Method and system for entering equipotential optimal path by considering influence of multiple factors

Through lidar scanning and ant colony algorithm, a three-dimensional model is established and the optimal entry equipotential path of the transmission line is calculated, which solves the problem of low intelligence level in the existing technology and improves safety and efficiency.

CN118747564APending Publication Date: 2024-10-08GUIZHOU POWER GRID CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410623722.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

In the existing technology, the intelligent level of live operation of transmission lines is low, relying on manual experience and two-dimensional drawings, which is risky and has high technical requirements. It is difficult to quickly calculate the optimal path to enter the equipotential.

Method used

Point cloud data is obtained through lidar scanning, and a three-dimensional tower model is established. Combined with constraints such as safety margin, operating difficulty and movable distance, the ant colony algorithm is used to calculate the optimal way and path to enter the equipotential.

Benefits of technology

It achieves fast and intelligent calculation of the optimal way and path for transmission lines to enter equipotential, which improves the safety and efficiency of the project and reduces the requirements for technical level.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747564A_ABST
    Figure CN118747564A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power transmission lines, in particular to a method and system for entering an equipotential optimal path by considering multi-factor influence, and the method comprises the steps: determining an implementation region of a power transmission line; the method comprises the following steps: acquiring point cloud data of all operation towers in a power transmission line implementation area through a laser radar scanning technology, wherein the point cloud data comprises specific information and color information of each operation tower; establishing a tower three-dimensional point cloud model based on the point cloud data; on the basis of the point cloud data in the above steps and the established three-dimensional point cloud model, constraint conditions are added, and the constraint conditions comprise the safety margin, the operation difficulty and the movable distance of each operation tower point; and based on the point cloud data, the three-dimensional point cloud model and the constraint condition, an optimization algorithm is adopted to calculate an optimal equipotential entering mode and path in the power transmission line implementation area. According to the method, the optimal equipotential entering mode and path can be rapidly calculated, and compared with a traditional mode, the method is more intelligent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power transmission lines, and in particular to a method and system for entering an optimal equipotential path taking into account the influence of multiple factors. Background Art

[0002] Live working on transmission lines is the most direct and effective measure to improve power supply reliability and has been widely promoted. Before the operation begins, an implementation plan must be formulated in advance, including the operation method, operation path selection, and safety clearance verification analysis. At present, the production of the plan mainly relies on two-dimensional tower design drawings and manual on-site survey information, with a high degree of dependence on operation experience, and the overall level of intelligence of live working is low.

[0003] Therefore, there is an urgent need for an intelligent way to calculate the optimal way to enter the equipotential. Summary of the invention

[0004] In view of the above problems existing in the prior art, the present invention is proposed.

[0005] Therefore, the present invention provides a method for entering the equipotential optimal path taking into account the influence of multiple factors, which can solve the problem that the traditional method of manually judging the entry into the equipotential mode and path depends on drawings and personal experience, which has certain risks and requires a high level of personal technical skills.

[0006] To solve the above technical problems, the present invention provides the following technical solutions: a method for entering the optimal path of equipotential considering the influence of multiple factors, comprising: determining the implementation area of ​​the transmission line; acquiring point cloud data of all operating pole towers in the implementation area of ​​the transmission line by laser radar scanning technology; establishing a three-dimensional point cloud model of the pole tower based on the point cloud data; adding constraints based on the point cloud data and the established three-dimensional point cloud model, the constraints including the safety margin, operation difficulty and movable distance of each operating pole tower point; and calculating the optimal way and path of entering the equipotential in the implementation area of ​​the transmission line by using an optimization algorithm based on the point cloud data, the three-dimensional point cloud model and the constraints.

[0007] As a preferred solution of the method for entering the optimal path of equal potential taking into account the influence of multiple factors described in the present invention, the point cloud data includes the specific location information and color information of each working tower.

[0008] As a preferred scheme of a method for entering the optimal path of equipotential considering the influence of multiple factors described in the present invention, the constraint conditions include the minimum combined gap thresholds of different voltage levels, the voltage levels include 110KV, 220KV and 500KV, the minimum combined gap threshold of 110KV potential operation is 1.2m, the minimum combined gap threshold of 220KV equipotential operation is 2.5m, and the minimum combined gap threshold of 5000KV equipotential operation is 3.9m.

[0009] As a preferred solution of the method for entering the optimal path of equal potential considering the influence of multiple factors described in the present invention, wherein: the establishment of a three-dimensional point cloud model of a tower based on point cloud data includes preprocessing, feature extraction, model construction, model optimization and verification of the collected point cloud data;

[0010] The point cloud data preprocessing is expressed as:

[0011] p' = median_filter(p)

[0012] Among them, p' is a point in the original point cloud, and p' is the denoised point;

[0013] P sub =voxel_grid_filter(P, v s )

[0014] Among them, P is the denoised point cloud data, v s is the voxel size, P sub is the downsampled point cloud;

[0015] The feature extraction includes extracting useful features from the processed point cloud to assist in building the model, which is expressed as:

[0016] n i = PCA(N i )

[0017] Among them, N i is the neighborhood point set of point i, n i is the normal vector of point i calculated by principal component analysis PCA;

[0018] The model building includes using feature points and normal vectors to start building a three-dimensional model of the tower;

[0019]

[0020] Among them, P i is a point in the point cloud, P is a point on the surface, and x is the surface parameter;

[0021] The accuracy of the model is verified by comparing the model predictions with the actual measurements, expressed as:

[0022]

[0023] Among them, P model is a point on the model, P clond is the point in the actual point cloud, and N is the total number of points.

[0024] As a preferred solution of the method for entering the optimal path of equal potential considering the influence of multiple factors described in the present invention, wherein: the optimization algorithm adopted includes each ant according to the probability Select the next node, expressed as:

[0025]

[0026] Among them, η ij is the heuristic information from node i to j, allowed k is the set of next nodes that ant k is allowed to select for the current node. In the ant colony algorithm, the variable l mentioned in the probability formula for selecting the next node represents a candidate node. When ant k is at node i, it can choose to move to any node directly connected to i. The node is represented by l, and l belongs to the set of next nodes that ant k is allowed to select for the current node. k , β is the heuristic factor, α is the pheromone intensity;

[0027] After each iteration, the pheromones on all paths are updated, and the update formula is expressed as:

[0028]

[0029] Where ρ is the evaporation rate, Δτ ij is the total amount of pheromone left by all ants passing through path i to j in this iteration, calculated as follows:

[0030]

[0031] in is the amount of pheromone left by ant k on the path from i to j.

[0032] As a preferred solution of the method for entering the equipotential optimal path considering the influence of multiple factors described in the present invention, wherein: the calculation of the optimal entry equipotential mode and path in the transmission line implementation area includes dividing the constraint conditions according to restriction categories to obtain at least one sub-path constraint condition, and identifying the constraint conditions for path generation in each sub-path constraint condition, obtaining the influencing factors corresponding to each sub-path constraint condition, and forming an evaluation value of the sub-path;

[0033] The constraints also include that at voltage levels of 110KV and 220KV, the minimum distance between the exposed unshielded parts of the human body and the live parts is 0.3m; at voltage level of 500kV, the minimum distance between the exposed unshielded parts of the human body and the live parts is 0.4m.

[0034] As a preferred solution of the method for entering the equipotential optimal path considering the influence of multiple factors described in the present invention, the method for entering the equipotential includes the soft ladder method, the flat ladder method, and the hanging basket method.

[0035] Another object of the present invention is to provide an optimal path system for entering equipotential that takes into account the influence of multiple factors. The selection module helps to clarify the implementation area and ensure that the initial positioning of the project accurately matches the actual needs. The acquisition module efficiently obtains the point cloud data of all towers in the implementation area through laser radar scanning technology. This high-precision data acquisition is the basis for all subsequent analysis. The modeling module uses these point cloud data to build an accurate three-dimensional model of the tower, providing detailed three-dimensional spatial information for further analysis. The constraint condition module introduces a variety of key factors in actual operations such as safety margin, operation difficulty and movable distance to ensure that the implementation of all plans is within the scope of safety and practical feasibility. The algorithm module uses advanced optimization algorithms, comprehensively considers point cloud data, three-dimensional models and various constraints, and calculates the optimal way and path to enter the equipotential. It optimizes resource allocation, improves the safety and efficiency of the project, and ensures the efficiency and accuracy of transmission line construction.

[0036] As a preferred solution of the system for entering the optimal path of equal potential considering the influence of multiple factors described in the present invention, it includes: a selection module, a collection module, a modeling module, a constraint condition module, and an algorithm module;

[0037] The selection module determines the implementation area of ​​the transmission line;

[0038] The acquisition module acquires point cloud data of all operating towers in the transmission line implementation area through laser radar scanning technology;

[0039] The modeling module establishes a three-dimensional point cloud model of the tower based on the point cloud data;

[0040] The constraint condition module is based on the point cloud data and the established three-dimensional point cloud model, and adds constraint conditions, which include the safety margin, operation difficulty, and movable distance of each operating tower point;

[0041] The algorithm module uses an optimization algorithm based on point cloud data, a three-dimensional point cloud model and constraint conditions to calculate the optimal way and path to enter the equipotential in the implementation area of ​​the transmission line.

[0042] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and is characterized in that when the processor executes the computer program, the steps of any one of the methods for entering an optimal path to an equipotential that takes into account the influence of multiple factors are implemented.

[0043] A computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the steps of any one of the methods for entering an optimal path to an equipotential that takes into account the influence of multiple factors are implemented.

[0044] Beneficial effects of the present invention: The method for calculating the optimal path to enter the equipotential taking into account the influence of multiple factors can quickly calculate the optimal way and path to enter the equipotential, which is more intelligent than the traditional method. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0046] Figure 1 A schematic flow chart of a method for entering an optimal path to an equipotential region taking into account the influence of multiple factors is provided as an embodiment of the present invention.

[0047] Figure 2 A schematic flow chart of a method for entering an optimal path to an equipotential region taking into account the influence of multiple factors is provided as an embodiment of the present invention. DETAILED DESCRIPTION

[0048] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0049] Example 1

[0050] Reference Figure 1-Figure 2 , which is the first embodiment of the present invention, provides a method for entering the optimal path of equal potential taking into account the influence of multiple factors, including:

[0051] S1: Determine the implementation area of ​​the transmission line.

[0052] S2: Obtain point cloud data of all operating towers within the transmission line implementation area through LiDAR scanning technology.

[0053] It should be noted that LiDAR (Light Detection and Ranging) scanning technology is an efficient remote sensing technology used to obtain accurate three-dimensional position information of objects. In live operations on transmission lines, LiDAR can be used to measure the structure of towers and their surroundings in detail. The following is the specific operation process of using LiDAR scanning technology to obtain point cloud data of all operating towers in the transmission line implementation area:

[0054] Select the appropriate LiDAR equipment. For transmission line work, LiDAR equipment mounted on unmanned aerial vehicles (UAVs) is often selected because UAVs can easily reach high altitudes and inaccessible areas. Mount the LiDAR equipment on the UAV and ensure that it is stable. Configure the equipment including power connection, data storage facilities and necessary navigation systems (such as GPS). Plan the flight path of the UAV according to the requirements. This step includes determining the altitude, speed and path of the flight to cover all target towers. Conduct a safety review to ensure that the flight path is away from obstacles, especially other high-voltage lines and possible flight obstacles. After the UAV takes off, the LiDAR equipment starts to emit laser pulses and receive reflected lasers to measure the distance to each point on the ground and the tower. The LiDAR equipment continuously records the laser data reflected from each point to form point cloud data. This data includes the position (X, Y, Z coordinates) and color information of each point, the latter of which is sometimes obtained through an integrated camera. After the flight mission is completed, the data on the LiDAR equipment is transferred to a computer system for further processing. Specialized software is used to process the raw LiDAR data to generate a three-dimensional point cloud model. This step may include data cleaning (removing noise points), data correction and point cloud reconstruction. Use point cloud models for analysis to identify the exact location and conditions of towers and other key structures. Based on the point cloud model, further path and strategy planning is carried out, such as determining the operation method and specific operation path.

[0055] S3: Establish a three-dimensional point cloud model of the tower based on the point cloud data.

[0056] Furthermore, building a 3D point cloud model of a tower based on point cloud data is a multi-step process. This process mainly includes point cloud data preprocessing, feature extraction, model building and optimization. The following are the detailed steps:

[0057] Step 1: Point cloud data preprocessing

[0058] In this step, the raw point cloud data first needs to be processed and prepared to make it suitable for subsequent processing.

[0059] 1.1 Noise Removal

[0060] p' = median_filter(p)

[0061] Where p' is a point in the original point cloud and p' is the denoised point. This step removes outliers by using median filtering or other denoising algorithms (such as statistical filtering).

[0062] 1.2 Data Downsampling

[0063] P sub =voxel_grid_filter(P, v s )

[0064] Among them, P is the denoised point cloud data, v s is the voxel size (i.e. the side length of the cube grid), P sub is the downsampled point cloud. This step reduces the amount of data and improves processing efficiency.

[0065] Step 2: Feature Extraction

[0066] In this step, useful features are extracted from the processed point cloud to assist in building the model.

[0067] 2.1 Normal vector calculation

[0068] n i = PCA(N i )

[0069] Among them, N i is the neighborhood point set of point i, n i is the normal vector of point i calculated by principal component analysis (PCA). The normal vector is crucial for identifying surface features and performing surface fitting.

[0070] 2.2 Feature Point Recognition

[0071] Identify key features such as tower connections or corners. This is usually done by analyzing local curvature or other geometric descriptors.

[0072] Step 3: Model building

[0073] Using feature points and normal vectors, we start to build a three-dimensional model of the tower.

[0074] 3.1 Surface fitting

[0075]

[0076] Among them, P i is a point in the point cloud, P is a point on the surface, and x is a surface parameter. This step usually uses the least squares method for surface fitting.

[0077] 3.2 Structural connection

[0078] When building a complete model, it is necessary to correctly connect the various parts through logical relationships, such as connecting the tower body to the base.

[0079] Step 4: Model optimization and validation

[0080] Finally, the constructed model is optimized and verified to ensure its accuracy and reliability.

[0081] 4.1 Model Optimization

[0082] Model parameters are adjusted to minimize the deviation between the point cloud data and the model.

[0083] 4.2 Verification

[0084] The accuracy of the model is verified by comparing the model predictions with the actual measurements, perhaps using a formula like:

[0085]

[0086] Among them, P model is a point on the model, P clond is the point in the actual point cloud, and N is the total number of points (“dis” appears in a mathematical formula, and it usually stands for “distance”. In this case, it is used to calculate the distance between the points generated by the model and the points in the actual point cloud data. This distance is often used to evaluate the accuracy of the model by calculating the error or deviation to see how close the model prediction is to the actual measurement).

[0087] S4: Based on the point cloud data and the established 3D point cloud model, constraints are added. The constraints include the safety margin, operation difficulty, and movable distance of each operating tower point.

[0088] The constraint conditions include minimum combined clearance thresholds for different voltage levels, including 110KV, 220KV and 500KV. The minimum combined clearance threshold for 110KV equipotential operation is 1.2m, the minimum combined clearance threshold for 220KV equipotential operation is 2.5m, and the minimum combined clearance threshold for 5000KV equipotential operation is 3.9m.

[0089] S5: Based on the point cloud data, 3D point cloud model and constraints, an optimization algorithm is used to calculate the optimal way and path to enter the equipotential in the transmission line implementation area.

[0090] It should be noted that the ant colony algorithm is a heuristic optimization algorithm, which was proposed by being inspired by the behavior of ants looking for food. In this algorithm, a group of virtual "ants" search for the optimal solution in the solution space. Each ant chooses the next position based on the pheromone concentration and heuristic information, and releases pheromones on the path. The pheromone concentration is affected by the quality of the ant's path, and the behavior of the ants increases the pheromone. This positive feedback mechanism leads to the gradual aggregation of pheromones in the solution space, and eventually attracts ants to form clusters near the global optimal solution, thereby finding the best path or solution. The ant colony algorithm has the characteristics of being distributed, parallel, adaptive, and robust, and is suitable for solving a variety of optimization problems, such as path planning, combinatorial optimization, resource allocation, etc.; the ant colony algorithm is an optimization method inspired by the behavior of ants in nature, used to find the best solution to a problem, especially in path optimization problems.

[0091] When applied to the optimization of live working paths for transmission lines based on point cloud data and 3D models, the ant algorithm can help find the optimal path that meets safety standards and operational efficiency. The following are the specific steps:

[0092] Step 1: Initialization

[0093] Initialize pheromone: Set the initial pheromone concentration on all possible paths. Use τ ij (0) represents the initial pheromone concentration on the path connecting nodes i and j.

[0094] Parameter setting: Set the evaporation rate ρ, pheromone strength α, and heuristic factor β. The pheromone evaporation rate is a parameter between 0 and 1, which is used to simulate the natural phenomenon of pheromone volatilization over time. A higher evaporation rate can prevent the algorithm from converging to the local optimal solution too early and encourage the exploration of new paths. A lower evaporation rate makes pheromones accumulate faster, which may accelerate the convergence of the algorithm, but it may also fall into the local optimum. The pheromone strength parameter controls the relative importance of pheromones in the probability of path selection. A higher α value will enhance the influence of pheromones, causing ants to tend to choose paths with higher pheromones. This can accelerate the accumulation of good paths, but it may also increase the risk of falling into the local optimum. A lower α value weakens this effect and increases the probability of exploring unknown paths. The heuristic factor is used to emphasize the importance of heuristic information (such as the inverse of distance or other quality indicators) in path selection. A higher β value encourages ants to choose paths with high heuristic scores, such as paths with short distances or paths that meet constraints. This helps the algorithm find effective solutions quickly, but may ignore long-term interests. A lower β value reduces this bias and helps to explore the solution space more balanced.

[0095] Step 2: Place the Ants

[0096] The ants are randomly placed on different tower nodes. Assume there are k ants, and each ant starts to build its path at a starting point.

[0097] Step 3: Build the Solution

[0098] Select the next node: Each ant chooses the next node according to the probability Select the next node, the formula is as follows:

[0099]

[0100] , where η ij is the heuristic information from node i to j (usually the inverse of the distance or the degree to which the constraint is satisfied), allowed k is the set of next nodes that ant k is allowed to select from its current node. In the ant colony algorithm, the variable l mentioned in the probability formula for selecting the next node represents a candidate node. When ant k is at node i, it can choose to move to any other node directly connected to i, and these nodes are represented by l. In the formula, l belongs to the set of next nodes that ant k is allowed to select from its current node. k .

[0101] Heuristic information: can be defined based on constraints such as voltage level, safety distance, etc. For example, a shorter distance or a higher safety margin can have a higher η ij value.

[0102] Step 4: Update Pheromones

[0103] After each iteration, the pheromones on all paths are updated. The update formula is as follows:

[0104]

[0105] where Δτ ij is the total amount of pheromone left by all ants passing through path i to j in this iteration, calculated as follows: in is the amount of pheromone left by ant k on the path from i to j, which is usually proportional to the quality of the path, such as short path or high safety.

[0106] Step 5: Repeat the build and update

[0107] Repeat steps 3 and 4 until a stopping condition is reached, such as reaching a maximum number of iterations or the quality of the solution no longer improves significantly.

[0108] Step 6: Select the best path

[0109] Finally, the path with the highest pheromone content is selected as the optimal solution.

[0110] Identify the constraint value of each constraint condition corresponding to each implementation path, and the constraint value range of each constraint condition, including: dividing the constraint conditions according to restriction categories to obtain at least one sub-path constraint condition, and identifying the constraint conditions generated for the path in each sub-path constraint condition, obtain the influencing factors corresponding to each sub-path constraint condition, and form an evaluation value of the sub-path.

[0111] The constraints also include: at voltage levels of 110KV and 220KV, the minimum distance between the exposed unshielded parts of the human body and the live body is 0.3m; at voltage level of 500kV, the minimum distance between the exposed unshielded parts of the human body and the live body is 0.4m.

[0112] The point cloud data of all operating towers in the transmission line implementation area are obtained through the lidar scanning technology on the drone.

[0113] The method of entering the equipotential includes at least one of a soft ladder method, a flat ladder method, and a hanging basket method.

[0114] The method of entering the equipotential includes at least one of a soft ladder method, a flat ladder method, and a hanging basket method.

[0115] Among them, the soft ladder method is to work through an insulated soft ladder. The insulated soft ladder is one of the tools for equipotential electricians to enter the electric field for equipotential work. When the condition of the conductor or overhead ground wire allows the hanging of a soft ladder, the soft ladder is generally used for conductor repair and other operations. There are three methods of hanging a soft ladder. The first is to use an insulating rod to hang the wiring pulley on the outside of the conductor clamp; the second is to use throwing or using a rope gun to throw a small insulating rope across the conductor in the gear, and use the small insulating rope to hang the heel pulley on the conductor, and then use the insulating rope on the heel pulley to hang the soft ladder on the conductor; the third is to use the method of hanging the wiring pulley on the overhead ground wire when the conductor is severely damaged and cannot be hung. Hang the soft ladder directly on the overhead ground wire, that is, hang the soft ladder on the overhead ground wire. When working, the ground electrician will bring the soft ladder close to the conductor, and the equipotential electrician can perform equipotential repair of the conductor and other operations.

[0116] The horizontal ladder method is to work by means of an edge ladder. An insulated horizontal ladder is installed. There should be an end hook at the front end of the ladder body to hook the live wire. The hook at the ladder head has the function of folding and changing direction so that the staff can easily hook the wire. When using a longer ladder frame, add an intermediate rope in the middle to make the ladder body stable. The ladder head should have reliable control, and the ladder tail is tied to the cross angle iron of the corresponding tower with a rope. The horizontal ladder should be pointed to the live equipment in advance.

[0117] The hanging basket method uses an insulating hanging basket (ladder) to work. The insulating hanging basket (ladder) is tied to the cross arm with an insulating rope (the length of the insulating rope is adjustable). The equipotential personnel sit on the hanging basket (ladder) and adjust the height of the hanging basket (ladder) so that the height of the head position is on the same level as the height of the first insulator position close to the conductor. Matters needing attention during equipotential work: The insulating rope must be tied firmly; the equipotential electrician must meet the minimum safety distance when entering and exiting the equipotential.

[0118] Figure 2 The schematic diagram of the path and access method provided by the present invention is shown. The method can be run on a computer and interact with the user through an interactive terminal. The user obtains the optimal access equipotential method and path in the final transmission line implementation area through the interactive terminal, wherein the interactive terminal is a screen. Figure 2 As shown, the interactive end displays path S1 as the optimal entry path through an image, and the display mode is a soft ladder, which is more intuitive. Optionally, various constraint information and risk points can be marked on the image.

[0119] The method for calculating the optimal path to enter the equipotential taking into account the influence of multiple factors of the present invention can quickly calculate the optimal way and path to enter the equipotential, which is more intelligent than the traditional method.

[0120] Example 2

[0121] The second embodiment of the present invention is different from the previous embodiment in that:

[0122] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.

[0123] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0124] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0125] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0126] Example 3

[0127] The third embodiment of the present invention provides an optimal path system for entering equal potential considering the influence of multiple factors, characterized by comprising: a selection module, a collection module, a modeling module, a constraint condition module, and an algorithm module;

[0128] The selection module determines the implementation area of ​​the transmission line;

[0129] The acquisition module acquires point cloud data of all operating towers in the transmission line implementation area through laser radar scanning technology;

[0130] The modeling module establishes a three-dimensional point cloud model of the tower based on the point cloud data;

[0131] The constraint condition module is based on the point cloud data and the established three-dimensional point cloud model, and adds constraint conditions, which include the safety margin, operation difficulty, and movable distance of each operating tower point;

[0132] The algorithm module uses an optimization algorithm based on point cloud data, a three-dimensional point cloud model and constraint conditions to calculate the optimal way and path to enter the equipotential in the implementation area of ​​the transmission line.

[0133] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for entering the optimal path of equal potential considering the influence of multiple factors, characterized in that: include, Determine the implementation area of ​​the transmission line; Obtain point cloud data of all operating towers in the transmission line implementation area through LiDAR scanning technology; Establish a three-dimensional point cloud model of the tower based on point cloud data; Based on the point cloud data and the established 3D point cloud model, constraints are added, including the safety margin, operation difficulty, and movable distance of each operating tower point; Based on point cloud data, three-dimensional point cloud model and constraints, an optimization algorithm is used to calculate the optimal way and path to enter the equipotential within the transmission line implementation area.

2. A method for entering an optimal path to an equipotential region taking into account the influence of multiple factors as claimed in claim 1, characterized in that: The point cloud data includes specific location information and color information of each operating tower.

3. A method for entering the optimal path of equal potential considering the influence of multiple factors as claimed in claim 2, characterized in that: The constraint conditions include minimum combined clearance thresholds for different voltage levels, including 110KV, 220KV and 500KV. The minimum combined clearance threshold for 110KV potential operation is 1.2m, the minimum combined clearance threshold for 220KV equipotential operation is 2.5m, and the minimum combined clearance threshold for 5000KV equipotential operation is 3.9m.

4. A method for entering an optimal path to an equipotential region taking into account the influence of multiple factors as claimed in claim 3, characterized in that: The establishment of a three-dimensional point cloud model of a tower based on point cloud data includes preprocessing, feature extraction, model construction, model optimization and verification of the collected point cloud data; The point cloud data preprocessing is expressed as: p' = median_filter(p) Among them, p' is a point in the original point cloud, and p' is the denoised point; P sub =voxel_grid_filter(P,v s ) Among them, P is the denoised point cloud data, v s is the voxel size, P sub is the downsampled point cloud; The feature extraction includes extracting useful features from the processed point cloud to assist in building the model, which is expressed as: n i =PCA(N i ) Among them, N i is the neighborhood point set of point i, n i is the normal vector of point i calculated by principal component analysis PCA; The model building includes using feature points and normal vectors to start building a three-dimensional model of the tower; Among them, P i is a point in the point cloud, P is a point on the surface, and x is the surface parameter; The accuracy of the model is verified by comparing the model predictions with the actual measurements, expressed as: Among them, P model is a point on the model, P clond is the point in the actual point cloud, and N is the total number of points.

5. A method for entering an optimal path to an equipotential region taking into account the influence of multiple factors as claimed in claim 4, characterized in that: The optimization algorithm includes each ant according to the probability Select the next node, expressed as: Among them, η ij is the heuristic information from node i to j, allowed k is the set of next nodes that ant k is allowed to select for the current node. In the ant colony algorithm, the variable l mentioned in the probability formula for selecting the next node represents a candidate node. When ant k is at node i, it can choose to move to any node directly connected to i. The node is represented by l, and l belongs to the set of next nodes that ant k is allowed to select for the current node. k , β is the heuristic factor, α is the pheromone intensity; After each iteration, the pheromones on all paths are updated, and the update formula is expressed as: Where ρ is the evaporation rate, Δτ ij is the total amount of pheromone left by all ants passing through path i to j in this iteration, calculated as follows: in is the amount of pheromone left by ant k on the path from i to j.

6. A method for entering an optimal path to an equipotential region taking into account the influence of multiple factors as claimed in claim 5, characterized in that: The calculating of the optimal access equipotential mode and path in the transmission line implementation area includes dividing the constraint conditions according to restriction categories to obtain at least one sub-path constraint condition, and identifying the constraint conditions for path generation in each sub-path constraint condition, obtaining the influencing factors corresponding to each sub-path constraint condition, and forming an evaluation value of the sub-path; The constraints also include that at voltage levels of 110KV and 220KV, the minimum distance between the exposed unshielded parts of the human body and the live parts is 0.3m; at voltage level of 500kV, the minimum distance between the exposed unshielded parts of the human body and the live parts is 0.4m.

7. A method for entering an optimal path to an equipotential region taking into account the influence of multiple factors as claimed in claim 6, characterized in that: The methods of entering the equipotential state include a soft ladder method, a flat ladder method, and a hanging basket method.

8. A system for entering the optimal path of equal potential considering the influence of multiple factors based on any one of claims 1 to 7, characterized in that: Including selection module, acquisition module, modeling module, constraint condition module and algorithm module; The selection module determines the implementation area of ​​the transmission line; The acquisition module acquires point cloud data of all operating towers in the transmission line implementation area through laser radar scanning technology; The modeling module establishes a three-dimensional point cloud model of the tower based on the point cloud data; The constraint condition module is based on the point cloud data and the established three-dimensional point cloud model, and adds constraint conditions, which include the safety margin, operation difficulty, and movable distance of each operating tower point; The algorithm module uses an optimization algorithm based on point cloud data, a three-dimensional point cloud model and constraint conditions to calculate the optimal way and path to enter the equipotential in the implementation area of ​​the transmission line.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.