Method for determining collaborative development step pitch of transverse mining working side and inner dumping site of open pit coal mine
By obtaining the physical and mechanical parameters of rock and soil and slope morphological parameters in open-pit coal mines, we design and simulate different step spacing schemes, determine the optimal step spacing, and solve the problem of coordinated development of cross mining work gangs and internal dumping yards under three-dimensional conditions. The determination of the problem has improved slope stability and mining efficiency, and reduced costs and transportation distances.
Patent Information
- Application Number
- CN202410888990.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-10-08
AI Technical Summary
In open-pit coal mining, existing technology has not been able to effectively solve this problem: how to determine the step distance for the coordinated development of the cross-mining working gang and the internal dumping field under three-dimensional conditions to ensure the stability of tall composite slopes.
By obtaining the physical and mechanical parameters of the geotechnical body of each stratum lithology and the slope shape parameters of the stope and dump site, we design different collaborative development step plans, establish a three-dimensional numerical simulation model, and use FLAC3D numerical simulation software to calculate the stability coefficient , compare the results to determine the optimal step distance to ensure that the safety reserve factor from the stope to the boundary slope meets the requirements.
It realizes the rapid and full occupation of the inner soil dump space while ensuring the stability of the slope, shortens the stripping distance, reduces the mining cost, overcomes the shortcomings of the lag in the development of the inner dump yard and the large transportation distance in the traditional design, and optimizes the economy, technology, and Designed for safety and time.
Smart Images

Figure CN118747394A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of open-pit coal mining, and in particular to a method for determining the step distance of coordinated development of a horizontal mining working platform and an inner spoil dump in an open-pit coal mine. Background Art
[0002] Rapid occupation of the inner dump is an important way to achieve safe, efficient and green mining in open-pit coal mines. However, the stability of the high composite slope formed by the slope to the boundary mining area directly threatens the safety of open-pit coal mine workers and equipment. As the mining area moves forward, the follow-up of the inner dump can support the slope from the mining area to the boundary and improve the stability of the slope. However, how to determine the development step of the inner dump has become a problem to be solved.
[0003] Patent CN113742949A discloses a method for determining the mining width of a high-position coal seam in a composite coal seam open-pit coal mine. On the premise of determining the physical and mechanical parameters of each stratum, a slope geological model is constructed to determine the safety reserve coefficient of the local slope from the bottom plate of each coal seam to the surface, and the width of each flat plate is adjusted so that the adjusted slope meets the stability requirements. Finally, the difference before and after the adjustment of each flat plate is summed to obtain the mining width between coal seams; Patent CN117365485A discloses a method for controlling the mining of inclined inner row tracking pressure wall slope stability. On the premise of obtaining the base inclination angle of the dump in the mining area, the slope angle of the inner dump, and the slope angle of the working wall of the mining area, a spatial geometric model of the mining area, the inner dump, the end wall and the base is constructed, and the inner dump is divided into area I and area II; based on the maximum utilization of the inner row space, the working wall of the mining area is realized. The mathematical expression of the arrangement of the dumping line of an open-pit coal mine is derived based on the process conditions, and the influence of the arrangement of the working line of the mining field and the slope angle, the slope angle of the inner dumping field, and the base inclination angle on the arrangement of the dumping line are theoretically revealed; Patent CN112214867A discloses a method for co-optimizing the mining boundary and mining procedure of an open-pit coal mine under complex coal seam conditions, which determines the mining procedure plan by constructing a mining boundary model, an external dumping field boundary model, and a three-dimensional geological model, calculates the location and quantity of each year's stripping project, plans the location of each project in the mining field, and the flow direction and flow of various stripping materials, and optimizes the utilization plan of the inner dumping field; These patents are all studies on the method for determining the step distance of the coordinated development of the horizontal working side and the inner dumping field of an open-pit coal mine, but they do not consider the problem of determining the step distance of the coordinated development of the horizontal working side and the inner dumping field under three-dimensional conditions. Therefore, there is an urgent need for a method for determining the step distance of the coordinated development of the horizontal working side and the inner dumping field of an open-pit coal mine, which provides technical support for the development of the working side and the inner dumping field of an open-pit coal mine. Summary of the invention
[0004] The purpose of the present invention is to provide a method for determining the coordinated development step distance between the horizontal mining working side and the inner dump in an open-pit coal mine. Under three-dimensional conditions, the coordinated development step distance between the horizontal mining working side and the inner dump is determined, and the inner dump space is quickly and fully occupied while ensuring the stability of the high composite slope.
[0005] To achieve the above object, the present invention provides the following solutions:
[0006] A method for determining the step distance of coordinated development between a horizontal working side and an inner dump in an open-pit coal mine, the method comprising the following steps:
[0007] S1, based on the engineering geological characteristics of the study area, obtain the physical and mechanical parameters of the rock and soil of each stratum lithology;
[0008] S2, based on the open-pit coal mining design and operation parameters, obtain the slope morphology parameters of the stope and dump in the study area;
[0009] S3, design different coordinated development step plans according to the physical and mechanical parameters of the rock and soil of each stratum lithology and the slope morphological parameters of the stope and spoil dump in the study area, and establish the corresponding three-dimensional numerical simulation model;
[0010] S4, the three-dimensional numerical simulation models corresponding to different coordinated development step length schemes are used to calculate the stability coefficient using FLAC3D numerical simulation software. The calculation results are compared with the safety reserve coefficient K of the slope from the stope to the boundary to obtain the optimal step length for the coordinated development of the working side and the inner dump.
[0011] Furthermore, in S2, the slope morphological parameters of the stope and spoil dump in the research area specifically include:
[0012] The step height, flat plate width and slope angle from the mining area to the boundary slope, working side and internal and external dumping areas.
[0013] Furthermore, in S3, different coordinated development step schemes are designed according to the physical and mechanical parameters of the rock and soil bodies of each stratum lithology and the slope morphological parameters of the stope and spoil dump in the study area, and a corresponding three-dimensional numerical simulation model is established, specifically including:
[0014] S3.1, based on the physical and mechanical parameters of the rock and soil of each stratum lithology and the slope morphological parameters of the stope and spoil dump in the study area, a three-dimensional DEM model of the mining face is established using three-dimensional modeling technology;
[0015] S3.2, design different coordinated development step plans, and establish the corresponding three-dimensional numerical simulation model based on the three-dimensional DEM model of the mining working face using three-dimensional numerical simulation technology.
[0016] Furthermore, the three-dimensional DEM model of the mining working face is established by using the three-dimensional modeling technology, and the specific steps are as follows:
[0017] (1) Establish a three-dimensional wireframe model of the mining working face;
[0018] (2) Adjust the working line position or adjust the model parameters;
[0019] (3) Generate a three-dimensional DEM model of the mining working surface.
[0020] Furthermore, the three-dimensional numerical simulation technology is used to establish a corresponding three-dimensional numerical simulation model, and the specific steps are as follows:
[0021] (1) Based on the 3D DEM model of the mold working surface, the terrain lines with elevation data are imported into 3Dmine to generate a DTM triangulated network, which is then imported into Rhino software to generate a terrain surface using the curtain tool;
[0022] (2) Use surface tools to establish a geological interface that is consistent with the actual situation on site, and finally use the split command to cut off the redundant geometric elements to establish the geometric model required for numerical simulation;
[0023] (3) Use the Rhino meshing tool to simply divide the geometric model, and then use the Griddle plug-in to check and adjust the input Rhino mesh;
[0024] (4) Use Griddle to re-divide the adjusted mesh into a triangular mesh;
[0025] (5) Use Griddle GVol to output a three-dimensional numerical simulation model that can be recognized by numerical simulation software.
[0026] Furthermore, in S4, the three-dimensional numerical simulation models corresponding to different coordinated development step length schemes are calculated using FLAC3D numerical simulation software, and the calculation results are compared with the safety reserve coefficient K of the stope-to-boundary slope to obtain the optimal step length for the coordinated development of the working side and the inner dump, which specifically includes:
[0027] S4.1, obtain the stability coefficient of the final boundary slope of the stope under different coordinated development step distance schemes of the working side and the inner dump;
[0028] S4.2, compare the stability coefficient of the final slope from the stope to the boundary with the safety reserve coefficient K of the slope from the stope to the boundary, and obtain the optimal step distance for the coordinated development of the working side and the inner dump that meets the conditions.
[0029] Furthermore, the condition is satisfied, which means that the stability coefficient of the final slope to the boundary of the mining area is not lower than the safety reserve coefficient K of the slope to the boundary of the mining area.
[0030] Furthermore, in S4, the safety reserve coefficient K of the slope from the stope to the boundary is determined according to the service life and specifications of the slope.
[0031] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects: the method for determining the step size of the coordinated development of the working side and the inner dump of the horizontal mining of an open-pit coal mine provided by the present invention designs different coordinated development step size schemes according to the physical and mechanical parameters of the rock and soil bodies of each stratum lithology and the slope morphological parameters of the mining area and the dump, and establishes a corresponding three-dimensional numerical simulation model to calculate the stability coefficient under different coordinated development step size schemes, and compares it with the safety reserve coefficient K of the mining area to the boundary slope, so as to obtain the optimal step size for the coordinated development of the working side and the inner dump; the present invention realizes the rapid and full occupation of the inner dump space under the premise of ensuring the stability of the tall slope formed by the mining area to the boundary slope, can shorten the stripping and transportation distance, reduce the cost of open-pit coal mining, overcomes the shortcomings of the traditional design of the inner dumping area with lagging development and large transportation distance, and can be used to optimize the slope morphological parameters in the parallel development process of the inner dumping area from the aspects of economy, technology, safety, time, etc. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0033] Figure 1 It is a flow chart of the method for determining the step distance of the coordinated development of the horizontal working side and the inner dump of an open-pit coal mine of the present invention;
[0034] Figure 2 This is a schematic diagram of the slope morphology from the stope to the boundary according to an embodiment of the present invention;
[0035] Figure 3 This is a schematic diagram of a three-dimensional model of horizontal inner row tracking and pressing according to an embodiment of the present invention;
[0036] Figure 4 The calculation result of the slope stability of the stope when the step distance of the coordinated development of the working side and the inner dump is 50m in the embodiment of the present invention;
[0037] Figure 5 The calculation result of the slope stability of the stope when the step distance of the coordinated development of the working side and the inner dump is 100m in the embodiment of the present invention;
[0038] Figure 6 The calculation result of the slope stability of the stope when the step distance of the coordinated development of the working side and the inner dump is 200m in the embodiment of the present invention;
[0039] Figure 7 This is the calculation result of the slope stability of the stope when the working side and the inner dump develop in coordination with each other at a step distance of 300m in an embodiment of the present invention. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] The purpose of the present invention is to provide a method for determining the coordinated development step distance between the horizontal mining working side and the inner dump of an open-pit coal mine. Under three-dimensional conditions, the coordinated development step distance between the horizontal mining working side and the inner dump is determined, providing more reliable theoretical technology for mining projects and having good engineering application value.
[0042] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0043] like Figure 1 As shown, the method for determining the step distance of coordinated development between the horizontal working side and the inner dump of an open-pit coal mine provided by the present invention comprises the following steps:
[0044] S1, based on the engineering geological characteristics of the study area, obtain the physical and mechanical parameters of the rock and soil of each stratum lithology;
[0045] S2, according to the open-pit coal mining design and operation parameters, obtain the slope morphology parameters of the stope and dump in the study area, including: the step height, flat plate width and slope angle from the stope to the boundary slope, working side and inner and outer dumps;
[0046] S3, according to the physical and mechanical parameters of the rock and soil of each stratum lithology and the slope morphological parameters of the stope and spoil dump in the study area, design different coordinated development step plans and establish corresponding three-dimensional numerical simulation models; specifically including:
[0047] S3.1, based on the physical and mechanical parameters of the rock and soil of each stratum lithology and the slope morphological parameters of the stope and spoil dump in the study area, a three-dimensional DEM model of the mining face is established using three-dimensional modeling technology. The specific steps are as follows:
[0048] (1) Establish a three-dimensional wireframe model of the mining model;
[0049] (2) Adjust the working line position or parameters;
[0050] (3) Generate a three-dimensional DEM model of the mining model;
[0051] S3.2, design different coordinated development step plans, and establish the corresponding three-dimensional numerical simulation model based on the three-dimensional DEM model of the mining working face using three-dimensional numerical simulation technology. The specific steps are as follows:
[0052] (1) Import the terrain lines with elevation data into 3Dmine to generate a DTM triangulated mesh, import the generated mesh into Rhino software in .DXF format, and use the curtain tool to generate the terrain surface;
[0053] (2) Use surface tools to establish a geological interface that is consistent with the actual situation on site, and finally use the split command to cut off the redundant geometric elements to establish the geometric model required for numerical simulation;
[0054] (3) Use the Rhino meshing tool to simply divide the geometric model, and then use the Griddle plug-in to check and adjust the input Rhino mesh;
[0055] (4) Use Griddle to re-divide the adjusted grid into triangular grids. Before re-dividing, the mode and accuracy of the generated grid can be controlled by setting Mode, MinEdgeLength, MaxEdgeLength, etc.;
[0056] (5) Use Griddle GVol to output a three-dimensional numerical simulation model that can be recognized by numerical simulation software;
[0057] S4, the three-dimensional numerical simulation model corresponding to different coordinated development step length schemes is used to calculate the stability coefficient using FLAC3D numerical simulation software. The calculation results are compared with the safety reserve coefficient K of the stope-to-boundary slope to obtain the optimal step length for the coordinated development of the working side and the inner dump, including:
[0058] S401, obtain the stability coefficient of the final slope of the stope under different coordinated development step distances of the working side and the inner dump. The stability coefficient is calculated using the incremental elastic law. According to the generalized Hooke's law, the incremental expressions of the principal stress and principal strain are:
[0059]
[0060] Where: Δσ i (i=1, 2, 3) represents three generalized stress increments, represents three generalized strain increments, α1 and α2 represent material constants defined by shear modulus;
[0061] S402, comparing the stability coefficient of the final slope from the stope to the boundary with the safety reserve coefficient K of the slope from the stope to the boundary, and obtaining the optimal step distance for the coordinated development of the working side and the inner dump that meets the conditions, wherein the meeting conditions refer to: the stability coefficient of the final slope from the stope to the boundary is not less than the safety reserve coefficient K of the slope from the stope to the boundary. The safety reserve coefficient K of the slope from the stope to the boundary is determined according to the service life and specifications of the slope.
[0062] Example:
[0063] The present invention takes the northern slope of an open-pit coal mine in Inner Mongolia as an example, and provides a method for determining the step distance of the coordinated development of the horizontal working side and the inner dump of the open-pit coal mine in the study area, including the following steps:
[0064] Step 1, obtain the physical and mechanical parameters of the rock and soil of each stratum lithology: the stratum lithology from bottom to top are 4C coal, mudstone layer 1, 3B coal, mudstone layer 2, and a normal fault located at +608~+704 and NE-trending is developed; the main mining coal seams are 3B coal and 4C coal, with average thicknesses of 15m and 23m respectively. 3B coal and 4C coal both have weak interlayers in the bottom of the coal seam. The mineral composition of the weak layer is mainly illite and montmorillonite, and it has the characteristic of severe softening when exposed to water; the physical and mechanical parameters of the rock and soil are shown in Table 1.
[0065] Table 1 Physical and mechanical indicators of rock and soil
[0066]
[0067] Step 2, obtain the morphological parameters such as step height, flat plate width and slope angle of the stope-to-boundary slope, working side and inner and outer dumps in the study area, and obtain the morphological parameters of the dump slope in the study area;
[0068] In this embodiment, the transportation plate from the stope to the boundary slope is 40m, and the safety plate is 20m. The width of the plate below +812m is set as a 30-5m combined step, and the step height is 12m; the width of the working side plate is 25m, the step height is 12m, and the step slope angle is 70°; the width of the inner and outer dump plate is 30m, the step height is 24m, and the step slope angle is 33°. The shape of the stope to the boundary slope is as follows: Figure 2 shown.
[0069] Step 3: According to the slope morphology of the mining area and spoil dump in the study area, different coordinated development step distance schemes are designed, and the corresponding three-dimensional numerical simulation model is established.
[0070] In this example, the three-dimensional model of horizontal mining, internal row tracking and pressure pressing under different coordinated development step schemes is as follows Figure 3 shown.
[0071] Step 4: Calculate the three-dimensional DEM model of the mining face under different coordinated development step length schemes using FLAC3D numerical simulation software, compare the calculation results with the slope safety reserve factor K, and obtain the optimal step length for the coordinated development of the working face and the inner dump. The process is as follows:
[0072] Step 4.1, obtain the stability coefficient of the final boundary slope of the mining area under different coordinated development step conditions between the working area and the inner dump.
[0073] In this example, the results of the stability coefficient of the final boundary slope of the stope under four working conditions are as follows: Figures 4 to 7 The stability coefficients are summarized in Table 2.
[0074] Table 2 Slope stability coefficients under different coordinated development steps
[0075]
[0076]
[0077] Step 4.2: Compare the stability calculation results of different coordinated development steps with the safety reserve coefficient K to obtain the optimal step length for the coordinated development of the working side and the inner dump that meets the conditions. In this embodiment, according to the requirements of "GB 50197-2005 Coal Industry Open-Pit Mine Design Code", the safety reserve coefficient of the north side slope is determined, K = 1.2;
[0078] In this example, when the coordinated development step distance is 50m, the slope stability coefficient Fs=1.230>1.2, and when the coordinated development step distance is 100m, the slope stability coefficient Fs=1.194<1.2. It can be concluded that the optimal step distance for the coordinated development of the working side and the inner dump in this embodiment is 50m.
[0079] In summary, the method for determining the step distance for the coordinated development of the horizontal working side and the inner spoil dump in an open-pit coal mine provided by the present invention can achieve rapid and full occupation of the inner spoil dump space under the premise of ensuring the stability of the high slope formed by the slope from the mining area to the boundary, shorten the stripping and transportation distance, and reduce the cost of open-pit coal mining. It overcomes the shortcomings of the traditional design of the inner spoil dump, which has a slow development and a long transportation distance, and can be used to optimize the slope morphology parameters in the process of parallel development of the inner spoil dump from the aspects of economy, technology, safety, time, etc.
[0080] The present invention also provides a system for determining the step distance of coordinated development between the horizontal working side and the inner dump of an open-pit coal mine, which is applied to the above-mentioned method for determining the step distance of coordinated development between the horizontal working side and the inner dump of an open-pit coal mine, and comprises:
[0081] Basic parameter acquisition module, used to obtain the physical and mechanical parameters of rock and soil bodies of various strata and lithologies based on the engineering geological characteristics of the study area;
[0082] The morphological parameter acquisition module is used to obtain the morphological parameters of the stope and spoil dump slopes in the study area according to the open-pit coal mining design and operation parameters;
[0083] The model building module is used to design different coordinated development step plans and establish corresponding three-dimensional numerical simulation models based on the physical and mechanical parameters of the rock and soil bodies of each stratum lithology and the slope morphological parameters of the stope and spoil dump in the study area;
[0084] The optimal step size determination module is used to calculate the stability coefficient of the three-dimensional numerical simulation models corresponding to different coordinated development step size schemes using FLAC3D numerical simulation software. The calculation results are compared with the safety reserve coefficient K of the slope from the stope to the boundary to obtain the optimal step size for the coordinated development of the working side and the inner dump.
[0085] The present invention also provides an electronic device, comprising one or more processors; a memory; and one or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the one or more processors, and the one or more programs are configured to execute the method for determining the step distance for the coordinated development of the horizontal working side and the internal spoil dump of an open-pit coal mine as described above.
[0086] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the method for determining the step distance for the coordinated development of the horizontal working side and the internal spoil dump of an open-pit coal mine as described above is implemented.
[0087] Of course, those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing related hardware (such as a processor, a controller, etc.) through a computer program, and the program can be stored in a computer-readable storage medium, and the program can include the processes of the above-mentioned method embodiments when executed. The storage medium can be a memory, a disk, an optical disk, etc.
[0088] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A method for determining the step distance of coordinated development between the horizontal working side and the inner dump of an open-pit coal mine, characterized in that: The following steps are involved: S1, based on the engineering geological characteristics of the study area, obtain the physical and mechanical parameters of the rock and soil of each stratum lithology; S2, based on the open-pit coal mining design and operation parameters, obtain the slope morphology parameters of the stope and dump in the study area; S3, design different coordinated development step plans according to the physical and mechanical parameters of the rock and soil of each stratum lithology and the slope morphological parameters of the stope and spoil dump in the study area, and establish the corresponding three-dimensional numerical simulation model; S4, the three-dimensional numerical simulation models corresponding to different coordinated development step length schemes are used to calculate the stability coefficient using FLAC3D numerical simulation software. The calculation results are compared with the safety reserve coefficient K of the slope from the stope to the boundary to obtain the optimal step length for the coordinated development of the working side and the inner dump.
2. The method for determining the step distance of the coordinated development of the horizontal working side and the inner dump of an open-pit coal mine according to claim 1 is characterized in that: In S2, the slope morphological parameters of the stope and spoil dump in the study area include: The step height, flat plate width and slope angle from the mining area to the boundary slope, working side and internal and external dumping areas.
3. The method for determining the step distance of coordinated development of horizontal working side and inner dump of open-pit coal mine according to claim 1 is characterized in that: In S3, different coordinated development step distance schemes are designed according to the physical and mechanical parameters of the rock and soil bodies of various strata and the slope morphological parameters of the stope and spoil dump in the study area, and a corresponding three-dimensional numerical simulation model is established, which specifically includes: S3.1, based on the physical and mechanical parameters of the rock and soil of each stratum lithology and the slope morphological parameters of the stope and spoil dump in the study area, a three-dimensional DEM model of the mining face is established using three-dimensional modeling technology; S3.2, design different coordinated development step plans, and establish the corresponding three-dimensional numerical simulation model based on the three-dimensional DEM model of the mining working face using three-dimensional numerical simulation technology.
4. The method for determining the step distance of coordinated development of horizontal working side and inner dump of open-pit coal mine according to claim 3 is characterized in that: The three-dimensional DEM model of the mining face is established by using the three-dimensional modeling technology, and the specific steps are as follows: (1) Establish a three-dimensional wireframe model of the mining working face; (2) Adjust the working line position or adjust the model parameters; (3) Generate a three-dimensional DEM model of the mining working surface.
5. The method for determining the step distance of coordinated development of horizontal working side and inner dump of open-pit coal mine according to claim 3 is characterized in that: The three-dimensional numerical simulation technology is used to establish a corresponding three-dimensional numerical simulation model, and the specific steps are as follows: (1) Based on the 3D DEM model of the mold working surface, the terrain lines with elevation data are imported into 3Dmine to generate a DTM triangulated network, which is then imported into Rhino software to generate a terrain surface using the curtain tool; (2) Use surface tools to establish a geological interface that is consistent with the actual situation on site, and finally use the split command to cut off the redundant geometric elements to establish the geometric model required for numerical simulation; (3) Use the Rhino meshing tool to simply divide the geometric model, and then use the Griddle plug-in to check and adjust the input Rhino mesh; (4) Use Griddle to re-divide the adjusted mesh into a triangular mesh; (5) Use Griddle GVol to output a three-dimensional numerical simulation model that can be recognized by numerical simulation software.
6. The method for determining the step distance of coordinated development of horizontal working side and inner dump of open-pit coal mine according to claim 1 is characterized in that: In S4, the three-dimensional numerical simulation models corresponding to different coordinated development step length schemes are calculated using FLAC3D numerical simulation software, and the calculation results are compared with the safety reserve coefficient K of the stope-to-boundary slope to obtain the optimal step length for the coordinated development of the working side and the inner dump, which specifically includes: S4.1, obtain the stability coefficient of the final boundary slope of the stope under different coordinated development step distance schemes of the working side and the inner dump; S4.2, compare the stability coefficient of the final slope from the stope to the boundary with the safety reserve coefficient K of the slope from the stope to the boundary, and obtain the optimal step distance for the coordinated development of the working side and the inner dump that meets the conditions.
7. The method for determining the step distance of coordinated development of horizontal working side and inner dump of open-pit coal mine according to claim 6 is characterized in that: The satisfying condition means that the stability coefficient of the final slope to the boundary of the mining area is not lower than the safety reserve coefficient K of the slope to the boundary of the mining area.
8. The method for determining the step distance of coordinated development of horizontal working side and inner dump of open-pit coal mine according to claim 1 is characterized in that: In S4, the safety reserve coefficient K of the slope from the stope to the boundary is determined according to the service life and specifications of the slope.
Citation Information
Cited By
Composite coal seam soft rock strip mine slope form and mining program collaborative optimization method
CN120470841A
Safety-to-boundary mining control method for slope in landslide-containing risk area
CN120867754A