic field is as follows:
[0038] M-POT = (MUL / PRS) × 60
[0039] Wherein, M-POT is the opening time of the 1#EMS magnetic field, s; MUL is the distance from the upper opening of the M-EMS device in the on-site continuous casting equipment to the steel liquid surface;
[0040] The calculation method of the 1#EMS magnetic field end time is as follows:
[0041] M-PFT = {(MH+MUL) / PRS} × 60
[0042] Wherein, M-PFT is the end time of the 1#EMS magnetic field, s; MH is the height of the M-EMS device in the on-site continuous casting equipment;
[0043] The calculation method of the start time of the 2#EMS magnetic field is as follows:
[0044] F-POT = (FUL / PRS) × 60
[0045] Wherein, F-POT is the opening time of the 2#EMS magnetic field, s; FUL is the distance from the upper opening of the F-EMS device in the on-site continuous casting equipment to the steel liquid surface;
[0046] F-PFT = {(FH + FUL) / PRS} × 60
[0047] Wherein, F-PFT is the closing time of the 2#EMS magnetic field, s; FH is the terminal height of the F-EMS device in the on-site continuous casting equipment.
[0048] Furthermore, in the method for simulating the crystal structure of a material, after the rotation drive mechanism in S4 stops working, starting from the time when the rotation drive mechanism stops working, the opening time of the PMO magnetic field is:
[0049] P-POT = (PUL / PRS) × 60
[0050] Wherein, P-POT is the PMO magnetic field opening time, s; PUL is the distance from the upper opening of the PMO device to the steel liquid surface in the on-site continuous casting equipment;
[0051] P-PFT = {(PH+PUL) / PRS} × 60
[0052] Wherein, P-PFT is the PMO magnetic field closing time, s; PH is the height of the PMO device in the on-site continuous casting equipment.
[0053] The beneficial effects of the present invention are:
[0054] The present invention simulates the crystallization process of characteristic units in the metal crystallization process under rotation and different parameter conditions, truly restores the material crystal structure, and provides a reliable basis for adjusting the production process process parameters and improving the quality of the material crystal structure.
[0055] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 This is a schematic structural diagram of a rotatable material crystallization process experimental device described in the present invention.
[0057] Figure 2 A schematic diagram of the rotation of the simulation controller according to the present invention;
[0058] Figure 3 This is a schematic diagram of the analog controller of the present invention being rotated to a certain angle. DETAILED DESCRIPTION
[0059] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0060] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials can be obtained from commercial channels unless otherwise specified.
[0061] like Figure 1-Figure 3 As shown, an embodiment of the present invention provides a rotatable material crystallization process experimental device, comprising:
[0062] The simulation controller 1 is hollow inside and has two openings at both ends. The two ends of the simulation controller 1 are respectively connected to a water cooling mechanism and a rotation drive mechanism 9. The rotation drive mechanism 9 is connected to a control mechanism 18 through a rotation drive mechanism data line 15; the water cooling mechanism includes a water cooler 4 and a water circulator 11. The water circulator 11 is connected to the control mechanism 18 through a water circulator data line 14. The opening between the water cooler 4 and the simulation controller 1 is set as a detachable mechanism, which is convenient for placing the sample 6 into the simulation controller 1. The water cooler 4 is connected to the water circulator 11 through a water pipe 17, and the control mechanism 18 is electrically connected to the water cooler 4. The control mechanism 18 transmits the circulating water volume adjustment signal and the circulating water switch signal to the water circulator 11 through the water circulator data line 14 for related operations. A fire-resistant insulation pad is provided between the rotation drive mechanism 9 and the simulation controller 1. The rotation drive mechanism 9 drives the simulation controller 1 to rotate in a vertical plane. The rotation drive mechanism 9 outputs corresponding rotational force to the simulation controller 1 through the command issued by the control mechanism 18, and controls the rotation of the simulation controller 1 at different angles and rotation rates. When the simulation controller 1 is rotated to vertical, the water cooling mechanism is placed on the top of the simulation controller 1, the fire-resistant insulating pad 3 is placed on the bottom of the simulation controller 1, and the sample 6 is placed inside the simulation controller 1, with the distance between its upper end and the water cooling mechanism not less than 0.1m;
[0063] The central thermometer 7 has a measuring end extending into the analog controller 1; the central thermometer 7 is installed on the analog controller 1, and the distance from the fire-resistant insulation pad 3 is ≥0.5mm. After the sample 6 melts, the central thermometer 7 can measure the central temperature of the sample 6; the central thermometer 7 transmits the measured central temperature of the melted sample 6 to the control mechanism 18 through the central thermometer data line 8.
[0064] The sensor 5 is sleeved outside the analog controller 1; the insulation cotton 2 is filled between the analog controller 1 and the sensor 5 to play a heat insulation role;
[0065] A multi-power generator 12 is electrically connected to the sensor 5 to control the sensor 5 to generate an induction heating magnetic field, an EMS magnetic field or a PMO magnetic field; a control mechanism 18 is connected to the multi-power generator 12 via a command data line 13, and the multi-power generator 12 transmits different power sources to the sensor 5 at different times through a cable line 16 via a command signal, including an induction heating power source, an EMS power source, and a PMO power source. The sensor 5 generates different magnetic fields through the received power sources to perform electromagnetic action on the sample 6 in the analog controller 1.
[0066] The analog controller 1 is electrically connected to the water cooler 4, the rotary drive mechanism 9, the central temperature measuring instrument 7 and the multi-power generator 12 respectively.
[0067] Furthermore, in the rotatable material crystallization process simulation device, the sensor 5 includes: an induction heating module, an EMS module and a PMO module, and the type of power output to the sensor 5 is controlled by the output terminal of the control module, so that the sensor 5 triggers different types of magnetic fields. In order to simulate the M-EMS device and the F-EMS device often set in the on-site continuous casting equipment, the EMS module can output the M-EMS magnetic field and the F-EMS magnetic field respectively.
[0068] In this embodiment, when the device for simulating the crystal structure of a material is used to simulate the crystal structure of a material, the following steps are included:
[0069] S1, put the sample 6 into the simulation controller 1, and fill the insulation cotton between the simulation controller 1 and the sensor 5, the rotation drive mechanism 9 drives the simulation controller 1 to rotate vertically, at this time, the distance between the sample 6 and the water cooling mechanism is not less than 0.1m;
[0070] S2. Calculate the simulated equivalent strong cooling water volume and the simulated equivalent weak cooling water volume of the water cooling mechanism according to the actual strong cooling water volume and the actual weak cooling water volume of the on-site continuous casting equipment;
[0071] The calculation method of simulated equivalent strong cooling water volume is as follows:
[0072] Ψ=Aл
[0073] Among them, Ψ is the simulated equivalent strong cooling water volume; л is the actual strong cooling water volume of the on-site continuous casting equipment; A is the equivalent strong cooling water volume coefficient, and its value range is 1354-1987;
[0074] The calculation method of simulated equivalent weak cooling water volume is as follows:
[0075]
[0076] Among them, K is the simulated equivalent weak cooling water volume; is the actual weak cooling water volume of the on-site continuous casting equipment; B is the equivalent weak cooling water volume coefficient, and its value range is 346-512.
[0077] Other parameters required for simulation process calculation are input into the simulation controller 1 in advance, including: liquidus temperature of sample 6, solidus temperature of sample 6, production speed, 1#EMS power, 1#EMS height, length of 1#EMS upper mouth from meniscus, 2#EMS power, 2#EMS height, length of 2#EMS upper mouth from meniscus, PMO power, PMO height, length of PMO upper mouth from meniscus, 1#EMS height, arc segment length. Since two EMS may be installed at different heights of the production equipment in the actual production process, it is estimated that they are named 1#EMS and 2#EMS here.
[0078] S3, the multi-power generator 12 controls the sensor 5 to generate an induction heating magnetic field to heat the sample 6 in the analog controller 1, and obtains the central temperature of the sample 6 in the analog controller 1 through the central temperature meter 7; wherein the interval time for the central temperature meter 7 to obtain the temperature measurement is 0.1s-2min.
[0079] S4, when the center temperature of the sample 6 exceeds its liquidus temperature, the multi-power generator 12 controls the inductor 5 to stop generating the induction heating magnetic field, the rotary drive mechanism 9 drives the analog controller 1 to rotate until the melted sample 6 contacts the water cooling mechanism and then stops working, at which time the water cooling mechanism operates with a simulated equivalent amount of strong cold water, and the multi-power generator 12 controls the inductor 5 to generate an EMS magnetic field and a PMO magnetic field;
[0080] The calculation method of the angular velocity of the analog controller 1 during rotation is as follows:
[0081] FR=90° / {(AL / PRS)×60}
[0082] Wherein, FR is the angular velocity of the simulation controller 1 when rotating; AL is the arc segment length of the on-site continuous casting equipment; PRS is the actual production speed of the on-site continuous casting equipment;
[0083] The calculation method of the time required for the simulation controller 1 to rotate from vertical to horizontal is as follows:
[0084]
[0085] in, It is the time required for the simulated controller 1 to rotate from vertical to horizontal.
[0086] The rotation process can be stopped at any angle and the metal crystallization process can be controlled.
[0087] After the rotation drive mechanism 9 stops working in S4, the simulation controller 1 first controls the sensor 5 to generate the 1#EMS magnetic field, and then controls the sensor 5 to generate the 2#EMS magnetic field, starting with the rotation drive mechanism 9 stopping working:
[0088] The calculation method of the start time of the 1#EMS magnetic field is as follows:
[0089] M-POT = (MUL / PRS) × 60
[0090] Wherein, M-POT is the opening time of the 1#EMS magnetic field, s; MUL is the distance from the upper opening of the M-EMS device in the on-site continuous casting equipment to the steel liquid surface;
[0091] The calculation method of the 1#EMS magnetic field end time is as follows:
[0092] M-PFT = {(MH+MUL) / PRS} × 60
[0093] Wherein, M-PFT is the end time of the 1#EMS magnetic field, s; MH is the height of the M-EMS device in the on-site continuous casting equipment;
[0094] The calculation method of the start time of the 2#EMS magnetic field is as follows:
[0095] F-POT = (FUL / PRS) × 60
[0096] Wherein, F-POT is the opening time of the 2#EMS magnetic field, s; FUL is the distance from the upper opening of the F-EMS device in the on-site continuous casting equipment to the steel liquid surface;
[0097] F-PFT = {(FH + FUL) / PRS} × 60
[0098] Wherein, F-PFT is the closing time of the 2#EMS magnetic field, s; FH is the terminal height of the F-EMS device in the on-site continuous casting equipment.
[0099] After the rotation drive mechanism 9 stops working in S4, starting from the stop of the rotation drive mechanism 9, the opening time of the PMO magnetic field is:
[0100] P-POT = (PUL / PRS) × 60
[0101] Wherein, P-POT is the PMO magnetic field opening time, s; PUL is the distance from the upper opening of the PMO device to the steel liquid surface in the on-site continuous casting equipment;
[0102] P-PFT = {(PH+PUL) / PRS} × 60
[0103] Wherein, P-PFT is the PMO magnetic field closing time, s; PH is the height of the PMO device in the on-site continuous casting equipment.
[0104] S5. According to the actual production speed of the on-site continuous casting equipment and the height of the electromagnetic stirring device, the water volume switching time of the water cooling mechanism is calculated. After the water cooling mechanism runs at a simulated equivalent strong cooling water volume for the water volume switching time, the water cooling mechanism switches to a simulated equivalent weak cooling water volume operation;
[0105] The calculation method of the water volume switching time of the water cooling mechanism is as follows:
[0106] T=60×PRS / θ
[0107] Wherein, T is the water volume switching time of the water cooling mechanism; θ is the height of 1#EMS.
[0108] S6. When the center temperature of sample 6 exceeds its solidus temperature, the water cooling mechanism stops working.
[0109] In order to further verify the effect of using the rotatable device for simulating the crystal structure of a material, the present invention uses the above method to carry out four different embodiments:
[0110] (Example 1)
[0111] Step 1
[0112] A fire-resistant insulation pad with a size of The sample 6 is placed in the simulation controller 1, and the initial state of the simulation controller 1 is adjusted to a vertical state. At this time, the distance between the upper surface of the sample 6 and the lower surface of the water cooler 4 is 0.1 mm.
[0113] Step 2
[0114] The actual strong cooling water flow rate of 2666.67L / min and the weak cooling water flow rate of 92L / min on site are input into the command station and converted into simulated equivalent strong cooling water volume of 1.45L / min and simulated equivalent weak cooling water volume of 0.22L / min through the command station. The command station sends instructions to the water circulator 11 through the water circulator data line 14, and the water circulator 11 provides cooling circulating water to the water cooler 4 through the water pipe 17. The cooling circulating water volume is the simulated equivalent strong cooling water volume of 1.45L / min.
[0115] Step 3
[0116] Enter the following actual production parameters into the command console:
[0117] Sample 6 liquidus temperature: 1453°C, sample 6 solidus temperature: 1367°C;
[0118] The production speed is 1.8m / min;
[0119] The power of 1#EMS is 0KW, the height of 1#EMS is 0.6m, and the distance between the upper opening of 1#EMS and the meniscus is 0.15m;
[0120] The power of 2#EMS is 0KW, the height of 2#EMS is 0.5m, and the distance between the upper opening of 2#EMS and the meniscus is 10m;
[0121] The PMO power is 0KW, the PMO height is 0.45m, and the length of the PMO upper mouth from the meniscus is 1.5m;
[0122] 1#EMS height is 0.85m;
[0123] The length of the arc segment is 7m;
[0124] Step 4
[0125] The command station controls the multi-power generator 12 to output induction heating power to the inductor 5 , and the output induction heating power is 30KW. The inductor 5 heats the sample 6 in the simulation controller 1 .
[0126] Step 5
[0127] During the process of the inductor 5 heating the sample 6, the central temperature measuring instrument 7 continuously measures the temperature of the sample 6 at an interval of 1 second, and transmits the measured temperature data to the command station. When the measured temperature exceeds 1473°C, the command station sends a command to the multi-power generator 12 through the command data line 13 to turn off the induction heating. The command station transmits a command to the electric motor, starts the motor, and rotates the analog control to a horizontal position through a rotating rod. At this time, the molten steel contacts the water cooler 4, and the water cooler 4 performs single-phase cooling on the molten steel.
[0128] Step 6
[0129] The command station calculates based on the actual production speed of 1.8m / min and the arc segment length of 7m, and obtains that the rotation rate of the analog controller 1 is 0.386° / s. The command station transmits corresponding instructions to the power motor through the rotation drive mechanism data line 15, and the power motor controls the rotating rod to rotate the analog controller 1, and the rotation rate is 0.386° / s.
[0130] Step 7
[0131] The command station performs calculations based on the production speed of 1.8 m / min and the height of 1#EMS 0.85 m. At 28.32 s, the command station sends a command to the water circulator 11 through the water circulator data line 14 to reduce the circulating cooling water flow rate provided from the simulated equivalent strong cooling water volume of 1.45 L / min to the simulated equivalent weak cooling water volume of 0.22 L / min.
[0132] Step 8
[0133] The command station calculates through the rotation rate that when the rotation time reaches 233s, the command station sends a command to the electric motor, and the electric motor stops. At this time, the rotating rod stops driving the analog controller 1 to rotate.
[0134] Step 8
[0135] When the central temperature meter 7 measures that the central temperature of the sample 6 is lower than 1367°C, the central temperature meter 7 transmits the temperature signal to the command station through the central temperature meter data line 8, and the command station sends a command to the water circulator 11 through the water circulator data line 14 to close the circulating cooling water, and the simulation process ends.
[0136] (Example 2)
[0137] Step 1
[0138] A fire-resistant insulation pad with a size of The sample 6 is placed in the simulation controller 1, and the initial state of the simulation controller 1 is adjusted to a vertical state. At this time, the distance between the upper surface of the sample 6 and the lower surface of the water cooler 4 is 0.1 mm.
[0139] Step 2
[0140] The actual strong cooling water flow rate of 2333.33 L / min and the weak cooling water flow rate of 67 L / min on site are input into the command station and converted into simulated equivalent strong cooling water volume of 1.35 L / min and simulated equivalent weak cooling water volume of 0.14 L / min by the command station. The command station sends instructions to the water circulator 11 through the water circulator data line 14, and the water circulator 11 provides cooling circulating water to the water cooler 4 through the water pipe 17. The cooling circulating water volume is the simulated equivalent strong cooling water volume of 1.35 L / min.
[0141] Step 3
[0142] Enter the following actual production parameters into the command console:
[0143] Sample 6 liquidus temperature: 1453°C, sample 6 solidus temperature: 1367°C;
[0144] The production speed is 1.2m / min;
[0145] The power of 1#EMS is 100KW, the height of 1#EMS is 0.6m, and the distance between the upper opening of 1#EMS and the meniscus is 0.15m;
[0146] The power of 2#EMS is 150KW, the height of 2#EMS is 0.5m, and the distance between the upper opening of 2#EMS and the meniscus is 10m;
[0147] The PMO power is 0KW, the PMO height is 0.45m, and the length of the PMO upper mouth from the meniscus is 1.5m;
[0148] 1#EMS height is 0.85m;
[0149] The length of the arc segment is 8m;
[0150] Step 4
[0151] The command station controls the multi-power generator 12 to output induction heating power to the inductor 5 , and the output induction heating power is 35KW. The inductor 5 heats the sample 6 in the simulation controller 1 .
[0152] Step 5
[0153] During the process of the inductor 5 heating the sample 6, the central temperature measuring instrument 7 continuously measures the temperature of the sample 6 at an interval of 1 second, and transmits the measured temperature data to the command station. When the measured temperature exceeds 1473°C, the command station sends a command to the multi-power generator 12 through the command data line 13 to turn off the induction heating. The command station transmits a command to the electric motor, starts the motor, and rotates the analog control to a horizontal position through a rotating rod. At this time, the molten steel contacts the water cooler 4, and the water cooler 4 performs single-phase cooling on the molten steel.
[0154] Step 6
[0155] The command station calculates based on the actual production speed of 1.2m / min and the arc segment length of 8m, and obtains that the rotation rate of the analog controller 1 is 0.225° / s. The command station transmits corresponding instructions to the power motor through the rotation drive mechanism data line 15, and the power motor controls the rotating rod to rotate the analog controller 1 at a rotation rate of 0.225° / s.
[0156] Step 7
[0157] When the rotation lasts for 7.5s from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns on the EMS module, and introduces power to the sensor 5 through the cable 16 to perform field treatment on the sample 6 with a power of 100KW. When the rotation lasts for 37.5s from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns off the EMS module, and stops the sensor 5 from performing field treatment on the sample 6.
[0158] Step 8
[0159] The command station performs calculations based on the production speed of 1.2 m / min and the height of 0.85 m of 1#EMS. At 42.50 s, the command station sends a command to the water circulator 11 through the water circulator data line 14 to reduce the circulating cooling water flow rate provided from the simulated equivalent strong cooling water volume of 1.35 L / min to the simulated equivalent weak cooling water volume of 0.14 L / min.
[0160] Step 9
[0161] The command station calculates through the rotation rate. When the rotation time reaches 400s, the command station sends a command to the electric motor, and the electric motor stops. At this time, the rotating rod stops driving the analog controller 1 to rotate.
[0162] Step 10
[0163] When the rotation lasts for 500 seconds from the start, the command station sends a command to the multi-power generator 12 through the command data line 13 to turn on the EMS module, introduce power to the sensor 5 through the cable 16, and perform field treatment on the sample 6 with a power of 150KW. When the rotation lasts for 525 seconds from the start, the command station sends a command to the multi-power generator 12 through the command data line 13 to turn off the EMS module and stop the sensor 5 from performing field treatment on the sample 6.
[0164] Step 11
[0165] When the central temperature meter 7 measures that the central temperature of the sample 6 is lower than 1367°C, the central temperature meter 7 transmits the temperature signal to the command station through the central temperature meter data line 8, and the command station sends a command to the water circulator 11 through the water circulator data line 14 to close the circulating cooling water, and the simulation process ends.
[0166] (Example 3)
[0167] Step 1
[0168] A fire-resistant insulation pad with a size of The sample 6 is placed in the simulation controller 1, and the initial state of the simulation controller 1 is adjusted to a vertical state. At this time, the distance between the upper surface of the sample 6 and the lower surface of the water cooler 4 is 0.1 mm.
[0169] Step 2
[0170] The actual strong cooling water flow rate of 2000L / min and weak cooling water flow rate of 43L / min on site are input into the command station and converted into simulated equivalent strong cooling water volume of 1.20L / min and simulated equivalent weak cooling water volume of 0.10L / min by the command station. The command station sends instructions to the water circulator 11 through the water circulator data line 14, and the water circulator 11 provides cooling circulating water to the water cooler 4 through the water pipe 17. The cooling circulating water volume is the simulated equivalent strong cooling water volume of 1.20L / min.
[0171] Step 3
[0172] Enter the following actual production parameters into the command console:
[0173] Sample 6 liquidus temperature: 1453°C, sample 6 solidus temperature: 1367°C;
[0174] The production speed is 0.6m / min;
[0175] The power of 1#EMS is 100KW, the height of 1#EMS is 0.6m, and the distance between the upper opening of 1#EMS and the meniscus is 0.15m;
[0176] The power of 2#EMS is 150KW, the height of 2#EMS is 0.5m, and the distance between the upper opening of 2#EMS and the meniscus is 10m;
[0177] The PMO power is 50KW, the PMO height is 0.45m, and the length from the upper opening of the PMO to the meniscus is 1.5m;
[0178] 1#EMS height is 0.85m;
[0179] The length of the arc segment is 11m;
[0180] Step 4
[0181] The command station controls the multi-power generator 12 to output induction heating power to the inductor 5 , and the output induction heating power is 48KW. The inductor 5 heats the sample 6 in the simulation controller 1 .
[0182] Step 5
[0183] During the process of the inductor 5 heating the sample 6, the central temperature measuring instrument 7 continuously measures the temperature of the sample 6 at an interval of 1 second, and transmits the measured temperature data to the command station. When the measured temperature exceeds 1473°C, the command station sends a command to the multi-power generator 12 through the command data line 13 to turn off the induction heating. The command station transmits a command to the electric motor, starts the motor, and rotates the analog control to a horizontal position through a rotating rod. At this time, the molten steel contacts the water cooler 4, and the water cooler 4 performs single-phase cooling on the molten steel.
[0184] Step 6
[0185] The command station calculates based on the actual production speed of 0.6m / min and the arc segment length of 11m, and obtains that the rotation rate of the analog controller 1 is 0.082° / s. The command station transmits corresponding instructions to the power motor through the rotation drive mechanism data line 15, and the power motor controls the rotating rod to rotate the analog controller 1, and the rotation rate is 0.082° / s.
[0186] Step 7
[0187] When the rotation lasts for 15 seconds from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns on the EMS module, and introduces power to the sensor 5 through the cable 16 to perform field treatment on the sample 6 with a power of 100KW. When the rotation lasts for 75 seconds from the start, the command station sends a command to the multi-power generator 12 through the command data line 13 to turn off the EMS module and stop the sensor 5 from performing field treatment on the sample 6.
[0188] Step 8
[0189] The command station calculates based on the production speed of 0.6m / min and the height of 1#EMS 0.85m. At 85s, the command station sends a command to the water circulator 11 through the water circulator data line 14 to reduce the circulating cooling water flow rate provided from the simulated equivalent strong cooling water volume of 1.20L / min to the simulated equivalent weak cooling water volume of 0.10L / min.
[0190] Step 9
[0191] When the rotation lasts for 150s from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns on the PMO module, and introduces a pulse power supply to the sensor 5 through the cable 16 to perform an external field treatment on the sample 6 with a power of 50KW. When the rotation lasts for 195s from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns off the PMO module, and stops the sensor 5 from performing an external field treatment on the sample 6.
[0192] Step 10
[0193] The command station calculates through the rotation rate. When the rotation time reaches 1097s, the command station sends a command to the electric motor, and the electric motor stops. At this time, the rotating rod stops driving the analog controller 1 to rotate.
[0194] Step 11
[0195] When the rotation lasts for 1000s from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns on the EMS module, and introduces the EMS power to the sensor 5 through the cable 16 to perform an external field treatment on the sample 6 with a power of 150KW. When the rotation lasts for 1050s from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns off the EMS module, and stops the sensor 5 from performing an external field treatment on the sample 6.
[0196] Step 12
[0197] When the central temperature meter 7 measures that the central temperature of the sample 6 is lower than 1367°C, the central temperature meter 7 transmits the temperature signal to the command station through the central temperature meter data line 8, and the command station sends a command to the water circulator 11 through the water circulator data line 14 to close the circulating cooling water, and the simulation process ends.
[0198] (Example 4)
[0199] Step 1
[0200] A fire-resistant insulation pad with a size of The sample 6 is placed in the simulation controller 1, and the initial state of the simulation controller 1 is adjusted to a vertical state. At this time, the distance between the upper surface of the sample 6 and the lower surface of the water cooler 4 is 0.1 mm.
[0201] Step 2
[0202] The actual strong cooling water flow rate of 2000L / min and the weak cooling water flow rate of 26L / min on site are input into the command station and converted into simulated equivalent strong cooling water volume of 1.20L / min and simulated equivalent weak cooling water volume of 0.07L / min by the command station. The command station sends instructions to the water circulator 11 through the water circulator data line 14, and the water circulator 11 provides cooling circulating water to the water cooler 4 through the water pipe 17. The cooling circulating water volume is the simulated equivalent strong cooling water volume of 1.20L / min.
[0203] Step 3
[0204] Enter the following actual production parameters into the command console:
[0205] Sample 6 liquidus temperature: 1453°C, sample 6 solidus temperature: 1367°C;
[0206] The production speed is 0.3m / min;
[0207] The power of 1#EMS is 0KW, the height of 1#EMS is 0.6m, and the distance between the upper opening of 1#EMS and the meniscus is 0.15m;
[0208] The power of 2#EMS is 0KW, the height of 2#EMS is 0.5m, and the distance between the upper opening of 2#EMS and the meniscus is 10m;
[0209] The PMO power is 50KW, the PMO height is 0.45m, and the length from the upper opening of the PMO to the meniscus is 1.5m;
[0210] 1#EMS height is 0.85m;
[0211] The length of the arc section is 13m;
[0212] Step 4
[0213] The command station controls the multi-power generator 12 to output induction heating power to the inductor 5 , and the output induction heating power is 62KW. The inductor 5 heats the sample 6 in the simulation controller 1 .
[0214] Step 5
[0215] During the process of the inductor 5 heating the sample 6, the central temperature measuring instrument 7 continuously measures the temperature of the sample 6 at an interval of 1 second, and transmits the measured temperature data to the command station. When the measured temperature exceeds 1473°C, the command station sends a command to the multi-power generator 12 through the command data line 13 to turn off the induction heating. The command station transmits a command to the electric motor, starts the motor, and rotates the analog control to a horizontal position through a rotating rod. At this time, the molten steel contacts the water cooler 4, and the water cooler 4 performs single-phase cooling on the molten steel.
[0216] Step 6
[0217] The command station calculates based on the actual production speed of 0.3m / min and the arc segment length of 13m, and obtains that the rotation rate of the analog controller 1 is 0.035° / s. The command station transmits corresponding instructions to the power motor through the rotation drive mechanism data line 15, and the power motor controls the rotating rod to rotate the analog controller 1 at a rotation rate of 0.035° / s.
[0218] Step 7
[0219] The command station performs calculations based on the production speed of 0.3m / min and the height of 1#EMS of 0.85m. At 170s, the command station sends a command to the water circulator 11 through the water circulator data line 14 to reduce the circulating cooling water flow rate provided from the simulated equivalent strong cooling water volume of 1.20L / min to the simulated equivalent weak cooling water volume of 0.07L / min.
[0220] Step 8
[0221] When the rotation lasts for 300s from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns on the PMO module, introduces a pulse power supply to the sensor 5 through the cable 16, and performs an external field treatment on the sample 6 with a power of 50KW. When the rotation lasts for 390s from the start, the command station sends a command to the multi-power generator 12 through the command data line 13, turns off the PMO module, and stops the sensor 5 from performing an external field treatment on the sample 6.
[0222] Step 9
[0223] The command station calculates through the rotation rate, and when the rotation time reaches 2571s, the command station sends a command to the electric motor, and the electric motor stops. At this time, the rotating rod stops driving the analog controller 1 to rotate.
[0224] Step 10
[0225] When the central temperature meter 7 measures that the central temperature of the sample 6 is lower than 1367°C, the central temperature meter 7 transmits the temperature signal to the command station through the central temperature meter data line 8, and the command station sends a command to the water circulator 11 through the water circulator data line 14 to close the circulating cooling water, and the simulation process ends.
[0226] The samples in the above-mentioned Examples 1 to 4 are all made of metal materials. After the simulation process is completed, after the samples 6 of Examples 1 to 4 are completely cooled, the samples 6 are taken out from the simulation controller 1, and the samples 6 are tested and analyzed. The test results are shown in the following Table 1:
[0227] Table 1 Detection and analysis results of sample 6
[0228]
[0229] According to the test data in Table 1, the simulated value of the average length of the primary dendrite in Example 1 is 137 μm, and the actual production value is 136.5. The simulated value of the average spacing of the secondary dendrite arms is 79 μm, and the actual production value is 79 μm. The simulated value of the average area of the equiaxed crystal is 0.32 mm. 2 , the actual production value is 0.32mm 2 The simulated value of the average length of the primary dendrite in Example 2 is 165 μm, and the actual production value is 165. The simulated value of the average spacing of the secondary dendrite arms is 101.5 μm, and the actual production value is 102 μm. The simulated value of the average area of the equiaxed crystal is 0.37 mm. 2 , the actual production value is 0.37mm 2 The simulated value of the average length of the primary dendrite in Example 3 is 127.5 μm, and the actual production value is 128. The simulated value of the average spacing of the secondary dendrite arms is 71 μm, and the actual production value is 71.5 μm. The simulated value of the average area of the equiaxed crystal is 0.18 mm. 2 , the actual production value is 0.18mm 2 The simulated value of the average length of the primary dendrite in Example 4 is 170.5 μm, and the actual production value is 170. The simulated value of the average spacing of the secondary dendrite arms is 105 μm, and the actual production value is 105 μm. The simulated value of the average area of the equiaxed crystal is 0.19 mm 2 , the actual production value is 0.19mm 2 .
[0230] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the embodiments shown and described herein.
Claims
1. A rotatable material crystallization process experimental device, characterized in that: include: The analog controller is hollow inside and has two openings at both ends. The two ends of the analog controller are respectively connected to a water cooling mechanism and a rotation drive mechanism, and a fire-resistant insulation pad is provided between the rotation drive mechanism and the analog controller. The rotation drive mechanism drives the analog controller to rotate in a vertical plane. A central temperature measuring instrument, the measuring end of which extends into the analog controller; A sensor, which is mounted outside the analog controller; a multi-power generator electrically connected to the inductor to control the inductor to generate an induction heating magnetic field, an EMS magnetic field or a PMO magnetic field; A control mechanism is electrically connected to the water cooling mechanism, the rotary drive mechanism, the central temperature measuring instrument and the multi-power generator respectively.
2. A rotatable material crystallization process experimental device as claimed in claim 1, characterized in that: The multi-power generator comprises: The induction heating module, the EMS module and the PMO module are all electrically connected to the inductor.
3. A method for simulating a material crystallization process, which uses a rotatable material crystallization process experimental device as claimed in claim 1, characterized in that: The following steps are involved: S1. Place the sample in the simulation controller and fill insulation cotton between the simulation controller and the sensor. The rotation drive mechanism drives the simulation controller to rotate vertically. At this time, the distance between the sample and the water cooling mechanism is not less than 0.1 m. S2. Calculate the simulated equivalent strong cooling water volume and the simulated equivalent weak cooling water volume of the water cooling mechanism according to the actual strong cooling water volume and the actual weak cooling water volume of the on-site continuous casting equipment to be simulated; S3, the multi-power generator controls the sensor to generate an induction heating magnetic field to heat the sample in the analog controller, and obtains the central temperature of the sample in the analog controller through the central temperature measuring instrument; S4. When the center temperature of the sample exceeds its liquidus temperature, the multi-power generator controls the inductor to stop generating the induction heating magnetic field, and the rotary drive mechanism drives the analog controller to rotate to a horizontal position, so that the melted sample stops working after contacting the water cooling mechanism. At this time, the water cooling mechanism operates with a simulated equivalent strong cold water volume, and the multi-power generator controls the inductor to generate an EMS magnetic field and a PMO magnetic field; S5. According to the actual production speed of the on-site continuous casting equipment and the height of the electromagnetic stirring device, the water volume switching time of the water cooling mechanism is calculated. After the water cooling mechanism runs at a simulated equivalent strong cooling water volume for the water volume switching time, the water cooling mechanism switches to a simulated equivalent weak cooling water volume operation; S6. When the center temperature of the sample exceeds its solidus temperature, the water cooling mechanism stops working.
4. A method for simulating the crystal structure of a material as claimed in claim 3, characterized in that: In S2: The calculation method of simulated equivalent strong cooling water volume is as follows: Ψ=Aл Among them, Ψ is the simulated equivalent strong cooling water volume; л is the actual strong cooling water volume of the on-site continuous casting equipment; A is the equivalent strong cooling water volume coefficient, and its value range is 1354-1987; The calculation method of simulated equivalent weak cooling water volume is as follows: Among them, K is the simulated equivalent weak cooling water volume; is the actual weak cooling water volume of the on-site continuous casting equipment; B is the equivalent weak cooling water volume coefficient, and its value range is 346-512.
5. A method for simulating the crystal structure of a material as claimed in claim 3, characterized in that: The central temperature measuring instrument in S3 obtains temperature measurement at an interval of 0.1s-2min.
6. A method for simulating a material crystal structure as claimed in claim 3, characterized in that: The calculation method of the angular velocity of the simulated controller when rotating in S4 is as follows: FR=α / {(AL / PRS)×60} Wherein, FR is the angular velocity of the analog controller when rotating, ° / s; α is the angle of rotation of the analog controller, α≤90°; AL is the arc segment length of the on-site continuous casting equipment; PRS is the actual production speed of the on-site continuous casting equipment; The calculation method of the time required for the analog controller to rotate from vertical to horizontal is as follows: in, It is the time required for the simulation controller to rotate from vertical to horizontal.
7. A method for simulating a material crystal structure as claimed in claim 3, characterized in that: The calculation method of the water flow switching time of the water cooling mechanism in S5 is as follows: T=60×PRS / θ Wherein, T is the water volume switching time of the water cooling mechanism, s; θ is the height of the M-EMS device in the on-site continuous casting equipment.
8. A method for simulating a material crystal structure as claimed in claim 3, characterized in that: After the rotation drive mechanism stops working in S4, the analog controller first controls the sensor to generate a 1#EMS magnetic field, and then controls the sensor to generate a 2#EMS magnetic field, starting with the rotation drive mechanism stopping working: The calculation method of the start time of the 1#EMS magnetic field is as follows: M-POT = (MUL / PRS) × 60 Wherein, M-POT is the opening time of the 1#EMS magnetic field, s; MUL is the distance from the upper opening of the M-EMS device in the on-site continuous casting equipment to the steel liquid surface; The calculation method of the 1#EMS magnetic field end time is as follows: M-PFT = {(MH+MUL) / PRS} × 60 Wherein, M-PFT is the end time of the 1#EMS magnetic field, s; MH is the height of the M-EMS device in the on-site continuous casting equipment; The calculation method of the start time of the 2#EMS magnetic field is as follows: F-POT = (FUL / PRS) × 60 Wherein, F-POT is the opening time of the 2#EMS magnetic field, s; FUL is the distance from the upper opening of the F-EMS device to the steel liquid surface in the on-site continuous casting equipment; F-PFT = {(FH + FUL) / PRS} × 60 Wherein, F-PFT is the closing time of the 2#EMS magnetic field, s; FH is the terminal height of the F-EMS device in the on-site continuous casting equipment.
9. A method for simulating a material crystal structure as claimed in claim 3, characterized in that: After the rotation drive mechanism in S4 stops working, starting from the stop of the rotation drive mechanism, the opening time of the PMO magnetic field is: P-POT = (PUL / PRS) × 60 Wherein, P-POT is the PMO magnetic field opening time, s; PUL is the distance from the upper opening of the PMO device to the steel liquid surface in the on-site continuous casting equipment; P-PFT = {(PH+PUL) / PRS} × 60 Wherein, P-PFT is the PMO magnetic field closing time, s; PH is the height of the PMO device in the on-site continuous casting equipment.