Material loading control method and device

Through the combination of sensors and lidar data, the relationship between material weight and volume changes is established, and the control parameters are adjusted, and the loading accuracy problem caused by changes in material density in irregular shape warehouses is solved, and the precise control of material loading is achieved.

CN118753845BActive Publication Date: 2024-12-03SHANDONG MATRIX SOFTWARE ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411237495.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-03
Estimated Expiration
2044-09-05

AI Technical Summary

Technical Problem

When loading particulate materials in an irregular shape quantitative bin, due to density changes, the prior art is difficult to accurately control the loading of materials, resulting in failure of loading.

Method used

The preset sensor collects material weight and point cloud data collected by preset lidar, determines the volume and weight change relationship of loading materials, establishes mapping relationships, and adjusts control parameters to achieve precise loading.

Benefits of technology

Improve the accuracy of material loading, ensure accurate loading of materials when full warehouse, and avoid loading failures caused by density changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118753845B_ABST
    Figure CN118753845B_ABST
Patent Text Reader

Abstract

The present application discloses a material loading control method and device, the method is: determine the loading material weight and loading material volume corresponding to multiple sampling times in a first time period; determine the total time length of the second time period based on the loading material weight corresponding to multiple sampling times; determine the first mapping relationship between the target time and the loading material volume based on the loading material volume corresponding to multiple sampling times; determine the target loading material volume corresponding to the target sampling time based on the first mapping relationship in combination with the total time length; determine the parameter value of the control parameter in the second time period based on the target loading material volume. The method is based on the target sampling time as the time point when the material warehouse is full, and can accurately calculate the material loading volume under the full warehouse condition, so as to adjust the parameter value of the control parameter in the second time period according to the target loading material volume, so as to achieve accurate material loading under the full warehouse condition, and effectively improve the material loading accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of automation, and in particular to a material loading control method and device. Background Art

[0002] In the process of loading materials through irregular shaped quantitative bins, the density of granular materials will change greatly due to different storage forms. The principle is that the void ratio of the material will change due to its arrangement form. Figure 1 In the silo shown, the density of the material stored in the lower wedge is higher than that in the upper cuboid, so the relationship between material and volume can be seen in Figure 2 ( Figure 2 The horizontal axis shown in represents the loading time of the material), that is, the weight of the material will be greater than its volume at the beginning, but as the loading process continues, after the material overflows the loading position of the wedge-shaped part, the weight of the material will gradually become less than the volume, and the density of the material will be less than 1. If the tonnage (i.e. material weight) and volume measured when the warehouse is full are used to control the automatic loading program, it will cause data misjudgment and lead to loading failure. Summary of the invention

[0003] The present application provides a material loading control method and device, the purpose of which is to improve the material loading accuracy.

[0004] In order to achieve the above objectives, this application provides the following technical solutions:

[0005] A material loading control method includes: determining the loading material weight and loading material volume corresponding to multiple sampling times within a first time period; the first time period is a time period when the loading material weight changes from a first value to a second value; the loading material weight is obtained based on data collected by a preset sensor; the loading material volume is determined based on point cloud data collected by a preset laser radar; based on the loading material weight corresponding to the multiple sampling times, determining the total time length of the second time period; the second time period is a time period when the loading material weight changes from the second value to a third value; based on the loading material volume corresponding to the multiple sampling times, determining a first mapping relationship between a target time and the loading material volume; the target time represents the loading time of the material; based on the first mapping relationship, combined with the total time length, determining a target loading material volume corresponding to the target sampling time; the target sampling time is the sampling time when the loading material weight reaches the third value; based on the target loading material volume, determining the parameter value of a control parameter within the second time period; the control parameter is used to control the loading of the material.

[0006] Optionally, the process of determining the volume of the loaded materials based on the point cloud data collected by a preset laser radar includes: obtaining the content volume parameters of the target to be loaded; the content volume parameters are parameters related to the content volume of the loading space; based on the point cloud data collected by the preset laser radar, combined with the content volume parameters, determining the volume of the loaded materials.

[0007] Optionally, the volume of the loaded materials is determined based on the point cloud data collected by a preset laser radar in combination with the content volume parameters, including: determining the material height in the loading space based on the point cloud data collected by the preset laser radar; determining the corresponding material area and material forming shape based on the content volume parameters; and calculating the volume of the loaded materials based on the material height, the material area and the material forming shape.

[0008] Optionally, based on the weight of the loaded materials corresponding to the multiple sampling times, the total length of time for the second time period is determined, including: based on the weight of the loaded materials corresponding to the multiple sampling times, determining a second mapping relationship between the target time and the weight of the loaded materials; based on the second mapping relationship, determining an estimated time required for the weight of the loaded materials to change from the second value to a third value; based on the estimated time, determining the total length of time for the second time period.

[0009] Optionally, based on the first mapping relationship and in combination with the total time, the target loading material volume corresponding to the target sampling time is determined, including: based on the first mapping relationship and in combination with the total time, the corresponding target growth volume is determined; the target growth volume represents the growth amount of the loading material volume within the total time; based on the sum of the growth amount and the first loading material volume, the target loading material volume corresponding to the target sampling time is determined; the first loading material volume is the loading material volume corresponding to the first sampling time; the first sampling time is the sampling time corresponding to when the loading material weight reaches the second value within the first time period.

[0010] Optionally, the control parameters include the telescopic length of the discharge chute, and there is a corresponding relationship between the telescopic length and the loading height of the material in the loading space; based on the target loading material volume, the parameter value of the control parameter within the second time period is determined, including: obtaining the content volume parameter of the target to be loaded; the content volume parameter is a parameter related to the content volume of the loading space; based on the content volume parameter, the corresponding material area and material forming shape are determined; based on the target loading material volume, combined with the material area and the material forming shape, the target loading height is calculated; based on the target telescopic length corresponding to the target loading height, it is determined as the parameter value of the control parameter within the second time period.

[0011] Optionally, the method also includes: monitoring the position of the target to be loaded; when the position of the target to be loaded meets the specified requirements, controlling the silo to open the discharge port so that the material in the silo enters the loading space of the target to be loaded, and obtaining the weight of the loaded material in the loading space collected by the preset sensor and the point cloud data of the loaded material in the loading space collected by the preset laser radar at preset time intervals.

[0012] A material loading control device comprises: a data determination unit, used to determine the weight and volume of loaded materials corresponding to a plurality of sampling times within a first time period; the first time period is a time period when the weight of the loaded materials changes from a first value to a second value; the weight of the loaded materials is acquired based on data collected by a preset sensor; the volume of the loaded materials is determined based on point cloud data acquired by a preset laser radar; a duration estimation unit, used to determine the total duration of a second time period based on the weight of the loaded materials corresponding to the plurality of sampling times; the second time period is a time period when the weight of the loaded materials changes from the second value to a third value. period; a relationship fitting unit, used to determine a first mapping relationship between the target time and the loading material volume based on the loading material volumes corresponding to the multiple sampling times; the target time represents the loading time of the material; a volume estimation unit, used to determine the target loading material volume corresponding to the target sampling time based on the first mapping relationship and in combination with the total time; the target sampling time is the sampling time when the loading material weight reaches the third value; a parameter determination unit, used to determine the parameter value of the control parameter within the second time period based on the target loading material volume; the control parameter is used to control the loading of the material.

[0013] Optionally, the data determination unit is specifically used to: obtain the content volume parameter of the target to be loaded; the content volume parameter is a parameter related to the content volume of the loading space; based on the point cloud data collected by a preset laser radar, combined with the content volume parameter, determine the volume of the loaded material.

[0014] Optionally, the data determination unit is specifically used to: determine the material height in the loading space based on the point cloud data collected by a preset laser radar; determine the corresponding material area and material forming shape based on the content volume parameter; and calculate the loading material volume based on the material height, the material area and the material forming shape.

[0015] Optionally, the duration estimation unit is specifically used to: determine a second mapping relationship between the target time and the loading material weight based on the loading material weights corresponding to multiple sampling times; determine an estimated duration required for the loading material weight to change from the second value to a third value based on the second mapping relationship; and determine the total length of time for the second time period based on the estimated duration.

[0016] Optionally, the volume estimation unit is specifically used to: determine the corresponding target growth volume based on the first mapping relationship and the total time; the target growth volume represents the growth amount of the loading material volume within the total time; determine the target loading material volume corresponding to the target sampling time based on the sum of the growth amount and the first loading material volume; the first loading material volume is the loading material volume corresponding to the first sampling time; the first sampling time is the sampling time corresponding to the weight of the loading material reaching the second value within the first time period.

[0017] Optionally, the control parameters include the telescopic length of the discharge chute, and there is a corresponding relationship between the telescopic length and the loading height of the material in the loading space. The parameter determination unit is specifically used to: obtain the content volume parameter of the target to be loaded; the content volume parameter is a parameter related to the content volume of the loading space; based on the content volume parameter, determine the corresponding material area and material forming shape; based on the target loading material volume, combined with the material area and the material forming shape, calculate the target loading height; based on the target telescopic length corresponding to the target loading height, determine it as the parameter value of the control parameter in the second time period.

[0018] Optionally, the device also includes: a data acquisition unit, used to: monitor the position of the target to be loaded; when the position of the target to be loaded meets the specified requirements, control the silo to open the discharge port so that the material in the silo enters the loading space of the target to be loaded, and obtain the weight of the loaded material in the loading space collected by the preset sensor and the point cloud data of the loaded material in the loading space collected by the preset laser radar at preset time intervals.

[0019] A storage medium includes a stored program, wherein the program executes the material loading control method when the program is run by a processor.

[0020] An electronic device comprises: a processor, a memory and a bus; the processor and the memory are connected via the bus; the memory is used to store programs, and the processor is used to run the programs, wherein the program executes the material loading control method when run by the processor.

[0021] The technical solution provided by the present application determines the weight and volume of loaded materials corresponding to multiple sampling times in a first time period. Based on the weight of loaded materials corresponding to multiple sampling times, the total length of time in the second time period is determined. Based on the volume of loaded materials corresponding to multiple sampling times, the first mapping relationship between the target time and the volume of loaded materials is determined. Based on the first mapping relationship, in combination with the total length of time, the target volume of loaded materials corresponding to the target sampling time is determined. Based on the target volume of loaded materials, the parameter value of the control parameter in the second time period is determined. Based on the target volume of loaded materials, the present application determines the target volume of loaded materials corresponding to the target sampling time based on the weight of loaded materials and the volume of loaded materials corresponding to multiple sampling times in the first time period. Based on the target sampling time as the time point when the material warehouse is full, the material loading volume under the full warehouse condition can be accurately calculated, so as to adjust the parameter value of the control parameter in the second time period according to the target volume of loaded materials, so as to achieve accurate material loading under the full warehouse condition, and effectively improve the accuracy of material loading. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 A schematic diagram of a silo structure provided in an embodiment of the present application;

[0024] Figure 2 A schematic diagram of the relationship between material volume and weight provided in an embodiment of the present application;

[0025] Figure 3 A schematic diagram of a material loading control method provided in an embodiment of the present application;

[0026] Figure 4 A schematic diagram of a process for determining the volume of materials loaded on a vehicle provided in an embodiment of the present application;

[0027] Figure 5 A schematic diagram of a process for determining the total length of time of a second time period provided in an embodiment of the present application;

[0028] Figure 6 A schematic diagram of a process for determining a target loading material volume corresponding to a target sampling time provided in an embodiment of the present application;

[0029] Figure 7 A schematic diagram of a process for determining a parameter value of a control parameter within a second time period provided in an embodiment of the present application;

[0030] Figure 8 A curve diagram of a first mapping relationship provided in an embodiment of the present application;

[0031] Fig. 9 A schematic diagram of material loading provided in an embodiment of the present application;

[0032] Fig.10 A curve diagram of a second mapping relationship provided in an embodiment of the present application;

[0033] Fig.11 A schematic diagram of the architecture of a material loading control device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0035] In this application, relational terms such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. The terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of more restrictions, the elements defined by the sentence "comprise one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0036] like Figure 3 As shown, it is a flow chart of a material loading control method provided in an embodiment of the present application, which includes the following steps.

[0037] S301: Determine the weight and volume of loaded materials corresponding to multiple sampling times within a first time period.

[0038] Among them, the first time period is the time period when the weight of the loaded materials changes from a first value to a second value. The weight of the loaded materials is collected based on the preset sensor, and the volume of the loaded materials is determined based on the point cloud data collected by the preset laser radar.

[0039] It should be explained that the loading material weight may represent the weight of the material accumulated in the loading space of the target to be loaded (such as a carriage), and the loading material volume may represent the volume of the material accumulated in the loading space of the target to be loaded. In addition, the shape of the loading space may be regular or irregular.

[0040] In some examples, the preset sensor may be a pressure sensor, which may be installed in a silo, and the silo may be a quantitative silo.

[0041] In some examples, a preset laser radar can be installed in a silo to collect point cloud data of the materials stored in the silo. Generally speaking, point cloud data, also known as three-dimensional point cloud or point cloud, is a discrete data set composed of a series of three-dimensional coordinate points, each of which includes coordinate values ​​in the three directions of X, Y, and Z, and is used to describe the geometric characteristics of the material such as the surface shape, spatial position, and size.

[0042] In some examples, the first value is smaller than the second value, the first value may be set to 0, and the second value may be set to a value greater than 0.

[0043] It should be noted that the second value can be determined based on the detection performance of a preset laser radar. During the material loading process, as the material accumulates in the loading space, the preset laser radar collects point cloud data based on laser rays. As the material accumulation height reaches a specified threshold, the range that can be covered by the laser rays will be reduced, making it impossible to continue to measure the volume of the subsequent accumulated materials.

[0044] It is understandable that after the material stacking height reaches the specified threshold, although valid point cloud data cannot be obtained, the preset sensor can still be used to obtain the accurate weight of the loaded materials. For this reason, the second value can be set to track the material loading time when the point cloud data is invalid. For example, the second value is set to 80, that is, when the weight of the loaded materials reaches 80 tons, the point cloud data collected by the preset lidar is invalid and unusable.

[0045] It should be noted that the time intervals between multiple sampling times are the same. The specific time interval can be set by the technical staff according to the actual situation. For example, it can be set to every 100ms to collect the corresponding loading material weight and loading material volume.

[0046] Optionally, based on the point cloud data collected by the preset LiDAR, the implementation process of determining the volume of the loaded materials can be found in Figure 4 Steps shown and explanations of the steps.

[0047] S302: Determine the total length of the second time period based on the weight of the loaded materials corresponding to the multiple sampling times.

[0048] The second time period is a time period in which the weight of the loaded materials changes from the second value to the third value.

[0049] Optionally, the implementation process of determining the total length of the second time period based on the weight of the loaded materials corresponding to multiple sampling times can be found in Figure 5 Steps shown and explanations of the steps.

[0050] S303: Determine a first mapping relationship between the target time and the volume of the loaded materials based on the volumes of the loaded materials corresponding to the multiple sampling times.

[0051] The target time represents the material loading time, such as milliseconds.

[0052] It should be noted that a fitting algorithm may be used to perform data fitting (or curve fitting) on ​​the loading material volumes corresponding to a plurality of sampling times within the first time period to obtain a first mapping relationship between the target time and the loading material volume.

[0053] In a possible implementation manner, the first mapping relationship may be expressed as a curve graph, such as Figure 8 shown.

[0054] In some examples, the fitting algorithm includes, but is not limited to, GBRT (Gradient Boosting Regression Tree), SVR (Support Vector Regression), GPR (Gaussian process regression), NN regression algorithm, etc.

[0055] S304: Based on the first mapping relationship and in combination with the total time, determine the target loading material volume corresponding to the target sampling time.

[0056] Among them, the target sampling time is the sampling time when the weight of the loaded materials reaches the third value.

[0057] It should be noted that the target sampling time is a sampling time that did not actually occur. Correspondingly, the second time period is also a time period that did not actually occur. For this reason, the control parameters of the second time period can be adjusted by the target loading material volume corresponding to the target sampling time to ensure that the actual loading material volume when the target sampling time occurs is equivalent to the target loading material volume, thereby achieving effective control of material loading and avoiding material loading failure.

[0058] Optionally, based on the first mapping relationship and combined with the total time, the target loading material volume corresponding to the target sampling time is determined, which can be seen in Figure 6 Steps shown and explanations of the steps.

[0059] S305: Determine parameter values ​​of the control parameters within the second time period based on the target loading material volume.

[0060] Among them, the control parameters are used to control the loading of materials.

[0061] Optionally, the control parameters include the telescopic length of the unloading chute. The telescopic length corresponds to the loading height of the material in the loading space. For a schematic diagram of the telescopic length and loading height, see Fig. 9 shown.

[0062] For the telescopic length of the unloading chute and the target loading material volume, the implementation process of determining the parameter value of the control parameter in the second time period can be found in Figure 7 Steps shown and explanations of the steps.

[0063] It can be understood that by determining the parameter value of the control parameter in the second time period through the target loading material volume corresponding to the target sampling time, effective adjustment of the control parameter can be achieved, ensuring that the actual loading material volume when the target sampling time occurs meets expectations, and effectively improving the control accuracy of material loading.

[0064] It should be noted that the target loading material volume shown in the embodiment of the present application requires the use of data collected by the preset sensor and the preset laser radar respectively, and the objects collected by the preset sensor and the preset laser radar are the materials accumulated in the loading space. Therefore, controlling the material from the silo into the loading space is also an important part of material loading control.

[0065] Optionally, the position of the target to be loaded can be monitored. When the position of the target to be loaded meets the specified requirements, the silo is controlled to open the discharge port so that the material in the silo enters the loading space of the target to be loaded, and at preset time intervals, the weight of the loaded material in the loading space collected by the preset sensor and the point cloud data of the loaded material in the loading space collected by the preset laser radar are obtained.

[0066] In some examples, a preset radar installed at a designated location can be used to monitor the location of the target to be loaded.

[0067] In some examples, the location of the target to be loaded meets a specified requirement, and the specified requirement may be that the location of the target to be loaded is below the unloading chute.

[0068] It is understandable that the weight of the loaded materials collected by the preset sensor at multiple sampling times and the point cloud data (or the volume of the loaded materials) collected by the preset laser radar at multiple sampling times belong to data of different dimensions. The second mapping relationship is determined by using the weight of the loaded materials corresponding to the multiple sampling times, and the first mapping relationship is determined by using the volume of the loaded materials corresponding to the multiple sampling times, so as to achieve the fitting of the data changes in different dimensions, thereby effectively measuring and obtaining the target volume of the loaded materials.

[0069] The process shown in the above S301-S305 determines the target loading material volume corresponding to the target sampling time based on the loading material weight and loading material volume corresponding to multiple sampling times in the first time period, and uses the target sampling time as the time point when the material warehouse is full. The material loading volume under the full warehouse condition can be accurately calculated, so as to adjust the parameter value of the control parameter in the second time period according to the target loading material volume, so as to realize accurate material loading under the full warehouse condition and effectively improve the material loading accuracy.

[0070] like Figure 4 As shown, it is a schematic diagram of a process for determining the volume of loaded materials provided in an embodiment of the present application, including the following steps.

[0071] S401: Obtain the volume parameters of the target to be loaded.

[0072] The internal volume parameter is a parameter related to the internal volume of the loading space. Generally speaking, the internal volume of the loading space can be calculated using the internal volume parameter.

[0073] In some examples, the internal volume parameters include bottom area, length of the bottom area, and parameters such as width and height.

[0074] It should be noted that different types of objects to be loaded have different content volume parameters. After the type of the object to be loaded is identified, the content volume parameter of the object to be loaded is obtained by querying from the local database according to the type of the object to be loaded.

[0075] Optionally, after obtaining the content volume parameters of the target to be loaded, the volume of the loaded material can be determined based on the point cloud data collected by a preset laser radar in combination with the content volume parameters.

[0076] It should be noted that the point cloud data collected by the preset laser radar at each sampling time is the point cloud data of all materials in the loading space at each sampling time.

[0077] S402: Determine the height of the material in the loading space based on the point cloud data collected by the preset laser radar.

[0078] Among them, the point cloud data collected by the preset laser radar can be used to construct a corresponding three-dimensional model, and the model height based on the three-dimensional model can be determined as the material height in the loading space.

[0079] It is understandable that as the material loading time accumulates, the material height in the loading space will gradually increase.

[0080] S403: Determine the corresponding material area and material forming shape based on the internal volume parameter.

[0081] Since the material is loaded in the loading space, the material area can be understood as the bottom area of ​​the loading space, and the material forming shape can be understood as the shape of the loading space.

[0082] S404: Based on the material height, material area and material forming shape, the volume of the loaded material is calculated.

[0083] Among them, the volume of the loaded materials is calculated based on the material height, material area and material forming shape. This is the use of conventional mathematical geometry knowledge and will not be elaborated here.

[0084] The process shown in S401-S404 above determines the volume of loaded materials based on the point cloud data collected by the preset laser radar and the content volume parameter, thereby obtaining the volume of loaded materials corresponding to multiple sampling times in the first time period.

[0085] like Figure 5 As shown, a flow chart of determining the total length of time of a second time period provided in an embodiment of the present application includes the following steps.

[0086] S501: Determine a second mapping relationship between a target time and a loading material weight based on the loading material weights corresponding to a plurality of sampling times.

[0087] Among them, the target time is used to represent the loading time of the materials.

[0088] It should be noted that a fitting algorithm may be used to perform data fitting (or curve fitting) on ​​the loading material weights corresponding to a plurality of sampling times within the first time period to obtain a second mapping relationship between the target time and the loading material weight.

[0089] In a possible implementation manner, the second mapping relationship may be expressed as a curve graph, such as Fig.10 shown.

[0090] S502: Based on the second mapping relationship, determine the estimated time required for the weight of the loaded materials to change from the second value to the third value.

[0091] Among them, the target time corresponding to the second value (that is, the sampling time corresponding to when the weight of the loaded materials reaches the second value) is determined. Therefore, the third value can be set by the technical personnel according to the actual situation, and the third value is greater than the second value. Therefore, the second value, the third value and the target time corresponding to the second value can be substituted into the second mapping relationship to determine the target time corresponding to the third value. Based on the time difference between the target time corresponding to the third value and the target time corresponding to the second value, the estimated time required for the weight of the loaded materials to change from the second value to the third value is determined.

[0092] In a possible implementation, the second value is set to 70, the third value is set to 80, the target time corresponding to the second value is 150ms, and combined with the second mapping relationship, the target time corresponding to the third value is determined to be 165ms. The time difference between 165ms and 150ms is calculated to determine that the estimated time required for the weight of the loaded materials to change from the second value to the third value is 15ms.

[0093] S503: Based on the estimated duration, determine the total duration of the second time period.

[0094] The second time period may be considered as a time period starting from the target time corresponding to the second value and ending at the target time corresponding to the third value.

[0095] The process shown in the above S501-S503 uses the loading material weights corresponding to multiple sampling times to determine the second mapping relationship between the target time and the loading material weight, and uses the second mapping relationship to determine the total length of the second time period, so as to provide an effective reference basis for the subsequent calculation of the target loading material volume.

[0096] like Figure 6 As shown, it is a schematic diagram of a process for determining a target loading material volume corresponding to a target sampling time provided in an embodiment of the present application, including the following steps.

[0097] S601: Based on the first mapping relationship and in combination with the total time, determine the corresponding target growth volume.

[0098] Among them, the target growth volume represents the growth of the volume of loaded materials within the total time.

[0099] In some examples, the total time length is 15 ms, and the first mapping relationship is expressed as a curve graph. Using the curve, it can be determined that the slope of the curve is 0.4. Based on the slope and the total time length, the target growth volume is calculated to be 6 tons.

[0100] S602: Determine a target loading material volume corresponding to a target sampling time based on a sum of the increase amount and the first loading material volume.

[0101] The first loading material volume is the loading material volume corresponding to the first sampling time, and the first sampling time is the sampling time corresponding to when the loading material weight reaches the second value within the first time period.

[0102] The process shown in S601-S602 above uses the first mapping relationship and the total length of time in the second time period to calculate the target loading material volume corresponding to the target sampling time. The first mapping relationship uses the loading material volume corresponding to multiple sampling times in the first time period, and the total length of time is determined based on the second mapping relationship, so that the calculated target loading material volume has higher data accuracy.

[0103] like Figure 7 As shown, a flow chart of determining the parameter value of a control parameter in a second time period provided in an embodiment of the present application includes the following steps.

[0104] S701: Obtain the volume parameters of the target to be loaded.

[0105] The internal volume parameter is a parameter related to the internal volume of the loading space.

[0106] S702: Based on the internal volume parameter, determine the corresponding material area and material forming shape.

[0107] Since the material is loaded in the loading space, the material area can be understood as the bottom area of ​​the loading space, and the material forming shape can be understood as the shape of the loading space.

[0108] S703: Calculate the target loading height based on the target loading material volume, combined with the material area and the material forming shape.

[0109] Among them, the target loading height is calculated based on the target loading material volume, combined with the material area and the material forming shape. This is the use of conventional mathematical geometry knowledge and will not be repeated here.

[0110] S704: Determine, based on the target telescopic length corresponding to the target loading height, a parameter value of the control parameter in the second time period.

[0111] Among them, after determining the target loading height, the target telescopic length corresponding to the target loading height can be queried from the preset relationship table and determined as the parameter value of the control parameter in the second time period to ensure that the actual loading material volume when the target sampling time occurs is equal to the target loading material volume.

[0112] The process shown in S701-S704 above uses the target loading material volume to determine the target loading height, thereby further determining the corresponding target telescopic length, achieving effective control of the unloading chute, and ensuring that the actual loading material volume at the target sampling time meets expectations.

[0113] like Fig.11 As shown, it is a schematic diagram of the architecture of a material loading control device provided in an embodiment of the present application, including the units shown below.

[0114] The data determination unit 100 is used to determine the weight and volume of loaded materials corresponding to multiple sampling times within a first time period; the first time period is a time period in which the weight of loaded materials changes from a first value to a second value; the weight of loaded materials is collected based on a preset sensor; the volume of loaded materials is determined based on point cloud data collected by a preset laser radar.

[0115] The duration estimation unit 200 is used to determine the total duration of the second time period based on the weight of the loaded materials corresponding to the multiple sampling times; the second time period is the time period when the weight of the loaded materials changes from the second value to the third value.

[0116] The relationship fitting unit 300 is used to determine a first mapping relationship between the target time and the loading material volume based on the loading material volumes corresponding to the multiple sampling times; the target time represents the loading time of the material.

[0117] The volume estimation unit 400 is used to determine the target loading material volume corresponding to the target sampling time based on the first mapping relationship and the total time; the target sampling time is the sampling time when the loading material weight reaches the third value.

[0118] The parameter determination unit 500 is used to determine the parameter value of the control parameter within the second time period based on the target loading material volume; the control parameter is used to control the loading of the material.

[0119] Optionally, the data determination unit 100 is specifically used to: obtain the content volume parameter of the target to be loaded; the content volume parameter is a parameter related to the content volume of the loading space; based on the point cloud data collected by the preset laser radar, combined with the content volume parameter, determine the volume of the loaded material.

[0120] Optionally, the data determination unit 100 is specifically used to: determine the material height in the loading space based on the point cloud data collected by a preset laser radar; determine the corresponding material area and material forming shape based on the content volume parameter; and calculate the loading material volume based on the material height, material area and material forming shape.

[0121] Optionally, the duration estimation unit 200 is specifically used to: determine a second mapping relationship between the target time and the loading material weight based on the loading material weight corresponding to multiple sampling times; determine an estimated duration required for the loading material weight to change from a second value to a third value based on the second mapping relationship; and determine the total length of time for the second time period based on the estimated duration.

[0122] Optionally, the volume estimation unit 400 is specifically used to: determine the corresponding target growth volume based on the first mapping relationship and the total time; the target growth volume represents the growth amount of the loading material volume within the total time; determine the target loading material volume corresponding to the target sampling time based on the sum of the growth amount and the first loading material volume; the first loading material volume is the loading material volume corresponding to the first sampling time; the first sampling time is the sampling time corresponding to the weight of the loading material reaching the second value within the first time period.

[0123] Optionally, the control parameters include the telescopic length of the discharge chute, and there is a corresponding relationship between the telescopic length and the loading height of the material in the loading space. The parameter determination unit 500 is specifically used to: obtain the content volume parameter of the target to be loaded; the content volume parameter is a parameter related to the content volume of the loading space; based on the content volume parameter, determine the corresponding material area and material forming shape; based on the target loading material volume, combined with the material area and material forming shape, calculate the target loading height; based on the target telescopic length corresponding to the target loading height, determine it as the parameter value of the control parameter in the second time period.

[0124] The data acquisition unit 600 is used to: monitor the position of the target to be loaded; when the position of the target to be loaded meets the specified requirements, control the silo to open the discharge port so that the material in the silo enters the loading space of the target to be loaded, and obtain the weight of the loaded material in the loading space collected by the preset sensor and the point cloud data of the loaded material in the loading space collected by the preset laser radar at preset time intervals.

[0125] The loading control device for the materials shown above determines the target loading material volume corresponding to the target sampling time based on the loading material weight and loading material volume corresponding to multiple sampling times in the first time period, and uses the target sampling time as the time point when the material warehouse is full. The material loading volume under the full warehouse condition can be accurately calculated, so as to adjust the parameter values ​​of the control parameters in the second time period according to the target loading material volume, so as to realize accurate material loading under the full warehouse condition and effectively improve the material loading accuracy.

[0126] The present application also provides a computer-readable storage medium, which includes a stored program, wherein the program executes the material loading control method provided by the present application.

[0127] The present application also provides an electronic device, including: a processor, a memory and a bus. The processor and the memory are connected via a bus, the memory is used to store programs, and the processor is used to run the programs, wherein the material loading control method provided by the present application is executed when the programs are run.

[0128] In addition, the functions described above in the embodiments of the present application may be at least partially performed by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0129] Although the subject matter has been described in language specific to structural features and / or methodological logical actions, it should be understood that the subject matter defined in the appended claims is not necessarily limited to the specific features or actions described above. On the contrary, the specific features and actions described above are merely example forms of implementing the claims.

[0130] Although several specific implementation details are included in the above discussion, these should not be interpreted as limiting the scope of the present application. Certain features described in the context of a separate embodiment can also be implemented in a single embodiment in combination. On the contrary, the various features described in the context of a single embodiment can also be implemented in multiple embodiments individually or in any suitable sub-combination.

[0131] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.

Claims

1. A material loading control method, characterized in that: include: Determine the weight and volume of loaded materials corresponding to multiple sampling times within a first time period; the first time period is a time period in which the weight of the loaded materials changes from a first value to a second value; the weight of the loaded materials is obtained based on data collected by a preset sensor; the volume of the loaded materials is determined based on point cloud data collected by a preset laser radar; Based on the weights of the loaded materials corresponding to the plurality of sampling times, determining the total length of a second time period; the second time period is a time period during which the weight of the loaded materials changes from the second value to a third value; Determine a first mapping relationship between the target time and the volume of the loaded materials based on the volumes of the loaded materials corresponding to the plurality of sampling times; The target time represents the loading time of the materials; Based on the first mapping relationship and in combination with the total time, determine the target loading material volume corresponding to the target sampling time; the target sampling time is the sampling time when the loading material weight reaches the third value; Based on the target loading material volume, the parameter value of the control parameter within the second time period is determined; the control parameter is used to control the loading of the material; the control parameter includes the telescopic length of the discharge chute, and there is a corresponding relationship between the telescopic length and the loading height of the material in the loading space.

2. The method according to claim 1, characterized in that The process of determining the volume of the loaded material based on the point cloud data collected by the preset laser radar includes: Obtaining a content volume parameter of the object to be loaded; the content volume parameter is a parameter related to the content volume of the loading space; Based on the point cloud data collected by the preset laser radar and combined with the content volume parameter, the volume of the loaded materials is determined.

3. The method according to claim 2, characterized in that Based on the point cloud data collected by the preset laser radar and in combination with the content volume parameter, the volume of the loaded material is determined, including: Determine the height of the material in the loading space based on the point cloud data collected by the preset laser radar; Based on the internal volume parameter, determining the corresponding material area and material forming shape; The volume of the loaded material is calculated based on the material height, the material area and the material forming shape.

4. The method according to claim 1, characterized in that Determining the total length of the second time period based on the weight of the loaded materials corresponding to the plurality of sampling times includes: Determine a second mapping relationship between the target time and the weight of the loaded materials based on the weights of the loaded materials corresponding to the plurality of sampling times; Based on the second mapping relationship, determining an estimated time required for the weight of the loaded materials to change from the second value to a third value; Based on the estimated duration, the total duration of the second time period is determined.

5. The method according to claim 1, characterized in that Based on the first mapping relationship and in combination with the total time, determining a target loading material volume corresponding to the target sampling time includes: Based on the first mapping relationship and in combination with the total time, a corresponding target growth volume is determined; the target growth volume represents the growth amount of the volume of the loaded materials within the total time; Based on the sum of the growth amount and the first loading material volume, the target loading material volume corresponding to the target sampling time is determined; the first loading material volume is the loading material volume corresponding to the first sampling time; the first sampling time is the sampling time corresponding to when the loading material weight reaches the second value within the first time period.

6. The method according to claim 1, characterized in that Determining a parameter value of a control parameter in the second time period based on the target loading material volume includes: Obtaining a content volume parameter of the object to be loaded; the content volume parameter is a parameter related to the content volume of the loading space; Based on the internal volume parameter, determining the corresponding material area and material forming shape; Based on the target loading material volume, combined with the material area and the material forming shape, a target loading height is calculated; Based on the target telescopic length corresponding to the target loading height, the parameter value of the control parameter in the second time period is determined.

7. The method according to claim 1, characterized in that The method further comprises: Monitor the location of the target to be loaded; When the position of the target to be loaded meets the specified requirements, the silo is controlled to open the discharge port so that the material in the silo enters the loading space of the target to be loaded, and at preset time intervals, the weight of the loaded material in the loading space collected by the preset sensor and the point cloud data of the loaded material in the loading space collected by the preset laser radar are obtained.

8. A material loading control device, characterized in that: include: A data determination unit, used to determine the weight and volume of the loaded materials corresponding to a plurality of sampling times within a first time period; The first time period is the time period during which the weight of the loaded materials changes from a first value to a second value; the weight of the loaded materials is acquired based on data collected by a preset sensor; the volume of the loaded materials is determined based on point cloud data collected by a preset laser radar; A duration estimation unit, used to determine the total duration of the second time period based on the weight of the loaded materials corresponding to the plurality of sampling times; The second time period is the time period during which the weight of the loaded materials changes from the second value to the third value; A relationship fitting unit, configured to determine a first mapping relationship between a target time and a loading material volume based on the loading material volumes corresponding to the plurality of sampling times; The target time represents the loading time of the materials; A volume estimation unit, configured to determine a target loading material volume corresponding to a target sampling time based on the first mapping relationship and the total time; the target sampling time is a sampling time when the loading material weight reaches the third value; A parameter determination unit is used to determine the parameter value of a control parameter within the second time period based on the target loading material volume; the control parameter is used to control the loading of the material; the control parameter includes the telescopic length of the discharge chute, and there is a corresponding relationship between the telescopic length and the loading height of the material in the loading space.

9. A storage medium, characterized in that: The storage medium includes a stored program, wherein the program, when executed by a processor, executes the material loading control method described in any one of claims 1-7.

10. An electronic device, characterized in that: include: processor, memory, and bus; The processor is connected to the memory via the bus; The memory is used to store programs, and the processor is used to run programs, wherein the program, when run by the processor, executes the material loading control method described in any one of claims 1-7.