U-shaped beam hoisting device and method
By arranging the balance beam frame and the lifting rope clamp on the flange of the U-shaped beam, the balance control point is improved, and combined with the connecting components and the supporting plate, the problem of insufficient balance in the lifting of the U-shaped beam is solved, and a more stable lifting process is achieved. And more uniform force, suitable for U-shaped beams of different sizes.
Patent Information
- Application Number
- CN202411046849.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-11
AI Technical Summary
The existing U-shaped beam hoisting device has insufficient balance, especially for U-shaped beams with wide wingspan and narrow base plate, which results in poor balance during the hoisting process and affects construction efficiency.
By setting the balance beam frame on both sides of the U-shaped beam, and using a sling clamp to bind the sling to the balance beam frame, raise the balance control point to the height of the flange, and combine the connecting components and the supporting plate to realize the U-shaped beam. Smooth and efficient lifting, suitable for U-shaped beams with different flange widths.
It improves the stability and balance of the U-shaped beam hoisting process, reduces the shaking amplitude, adapts to U-shaped beams of different sizes, and shares the lifting force through the elastic interlayer and additional slings, enhances the uniformity of force and the lateral span, and improves Improve the safety and efficiency of hoisting.
Smart Images

Figure CN118753984A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to a U-shaped beam hoisting device and method. Background Art
[0002] U-beam is an important functional component in road and bridge construction projects. Because it has a good force-bearing structure, it can reduce the material consumption while ensuring the load-bearing capacity of the beam. U-beam is a concrete beam that is generally prefabricated and transported to the construction site for installation. U-beams are mostly used in the erection of viaducts, so hoisting issues are involved.
[0003] Since the U-beam is heavy, long and wide, gantry cranes or other heavy lifting equipment are usually used for lifting operations on construction sites. The stability of the U-beam body is very high during the lifting process, otherwise the consequences of the beam shaking and tipping over will be devastating. To solve the problem of lifting stability, on the one hand, the speed of the lifting operation can be slowed down, which will affect the construction efficiency, and on the other hand, the balance characteristics of the lifting equipment can be improved to achieve a more stable vertical lifting and lateral movement effect. Chinese patent publication number CN205527316U, publication date August 31, 2016, entitled "Urban Rail U-Beam Portal Hoisting Device" discloses a hoisting device, including multiple pulleys, which realize balanced hoisting of the U-beam through the cooperation of a static pulley and a movable pulley, so that it can be applied to the hoisting of different types of U-beams. However, this device still sets the connection point of the U-beam hoisting on the bottom plate of the U-beam as in conventional technology, and does not impose balance restrictions on the upper flange and the hoisting rope, resulting in a lower balance control point of the hoist for the U-beam, and insufficient balance during the hoisting of the beam body, especially for U-beams with a wider wingspan and a narrower bottom plate, the balance problem is more obvious. Summary of the invention
[0004] The present invention overcomes the problem of insufficient balance in the prior art when hoisting a U-shaped beam, and provides a U-shaped beam hoisting device and method, wherein the hoisting device fixes the flanges on both sides of the U-shaped beam through a balance beam frame, and uses a hoisting rope clamp to bind the hoisting rope to the balance beam frame, so that the balance control point of the U-shaped beam is raised to the height of the flange, and through the cooperation of the balance beam frame and the hoisting rope, a smooth and efficient U-shaped beam hoisting process is achieved, and by adjusting the position of the clamping plate of the balance beam frame, it can be suitable for the hoisting of U-shaped beams with different flange widths.
[0005] In order to achieve the above object, the present invention adopts the following scheme:
[0006] U-beam lifting device, including:
[0007] A supporting plate, which is supported on the bottom of the U-shaped beam;
[0008] A connection assembly, comprising a connection block and a suspension rod, wherein the connection block is horizontally arranged along the width direction of the U-shaped beam and is connected to a set of suspension ropes at both ends, the upper ends of a pair of suspension rods are respectively fixed to the two ends of the connection block, and the lower ends of the suspension rods are connected to the support plate after passing through the bottom plate of the U-shaped beam;
[0009] A balance beam frame includes a pair of clamps, a main beam and a suspension rope clamp. The pair of clamps are respectively arranged on the outer sides of the flanges on both sides of the U-shaped beam, each clamp is provided with a pair of through holes and the lower end is bent to hook the outer lower side surface of the flange, the two ends of a pair of main beams are inserted into the through holes of the clamps and the beam bodies of the main beams are connected by bolts to form a ladder shape, the main beams are provided with threaded rods in the same direction, the threaded rods pass through the clamps and fix the clamps with corresponding nuts, and two groups of suspension rope clamps corresponding to the suspension ropes are arranged between the main beams.
[0010] Preferably, transverse auxiliary beams are provided between the main beams, and the auxiliary beams are connected upward with independent suspension ropes.
[0011] Preferably, the auxiliary beam is rotatably connected to an auxiliary lifting rod, the upper end of the auxiliary lifting rod is connected to an independent lifting rope, and the lower end is provided with an auxiliary hook for hooking the inner lower side surface of the flange.
[0012] Preferably, each group of the lifting rope clamps comprises two clamping blocks respectively connected to two main beams, and the two clamping blocks are provided with semicircular notches at opposite positions, forming a circular hole for accommodating the lifting rope when combined.
[0013] Preferably, the support plate comprises a first support plate with an elastic interlayer and a second support plate, and the hanger rod passes downward through the first support plate and is connected and fixed to the second support plate.
[0014] Preferably, a sleeve for covering the suspension rod is provided on the first supporting plate, and the sleeve is embedded in a suspension hole reserved on the bottom plate of the U-shaped beam.
[0015] Preferably, a plurality of slots are provided on the second supporting plate, a column with a distal end inserted into the slot is connected to the lower side of the first supporting plate, and the elastic interlayer is a spring sleeved on the suspension rod and the column.
[0016] Preferably, a connecting piece is provided below the connecting block, and the upper end of the suspension rod is threadedly connected to the connecting piece.
[0017] The present application also provides a U-beam hoisting method, using a U-beam hoisting device as described in any one of the above schemes, the method comprises the following steps:
[0018] S1: Pass the hanging rod through the hoisting hole reserved on the bottom plate of the U-shaped beam, install the supporting plate under the bottom plate, and adjust the connecting assembly to fix it to the U-shaped beam downward and the hanging rope upward;
[0019] S2: Place the main beam of the balance beam frame on the flange of the U-shaped beam, adjust the rope clamp to clamp the rope, cover the two main beams with clamps from both ends and hook the lower side of the flange, fix the main beam and clamp with threaded rods and nuts, and tighten and fix the two main beams with bolts;
[0020] S3: Start the lifting device and use the lifting rope to lift the U-beam for installation. After the installation is completed, release the U-beam lifting device in the opposite order.
[0021] Preferably, a transverse auxiliary beam is arranged between the main beams, the auxiliary beam is upwardly connected with an independent lifting rope, the auxiliary beam is rotatably connected upward with an auxiliary lifting rod, the upper end of the auxiliary lifting rod is connected with the independent lifting rope, and the lower end is provided with an auxiliary hook for hooking the inner lower side surface of the flange, and the operation of step S2 also includes: rotating the auxiliary lifting rod so that the auxiliary hook hooks the inner lower side surface of the U-beam flange.
[0022] The present invention includes at least the following beneficial effects: (1) the U-beam is connected to the lifting rope of the lifting equipment through a connecting assembly, the flange and the lifting rope are bound through a balance beam frame, and the balance control point is lifted from the base plate to the position of the lifting rope clamp, thereby reducing the swing amplitude of the U-beam, and the lifting balance is not affected by the span of the U-beam, and the lifting process is more stable; (2) by providing a supporting plate with an elastic interlayer, a buffer can be provided for the base plate of the U-beam, thereby improving the force stability of the U-beam during the lifting process; (3) by providing a sleeve embedded in the lifting hole reserved on the base plate of the U-beam on the first supporting plate, an isolation protection is formed between the lifting hole and the suspension rod, thereby avoiding damage to the base plate structure near the lifting hole; (4) by providing an additional independent lifting rope on the balance beam frame, the force applied to the flange can share the lifting force on the base plate, and the U-beam is more evenly stressed. In addition, the position of the additional lifting rope is not limited by the width of the base plate, and can be provided at a position closer to the flange, thereby increasing the lateral span of the lifting rope connection and improving the lifting balance. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of a device of the present invention;
[0024] Figure 2 A schematic side view of a device structure of the present invention;
[0025] Figure 3 A schematic diagram of a balance beam structure of the present invention;
[0026] Figure 4 A schematic diagram of a balancing beam installation method of the present invention;
[0027] Figure 5 The figure is a schematic diagram of a supporting plate structure of the present invention.
[0028] In the figure: a supporting plate 1, a U-shaped beam 2, a connecting block 3, a suspension rod 4, a suspension rope 5, a clamp 6, a main beam 7, a suspension rope clamp 8, a bolt 9, a threaded rod 10, an auxiliary beam 11, an auxiliary lifting rod 12, an auxiliary hook 13, a first supporting plate 101, a second supporting plate 102, and a transition piece 14. DETAILED DESCRIPTION
[0029] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0030] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.
[0031] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the materials, unless otherwise specified, can be obtained from commercial channels; in the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "set" should be understood in a broad sense, for example, they can be fixedly connected, set, or detachably connected, set, or connected and set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood in specific circumstances. The orientation or position relationship indicated by the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention.
[0032] like Figure 1-4 As shown, the U-beam hoisting device of the present invention comprises:
[0033] The supporting plate 1 is supported on the bottom of the U-shaped beam 2; the supporting plate 1 is arranged to fit the bottom of the bottom plate of the U-shaped beam 2, and is used to increase the bottom force-bearing area of the U-shaped beam 2. By adjusting the shape and size of the supporting plate 1, it can avoid the contact part between the bottom of the U-shaped beam 2 and the beam base.
[0034] A connecting assembly includes a connecting block 3 and a suspension rod 4. The connecting block 3 is horizontally arranged along the width direction of the U-shaped beam 2 and is connected to a group of suspension ropes 5 at both ends. The upper ends of a pair of the suspension rods 4 are respectively fixed at the two ends of the connecting block 3, and the lower ends of the suspension rods 4 are connected to the supporting plate 1 after passing through the bottom plate of the U-shaped beam 2; the connecting block 3 is a common component for connecting and fixing the suspension ropes 5, and the number of suspension ropes 5 connected at both ends is selected according to actual performance requirements. The suspension rod 4 and the supporting plate 1 can be connected in a detachable manner or in a fixed manner. The coordination method with the supporting plate 1 can be that two suspension rods 4 are each connected to an independent supporting plate 1, or that two suspension rods 4 share a supporting plate 1 with two connection points.
[0035] The balance beam frame includes a pair of clamps 6, a main beam 7 and a rope clamp 8. The pair of clamps 6 are respectively arranged on the outer sides of the flanges on both sides of the U-shaped beam 2, and each clamp 6 is provided with a pair of through holes and the lower end is bent to hook the outer lower side of the flange. The two ends of a pair of main beams 7 are inserted into the through holes of the clamps 6 and the beam bodies of the main beams 7 are connected with bolts 9 to form a ladder shape. The main beam 7 is provided with a threaded rod 10 in the same direction. The threaded rod 10 passes through the clamps 6 and fixes the clamps 6 with corresponding nuts. Two groups of rope clamps 8 corresponding to the ropes 5 are provided between the main beams 7. The clamp 6 clamps the outer side of the flange from both sides, and the lower end of the clamp 6 hooks inward to fit the outer lower side of the flange. The through holes on the clamp 6 are used to maintain the spacing between the two main beams 7. As an example, the clamp 6 includes a thick plate part and a thin plate part, wherein the thick plate part is T-shaped, and the thin plate part is located under the armpit of the T-shaped thick plate. The thick plate and the thin plate are enclosed to form a through hole for inserting the main beam 7; the threaded rod 10 is located on the side of the main beam 7 and passes through the thin plate, and is clamped and fixed from both sides of the thin plate with nuts. There are multiple bolts 9 for fixing the two main beams 7, and the bolts 9 penetrate the two main beams 7 for tightening and fixing. The rope clamp 8 connects and restricts the balance beam frame and the rope 5. Common rope clamps or customized wire rope clamps can be used to achieve a detachable connection between the clamp and the wire rope.
[0036] This device connects the U-beam 2 to the lifting rope 5 of the lifting equipment through a connecting component, binds the flange and the lifting rope 5 through a balance beam frame, and lifts the balance control point from the bottom plate to the position of the lifting rope clamp 8, providing additional lateral straightening ability for the flange, reducing the shaking amplitude of the U-beam 2, and the lifting balance is not affected by the span of the U-beam, and the lifting process is more stable. The balance beam frame used therein adopts a detachable assembly structure, which can be adjusted accordingly according to different sizes of U-beams 2, and has strong applicability. When both ends of the lifting rope 5 are fixed, it does not affect the installation of the balance beam frame and the clamping and fixing of the lifting rope 5.
[0037] In another technical solution, Figure 3 and Figure 4As shown, a transverse auxiliary beam 11 is arranged between the main beams 7, and the auxiliary beam 11 is upwardly connected with an independent suspension rope 5. By arranging an additional independent suspension rope 5 on the balance beam frame, the force applied to the flange can share the lifting force on the bottom plate, and the U-shaped beam 2 is more evenly stressed. In addition, the position of the additional suspension rope 5 is not limited by the width of the bottom plate and can be arranged closer to the flange, thereby increasing the transverse span of the suspension rope 5 connection and improving the balance of the lifting.
[0038] The auxiliary beam 11 is rotated upward and connected to an auxiliary lifting rod 12, the upper end of which is connected to an independent lifting rope 5, and the lower end is provided with an auxiliary hook 13 for hooking the inner lower side of the flange. Before installing the balance beam frame, the auxiliary lifting rod 12 can be rotated around the auxiliary beam 11 to make the auxiliary hook 13 at the lower end away from the flange to facilitate the normal placement of the main beam 7. After the main beam 7 is placed, the auxiliary lifting rod 12 is rotated to make the auxiliary hook 13 hook the inner lower side of the flange. The auxiliary hook 13 and the lower end of the clamping plate 6 cooperate to hook the lower side of the flange, making the device more stable and not easy to fall off.
[0039] In another technical solution, Figure 3 As shown, each group of the rope clamps 8 includes two clamping blocks respectively connected to the two main beams 7, and the two clamping blocks have semicircular notches at opposite positions, and when combined, a round hole for accommodating the rope 5 is formed. The two clamping blocks are respectively arranged on the two main beams 7. When in use, the two main beams 7 are misaligned so that the rope 5 is located in the semicircular notches, and then the main beams 7 are aligned and reset. At this time, the two clamping blocks can clamp the rope 5, which is convenient for installation and disassembly. The rope clamps 8 can also adjust the spacing between the ropes 5 so that the ropes 5 can better cooperate with the connecting blocks 3.
[0040] An adapter 14 is provided below the connection block 3, and the upper end of the suspension rod 4 is threadedly connected to the adapter 14. The suspension rod 4 is connected to the connection block 3 through the adapter 14, which can facilitate the replacement of different suspension rods 4, and the suspension rod 4 can be passed upward from the bottom plate of the U-shaped beam 2 for fixing during installation.
[0041] In another technical solution, Figure 5 As shown, the support plate 1 includes a first support plate 101 with an elastic interlayer and a second support plate 102, and the suspension rod 4 passes downward through the first support plate 101 and is connected and fixed to the second support plate 102. By providing the support plate 1 with an elastic interlayer, a buffer can be provided for the bottom plate of the U-shaped beam 2, thereby improving the force stability of the U-shaped beam 2 during the lifting process.
[0042] The first supporting plate 101 is provided with a sleeve that covers the suspension rod 4, and the sleeve is embedded in the suspension hole reserved on the bottom plate of the U-shaped beam 2. By providing the sleeve embedded in the suspension hole reserved on the bottom plate of the U-shaped beam 2 on the first supporting plate 101, an elastic buffer material can be attached to the periphery of the sleeve to form an isolation protection between the suspension hole and the suspension rod 4, thereby preventing the bottom plate structure near the suspension hole from being damaged.
[0043] The second support plate 102 is provided with a plurality of slots, the lower side of the first support plate 101 is connected with a column whose end is inserted into the slot, and the elastic interlayer is a spring sleeved on the suspension rod 4 and the column. When the support plate 1 is compressed, the column on the first support plate 101 is pressed into the slot of the second support plate 102, and the elastic support of the plurality of springs has better force characteristics.
[0044] The present application also provides a U-beam hoisting method, using a U-beam hoisting device as described in any one of the above schemes, the method comprises the following steps:
[0045] S1: Pass the suspension rod 4 through the hoisting hole reserved on the bottom plate of the U-shaped beam 2, install the support plate 1 under the bottom plate, and adjust the connecting assembly so that it is fixed to the U-shaped beam 2 downward and fixed to the suspension rope 5 upward;
[0046] S2: Set the main beam 7 of the balance beam frame on the flange of the U-shaped beam 2, adjust the rope clamp 8 to clamp the rope 5, cover the two main beams 7 with the clamping plates 6 from both ends and hook the lower side of the flange, fix the main beam 7 and the clamping plates 6 with the threaded rod 10 and the nut, and tighten and fix the two main beams 7 with the bolts 9;
[0047] S3: Start the lifting device to lift the U-shaped beam 2 with the lifting rope 5 for installation. After the installation is completed, release the lifting device of the U-shaped beam 2 in the opposite operation steps.
[0048] This method uses a balance beam to limit the position of the flange and the suspension rope 5, and lifts the balance control point from the bottom plate to the position of the suspension rope clamp 8. The retractable deformation range of the suspension rope 5 is shortened, providing a lateral holding force for the flange angle, reducing the shaking amplitude of the U-shaped beam 2, and making the lifting process more stable. The balance beam used therein adopts a detachable assembly structure, which can be adjusted accordingly according to different sizes of U-shaped beams 2, and has strong applicability. When both ends of the suspension rope 5 are fixed, it does not affect the installation of the balance beam and the clamping and fixing of the suspension rope 5, and optimizes the operation steps of the U-shaped beam 2 lifting.
[0049] In another technical solution, a transverse auxiliary beam 11 is arranged between the main beams 7, and the auxiliary beam 11 is upwardly connected to an independent lifting rope 5. The auxiliary beam 11 is upwardly rotatably connected to an auxiliary lifting rod 12, and the upper end of the auxiliary lifting rod 12 is connected to the independent lifting rope 5, and the lower end is provided with an auxiliary hook 13 for hooking the inner lower side surface of the flange. The operation of step S2 also includes: rotating the auxiliary lifting rod 12 so that the auxiliary hook 13 hooks the inner lower side surface of the flange of the U-shaped beam 2.
[0050] By hooking the lower inner side of the flange with the auxiliary hook 13, the lower ends of the auxiliary hook 13 and the clamp 6 cooperate to hook the lower side of the flange, making the device less likely to fall off. Using an additional lifting rope 5 can reduce the load of a single lifting rope 5, and the lifting process is safer and smoother.
[0051] The number of devices and processing scales described here are used to simplify the description of the present invention. Applications, modifications and variations of the present invention will be obvious to those skilled in the art.
[0052] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. U-beam lifting device, It is characterized in that include: A supporting plate, which is supported on the bottom of the U-shaped beam; A connection assembly, comprising a connection block and a suspension rod, wherein the connection block is horizontally arranged along the width direction of the U-shaped beam and is connected to a set of suspension ropes at both ends, the upper ends of a pair of suspension rods are respectively fixed to the two ends of the connection block, and the lower ends of the suspension rods are connected to the support plate after passing through the bottom plate of the U-shaped beam; A balancing beam frame includes a pair of clamps, a main beam and a suspension rope clamp. A pair of the clamps are respectively arranged on the outer sides of the flanges on both sides of the U-shaped beam, each clamp is provided with a pair of through holes and the lower end is bent to hook the outer lower side surface of the flange, the two ends of a pair of main beams are inserted into the through holes of the clamps and the beam bodies of the main beams are connected by bolts to form a ladder shape, the main beams are provided with threaded rods in the same direction, the threaded rods pass through the clamps and fix the clamps with corresponding nuts, and two groups of suspension rope clamps corresponding to the suspension ropes are arranged between the main beams.
2. The U-beam lifting device according to claim 1, It is characterized in that A transverse auxiliary beam is arranged between the main beams, and the auxiliary beam is connected upward with an independent suspension rope.
3. The U-beam lifting device according to claim 2, It is characterized in that The auxiliary beam is rotated upward to be connected with an auxiliary lifting rod, the upper end of the auxiliary lifting rod is connected with an independent lifting rope, and the lower end is provided with an auxiliary hook for hooking the inner lower side surface of the flange.
4. The U-beam hoisting device according to claim 1, It is characterized in that Each group of the suspension rope clamps comprises two clamping blocks respectively connected to two main beams, and the two clamping blocks are provided with semicircular notches at opposite positions, which form a circular hole for accommodating the suspension rope when combined.
5. The U-beam hoisting device according to claim 1, It is characterized in that The supporting plate comprises a first supporting plate with an elastic interlayer and a second supporting plate, and the suspension rod passes downward through the first supporting plate and is connected and fixed to the second supporting plate.
6. The U-beam hoisting device according to claim 5, It is characterized in that The first supporting plate is provided with a sleeve for covering the suspension rod, and the sleeve is embedded in a suspension hole reserved on the bottom plate of the U-shaped beam.
7. The U-beam hoisting device according to claim 5, It is characterized in that The second supporting plate is provided with a plurality of slots, the lower side of the first supporting plate is connected with a column with the ends inserted into the slots, and the elastic interlayer is a spring sleeved on the suspension rod and the column.
8. The U-beam hoisting device according to claim 1, It is characterized in that A transition piece is arranged below the connection block, and the upper end of the suspension rod is threadedly connected to the transition piece.
9. U-beam hoisting method, It is characterized in that Using the U-beam lifting device according to any one of claims 1 to 8, the method comprises the following steps: S1: Pass the hanging rod through the hoisting hole reserved on the bottom plate of the U-shaped beam, install the supporting plate under the bottom plate, and adjust the connecting assembly to fix it to the U-shaped beam downward and the hanging rope upward; S2: Place the main beam of the balance beam frame on the flange of the U-shaped beam, adjust the rope clamp to clamp the rope, cover the two main beams with clamps from both ends and hook the lower side of the flange, fix the main beam and clamp with threaded rods and nuts, and tighten and fix the two main beams with bolts; S3: Start the lifting device and use the lifting rope to lift the U-beam for installation. After the installation is completed, release the U-beam lifting device in the opposite order.
10. The U-beam hoisting method according to claim 9, It is characterized in that A transverse auxiliary beam is arranged between the main beams, the auxiliary beam is connected upward with an independent lifting rope, the auxiliary beam is rotatably connected upward with an auxiliary lifting rod, the upper end of the auxiliary lifting rod is connected with the independent lifting rope, and the lower end is provided with an auxiliary hook for hooking the inner lower side surface of the flange, and the operation of step S2 also includes: rotating the auxiliary lifting rod so that the auxiliary hook hooks the inner lower side surface of the U-beam flange.