Charging device
By designing charging equipment using existing power sources in the data center and charging the charging equipment directly, the problem of long construction time and high cost of the charging pile power supply system in the data center is solved, and the effects of efficient use of power and cost reduction are achieved.
Patent Information
- Application Number
- CN202410781003.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2044-06-17
AI Technical Summary
When new charging piles are built in or near the data center campus, power supply facilities and backup facilities need to be re-planned, resulting in a long and costly construction of the power supply system.
Design a charging equipment, including a power conversion unit and a charge controller. It uses the existing power supply in the data center to convert the power output voltage into a charging voltage through the power conversion unit, and directly charges the equipment to be charged, avoiding re-planning of power supply facilities and reducing construction costs. time and cost.
Effectively utilize the power supply of the data center to improve the power utilization rate, shorten the construction time of the charging pile power supply system, reduce the construction cost, and ensure the reliability of the power supply of the charging equipment.
Smart Images

Figure CN118748447A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present application relate to the field of power supply technology, and in particular to a charging device. Background Art
[0002] A data center (DC) is a place that provides an operating environment for centrally placed computing devices (such as terminal devices or servers and other electronic devices).
[0003] At present, considering the charging demand of electric vehicles in data center parks or near data centers, new charging piles can be built in data center parks or near data centers. However, when new charging piles are built in data center parks or near data centers, it is necessary to re-plan the power supply facilities and backup power facilities to rebuild the power supply system of the charging piles, resulting in a long construction time and high construction cost for the power supply system. Summary of the invention
[0004] The embodiment of the present application provides a charging device, which can shorten the construction time of the charging pile power supply system and reduce the construction cost of the power supply system.
[0005] In order to achieve the above purpose, the embodiment of the present application adopts the following technical solution:
[0006] On the one hand, an embodiment of the present application provides a charging device, including a power conversion unit and a charging controller; wherein:
[0007] The input end of the power conversion unit is electrically connected to the output end of the first power supply; the first power supply is a power supply for powering computing devices in a data center; the first power supply includes an uninterruptible power supply UPS or a high-voltage direct current power supply system HVDC;
[0008] The output end of the power conversion unit is electrically connected to the device to be charged; the power conversion unit is used to convert the output voltage of the first power supply into a charging voltage for the device to be charged;
[0009] The charging controller is electrically connected to the power conversion unit; the charging controller is used to control the charging device to charge the device to be charged based on the charging information.
[0010] In the above charging device, the input end of the power conversion unit is electrically connected to the output end of the power supply for the computing device in the data center, so that the charging controller controls the power conversion unit to convert the output voltage of the power supply into the charging voltage of the device to be charged, thereby charging the device to be charged. In this way, the existing power supply in the data center is used to charge the device to be charged. On the one hand, the power supply in the data center can be effectively utilized, the role of the power supply in the data center can be fully utilized, and the utilization rate of the power supply in the data center can be improved. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0011] In some possible implementations, the first power supply further includes a battery and a power controller; wherein the battery is a power supply device in a data center for providing backup power to computing devices;
[0012] The power controller is electrically connected to the battery; the power controller is used to obtain the power information of the battery;
[0013] The input end of the power conversion unit is electrically connected to the output end of the battery;
[0014] The charging controller is electrically connected to the power controller;
[0015] The charging controller is used to control the charging device to charge the device to be charged, including:
[0016] Obtaining battery power information based on the power controller;
[0017] When the power information meets the preset conditions, the charging device is controlled to charge the device to be charged.
[0018] In the above implementation, it is ensured that when the battery power information meets the preset conditions, the device to be charged is charged based on the battery, which can not only ensure the power supply reliability of the data center, but also ensure the power supply reliability of the device to be charged.
[0019] In some possible implementations, when the first power supply includes a UPS and the UPS outputs alternating current, the power conversion unit includes a first AC / DC conversion unit;
[0020] Wherein, the input end of the first AC / DC conversion unit is electrically connected to the output end of the UPS;
[0021] An output end of the first AC / DC conversion unit is electrically connected to the device to be charged;
[0022] The charging controller is electrically connected to the first AC / DC conversion unit; the charging controller is also used to control the first AC / DC conversion unit to convert the AC power output by the UPS into a charging voltage.
[0023] In the above implementation, a solution is provided for converting the voltage of the AC power output by the UPS based on the first AC / DC conversion unit, which can control the output power so as to output a voltage with better power supply effect, thereby realizing reliable charging of the device to be charged.
[0024] In some possible implementations, when the first power supply includes a UPS and the UPS output is direct current, or when the first power supply includes an HVDC, the power conversion unit includes a first DC / DC conversion unit;
[0025] Wherein, the input end of the first DC / DC conversion unit is electrically connected to the output end of the UPS or the output end of the HVDC;
[0026] An output end of the first DC / DC conversion unit is electrically connected to the device to be charged;
[0027] The charging controller is electrically connected to the first DC / DC conversion unit; the charging controller is also used to control the first DC / DC conversion unit to convert the DC power output by the UPS or the DC power output by the HVDC into a charging voltage.
[0028] In the above implementation, a solution is provided for voltage conversion of the DC power output by the UPS or the DC power output by the HVDC based on the first DC / DC conversion unit, which can realize the control of the output electric energy so as to output a voltage with better power supply effect, thereby realizing reliable charging of the device to be charged.
[0029] In some possible implementations, when the first power supply also includes a battery, the power conversion unit also includes a second DC / DC conversion unit;
[0030] Wherein, the input end of the second DC / DC conversion unit is electrically connected to the output end of the battery;
[0031] An output end of the second DC / DC conversion unit is electrically connected to the device to be charged;
[0032] The charging controller is electrically connected to the second DC / DC conversion unit; the charging controller is also used to control the second DC / DC conversion unit to convert the DC power output by the battery into a charging voltage.
[0033] In the above implementation, a solution is provided for converting the DC power output by the battery into a voltage based on a second DC / DC conversion unit, which can control the output power so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged.
[0034] In some possible implementations, the charging device further includes an input power distribution unit;
[0035] The input end of the input power distribution unit is electrically connected to the output end of the first power supply;
[0036] The output end of the input power distribution unit is electrically connected to the input end of the power conversion unit.
[0037] In the above implementation, an input power distribution unit is provided to electrically connect the output end of the first power supply to the input end of the power conversion unit, thereby transmitting the electric energy output by the battery to the power conversion unit.
[0038] In some possible implementations, the charging device further includes an output power distribution unit;
[0039] The input end of the output power distribution unit is electrically connected to the output end of the power conversion unit;
[0040] The output end of the output power distribution unit is electrically connected to the device to be charged.
[0041] In the above implementation, an output power distribution unit is provided to transmit the electric energy output by the power conversion unit to the device to be charged, thereby charging the device to be charged.
[0042] In some possible implementations, the charging device is an integrated charging pile or a charging host, and the output end of the charging host is electrically connected to one or more split charging piles; each split charging pile is used to charge a device to be charged.
[0043] In the above implementation, it is supported to deploy an integrated charging pile or a split charging pile in the charging device.
[0044] In some possible implementations, the charging host is deployed inside a data center.
[0045] In the above implementation, since the data center itself has a complete environmental control system, by centrally deploying the charging hosts inside the data center, the existing complete environmental control system can be effectively utilized for design and manufacturing inside the data center, which can effectively reduce design and manufacturing costs. At the same time, compared with designing and manufacturing outside the data center, it can also avoid unexpected situations caused by cable lengthening (such as surge current caused by lightning, etc.), effectively improving charging reliability.
[0046] In some possible implementations, the charging device further includes a second AC / DC conversion unit;
[0047] Wherein, the input end of the second AC / DC conversion unit is electrically connected to the second power supply; the second power supply is the AC power of the power grid;
[0048] An output end of the second AC / DC conversion unit is electrically connected to the device to be charged;
[0049] The charging controller is electrically connected to the second AC / DC conversion unit; the charging controller is also used to control the second AC / DC conversion unit to convert the AC power of the power grid into a charging voltage.
[0050] In the above implementation, a solution is provided for converting the voltage of the AC power output by the second power supply based on the second AC / DC conversion unit, which can control the output electric energy so as to output a voltage with better power supply effect, thereby realizing reliable charging of the device to be charged.
[0051] On the other hand, an embodiment of the present application provides a charging method, which is applied to the above-mentioned charging device, and the charging device includes a power conversion unit and a charging controller; wherein,
[0052] The input end of the power conversion unit is electrically connected to the output end of the first power supply; the first power supply is a power supply for powering computing devices in a data center; the first power supply includes an uninterruptible power supply UPS or a high-voltage direct current power supply system HVDC;
[0053] The output end of the power conversion unit is electrically connected to the device to be charged; the power conversion unit is used to convert the output voltage of the first power supply into a charging voltage for the device to be charged;
[0054] The charging controller is electrically connected to the power conversion unit;
[0055] The method includes:
[0056] The charging controller controls the charging device to charge the device to be charged based on the charging information.
[0057] In the above technical solution, the input end of the power conversion unit is electrically connected to the output end of the power supply for the computing device in the data center, so that the charging controller controls the power conversion unit to convert the output voltage of the power supply into the charging voltage of the device to be charged, thereby charging the device to be charged. In this way, the existing power supply in the data center is used to charge the device to be charged. On the one hand, the power supply in the data center can be effectively utilized, the role of the power supply in the data center can be fully utilized, and the utilization rate of the power supply in the data center can be improved. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0058] In some possible implementations, the first power supply further includes a battery and a power controller; wherein the battery is a power supply device in a data center for providing backup power to computing devices;
[0059] The power controller is electrically connected to the battery; the power controller is used to obtain the power information of the battery;
[0060] The input end of the power conversion unit is electrically connected to the output end of the battery;
[0061] The charging controller is electrically connected to the power controller;
[0062] The charging controller controls the charging device to charge the device to be charged, including:
[0063] The charging controller obtains the battery power information based on the power controller;
[0064] When the power information meets the preset conditions, the charging controller controls the charging device to charge the device to be charged.
[0065] In the above implementation, it is ensured that when the battery power information meets the preset conditions, the device to be charged is charged based on the battery, which can not only ensure the power supply reliability of the data center, but also ensure the power supply reliability of the device to be charged.
[0066] In some possible implementations, when the first power supply includes a UPS and the UPS outputs alternating current, the power conversion unit includes a first AC / DC conversion unit;
[0067] Wherein, the input end of the first AC / DC conversion unit is electrically connected to the output end of the UPS;
[0068] An output end of the first AC / DC conversion unit is electrically connected to the device to be charged;
[0069] The charging controller is electrically connected to the first AC / DC conversion unit;
[0070] The method also includes: the charging controller controls the first AC / DC conversion unit to convert the AC power output by the UPS into a charging voltage.
[0071] In the above implementation, a solution is provided for converting the voltage of the AC power output by the UPS based on the first AC / DC conversion unit, which can control the output power so as to output a voltage with better power supply effect, thereby realizing reliable charging of the device to be charged.
[0072] In some possible implementations, when the first power supply includes a UPS and the UPS output is direct current, or when the first power supply includes an HVDC, the power conversion unit includes a first DC / DC conversion unit;
[0073] Wherein, the input end of the first DC / DC conversion unit is electrically connected to the output end of the UPS or the output end of the HVDC;
[0074] An output end of the first DC / DC conversion unit is electrically connected to the device to be charged;
[0075] The charging controller is electrically connected to the first DC / DC conversion unit;
[0076] The method further includes: the charging controller controls the first DC / DC conversion unit to convert the DC power output by the UPS or the DC power output by the HVDC into a charging voltage.
[0077] In the above implementation, a solution is provided for voltage conversion of the DC power output by the UPS or the DC power output by the HVDC based on the first DC / DC conversion unit, which can realize the control of the output electric energy so as to output a voltage with better power supply effect, thereby realizing reliable charging of the device to be charged.
[0078] In some possible implementations, when the first power supply also includes a battery, the power conversion unit also includes a second DC / DC conversion unit;
[0079] Wherein, the input end of the second DC / DC conversion unit is electrically connected to the output end of the battery;
[0080] An output end of the second DC / DC conversion unit is electrically connected to the device to be charged;
[0081] The charging controller is electrically connected to the second DC / DC conversion unit;
[0082] The method also includes: the charging controller controls the second DC / DC conversion unit to convert the DC power output by the battery into a charging voltage.
[0083] In the above implementation, a solution is provided for converting the DC power output by the battery into a voltage based on a second DC / DC conversion unit, which can control the output power so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged.
[0084] In some possible implementations, the charging device further includes a second AC / DC conversion unit;
[0085] Wherein, the input end of the second AC / DC conversion unit is electrically connected to the second power supply; the second power supply is the AC power of the power grid;
[0086] An output end of the second AC / DC conversion unit is electrically connected to the device to be charged;
[0087] The charging controller is electrically connected to the second AC / DC conversion unit;
[0088] The method also includes: the charging controller controls the second AC / DC conversion unit to convert the AC power of the power grid into a charging voltage.
[0089] In the above implementation, a solution is provided for converting the voltage of the AC power output by the second power supply based on the second AC / DC conversion unit, which can control the output electric energy so as to output a voltage with better power supply effect, thereby realizing reliable charging of the device to be charged.
[0090] On the other hand, an embodiment of the present application provides a charging controller, which includes a processor and a memory, wherein the processor and the memory are coupled. The memory is used to store computer program instructions, and the processor is used to call the computer program instructions in the memory to execute the charging method shown in the above embodiment.
[0091] On the other hand, an embodiment of the present application provides a computer-readable storage medium, which stores computer program instructions, and the computer program instructions are used to enable a charging controller to execute the charging method shown in the above embodiment.
[0092] On the other hand, an embodiment of the present application provides a computer program product, including computer program instructions. When the computer program instructions are executed on a charging controller, the charging controller executes the charging method shown in the above embodiment. BRIEF DESCRIPTION OF THE DRAWINGS
[0093] Figure 1 A schematic diagram of the architecture of a charging device provided in an embodiment of the present application;
[0094] Figure 2 A schematic diagram of the architecture of another charging device provided in an embodiment of the present application;
[0095] Figure 3 A schematic diagram of the architecture of a power conversion unit provided in an embodiment of the present application;
[0096] Figure 4 A schematic diagram of the architecture of another power conversion unit provided in an embodiment of the present application;
[0097] Figure 5 A schematic diagram of the architecture of another charging device provided in an embodiment of the present application;
[0098] Figure 6 A schematic diagram of the architecture of another charging device provided in an embodiment of the present application;
[0099] Figure 7 A schematic diagram of the architecture of another charging device provided in an embodiment of the present application;
[0100] Figure 8 A schematic diagram of the architecture of a UPS-based charging device provided in an embodiment of the present application;
[0101] Fig. 9 A schematic diagram of the architecture of another UPS-based charging device provided in an embodiment of the present application;
[0102] Fig.10 A schematic diagram of the architecture of a HVDC-based charging device provided in an embodiment of the present application;
[0103] Fig.11 A schematic diagram of the architecture of another HVDC-based charging device provided in an embodiment of the present application;
[0104] Fig.12 A schematic diagram of the hardware structure of a charging controller provided in an embodiment of the present application;
[0105] Fig.13 A schematic diagram of a charging method provided in an embodiment of the present application;
[0106] Fig.14 A schematic diagram of a charging method provided in an embodiment of the present application;
[0107] Fig.15 A schematic diagram of the structure of a charging device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0108] In the description of the embodiments of the present application, unless otherwise specified, " / " means "or". For example, A / B can mean A or B. "And / or" in this article is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, "at least one" means one or more, and "multiple" means two or more. The words "first", "second", etc. do not limit the quantity and execution order, and the words "first", "second", etc. do not limit them to be different.
[0109] It should be noted that in the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.
[0110] The embodiment of the present application provides a charging device that can be used in a data center or outside a data center. A data center refers to a building that provides an operating environment for centrally placed computing devices. It can be understood that a data center is a place where a large amount of data information is collected, stored, processed, distributed, and accessed on a network infrastructure of computing devices.
[0111] For example, the charging device can be a charging pile built inside or outside the data center, such as a DC fast charging pile. In some possible implementations, the charging device provided in the embodiment of the present application can be applied to the scenario of building a new charging pile in a data center park or near a data center.
[0112] The charging device provided in the embodiment of the present application electrically connects the input end of the power conversion unit to the output end of the power supply for the computing device in the data center, so that the charging controller controls the power conversion unit to convert the output voltage of the power supply into the charging voltage of the device to be charged, thereby charging the device to be charged. In this way, the existing power supply in the data center is used to charge the device to be charged. On the one hand, the power supply in the data center can be effectively utilized, the role of the power supply in the data center can be fully utilized, and the utilization rate of the power supply in the data center can be improved. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0113] Figure 1 This is a schematic diagram of the architecture of a charging device provided in an embodiment of the present application. Figure 1 The charging device includes: a power conversion unit 101 and a charging controller 102.
[0114] The input end of the power conversion unit 101 is electrically connected to the output end of the first power supply 103. The output end of the power conversion unit 101 is electrically connected to the device to be charged 104. The power conversion unit 101 is used to convert the output voltage of the first power supply 103 into a charging voltage for the device to be charged 104.
[0115] In some possible implementations, the input end of the power conversion unit 101 is electrically connected to the output end of the first power supply 103 through a high-voltage DC cable. In this way, a method for connecting the input end of the power conversion unit 101 and the output end of the first power supply 103 based on a high-voltage DC cable is provided. Furthermore, a charging solution based on high-voltage DC can be implemented, for example, a high-voltage fast charging solution based on a charging pile can be implemented. Among them, high-voltage fast charging refers to a charging function that provides high power in a short period of time, thereby shortening the charging time and improving the charging efficiency.
[0116] In some possible implementations, the output end of the power conversion unit 101 is electrically connected to the device to be charged 104 via a charging gun. For example, the charging gun may be a DC charging gun, such as an industry-standard DC charging gun, which may be air-cooled or liquid-cooled. In this way, the charging gun can be used to transmit the electric energy output by the power conversion unit 101 to the device to be charged 104, thereby charging the device to be charged 104.
[0117] The charging controller 102 is electrically connected to the power conversion unit 101. The charging controller 102 is used to control the charging device to charge the device to be charged 104. Exemplarily, the charging controller 102 is used to control the power conversion unit 101 in the charging device to convert the output voltage of the first power supply 103 into the charging voltage of the device to be charged 104, thereby charging the device to be charged 104.
[0118] The first power supply 103 is a power supply for supplying power to a computing device in a data center, wherein the computing device may be a server.
[0119] Figure 2 This is a schematic diagram of the architecture of another charging device provided in an embodiment of the present application. Figure 2 , the first power supply 103 may include a main power supply 1031, such as an uninterruptable power supply (UPS) or a high voltage DC power supply system (HVDC). It should be noted that UPS supports outputting AC power or DC power. HVDC supports outputting DC power. In some embodiments, the charging controller 102 may be specifically used to control the main power supply 1031 to charge the device to be charged 104.
[0120] See also Figure 2 The first power supply 103 may further include a battery 1032 and a power controller 1033 .
[0121] The battery 1032 is a power supply device used in a data center to provide backup power for computing devices, such as a backup battery pack. It should be understood that the battery 1032 is used to power computing devices in a data center when the mains power output is abnormal.
[0122] The power controller 1033 is electrically connected to the battery 1032, and is used to obtain power information of the battery 1032. Exemplarily, the power controller 1033 may be a battery management unit.
[0123] The input end of the power conversion unit 101 is electrically connected to the output end of the battery 1032. In some embodiments, the power conversion unit 101 is used to convert the output voltage of the battery 1032 into a charging voltage for the device 104 to be charged.
[0124] In some embodiments, the charging controller 102 may be specifically configured to control the battery 1032 to charge the device 104 to be charged.
[0125] The charging controller 102 is electrically connected to the power controller 1033. The charging controller 102 is specifically used to: obtain the power information of the battery 1032 based on the power controller 1033; and control the charging device to charge the device 104 to be charged when the power information meets the preset conditions.
[0126] In some possible implementations, the power controller 1033 may be connected to the charging controller 102 via a communication cable for communicating with the charging controller 102. In some possible implementations, the charging controller 102 may be provided with a communication interface, and the power controller 1033 is connected to the communication interface of the charging controller 102 via a cable. The communication interface is provided in the charging controller 102 so that the power controller 1033 is electrically connected via a cable based on the communication interface.
[0127] For example, taking the first power supply 103 as a UPS, the battery 1032 may be a battery pack of the UPS. Alternatively, taking the first power supply as an HVDC, the battery 1032 may be a battery pack of the HVDC. In this way, the battery pack based on the UPS or the HVDC is supported to charge the device 104 to be charged.
[0128] It should be noted that the battery types of the UPS battery pack and the HVDC battery pack may be the same or different. It should be noted that in other possible implementations, the battery 1032 may also be a battery pack of other types, which is not limited in the present embodiment.
[0129] Among them, the preset condition may be the backup power requirement of the data center. In some possible implementations, the backup power requirement of the data center refers to the minimum power requirement for powering each computing device in the data center. Exemplarily, the backup power requirement of the data center can determine whether the battery 1032 supports external power supply by setting a minimum power threshold. In other possible implementations, the backup power requirement of the data center can be based on the charging requirements indicated by the charging information of the device to be charged 104 and the equipment load of the data center to determine whether the battery 1032 supports external power supply.
[0130] It should be understood that if the power information of the battery 1032 meets the backup power requirement of the data center, that is, the power information of the battery 1032 is greater than or equal to the minimum power requirement for powering each computing device in the data center, then the battery 1032 can be used to charge the device to be charged 104. Exemplarily, when the power information of the battery 1032 meets the backup power requirement of the data center, the charging controller 102 controls the battery 1032 to charge the device to be charged 104, such as controlling the battery 1032 to charge the device to be charged 104 based on the charging information.
[0131] In the above embodiment, through communication between the charging controller 102 and the power controller 1033, it is ensured that when the power information of the battery 1032 meets the backup power requirements of the data center, the device to be charged 104 is charged based on the battery 1032, which can not only ensure the power supply reliability of the data center, but also ensure the power supply reliability of the device to be charged 104.
[0132] In some possible implementations, the charging controller 102 may determine the available power supply based on the power information of the battery 1032 and the backup power requirements of the data center. The available power supply is the power that the battery 1032 is allowed to supply to the device to be charged 104. Then, based on the available power supply, the battery 1032 is controlled to charge the device to be charged 104.
[0133] It should be noted that the backup power requirements of the data center change in real time, for example, they may change according to the power supply time of the data center (such as high power demand during the day and low power demand at night), the power supply object (such as high power demand for devices with large computing loads and low power demand for devices with small computing loads), or other factors. Exemplarily, the charging controller 102 can determine the available power supply in real time according to the real-time changing backup power requirements of the data center, and then control the battery 1032 to charge the device 104 to be charged based on the real-time determined available power supply.
[0134] Regarding the power information of the battery 1032, in some possible implementations, the process of the power controller 1033 obtaining the power information of the battery 1032 may be: the power controller 1033 obtains the battery pack capacity (such as 30KWH) and the state of charge (SOC) of the battery 1032, and determines the product of the battery pack capacity and the SOC of the battery 1032 as the power information of the battery 1032. Among them, SOC refers to the available state of the remaining charge in the battery, which is generally expressed as a percentage.
[0135] In the embodiment of the present application, when the charging device is connected to the device to be charged 104, the charging controller 102 is specifically used to: send a power query signal to the power controller 1033, the power query signal is used to query the power information of the battery 1032; receive the power information of the battery 1032 returned by the power controller 1033; if the power information of the battery 1032 meets the preset conditions, control the charging device to supply power to the device to be charged 104. Among them, the charging controller 102 can detect whether the charging device is connected to the device to be charged 104 through a handshake protocol.
[0136] Based on the above charging equipment, a solution can be implemented to charge the device 104 to be charged outside the data center based on the battery 1032 inside the data center. On the one hand, the battery 1032 of the data center can be effectively utilized, the role of the battery 1032 of the data center can be fully utilized, and the utilization rate of the battery 1032 of the data center can be improved. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which can reduce the time and cost of building a power supply system (such as a charging pile power supply system).
[0137] See also Figure 2, the first power supply 103 may further include a battery charger 1034 .
[0138] The battery charger 1034 is electrically connected to the battery 1032 , and the battery charger 1034 is used to charge the battery 1032 .
[0139] In some possible implementations, the battery charger 1034 can be integrated with the main power supply 1031 as a whole, such as HVDC. Alternatively, the battery charger 1034 can be a unit deployed separately in the first power supply 103, such as a battery charger deployed separately by UPS. It can be understood that in the UPS / HVDC power supply scenario, the output of the UPS / HVDC is used to power the computing devices in the data center and also to charge the battery 1032. Therefore, in the HVDC power supply scenario, the battery charger 1034 and the main power supply 1031 (UPS / HVDC) can be integrated as a whole.
[0140] The input end of the power conversion unit 101 is electrically connected to the output end of the battery charger 1034. In some embodiments, the power conversion unit 101 is used to convert the output voltage of the battery charger 1034 into a charging voltage for the device 104 to be charged.
[0141] In some embodiments, the charging controller 102 may be specifically configured to control the battery charger 1034 to charge the device to be charged 104 .
[0142] Based on the above-mentioned charging equipment, a solution can be implemented to charge the device 104 to be charged outside the data center based on the battery inside the data center. On the one hand, the battery of the data center can be effectively utilized, and the role of the battery of the data center can be fully utilized, thereby improving the utilization rate of the battery of the data center. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which can reduce the time and cost required to build a power supply system (such as a charging pile power supply system). In some embodiments, the charging controller 102 is also used to obtain charging information of the device 104 to be charged, and the charging information includes at least one of voltage, current and power. Furthermore, based on the charging information, the charging device is controlled to charge the device 104 to be charged.
[0143] The charging information of the device to be charged 104 is used to indicate the charging requirement of the device to be charged 104 , such as at least one of a voltage requirement, a current requirement, and a power requirement.
[0144] In some possible implementations, the charging information of the device to be charged 104 may be in the form of a charging curve, such as a current curve and a voltage curve. Among them, the current curve may be a curve showing the current variation over time of the battery pack of the device to be charged 104 during the charging process, which is used to characterize the current requirement of the device to be charged 104. The voltage curve may be a curve showing the voltage variation over time of the battery pack of the device to be charged 104 during the charging process, which is used to characterize the voltage requirement of the device to be charged 104. It is worth noting that the charging information may also be in other forms, such as a numerical range. The embodiments of the present application are not limited to this. Exemplarily, the charging requirements of the device to be charged 104 may be: constant current charging first, and then constant voltage charging when the voltage gradually increases to a preset voltage threshold (such as 700V).
[0145] In some possible implementations, after the charging controller 102 obtains the charging information of the device to be charged 104, it is specifically used to: control the power conversion unit 101 to perform voltage conversion on the output voltage of the first power supply 103, so as to convert the output voltage of the first power supply 103 into the charging voltage of the device to be charged 104, thereby charging the device to be charged 104.
[0146] Exemplarily, the number of power conversion units 101 may be multiple, and multiple power conversion units 101 are connected in parallel. In some possible implementations, the charging controller 102 controls a preset number of power conversion units 101 among the multiple power conversion units 101 to perform voltage conversion on the output voltage of the first power supply 103, thereby converting the output voltage of the first power supply 103 into a charging voltage for the device to be charged 104.
[0147] In this way, by controlling different numbers of power conversion units 101 to output electrical energy, output capabilities of different voltages can be achieved, thereby achieving precise control of the output electrical energy so as to output a voltage with a better power supply effect, thereby achieving reliable charging of the device to be charged 104.
[0148] In the above embodiment, considering that the battery capacity or voltage level of different devices to be charged 104 may be greatly different, a power conversion unit 101 is deployed in the charging device, and then the charging controller 102 controls the power conversion unit 101 to convert the output voltage of the first power supply 103 according to the charging information of the device to be charged 104, so as to achieve precise control of the output voltage or output current, such as ensuring that the deviation of the output voltage and the output current is less than 1%, thereby achieving reliable charging of the device to be charged 104.
[0149] Exemplarily, when the first power supply 103 includes a UPS and the UPS outputs AC power, the power conversion unit 101 may include a first AC / DC conversion unit, such as one or more AC / DC conversion units. The AC / DC conversion unit is used to convert AC power into DC power and perform voltage conversion on the converted DC power.
[0150] The input end of the first AC / DC conversion unit is electrically connected to the output end of the UPS. The output end of the first AC / DC conversion unit is electrically connected to the device to be charged 104. The charging controller 102 is electrically connected to the first AC / DC conversion unit. In the embodiment of the present application, the charging controller 102 is also used to control the first AC / DC conversion unit to convert the AC power output by the UPS into a charging voltage.
[0151] In the above example, a solution is provided for converting the voltage of the AC power output by the UPS based on the first AC / DC conversion unit, which can control the output power so as to output a voltage with better power supply effect, thereby realizing reliable charging of the device to be charged 104.
[0152] As another example, when the first power supply 103 includes a UPS, and the UPS output is direct current, or the first power supply 103 includes an HVDC, the power conversion unit 101 may include a first direct current / direct current conversion unit, such as one or more DC / DC conversion units. The DC / DC conversion unit is used to convert the voltage of direct current.
[0153] The input end of the first DC / DC conversion unit is electrically connected to the output end of the UPS or the output end of the HVDC. The output end of the first DC / DC conversion unit is electrically connected to the device to be charged 104. The charging controller 102 is electrically connected to the first DC / DC conversion unit. In the embodiment of the present application, the charging controller 102 is also used to control the first DC / DC conversion unit to convert the DC power output by the UPS or the DC power output by the HVDC into a charging voltage.
[0154] In the above example, a solution is provided for voltage conversion of the DC power output by the UPS or the DC power output by the HVDC based on the first DC / DC conversion unit, which can realize the control of the output electric energy so as to output a voltage with better power supply effect, thereby realizing reliable charging of the device to be charged 104.
[0155] As another example, when the first power supply 103 further includes a battery 1032 , the power conversion unit 101 further includes a second DC / DC conversion unit, such as one or more DC / DC conversion units.
[0156] The input end of the second DC / DC conversion unit is electrically connected to the output end of the battery 1032. The output end of the second DC / DC conversion unit is electrically connected to the device to be charged 104. The charging controller 102 is electrically connected to the second DC / DC conversion unit. In the embodiment of the present application, the charging controller 102 is also used to control the second DC / DC conversion unit to convert the DC power output by the battery 1032 into a charging voltage.
[0157] In the above example, a solution is provided for converting the DC power output by the battery 1032 into a voltage based on a second DC / DC conversion unit, which can control the output power so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged 104.
[0158] In some possible implementations, when the charging information of the device to be charged 104 indicates high-power charging, the device to be charged 104 may be charged based on the main power supply 1031 and the battery 1032 in the first power supply 103. In other possible implementations, when the charging information of the device to be charged 104 indicates low-power charging, the device to be charged 104 may be charged based on the main power supply 1031 in the first power supply 103. Or, when the charging information of the device to be charged 104 indicates low-power charging, the device to be charged 104 may be charged based on the battery 1032 in the first power supply 103.
[0159] In some possible implementations, when the charging information of the device to be charged 104 indicates high-power charging, the device to be charged 104 may be charged based on the main power supply 1031 , the battery 1032 and the battery charger 1034 in the first power supply 103 .
[0160] In addition, in some possible implementations, when the power information of the battery 1032 does not meet the preset conditions (such as the backup power requirements of the data center), other power sources (such as the main power supply 1031, the battery charger 1034) in the first power supply 103 except the battery 1032 are controlled to charge the device 104 to be charged.
[0161] In this way, by judging whether the power information of battery 1032 meets the backup power requirements of the data center, when the power information of battery 1032 does not meet the backup power requirements of the data center, the device to be charged 104 can be charged based on the main power supply 1031, thereby ensuring the charging reliability of the device to be charged 104.
[0162] For example, Figure 3 This is a schematic diagram of the architecture of a power conversion unit provided in an embodiment of the present application. Figure 3, shows an architecture based on multiple DC / DC conversion units, wherein the multiple DC / DC conversion units are connected in parallel.
[0163] For example, Figure 4 This is a schematic diagram of the architecture of another power conversion unit provided in an embodiment of the present application. Figure 4 , shows an architecture based on multiple AC / DC conversion units and multiple DC / DC conversion units, wherein multiple AC / DC conversion units are connected in parallel, and multiple DC / DC conversion units are connected in parallel. In the case where the power conversion unit 101 includes multiple AC / DC conversion units and multiple DC / DC conversion units, the number of input distribution units 105 can be two, such as an AC input distribution unit and a DC input distribution unit, wherein the AC input distribution unit is used to connect multiple AC / DC conversion units to transmit AC power to the multiple AC / DC conversion units, and the DC input distribution unit is used to connect multiple DC / DC conversion units to transmit DC power to the multiple DC / DC conversion units.
[0164] For example, Figure 5 This is a schematic diagram of the architecture of another charging device provided in an embodiment of the present application. Figure 5 The charging device further includes an input power distribution unit 105. The input end of the input power distribution unit 105 is electrically connected to the output end of the first power supply 103. The output end of the input power distribution unit 105 is electrically connected to the input end of the power conversion unit 101.
[0165] In the embodiment of the present application, an input power distribution unit 105 is provided to electrically connect the output end of the first power supply 103 to the input end of the power conversion unit 101 , thereby transmitting the electric energy output by the first power supply 103 to the power conversion unit 101 .
[0166] Exemplarily, the input power distribution unit 105 may be an input power distribution switch. The input power distribution unit 105 is also used to disconnect the circuit in the event of a circuit abnormality. For example, in some possible implementations, the input power distribution unit 105 may be disconnected in the event of a fault or maintenance to disconnect the circuit and thereby implement a circuit protection function.
[0167] In some possible implementations, see Figure 5 The charging device may further include an output power distribution unit 106. The input end of the output power distribution unit 106 is electrically connected to the output end of the power conversion unit 101. The output end of the output power distribution unit 106 is electrically connected to the device to be charged 104.
[0168] In the embodiment of the present application, an output distribution unit 106 is provided to electrically connect the output end of the power conversion unit 101 to the input end of the device to be charged 104, so that the electric energy output by the power conversion unit 101 is transmitted to the device to be charged 104, thereby charging the device to be charged 104.
[0169] Exemplarily, the output distribution unit 106 may be an output distribution switch. The output distribution unit 106 is also used to disconnect the circuit in the event of a circuit abnormality. For example, in some possible implementations, the output distribution unit 106 may be disconnected in the event of a fault or maintenance to disconnect the circuit and thereby implement a circuit protection function.
[0170] In the embodiment of the present application, the charging device may be an integrated charging pile or a charging host. Accordingly, the device to be charged 104 may be an electric vehicle.
[0171] Among them, the integrated charging pile refers to a charging pile that integrates the charging controller 102, the input distribution unit 105, the power conversion unit 101 and the output distribution unit 106. The output end of the charging host is electrically connected to one or more split charging piles, and each split charging pile is used to charge a device to be charged. The charging host refers to the charging controller 102, the input distribution unit 105, the power conversion unit 101 and the output distribution unit 106 as a whole and deployed separately with the split charging pile. In this way, it supports the deployment of an integrated charging pile or a split charging pile in the charging device.
[0172] It should be noted that, when the charging device is an integrated charging pile, the charging device (integrated charging pile) can be deployed outside the data center.
[0173] It should also be noted that, when the charging device is a charging host, the charging device (charging host) can be deployed outside the data center. Alternatively, when the charging device is a charging host, the charging host can also be deployed inside the data center, specifically, the components of the charging host, such as the power conversion unit 101, the charging controller 102, the input distribution unit 105 and the output distribution unit 106, can be centrally deployed inside the data center, and one or more split charging piles electrically connected to the output end of the charging host can be deployed outside the data center.
[0174] In some embodiments, when the charging equipment is deployed outside the data center, the output distribution unit 107 also needs to be deployed inside the data center. Figure 6 This is a schematic diagram of the architecture of another charging device provided in an embodiment of the present application. Figure 6, the input end of the output distribution unit 107 is electrically connected to the output end of the first power supply 103, and the output end of the output distribution unit 107 is electrically connected to the input distribution unit 105 of the charging device. In the embodiment of the present application, the output distribution unit 107 is used to transmit the electric energy output by the first power supply 103 to the input distribution unit 105 of the charging device, so as to charge the device 104 to be charged.
[0175] The output power distribution unit 107 can be connected to the input power distribution unit 105 of the charging device through a high-voltage DC cable, so as to provide power to the device to be charged 104 outside the data center. In this way, by deploying the output power distribution unit 107 inside the data center, the power output by the first power supply 103 can be transmitted to the input power distribution unit 105 of the charging device through the output power distribution unit 107, thereby ensuring the power supply reliability of the charging device.
[0176] Exemplarily, the output power distribution unit 107 may be an output power distribution switch. The output power distribution unit 107 is also used to disconnect the circuit in the event of a circuit abnormality. For example, in some possible implementations, the output power distribution unit 107 may be disconnected in the event of a fault or maintenance to disconnect the circuit and thereby implement a circuit protection function.
[0177] In some possible implementations, the output distribution unit 107 may also include a lightning surge protection circuit, which is used to prevent surge current caused by lightning. The lightning surge protection circuit is a circuit that provides safety protection for the output distribution unit 107, which can absorb surge current (such as peak current) to ensure that the output distribution unit 107 is not damaged. In this way, considering that the high-voltage DC cable connected to the output distribution unit 107 is far away, by adding a lightning surge protection circuit in the output distribution unit 107, the surge current caused by lightning can be effectively prevented, thereby ensuring the safety of the power supply system.
[0178] In the above embodiment, the output distribution unit 107, the input distribution unit 105, the power conversion unit 101 and the output distribution unit 106 are electrically connected in sequence, and are used to transmit the electric energy output by the first power supply 103 to the charging device 104 via the output distribution unit 107, the input distribution unit 105, the power conversion unit 101 and the output distribution unit 106 in sequence.
[0179] It should be noted that, when the power conversion unit 101, the charging controller 102, the input distribution unit 105, and the output distribution unit 106 are centrally deployed inside the data center, the output distribution unit 107 may not be deployed inside the data center. It is understandable that when the power conversion unit 101, the charging controller 102, the input distribution unit 105, and the output distribution unit 106 are centrally deployed inside the data center, there is no need to connect the input distribution unit 105, the power conversion unit 101, etc. by pulling high-voltage DC cables, and there is no need to deploy the output distribution unit 107.
[0180] In the above embodiment, the power conversion unit 101, the charging controller 102, the input distribution unit 105 and the output distribution unit 106 are centrally deployed inside the data center. Since the data center itself has a complete environmental control system, the power conversion unit and the charging controller are centrally deployed inside the data center. The existing complete environmental control system can be effectively utilized to design and manufacture inside the data center, which can effectively reduce the design cost and manufacturing cost. At the same time, compared with designing and manufacturing outside the data center, the power supply reliability is also effectively improved.
[0181] Regarding the process of the charging controller 102 obtaining the charging information of the device to be charged 104, when the charging device is an integrated charging pile, the charging controller 102 can obtain the charging information of the device to be charged 104 through communication interaction with the battery management system (BMS) of the device to be charged 104.
[0182] The charging gun can be connected to the device to be charged 104 through a communication cable to enable the charging controller 102 of the charging device to access the battery management system of the device to be charged 104 through the communication cable. Exemplarily, the communication cable can be a controller area network (CAN).
[0183] In the case where the charging device is a charging host, the split charging pile electrically connected to the output end of the charging host includes a charging pile control unit, and the charging pile control unit is used to obtain charging information of the device to be charged. The charging controller 102 is electrically connected to the charging pile control unit. In some possible implementations, the charging controller 102 can be connected to the charging pile control unit for communication with the charging pile control unit. The charging controller 102 is specifically used to obtain charging information of the device to be charged 104 based on the charging pile control unit of the split charging pile electrically connected to the output end of the charging host.
[0184] Exemplarily, the charging controller 102 may send an information acquisition request to the charging pile control unit, the information acquisition request being used to request the charging information of the device to be charged 104, and then receive the charging information of the device to be charged 104 returned by the charging pile control unit. The charging pile control unit may acquire the charging information of the device to be charged 104 through communication interaction with the BMS of the device to be charged 104.
[0185] For example, Figure 7 This is a schematic diagram of the architecture of another charging device provided in an embodiment of the present application. Figure 7 The charging device is also electrically connected to a second power supply 108. The second power supply 108 is AC power from a power grid, such as a city power supply.
[0186] In some possible implementations, the device to be charged 104 may also be charged based on the second power supply 108. Exemplarily, the charging controller 102 is further configured to: if the electric energy output by the first power supply 103 does not meet the charging information of the device to be charged 104, the device to be charged 104 is charged based on the first power supply 103 and the second power supply 108 together.
[0187] In the above embodiment, a scheme is provided for charging the device 104 to be charged based on the first power supply 103 and the second power supply 108. By judging whether the electric energy output by the first power supply 103 meets the charging demand of the device 104 to be charged, the device 104 to be charged can be charged together with the second power supply 108 when the electric energy output by the first power supply 103 does not meet the charging demand of the device 104 to be charged, thereby ensuring the power supply reliability of the device 104 to be charged.
[0188] Exemplarily, in the case of charging the device to be charged 104 in combination with the second power supply 108 , the charging device further includes a second AC / DC conversion unit, such as one or more AC / DC conversion units.
[0189] The input end of the second AC / DC conversion unit is electrically connected to the second power supply 108. The output end of the second AC / DC conversion unit is electrically connected to the device to be charged 104. The charging controller 102 is electrically connected to the second AC / DC conversion unit. The charging controller 102 is also used to control the second AC / DC conversion unit to convert the AC power of the power grid into a charging voltage.
[0190] It should be noted that the second power supply 108 outputs alternating current. In the above example, a solution for converting the voltage of the alternating current output by the second power supply 108 based on the second AC / DC conversion unit is provided, which can realize the control of the output electric energy so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged 104.
[0191] In the scenario where the second power supply 108 is used to charge the device 104 to be charged, the charging controller 102 can be used to control the second AC / DC conversion unit to output the AC power of the power grid. When the AC power of the power grid is converted into voltage, the AC power output by the power grid can be output at full power in consideration of the relatively stable characteristics of the power grid, thereby achieving high-power fast charging.
[0192] For high-power DC fast charging piles, the output power of the first power supply 103 may not be able to support the fast charging requirements (such as fast charging power) of the high-power DC fast charging pile. At this time, the second power supply 108 can be combined to charge the device to be charged 104, so that part of the power comes from the main power grid and part of the power comes from the first power supply 103 such as the main power supply 1031 and the battery 1032, so that fast charging can be achieved.
[0193] It should be noted that, when the first power supply 103 and the second power supply 108 are used to charge the device 104 to be charged, the output voltage of the AC / DC conversion unit is the same as the output voltage of the DC / DC conversion unit to ensure that the output voltages are the charging voltages of the device 104 to be charged. In some possible implementations, the output current of the AC / DC conversion unit and the output current of the DC / DC conversion unit can be flexibly adjusted according to the system energy. For example, the output current can be adaptively adjusted according to factors such as changes in electricity prices, charging time, or charging requirements of different vehicle models.
[0194] In addition, the charging controller 102 is also used to: in the process of charging the device 104 to be charged based on the battery 1032, if the power information of the battery 1032 is lower than the preset power threshold, control the power conversion unit 101 to stop outputting electric energy. In this way, by judging whether the power information of the battery 1032 is lower than the preset power threshold, it can ensure that the output of electric energy is stopped when the power of the battery 1032 does not support the continued provision of energy to the outside, thereby avoiding the problem of battery 1032 being out of power.
[0195] In some possible implementations, the device to be charged 104 may be charged by first charging quickly with high power, and then reducing the power when the preset power requirement (such as 80% power) of the device to be charged is reached.
[0196] For example, in the initial stage of charging the device to be charged 104, the charging controller 102 can control the power conversion unit 101 to output the input electric energy at full power to achieve high-power fast charging. When the power of the device to be charged 104 reaches the preset power requirement, the charging controller 102 can control the power conversion unit 101 to convert the input electric energy into voltage to reduce the power and output electric energy with a lower voltage.
[0197] As another example, in the initial stage of charging the device 104 to be charged, the charging controller 102 can charge the device 104 to be charged based on the first power supply 103 and the second power supply 108 to achieve high-power fast charging. When the power of the device 104 to be charged reaches the preset power requirement, the charging controller 102 can charge the device 104 to be charged based on at least one of the main power supply 1031, the battery 1032, the battery charger 1034 and the second power supply 108 in the first power supply 103, thereby outputting electric energy with a relatively low voltage.
[0198] The following is based on Figure 8 , taking the integrated charging pile as an example, the architecture of the charging equipment based on UPS is explained. Figure 8 This is a schematic diagram of the architecture of a UPS-based charging device provided in an embodiment of the present application. Figure 8 , the left side of the dotted line is the inside of the data center, including the first power supply (such as UPS), the output distribution unit and the computing equipment, etc. The right side of the dotted line is the outside of the data center, including the integrated charging pile and the equipment to be charged.
[0199] The first power supply may be a UPS, in which a UPS host (UPS power supply), a battery charger, a power controller and a battery pack are deployed. The integrated charging pile integrates a charging controller, an input distribution unit, a power conversion unit and an output distribution unit.
[0200] Regarding UPS, inside the data center, UPS can stabilize the AC power output from the mains and supply it to computing devices. At this time, UPS is equivalent to an AC voltage stabilizer. At the same time, UPS can also convert the AC power output from the mains into DC power through a battery charger to charge the battery pack. When the mains output is abnormal (such as overvoltage, undervoltage, power outage, abnormal frequency, etc.), UPS can convert the DC power output from the battery pack into AC power and continue to supply it to computing devices. It can provide short-term backup power for computing devices in the data center, thereby ensuring the power supply reliability of the data center.
[0201] In a UPS-based charging device, the UPS and the battery pack can be in a one-to-one correspondence, that is, one UPS host corresponds to one set of battery packs. In the case where the charging pile is an integrated charging pile, a UPS host can support the connection of an integrated charging pile, thereby realizing a solution in which one set of battery packs supports one integrated charging pile. It is worth noting that in other possible implementations, in a UPS-based charging device, the UPS and the battery pack can also be in a one-to-many correspondence, that is, one UPS host corresponds to multiple sets of battery packs. The embodiments of the present application are not limited to this.
[0202] Exemplarily, when the above-mentioned integrated charging pile is connected to a device to be charged, the charging controller is used to: obtain the charging information of the device to be charged, and obtain the power information of the battery pack of the UPS; when the power information of the battery pack of the UPS meets preset conditions, based on the charging information, control the first power supply (such as at least one of the UPS host or the battery pack) to power the integrated charging pile.
[0203] Based on the above Figure 8 The charging equipment shown in the figure realizes the solution of charging the integrated charging pile outside the data center based on the UPS host and battery pack inside the data center. On the one hand, it can effectively utilize the power supply in the data center, give full play to the role of the power supply in the data center, and improve the utilization rate of the power supply in the data center. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0204] The following is based on Fig. 9 , taking the charging host as an example, the architecture of the charging device based on UPS is explained. Fig. 9 A schematic diagram of the architecture of another UPS-based charging device provided in an embodiment of the present application.
[0205] See also Fig. 9 (9-1) in FIG. 1 shows a deployment method of charging equipment, wherein the left side of the dotted line is the inside of the data center, including the first power supply (such as UPS), the output distribution unit, and the computing device, etc. The right side of the dotted line is the outside of the data center, including the charging host (including the charging controller, the input distribution unit, the power conversion unit, and the output distribution unit), the multiple split-type charging piles connected to the charging host, and the equipment to be charged.
[0206] See also Fig. 9 (9-2) in FIG. 1 shows another deployment mode of charging equipment, wherein the left side of the dotted line is the inside of the data center, including the first power supply (such as UPS), computing equipment and charging host. The right side of the dotted line is the outside of the data center, including multiple split charging piles connected to the charging host and the equipment to be charged.
[0207] In this way, by deploying the charging host inside the data center, since the data center itself has a complete environmental control system and can provide the ability to centrally control power equipment or environmental variables, when the charging host is deployed inside the data center, the indoor working requirements supported by the existing complete environmental control system can be effectively utilized to design and manufacture the charging equipment. Compared with designing and manufacturing the charging equipment according to outdoor working requirements outside the data center, the design cost and manufacturing cost of the charging equipment can be effectively reduced. At the same time, compared with designing and manufacturing outside the data center, it can also avoid cable loss and unexpected situations caused by cable lengthening (such as surge current caused by lightning, etc.), effectively improving the power supply reliability.
[0208] Among them, in the charging host, the charging controller is responsible for the global power management and global power distribution of multiple split charging piles, and can also be called a system controller. In the charging host, the charging controller, input distribution unit, power conversion unit and output distribution unit are all deployed separately, and the output end of the charging host is electrically connected to one or more split charging piles, such as Fig. 9 The charging piles 1, 2, ..., N shown in the figure, each of which is a split-type charging pile, includes its own power distribution switch, protection circuit, detection circuit, charging pile control unit and human-computer interaction unit.
[0209] See also Fig. 9 , the power conversion unit may include multiple power conversion unit groups, such as Fig. 9 Power conversion units 1 to N can form a group, and power conversion units N+1 to N+M can form a group, where N and M are both positive integers. One of the power conversion unit groups is connected to a split charging pile. In this way, by grouping the power conversion units, one or more power conversion unit groups are connected to a split charging pile, and then the charging power of multiple split charging piles can be flexibly controlled by using separately deployed power conversion units, thereby improving the flexibility of the charging equipment.
[0210] In this way, by centrally deploying the charging controller, input distribution unit, power conversion unit and output distribution unit, it supports the connection of multiple split charging piles. The charging process of multiple split charging piles is controlled by the centrally deployed charging controller, input distribution unit, power conversion unit and output distribution unit, thereby realizing a charging solution based on the charging host.
[0211] Exemplarily, when the above-mentioned charging pile is connected to a device to be charged, the charging controller is used to: obtain the charging information of the device to be charged, and obtain the power information of the battery pack of the UPS; when the power information of the battery pack of the UPS meets preset conditions, based on the charging information, control the first power supply (such as at least one of the UPS host, battery charger or battery pack) to power the split charging pile.
[0212] Based on the above Fig. 9 The charging device shown in the figure realizes a solution of using the UPS battery pack inside the data center to power the charging device (split charging pile) outside the data center. On the one hand, it can effectively utilize the power supply in the data center, give full play to the role of the power supply in the data center, and improve the utilization rate of the power supply in the data center. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0213] The following is based on Fig.10 , taking an integrated charging pile as an example, the architecture of a charging device based on HVDC is described. Fig.10 This is a schematic diagram of the architecture of a HVDC-based charging device provided in an embodiment of the present application. Fig.10 , the left side of the dotted line is the inside of the data center, including the first power supply (such as HVDC), the output distribution unit, and the computing equipment, etc. The right side of the dotted line is the outside of the data center, including the integrated charging pile and the equipment to be charged.
[0214] The first power supply may be HVDC, and the HVDC includes an HVDC power supply, a power controller and a battery pack. It should be noted that the HVDC power supply and the battery charger in the HVDC may be integrated into one. Fig.10 It is represented by HVDC power supply.
[0215] In some possible implementations, the output end of the HVDC power supply is electrically connected to the integrated charging pile through a high-voltage DC bus, and the power controller and the battery pack are also connected to the high-voltage DC bus. The number of battery packs can be one or more. In the case of multiple battery packs, multiple battery packs can be connected to the high-voltage DC bus together, such as Fig.10 A plurality of battery packs (such as battery pack 1, ..., battery pack N, etc.) can form battery pooling.
[0216] Regarding HVDC, inside the data center, HVDC can convert the AC power output from the mains into high-voltage DC power, and then output DC power through the high-voltage DC bus to supply computing devices. At the same time, HVDC can also convert the AC power output from the mains into DC power to charge the battery pack. When the mains output is abnormal (such as overvoltage, undervoltage, power outage, abnormal frequency, etc.), HVDC can supply the DC power output from the battery pack to computing devices through the high-voltage DC bus, which can provide short-term backup power for computing devices in the data center, and provide stable and uninterrupted power supply for computing devices in the data center, thereby ensuring the power supply reliability of the data center.
[0217] In the HVDC-based charging equipment, the charging controller can realize the solution of the HVDC-based battery pack powering the integrated charging pile by communicating with the power controller connected to the battery pack. Among them, the power controller and the battery pack can be a one-to-one correspondence, for example, one power controller is connected to one battery pack. Or, the power controller and the battery pack can be a one-to-many correspondence, for example, one power controller is connected to multiple battery packs.
[0218] Exemplarily, when the above-mentioned integrated charging pile is connected to a device to be charged, the charging controller is used to: obtain charging information of the device to be charged, and obtain power information of the HVDC battery pack; when the power information of the HVDC battery pack meets preset conditions, based on the charging information, control the first power supply (such as at least one of the HVDC power supply and the battery pack) to power the integrated charging pile.
[0219] Based on the above Fig.10 The charging equipment shown in the figure realizes the solution of charging the integrated charging pile outside the data center based on the HVDC power supply and battery pack inside the data center. On the one hand, it can effectively utilize the power supply in the data center, give full play to the role of the power supply in the data center, and improve the utilization rate of the power supply in the data center. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0220] The following is based on Fig.11 , taking the charging host as an example, the architecture of the HVDC-based charging device is described. Fig.11 A schematic diagram of the architecture of another HVDC-based charging device provided in an embodiment of the present application.
[0221] See also Fig.11(11-1) in FIG. 1 shows a deployment method of charging equipment, wherein the left side of the dotted line is the inside of the data center, including the first power supply (such as HVDC), the output distribution unit, and the computing equipment, etc. The right side of the dotted line is the outside of the data center, including the charging host, the multiple split-type charging piles connected to the charging host, and the equipment to be charged.
[0222] See also Fig.11 (11-2) in FIG. 1 shows another deployment mode of charging equipment, wherein the left side of the dotted line is the inside of the data center, including the first power supply (such as HVDC), computing equipment and charging host. The right side of the dotted line is the outside of the data center, including multiple split charging piles connected to the charging host and the equipment to be charged.
[0223] In this way, by deploying the charging host inside the data center, since the data center itself has a complete environmental control system and can provide the ability to centrally control power equipment or environmental variables, when the charging host is deployed inside the data center, the indoor working requirements supported by the existing complete environmental control system can be effectively utilized to design and manufacture the charging equipment. Compared with designing and manufacturing the charging equipment according to outdoor working requirements outside the data center, the design cost and manufacturing cost of the charging equipment can be effectively reduced. At the same time, compared with designing and manufacturing outside the data center, it can also avoid cable loss and unexpected situations caused by cable lengthening (such as surge current caused by lightning, etc.), effectively improving the power supply reliability.
[0224] Exemplarily, when the above-mentioned charging host is connected to the device to be charged, the charging controller is used to: obtain the charging information of the device to be charged, and obtain the power information of the HVDC battery pack; when the power information of the HVDC battery pack meets the preset conditions, based on the charging information, control the first power supply (such as at least one of the HVDC power supply and the battery pack) to power the split charging pile.
[0225] Based on the above Fig.11 The charging equipment shown in the figure realizes the solution of charging the split charging pile outside the data center based on the HVDC power supply and battery pack inside the data center. On the one hand, it can effectively utilize the power supply in the data center, give full play to the role of the power supply in the data center, and improve the utilization rate of the power supply in the data center. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0226] In the above embodiment, the existing power supply and distribution system (such as UPS or HVDC) of the data center is utilized to add the charging function of the charging equipment to the data center, thereby improving the utilization rate of the power supply in the data center, reducing the repeated investment and waste of resources in the power supply, and realizing the sharing of power resources between the data center and the charging equipment.
[0227] In addition, in some possible implementations, the charging device may further include a human-computer interaction unit, which may be used to provide functions such as a card reader, a display screen, a DC meter, and charging billing.
[0228] The card reader is used to provide a card swiping function. For example, payment can be made by swiping a card. Of course, in other possible implementations, other payment methods such as code scanning can also be supported.
[0229] The display screen may be a liquid crystal display (LCD), such as a touch screen. In some possible implementations, the display screen is used to provide a display interface so that the user can perform human-computer interaction with the charging device based on the display interface. Exemplarily, the user can select a charging mode, such as a fixed power mode, a fixed time mode, a fixed amount mode, or an automatic charging mode (that is, until fully charged) by operating in the display interface. Moreover, during the charging process, the display interface can also display the current charging mode, time (charged time, remaining charging time, etc.), power (charged power, power to be charged, etc.) and current billing information, etc. In this way, by deploying a display screen, human-computer interaction functions can be provided during the charging process, thereby improving the efficiency of human-computer interaction.
[0230] In the embodiment of the present application, when the power information of the battery 1032 meets the backup power requirements of the data center, the display interface is used to display the fast charging status. When the power information of the battery 1032 does not meet the backup power requirements of the data center, the display interface is used to display the slow charging status. In this way, by providing a display interface for the charging device, the user can timely know the current charging status based on the fast charging status or slow charging status displayed on the display interface, thereby improving the human-computer interaction effect.
[0231] In some possible implementations, when the charging device is a charging host, the charging pile control unit and the human-computer interaction unit can share a controller, thereby realizing the human-computer interaction, charging control and communication functions between the distributed charging pile and the charging controller based on the same controller.
[0232] In addition, in some possible implementations, the charging device may further include a protection circuit and a detection circuit.
[0233] Among them, the protection circuit is used to provide overvoltage protection, undervoltage protection, overload protection, short circuit protection, leakage protection and other functions, providing complete protection functions.
[0234] The detection circuit can be used to detect the output current and output voltage of the power conversion unit 101 to implement the circuit protection function of the power supply system. Alternatively, the detection circuit can also be used to detect the actual amount of electricity charged this time, so that the actual charged amount and current billing information can be displayed in the display interface later.
[0235] In the embodiment of the present application, the existing power supply in the data center is used as the power supply for the charging device. The existing power supply in the data center can be used to charge the device to be charged. On the one hand, the power supply in the data center can be effectively utilized, the role of the power supply in the data center can be fully exerted, and the utilization rate of the power supply in the data center can be improved. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0236] The charging controller involved in the embodiment of the present application may be a control board, such as a main control board, which is a central controller in the charging device having functions such as communication connection, data processing and centralized control.
[0237] For example, Fig.12 A hardware structure diagram of a charging controller provided in an embodiment of the present application. Fig.12 , Fig.12 The charging controller 1200 shown may include: a processor 1201 , a memory 1202 , a communication interface 1203 , and a communication cable 1204 . The processor 1201 , the memory 1202 , and the communication interface 1203 may be connected via the communication cable 1204 .
[0238] The processor 1201 is the control center of the charging controller 1200, and may be a general-purpose central processing unit (CPU) or other general-purpose processors. The general-purpose processor may be a microprocessor or any conventional processor. In the embodiment of the present application, the charging method may be executed by the processor 1201 in the charging controller 1200. As an example, the processor 1201 may include one or more CPUs, such as Fig.12 CPU core 0 and CPU core 1 shown in .
[0239] The memory 1202 may be a read-only memory (ROM) or other type of static storage device that can store static information and instructions, or other type of dynamic storage device that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited to these.
[0240] In one possible implementation, the memory 1202 may exist independently of the processor 1201. The memory 1202 may be connected to the processor 1201 via a bus 1204 and used to store data, instructions, or program codes. When the processor 1201 calls and executes the instructions or program codes stored in the memory 1202, the charging method provided in the embodiment of the present application can be implemented.
[0241] In another possible implementation, the memory 1202 may also be integrated with the processor 1201 .
[0242] The communication interface 1203 is used for the charging controller 1200 to connect with other devices through a communication network, and the communication network may be Ethernet, a radio access network (RAN), a wireless local area network (WLAN), etc. The communication interface 1203 may include a receiving unit for receiving data and a sending unit for sending data.
[0243] The communication cable 1204 may be an industry standard architecture (ISA) bus, a peripheral component interconnect (PCI) bus, or an extended industry standard architecture (EISA) bus. For ease of representation, Fig.12 Only one thick line is used in the figure, but it does not mean that there is only one communication cable or one type of communication cable.
[0244] It should be pointed out that Fig.12 The structure shown in the figure does not constitute a limitation on the charging controller 1200. Fig.12In addition to the components shown, the charge controller 1200 may include more or fewer components than shown, or combine certain components, or arrange the components differently.
[0245] Fig.13 This is a schematic flow chart of a charging method provided in an embodiment of the present application. The method can be applied to the above-mentioned charging device, for example, it can be executed by a charging controller of the charging device. Fig.13 , the method comprising:
[0246] S1301. The charging controller obtains charging information of the device to be charged.
[0247] The charging information includes at least one of voltage, current and power. It is understandable that the charging information is used to indicate the charging requirements of the device to be charged, such as including at least one of voltage, current and power.
[0248] In some possible implementations, the charging information of the device to be charged may be in the form of a charging curve, such as a current curve and a voltage curve. The current curve may be a curve showing the current of the battery pack of the device to be charged changing over time during the charging process, which is used to characterize the current requirement of the device to be charged. The voltage curve may be a curve showing the voltage of the battery pack of the device to be charged changing over time during the charging process, which is used to characterize the voltage requirement of the device to be charged.
[0249] It is worth noting that the charging information can also be in other forms, such as a numerical range. The present application embodiment does not limit this. Exemplarily, the charging requirements of the device to be charged may be: first constant current charging, and then constant voltage charging when the voltage gradually increases to a preset voltage threshold (such as 700V).
[0250] S1302: The charging controller controls the charging device to charge the device to be charged based on the charging information.
[0251] In some possible implementations, the charging controller controls the power conversion unit to perform voltage conversion on the output voltage of the first power supply based on the charging information, so as to convert the output voltage of the first power supply into a charging voltage of the device to be charged, thereby charging the device to be charged.
[0252] Exemplarily, based on the charging information, the charging controller controls the power conversion unit to perform voltage conversion on the output voltage of at least one of the main power supply, the battery, and the battery charger in the first power supply, so as to convert the output voltage into a charging voltage of the device to be charged, thereby charging the device to be charged.
[0253] The technical solution provided by the embodiment of the present application electrically connects the input end of the power conversion unit to the output end of the power supply for the computing device in the data center, so that after the charging controller obtains the charging information of the device to be charged, it can control the power conversion unit to convert the output voltage of the power supply into the charging voltage of the device to be charged based on the charging information, thereby charging the device to be charged. In this way, the existing power supply in the data center is used to charge the device to be charged. On the one hand, the power supply in the data center can be effectively utilized, the role of the power supply in the data center can be fully utilized, and the utilization rate of the power supply in the data center can be improved. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0254] Fig.14 A schematic flow chart of a charging method provided in an embodiment of the present application, taking the interaction process between the charging controller and the power controller as an example, the method includes the following S1401-S1409:
[0255] S1401. The charging controller obtains charging information of the device to be charged.
[0256] The device to be charged may be an electric vehicle. The charging information includes at least one of voltage, current and power. The charging information of the device to be charged is used to indicate the charging requirements of the device to be charged, such as at least one of voltage requirement, current requirement and power requirement.
[0257] In some possible implementations, the charging information of the device to be charged may include a charging curve, such as a current curve and a voltage curve. Among them, the current curve may be a curve showing the change of the current of the battery pack of the device to be charged over time during the charging process, which is used to characterize the current requirement of the device to be charged. The voltage curve may be a curve showing the change of the voltage of the battery pack of the device to be charged over time during the charging process, which is used to characterize the voltage requirement of the device to be charged. Exemplarily, the charging requirement of the device to be charged may be: first, constant current charging, and then constant voltage charging when the voltage gradually increases to a preset voltage threshold (such as 700V).
[0258] When the charging device is an integrated charging pile, the charging controller obtains the charging information of the device to be charged through communication interaction with the BMS of the device to be charged.
[0259] Exemplarily, the process of the charging controller acquiring the charging information of the device to be charged may be: the BMS acquires the battery system configuration (such as voltage, current, power and other safety parameters, etc.), SOC and state of health (SOH) and other information of the device to be charged, determines the charging information of the device to be charged according to the battery pack system configuration, SOC and SOH and other information of the device to be charged, and sends the determined charging information of the device to be charged to the charging controller, so that the charging controller can acquire the charging information of the device to be charged. Among them, SOH refers to the relative state of the health of the battery compared with a new battery, generally expressed as a percentage.
[0260] As another example, the process of the charging controller acquiring the charging information of the device to be charged may be: the BMS acquires the battery system configuration, SOC, SOH and other information of the device to be charged, and sends the battery pack system configuration, SOC, SOH and other information of the device to be charged to the charging controller. After receiving the battery pack system configuration, SOC, SOH and other information of the device to be charged, the charging controller determines the charging information of the device to be charged according to the battery pack system configuration, SOC, SOH and other information of the device to be charged.
[0261] In some other possible implementations, when the charging device is a charging host, the charging controller obtains the charging information of the device to be charged through communication interaction with the charging pile control unit of the split-type charging pile.
[0262] In an embodiment of the present application, the charging controller may send an information acquisition request to the charging pile control unit, where the information acquisition request is used to request the charging information of the device to be charged, and then receive the charging information of the device to be charged returned by the charging pile control unit.
[0263] The charging pile control unit can obtain the charging information of the device to be charged through communication interaction with the BMS of the device to be charged.
[0264] Exemplarily, the process of the charging pile control unit acquiring the charging information of the device to be charged may be: the BMS acquires the battery system configuration (such as voltage, current, power and other safety parameters, etc.), SOC and SOH and other information of the device to be charged, determines the charging information of the device to be charged according to the battery pack system configuration, SOC and SOH and other information of the device to be charged, and sends the determined charging information of the device to be charged to the charging pile control unit, so that the charging pile control unit can acquire the charging information of the device to be charged. Furthermore, the charging pile control unit can send the charging information of the device to be charged to the charging controller.
[0265] As another example, the process of the charging pile control unit acquiring the charging information of the device to be charged may be: the BMS acquires the battery system configuration, SOC, SOH and other information of the device to be charged, and sends the battery pack system configuration, SOC, SOH and other information of the device to be charged to the charging pile control unit. After the charging pile control unit receives the battery pack system configuration, SOC, SOH and other information of the device to be charged, it determines the charging information of the device to be charged according to the battery pack system configuration, SOC, SOH and other information of the device to be charged. Furthermore, the charging pile control unit may send the charging information of the device to be charged to the charging controller.
[0266] It is worth noting that in some other possible implementations, the charging controller may also use other possible implementations to obtain the charging information of the device to be charged. For example, after the charging pile control unit receives the battery pack system configuration, SOC, SOH and other information of the device to be charged, it may send the battery pack system configuration, SOC, SOH and other information of the device to be charged to the charging controller. Then, after the charging controller receives the battery pack system configuration, SOC, SOH and other information of the device to be charged, it determines the charging information of the device to be charged according to the battery pack system configuration, SOC, SOH and other information of the device to be charged. The embodiments of the present application are not limited to this.
[0267] S1402: The charging controller sends a power query signal to the power controller of the first power supply.
[0268] The power inquiry signal is used to inquire about the power information of the battery in the first power supply, such as the remaining power.
[0269] In an embodiment of the present application, the first power supply may include a main power supply, a battery, a power supply controller, and a battery charger. The main power supply may be a UPS or an HVDC. It should be noted that in the HVDC power supply scenario, the battery charger and the main power supply (i.e., the HVDC) may be integrated into one. In the UPS power supply scenario, a battery charger for charging the battery may be deployed separately.
[0270] S1403: The power controller of the first power supply receives a power query signal, obtains power information of a battery in the first power supply, and returns the power information to the charging controller.
[0271] In some possible implementations, the process of the power controller acquiring the battery power information may be: the power controller acquires the battery pack capacity and SOC of the battery, and determines the product of the battery pack capacity and SOC of the battery as the battery power information.
[0272] It is worth noting that in some other possible implementations, the power controller may also adopt other possible implementations to obtain the battery power information, which is not limited in the embodiments of the present application.
[0273] S1404: The charging controller receives the battery power information returned by the power controller.
[0274] It should be noted that the above S1402 to S1404 illustrate the process of the charging controller obtaining the battery power information based on the power controller. It is worth noting that in other embodiments, the charging controller can also use other methods to obtain the battery power information, which is not limited in the embodiment of the present application.
[0275] S1405: The charging controller determines whether the battery power information meets the preset conditions. If the battery power information meets the preset conditions, S1406 is executed. If the battery power information does not meet the preset conditions, S1407 is executed.
[0276] Among them, the preset condition may be the backup power requirement of the data center. The backup power requirement of the data center refers to a power requirement greater than or equal to the minimum power requirement for powering each computing device in the data center. It should be understood that if the power information of the battery meets the backup power requirement of the data center, it means that the power information of the battery is greater than or equal to the minimum power requirement for powering each computing device in the data center, and the battery can be used to charge the device to be charged.
[0277] In the above embodiment, by judging whether the battery power information meets the preset conditions such as the backup power requirements of the data center, it is ensured that when the battery power information meets the backup power requirements of the data center, the subsequent process of using the battery to charge the device to be charged is executed. In addition, when the battery power information does not meet the backup power requirements of the data center, the device to be charged can be charged based on other power sources other than the battery in the first power supply, such as the main power supply (such as UPS or HVDC) and the battery charger, thereby ensuring the charging reliability of the device to be charged.
[0278] It should be noted that the above steps S1402 to S1405 are optional steps. In other embodiments, after obtaining the charging information of the device to be charged, the charging controller does not need to execute the process of obtaining the battery power information and judging whether the battery power information meets the preset conditions, and based on the charging information of the device to be charged, controls the charging device to charge the device to be charged, such as controlling other power sources except the battery in the first power supply of the charging device to charge the device to be charged.
[0279] S1406. The charging controller determines whether the power output of the power source including the battery in the first power supply meets the charging information of the device to be charged. If the power output of the power source including the battery in the first power supply meets the charging information of the device to be charged, execute S1408. If the power output of the power source including the battery in the first power supply does not meet the charging information of the device to be charged, execute S1409.
[0280] In some possible implementations, the charging controller determines whether the power output by the main power supply (such as UPS or HVDC), the battery, and the battery charger in the first power supply meets the charging information of the device to be charged. If the power output by the main power supply (such as UPS or HVDC), the battery, and the battery charger in the first power supply meets the charging information of the device to be charged, it indicates that the power output by the first power supply meets the charging information of the device to be charged. If the power output by the main power supply (such as UPS or HVDC), the battery, and the battery charger in the first power supply does not meet the charging information of the device to be charged, it indicates that the power output by the first power supply does not meet the charging information of the device to be charged.
[0281] S1407. The charging controller determines whether the power output of the power sources other than the battery in the first power supply meets the charging information of the device to be charged. If the power output of the power sources other than the battery in the first power supply meets the charging information of the device to be charged, execute S1408. If the power output of the power sources other than the battery in the first power supply does not meet the charging information of the device to be charged, execute S1409.
[0282] In some possible implementations, the charging controller determines whether the power output by the main power supply (such as UPS or HVDC) and the battery charger in the first power supply meets the charging information of the device to be charged. If the power output by the main power supply (such as UPS or HVDC) and the battery charger in the first power supply meets the charging information of the device to be charged, it indicates that the power output by other power supplies other than the battery in the first power supply meets the charging information of the device to be charged. If the power output by the main power supply (such as UPS or HVDC) and the battery charger in the first power supply does not meet the charging information of the device to be charged, it indicates that the power output by other power supplies other than the battery in the first power supply does not meet the charging information of the device to be charged.
[0283] S1408: The charging controller controls the first power supply to charge the device to be charged based on the charging information.
[0284] In some possible implementations, when the electric energy output by the power supply including the battery in the first power supply meets the charging information of the device to be charged, the charging controller controls the main power supply (such as UPS or HVDC), the battery charger and the battery in the first power supply to charge the device to be charged based on the charging information.
[0285] In some other possible implementations, when the electric energy output by power sources other than the battery in the first power supply meets the charging information of the device to be charged, the charging controller controls the main power supply (such as UPS or HVDC) and the battery charger in the first power supply to charge the device to be charged based on the charging information.
[0286] Exemplarily, when the first power supply includes a UPS and the UPS outputs AC power, the charging controller controls the first AC / DC conversion unit to convert the AC power output by the UPS into a charging voltage. In this way, a solution for converting the voltage of the AC power output by the UPS based on the first AC / DC conversion unit is provided, which can realize the control of the output power so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged.
[0287] Exemplarily, when the first power supply includes a UPS, and the UPS outputs direct current, or the first power supply includes an HVDC, the charging controller controls the first DC / DC conversion unit to convert the direct current output by the UPS or the direct current output by the HVDC into a charging voltage. In this way, a solution for converting the voltage of the direct current output by the UPS or the direct current output by the HVDC based on the first DC / DC conversion unit is provided, which can realize the control of the output electric energy so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged.
[0288] Exemplarily, when the first power supply also includes a battery, the charging controller controls the second DC / DC conversion unit to convert the DC power output by the battery into a charging voltage. In this way, a solution for converting the DC power output by the battery into a voltage based on the second DC / DC conversion unit is provided, which can realize the control of the output electric energy so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged.
[0289] The charging controller can determine the available power supply based on the power information of the battery and the backup power requirement of the data center. The available power supply is the power that the battery is allowed to supply to the device to be charged. Then, based on the available power supply, the battery is controlled to charge the device to be charged.
[0290] In this way, taking into account the backup power requirements of the data center, while ensuring that the backup power requirements of the data center are met, the amount of electricity that the battery is allowed to supply to the device to be charged is determined, and then based on the amount of electricity that the battery is allowed to supply to the device to be charged, the battery is controlled to charge the device to be charged, which not only ensures the backup power reliability of the data center, but also ensures the power supply reliability of the charging equipment.
[0291] Exemplarily, when the first power supply also includes a battery charger, the charging controller controls the third DC / DC conversion unit to convert the DC power output by the battery charger into a charging voltage. Thus, a solution for converting the DC power output by the battery charger into a voltage based on the third DC / DC conversion unit is provided, which can control the output power so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged.
[0292] S1409: The charging controller controls the first power supply and the second power supply to charge the device to be charged based on the charging information.
[0293] The second power supply is AC power from a power grid.
[0294] In some possible implementations, when the electric energy output by the power supply including the battery in the first power supply does not meet the charging information of the device to be charged, the charging controller controls the main power supply (such as UPS or HVDC), the battery charger, the battery and the second power supply in the first power supply to charge the device to be charged based on the charging information.
[0295] In some other possible implementations, when the electric energy output by power sources other than the battery in the first power supply does not meet the charging information of the device to be charged, the charging controller controls the main power supply (such as UPS or HVDC), the battery charger and the second power supply in the first power supply to charge the device to be charged based on the charging information.
[0296] Exemplarily, when the second power supply is combined to charge the device to be charged, the charging controller also controls the second AC / DC conversion unit to convert the AC power of the power grid into a charging voltage. In this way, a solution for converting the voltage of the AC power output by the second power supply based on the second AC / DC conversion unit is provided, which can realize the control of the output electric energy so as to output a voltage with a better power supply effect, thereby realizing reliable charging of the device to be charged.
[0297] In the above embodiment, a scheme for charging a device to be charged based on a first power supply and a second power supply is provided. By judging whether the electric energy output by the first power supply meets the charging information of the device to be charged, the device to be charged can be charged in combination with the second power supply when the electric energy output by the first power supply does not meet the charging information of the device to be charged, thereby ensuring the charging reliability of the device to be charged.
[0298] In addition, in some possible implementations, during the process of charging a device to be charged based on a battery, if the battery power information is lower than a preset power threshold, the charging controller controls the power conversion unit to stop outputting electric energy. In this way, by judging whether the battery power information is lower than the preset power threshold, it is possible to ensure that the output of electric energy is stopped when the battery power does not support the continued provision of energy to the outside, thereby avoiding the problem of battery power shortage.
[0299] It should be noted that the above Fig.14 Taking the judgment process based on the battery power information and the charging information of the device to be charged as an example, the process of controlling the charging device to charge the device to be charged is described. In other possible implementations, the charging device can also be controlled to charge the device to be charged based on other types of charging strategies. The embodiment of the present application does not limit the setting of the charging strategy.
[0300] The technical solution provided by the embodiment of the present application electrically connects the input end of the power conversion unit to the output end of the power supply for the computing device in the data center, so that after the charging controller obtains the charging information of the device to be charged, it can control the power conversion unit to convert the output voltage of the power supply into the charging voltage of the device to be charged based on the charging information, thereby charging the device to be charged. In this way, the existing power supply in the data center is used to charge the device to be charged. On the one hand, the power supply in the data center can be effectively utilized, the role of the power supply in the data center can be fully utilized, and the utilization rate of the power supply in the data center can be improved. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0301] The above mainly introduces the scheme of the embodiment of the present application from the perspective of the method. It can be understood that in order to realize the above functions, the charging controller in the embodiment of the present application includes hardware structures and / or software modules corresponding to the execution of each function. It should be easily appreciated by those skilled in the art that, in combination with the units and algorithm steps of each example described in the embodiments disclosed herein, the embodiments of the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to exceed the scope of the embodiments of the present application.
[0302] Fig.15 This is a schematic diagram of the structure of a charging device provided in an embodiment of the present application. Fig.15 The charging device includes an acquisition module 1501 and a charging module 1502.
[0303] The acquisition module 1501 is used to acquire charging information of the device to be charged; the charging information includes at least one of voltage, current and power;
[0304] The charging module 1502 is used to control the charging device to charge the device to be charged based on the charging information.
[0305] The technical solution provided by the embodiment of the present application electrically connects the input end of the power conversion unit to the output end of the power supply for the computing device in the data center, so that after the charging controller obtains the charging information of the device to be charged, it can control the power conversion unit to convert the output voltage of the power supply into the charging voltage of the device to be charged based on the charging information, thereby charging the device to be charged. In this way, the existing power supply in the data center is used to charge the device to be charged. On the one hand, the power supply in the data center can be effectively utilized, the role of the power supply in the data center can be fully utilized, and the utilization rate of the power supply in the data center can be improved. On the other hand, there is no need to re-plan the power supply facilities and backup power facilities, which reduces the time and cost required to build the power supply system.
[0306] In some possible implementations, the first power supply further includes a battery and a power controller; wherein the battery is a power supply device in a data center used to provide backup power for computing devices; the power controller is electrically connected to the battery; the power controller is used to obtain power information of the battery; the input end of the power conversion unit is electrically connected to the output end of the battery; the charging controller is electrically connected to the power controller;
[0307] The charging module 1502 is specifically used for:
[0308] The power information of the battery is obtained based on the power controller; when the power information meets the preset conditions, the charging device is controlled to charge the device to be charged based on the charging information.
[0309] In some possible implementations, when the first power supply includes a UPS and the UPS output is AC power, the power conversion unit includes a first AC / DC conversion unit; wherein an input end of the first AC / DC conversion unit is electrically connected to an output end of the UPS; an output end of the first AC / DC conversion unit is electrically connected to a device to be charged; and a charging controller is electrically connected to the first AC / DC conversion unit;
[0310] The charging module 1502 is also used for:
[0311] The first AC / DC conversion unit is controlled to convert the AC power output by the UPS into a charging voltage.
[0312] In some possible implementations, when the first power supply includes a UPS and the UPS output is direct current, or when the first power supply includes an HVDC, the power conversion unit includes a first DC / DC conversion unit; wherein an input end of the first DC / DC conversion unit is electrically connected to an output end of the UPS or an output end of the HVDC; an output end of the first DC / DC conversion unit is electrically connected to a device to be charged; and a charging controller is electrically connected to the first DC / DC conversion unit;
[0313] The charging module 1502 is also used for:
[0314] The first DC / DC conversion unit is controlled to convert the DC power output by the UPS or the DC power output by the HVDC into a charging voltage.
[0315] In some possible implementations, when the first power supply also includes a battery, the power conversion unit also includes a second DC / DC conversion unit; wherein the input end of the second DC / DC conversion unit is electrically connected to the output end of the battery; the output end of the second DC / DC conversion unit is electrically connected to the device to be charged; and the charging controller is electrically connected to the second DC / DC conversion unit;
[0316] The charging module 1502 is also used for:
[0317] The second DC / DC conversion unit is controlled to convert the DC power output by the battery into a charging voltage.
[0318] In some possible implementations, when the charging device is a charging host, the split charging pile electrically connected to the output end of the charging host includes a charging pile control unit, and the charging pile control unit is used to obtain charging information of the device to be charged; the charging controller is electrically connected to the charging pile control unit;
[0319] The acquisition module 1501 is specifically used for:
[0320] A charging pile control unit of a split-type charging pile electrically connected to the output end of the charging host obtains charging information of the device to be charged.
[0321] In some possible implementations, the charging device further includes a second AC / DC conversion unit; wherein an input end of the second AC / DC conversion unit is electrically connected to a second power supply; the second power supply is AC power of a power grid; an output end of the second AC / DC conversion unit is electrically connected to the device to be charged; and the charging controller is electrically connected to the second AC / DC conversion unit;
[0322] The charging module 1502 is also used for:
[0323] The second AC / DC conversion unit is controlled to convert the AC power of the power grid into a charging voltage.
[0324] The embodiment of the present application further provides a charging controller, which includes a processor and a memory, wherein the processor and the memory are coupled, wherein the memory is used to store computer program instructions, and the processor is used to call the computer program instructions in the memory to execute the charging method shown in the above embodiment.
[0325] An embodiment of the present application further provides a computer-readable storage medium, which stores computer program instructions, and the computer program instructions are used to enable a charging controller to execute the charging method shown in the above embodiment.
[0326] An embodiment of the present application also provides a computer program product, including computer program instructions. When the computer program instructions are executed on a charging controller, the charging controller executes the charging method shown in the above embodiment.
[0327] Among them, the charging controller, computer-readable storage medium or computer program product provided in the embodiments of the present application are used to execute the corresponding methods provided above. Therefore, the beneficial effects that can be achieved can refer to the beneficial effects in the corresponding methods provided above, and will not be repeated here.
[0328] Through the description of the above implementation methods, those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above functional modules is used as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device (such as the charging controller) is divided into different functional modules to complete all or part of the functions described above. The specific working process of the system, device (such as the charging controller) and unit described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0329] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices (such as charging controllers) and methods can be implemented in other ways. For example, the device (such as a charging controller) embodiments described above are merely schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0330] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0331] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0332] If the above-mentioned integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) or a processor to perform all or part of the steps of the method of each embodiment of the present application. The aforementioned storage medium includes: flash memory, mobile hard disk, read-only memory, random access memory, disk or optical disk, etc., various media that can store program codes.
[0333] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A charging device, characterized in that: It includes a power conversion unit and a charging controller; wherein, The input end of the power conversion unit is electrically connected to the output end of the first power supply; the first power supply is a power supply for powering computing devices in a data center; the first power supply includes an uninterruptible power supply UPS or a high-voltage direct current power supply system HVDC; The output end of the power conversion unit is electrically connected to the device to be charged; the power conversion unit is used to convert the output voltage of the first power supply into a charging voltage for the device to be charged; The charging controller is electrically connected to the power conversion unit; the charging controller is used to control the charging device to charge the device to be charged.
2. The charging device according to claim 1, characterized in that: The first power supply also includes a battery and a power controller; wherein the battery is a power supply device in a data center for providing backup power to the computing device; The power controller is electrically connected to the battery; the power controller is used to obtain the power information of the battery; The input end of the power conversion unit is electrically connected to the output end of the battery; The charging controller is electrically connected to the power controller; The charging controller is used to control the charging device to charge the device to be charged, including: Acquiring power information of the battery based on the power controller; When the power information meets a preset condition, the charging device is controlled to charge the device to be charged.
3. The charging device according to claim 1 or 2, characterized in that: In the case where the first power supply includes the UPS and the UPS outputs AC power, the power conversion unit includes a first AC / DC conversion unit; Wherein, the input end of the first AC / DC conversion unit is electrically connected to the output end of the UPS; The output end of the first AC / DC conversion unit is electrically connected to the device to be charged; The charging controller is electrically connected to the first AC / DC conversion unit; the charging controller is also used to control the first AC / DC conversion unit to convert the AC power output by the UPS into the charging voltage.
4. The charging device according to claim 1 or 2, characterized in that: In the case where the first power supply includes the UPS and the UPS outputs direct current, or the first power supply includes HVDC, the power conversion unit includes a first DC / DC conversion unit; Wherein, the input end of the first DC / DC conversion unit is electrically connected to the output end of the UPS or the output end of the HVDC; The output end of the first DC / DC conversion unit is electrically connected to the device to be charged; The charging controller is electrically connected to the first DC / DC conversion unit; the charging controller is also used to control the first DC / DC conversion unit to convert the DC power output by the UPS or the DC power output by the HVDC into the charging voltage.
5. The charging device according to claim 3 or 4, characterized in that: In the case where the first power supply also includes a battery, the power conversion unit also includes a second DC / DC conversion unit; Wherein, the input end of the second DC / DC conversion unit is electrically connected to the output end of the battery; The output end of the second DC / DC conversion unit is electrically connected to the device to be charged; The charging controller is electrically connected to the second DC / DC conversion unit; the charging controller is also used to control the second DC / DC conversion unit to convert the DC power output by the battery into the charging voltage.
6. The charging device according to any one of claims 1 to 5, characterized in that: The charging device also includes an input power distribution unit; The input end of the input power distribution unit is electrically connected to the output end of the first power supply; The output end of the input power distribution unit is electrically connected to the input end of the power conversion unit.
7. The charging device according to any one of claims 1 to 6, characterized in that: The charging device also includes an output power distribution unit; The input end of the output power distribution unit is electrically connected to the output end of the power conversion unit; The output end of the output power distribution unit is electrically connected to the device to be charged.
8. The charging device according to any one of claims 1 to 7, characterized in that: The charging device is an integrated charging pile or a charging host, and the output end of the charging host is electrically connected to one or more split charging piles; each of the split charging piles is used to charge one of the devices to be charged.
9. The charging device according to claim 8, characterized in that: The charging host is deployed inside the data center.
10. The charging device according to any one of claims 2 to 9, characterized in that: The charging device also includes a second AC / DC conversion unit; Wherein, the input end of the second AC / DC conversion unit is electrically connected to a second power supply; the second power supply is the AC power of the power grid; The output end of the second AC / DC conversion unit is electrically connected to the device to be charged; The charging controller is electrically connected to the second AC / DC conversion unit; the charging controller is also used to control the second AC / DC conversion unit to convert the AC power of the power grid into the charging voltage.
Citation Information
Patent Citations
Electric vehicle power sharing group charging system and method thereof
CN112937342A
Charging system and method for new energy automobile
CN113306429A
Integrated double-gun charging pile
CN113442760A
Power supply system, data center and charging equipment
CN114846715A
Data center power supply system and method
CN114938066A
Cited By
Power supply management circuit, power supply control method, power supply management equipment and server cabinet
CN120566535A
Power supply circuit, charging pile, server cabinet and power generation equipment
CN120566536A
Power supply system, power supply equipment and server cabinet
CN120566537A
Charging device
WO2025260924A1