Secondary disaster early warning method and device based on rainfall runoff analysis and medium

Through multi-dimensional data preprocessing and model construction, combined with GIS and remote sensing technology, the problem of insufficient data utilization and untimely information in secondary disaster early warning is solved, achieving rapid and accurate assessment and early warning of secondary disaster risks, and improving improve the effectiveness and reliability of early warning.

CN118747600AInactive Publication Date: 2024-10-08山东浪潮智水数字科技有限公司 +1

Patent Information

Application Number
CN202410838950.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology is insufficient in data integration and utilization in secondary disaster early warning, the early warning information is not comprehensive and timely, and the accuracy and efficiency of rainfall generation and confluence analysis are affected.

Method used

By acquiring multi-dimensional data for preprocessing, a rainfall generation and confluence model and a secondary disaster risk assessment model are constructed, GIS technology and remote sensing technology are used to update the data in real time, and fuzzy evaluation matrices and weight vectors are combined for risk assessment and early warning.

Benefits of technology

It achieves rapid accuracy and timely early warning of risk assessment results in the area to be analyzed, improves the accuracy and reliability of secondary disaster early warning, and reduces disaster losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747600A_ABST
    Figure CN118747600A_ABST
Patent Text Reader

Abstract

The invention discloses a secondary disaster early warning method and device based on rainfall runoff analysis and a medium, and is used for solving the problems that an existing disaster early warning method is insufficient in data utilization and incomplete and timely in early warning information. The method comprises the following steps: acquiring original multi-dimensional data of a to-be-analyzed area, and preprocessing the original multi-dimensional data to obtain standard multi-dimensional data; inputting the standard rainfall data and the geographic data into a pre-trained rainfall runoff model, and outputting corresponding rainfall related parameters; constructing a secondary disaster risk assessment model based on the secondary disaster record, the geographic data and the rainfall related parameters, and optimizing a secondary disaster assessment standard according to a feedback result of the secondary disaster risk assessment model; and based on the optimized secondary disaster record risk assessment model and a preset disaster risk level library, determining a risk assessment result corresponding to the to-be-analyzed area, and performing secondary disaster early warning on the risk assessment result exceeding a risk threshold.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of hydrological disaster early warning, and in particular to a secondary disaster early warning method, equipment and medium based on rainfall runoff analysis. Background Art

[0002] With the advancement of science and technology and the increasing abundance of data, the role of rainfall runoff analysis in secondary disaster warning has become increasingly prominent. However, there are still some defects in the existing technical system that need to be solved, which to a certain extent restrict the accuracy and timeliness of secondary disaster warning.

[0003] First, existing technologies have obvious deficiencies in data integration and utilization. Although modern remote sensing, meteorological and geographic information technology can provide massive amounts of rainfall, topography, soil vegetation and historical secondary disaster data, these data are often scattered and in different formats, lacking effective integration and utilization. This situation results in the inability to fully utilize these valuable information resources when simulating rainfall runoff and assessing secondary disaster risks, thus affecting the accuracy and reliability of early warnings.

[0004] Secondly, the current warning systems on the market still need to be improved in providing comprehensive and timely warning information on secondary disasters. Due to the lack of a comprehensive disaster assessment model and efficient data processing process, existing systems often find it difficult to accurately predict the probability and impact level of secondary disasters under different rainfall intensities. The incompleteness and untimeliness of this information puts relevant departments in a passive state when dealing with secondary disasters, and they are unable to take preventive measures.

[0005] Furthermore, existing rainfall runoff models and disaster assessment models have certain limitations in accuracy and applicability. These models often fail to fully consider the complexity of the natural environment and the diversity of socio-economic conditions, resulting in certain deviations in the simulation and prediction process. Such deviations not only affect the accuracy of early warnings, but may also mislead decision makers, thereby bringing unnecessary risks to the prevention of secondary disasters. Summary of the invention

[0006] The embodiments of the present application provide a secondary disaster warning method, device and medium based on rainfall runoff analysis, which are used to solve the technical problems of insufficient data utilization and incomplete and timely warning information in existing disaster warning methods, which affect the accuracy of rainfall runoff analysis and the effectiveness of secondary disaster warning.

[0007] On the one hand, the embodiment of the present application provides a secondary disaster early warning method based on rainfall runoff analysis, including:

[0008] Acquire original multi-dimensional data of the area to be analyzed, and pre-process the original multi-dimensional data to obtain standard multi-dimensional data; wherein the multi-dimensional data includes: rainfall data, geographic data and secondary disaster records;

[0009] Input standard rainfall data and geographic data into a pre-trained rainfall runoff model, and output corresponding rainfall-related parameters; wherein the rainfall-related parameters include: runoff depth, flow rate and runoff time corresponding to the rainfall;

[0010] Based on the secondary disaster records, the geographic data and the rainfall-related parameters, a secondary disaster risk assessment model is constructed, and according to the feedback results of the secondary disaster risk assessment model, a secondary disaster assessment standard is optimized;

[0011] Based on the optimized secondary disaster record risk assessment model and the preset disaster risk level library, the risk assessment results corresponding to the area to be analyzed are determined, and secondary disaster warnings are issued for risk assessment results that exceed the risk threshold.

[0012] In one implementation of the present application, the obtaining of original multi-dimensional data of the area to be analyzed and preprocessing of the original multi-dimensional data to obtain standard multi-dimensional data specifically includes:

[0013] Obtain rainfall data of the area to be analyzed through ground rain gauges, radar and satellite data to determine the time scale, time dimension and spatial resolution corresponding to the rainfall data; wherein the rainfall data includes rainfall intensity, rainfall duration and rainfall temporal and spatial distribution;

[0014] Collecting topographic data, land type data, and vegetation coverage data of the area to be analyzed through a geographic information system, and updating the land type data and vegetation coverage data in real time based on remote sensing technology; wherein the topographic data include elevation, slope, watershed boundary, and river network;

[0015] Acquire secondary disaster records of the area to be analyzed, and determine potential risk areas in the area to be analyzed based on disaster point data in the secondary disaster records;

[0016] The rainfall data, geographic data and the secondary disaster records are cleaned, null values ​​are filled in the cleaned data, and the cleaned and filled data are normalized to obtain standard multi-dimensional data.

[0017] In one implementation of the present application, the standard rainfall data and geographic data are input into a pre-trained rainfall runoff model, and the corresponding rainfall-related parameters are output, specifically including:

[0018] Constructing a rainfall runoff model for the area to be analyzed, and obtaining historical rainfall data for the area to be analyzed;

[0019] Training the rainfall runoff model based on the historical rainfall data to obtain a trained rainfall runoff model;

[0020] The real-time acquired rainfall data and real-time updated geographic data are input into the trained rainfall runoff generation and confluence model, and the runoff depth formed by the rainfall, the flow velocity and flow rate corresponding to the rainfall, and the runoff time are output.

[0021] In one implementation of the present application, the secondary disaster risk assessment model is constructed based on the secondary disaster record, the geographic data and the rainfall-related parameters, specifically including:

[0022] Based on GIS technology, and according to the topographic data, land use type, and vegetation coverage data corresponding to the area to be analyzed, a digital elevation model, slope map, soil type map, and vegetation coverage map corresponding to the area to be analyzed are drawn to obtain a secondary disaster risk assessment model;

[0023] Based on the digital elevation model, the slope map, the soil type map and the vegetation coverage map, a debris flow simulation is performed on the area to be analyzed, and a corresponding simulation result is obtained;

[0024] The historical debris flow events corresponding to the area to be analyzed are obtained, and the simulation results are compared with the historical debris flow events, so as to adjust the model parameters of the secondary disaster risk assessment model according to the comparison results, and complete the training of the secondary disaster risk assessment model.

[0025] In one implementation of the present application, the simulation result is compared with the historical debris flow event to adjust the model parameters of the secondary disaster risk assessment model according to the comparison result. After completing the training of the secondary disaster risk assessment model, the method further includes:

[0026] According to the simulation results corresponding to the debris flow simulation and the secondary disaster records, the influencing factors corresponding to the debris flow risk are determined, and a corresponding set of influencing factors is constructed; wherein the influencing factors include: terrain slope, rainfall, vegetation coverage, and soil type;

[0027] According to the actual situation of debris flow risk, construct a comment set corresponding to the risk level; wherein the risk level includes no risk, low risk, medium risk, high risk and extremely high risk;

[0028] The membership of each influencing factor at different risk levels is scored, and a fuzzy evaluation matrix corresponding to the scoring results is constructed.

[0029] In one implementation of the present application, after scoring the membership of each influencing factor at different risk levels and constructing a fuzzy evaluation matrix corresponding to the scoring results, the method further includes:

[0030] Perform fuzzy operation on the fuzzy evaluation matrix and the weight vector corresponding to the influencing factors to obtain the corresponding fuzzy comprehensive evaluation result;

[0031] Normalizing the fuzzy comprehensive evaluation results, and determining the risk level of the debris flow event corresponding to the area to be analyzed based on the normalized fuzzy comprehensive evaluation results;

[0032] Based on the risk level, a disaster simulation result corresponding to the debris flow time is determined; wherein the disaster simulation result includes an impact range and disaster intensity.

[0033] In one implementation of the present application, optimizing the secondary disaster assessment standard according to the feedback result of the secondary disaster risk assessment model specifically includes:

[0034] Acquire historical rainfall related parameters of historical rainfall events, and input the historical rainfall related parameters into a trained secondary disaster risk assessment model to compare the historical rainfall related parameters with a risk threshold preset in the secondary disaster risk assessment model;

[0035] According to the comparison result, determining whether the historical rainfall related parameters meet the warning conditions, so as to dynamically update the risk assessment results;

[0036] Based on the actual disaster situation in the risk assessment result, the disaster assessment standard corresponding to the secondary disaster risk assessment model is updated to obtain an optimized secondary disaster risk assessment model.

[0037] In one implementation of the present application, the secondary disaster warning for the risk assessment result exceeding the risk threshold specifically includes:

[0038] When the disaster risk level of the risk assessment result exceeds the risk threshold, the warning information corresponding to the risk assessment result is determined, and a secondary disaster warning is performed on the risk assessment result; wherein the warning information includes: secondary disaster type, warning level, warning area, and impact range;

[0039] The warning information corresponding to the risk assessment result is visually displayed, and the warning information is sent to the corresponding disaster emergency department.

[0040] On the other hand, the embodiment of the present application further provides a secondary disaster warning device based on rainfall runoff analysis, the device comprising:

[0041] at least one processor;

[0042] and, a memory communicatively coupled to the at least one processor;

[0043] The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the secondary disaster warning method based on rainfall runoff analysis as described above.

[0044] On the other hand, an embodiment of the present application further provides a non-volatile computer storage medium storing computer executable instructions, which, when executed, implement the secondary disaster warning method based on rainfall runoff analysis as described above.

[0045] The embodiments of the present application provide a secondary disaster early warning method, device and medium based on rainfall runoff analysis, which at least have the following beneficial effects:

[0046] By preprocessing the original multi-dimensional data, noise, outliers and missing values ​​in the data can be eliminated, thereby obtaining more standard and accurate multi-dimensional data; using the pre-trained rainfall runoff model, more accurate rainfall-related parameters can be output; the secondary disaster risk assessment model constructed based on secondary disaster records, geographic data and rainfall-related parameters can comprehensively consider multiple factors and achieve a comprehensive assessment of the risks in the area to be analyzed; through the optimized secondary disaster risk assessment model and the preset disaster risk level library, the risk assessment results of the area to be analyzed can be quickly and accurately determined, and secondary disaster warnings can be issued for risk assessment results that exceed the risk threshold, which helps to take timely measures to reduce disaster losses; through secondary disaster warnings, relevant departments and personnel can prepare in advance and take necessary preventive measures, thereby reducing the losses caused by secondary disasters and improving disaster response capabilities. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0048] Figure 1 A schematic diagram of a flow chart of a secondary disaster early warning method based on rainfall runoff analysis provided in an embodiment of the present application;

[0049] Figure 2 A schematic diagram of the internal structure of a secondary disaster warning device based on rainfall runoff analysis provided in an embodiment of the present application. DETAILED DESCRIPTION

[0050] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0051] The embodiments of the present application provide a secondary disaster warning method, device and medium based on rainfall runoff analysis, which solves the technical problems in the prior art of disaster warning methods, such as insufficient data utilization and incomplete and timely warning information, which affect the accuracy of rainfall runoff analysis and the effectiveness of secondary disaster warning.

[0052] The technical solutions provided by various embodiments of the present application are described in detail below in conjunction with the accompanying drawings.

[0053] Figure 1 A schematic flow chart of a secondary disaster early warning method based on rainfall runoff analysis provided in an embodiment of the present application.

[0054] The analysis method involved in the embodiments of the present application can be implemented by a terminal device or a server, and the present application does not impose any special restrictions on this. For the convenience of understanding and description, the following embodiments are described in detail by taking a server as an example.

[0055] It should be noted that the server may be a single device or a system consisting of multiple devices, that is, a distributed server, and this application does not make any specific limitation on this.

[0056] like Figure 1 As shown, the secondary disaster early warning method based on rainfall runoff analysis provided in the embodiment of the present application includes:

[0057] 101. Obtain original multi-dimensional data of the area to be analyzed, and pre-process the original multi-dimensional data to obtain standard multi-dimensional data. It should be noted that the multi-dimensional data in the embodiment of the present application includes: rainfall data, geographic data and secondary disaster records.

[0058] Specifically, in one embodiment of the present application, the server obtains rainfall data of the area to be analyzed through ground rain gauges, radar and satellite data to determine the time scale, time dimension and spatial resolution corresponding to the rainfall data. It should be noted that the rainfall data in the embodiment of the present application includes rainfall intensity, rainfall duration and rainfall temporal and spatial distribution.

[0059] The topographic data, land type data, and vegetation cover data of the area to be analyzed are collected through the geographic information system, and the land type data and vegetation cover data are updated in real time based on remote sensing technology. It should be noted that the topographic data in the embodiment of the present application include elevation, slope, watershed boundary, and river network. These data are crucial for processing the hydrological characteristics and water flow paths of the watershed, and for the infiltration, evaporation, and runoff generation process of rainfall.

[0060] The server obtains the secondary disaster records of the area to be analyzed, and determines the potential risk areas in the area to be analyzed based on the disaster point data in the secondary disaster records. These disaster point data are used as sections for runoff calculation to form accurate spatial location warnings for possible secondary disasters. Data cleaning is performed on rainfall data, geographic data, and secondary disaster records, and the cleaned data is filled with null values, and the cleaned and filled data is normalized to obtain standard multi-dimensional data.

[0061] In one example, in a rainfall runoff and secondary disaster early warning project in a mountainous city, the project team first collected real-time rainfall data in the city and its surrounding areas through ground rain gauges, including rainfall per minute, rainfall intensity, etc. At the same time, meteorological radars were used to monitor the movement and intensity changes of rainfall clouds, and satellite data was used to obtain rainfall distribution in a wider area. These data combined provided the team with comprehensive rainfall information, including rainfall intensity, rainfall duration, and the spatial and temporal distribution characteristics of rainfall.

[0062] Then, the team used the Geographic Information System (GIS) to obtain the city's topographic data, such as mountain elevation, slope information, and key geographical features such as river networks and watershed boundaries. In order to keep the data real-time, remote sensing technology is also used to regularly update land use types and vegetation coverage. For example, if recent deforestation or new afforestation activities are monitored, these data will be updated in a timely manner.

[0063] In addition, the project team also obtained historical secondary disaster records from local governments and emergency management departments, especially detailed information on debris flows, landslides, etc. By analyzing the point data in these disaster records, the team successfully identified several potential risk areas, which have experienced similar disasters many times in the past or have the geological and environmental conditions for disasters.

[0064] Finally, to ensure the accuracy and consistency of the data, the team conducted detailed data cleaning work on all collected rainfall data, geographic data, and secondary disaster records, including removing outliers, filling in missing data, and normalizing all data to facilitate subsequent model analysis and early warning work.

[0065] In one embodiment, an agricultural area located in a river basin needs to establish a secondary disaster early warning system. In order to build this system, rainfall data is first needed. Ground rain gauges are placed at key locations in the agricultural area to collect real-time rainfall data. At the same time, through weather radar and satellite images, rainfall conditions over a larger area can be monitored and the spatial and temporal distribution of rainfall can be determined, which is crucial to understanding how rainfall affects the entire river basin.

[0066] Using GIS technology, the team obtained detailed topographic data of the basin, such as elevation models and slope distribution, which are critical for assessing the direction and accumulation of water flow after rainfall. In addition, land use and vegetation cover data were collected and regularly updated through remote sensing technology to reflect changes in agricultural activities and vegetation growth.

[0067] In order to more comprehensively assess the risk of secondary disasters, the team also collected historical records of disasters such as floods, mudslides, and other disasters. By analyzing the locations and conditions of the disasters in these records, they identified potential risk points in the area.

[0068] 102. Input standard rainfall data and geographic data into a pre-trained rainfall runoff model, and output corresponding rainfall-related parameters. It should be noted that the rainfall-related parameters in the embodiment of the present application include: runoff depth, flow rate and runoff time corresponding to the rainfall.

[0069] Specifically, in one embodiment of the present application, the server constructs a rainfall runoff model for the area to be analyzed, and obtains historical rainfall data for the area to be analyzed; the rainfall runoff model is trained based on the historical rainfall data to obtain a trained rainfall runoff model; the rainfall data obtained in real time and the geographic data updated in real time are input into the trained rainfall runoff model, and the runoff depth formed by the rainfall, the flow velocity and flow rate corresponding to the rainfall, and the runoff time are output.

[0070] In one embodiment, a model suitable for local hydrological characteristics is selected, such as SWAT (Soil and Water Assessment Tool), HEC-HMS (Hydrological Modeling System), etc. Considering the applicability and computational efficiency of the model, a customized model suitable for the specific application scenario is selected or developed. The model is parameterized and calibrated through historical rainfall events and flow records. The model is validated using a cross-validation method to ensure the generalization ability and accuracy of the model under different conditions.

[0071] In one embodiment, in a mountainous watershed, in order to more accurately predict and prevent secondary disasters caused by rainfall, the research team plans to construct a rainfall runoff model.

[0072] First, the research team conducted a detailed on-site survey and data collection in the mountainous watershed to understand key information such as the basin's topography, landforms, soil types, and vegetation coverage. Based on this information, the team constructed a preliminary rainfall runoff model that can simulate the distribution, flow, and accumulation of rainfall in the basin.

[0073] Next, the team obtained historical rainfall data from the local meteorological and hydrological departments over the past decade, including detailed information such as rainfall amount, rainfall intensity, and rainfall duration. These data were used to train the initially constructed rainfall runoff model. By continuously adjusting the parameters and structure of the model, it was able to better simulate the actual rainfall runoff process.

[0074] After multiple rounds of training and optimization, the team finally obtained a trained rainfall runoff model that can accurately simulate the flow dynamics under different rainfall conditions, including key parameters such as runoff depth, flow rate, and runoff time.

[0075] Subsequently, the team began to input the real-time rainfall data and geographic data into the trained model. These data include information such as rainfall and rainfall intensity obtained from rain gauges in real time, as well as geographical data such as topography, land use type, and vegetation cover updated in real time through remote sensing technology. Based on these data, the model simulates and outputs parameters such as runoff depth, flow rate, and runoff time formed by rainfall in real time.

[0076] 103. Based on secondary disaster records, geographic data and rainfall-related parameters, a secondary disaster risk assessment model is constructed, and the secondary disaster assessment criteria are optimized according to the feedback results of the secondary disaster risk assessment model;

[0077] Specifically, the server is based on GIS technology, and according to the topographic data, land use type, and vegetation coverage data corresponding to the area to be analyzed, it draws the digital elevation model, slope map, soil type map, and vegetation coverage map corresponding to the area to be analyzed to obtain a secondary disaster risk assessment model; based on the digital elevation model, slope map, soil type map, and vegetation coverage map, it simulates debris flow in the area to be analyzed and obtains the corresponding simulation results; obtains the historical debris flow events corresponding to the area to be analyzed, and compares the simulation results with the historical debris flow events, so as to adjust the model parameters of the secondary disaster risk assessment model according to the comparison results, and completes the training of the secondary disaster risk assessment model.

[0078] In one example, in a mountainous area, in order to accurately assess the risk of secondary disasters, especially the risk of debris flow, the research team used GIS technology and integrated multiple data sources to conduct in-depth analysis and simulation.

[0079] First, the team used GIS technology to integrate the topographic data, land use type and vegetation cover data of the area to be analyzed. These data were used to draw digital elevation models (DEMs), slope maps, soil type maps and vegetation cover maps. The digital elevation model accurately reflects the ups and downs of the area, the slope map reveals the degree of inclination of the surface, and the soil type map and vegetation cover map provide important information about the surface cover and soil characteristics.

[0080] Next, based on these carefully crafted layers, the team built a secondary disaster risk assessment model, which takes into account multiple factors such as topography, soil, and vegetation to assess the risk of secondary disasters such as mudslides.

[0081] To verify the accuracy of the model, the team conducted a debris flow simulation. Using digital elevation models, slope maps, soil type maps, and vegetation coverage maps as input, the team used complex algorithms to simulate the occurrence and development of debris flows under different conditions. The simulation results detailed the possible paths, impact range, and degree of harm of debris flows.

[0082] To further improve the accuracy of the model, the team also obtained historical records of debris flow events in the area to be analyzed. The simulation results were carefully compared with these historical events, and the accuracy and shortcomings of the model in predicting debris flow were analyzed.

[0083] By comparing the results, the team found that the model had some deviations, so they adjusted the model parameters based on these findings. For example, key parameters such as soil shear strength and the reinforcement effect of vegetation on soil may be adjusted to make the simulation results closer to historical reality.

[0084] In one embodiment of the present application, the server compares the simulation results with historical debris flow events to adjust the model parameters of the secondary disaster risk assessment model according to the comparison results, and after completing the training of the secondary disaster risk assessment model, the server determines the influencing factors corresponding to the debris flow risk according to the simulation results corresponding to the debris flow simulation and the secondary disaster records, and constructs a corresponding set of influencing factors. It should be noted that the influencing factors in the embodiment of the present application include: terrain slope, rainfall, vegetation coverage, and soil type.

[0085] According to the actual situation of debris flow risk, a comment set corresponding to the risk level is constructed. It should be noted that the risk levels in the embodiment of the present application include no risk, low risk, medium risk, high risk and extremely high risk.

[0086] The membership of each influencing factor at different risk levels is scored, and a fuzzy evaluation matrix corresponding to the scoring results is constructed.

[0087] In one embodiment, in a mountainous area prone to debris flow, in order to formulate scientific debris flow risk prevention measures, it is necessary to quantitatively assess the debris flow risk. To this end, the researchers performed the following steps:

[0088] First, the researchers conducted a detailed analysis of the factors affecting debris flow based on the results of previous debris flow simulations and the secondary disaster records they collected. They identified four main influencing factors: terrain slope, rainfall, vegetation coverage, and soil type, and constructed a set of influencing factors based on these factors.

[0089] Next, the researchers constructed a risk rating set based on the actual situation of debris flow risks. This rating set divides debris flow risks into five levels: no risk, low risk, medium risk, high risk and extremely high risk. This classification helps to understand the severity of debris flow risks in more detail and provide guidance for subsequent preventive measures.

[0090] Then, the researchers began to score each influencing factor at different risk levels. Geologists, meteorologists, and environmental protection experts were invited to form an evaluation team to jointly score each influencing factor. For example, for the influencing factor of terrain slope, the degree of membership in the extremely high risk level may be higher, because steep terrain is more likely to cause mudslides. Similarly, rainfall, vegetation cover, and soil type were also scored accordingly at different risk levels.

[0091] Finally, the researchers constructed a fuzzy evaluation matrix based on these scoring results, which can clearly show the impact of each influencing factor on different risk levels.

[0092] In one embodiment of the present application, after the server scores the membership of each influencing factor at different risk levels and constructs a fuzzy evaluation matrix corresponding to the scoring result, the fuzzy evaluation matrix and the weight vector corresponding to the influencing factor are fuzzy operated to obtain the corresponding fuzzy comprehensive evaluation result; the fuzzy comprehensive evaluation result is normalized, and based on the normalized fuzzy comprehensive evaluation result, the risk level of the debris flow event corresponding to the area to be analyzed is determined; based on the risk level, the disaster simulation result corresponding to the debris flow time is determined. It should be noted that the disaster simulation result in the embodiment of the present application includes the impact range and the disaster intensity.

[0093] In one example, in a specific mountain debris flow risk assessment project, the research team has constructed a fuzzy evaluation matrix and determined the weight vector of each influencing factor. Next, a fuzzy comprehensive evaluation will be conducted to determine the risk level of the debris flow event and further derive the disaster simulation results.

[0094] First, the research team performed fuzzy operations on the fuzzy evaluation matrix and the weight vectors corresponding to the influencing factors. This operation process comprehensively considers the membership of each influencing factor at different risk levels and the influence of the factor, thereby obtaining a comprehensive evaluation result. This result is a vector whose elements represent the comprehensive membership of the area to be analyzed at different risk levels.

[0095] Then, in order to understand the evaluation results more intuitively, the research team normalized the fuzzy comprehensive evaluation results. The normalized results make the sum of the membership degrees at each risk level equal to 1, which is easier to compare and analyze.

[0096] Based on the normalized fuzzy comprehensive evaluation results, the research team determined the risk level of debris flow events in the area to be analyzed. The risk level with the highest membership was selected as the debris flow risk level of the area. For example, if the high risk level has the highest membership, then the area is identified as a high risk area.

[0097] Finally, based on the determined risk level, the research team further derived the disaster simulation results of the debris flow event. This simulation result includes the possible impact range and disaster intensity of the debris flow. For high-risk areas, the simulation results show that the debris flow may affect a wider area and the disaster intensity is also higher.

[0098] In one embodiment, the construction of the secondary disaster risk assessment model in this application is a method that combines disaster simulation and modeling with fuzzy comprehensive evaluation method, taking debris flow assessment as an example:

[0099] Disaster Simulation and Modeling:

[0100] First, basic data such as the area’s geology, topography, climate, and vegetation coverage were collected, and GIS technology was used to draw the area’s digital elevation model (DEM), slope map, soil type map, vegetation coverage map, etc.

[0101] Secondly, use professional debris flow simulation software, such as RAMMS or FLO-2D, to simulate debris flow based on DEM, soil type, vegetation cover and other data.

[0102] Afterwards, the simulation results were compared with historical debris flow events to verify the accuracy and reliability of the model. Based on the results of the comparative analysis, the model was calibrated and optimized to improve the accuracy of the simulation.

[0103] Fuzzy comprehensive evaluation method:

[0104] According to the results of debris flow simulation and historical disaster data, the main factors affecting debris flow risk are determined, such as terrain slope, rainfall, vegetation coverage, soil type, etc. The factor set U = {U1, U2, ..., Un} is constructed, where U1, U2, ..., Un represent various influencing factors respectively.

[0105] According to the actual situation of debris flow risk, the comment set V = {v1, v2, ..., vm} is set, where v1, v2, ..., vm represent different risk levels, such as no risk, low risk, medium risk, high risk, extremely high risk, etc.

[0106] The membership of each influencing factor at different risk levels is scored to construct the fuzzy evaluation matrix R. The fuzzy evaluation matrix R is a matrix with n rows and m columns, where rij represents the membership of the i-th factor at the j-th risk level.

[0107] V1 V2 V3 … Vm 1 0.2 0.4 0.2 … 0.1 2 0.1 0.2 0.1 … 0.4 3 0.3 0.15 0.2 … 0.1 … … … … … … n … … … … …

[0108] Then, the fuzzy evaluation matrix and the weight vector of the factors are fuzzy operated and normalized. For example, using the weighted average method: B = A*R

[0109] Among them, R is the fuzzy evaluation matrix, A is the weight vector, and B is the fuzzy comprehensive evaluation result vector.

[0110] Through calculation, we can get:

[0111] B = (0.3, 0.2, 0.4, 0.2, 0.1) * (fuzzy evaluation matrix R)

[0112] Assume the calculation result is: B = (0.22, 0.33, 0.3, 0.12, 0.03)

[0113] Finally, according to the fuzzy comprehensive evaluation result vector B, the potential risk level of debris flow in the mountainous area can be determined, and the disaster simulation results such as the impact range and disaster intensity of the debris flow can be output according to the level.

[0114] In one embodiment of the present application, the server obtains historical rainfall related parameters of historical rainfall events, and inputs the historical rainfall related parameters into a trained secondary disaster risk assessment model to compare the historical rainfall related parameters with the risk thresholds preset in the secondary disaster risk assessment model; based on the comparison results, it is determined whether the historical rainfall related parameters meet the warning conditions to dynamically update the risk assessment results; based on the actual disaster situation in the risk assessment results, the disaster assessment standards corresponding to the secondary disaster risk assessment model are updated to obtain an optimized secondary disaster risk assessment model.

[0115] In one embodiment, in a rainy area prone to secondary disasters, in order to improve the accuracy and timeliness of disaster warnings, the local government introduced a secondary disaster risk assessment model. In order to ensure the effectiveness and adaptability of the model, it was decided to verify and optimize the model through historical rainfall events.

[0116] First, the government department obtained relevant parameters of multiple historical rainfall events from meteorological archives, including rainfall amount, rainfall intensity, rainfall duration, etc. These historical rainfall related parameters were input into the trained secondary disaster risk assessment model.

[0117] The model has a preset risk threshold to determine whether a rainfall event is likely to cause secondary disasters. When historical rainfall-related parameters are input into the model, the model will automatically compare these parameters with the preset risk threshold. For example, if the rainfall of a historical rainfall event exceeds the rainfall threshold in the model, the model will determine that this rainfall event has the risk of causing secondary disasters.

[0118] Based on the comparison results, the government can determine which historical rainfall events meet the warning conditions. This step not only verifies the model's warning capabilities, but also helps the government dynamically update the risk assessment results. By comparing with the actual disaster situation, the government found that the model's warning accuracy in some aspects needs to be improved.

[0119] In order to optimize the model, the government department updated the disaster assessment standards corresponding to the secondary disaster risk assessment model based on the actual disaster situation in the risk assessment results. For example, key parameters such as rainfall threshold and rainfall intensity threshold may be adjusted to make the model closer to the actual local situation.

[0120] 104. Based on the optimized secondary disaster record risk assessment model and the preset disaster risk level database, the risk assessment results corresponding to the area to be analyzed are determined, and secondary disaster warnings are issued for risk assessment results that exceed the risk threshold.

[0121] Specifically, in one embodiment of the present application, when the disaster risk level of the risk assessment result exceeds the risk threshold, the server determines the warning information corresponding to the risk assessment result and issues a secondary disaster warning for the risk assessment result. It should be noted that the warning information in the embodiment of the present application includes: secondary disaster type, warning level, warning area, and impact range.

[0122] The warning information corresponding to the risk assessment results is displayed visually and sent to the corresponding disaster emergency department.

[0123] In one embodiment, in a certain city, due to continuous heavy rains, the risk assessment results output by the secondary disaster risk assessment model show that the disaster risk level in a certain mountain area has exceeded the set risk threshold. Faced with this emergency, the relevant departments immediately took action.

[0124] First, based on the risk assessment results, specific warning information was determined. This warning information includes the following: the secondary disaster type is debris flow, the warning level is high, the warning area is a specific section of a mountainous area, and the expected impact range includes several villages at the foot of the mountain.

[0125] In order to let relevant personnel understand the warning situation more intuitively, the relevant departments used GIS technology and visualization tools to visualize the warning information. In the display, not only the specific location of the warning area is marked, but also different colors are used to indicate different warning levels. At the same time, animation is used to demonstrate the possible flow path and impact range of the debris flow.

[0126] Then, these warning information was quickly sent to the corresponding disaster emergency departments. After receiving the warning information, the disaster emergency departments immediately activated the emergency plan, organized personnel to evacuate the warning area, and mobilized resources to respond to the disaster. Because the warning was timely and accurate, the relevant departments were able to respond quickly, effectively avoiding casualties and property losses.

[0127] The above is an embodiment of the method proposed in this application. Based on the same inventive concept, the embodiment of this application also provides a secondary disaster warning device based on rainfall runoff analysis, the structure of which is as follows: Figure 2 shown.

[0128] Figure 2 This is a schematic diagram of the internal structure of a secondary disaster warning device based on rainfall runoff analysis provided in an embodiment of the present application. Figure 2 As shown, the device includes:

[0129] at least one processor;

[0130] and, a memory communicatively coupled to the at least one processor;

[0131] The memory stores instructions that can be executed by at least one processor, and the instructions are executed by at least one processor to enable the at least one processor to:

[0132] Obtaining original multi-dimensional data of the area to be analyzed, and preprocessing the original multi-dimensional data to obtain standard multi-dimensional data; wherein the multi-dimensional data includes: rainfall data, geographic data and secondary disaster records;

[0133] Input standard rainfall data and geographic data into the pre-trained rainfall runoff model, and output corresponding rainfall-related parameters; wherein the rainfall-related parameters include: runoff depth, flow velocity, and runoff time corresponding to the rainfall;

[0134] Based on secondary disaster records, geographic data and rainfall-related parameters, a secondary disaster risk assessment model is constructed, and the secondary disaster assessment criteria are optimized according to the feedback results of the secondary disaster risk assessment model;

[0135] Based on the optimized secondary disaster record risk assessment model and the preset disaster risk level database, the risk assessment results corresponding to the area to be analyzed are determined, and secondary disaster warnings are issued for risk assessment results that exceed the risk threshold.

[0136] The present application also provides a non-volatile computer storage medium storing computer executable instructions. When the computer executable instructions are executed, they can:

[0137] Obtaining original multi-dimensional data of the area to be analyzed, and preprocessing the original multi-dimensional data to obtain standard multi-dimensional data; wherein the multi-dimensional data includes: rainfall data, geographic data and secondary disaster records;

[0138] Input standard rainfall data and geographic data into the pre-trained rainfall runoff model, and output corresponding rainfall-related parameters; wherein the rainfall-related parameters include: runoff depth, flow velocity, and runoff time corresponding to the rainfall;

[0139] Based on secondary disaster records, geographic data and rainfall-related parameters, a secondary disaster risk assessment model is constructed, and the secondary disaster assessment criteria are optimized according to the feedback results of the secondary disaster risk assessment model;

[0140] Based on the optimized secondary disaster record risk assessment model and the preset disaster risk level database, the risk assessment results corresponding to the area to be analyzed are determined, and secondary disaster warnings are issued for risk assessment results that exceed the risk threshold.

[0141] Each embodiment in this application is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device and medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.

[0142] The above describes specific embodiments of the present application. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0143] The devices and media provided in the embodiments of the present application correspond one-to-one to the methods. Therefore, the devices and media also have similar beneficial technical effects as the corresponding methods. Since the beneficial technical effects of the methods have been described in detail above, the beneficial technical effects of the devices and media will not be repeated here.

[0144] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0145] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0146] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0147] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0148] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0149] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0150] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0151] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0152] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A secondary disaster early warning method based on rainfall runoff analysis is characterized by: The method comprises: Acquire original multi-dimensional data of the area to be analyzed, and pre-process the original multi-dimensional data to obtain standard multi-dimensional data; wherein the multi-dimensional data includes: rainfall data, geographic data and secondary disaster records; Input standard rainfall data and geographic data into a pre-trained rainfall runoff model, and output corresponding rainfall-related parameters; wherein the rainfall-related parameters include: runoff depth, flow rate and runoff time corresponding to the rainfall; Based on the secondary disaster records, the geographic data and the rainfall-related parameters, a secondary disaster risk assessment model is constructed, and according to the feedback results of the secondary disaster risk assessment model, a secondary disaster assessment standard is optimized; Based on the optimized secondary disaster record risk assessment model and the preset disaster risk level library, the risk assessment results corresponding to the area to be analyzed are determined, and secondary disaster warnings are issued for risk assessment results that exceed the risk threshold.

2. The secondary disaster early warning method based on rainfall runoff analysis according to claim 1 is characterized in that: The obtaining of original multi-dimensional data of the area to be analyzed and preprocessing the original multi-dimensional data to obtain standard multi-dimensional data specifically includes: Obtain rainfall data of the area to be analyzed through ground rain gauges, radar and satellite data to determine the time scale, time dimension and spatial resolution corresponding to the rainfall data; wherein the rainfall data includes rainfall intensity, rainfall duration and rainfall temporal and spatial distribution; Collecting topographic data, land type data, and vegetation coverage data of the area to be analyzed through a geographic information system, and updating the land type data and vegetation coverage data in real time based on remote sensing technology; wherein the topographic data include elevation, slope, watershed boundary, and river network; Acquire secondary disaster records of the area to be analyzed, and determine potential risk areas in the area to be analyzed based on disaster point data in the secondary disaster records; The rainfall data, geographic data and the secondary disaster records are cleaned, null values ​​are filled in the cleaned data, and the cleaned and filled data are normalized to obtain standard multi-dimensional data.

3. The secondary disaster early warning method based on rainfall runoff analysis according to claim 1 is characterized in that: The standard rainfall data and geographic data are input into the pre-trained rainfall runoff model, and the corresponding rainfall related parameters are output, specifically including: Constructing a rainfall runoff model for the area to be analyzed, and obtaining historical rainfall data for the area to be analyzed; Training the rainfall runoff model based on the historical rainfall data to obtain a trained rainfall runoff model; The real-time acquired rainfall data and real-time updated geographic data are input into the trained rainfall runoff generation and confluence model, and the runoff depth formed by the rainfall, the flow velocity and flow rate corresponding to the rainfall, and the runoff time are output.

4. The secondary disaster early warning method based on rainfall runoff analysis according to claim 1 is characterized in that: The constructing of a secondary disaster risk assessment model based on the secondary disaster record, the geographic data and the rainfall-related parameters specifically includes: Based on GIS technology, and according to the topographic data, land use type, and vegetation coverage data corresponding to the area to be analyzed, a digital elevation model, slope map, soil type map, and vegetation coverage map corresponding to the area to be analyzed are drawn to obtain a secondary disaster risk assessment model; Based on the digital elevation model, the slope map, the soil type map and the vegetation coverage map, a debris flow simulation is performed on the area to be analyzed, and a corresponding simulation result is obtained; The historical debris flow events corresponding to the area to be analyzed are obtained, and the simulation results are compared with the historical debris flow events, so as to adjust the model parameters of the secondary disaster risk assessment model according to the comparison results, and complete the training of the secondary disaster risk assessment model.

5. The secondary disaster early warning method based on rainfall runoff analysis according to claim 4 is characterized in that: After comparing the simulation result with the historical debris flow event to adjust the model parameters of the secondary disaster risk assessment model according to the comparison result and completing the training of the secondary disaster risk assessment model, the method further includes: According to the simulation results corresponding to the debris flow simulation and the secondary disaster records, the influencing factors corresponding to the debris flow risk are determined, and a corresponding set of influencing factors is constructed; wherein the influencing factors include: terrain slope, rainfall, vegetation coverage, and soil type; According to the actual situation of debris flow risk, construct a comment set corresponding to the risk level; wherein the risk level includes no risk, low risk, medium risk, high risk and extremely high risk; The membership of each influencing factor at different risk levels is scored, and a fuzzy evaluation matrix corresponding to the scoring results is constructed.

6. The secondary disaster early warning method based on rainfall runoff analysis according to claim 5 is characterized in that: After scoring the membership of each influencing factor at different risk levels and constructing a fuzzy evaluation matrix corresponding to the scoring results, the method further includes: Perform fuzzy operation on the fuzzy evaluation matrix and the weight vector corresponding to the influencing factors to obtain the corresponding fuzzy comprehensive evaluation result; Normalizing the fuzzy comprehensive evaluation results, and determining the risk level of the debris flow event corresponding to the area to be analyzed based on the normalized fuzzy comprehensive evaluation results; Based on the risk level, a disaster simulation result corresponding to the debris flow time is determined; wherein the disaster simulation result includes an impact range and disaster intensity.

7. The secondary disaster early warning method based on rainfall runoff analysis according to claim 1 is characterized in that: Optimizing the secondary disaster assessment standard according to the feedback results of the secondary disaster risk assessment model specifically includes: Acquire historical rainfall related parameters of historical rainfall events, and input the historical rainfall related parameters into a trained secondary disaster risk assessment model to compare the historical rainfall related parameters with a risk threshold preset in the secondary disaster risk assessment model; According to the comparison result, determining whether the historical rainfall related parameters meet the warning conditions, so as to dynamically update the risk assessment results; Based on the actual disaster situation in the risk assessment result, the disaster assessment standard corresponding to the secondary disaster risk assessment model is updated to obtain an optimized secondary disaster risk assessment model.

8. The secondary disaster early warning method based on rainfall runoff analysis according to claim 1 is characterized in that: The secondary disaster warning for risk assessment results exceeding the risk threshold specifically includes: When the disaster risk level of the risk assessment result exceeds the risk threshold, the warning information corresponding to the risk assessment result is determined, and a secondary disaster warning is performed on the risk assessment result; wherein the warning information includes: secondary disaster type, warning level, warning area, and impact range; The warning information corresponding to the risk assessment result is visually displayed, and the warning information is sent to the corresponding disaster emergency department.

9. The secondary disaster early warning device based on rainfall runoff analysis is characterized by: The device comprises: at least one processor; and, a memory communicatively coupled to the at least one processor; The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the secondary disaster warning method based on rainfall runoff analysis as described in any one of claims 1 to 8.

10. A non-volatile computer storage medium storing computer executable instructions, characterized in that: When the computer executable instructions are executed, the secondary disaster early warning method based on rainfall runoff analysis as described in any one of claims 1 to 8 is implemented.

Citation Information

Patent Citations

  • Debris flow disaster early warning method based on landform information entropy and rainfall

    CN112862152A

  • Regional rainstorm disaster risk early warning method and device

    CN117789416A

  • Fuzzy mathematics comprehensive evaluation method suitable for risk removal and reinforcement of small and medium-sized reservoirs

    CN118095829A

  • Method and device for generating rainfall flood disaster risk map by coupling intelligent algorithm and multi-source data

    CN118248035A

  • Method for evaluating potential risk of phosphorus loss of outdoor vegetable crops

    GB202400578D0

Cited By

  • Slope collapse risk assessment method and system

    CN119294838A

  • Raindrop distribution trueness evaluation method and device for site simulated rainfall

    CN119442102A

  • A method and apparatus for evaluating the realism of raindrop distribution in simulated rainfall at a site

    CN119442102B

  • Rainfall prediction method and system for Beijing, Tianjin and Hebei regions

    CN119556377A