Offshore floating and sinking submersible pipe laying operation equipment and use method

By using offshore floating and submersible submersible pipe operation equipment in exposed or suspended submarine oil pipelines, combined with three-dimensional sonar positioning and precise sandblasting landfill technology of rotary sandblasting mechanisms, the damage and leakage problems caused by exposed or suspended submarine pipelines are solved, and the damage and leakage problems caused by exposed or suspended submarine pipelines are achieved. Efficient and accurate pipe buried operations.

CN118753473BActive Publication Date: 2024-11-29SHANDONG PETROCHEMICAL INST
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411047948.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-29
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

In shallow sea areas, submarine oil pipelines are prone to exposure or suspended due to factors such as current erosion, which leads to the pipeline being easily damaged by external forces, resulting in crude oil leakage and environmental pollution. The existing governance plans have problems such as high construction costs, low operating efficiency and difficult positioning.

Method used

A offshore floating and sinking submersible pipe buried operation equipment is adopted, including an electric drive walking chassis, floating and sinking box, a four-point lifting mechanism, an external flexible buoyancy box and a buried pipe sand blasting device. Through three-dimensional sonar positioning of suspended or exposed pipelines, the rotary sandblasting mechanism is used to accurately sandblast and landfill, so as to achieve accurate pipe burial operations of subsea pipelines.

Benefits of technology

The precise pipe buried operation of suspended or exposed pipelines under the sea has been realized, avoiding external damage to the pipeline due to exposed or suspended pipelines, reducing construction costs and safety hazards, and improving operating efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118753473B_ABST
    Figure CN118753473B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of offshore oil pipeline burial operations, and in particular to an offshore floating and sinking submersible pipeline burial operation equipment and a method of use. The technical solution is: a sealed material box, a rotating sandblasting mechanism, and a flexible connecting pipe constitute a buried pipe sandblasting device, which is installed on the upper part of the floating and sinking box body. The rotating sandblasting mechanism is located on the upper part of the sealed material box, and the sealed material box and the operating mother ship on the water surface are connected through a flexible connecting pipe. The sand liquid from the operating mother ship is received through the flexible connecting pipe and the sealed material box, and the sand liquid is sprayed to the suspended and exposed pipelines through the rotating sandblasting mechanism to realize the buried pipe operation; the positioning device is installed on the front side of the floating and sinking box body, which is used to realize the discovery and positioning of suspended and exposed pipelines. The beneficial effect is: the present invention locates the suspended or exposed pipelines through three-dimensional sonar, and then receives the sand liquid from the operating mother ship, and accurately blasts sand around the exposed or suspended pipelines, thereby realizing accurate buried pipe operations and avoiding the exposed or suspended pipelines from being damaged by external forces.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of offshore oil pipe laying operations, and in particular to offshore floating, sinking and submersible pipe laying operations equipment and a use method thereof. Background Art

[0002] Submarine oil pipelines are important facilities for oil and gas transportation in the development of offshore oil and gas fields. Their safety is an important factor in ensuring safe production of oil fields and protecting the marine environment. In order to ensure that submarine pipelines are not damaged by ships anchoring, submarine pipelines in shallow sea areas are usually laid in the bottom mud below 1.5m on the seabed. However, due to the influence of factors such as ocean current erosion all year round, submarine pipelines will be exposed or suspended. Exposed or suspended pipelines are easily damaged by external forces, which will eventually cause damage to submarine oil pipelines and crude oil leakage accidents, which will not only cause significant economic losses, but more importantly, cause irreparable environmental pollution. Therefore, the problem of exposed or suspended submarine oil pipelines needs to be dealt with urgently, which is currently an important problem in the oil industry.

[0003] The solutions for treating exposed or suspended submarine oil pipelines include the following: In China, the main methods used are manual backfilling and burial, installation of interlocking rows, bionic water grass reinforcement, and bagged overall delivery. These methods are mainly manual, and there is no dedicated mechanical precision delivery equipment. Among them, manual backfilling and burial mainly adopts the method of manual surface throwing and secondary sorting by divers. The problems with this method are: high construction cost, inaccurate sand throwing position, low operation efficiency, and safety hazards such as drowning of divers. In foreign countries, professional special ships equipped with gravel throwing equipment are mainly used to treat suspended and exposed submarine pipelines. However, special equipment equipped with special ships has difficulty in positioning, which makes it difficult to accurately deliver gravel around exposed or suspended pipelines.

[0004] The Chinese patent document publication number is CN103123018B, and the patent name is "Plow-type suspended span submarine pipeline landfill equipment", which includes a frame, a plow frame, a plow body, a baffle, a steering mechanism, and a walking mechanism. The plow-type suspended span submarine pipeline landfill equipment is a bilaterally symmetrical structure; the front of the plow frame is rotatably connected to the rear of the frame; the plow body is fixed on the left and right sides of the plow frame, and the baffle is fixed on the rear of the plow frame; the front end of the frame is supported by the walking mechanism, and the steering mechanism is arranged on the front top of the frame. This patent turns the soil in a plow-like manner, and then transfers the soil to the suspended part of the pipeline to fill the suspended span pipeline. The problems are: on the one hand, during the construction process, it is easy to cause accidents that the plow frame and the plow body touch the oil pipeline; on the other hand, it adopts hydraulic drive, and the control system on the sea surface tugboat remotely controls the opening and closing logic of each hydraulic cylinder solenoid valve to control the movement direction of each hydraulic cylinder of the trencher, and then completes the steering of the trencher steering device, the forward tilting of the walking device support legs and other actions, and the structure and operation are complicated.

[0005] Therefore, it is necessary to develop a kind of offshore floating and sinking submersible pipe laying operation equipment and use method. Summary of the invention

[0006] The purpose of the present invention is to address the above-mentioned defects of the prior art and to provide an offshore floating and sinking submersible pipe burying operation equipment and a method of use. The present invention uses three-dimensional sonar to locate suspended or exposed pipelines, and then receives sand and liquid from the operating mother ship to accurately spray sand around the exposed or suspended pipelines, thereby achieving precise pipe burying operations of suspended or exposed pipelines on the seabed and preventing the exposed or suspended pipelines from being damaged by external forces.

[0007] The present invention mentions an offshore floating and sinking submersible pipe laying operation equipment, and its technical solution is: including an electric drive walking chassis, a floating and sinking box, a four-point lifting mechanism, an external flexible buoyancy box and a power control mechanism, the electric drive walking chassis, the floating and sinking box and the four-point lifting mechanism constitute a chassis walking mechanism, the floating and sinking box is movably connected to the electric drive walking chassis through the four-point lifting mechanism, the floating and sinking box is used to achieve the rise and fall between the sea surface and the seabed, and the electric drive walking chassis is used to make the whole machine walk on the seabed; the external flexible buoyancy box is installed on the floating and sinking box to provide additional buoyancy; its improvement is: it also includes A sealed material box, a rotary sandblasting mechanism, a flexible connecting pipe and a positioning device, wherein the sealed material box, the rotary sandblasting mechanism and the flexible connecting pipe constitute a buried pipe sandblasting device, which is installed on the upper part of the floating and sinking box body. The rotary sandblasting mechanism is located on the upper part of the sealed material box, and the sealed material box and the operating mother ship on the water surface are connected by a flexible connecting pipe. The sand liquid is received from the operating mother ship through the flexible connecting pipe and the sealed material box, and the sand liquid is sprayed onto the suspended and exposed pipelines through the rotary sandblasting mechanism to realize the buried pipe operation; the positioning device is installed on the front side of the floating and sinking box body, and is used to realize the discovery and positioning of suspended and exposed pipelines.

[0008] Preferably, the above-mentioned rotary sandblasting mechanism includes a sand pump, a connecting pipe, a flexible joint, a universal joint, a swing mechanism, an elbow, a telescopic tube, an electric push rod and a universal wheel. The universal joint, the swing mechanism, the elbow, the telescopic tube, the electric push rod and the universal wheel constitute a rotary telescopic sandblasting mechanism. The universal joint is located at the lower part of the elbow, and the elbow is connected to the swing mechanism and the telescopic tube for adjusting the direction of the pipeline. The base of the electric push rod is installed on the swing mechanism, and the electric push rod is connected to the protruding end of the telescopic tube for driving the telescopic movement of the telescopic tube. The universal wheel is located below the telescopic tube, is a supporting mechanism of the telescopic tube, and rotates with the telescopic tube; the lower part of the universal joint is connected to the sand pump through the flexible joint and the connecting pipe.

[0009] Preferably, the above-mentioned swing mechanism includes a waterproof low-speed motor, an arc guide rail and a connecting hoop. The arc guide rail is installed on the top of the sealed material box, the upper part of the connecting hoop is installed on the electric push rod, and the lower part is connected to the slider on the arc guide rail. The waterproof low-speed motor drives the electric push rod to rotate along the arc guide rail through the connecting hoop to achieve steering.

[0010] Preferably, the above-mentioned flexible connecting pipe includes a connecting pipe, a rotating joint, and a buoyancy block, wherein one end of the connecting pipe is connected to the buoyancy block, and the other end is connected to the rotating joint, the rotating joint is installed on the upper part of the sealed material box, and an umbilical cable is installed in the connecting pipe; the buoyancy block provides buoyancy to the connecting pipe, so that the upper end of the connecting pipe floats on the water surface when the connecting pipe is in the sand transport working state; the umbilical cable is composed of a three-phase power cable and a signal control cable, which provides power for the whole machine and monitors the transmission of control signals.

[0011] Preferably, the above-mentioned sealed material box includes a material box body, an upper cover, a connecting base, an interface, a one-way valve, a discharge port, an exhaust pressure valve and a hook. The top of the material box body is provided with an upper cover, and the lower surface of the upper cover is provided with reinforcing ribs. The bottom of the material box body is installed on the mounting main beam through the connecting base, and the interface is installed on the upper cover. The interface is connected to the flexible connecting pipe through a one-way valve; a hook and an exhaust pressure valve are provided on the outer side of the top of the material box body, and the discharge port is installed on the lower side of the material box body.

[0012] Preferably, the above-mentioned floating and sinking box includes a box beam structure, a sealed box, an installation main beam, an air storage tank, an air inlet valve, an exhaust valve, a ballast valve and a ballast discharge valve. The box beam structure is a frame structure, and the sealed box is installed outside the box beam structure. The installation main beam is located at the upper part of the box beam structure. There is more than one air storage tank in the sealed box, and an air inlet valve, an exhaust valve, a ballast valve and a ballast discharge valve are arranged. The exhaust valve provides the sealed box with power for discharging ballast water. The ballast valve is installed at the bottom of the sealed box for discharging and entering ballast water. The ballast discharge valve is installed at the upper part of the sealed box. When the ballast valve is opened and ballast water is inlet, the ballast discharge valve discharges the air in the sealed box.

[0013] Preferably, the box beam structure includes a flat main beam, a bottom main beam, an inclined main beam, a side main beam, a transverse main beam and a sub-box beam. The flat main beam is located on the upper side and is composed of four sections of flat main beams to form a rectangular frame structure, which is an upper support mechanism. The bottom main beam is located at the bottom and is composed of four sections of bottom main beams to form a rectangular frame structure, which is a bottom support mechanism. The inclined main beam connects the intersection of the flat main beam and the bottom main beam rectangular space structure frame. The flat main beam, the bottom main beam and the inclined main beam form a trapezoidal body frame to form a supporting main frame for the floating and sinking box.

[0014] Preferably, two transverse main beams are connected to the side main beams to divide the inner cavity of the floating and sinking box into three compartments: front, middle and rear; the sub-box beams of the floating and sinking box are located between the front compartment and the rear compartment; a bidirectional inclination sensor is installed in the inner cavity of the floating and sinking box, and the bidirectional inclination sensor is connected to the control box through a signal line, and the control box adjusts the ballast condition according to the signal of the bidirectional inclination sensor to achieve the posture balance of the whole machine.

[0015] Preferably, the electric-driven walking chassis comprises a wide crawler, an underwater motor and a reducer, and the underwater motor drives the driving wheel of the wide crawler to rotate through the reducer to realize the movement of the whole machine;

[0016] The four-point lifting mechanism includes a rectangular set frame, an end cross beam, a lower support beam, a lower support beam guide, a power machine, a lift, a transmission rod, a lower connecting plate, a bracket and an upper connecting plate. The rectangular set frame is connected to the end cross beam through the lower support beam to transfer the load to the walking frame of the wide crawler track of the electric drive walking chassis; the lower support beam guide is slidably matched with the lower support beam, and a guide pillar is provided on one side of the lower support beam guide; the power machine is connected to the power input shaft of the lift through a transmission rod, and the lift is installed between the upper connecting plate and the bracket. The lower part of the lower connecting plate is installed on the box beam structure of the floating box, and the upper part is connected to the bracket.

[0017] The method for using the offshore floating and sinking submersible pipe laying operation equipment mentioned in the present invention includes the following process:

[0018] The first step is for the mother ship to reach the target area offshore; the second step is to use the positioning device to locate the position of the exposed or suspended pipeline and guide the mother ship to the position of the exposed or suspended pipeline; the third step is to lower the offshore floating and sinking submersible pipe laying equipment to the seabed, and control the intake valve, exhaust valve, ballast valve, and ballast discharge valve switches to achieve ballast water intake and ballast discharge, thereby controlling the buoyancy of the whole machine and achieving the sinking and floating of the whole machine; the fourth step is then to patrol and inspect the exposed or suspended pipelines, and formulate spraying plans according to the exposed or suspended working conditions. Sand operation process; the fifth step, the whole machine moves to the side of the exposed or suspended pipeline, adjusts the angle of the telescopic tube of the rotating sandblasting mechanism, and prepares to start the sandblasting and pipe burying operation; the sixth step, sandblasting operation, the operation mother ship supplies sand liquid to the sealed material box through the flexible connecting pipe, and after reaching one-third of the depth, the sand pump in the rotating sandblasting mechanism is started, and the sandblasting operation begins until the sandblasting and landfill of the exposed or suspended pipelines in the area are completed; the seventh step, recover the whole machine, the whole machine discharges ballast water, floats to the sea surface, and the operation mother ship recovers the offshore floating and sinking submersible pipe burying operation equipment.

[0019] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0020] The positioning device mentioned in the present invention is used to realize the discovery and positioning of suspended and exposed pipelines; the rotary sandblasting mechanism mentioned is located on the upper part of the sealed material box, and is connected to the sealed material box and the operating mother ship on the water surface through a flexible connecting pipe. The sand liquid from the operating mother ship is received through the flexible connecting pipe and the sealed material box, and the sand liquid is sprayed to the suspended and exposed pipelines through the rotary sandblasting mechanism to realize the pipe burying operation, and the problem of touching the oil pipeline due to misoperation in the prior art, which then causes damage and leakage of the oil pipeline, will not occur; and the external flexible buoyancy box is used to increase the buoyancy. In the case that the whole machine fails to rise and sink, it is inflated to realize the lifting of the whole machine; in addition, the present invention The electric-driven walking chassis, floating and sinking box and four-point lifting mechanism mentioned in the specification constitute a chassis walking mechanism, and the floating and sinking box is movably connected to the electric-driven walking chassis through the four-point lifting mechanism to realize the lifting and lowering of the floating and sinking box relative to the electric-driven walking chassis, ensuring a reasonable ground clearance for walking, and controlling the lifting of the floating and sinking box when the floating and sinking box is in a grounded condition to ensure that the floating and sinking box is freed from the seabed, and the whole machine is allowed to walk on the seabed through the electric-driven walking chassis; in short, the present invention receives sand and liquid from the operating mother ship and uses a rotating sandblasting mechanism to accurately blast sand around exposed or suspended pipelines, thereby realizing precise pipe burying operations of suspended or exposed pipelines on the seabed. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a front view of the overall structure of the present invention;

[0022] Figure 2 It is a top view of the overall structure of the present invention;

[0023] Figure 3 It is a side view of the overall structure of the present invention;

[0024] Figure 4 It is a main cross-sectional view of the floating and sinking box of the present invention;

[0025] Figure 5 A top sectional view of the floating and sinking box of the present invention;

[0026] Figure 6 The structural front view of the four-point lifting mechanism of the present invention

[0027] Figure 7 It is a side view of the four-point lifting mechanism structure of the present invention;

[0028] Figure 8 It is a main cross-sectional view of the sealed material box and the rotary sandblasting mechanism;

[0029] Fig. 9 It is a top view of the sealed material box and the rotary sandblasting mechanism;

[0030] In the figure above: electric drive walking chassis 1, floating box 2, four-point lifting mechanism 3, external flexible buoyancy box 4, sealed material box 5, rotary sandblasting mechanism 6, flexible connecting pipe 7, positioning device 8, power control mechanism 9, wide track 1.1, underwater motor 1.2, reducer 1.3, box beam structure 2.1, guide pillar 2.2, sealed box 2.3, installation main beam 2.4, air storage tank 2.5, air intake valve 2.6, exhaust valve 2.7, ballast valve 2.8, ballast discharge valve 2.9, electromagnetic level gauge 2.10, flat main beam 2.1.1, bottom main beam 2.1.2, inclined main beam 2.1.3, side main beam 2.1.4, cross main beam 2.1.5, sub-box beam 2.1.6, rectangular set frame 3.1, end cross beam 3.2, lower support beam 3.3, lower support beam guide Direction 3.4, power machine 3.5, lift 3.6, transmission rod 3.7, lower connecting plate 3.8, bracket 3.9, upper connecting plate 3.10, material box body 5.1, upper cover 5.2, connecting base 5.3, interface 5.4, one-way valve 5.5, discharge port 5.6, exhaust pressure valve 5.7, hook 5.8, sand pump 6.1, connecting pipe 6.2, flexible joint 6.3, universal joint 6.4, swing mechanism 6.5, elbow 6.6, telescopic pipe 6.7, electric push rod 6.8, universal wheel 6.9, waterproof low-speed motor 6.5.1, arc guide rail 6.5.2, connecting hoop 6.5.3, connecting pipe 7.1, rotating joint 7.2, buoyancy block 7.3, two-way tilt sensor 9.1, umbilical cable 9.2, control box 9.3, waterproof joint 9.4. DETAILED DESCRIPTION

[0031] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0032] Example 1, reference Figure 1-Figure 9The present invention mentions an offshore floating and sinking submersible pipe laying operation equipment, comprising an electric-driven walking chassis 1, a floating and sinking box 2, a four-point lifting mechanism 3, an external flexible buoyancy box 4 and a power control mechanism 9. The electric-driven walking chassis 1, the floating and sinking box 2 and the four-point lifting mechanism 3 constitute a chassis walking mechanism. The floating and sinking box 2 is movably connected to the electric-driven walking chassis 1 through the four-point lifting mechanism 3 to realize the lifting and lowering of the floating and sinking box 2 relative to the electric-driven walking chassis 1 to ensure a reasonable ground clearance for walking. When the floating and sinking box 2 is grounded, the floating and sinking box 2 can be controlled to be lifted to ensure that the floating and sinking box 2 is easy to get out of trouble, and the whole machine can be moved on the seabed through the electric-driven walking chassis 1; the external flexible buoyancy box 4 is installed on the floating and sinking box 2 to provide Additional buoyancy; its improvements are: it also includes a sealed material box 5, a rotary sandblasting mechanism 6, a flexible connecting pipe 7 and a positioning device 8, the sealed material box 5, the rotary sandblasting mechanism 6, the flexible connecting pipe 7 constitute a buried pipe sandblasting device, which is installed on the upper part of the floating and sinking box body 2, the rotary sandblasting mechanism 6 is located on the upper part of the sealed material box 5, and the sealed material box 5 and the operating mother ship on the water surface are connected through the flexible connecting pipe 7, and the sand liquid from the operating mother ship is received through the flexible connecting pipe 7 and the sealed material box 5, and the sand liquid is sprayed to the suspended and exposed pipelines through the rotary sandblasting mechanism 6 to realize the buried pipe operation; the positioning device 8 can use a three-dimensional sonar, which is installed on the front side of the floating and sinking box body 2, and is used to realize the discovery and positioning of suspended and exposed pipelines.

[0033] Reference Figure 8 and Fig. 9 The rotary sandblasting mechanism 6 mentioned in the present invention comprises a sand pump 6.1, a connecting pipe 6.2, a flexible joint 6.3, a universal joint 6.4, a swing mechanism 6.5, an elbow 6.6, a telescopic tube 6.7, an electric push rod 6.8 and a universal wheel 6.9. The universal joint 6.4, the swing mechanism 6.5, the elbow 6.6, the telescopic tube 6.7, the electric push rod 6.8 and the universal wheel 6.9 constitute a rotary telescopic sandblasting mechanism. The universal joint 6.4 is located at the lower part of the elbow 6.6, and the elbow 6.6 is connected to the swing mechanism 6.5 and the telescopic tube 6.7 to adjust the direction of the pipeline. The base of the electric push rod 6.8 is installed on the swing mechanism 6.5. The electric push rod 6.8 is connected to the protruding end of the telescopic tube 6.7 to drive the telescopic tube 6.7 to move in telescopic manner. The telescopic tube 6.7 is a tube-in-tube structure. The inner tube is telescopic under the action of the electric push rod 6.8, thereby increasing the coverage of the telescopic tube 6.7. The universal wheel 6.9 is located below the telescopic tube 6.7 and is a supporting mechanism of the telescopic tube 6.7. It rotates with the telescopic tube 6.7. The lower part of the universal joint 6.4 is connected to the sand pump 6.1 through the flexible joint 6.3 and the connecting pipe 6.2.

[0034] Among them, the above-mentioned swing mechanism 6.5 includes a waterproof low-speed motor 6.5.1, an arc guide rail 6.5.2 and a connecting hoop 6.5.3. The arc guide rail 6.5.2 is installed on the top of the sealed material box 5. The upper part of the connecting hoop 6.5.3 is installed on the electric push rod 6.8, and the lower part is connected to the slider on the arc guide rail 6.5.2. The waterproof low-speed motor 6.5.1 drives the electric push rod 6.8 to rotate along the arc guide rail 6.5.2 through the connecting hoop 6.5.3 to achieve steering.

[0035] In addition, the flexible connecting pipe 7 comprises a connecting pipe 7.1, a rotating joint 7.2 and a buoyancy block 7.3, wherein one end of the connecting pipe 7.1 is connected to the buoyancy block 7.3, and the other end is connected to the rotating joint 7.2, the rotating joint 7.2 is installed on the upper part of the sealed material box 5, and an umbilical cable 9.2 is installed in the connecting pipe 7.1; the buoyancy block 7.3 provides buoyancy to the connecting pipe 7.1, so that the upper end of the connecting pipe 7.1 floats on the water surface when the sand transporting working state is in progress; the umbilical cable 9.2 is composed of a three-phase power cable and a signal control cable, which provides power for the whole machine and monitors the transmission of control signals.

[0036] In addition, the sealed material box 5 mentioned in the present invention is an actuator for sandblasting operations, which is a pressure-sealed cabin installed on the main beam 2.4; specifically, the sealed material box 5 includes a material box body 5.1, an upper cover 5.2, a connecting base 5.3, an interface 5.4, a one-way valve 5.5, a discharge port 5.6, an exhaust pressure valve 5.7 and a hook 5.8, the top of the material box body 5.1 is provided with an upper cover 5.2, and the lower surface of the upper cover 5.2 is provided with reinforcing ribs, the bottom of the material box body 5.1 is installed on the mounting main beam 2.4 through the connecting base 5.3, the interface 5.4 is installed on the upper cover 5.2, and the interface 5.4 is connected to the flexible connecting pipe 7 through a one-way valve 5.5; the top outer side of the material box body 5.1 is provided with a hook 5.8 and an exhaust pressure valve 5.7, and the lower side of the material box body 5.1 is provided with a discharge port 5.6.

[0037] The positioning device 8 is installed on both sides of the material box body 5.1, preferably an ultrasonic positioning mechanism, such as a three-dimensional sonar, for locating the position of the exposed pipeline;

[0038] The power control mechanism 9 is located in the floating and sinking box 2, and includes a bidirectional tilt sensor 9.1, an umbilical cable 9.2, a control box 9.3 and a waterproof connector 9.4. The bidirectional tilt sensor 9.1 is installed in the inner cavity of the floating and sinking box 2, adjusted to be horizontally installed, and sends the left and right posture signals of the whole machine to the control box 9.3. The umbilical cable 9.2 is a channel connecting the whole machine and the working mother ship, providing electric power and control signals for the whole machine; a PLC control module is installed in the control box 9.3, and the PLC control module is a conventional technology well known to those skilled in the art and will not be described in detail; the waterproof connector 9.4 is installed on the upper part of the floating and sinking box 2, and is a channel for the umbilical cable 9.2 to enter and exit the floating and sinking box 2. During operation, the PLC control module adjusts the ballast condition according to the left and right attitude signals of the bidirectional tilt sensor 9.1 to achieve the attitude balance of the whole machine, and then controls the opening and closing of the air intake valve 2.6, the exhaust valve 2.7, the ballast valve 2.8 and the ballast discharge valve 2.9 to achieve ballast water inlet and ballast water discharge, thereby achieving the rise and sinking of the floating and sinking box 2.

[0039] Reference Figure 4 and Figure 5 The floating and sinking box 2 mentioned in the present invention includes a box beam structure 2.1, a guide support 2.2, a sealed box 2.3, a mounting main beam 2.4, an air storage chamber 2.5, an air inlet valve 2.6, an exhaust valve 2.7, a ballast valve 2.8, a ballast discharge valve 2.9 and an electromagnetic level gauge 2.10. The box beam structure 2.1 is a frame structure. The sealed box 2.3 is installed outside the box beam structure 2.1. The mounting main beam 2.4 is located at the upper part of the box beam structure 2.1. One or more air storage chambers 2.5 are arranged in the sealed box 2.3, and the arrangement Inlet valve 2.6, exhaust valve 2.7, ballast valve 2.8 and ballast discharge valve 2.9. The exhaust valve 2.7 provides the sealed box 2.3 with power for discharging ballast water. The ballast valve 2.8 is installed at the bottom of the sealed box 2.3 for discharging and entering ballast water. The ballast discharge valve 2.9 is installed at the upper part of the sealed box 2.3. When the ballast valve 2.8 is opened and ballast water is inlet, the ballast discharge valve 2.9 discharges the air in the sealed box 2.3. The electromagnetic level meter 2.10 is installed in the inner cavity of the sealed box 2.3.

[0040] Among them, the above-mentioned box beam structure 2.1 includes a flat main beam 2.1.1, a bottom main beam 2.1.2, an inclined main beam 2.1.3, a side main beam 2.1.4, a transverse main beam 2.1.5 and a sub-box beam 2.1.6. The flat main beam 2.1.1 is located on the upper side, and is composed of four sections of flat main beams 2.1.1 to form a rectangular frame structure, which is an upper supporting mechanism. The bottom main beam 2.1.2 is located at the bottom, and is composed of four sections of bottom main beams 2.1.2 to form a rectangular frame structure, which is a bottom supporting mechanism. The inclined main beam 2.1.3 connects the intersection of the flat main beam 2.1.1 and the bottom main beam 2.1.2 rectangular space structure frame. The flat main beam 2.1.1, the bottom main beam 2.1.2 and the inclined main beam 2.1.3 form a trapezoidal body frame to form the supporting main frame of the floating and sinking box 2.

[0041] In addition, two transverse main beams 2.1.5 are connected to the side main beams 2.1.4, dividing the inner cavity of the floating and sinking box 2 into three compartments: front, middle and rear; the sub-box beams 2.1.6 of the floating and sinking box 2 are located between the front compartment and the rear compartment, and a two-way inclination sensor 9.1 is also installed in the inner cavity of the floating and sinking box 2. The two-way inclination sensor 9.1 is connected to the control box 9.3 through a signal line, and the control box 9.3 adjusts the ballast condition according to the signal of the two-way inclination sensor 9.1 to achieve the balance of the whole machine posture.

[0042] The electric-driven walking chassis 1 mentioned in the present invention comprises a wide crawler 1.1, an underwater motor 1.2 and a reducer 1.3. The underwater motor 1.2 drives the driving wheel of the wide crawler 1.1 to rotate through the reducer 1.3 to realize the movement of the whole machine.

[0043] Reference Figure 6 and Figure 7 The four-point lifting mechanism 3 mentioned in the present invention includes a rectangular set frame 3.1, an end crossbeam 3.2, a lower support beam 3.3, a lower support beam guide 3.4, a power machine 3.5, a lift 3.6, a transmission rod 3.7, a lower connecting plate 3.8, a bracket 3.9 and an upper connecting plate 3.10. The rectangular set frame 3.1 is connected to the end crossbeam 3.2 through the lower support beam 3.3 to transfer the load to the walking frame of the wide crawler 1.1 of the electric drive walking chassis 1; the lower support beam guide 3.4 is slidably matched with the lower support beam 3.3, and a guide pillar 2.2 is provided on one side of the lower support beam guide 3.4; the power machine 3.5 is connected to the power input shaft of the lift 3.6 through the transmission rod 3.7, and the lift 3.6 is installed between the upper connecting plate 3.10 and the bracket 3.9. The lower part of the lower connecting plate 3.8 is installed on the box beam structure 2.1 of the floating box 2, and the upper part is connected to the bracket 3.9.

[0044] The method for using the offshore floating and sinking submersible pipe laying operation equipment mentioned in the present invention includes the following process:

[0045] The first step is that the mother ship reaches the target area near the coast; the second step is to use the positioning device 8 to locate the position of the exposed or suspended pipeline and guide the mother ship to the position of the exposed or suspended pipeline; the third step is to lower the offshore floating and sinking submersible pipe laying operation equipment to the seabed, and control the air intake valve 2.6, the exhaust valve 2.7, the ballast valve 2.8, and the ballast discharge valve 2.9 to realize ballast water intake and ballast discharge, thereby controlling the buoyancy of the whole machine and realizing the sinking and floating of the whole machine; the fourth step is then to patrol and inspect the exposed or suspended pipelines, and formulate spraying according to the exposed or suspended working conditions. Sand operation process; the fifth step, the whole machine moves to the side of the exposed or suspended pipeline, adjusts the angle of the telescopic tube 6.7 of the rotating sandblasting mechanism 6, and prepares to start the sandblasting and pipe burying operation; the sixth step, the sandblasting operation, the operation mother ship supplies sand liquid to the sealing material box 5 through the flexible connecting pipe 7, and after reaching one-third or more of the depth, the sand pump 6.1 in the rotating sandblasting mechanism 6 is started, and the sandblasting operation is started until the sandblasting and landfilling of the exposed or suspended pipeline in the area is completed; the seventh step, the whole machine is recovered, the whole machine discharges ballast water, floats to the sea surface, and the operation mother ship recovers the offshore floating and sinking submersible pipe burying operation equipment.

[0046] The above are only some preferred embodiments of the present invention. Any person skilled in the art may modify the above technical solutions or modify them into equivalent technical solutions. Therefore, the corresponding simple modifications or equivalent transformations made according to the technical solutions of the present invention shall fall within the scope of protection claimed by the present invention.

Claims

1. An offshore floating and sinking submersible pipe laying operation equipment, comprising an electric-driven walking chassis (1), a floating and sinking box (2), a four-point lifting mechanism (3), an external flexible buoyancy box (4) and a power control mechanism (9), wherein the electric-driven walking chassis (1), the floating and sinking box (2) and the four-point lifting mechanism (3) constitute a chassis walking mechanism, the floating and sinking box (2) is movably connected to the electric-driven walking chassis (1) through the four-point lifting mechanism (3), the floating and sinking box (2) is used to achieve the rise and fall between the sea surface and the seabed, and the electric-driven walking chassis (1) is used to make the whole machine walk on the seabed; the external flexible buoyancy box (4) is installed on the floating and sinking box (2) to provide additional buoyancy, and the characteristics are: Also includes A sealing material box (5), a rotary sandblasting mechanism (6), a flexible connecting pipe (7) and a positioning device (8), wherein the sealing material box (5), the rotary sandblasting mechanism (6) and the flexible connecting pipe (7) constitute a pipe burying sandblasting device, which is installed on the upper part of the floating and sinking box body (2); the rotary sandblasting mechanism (6) is located on the upper part of the sealing material box (5), and is connected to the sealing material box (5) and the operating mother ship on the water surface through the flexible connecting pipe (7); the sand liquid is received from the operating mother ship through the flexible connecting pipe (7) and the sealing material box (5), and the sand liquid is sprayed to the suspended and exposed pipelines through the rotary sandblasting mechanism (6) to realize the pipe burying operation; the positioning device (8) is installed on the front side of the floating and sinking box body (2) and is used to realize the discovery and positioning of the suspended and exposed pipelines; The rotary sandblasting mechanism (6) comprises a sand pump (6.1), a connecting pipe (6.2), a flexible joint (6.3), a universal joint (6.4), a swing mechanism (6.5), an elbow (6.6), a telescopic tube (6.7), an electric push rod (6.8) and a universal wheel (6.9); the universal joint (6.4), the swing mechanism (6.5), the elbow (6.6), the telescopic tube (6.7), the electric push rod (6.8) and the universal wheel (6.9) constitute the rotary telescopic sandblasting mechanism; the universal joint (6.4) is located at the lower part of the elbow (6.6), and the elbow (6.6) is connected to the universal joint (6.4). The swing mechanism (6.5) and the telescopic tube (6.7) are connected to adjust the direction of the pipeline. The base of the electric push rod (6.8) is installed on the swing mechanism (6.5). The electric push rod (6.8) is connected to the extended end of the telescopic tube (6.7) to drive the telescopic tube (6.7) to move. The universal wheel (6.9) is located below the telescopic tube (6.7) and is a supporting mechanism of the telescopic tube (6.7). It rotates with the telescopic tube (6.7). The lower part of the universal joint (6.4) is connected to the sand pump (6.1) through the flexible joint (6.3) and the connecting pipe (6.2). The swing mechanism (6.5) comprises a waterproof low-speed motor (6.5.1), an arc-shaped guide rail (6.5.2) and a connecting hoop (6.5.3); the arc-shaped guide rail (6.5.2) is mounted on the top of the sealed material box (5); the upper part of the connecting hoop (6.5.3) is mounted on the electric push rod (6.8); the lower part is connected to the slider on the arc-shaped guide rail (6.5.2); the waterproof low-speed motor (6.5.1) drives the electric push rod (6.8) to rotate along the arc-shaped guide rail (6.5.2) through the connecting hoop (6.5.3) to achieve steering; The flexible connecting pipe (7) comprises a connecting pipe (7.1), a rotating joint (7.2), and a buoyancy block (7.3), wherein one end of the connecting pipe (7.1) is connected to the buoyancy block (7.3), and the other end is connected to the rotating joint (7.2); the rotating joint (7.2) is installed on the upper part of the sealed material box (5), and an umbilical cable (9.2) is installed in the connecting pipe (7.1); the buoyancy block (7.3) provides buoyancy to the connecting pipe (7.1), so that the upper end of the connecting pipe (7.1) floats on the water surface when the connecting pipe (7.1) is in a sand transporting working state; the umbilical cable (9.2) consists of a three-phase power cable and a signal control cable, and provides power for the whole machine and monitors the transmission of control signals; The sealed material box (5) comprises a material box body (5.1), an upper cover (5.2), a connecting base (5.3), an interface (5.4), a one-way valve (5.5), a discharge port (5.6), an exhaust pressure valve (5.7) and a hook (5.8); the top of the material box body (5.1) is provided with an upper cover (5.2), and the lower surface of the upper cover (5.2) is provided with reinforcing ribs; the bottom of the material box body (5.1) is mounted on the mounting main beam (2.4) through the connecting base (5.3); the interface (5.4) is mounted on the upper cover (5.2), and the interface (5.4) is connected to a flexible connecting pipe (7) through a one-way valve (5.5); the outer side of the top of the material box body (5.1) is provided with a hook (5.8) and an exhaust pressure valve (5.7), and the discharge port (5.6) is installed on the lower side of the material box body (5.1).

2. The offshore floating and sinking submersible pipe laying equipment according to claim 1 is characterized by: The floating and sinking box (2) comprises a box beam structure (2.1), a sealed box (2.3), an installation main beam (2.4), an air storage chamber (2.5), an air intake valve (2.6), an exhaust valve (2.7), a ballast valve (2.8) and a ballast discharge valve (2.9); the box beam structure (2.1) is a frame structure; the sealed box (2.3) is installed outside the box beam structure (2.1); the installation main beam (2.4) is located outside the box beam structure (2.1); The sealed box (2.3) is provided with one or more air storage tanks (2.5) at the upper part of the sealed box (2.1), and is provided with an air intake valve (2.6), an air exhaust valve (2.7), a ballast valve (2.8) and a ballast discharge valve (2.9), wherein the air exhaust valve (2.7) provides the sealed box (2.3) with power for discharging ballast water, the ballast valve (2.8) is installed at the bottom of the sealed box (2.3) and is used for discharging and inletting ballast water, and the ballast discharge valve (2.9) is installed at the upper part of the sealed box (2.3), and when the ballast valve (2.8) is opened and ballast water is inletted, the ballast discharge valve (2.9) discharges air in the sealed box (2.3).

3. The offshore floating and sinking submersible pipe laying equipment according to claim 2 is characterized by: The box beam structure (2.1) comprises a flat main beam (2.1.1), a bottom main beam (2.1.2), an inclined main beam (2.1.3), a side main beam (2.1.4), a transverse main beam (2.1.5) and a sub-box beam (2.1.6), wherein the flat main beam (2.1.1) is located on the upper side and is composed of four sections of flat main beams ( The main beam (2.1.1) is composed of a rectangular frame structure, which is the upper support mechanism. The bottom main beam (2.1.2) is located at the bottom and is composed of four sections of bottom main beams (2.1.2) to form a rectangular frame structure, which is the bottom support mechanism. The inclined main beam (2.1.3) connects the intersection of the flat main beam (2.1.1) and the bottom main beam (2.1.2) rectangular space structure frame. The flat main beam (2.1.1), the bottom main beam (2.1.2) and the inclined main beam (2.1.3) form a trapezoidal frame, forming the supporting main frame of the floating and sinking box (2).

4. The offshore floating and sinking submersible pipe laying equipment according to claim 3 is characterized by: Two transverse main beams (2.1.5) are connected to the side main beams (2.1.4), dividing the inner cavity of the floating and sinking box (2) into three compartments: front, middle and rear; the sub-box beams (2.1.6) of the floating and sinking box (2) are located between the front compartment and the rear compartment; a bidirectional inclination sensor (9.1) is installed in the inner cavity of the floating and sinking box (2), and the bidirectional inclination sensor (9.1) is connected to the control box (9.3) through a signal line, and the control box (9.3) adjusts the ballast condition according to the signal of the bidirectional inclination sensor (9.1) to achieve the balance of the whole machine posture.

5. The offshore floating and sinking submersible pipe laying equipment according to claim 4 is characterized by: The electric-driven walking chassis (1) comprises a wide crawler (1.1), an underwater motor (1.2) and a reducer (1.3); the underwater motor (1.2) drives the driving wheel of the wide crawler (1.1) to rotate via the reducer (1.3), thereby achieving movement of the entire machine; The four-point lifting mechanism (3) comprises a rectangular set frame (3.1), an end cross beam (3.2), a lower support beam (3.3), a lower support beam guide (3.4), a power machine (3.5), a lifter (3.6), a transmission rod (3.7), a lower connecting plate (3.8), a bracket (3.9) and an upper connecting plate (3.10). The rectangular set frame (3.1) is connected to the end cross beam (3.2) via the lower support beam (3.3) to transfer the load to the wide crawler track (1.1) of the electric drive walking chassis (1). On the walking frame; the lower support beam guide (3.4) is slidably matched with the lower support beam (3.3), and a guide pillar (2.2) is provided on one side of the lower support beam guide (3.4); the power machine (3.5) is connected to the power input shaft of the elevator (3.6) through a transmission rod (3.7), and the elevator (3.6) is installed between the upper connecting plate (3.10) and the bracket (3.9), and the lower part of the lower connecting plate (3.8) is installed on the box beam structure (2.1) of the floating box (2), and the upper part is connected to the bracket (3.9).

6. A method for using the offshore floating and sinking submersible pipe laying equipment according to claim 5, characterized in that: The process includes: The first step is for the mother ship to reach the target area offshore; The second step is to use a positioning device (8) to locate the position of the exposed or suspended pipeline and guide the mother ship to the position of the exposed or suspended pipeline; the third step is to lower the offshore floating and submersible pipe burying operation equipment to the seabed, and control the opening and closing of the air intake valve (2.6), the exhaust valve (2.7), the ballast valve (2.8) and the ballast discharge valve (2.9) to achieve ballast water intake and ballast discharge, thereby controlling the buoyancy of the whole machine and achieving the sinking and floating of the whole machine; the fourth step is then to patrol and inspect the exposed or suspended pipeline, and formulate a sandblasting operation process according to the exposed or suspended working conditions; the fifth step is to move the whole machine to the side of the exposed or suspended pipeline, adjust the angle of the telescopic tube (6.7) of the rotating sandblasting mechanism (6), and prepare to start the sandblasting pipe burying operation; The sixth step is the sandblasting operation. The mother ship supplies sand liquid to the sealed material box (5) through the flexible connecting pipe (7). After reaching one-third of the depth, the sand pump (6.1) in the rotating sandblasting mechanism (6) is started to start the sandblasting operation until the exposed or suspended pipelines in the area are completed. The seventh step is to recover the whole machine. The whole machine discharges ballast water and floats to the sea surface. The mother ship recovers the offshore floating and submersible pipe burial operation equipment.

Citation Information

Patent Citations

  • Plough type suspended span submarine pipeline dumping device

    CN103123018B

  • Ship-shaped amphibious car

    CN105774445A

  • AI intelligent vertical take-off and landing and sea-land-air convertible aircraft carrier, carrier and universal carrying device

    CN108819633A