Large-span slow-condensation prestressed floor slab construction device and method thereof
By designing a combined structure of right-angle frames, pedals, bent steel sheets and rotating pendant components, the friction of rollers and pendant counterweights is used to realize the smooth downward movement of prestressed floor slabs, which solves the problem of safety for construction workers working in high-risk areas. Risk and installation error issues are eliminated, and construction safety and accuracy are improved.
Patent Information
- Application Number
- CN202411088961.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-08-09
AI Technical Summary
During the construction process of prestressed floor slabs, construction workers work in high-risk areas, which poses safety risks, and human operations lead to large installation errors.
A large-span slow-condensation prestressed floor construction device is designed, including a right-angle frame, pedals, bent steel sheets and rotating sagging components. Through the rolling contact between the rollers and the floor and the friction of the sagging counterweights, the smoothness of the floor is achieved. Move down to reduce manual support operation and installation errors.
It greatly reduces the manual support operations of construction workers, improves construction safety, and reduces errors during pre-arrangement and installation of floor slabs to a certain extent.
Smart Images

Figure CN118756970A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building component construction, and in particular to a large-span slow-setting prestressed floor slab construction device and method thereof. Background Art
[0002] Prestressed floor slabs (hereinafter referred to as SP floor slabs) are commonly used prestressed components in building components. During their construction, the SP floor slabs are generally hoisted by steel cables. Then the construction workers stand at both ends of the hoisted SP floor slabs, communicate with the crane driver in real time through walkie-talkies, and continuously correct the position of the SP floor slab by hand until the SP floor slab moves to the bottom and the pre-installation is completed.
[0003] However, when installing the SP floor, the construction workers are standing on the suspended roof, which is in a high-risk area. In addition, in many construction sites, the construction workers are older (not over the age limit). During the downward movement of the SP floor, the construction workers move the SP floor downward with their hands, and the construction workers constantly move their positions and postures, which may pose safety risks. In addition, the installation of the SP floor is completed by human observation and hand support, but this purely manual method can result in large installation errors. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a large-span slow-setting prestressed floor construction device and method, which greatly reduces the manual support and other operations of construction workers during the construction process, is beneficial to the safety of the construction process, and reduces the error degree of pre-placement and installation of SP floor slabs to a certain extent.
[0005] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:
[0006] The present invention provides a large-span slow-setting prestressed floor slab construction device, comprising the following contents:
[0007] Right angle frame: It includes a horizontal plate in contact with the top side of the SP floor, a vertical frame fixed and vertically connected to one side of the horizontal plate, and an arc plate located on the upper part of the vertical frame. A slot is provided on the top of the arc plate, and a positioning blind slot is provided on the bottom of the slot wall. Two first screws are welded on the upper side of the horizontal plate, and a plurality of rollers facing the SP floor being assembled are movably arranged on the vertical frame.
[0008] The pedal comprises an upper plate which is positioned and installed with the horizontal plate, and a lower plate which is welded to the bottom side of the upper plate, wherein the upper plate is provided with a strip groove which matches with the first screw rod.
[0009] Bending steel sheet: including a horizontal sheet connected with the side end of the stepping plate, and a vertical sheet vertically fixedly connected with the horizontal sheet and inserted in the gap between two SP floor slabs that have been positioned and assembled.
[0010] Rotating and drooping assembly: includes a rotating rod with one end rotatably connected to the arc plate, and a drooping counterweight block rotatably connected to the other end of the rotating rod. A positioning shaft is arranged at one end of the rotating rod rotatably connected to the arc plate. Both ends of the positioning shaft are snap-fitted and installed at the slot positions. Positioning protrusions are provided on the side surfaces of the rings at both ends of the positioning shaft for positioning and installation in cooperation with the positioning blind slots.
[0011] As a preferred technical solution of the prestressed floor construction device in the present invention: the ring side of the roller faces the SP floor being assembled, and the side of the roller facing the SP floor protrudes and the side of the vertical frame facing the SP floor.
[0012] As an optimal technical solution for the prestressed floor construction device in the present invention: let the transverse length of the cross plate be La, let the transverse length of the upper plate be Lc, let the transverse length of the strip groove be Le, let the transverse length of the lower plate be Ls, then Lc-Ls=La>Le.
[0013] As a preferred technical solution for the prestressed floor construction device in the present invention: a through hole structure for movably inserting a positioning shaft rod is opened at one end of the rotating rod, and a handle is fixedly installed on the rotating rod.
[0014] As a preferred technical solution for the prestressed floor construction device in the present invention: the upper flat plate and the lower flat plate are flush toward the side ends of the bent steel sheets.
[0015] As a preferred technical solution for the prestressed floor construction device in the present invention: a second screw is fixedly welded on the upper side of the upper flat plate toward the side end of the bent steel sheet, and a screw hole matching the second screw is opened on the transverse piece of the bent steel sheet.
[0016] As an optimal technical solution for the prestressed floor construction device in the present invention: a hanging slot hole vertically penetrating the upper flat plate and the lower flat plate is opened at the side end of the pedal toward the bent steel sheet, and a hanging rod inserted at the hanging slot hole is provided on the bottom side of the transverse sheet of the bent steel sheet.
[0017] The present invention provides a large-span slow-setting prestressed floor slab construction method, comprising the following contents:
[0018] S1. First, adjust the positioning and connection position of the step board and the cross board according to the horizontal width of the SP floor slab, so that the horizontal length of the step board and the right-angle frame is the same as that of the SP floor slab, and then install the bent steel sheet on the other side of the step board.
[0019] S2. Place the right-angle frame and pedal assembly structure on the upper side of the most recently placed SP floor slab, and insert the bent steel sheet into the gap between the most recently placed SP floor slab and the adjacent already placed SP floor slab;
[0020] S3. The construction worker steps on the pedal, and the new SP floor slab is slowly lowered by the hoist. The SP floor slab continues to move down close to the vertical frame, and the end surface of one side of the SP floor slab rolls in contact with the roller;
[0021] S4. When the SP floor level is lower than the curved plate, the positioning shaft at one end of the rotating rod is mounted in the slot of the curved plate, and the drooping counterweight connected to the other end of the rotating rod is placed flat on the side of the SP floor that is moving downward;
[0022] S5. As the SP floor slab continues to move downward, the rotating rod rotates downward due to its own gravity and the gravity of the drooping counterweight block. There is friction between the bottom side of the drooping counterweight block and the upper side of the SP floor slab. The friction force of the drooping counterweight block on the SP floor slab is in the direction of the vertical frame. After the SP floor slab is subjected to the friction force of the drooping counterweight block, the end face of one side of the SP floor slab moves downward in contact with the roller until the SP floor slab moves down to the position. At this position, the pre-placement assembly of the SP floor slab is completed;
[0023] S6. Then remove the rotating droop assembly from the curved plate, lift the right-angle frame, step on the pedal, and move the combined structure of the bent steel sheet to the next SP floor construction operation position;
[0024] S7. Repeat the contents of S2 to S6.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] The present invention designs a structural combination of right-angle frames, pedals, bent steel sheets, rotating and drooping components, etc. During the descending process of the SP floor slab, the rollers directly roll in contact with the SP floor slab, the drooping counterweight blocks contact the upper side of the SP floor slab, and the continuous friction force on the SP floor slab during the descending process of the rotating rod and the drooping counterweight blocks forms a continuous "pulling" force in the direction of the vertical frame, so that the SP floor slab can move downward along the rollers more smoothly, greatly reducing the manual support operations of the construction workers during the construction operation, which is beneficial to the safety during the construction operation and reduces the error degree of the SP floor slab during pre-placement and installation to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the construction device of the present invention cooperating with the descending SP floor slab for construction.
[0028] Figure 2 It is a schematic diagram of the overall structure of the SP floor construction device in the present invention.
[0029] Figure 3 It is a schematic diagram of the component decomposition of the SP floor construction device in the present invention.
[0030] Figure 4 for Figure 3 Schematic diagram of the structure with a partial enlargement at point A in the middle.
[0031] Figure 5 for Figure 3 Schematic diagram of the structure with a partial enlargement at point B in the middle.
[0032] Figure 6 This is another matching structure between the bent steel sheet and the pedal in the present invention.
[0033] Among them: 1-SP floor; 2-right angle frame, 201-horizontal plate, 202-vertical frame, 203-first screw, 204-roller, 205-arc plate, 2051-slot, 2052-positioning blind slot; 3-pedal board, 301-upper plate, 302-lower plate, 303-strip slot, 304-second screw, 305-hanging slot; 4-rotating drooping assembly, 401-rotating rod, 402-positioning shaft rod, 4021-positioning protrusion, 403-drooping counterweight, 404-handle; 5-bent steel sheet, 501-horizontal sheet, 502-vertical sheet, 503-screw hole, 504-hanging rod. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0035] Embodiment 1: The present invention designs a construction device for large-span slow-setting prestressed floor slabs. The specific structural design is as follows:
[0036] See also Figure 2 , Figure 3 , Figure 4The right-angle frame 2 includes a horizontal plate 201, a vertical frame 202, a roller 204, and an arc plate 205. The horizontal plate 201 contacts the top side of the SP floor 1, the vertical frame 202 is fixed and vertically connected to one side end of the horizontal plate 201, and the arc plate 205 is located at the upper position of the vertical frame 202. A plurality of rollers 204 are movably arranged on the vertical frame 202, and the rollers 204 face the SP floor 1 being assembled while being lowered, wherein the arc plate 205 is bent backwards, so that when the SP floor 1 is moved down and close to the vertical frame 202, if the SP floor 1 "crosses" the vertical direction where the vertical frame 202 is located, the arc plate 205 forms a guiding effect to correct the vertical position of the SP floor 1 being lowered, so as to facilitate the subsequent rolling contact between the SP floor 1 and the roller 204. A slot 2051 is provided on the top of the arc plate 205, and a positioning blind slot 2052 is provided on the bottom of the wall of the slot 2051.
[0037] Among them, two first screws 203 are welded on the upper side of the horizontal plate 201. The first screw 203 is a single screw structure made of commonly used bolts with the nuts of the bolts cut off. Then, the first screw 203 can be welded to a pre-selected position on the upper side of the horizontal plate 201.
[0038] The side of the roller 204 faces the SP floor 1 being lowered and assembled, and the side of the roller facing the SP floor 1 protrudes from the side of the vertical frame facing the SP floor 1, such as Figure 1 , Figure 2 The roller 204 protrudes from the vertical frame 202, and the side end surface of the SP floor 1 being lowered for assembly can roll in contact with the roller 204.
[0039] See also Figure 2 , Figure 3 The pedal board 3 includes an upper flat plate 301, a lower flat plate 302, and a strip groove 303. The upper flat plate 301 is positioned and installed together with the cross plate 201, and the lower flat plate 302 is welded to the bottom side of the upper flat plate 301. The upper flat plate 301 and the lower flat plate 302 are flush with the side ends of the bent steel sheet 5.
[0040] The strip groove 303 is located on the side of the upper plate 301 facing the transverse plate 201, and the strip groove 303 cooperates with the first screw 203. The transverse length difference between the upper plate 301 and the lower plate 302 is the same as the transverse length of the transverse plate 201, and the transverse length of the strip groove 303 is less than the transverse length of the transverse plate 201.
[0041] See also Figure 2 , Figure 3 , Figure 4The rotating and drooping assembly 4 includes a rotating rod 401, a positioning shaft rod 402, a drooping counterweight 403, and a handle 404. One end of the rotating rod 401 is rotatably connected to the arc plate 205, and the drooping counterweight 403 is rotatably connected to the other end of the rotating rod 401. The drooping counterweight 403 can be made of a metal block, such as a copper block. The handle 404 is fixedly installed on the rotating rod 401. The positioning shaft rod 402 is configured at one end of the rotating rod 401 that is rotatably connected to the arc plate 205. A through hole structure is opened at one end of the rotating rod 401. The positioning shaft rod 402 is movably inserted at the position of the through hole structure. If conditions permit, a bearing structure can be installed at this position.
[0042] Positioning protrusions 4021 are provided on the ring side surfaces at both ends of the positioning shaft rod 402. The two ends of the positioning shaft rod 402 are snap-fitted and installed at the positions of the slots 2051. When snapping, pay attention to aligning the positioning protrusions 4021 with the positioning blind slots 2052, so that the positioning shaft rod 402 will not deviate or rotate.
[0043] See also Figure 2 , Figure 3 , Figure 5 The bent steel sheet 5 includes a horizontal sheet 501 and a vertical sheet 502. The horizontal sheet 501 is connected to the side end of the pedal board 3, and the vertical sheet 502 is vertically fixedly connected to the horizontal sheet 501. The vertical sheet 502 is inserted into the gap between the two SP floor slabs 1 that have been positioned and assembled.
[0044] The upper plate 301 is fixedly welded with a second screw 304 on the upper side of the side end of the bent steel sheet 5. When configuring the second screw 304, a conventional bolt can be used, the nut of the bolt is cut off, and then the remaining screw part is welded to the position specified by the upper plate 301. The transverse plate 501 of the bent steel sheet 5 is provided with a screw hole 503. The second screw 304 passes through the screw hole 503 and is reinforced with a mounting nut, thereby completing the fixed connection between the bent steel sheet 5 and the upper plate 301.
[0045] See also Figure 2 , Figure 3 , Figure 6 Another form of coordinated installation of the bent steel sheet 5 and the pedal board 3: a hanging slot 305 is provided at the side end of the pedal board 3 facing the bent steel sheet 5, and the hanging slot 305 vertically penetrates the upper plate 301 and the lower plate 302. A hanging rod 504 is provided on the bottom side of the transverse sheet 501 of the bent steel sheet 5. The hanging rod 504 can be welded to the bottom side of the transverse sheet 501 using a short steel bar cut to a good length. The hanging rod 504 is inserted at the position of the hanging slot 305 to complete the coordinated installation of the bent steel sheet 5 and the pedal board 3.
[0046] Embodiment 2: The present invention designs a construction method for assembling a large-span slow-setting prestressed floor slab, comprising the following contents:
[0047] First, according to the horizontal width of the SP floor 1, adjust the positioning and connection position of the stepping board 3 and the horizontal board 201 to ensure that the horizontal length of the stepping board 3 and the right-angle frame 2 is the same as that of the SP floor 1, and then install the bent steel sheet 5 on the other side of the stepping board 3. When installing the bent steel sheet 5, it depends on the specific connection structure of the bent steel sheet 5, for example Figure 5 In the case of the above, it is necessary to fix the bent steel sheet 5 on the pedal 3 before use. Figure 6 In the case of the above, it may be necessary to install the bent steel sheet 5 on the stepping plate 3 in correspondence with the position of the SP floor 1 on the lower side.
[0048] Then, place the combined structure of the right-angle frame 2 and the stepping plate 3 on the upper side of the SP floor 1 that was placed most recently, such as Figure 1 , insert the bent steel sheet 5 into the gap between the most recently placed SP floor slab 1 and the adjacent already placed SP floor slab 1 .
[0049] When the crane starts to lower the SP floor 1, the construction worker steps on the pedal 3, and the new SP floor 1 is slowly lowered with the crane. The SP floor 1 continues to move downward close to the vertical frame 202, and one side end surface of the SP floor 1 rolls in contact with the roller 204.
[0050] When the horizontal height of the SP floor 1 is lower than that of the curved plate 205, the positioning shaft 402 at one end of the rotating rod 401 is engaged and installed at the position of the slot 2051 of the curved plate 205, and the drooping counterweight 403 connected to the other end of the rotating rod 401 is rotatably placed flat on the upper side of the SP floor 1 that is moving downward;
[0051] It is worth noting that Figure 1 As shown, during the process of the SP floor 1 continuing to move downward, the rotating rod 401 rotates downward due to its own gravity and the gravity of the drooping counterweight block 403, and there is friction between the bottom side of the drooping counterweight block 403 and the upper side of the SP floor 1. The friction force of the drooping counterweight block 403 on the SP floor 1 is toward the direction of the vertical frame. After the SP floor 1 is subjected to the friction force of the drooping counterweight block 403, the end face of one side of the SP floor 1 is pressed against the roller 204 and moves downward until the SP floor 1 moves into place. At this position, the pre-placement assembly of the SP floor 1 is completed.
[0052] Finally, the rotating and hanging assembly 4 is removed from the arc plate 205, and the combined structure of the right-angle frame 2, the pedal 3, and the bent steel sheet 5 is lifted and moved to the next SP floor 1 construction operation position;
[0053] Then, the construction method of the SP floor 1 is repeated to complete the assembly of a plurality of consecutive SP floor slabs.
[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A large-span slow-setting prestressed floor construction device, characterized in that: include: The right-angle frame (2) comprises a horizontal plate (201) in contact with the top side of the SP floor (1), a vertical frame (202) fixed and vertically connected to one side end of the horizontal plate (201), and an arc-shaped plate (205) located above the vertical frame (202), wherein a slot (2051) is provided at the top of the arc-shaped plate (205), and a positioning blind slot (2052) is provided at the bottom of the wall surface of the slot (2051); Wherein, two first screw rods (203) are welded on the upper side of the transverse plate (201); Wherein, the vertical frame (202) is movably provided with a plurality of rollers (204) facing the SP floor slab (1) being lowered for assembly; The pedal (3) comprises an upper plate (301) positioned and mounted with the horizontal plate (201) and a lower plate (302) welded to the bottom side of the upper plate (301); Wherein, the upper plate (301) is provided with a strip-shaped slot (303) matching with the first screw rod (203); The bent steel sheet (5) comprises a transverse sheet (501) which is connected to the side end of the stepping plate (3) and a vertical sheet (502) which is vertically fixedly connected to the transverse sheet (501) and inserted into the gap between the two SP floor slabs (1) which have been positioned and assembled; The rotating and drooping component (4) comprises a rotating rod (401) having one end rotatably connected to the arc plate (205), and a drooping counterweight (403) rotatably connected to the other end of the rotating rod (401); a positioning shaft rod (402) is arranged at one end of the rotating rod (401) rotatably connected to the arc plate (205); both ends of the positioning shaft rod (402) are snap-fitted and installed at the positions of the slots (2051); and the annular side surfaces at both ends of the positioning shaft rod (402) are provided with positioning protrusions (4021) which are positioned and installed in cooperation with the positioning blind slots (2052).
2. A large-span slow-setting prestressed floor construction device according to claim 1, characterized in that: The ring side surface of the roller (204) faces the SP floor (1) being lowered for assembly, and the side of the roller facing the SP floor (1) protrudes from the side of the vertical frame facing the SP floor (1).
3. A large-span slow-setting prestressed floor construction device according to claim 1, characterized in that: Assuming that the transverse length of the transverse plate (201) is La, the transverse length of the upper plate (301) is Lc, the transverse length of the strip-shaped slot (303) is Le, and the transverse length of the lower plate (302) is Ls, then Lc-Ls=La>Le.
4. A large-span slow-setting prestressed floor construction device according to claim 1, characterized in that: A through hole structure for movably inserting a positioning shaft rod (402) is provided at one end of the rotating rod (401), and a handle (404) is fixedly mounted on the rotating rod (401).
5. A large-span slow-setting prestressed floor construction device according to claim 1, characterized in that: The upper flat plate (301) and the lower flat plate (302) are flush with the side ends of the bent steel sheet (5).
6. A large-span slow-setting prestressed floor construction device according to claim 1, characterized in that: A second screw (304) is fixedly welded to the upper side of the upper flat plate (301) facing the side end of the bent steel sheet (5), and a screw hole (503) matching with the second screw (304) is provided on the transverse sheet (501) of the bent steel sheet (5).
7. A large-span slow-setting prestressed floor construction device according to claim 1, characterized in that: The pedal (3) is provided with a hanging slot (305) which vertically penetrates the upper plate (301) and the lower plate (302) at the side end portion facing the bent steel sheet (5), and a hanging rod (504) which is inserted at the position of the hanging slot (305) is provided at the bottom side of the transverse sheet (501) of the bent steel sheet (5).
8. A method for constructing a large-span slow-setting prestressed floor slab, characterized in that: A large-span slow-setting prestressed floor construction device according to any one of claims 1 to 7, comprising the following contents: S1. First, according to the horizontal width of the SP floor (1), adjust the positioning and connection position of the stepping board (3) and the horizontal plate (201) to ensure that the horizontal length of the stepping board (3) and the right-angle frame (2) is the same as that of the SP floor (1), and then install the bent steel sheet (5) on the other side of the stepping board (3); S2. Place the combined structure of the right-angle frame (2) and the pedal (3) on the upper side of the most recently placed SP floor (1), and insert the bent steel sheet (5) into the gap between the most recently placed SP floor (1) and the adjacent already placed SP floor (1); S3. The construction worker steps on the pedal (3) with his foot, and the new SP floor (1) is slowly lowered by the hoist. The SP floor (1) continues to move down close to the vertical frame (202), and the end surface of one side of the SP floor (1) rolls in contact with the roller (204); S4. When the horizontal height of the SP floor (1) is lower than that of the curved plate (205), the positioning shaft (402) at one end of the rotating rod (401) is engaged and installed at the position of the slot (2051) of the curved plate (205), and the drooping counterweight (403) connected to the other end of the rotating rod (401) is rotated and placed flat on the upper side of the SP floor (1) that is moving downward; S5. As the SP floor (1) continues to move downward, the rotating rod (401) rotates downward due to its own weight and the weight of the drooping counterweight (403). There is friction between the bottom side of the drooping counterweight (403) and the upper side of the SP floor (1). The friction of the drooping counterweight (403) on the SP floor (1) is directed toward the vertical frame. After the SP floor (1) is subjected to the friction of the drooping counterweight (403), the end surface of one side of the SP floor (1) is pressed against the roller (204) and moves downward until the SP floor (1) moves down to the position where the SP floor (1) is in place. At this position, the pre-placement assembly of the SP floor (1) is completed. S6. Then remove the rotating drooping assembly (4) from the curved plate (205), lift the right-angle frame (2), step on the pedal (3), and the combined structure of the bent steel sheet (5) and move it to the next SP floor (1) construction position; S7. Repeat the contents of S2 to S6.
Citation Information
Patent Citations
Ground-type roller conveying mechanism suitable for floor slab arrangement
CN105083902A
Prefabricated slab assembling trolley for subway station
CN118207874A
Large -span steel beam mounting slides and promotes combination device
CN208294101U
Anti-slip floor hoisting device
CN220564113U
Stairway parallel moving device
JP1995277429A