Road geological disaster monitoring and early warning method and device based on millimeter wave radar
Through the road geological disaster monitoring and early warning method based on millimeter wave radar, radar point cloud data is collected and processed, and the curvature change threshold is calculated, which solves the problems of high cost, low real-time performance and low accuracy in the existing technology, and achieves efficient and accurate monitoring and early warning.
Patent Information
- Application Number
- CN202410916140.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-08
AI Technical Summary
Existing road geological disaster monitoring and early warning technologies have high costs, low real-time performance, low accuracy, and are greatly affected by natural factors.
The road geological hazard monitoring and early warning method based on millimeter wave radar is adopted to achieve real-time and accurate monitoring and early warning by collecting radar point cloud data, dividing road sections, preprocessing data, fitting curves, calculating curvature change thresholds and determining early warning levels.
It reduces the cost of monitoring and early warning, improves the real-time and accuracy, can comprehensively determine the early warning level through current and historical data, and improves the timeliness and reliability of geological disaster monitoring.
Smart Images

Figure CN118746830A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent road monitoring, and in particular to a method and device for monitoring and early warning of road geological disasters based on millimeter wave radar. Background Art
[0002] On traffic roads, environmental factors such as earthquakes, rainstorms, floods, and underground land displacement can lead to landslides, ground subsidence, and mudslides. This phenomenon not only causes road congestion, but also causes vehicle damage and even casualties. Therefore, road monitoring and prediction for the above situations are very important. Through prediction, areas where disasters may occur can be observed in advance, and early warnings can be issued to manage them in advance, which can also reduce the losses caused by natural disasters. Millimeter-wave radar is increasingly used in various detection and monitoring fields due to its stable detection performance, long range, high detection accuracy, and all-weather operation.
[0003] At present, the widely used road geological disaster monitoring and early warning is ground-based synthetic aperture interferometer radar, which achieves high-resolution imaging through synthetic aperture technology and is suitable for small-scale high-precision monitoring. Satellite synthetic aperture radar can cover large areas and is suitable for wide-area periodic monitoring. However, the use of satellites and radars makes the cost of monitoring and early warning high. Satellites monitor according to the monitoring cycle, which makes the real-time monitoring and early warning low. Satellite synthetic aperture radar is easily affected by various natural factors, and is restricted by factors such as atmospheric disturbances and volume scattering incoherence. Low coherence and incoherence phenomena will occur, making the accuracy of monitoring and early warning low. Summary of the invention
[0004] The purpose of the embodiments of the present invention is to provide a method and device for monitoring and early warning of road geological disasters based on millimeter wave radar, so as to solve the problems of high cost, low real-time performance and low accuracy of monitoring and early warning of road geological disasters.
[0005] To solve the above technical problems, the embodiments of the present invention provide the following technical solutions:
[0006] The first aspect of the present invention provides a road geological disaster monitoring and early warning method based on millimeter wave radar, and the road geological disaster monitoring and early warning method comprises:
[0007] Collect radar point cloud data corresponding to multiple road sections;
[0008] Divide each road section according to the preset value to obtain each divided road section and the corresponding target radar point cloud data;
[0009] Preprocess the target radar point cloud data to obtain the coordinates of multiple data points corresponding to each divided road section;
[0010] Determine multiple polynomial fitting orders corresponding to each divided road section according to the coordinates of each data point and the preset angle;
[0011] Determine the curve corresponding to each divided road section according to multiple polynomial fitting orders;
[0012] Calculating the curvature of each curve at multiple different moments, where the curvatures at multiple different moments include the curvature at the current moment and the curvature at the previous moment;
[0013] Determine the curvature change threshold according to the target curvature value, the empirical coefficient and the weight of each divided road section;
[0014] The warning level corresponding to each divided road section is determined according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold.
[0015] The second aspect of the present application provides a road geological disaster monitoring and early warning device based on millimeter wave radar, and the road geological disaster monitoring and early warning device includes:
[0016] A collection module, used to collect radar point cloud data corresponding to multiple road sections;
[0017] A division module is used to divide each road section according to a preset value to obtain radar point cloud data of each divided road section and the corresponding target;
[0018] A preprocessing module is used to preprocess the target radar point cloud data to obtain the coordinates of multiple data points corresponding to each divided road section;
[0019] A first determination module, used to determine a plurality of polynomial fitting orders corresponding to each divided road section according to the coordinates of each data point and a preset angle;
[0020] A second determination module is used to determine the curve corresponding to each divided road section according to a plurality of polynomial fitting orders;
[0021] A calculation module, used to calculate the curvature of each curve at multiple different moments, where the curvatures at multiple different moments include the curvature at the current moment and the curvature at the previous moment;
[0022] A third determination module is used to determine a curvature change threshold value according to a target curvature value, an empirical coefficient and a weight of each divided road section;
[0023] The fourth determination module is used to determine the warning level corresponding to each divided road section according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold.
[0024] Compared with the prior art, the present invention provides a road geological disaster monitoring and early warning method and device based on millimeter wave radar, which can collect radar point cloud data corresponding to multiple road sections in real time, so that the real-time measurement and early warning are higher. The collected radar point cloud data are collected by millimeter wave radar, so that the cost of monitoring and early warning is lower. The warning level corresponding to each divided road section can be determined by the curvature at the current moment, the curvature at the previous moment and the curvature change threshold, so that the data for determining the warning level corresponding to each divided road section is more comprehensive, with both current data and historical data, so that the accuracy of monitoring and early warning is higher. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] By reading the detailed description below with reference to the accompanying drawings, the above and other objects, features and advantages of the exemplary embodiments of the present invention will become readily understood. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:
[0026] Figure 1 The schematic diagram of the radar and corner reflector layout is shown schematically;
[0027] Figure 2 The process of the road geological disaster monitoring and early warning method based on millimeter wave radar is schematically shown. Figure 1 ;
[0028] Figure 3 The process of the road geological disaster monitoring and early warning method based on millimeter wave radar is schematically shown. Figure 2 ;
[0029] Figure 4 The structure of a road geological disaster monitoring and early warning device based on millimeter wave radar is schematically shown. DETAILED DESCRIPTION
[0030] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0031] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in the present invention should have the common meanings understood by those skilled in the art to which the present invention belongs.
[0032] The executor of the present invention is a system based on millimeter-wave radar and corner reflector. Before executing the method of the present invention, it is necessary to carry out preliminary installation and deployment of the system, including the installation of millimeter-wave radar, the installation and calibration of corner reflector, that is, calibration of millimeter-wave radar.
[0033] Specifically, the installation of millimeter-wave radar: millimeter-wave radar is the core sensor of the system, which can provide high-resolution terrain change data under severe weather conditions. Its installation steps include: selecting a suitable monitoring site, usually above a disaster-prone road, and setting up the radar above the road (such as 5 meters) at intervals (such as 500 meters) to ensure that the radar can cover the entire area while ensuring the effective detection range of the radar; then use a bracket to firmly fix the radar on the ground or other stable structure to ensure that it will not move during long-term use; finally, connect the power supply and communication lines, and realize data transmission through wired or wireless networks.
[0034] Installation of corner reflectors: Corner reflectors are used to enhance the reflection of radar signals and improve monitoring accuracy. The installation steps include: laying corner reflectors approximately every 10 meters on both sides of the road in the monitoring area, ensuring that the corner reflectors on each side of the road in the monitoring area form a curve; then firmly installing the corner reflectors on the ground or rock and ensuring that the corner reflectors are installed on a bracket perpendicular to the ground to avoid the influence of external factors such as wind and rain.
[0035] Calibration: Calibration is radar calibration, which is to eliminate or reduce system errors and improve the measurement accuracy and reliability of millimeter wave radar. During the calibration process, it should be noted that the position and angle of the radar and corner reflector should be adjusted according to the initial measurement data to ensure that it can accurately monitor geological disasters in the future.
[0036] Figure 1 The schematic diagram of the radar and corner reflector layout is shown schematically; Figure 1 101 is a corner reflector, 102 is a millimeter wave radar, the corner reflectors are arranged along both sides of the road, and the corner reflectors are monitored by radar.
[0037] The method in the embodiment of the present invention is described in detail below.
[0038] Figure 2 The flowchart of the road geological disaster monitoring and early warning method based on millimeter wave radar in the embodiment of the present invention is schematically shown. Figure 2 As shown, the method may include:
[0039] S201. Collect radar point cloud data corresponding to multiple road sections.
[0040] S202, dividing each road section according to a preset value to obtain each divided road section and corresponding target radar point cloud data.
[0041] The preset value may be 100 meters, and no specific limitation is made to the preset value here.
[0042] Exemplarily, each road section is divided into 100 meters to obtain each divided road section and target radar point cloud data corresponding to each divided road section.
[0043] S203, pre-processing the target radar point cloud data to obtain coordinates of multiple data points corresponding to each divided road section.
[0044] Preprocessing includes noise filtering and data coordinate conversion.
[0045] Each divided road section corresponds to the coordinates of multiple data points, and the coordinates of each data point include X-axis coordinates and Y-axis coordinates, where the X-axis coordinates are {X1, X2, X3...X n}, the Y-axis coordinates are {Y1,Y2,Y3...Y n}, n represents the number of data points. The data points are corner reflectors, and the coordinates of each data point are the coordinates of each corner reflector.
[0046] S204: Determine multiple polynomial fitting orders corresponding to each divided road section according to the coordinates of each data point and a preset angle.
[0047] One preset angle corresponds to a plurality of polynomial fitting orders, and the plurality of polynomial fitting orders corresponding to each preset angle are different.
[0048] There are three preset angles, which can be 0° to 30°, 30° to 60°, and greater than 60°.
[0049] S205: Determine the curve corresponding to each divided road section according to multiple polynomial fitting orders.
[0050] Specifically, the curve corresponding to each divided road section is determined according to the multiple polynomial fitting orders corresponding to each divided road section determined in step S204.
[0051] The multiple polynomial fitting orders may be second and third order, third and fourth order, or fourth order or fifth order.
[0052] S206: Calculate the curvature of each curve at multiple different moments.
[0053] The curvatures at multiple different moments include the curvature at the current moment and the curvature at the previous moment.
[0054] S207: Determine a curvature change threshold value according to the target curvature value, the empirical coefficient, and the weight of each divided road section.
[0055] The target curvature value is the curvature value of the road under normal conditions after the radar and corner reflectors are deployed.
[0056] S208. Determine the warning level corresponding to each divided road section according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold.
[0057] The warning levels include no risk warning level, low risk warning level, medium risk warning level and high risk warning level.
[0058] Specifically, according to the curvature at the current moment calculated in step S206, the curvature at the previous moment and the curvature change threshold determined in step S207, the warning level corresponding to each divided road section is determined as a no-risk warning level, a low-risk warning level, a medium-risk warning level or a high-risk warning level.
[0059] Based on the above Figure 2 It can be seen from the implementation method that the embodiment of the present invention collects radar point cloud data corresponding to multiple road sections; divides each road section according to a preset value to obtain each divided road section and the corresponding target radar point cloud data; pre-processes the target radar point cloud data to obtain the coordinates of multiple data points corresponding to each divided road section; determines multiple polynomial fitting orders corresponding to each divided road section according to the coordinates of each data point and a preset angle; determines the curve corresponding to each divided road section according to the multiple polynomial fitting orders; calculates the curvature of each curve at multiple different times; determines the curvature change threshold according to the target curvature value, the empirical coefficient and the weight of each divided road section; determines the warning level corresponding to each divided road section according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold. In this way, radar point cloud data corresponding to multiple road sections can be collected in real time, so that the real-time measurement and warning are higher. The collected radar point cloud data are collected by millimeter wave radar, which makes the cost of monitoring and early warning lower. The warning level corresponding to each divided road section can be determined by the curvature at the current moment, the curvature at the previous moment and the curvature change threshold, so that the data for determining the warning level corresponding to each divided road section is more comprehensive, with both current data and historical data, so that the accuracy of monitoring and early warning is higher.
[0060] As a refinement and expansion of the above embodiment, Figure 3 The process of the road geological disaster monitoring and early warning method based on millimeter wave radar in the embodiment of the present invention is as follows: Figure 2 , see Figure 3 As shown, a road geological disaster monitoring and early warning method based on millimeter wave radar provided by an embodiment of the present invention may include:
[0061] S301, collecting radar point cloud data corresponding to multiple road sections.
[0062] During the operation of the system, the millimeter-wave radar continuously emits millimeter-wave signals and receives signals reflected from the corner reflectors; a multi-target tracking algorithm is used to identify and track the positions and motion trajectories of multiple corner reflectors; based on the arrangement of the millimeter-wave radar and the corner reflectors, the data obtained by the millimeter-wave radar detection should be a point cloud curve formed by continuous corner reflectors, that is, radar point cloud data corresponding to multiple road sections; finally, the radar point cloud data corresponding to multiple road sections are uploaded to the edge server or cloud server in real time, waiting for further processing.
[0063] S302, dividing each road section according to a preset value to obtain each divided road section and corresponding target radar point cloud data.
[0064] The preset value may be 100 meters, and no specific limitation is made to the preset value here.
[0065] Exemplarily, each road section is divided into 100 meters to obtain each divided road section and target radar point cloud data corresponding to each divided road section.
[0066] S303: pre-process the target radar point cloud data to obtain coordinates of multiple data points corresponding to each divided road section.
[0067] Specifically, the target radar point cloud data is preprocessed to obtain the coordinates of multiple data points corresponding to each divided road section, including:
[0068] Step A1: According to the filtering algorithm, the target radar point cloud data is subjected to noise filtering to obtain filtered data.
[0069] The radar point cloud data is filtered using filtering algorithms to remove unnecessary interference signals and ensure the purity and accuracy of the data.
[0070] The filtering algorithm may be Kalman filtering, mean filtering, etc.
[0071] Step A2: Convert the filtered data into a road coordinate system to obtain coordinates of a plurality of data points corresponding to each divided road section.
[0072] The filtered data is converted into a road coordinate system to obtain the coordinates of multiple data points corresponding to each divided road section in a unified data format for subsequent processing.
[0073] The coordinates of each data point include X-axis coordinates and Y-axis coordinates, where the X-axis coordinates are {X1, X2, X3...X n}, the Y-axis coordinates are {Y1,Y2,Y3...Y n}, n represents the number of data points, X1 is the horizontal coordinate of the first data point, and Y1 is the vertical coordinate of the first data point. The data point is the corner reflector, and the coordinates of each data point are the coordinates of each corner reflector.
[0074] S304: Determine multiple polynomial fitting orders corresponding to each divided road section according to the coordinates of each data point and a preset angle.
[0075] The preset angles include a first preset angle, a second preset angle and a third preset angle, and the first preset angle, the second preset angle and the third preset angle are different.
[0076] There are three preset angles, which can be 0° to 30°, 30° to 60°, and greater than 60°.
[0077] Specifically, according to the coordinates of each data point and the preset angle, multiple polynomial fitting orders corresponding to each divided road section are determined, including:
[0078] Step B1: Determine the bending angle corresponding to each divided road section according to the coordinates of each data point.
[0079] The bending angle can be obtained by calculating the change in the tangent direction of the road curve. i ,Y i ), the bending angle θ can be expressed as:
[0080]
[0081] Among them, i∈(1,n), represents the i-th data point, Y i is the ordinate of the i-th data point, Y i+1 is the ordinate of the next data point after the ith data point, X i is the horizontal coordinate of the ith data point, X i+1 is the horizontal coordinate of the data point after the ith data point.
[0082] Step B2: Determine whether the bending angle belongs to the first preset angle, the second preset angle or the third preset angle.
[0083] The first preset angle is 0° to 30°, the second preset angle is 30° to 60°, and the third preset angle is greater than 60°.
[0084] It is determined whether the bending angle belongs to 0° to 30°, 30° to 60°, or greater than 60°.
[0085] Step B3: Determine the multiple polynomial fitting orders corresponding to the preset angles to which the bending angle belongs as the multiple polynomial fitting orders corresponding to each divided road section.
[0086] The preset angle is a first preset angle, a second preset angle or a third preset angle.
[0087] The multiple polynomial fit orders are second and third, third and fourth, or fourth and fifth.
[0088] If the preset angle to which the bending angle belongs is the first preset angle, ie, 0° to 30°, and the multiple polynomial fitting orders corresponding to the first preset angle are second order and third order, then the multiple polynomial fitting orders corresponding to each divided road section are second order and third order.
[0089] If the preset angle to which the bending angle belongs is the second preset angle, i.e., 30° to 60°, and the multiple polynomial fitting orders corresponding to the second preset angle are third and fourth order, then the multiple polynomial fitting orders corresponding to each divided road section are third and fourth order.
[0090] If the preset angle to which the bending angle belongs is the third preset angle, that is, greater than 60°, and the multiple polynomial fitting orders corresponding to the third preset angle are fourth and fifth orders, then the multiple polynomial fitting orders corresponding to each divided road section are fourth and fifth orders.
[0091] The second and third order polynomials can be called low-medium order polynomials, which can adapt to slight changes in curvature. The third and fourth order polynomials can be called medium order polynomials, which can adapt to more obvious changes in curvature. The fourth and fifth order polynomials can be called high order polynomials, which can accurately reflect the detailed changes of sharp bends.
[0092] S305: Determine the curve corresponding to each divided road section according to multiple polynomial fitting orders.
[0093] Specifically, according to a plurality of polynomial fitting orders, the curves corresponding to the divided road sections are determined, including:
[0094] Step C1: using a plurality of polynomial fitting orders, respectively fitting each divided road section, and calculating a plurality of fitting errors corresponding to each polynomial fitting order.
[0095] Using multiple polynomial fitting orders, each divided road section is fitted respectively to obtain a calculated value;
[0096] The fitting formula is:
[0097] f(X i )=a0+a1X i +a2X i 2 +...+a m X i m ;
[0098] Among them, f(X i ) is the calculated value, a m is the coefficient, X i is the horizontal coordinate of the ith data point, and m is the polynomial fitting order.
[0099] According to the calculated values, multiple fitting errors corresponding to each polynomial fitting order are calculated using the following formula:
[0100]
[0101] Where MSE is the fitting error, n is the number of data points, i∈(1,n) represents the i-th data point, Y i is the ordinate of the i-th data point, f(X i ) is the calculated value.
[0102] Step C2: determining the multiple polynomial fitting orders corresponding to the minimum fitting error among the multiple fitting errors as the final fitting orders.
[0103] Step C3: Perform curve fitting and smoothing according to the final fitting order to obtain the curve corresponding to each divided road section.
[0104] S306: Calculate the curvature of each curve at multiple different times.
[0105] The curvatures at multiple different moments include the curvature at the current moment and the curvature at the previous moment.
[0106] Curvature analysis is an important geometric analysis method used to evaluate the curvature of a curve. In road monitoring, curvature analysis can help identify subtle changes in road sections, thereby improving the accuracy of geological disaster detection.
[0107] Specifically, the curvature of each curve at multiple different times is calculated, including:
[0108] Step D1: For the function corresponding to each curve, determine the first-order derivative and the second-order derivative.
[0109] The function of each curve is expressed as y=f(x), and the first-order derivative and second-order derivative of the function y=f(x) corresponding to each curve are calculated using the following formula:
[0110] Among them, the first-order derivative of each curve y=f(x) is:
[0111]
[0112] Among them, y' is the first-order derivative of each curve, Y i+1 is the ordinate of the i+1th data point, Y i-1 is the ordinate of the i-1th data point, X i+1 is the horizontal coordinate of the i+1th data point, X i-1 is the horizontal coordinate of the i-1th data point, and i is the i-th data point.
[0113] The second derivative of each curve y=f(x):
[0114]
[0115] Among them, y" is the second-order derivative of each curve, Y i is the ordinate of the i-th data point, X i is the horizontal coordinate of the ith data point.
[0116] Step D2: Calculate the curvature at multiple different moments based on the first-order derivative and the second-order derivative.
[0117] According to the first-order derivative y' and the second-order derivative y", the curvature at multiple different times is calculated using the following formula:
[0118]
[0119] Among them, K b is the curvature at multiple different moments, b is multiple different moments, b includes t-1, t, etc., t-1 is the previous moment, and t is the current moment.
[0120] The curvatures at different times include the curvature K at the previous time t-1 and the curvature K at the current moment t The curvatures at different times can also include K t+1 ,K t+2 ....
[0121] The following steps S307 to S309 are specific operations for determining the curvature change threshold value based on the target curvature value, the empirical coefficient and the weight of each divided road section.
[0122] Use the curvature analysis method to further analyze the shape change of the curve. The change of curvature can help identify abnormal areas. Different curvature change thresholds K are divided according to different road sections. a , and calculate the curvature changes between the current moment and the historical moment to determine whether a geological disaster has occurred.
[0123] S307: Determine the average value corresponding to the curvature at different moments according to the target curvature value and the number of multiple data points.
[0124] Among them, the target curvature value is the curvature value of the road under normal conditions after the radar and corner reflector are deployed.
[0125] Before determining the average value corresponding to the curvature at different times based on the target curvature value and the number of multiple data points, it is necessary to collect the curvature value of the normal road. This can be done by randomly sampling multiple data points, i.e., the target curvature value, for a certain data point within a period of time after the radar and corner reflector are deployed.
[0126] According to the target curvature value and the number of multiple data points, the average value corresponding to the curvature at different times is determined using the following formula:
[0127]
[0128] Among them, μ n is the average value, n is the number of multiple data points, p is the number of acquisitions, K p is the target curvature value.
[0129] S308: Determine a standard deviation according to the average value, the target curvature value, and the number of multiple data points.
[0130] Based on the mean value, target curvature value, and the number of data points, the standard deviation is determined using the following formula:
[0131]
[0132] Among them, σ n is the standard deviation, n is the number of data points, i∈(1,n) represents the i-th data point, K p is the target curvature value, μ n is the average value.
[0133] S309: Determine a curvature change threshold value according to the standard deviation, the empirical coefficient, the average value, and the weight of each divided road section.
[0134] The weight is a first weight, a second weight or a third weight. The first weight is the weight of each divided road section belonging to the first preset road section category, the second weight is the weight of each divided road section belonging to the second preset road section category, and the third weight is the weight of each divided road section belonging to the third preset road section category. The first weight, the second weight and the third weight are all different.
[0135] The empirical coefficient is between 2 and 3.
[0136] The first preset road section category is a straight line and a slightly curved road section, the second preset road section category is a medium curved road section, and the third preset road section category is a sharp curve and other complex road sections.
[0137] The first weight is 1, corresponding to straight lines and slightly curved sections. The second weight is 1.2, corresponding to medium curves, and the third weight is 1.5, corresponding to sharp bends and other complex sections.
[0138] Specifically, the curvature change threshold is determined according to the standard deviation, the empirical coefficient, the average value and the weight of each divided road section, including:
[0139] According to the standard deviation, empirical coefficient, and mean value, the basic curvature threshold is determined using the following formula:
[0140] Ks =μ n ±kσ n ;
[0141] Among them, K s is the basic curvature threshold, μ n is the average value, k is the empirical coefficient, which is between 2 and 3, and σ n is the average value, and n is the number of data points.
[0142] According to the basic curvature threshold and the weight of each divided road section, the curvature change threshold is determined using the following formula:
[0143] K a =αK s ;
[0144] Among them, K a is the curvature change threshold, K s is the basic curvature threshold, α is the weight of each divided road section, the first weight of straight and slightly curved road sections is 1, the second weight of medium curved road sections is 1.2, and the third weight of other complex road sections such as sharp bends is 1.5.
[0145] The following steps S210 to S213 are specific operations for determining the warning level corresponding to each divided road section according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold.
[0146] The curvature at the current moment includes the curvatures of multiple first data points, and the curvature at the previous moment includes the curvatures of multiple second data points.
[0147] The curvature at the current moment is represented by K t , the curvature of the first data points is represented by K t,1 ,K t,2 ...K t,n , the curvature at the last moment is represented by K t-1 , the curvature of multiple second data points is represented by K t-1,1 ,K t-1,2 ...K t-1,n .
[0148] By analyzing multiple curvature changes, the severity of the change is determined. A larger change usually means a more serious geological disaster risk, and based on multiple curvature changes, each divided road section is divided into different warning risk levels (such as no risk warning level, low risk warning level, medium risk warning level and high risk warning level).
[0149] S310, taking the absolute value of the difference between the curvature of each first data point and the curvature of each corresponding second data point to obtain a plurality of curvature change amounts.
[0150] The multiple curvature changes are the curvature changes at the current moment relative to the historical moment, that is, the previous moment.
[0151] The curvature K of each first data point t,1 ,K t,2 ...K t,n The curvature K of each corresponding second data point t-1,1 ,K t-1,2 ...K t-1,n , using the following formula, taking the absolute value of the difference, we can get multiple curvature changes ΔK:
[0152] |K t,1 -K (t-1),1 |,|K t,2 -K (t-1),2 |....|K t,n -K (t-1),n |;
[0153] Among them, K t,n is the curvature of the nth first data point corresponding to the current moment, K (t-1),n is the curvature of the nth second data point corresponding to the previous moment.
[0154] S311 . Compare a plurality of curvature changes with a plurality of preset threshold ranges respectively, and determine at least one preset warning level corresponding to the plurality of curvature changes according to a correspondence between each preset threshold and a corresponding preset warning level.
[0155] Among them, the multiple preset threshold ranges are threshold ranges determined according to the curvature change threshold. The number of at least one warning level includes one and at least two. The multiple preset threshold ranges include a first preset threshold range, a second preset threshold range, a third preset threshold range and a fourth preset threshold range, and the first preset threshold range, the second preset threshold range, the third preset threshold range and the fourth preset threshold range are all different. The warning level includes a no-risk warning level, a low-risk warning level, a medium-risk warning level and a high-risk warning level.
[0156] The plurality of preset threshold ranges may include four: the first preset threshold range is ΔK≤K a , the second preset threshold range is K a <ΔK≤1.5K a , the third preset threshold range is 1.5K a <ΔK≤2K a , the fourth preset threshold range is ΔK>2K a .
[0157] The corresponding relationship between each preset threshold and the corresponding preset warning level is: the first preset threshold range ΔK≤K aCorresponding to the no-risk preset warning level, the second preset threshold range K a <ΔK≤1.5K a The corresponding low risk preset warning level, the third preset threshold range is 1.5K a <ΔK≤2K a Corresponding to the medium risk preset warning level, the fourth preset threshold range ΔK>2K a The corresponding warning level is high risk.
[0158] The system does not issue a warning when there is no risk preset warning level; the low risk preset warning level indicates that there may be slight geological activity, and the system issues a low-level warning; the medium risk preset warning level indicates that there is a greater risk of geological activity, and the system issues a medium-level warning; the high risk preset warning level indicates that serious geological disasters may occur, the system issues a high-level warning, and initiates emergency response measures.
[0159] Specifically, the plurality of curvature changes are compared with a plurality of preset threshold ranges respectively, and at least one preset warning level corresponding to the plurality of curvature changes is determined according to a correspondence between each preset threshold range and a corresponding preset warning level, including:
[0160] Step E1: compare a plurality of curvature variation amounts with a first preset threshold range, a second preset threshold range, a third preset threshold range, and a fourth preset threshold range respectively.
[0161] The multiple curvature changes ΔK are respectively compared with the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a , the third preset threshold range 1.5K a <ΔK≤2K a and the fourth preset threshold range ΔK>2K a Make a comparison.
[0162] Step E2: If the multiple curvature changes all belong to the first preset threshold range, the second preset threshold range, the third preset threshold range or the fourth preset threshold range, the number of preset warning levels corresponding to the multiple curvature changes is one.
[0163] If the multiple curvature changes ΔK all fall within the first preset threshold range ΔK≤K a , or, the multiple curvature changes ΔK all belong to the second preset threshold range K a <ΔK≤1.5K a , or, the multiple curvature changes ΔK all belong to the third preset threshold range 1.5K a <ΔK≤2K a , or, the multiple curvature changes ΔK all belong to the fourth preset threshold range ΔK>2Ka , then the number of preset warning levels corresponding to multiple curvature changes is one.
[0164] Step E3: determining a preset warning level corresponding to the multiple curvature changes according to the corresponding relationship between the preset threshold ranges to which the multiple curvature changes belong and the corresponding preset warning levels.
[0165] If the multiple curvature changes ΔK all fall within the first preset threshold range ΔK≤K a , the number of preset warning levels corresponding to the multiple curvature changes is one, and the multiple curvature changes ΔK belong to the first preset threshold range ΔK≤K a , the first preset threshold range ΔK≤K a Corresponding to the risk-free preset warning level, a preset warning level corresponding to the multiple curvature changes is determined as the risk-free preset warning level.
[0166] Alternatively, if the multiple curvature changes ΔK all belong to the second preset threshold range K a <ΔK≤1.5K a , the number of preset warning levels corresponding to the multiple curvature changes is one, and the multiple curvature changes ΔK belong to the second preset threshold range K a <ΔK≤1.5K a , the second preset threshold range K a <ΔK≤1.5K a Corresponding to a low-risk preset warning level, a preset warning level corresponding to a plurality of curvature changes is determined as the low-risk preset warning level.
[0167] Alternatively, if the multiple curvature changes ΔK all belong to the third preset threshold range 1.5K a <ΔK≤2K a , the number of preset warning levels corresponding to the multiple curvature changes is one, and the multiple curvature changes ΔK belong to the third preset threshold range 1.5K a <ΔK≤2K a , the third preset threshold range is 1.5K a <ΔK≤2K a Corresponding to the medium risk preset warning level, a preset warning level corresponding to the multiple curvature changes is determined as the medium risk preset warning level.
[0168] Alternatively, if the multiple curvature changes ΔK all belong to the fourth preset threshold range ΔK>2K a , the number of preset warning levels corresponding to the multiple curvature changes is one, and the multiple curvature changes ΔK belong to the fourth preset threshold range ΔK>2K a , the fourth preset threshold range ΔK>2K aCorresponding to the high-risk preset warning level, a preset warning level corresponding to the multiple curvature changes is determined as the high-risk preset warning level.
[0169] Step E4: If the multiple curvature changes belong to any at least two of the first preset threshold range, the second preset threshold range, the third preset threshold range and the fourth preset threshold range, the number of preset warning levels corresponding to the multiple curvature changes is at least two.
[0170] For example, if the multiple curvature changes ΔK belong to the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a When the multiple curvature changes ΔK belong to the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a , the third preset threshold range 1.5K a <ΔK≤2K a When , the number of preset warning levels corresponding to the multiple curvature changes is three. If the multiple curvature changes ΔK belong to the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a , the third preset threshold range 1.5K a <ΔK≤2K a , the fourth preset threshold range ΔK>2K a When , the number of preset warning levels corresponding to the multiple curvature changes is four.
[0171] Step E5: Determine at least two preset warning levels corresponding to the multiple curvature changes according to the corresponding relationship between the multiple preset threshold ranges to which the multiple curvature changes belong and the corresponding preset warning levels.
[0172] Following the example of step E4, the multiple curvature changes ΔK belong to the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a , the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a The corresponding preset warning levels are the no-risk preset warning level and the low-risk preset warning level, respectively. The two preset warning levels corresponding to the multiple curvature changes are determined to be the low-risk preset warning level and the medium-risk preset warning level. The multiple curvature changes ΔK belong to the first preset threshold range ΔK≤Ka , the second preset threshold range K a <ΔK≤1.5K a , the third preset threshold range 1.5K a <ΔK≤2K a , the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a , the third preset threshold range 1.5K a <ΔK≤2K a The corresponding preset warning levels are no risk preset warning level, low risk preset warning level and medium risk preset warning level, respectively. The three preset warning levels corresponding to the multiple curvature changes are determined to be no risk preset warning level, low risk preset warning level and medium risk preset warning level. The multiple curvature changes ΔK belong to the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a , the third preset threshold range 1.5K a <ΔK≤2K a , the fourth preset threshold range ΔK>2K a , the first preset threshold range ΔK≤K a , the second preset threshold range K a <ΔK≤1.5K a , the third preset threshold range 1.5K a <ΔK≤2K a , the fourth preset threshold range ΔK>2K a The corresponding preset warning levels are no-risk preset warning level, low-risk preset warning level, medium-risk preset warning level and high-risk preset warning level, and the four preset warning levels corresponding to multiple curvature changes are determined as no-risk preset warning level, low-risk preset warning level, medium-risk preset warning level and high-risk preset warning level.
[0173] S312: If the number of preset warning levels is one, determine one preset warning level as the warning level corresponding to each divided road section.
[0174] Exemplarily, if a preset warning level is determined, and the preset warning level is a low-risk preset warning level, the low-risk preset warning level is determined as the warning level corresponding to the divided road section. The warning level corresponding to the divided road section is the low-risk warning level. If a preset warning level is determined, and the preset warning level is a high-risk preset warning level, the high-risk preset warning level is determined as the warning level corresponding to the divided road section. The warning level corresponding to the divided road section is the high-risk warning level.
[0175] S313: If the number of preset warning levels is at least two, the highest preset warning level among the at least two preset warning levels is determined as the warning level corresponding to each divided road section.
[0176] For example, if two preset warning levels are determined, and the two preset warning levels are respectively a low-risk preset warning level and a medium-risk preset warning level, then the medium-risk preset warning level is determined as the warning level corresponding to the divided road section, and the warning level corresponding to the divided road section is the medium-risk warning level. If three preset warning levels are determined, and the preset warning levels are respectively a low-risk preset warning level, a medium-risk preset warning level, and a high-risk preset warning level, then the high-risk preset warning level is determined as the warning level corresponding to the divided road section, and the warning level corresponding to the divided road section is the high-risk warning level.
[0177] After determining the warning level corresponding to each divided road section, it is also necessary to upload and publish the warning level corresponding to each divided road section. Specifically, data upload: data is transmitted to the cloud server and big data monitoring platform through two data upload channels, one for daily data backup and the other for warning information release. The daily data backup channel uploads the radar processed data to the cloud server for subsequent review and analysis. The warning information release channel is dedicated. If the possibility of geological disasters is predicted, the warning information can be uploaded in time through a special channel to reduce the delay in the transmission process.
[0178] Data release: When the warning information is received, the release module will quickly send the warning information to relevant departments and personnel, as well as vehicles running on the road through SMS, email, APP push, etc. Ensure the accuracy and timeliness of the warning information, so that relevant personnel can take timely response measures. In addition, in the monitoring center, road monitoring data and warning information are displayed in real time through data visualization tools.
[0179] In particular, roadside information boards can be placed at appropriate locations in front of key monitoring areas or all information boards on the road can be linked to release early warning information in real time. Early warning information can be displayed on the information board as soon as possible to remind passing vehicles to pay attention and reduce the occurrence of safety accidents. According to the prediction level, the prediction road information board is linked to release early warning information on the road ahead in real time.
[0180] The beneficial effects of the method of the present invention are specifically analyzed from the aspects of real-time performance, cost, accuracy and algorithm.
[0181] In terms of real-time performance, the system of the present invention can achieve all-weather real-time monitoring after installation and deployment. Data is transmitted to the cloud server through two data upload channels, one for daily data backup and the other for early warning information release, to ensure the rapid transmission of early warning information. Once the possibility of road geological disasters is predicted, the system will send the information to the communication terminals of relevant departments or personnel through the big data platform as soon as possible to ensure that they can take necessary countermeasures as soon as possible.
[0182] In terms of cost, millimeter-wave radar has significant cost advantages, with relatively low manufacturing costs, mature technology and sufficient market supply. The miniaturized design of the equipment not only reduces material and production costs, but also makes it easy to install and maintain, further reducing overall operating costs. The high reliability and long life of millimeter-wave radar significantly reduce the frequency and cost of equipment replacement and maintenance. In addition, the wide coverage capability and versatility of the millimeter-wave radar system means that a large range of monitoring can be achieved with less equipment, further saving equipment procurement and deployment costs. These advantages make millimeter-wave radar a cost-effective option, especially for application scenarios that require large-scale, long-term monitoring, such as geological disaster early warning and intelligent transportation systems.
[0183] In terms of accuracy, the system of the present invention has obvious advantages in accuracy, ensuring reliable geological disaster early warning support under various environmental conditions. Millimeter-wave radar technology is not easily interfered by natural factors such as vegetation, weather and terrain, and can work stably in complex environments such as rainy days, foggy days and at night, ensuring the continuity and accuracy of monitoring data. The high-resolution millimeter-wave radar can accurately identify small position changes and curve shape changes of the corner reflector. The corner reflector design with strong anti-interference ability improves the reliability of the signal and the accuracy of the monitoring data. The big data platform uses machine learning algorithms to improve the accuracy of anomaly detection by comparing and analyzing historical data and real-time data, so that the system can more accurately identify early signals of geological disasters.
[0184] In terms of algorithms, this curvature analysis-based geological disaster monitoring algorithm has unique advantages over traditional monitoring methods by accurately calculating the difference between the current curve and the historical curve. The curve analysis method has high sensitivity and high precision, and can detect slight changes in the surface. Through subtle deformation of the curve, it can accurately identify subtle changes in the surface morphology. It has strong robustness to environmental noise and can work accurately in complex terrain and changing environments. Adaptive polynomial fitting curve generation and real-time curve analysis support rapid response and timely warning, enabling the system to automatically learn and identify precursors of geological disasters, significantly improving the accuracy and reliability of warnings. These advantages ensure that the system provides timely and accurate geological disaster warnings in complex environments, effectively ensuring road safety.
[0185] Based on the same inventive concept, as an implementation of the above-mentioned road geological disaster monitoring and early warning method based on millimeter wave radar, an embodiment of the present invention also provides a road geological disaster monitoring and early warning device based on millimeter wave radar. Figure 4 is a structural diagram of the device in the embodiment of the present invention, see Figure 4 As shown, the device may include:
[0186] The acquisition module 401 is used to acquire radar point cloud data corresponding to multiple road sections;
[0187] A division module 402 is used to divide each road section according to a preset value to obtain each divided road section and corresponding target radar point cloud data;
[0188] A preprocessing module 403 is used to preprocess the target radar point cloud data to obtain the coordinates of multiple data points corresponding to each divided road section;
[0189] A first determination module 404 is used to determine a plurality of polynomial fitting orders corresponding to each divided road section according to the coordinates of each data point and a preset angle;
[0190] The second determination module 405 is used to determine the curve corresponding to each divided road section according to a plurality of polynomial fitting orders;
[0191] A calculation module 406, used to calculate the curvature of each curve at multiple different moments, where the curvatures at multiple different moments include the curvature at the current moment and the curvature at the previous moment;
[0192] The third determination module 407 is used to determine the curvature change threshold value according to the target curvature value, the empirical coefficient and the weight of each divided road section;
[0193] The fourth determination module 408 is used to determine the warning level corresponding to each divided road section according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold.
[0194] The preprocessing module 403 is specifically used to filter the noise of the target radar point cloud data according to the filtering algorithm to obtain filtered data; convert the filtered data into a road coordinate system to obtain the coordinates of multiple data points corresponding to each divided road section.
[0195] The first determination module 404 is specifically used to determine the bending angle corresponding to each divided road section according to the coordinates of each data point; determine whether the bending angle belongs to the first preset angle, the second preset angle or the third preset angle; determine the multiple polynomial fitting orders corresponding to the preset angle to which the bending angle belongs as the multiple polynomial fitting orders corresponding to each divided road section, the preset angles include the first preset angle, the second preset angle and the third preset angle, and the first preset angle, the second preset angle and the third preset angle are different.
[0196] The second determination module 405 is specifically used to use multiple polynomial fitting orders to fit each divided road section respectively, and calculate multiple fitting errors corresponding to each polynomial fitting order; determine the multiple polynomial fitting orders corresponding to the minimum fitting error among the multiple fitting errors as the final fitting order; perform curve fitting and smoothing according to the final fitting order to obtain the curve corresponding to each divided road section.
[0197] The calculation module 406 is specifically used to determine the first-order derivative and the second-order derivative of the function corresponding to each curve; and calculate the curvature at multiple different moments according to the first-order derivative and the second-order derivative.
[0198] The third determination module 407 is specifically used to determine the average value corresponding to the curvature at different times according to the target curvature value and the number of multiple data points; determine the standard deviation according to the average value, the target curvature value and the number of multiple data points; determine the curvature change threshold according to the standard deviation, the empirical coefficient, the average value and the weight of each divided section, the weight is the first weight, the second weight or the third weight, the first weight is the weight of each divided section belonging to the first preset section category, the second weight is the weight of each divided section belonging to the second preset section category, and the third weight is the weight of each divided section belonging to the third preset section category, and the first weight, the second weight and the third weight are all different.
[0199] The fourth determination module 408 is specifically used to take the absolute value of the difference between the curvature of each first data point and the curvature of the corresponding second data point to obtain multiple curvature change quantities; compare the multiple curvature change quantities with multiple preset threshold ranges respectively, and determine at least one preset warning level corresponding to the multiple curvature change quantities based on the correspondence between each preset threshold range and the corresponding preset warning level, the number of at least one warning level includes one and at least two, and the multiple preset threshold ranges are threshold ranges determined based on the curvature change threshold; if the number of preset warning levels is one, determine one preset warning level as the warning level corresponding to each divided road section; if the number of preset warning levels is at least two, determine the highest preset warning level among the at least two preset warning levels as the warning level corresponding to each divided road section, the curvature at the current moment includes the curvatures of multiple first data points, and the curvature at the previous moment includes the curvatures of multiple second data points.
[0200] The fourth determination module 408 compares the multiple curvature changes with the multiple preset threshold ranges respectively, and determines at least one preset warning level corresponding to the multiple curvature changes according to the corresponding relationship between each preset threshold range and the corresponding preset warning level, including: comparing the multiple curvature changes with the first preset threshold range, the second preset threshold range, the third preset threshold range and the fourth preset threshold range respectively; if the multiple curvature changes all belong to the first preset threshold range, the second preset threshold range, the third preset threshold range or the fourth preset threshold range, then the number of preset warning levels corresponding to the multiple curvature changes is one; according to the corresponding relationship between the preset threshold ranges to which the multiple curvature changes belong and the corresponding preset warning levels, determining A preset warning level corresponding to multiple curvature changes is determined; if the multiple curvature changes belong to any at least two of a first preset threshold range, a second preset threshold range, a third preset threshold range and a fourth preset threshold range, the number of preset warning levels corresponding to the multiple curvature changes is at least two; according to the correspondence between the multiple preset threshold ranges to which the multiple curvature changes belong and the corresponding preset warning levels, at least two preset warning levels corresponding to the multiple curvature changes are determined, the multiple preset threshold ranges include a first preset threshold range, a second preset threshold range, a third preset threshold range and a fourth preset threshold range, and the first preset threshold range, the second preset threshold range, the third preset threshold range and the fourth preset threshold range are all different.
[0201] The fourth determination module 408, the warning level includes a no-risk warning level, a low-risk warning level, a medium-risk warning level, and a high-risk warning level.
[0202] It should be pointed out here that the above description of the embodiment of the road geological disaster monitoring and early warning device based on millimeter wave radar is similar to the description of the above method embodiment, and has similar beneficial effects as the method embodiment. For technical details not disclosed in the embodiment of the road geological disaster monitoring and early warning device based on millimeter wave radar in the embodiment of the present invention, please refer to the description of the method embodiment of the present invention for understanding.
[0203] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A road geological disaster monitoring and early warning method based on millimeter wave radar, characterized in that: The road geological disaster monitoring and early warning method comprises: Collect radar point cloud data corresponding to multiple road sections; Divide each road section according to the preset value to obtain each divided road section and the corresponding target radar point cloud data; Preprocessing the target radar point cloud data to obtain coordinates of multiple data points corresponding to each divided road section; Determining multiple polynomial fitting orders corresponding to each divided road section according to the coordinates of each data point and a preset angle; Determining the curves corresponding to the divided road sections according to the multiple polynomial fitting orders; Calculating the curvature of each curve at a plurality of different moments, wherein the curvatures at a plurality of different moments include the curvature at a current moment and the curvature at a previous moment; Determine the curvature change threshold according to the target curvature value, the empirical coefficient and the weight of each divided road section; The warning level corresponding to each divided road section is determined according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold.
2. The road geological disaster monitoring and early warning method according to claim 1 is characterized in that: The preprocessing of the target radar point cloud data to obtain the coordinates of a plurality of data points corresponding to each divided road section includes: According to a filtering algorithm, noise filtering is performed on the target radar point cloud data to obtain filtered data; The filtered data is converted into a road coordinate system to obtain coordinates of a plurality of data points corresponding to each divided road section.
3. The road geological disaster monitoring and early warning method according to claim 1 is characterized in that: The preset angles include a first preset angle, a second preset angle, and a third preset angle, the first preset angle, the second preset angle, and the third preset angle are different, and determining the multiple polynomial fitting orders corresponding to the divided road sections according to the coordinates of each data point and the preset angles includes: Determining the bending angle corresponding to each divided road section according to the coordinates of each data point; Determining that the bending angle belongs to the first preset angle, the second preset angle or the third preset angle; The multiple polynomial fitting orders corresponding to the preset angle to which the bending angle belongs are determined as the multiple polynomial fitting orders corresponding to the divided road sections.
4. The road geological disaster monitoring and early warning method according to claim 1 is characterized in that: The step of determining the curves corresponding to the divided road sections according to the multiple polynomial fitting orders includes: Using the multiple polynomial fitting orders, fitting each of the divided road sections respectively, and calculating multiple fitting errors corresponding to each polynomial fitting order; Determine the multiple polynomial fitting orders corresponding to the minimum fitting error among the multiple fitting errors as the final fitting orders; Curve fitting and smoothing are performed according to the final fitting order to obtain curves corresponding to the divided road sections.
5. The road geological disaster monitoring and early warning method according to claim 1 is characterized in that: The step of calculating the curvature of each curve at multiple different moments includes: For the functions corresponding to the curves, determining first-order derivatives and second-order derivatives; The curvatures at the multiple different moments are calculated according to the first-order derivative and the second-order derivative.
6. The road geological disaster monitoring and early warning method according to claim 1 is characterized in that: Determining the curvature change threshold according to the target curvature value, the empirical coefficient and the weight of each divided road section includes: Determine, according to the target curvature value and the number of multiple data points, an average value corresponding to the curvature at different moments; Determining a standard deviation according to the average value, the target curvature value, and the number of the plurality of data points; The curvature change threshold is determined based on the standard deviation, the empirical coefficient, the average value and the weight of each divided road section, the weight is the first weight, the second weight or the third weight, the first weight is the weight of each divided road section belonging to the first preset road section category, the second weight is the weight of each divided road section belonging to the second preset road section category, the third weight is the weight of each divided road section belonging to the third preset road section category, and the first weight, the second weight and the third weight are all different.
7. The road geological disaster monitoring and early warning method according to claim 1 is characterized in that: The curvature at the current moment includes the curvatures of a plurality of first data points, the curvature at the previous moment includes the curvatures of a plurality of second data points, and determining the warning level corresponding to each divided road section according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold, includes: Taking the absolute value of the difference between the curvature of each first data point and the curvature of each corresponding second data point to obtain a plurality of curvature changes; Comparing the multiple curvature change amounts with multiple preset threshold ranges respectively, and determining at least one preset warning level corresponding to the multiple curvature change amounts according to a corresponding relationship between each preset threshold range and a corresponding preset warning level, wherein the number of the at least one warning level includes one and at least two, and the multiple preset threshold ranges are threshold ranges determined according to the curvature change threshold; If the number of the preset warning levels is one, determining one preset warning level as the warning level corresponding to each divided road section; If the number of the preset warning levels is at least two, the highest preset warning level among the at least two preset warning levels is determined as the warning level corresponding to each divided road section.
8. The road geological disaster monitoring and early warning method according to claim 7 is characterized in that: The multiple preset threshold ranges include a first preset threshold range, a second preset threshold range, a third preset threshold range and a fourth preset threshold range, and the first preset threshold range, the second preset threshold range, the third preset threshold range and the fourth preset threshold range are all different; The comparing the multiple curvature changes with multiple preset threshold ranges respectively, and determining at least one preset warning level corresponding to the multiple curvature changes according to the corresponding relationship between each preset threshold range and the corresponding preset warning level, includes: Comparing the multiple curvature changes with the first preset threshold range, the second preset threshold range, the third preset threshold range, and the fourth preset threshold range respectively; If the multiple curvature changes all belong to the first preset threshold range, the second preset threshold range, the third preset threshold range or the fourth preset threshold range, the number of preset warning levels corresponding to the multiple curvature changes is one; Determining the one preset warning level corresponding to the multiple curvature changes according to the corresponding relationship between the preset threshold ranges to which the multiple curvature changes belong and the corresponding preset warning levels; If the multiple curvature changes belong to any at least two of the first preset threshold range, the second preset threshold range, the third preset threshold range, and the fourth preset threshold range, the number of preset warning levels corresponding to the multiple curvature changes is at least two; At least two preset warning levels corresponding to the multiple curvature changes are determined according to the correspondence between the multiple preset threshold ranges to which the multiple curvature changes belong and the corresponding preset warning levels.
9. The road geological disaster monitoring and early warning method according to any one of claims 7 and 8, characterized in that: The warning levels include no risk warning level, low risk warning level, medium risk warning level and high risk warning level.
10. A road geological disaster monitoring and early warning device based on millimeter wave radar, characterized in that: The road geological disaster monitoring and early warning device comprises: A collection module, used to collect radar point cloud data corresponding to multiple road sections; A division module is used to divide each road section according to a preset value to obtain radar point cloud data of each divided road section and the corresponding target; A preprocessing module, used for preprocessing the target radar point cloud data to obtain the coordinates of a plurality of data points corresponding to each divided road section; A first determination module, used to determine a plurality of polynomial fitting orders corresponding to each divided road section according to the coordinates of each data point and a preset angle; A second determination module, configured to determine the curves corresponding to the divided road sections according to the multiple polynomial fitting orders; A calculation module, used to calculate the curvature of each curve at multiple different moments, wherein the curvatures at multiple different moments include the curvature at the current moment and the curvature at the previous moment; A third determination module is used to determine a curvature change threshold value according to a target curvature value, an empirical coefficient and a weight of each divided road section; The fourth determination module is used to determine the warning level corresponding to each divided road section according to the curvature at the current moment, the curvature at the previous moment and the curvature change threshold.
Citation Information
Cited By
Anti-deception jamming method and system based on dynamic weight and time sequence constraint
CN122260241A