Universal bus bar power controller simulation system and test method
By designing a universal bus power controller simulation system, combining real-time simulation and real power distribution systems, and using interface adaptation modules and sampling resistors, real-time simulation and real joint debugging of aircraft bus power controllers are realized, solving existing technology problems. It solves the problems of long R&D time and high cost and improves development efficiency and verification accuracy.
Patent Information
- Application Number
- CN202410803276.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2024-10-11
AI Technical Summary
The existing aircraft bus power controller cannot be jointly debugged with the real-time simulation system and the real power distribution system at the same time during the development and testing process, resulting in a long development cycle, high cost, high test risk, and the existing technology cannot achieve the same goal. Joint debugging of real prototypes.
A general bus power controller simulation system is designed, including a real-time simulation subsystem, a real distribution subsystem, an interface adaptation module and a bus power controller simulator subsystem. Through the combination of the interface adaptation module and the sampling resistor, Realize signal collection and control of real-time simulation system and real power distribution system, and support joint debugging of the two systems.
It achieves seamless joint debugging of bus power controllers between real-time simulation and real power distribution systems, reduces R&D costs and time, improves development efficiency, and ensures the effectiveness of the controller's functional verification and protection algorithms.
Smart Images

Figure CN118760113A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of aircraft power system design, and in particular relates to a universal busbar power controller simulation system and a test method. Background Art
[0002] As an important part of the aircraft power distribution system, the bus power controller completes the power transmission and unloading of the bus in the aircraft power distribution system, and controls the action of related contactors by monitoring the status of each contactor and bus.
[0003] When developing a busbar power controller, especially in the pre-research stage, when there is no real distribution system in the early stage of development, the newly developed controller prototype or controller board needs to be tested with the real-time simulation system first to verify the controller board and control protection algorithm. A real-time model of the distribution system is established in the real-time simulation system to verify the functional performance of the controller board and the effectiveness of the control protection algorithm. After the real physical distribution system prototype is successfully developed, the busbar power controller is debugged with the real distribution system prototype. By first debugging with the real-time simulation system and then with the real distribution system, the high test risk, long construction period, and difficulty in locating problems caused by the direct debugging of the controller with the real prototype are avoided, reducing the development cost and development risk.
[0004] The signal range of the real-time simulation system output is narrow and the signal value is small. The developed BPCU controller sampling circuit is adapted to the 115V, 230V or 28V information in the aircraft power distribution system. For small signal collection, it may be impossible to collect or the accuracy is poor. The signal interacting between the real power distribution system and the BPCU controller is much higher than that of the real-time simulation system. If it is necessary to meet the precise joint debugging with the real-time simulation system and the joint debugging with the real power distribution system, the existing BPCU controller sampling circuit cannot achieve this function.
[0005] The busbar power controller currently developed does not have the function of being able to be debugged with both the real-time simulation system and the real distribution system. The busbar power controller can only be debugged with the real-time simulation system after the interface circuit is modified. When it is debugged with the real distribution system in the next step, a large number of controller hardware modifications need to be made again to adapt to the real distribution system signal. The entire execution process requires customized interface transfer circuits and hardware modifications, which leads to a long R&D cycle, a large amount of manpower and material resources, and high development costs.
[0006] Based on the above analysis, in order to solve the problems existing in the actual development and testing process of the existing aircraft bus power controller and improve the efficiency and economy of device development, it is urgent to adopt advanced testing systems and methods. In recent years, there have been relevant studies on the development and testing of aircraft bus power control systems, but so far, there has been no relevant research on universal bus power controllers that are suitable for both real-time simulation systems and real power distribution systems.
[0007] The existing patent (CN105549424A) discloses a busbar power controller simulation system and method for wide-body aircraft, including two left and right busbar power controllers, which can simulate aircraft busbar power controllers to control AC power grid, DC power grid and emergency power grid. The existing problem is that the hardware architecture of the controller is based on an industrial computer, which is different from the real physical prototype.
[0008] The existing patent (CN112436503A) discloses a method for controlling the power of a high-voltage DC busbar in an aircraft high-voltage DC power supply system. According to the system status information, the method can flexibly and reliably realize the power supply channel conversion during the operation of the system, and can also realize the position exchange in the left and right power distribution systems, effectively improving the maintainability of the system and ensuring the reliable power supply of the electrical equipment. The existing problem is that it only introduces the control method, but not the hardware composition.
[0009] The existing patent (CN109213001A) discloses an aircraft primary power distribution network simulator and a simulation equivalent test verification device, including a switch, a delay circuit board, a relay board, and an indicator. It is used to debug the busbar power controller, and can more conveniently and accurately debug the busbar power controller BPCU before installation. The existing problem is that the test verification of the controller and the simulated power distribution system cannot achieve joint debugging with the real prototype.
[0010] The busbar power controller or method proposed in the prior art can realize the power supply channel conversion during the system operation according to the system status information to ensure the reliable power supply of the power-consuming equipment. However, the above patents either realize the busbar power controller function based on industrial computers and traditional C language programming, or can only be tested with simulated distribution networks. Summary of the invention
[0011] In order to overcome the above problems existing in the prior art, the present invention provides a universal busbar power controller simulation system and a testing method, which are used to solve the above problems existing in the prior art.
[0012] A universal busbar power controller simulation system, the system comprising: a real-time simulation subsystem, a real power distribution subsystem, an interface adapter module and a busbar power controller simulator subsystem;
[0013] The real-time simulation subsystem is used for real-time simulation of the power distribution system of the real aircraft;
[0014] A real power distribution subsystem is used to generate real output signals;
[0015] The interface adapter module is used to select the real-time simulation subsystem or the real power distribution subsystem to connect with the busbar power controller simulator subsystem;
[0016] The Bus Power Controller Simulator subsystem is used to control a real-time simulation subsystem or a real power distribution subsystem.
[0017] According to the above aspects and any possible implementation manner, there is further provided an implementation manner, wherein the real power distribution subsystem includes a bus bar and a contactor.
[0018] According to the aspects described above and any possible implementation, there is further provided an implementation, wherein the busbar power controller simulator subsystem includes a control power module, a main control board and a signal conditioning board.
[0019] According to the above aspects and any possible implementation, there is further provided an implementation, wherein the interface adapter module is connected to the real-time simulation subsystem or the real power distribution subsystem using a CAN bus and / or Ethernet.
[0020] According to the aspects described above and any possible implementation method, an implementation method is further provided, wherein the interface adapter module includes a signal interface, an interface circuit component and a signal selection circuit, wherein the signal interface is used to connect a real-time simulation subsystem, a real distribution subsystem and a bus power controller simulator subsystem; the signal selection circuit is used to select a real-time simulation subsystem or a real distribution subsystem; and the interface circuit component is used to implement signal conditioning.
[0021] According to the above aspects and any possible implementation manner, an implementation manner is further provided, wherein the interface circuit component uses sampling resistors with different resistance values, and each of the sampling resistors is connected in series or in parallel.
[0022] According to the above aspects and any possible implementation, there is further provided an implementation, wherein the interface circuit assembly includes an analog quantity input board, a digital quantity input board, and a digital quantity output board.
[0023] According to the above aspects and any possible implementation manner, an implementation manner is further provided, wherein the output signal includes a voltage signal, a current signal, and a contactor signal.
[0024] According to the above aspects and any possible implementation, an implementation is further provided, wherein the main control board adopts a central processing unit, and the central processing unit operates using automatic code generation technology.
[0025] The present invention also provides a method for testing a universal busbar power controller simulation system, the method being implemented by the system, comprising:
[0026] S1. Before the development of the real power distribution system is completed, the busbar power controller simulator is connected to the interface adapter and the real-time simulation system, and the resistor and SW switch in the interface adapter are matched and switched to realize the joint debugging of the busbar power controller simulator and the real-time simulation system;
[0027] S2. After the development of the real power distribution system is completed, the busbar power controller simulator is connected to the interface adapter and the real power distribution system, and the resistor and SW switch in the interface adapter are matched and switched to realize the joint debugging of the busbar power controller simulator and the real power distribution system;
[0028] S3. When the busbar power controller simulator is co-adjusted with the real-time simulation system, the interface adapter collects the narrow range small signals of the real-time simulation system through a reasonable combination of sampling resistors, and realizes data exchange and control protection function verification with the real-time model of the distribution system in the real-time simulation system;
[0029] S4. When the busbar power controller simulator is coordinated with the real distribution system, the interface adapter device collects the wide range and large signals of the real distribution system through a reasonable combination of sampling resistors, and realizes data exchange and control and protection function verification with the real distribution system.
[0030] Beneficial effects of the present invention
[0031] Compared with the prior art, the present invention has the following beneficial effects:
[0032] The universal busbar power controller simulation system of the present invention includes: a real-time simulation subsystem, a real power distribution subsystem, an interface adapter module and a busbar power controller simulator subsystem; the real-time simulation subsystem is used for real-time simulation of the real aircraft power distribution system; the real power distribution subsystem is used to generate a real output signal; the interface adapter module is used to select the real-time simulation subsystem or the real power distribution subsystem to be connected to the busbar power controller simulator subsystem; the busbar power controller simulator subsystem is used to control the real-time simulation subsystem or the real power distribution subsystem. The present invention realizes the joint test of the busbar power controller simulation system and the real-time simulation model of the power distribution network or the real power distribution system by combining the advanced CPU hardware architecture that conforms to the real prototype and using the interface adapter device. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the structural frame of the system of the present invention;
[0034] Figure 2 The working method of the present invention is shown in FIG. Figure 1 ;
[0035] Figure 3 The working method of the present invention is shown in FIG. Figure 2 ;
[0036] Figure 4 It is a structural schematic diagram of the interface adapter module or device of the present invention. DETAILED DESCRIPTION
[0037] In order to better understand the technical solution of the present invention, the content of the present invention includes but is not limited to the specific implementation methods described below, and similar technologies and methods should be considered to be within the scope of protection of the present invention. In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following will be described in detail with reference to the accompanying drawings and specific embodiments.
[0038] It should be clear that the embodiments described in the present invention are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "said" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0040] like Figure 1 As shown, a universal busbar power controller simulation system of the present invention comprises: a real-time simulation subsystem, a real power distribution subsystem, an interface adapter module and a busbar power controller simulator subsystem;
[0041] The real-time simulation subsystem uses the real-time method of offline simulation model of power distribution system to simulate the functional performance characteristics of the real power distribution system prototype; the busbar power controller simulator subsystem verifies the control algorithm and protection function of the busbar power controller by controlling the real-time simulation subsystem when the power distribution system prototype has not yet been developed. It also verifies the power distribution system architecture, so that the power distribution system prototype can be partially functionally verified before the physical development is completed. It is used for real-time simulation of the real aircraft power distribution system, including the real-time simulation model of the aircraft power distribution system, the real-time simulation target machine, and the communication interface between the simulation target machine and the communication network. The real-time simulation model of the aircraft power distribution system is used to simulate the real-time of the real aircraft power distribution system. The real-time simulation target machine runs the real-time simulation model of the aircraft power distribution system in real time. The communication interface is used to transmit the simulation data of the simulation target machine to other systems through the simulation control bus and the real-time computing bus to realize data interaction.
[0042] The real distribution subsystem is used to generate real output signals; the interface adapter module is used to select one of the real-time simulation subsystem or the real distribution subsystem to connect with the bus power controller simulator subsystem; the bus power controller simulator subsystem is used to control the real-time simulation subsystem or the real distribution subsystem.
[0043] Preferably, the real power distribution subsystem includes busbars and contactors. The busbars are the main components of the power distribution system prototype and play the role of carrying and distributing the input electrical energy. Contactors are connected in series between the busbars, and the contactors are used to realize the conduction and disconnection of different busbars. The busbar power controller simulator controls the conduction and shutdown of all contactors based on the set control and protection logic, realizes the conduction and disconnection between different busbars, and finally realizes different power distribution system architectures and power distribution, as well as other related current and voltage signal output ports.
[0044] Preferably, the busbar power controller simulator subsystem comprises a control power module, a main control board and a signal conditioning board, and the three circuit boards are interconnected through pin headers and fixed together by screws. The main control board is the core circuit board of the bus power controller simulator. Other interface boards and communication interface signals are collected on the main control board, and the CPU of the main control board runs the software to realize the measurement and control function. The input voltage of the control power module varies in the range of 85-900VAC, and the output voltage is 28V, which meets the high frequency requirement of input 1080-2400Hz and supplies power to all boards in the bus power controller simulator. The signal conditioning board includes analog quantity conditioning circuit, digital quantity input and digital quantity output conditioning circuit, which are used to collect analog quantity and digital quantity of the aircraft power system, and perform signal conditioning on the collected analog quantity and digital quantity to become the level signal that the main control board can process. It can also output the digital quantity output signal 28V / open and ground / open to the distribution system for corresponding logic control. The bus power controller simulator subsystem collects the bus status, contactor status, current and voltage data of the distribution system, and then monitors and controls the status of the distribution system.
[0045] The system of the present invention is divided from the control perspective, including a control layer and a controlled object, wherein the control layer is a bus power controller simulator subsystem, and the controlled object is a real distribution system or a real-time simulation model of a distribution system. The control layer and the controlled object are connected via an interface adapter module or device, which can realize both the control of the real distribution system and the testing and control of the distribution architecture of the real-time simulation system, thereby realizing the universal control function of the bus power controller for the real-time simulation system and the physical distribution system.
[0046] Preferably, the interface adapter module or device is connected to the real-time simulation subsystem or the real power distribution subsystem using a CAN bus and / or Ethernet.
[0047] Preferably, if Figure 3 As shown, the interface adapter module or device can achieve the function of matching input analog and digital quantities of different amplitudes by switching different resistors, so that it can be connected to both the real power distribution device and the real-time simulation system. The interface adapter module or device includes a signal interface, an interface circuit component and a signal selection circuit, and the signal selection circuit is used to select the real-time simulation subsystem or the real power distribution subsystem, such as Figure 4 As shown, the box 1 on the left side of the signal selection circuit is a differential voltage sampling resistor circuit. The parallel resistors can be short-circuited using the dip switches SW1-SW3 and SW5-SW7. The more resistors are short-circuited, the narrower the voltage measurement range. The three pairs of resistors R1, R2, R3 and R9, R10 and R11 are designed with different resistance values so that the voltage measurement range can adapt to different requirements.
[0048] Box 2 is a 10Ω / 0.5W current sampling resistor. SW4 is closed to connect to the sampling resistor, and SW1-SW3 and SW5-SW7 are also closed. At this time, the differential voltage sampling resistor circuit is short-circuited and only current sampling is performed. When SW4 is disconnected, the input voltage enters the internal amplifier circuit through several resistors for voltage sampling.
[0049] Through different combinations of the above resistors, and in combination with the following Table 1, different voltage levels can be adapted, and the real-time simulation subsystem and the real power distribution subsystem can be switched.
[0050] Table 1: Voltage level adaptation table
[0051]
[0052] The signal interface is used to connect the real-time simulation subsystem, the real power distribution subsystem and the busbar power controller simulator
[0053] Subsystem; the interface circuit component is used to realize signal conditioning, and the function of the interface adapter module is to condition the voltage and current signals between the busbar power controller simulator subsystem and the real-time simulation system or the physical distribution system interface so that the digital and analog signals between the two can interact. The busbar power controller simulator subsystem needs to input and output corresponding signals, which are conditioned, transformed and transferred by the interface adapter module. These signals are mainly voltage and current signals and contactor signals related to them, and the contactor is controlled. Through the signal selection circuit, it is possible to switch whether the controlled object connected to the busbar power controller simulator subsystem BPCU is a real-time simulation system or a real distribution system; the unit that specifically realizes signal conditioning is the interface circuit component, which is composed of sampling resistors with different resistance values. According to the signal type and data range of the controlled object, the series and parallel connection of different resistors is realized through the parallel control switch, and the resistance value of the sampling resistor is changed, thereby adapting to different controlled object signal inputs.
[0054] Preferably, the interface circuit assembly uses sampling resistors with different resistance values, and each of the sampling resistors is connected in series or in parallel, including an analog input board, a digital input board and a digital output board.
[0055] Preferably, the output signal includes a voltage signal, a current signal and a contactor signal.
[0056] Preferably, the main control board adopts a central processing unit, and the central processing unit works using automatic code generation technology.
[0057] As a disclosed embodiment, the present invention further provides a method for testing a universal busbar power controller simulation system, the method being implemented by the system, comprising:
[0058] S1. Before the development of the real power distribution system is completed, the busbar power controller simulator is connected to the interface adapter module and the real-time simulation system, and the resistor and SW switch in the interface adapter module are matched and switched to realize the joint debugging of the busbar power controller simulator and the real-time simulation system;
[0059] S2. After the development of the real power distribution system is completed, the busbar power controller simulator is connected to the interface adapter module and the real power distribution system, and the resistors and SW switches in the interface adapter module are matched and switched to realize the joint debugging of the busbar power controller simulator and the real power distribution system;
[0060] S3. When the busbar power controller simulator is co-adjusted with the real-time simulation system, the interface adapter module collects the narrow range small signals of the real-time simulation system through a reasonable combination of sampling resistors, and realizes data exchange and control protection function verification with the real-time model of the distribution system in the real-time simulation system;
[0061] S4. When the busbar power controller simulator is coordinated with the real distribution system, the interface adapter module collects the wide range and large signals of the real distribution system through a reasonable combination of sampling resistors, and realizes data exchange and control and protection function verification with the real distribution system.
[0062] Specifically, the universal busbar power controller simulation system and test method based on embedded processor proposed in the present invention can support real-time simulation system testing and real physical device verification, which are described as follows:
[0063] (1) Real-time simulation system testing
[0064] like Figure 2 As shown, the signal output by the real-time simulation system is a small signal in a narrow range. The interface adapter module or device adjusts the size of the sampling resistor. After the signal passes through the sampling resistor, it is converted into a voltage signal acceptable to the BPCU board by the signal conditioning circuit of the BPCU, and then input into the BPCU data processing board. By adapting a suitable sampling resistor (closing the switch to short-circuit the unnecessary resistor and leaving the resistor that needs to be sampled), the acquisition accuracy of the small signal can be improved, so that the signal output by the real-time simulation system can be more accurately fed back to the BPCU for data processing, and the BPCU can implement a more accurate bus power control function.
[0065] (2) Test of the real power distribution system The signal output by the real power distribution system is a wide-range large signal. The interface adapter adjusts the size of the sampling resistor. After the signal passes through the sampling resistor, it is converted into a voltage signal acceptable to the BPCU board by the signal conditioning circuit of the BPCU and then input into the BPCU data processing board. By adapting the appropriate sampling resistor (closing the switch to short-circuit the unnecessary resistor and leaving the resistor that needs to be sampled), the acquisition accuracy of the large signal can be compatible, so that the signal output by the real power distribution system can be more accurately fed back to the BPCU for data processing, so that the BPCU can implement a more accurate bus power control function.
[0066] The above description shows and describes several preferred embodiments of the present invention, but as mentioned above, it should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the application concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art shall not depart from the spirit and scope of the present invention, and shall be within the scope of protection of the claims attached to the present invention.
Claims
1. A universal busbar power controller simulation system, characterized in that: The system includes: a real-time simulation subsystem, a real power distribution subsystem, an interface adapter module and a busbar power controller simulator subsystem; The real-time simulation subsystem is used for real-time simulation of the power distribution system of the real aircraft; A real power distribution subsystem is used to generate real output signals; The interface adapter module is used to select the real-time simulation subsystem or the real power distribution subsystem to connect with the busbar power controller simulator subsystem; The Bus Power Controller Simulator subsystem is used to control a real-time simulation subsystem or a real power distribution subsystem.
2. The universal busbar power controller simulation system according to claim 1, characterized in that: The real power distribution subsystem includes bus bars and contactors.
3. The universal busbar power controller simulation system according to claim 1, characterized in that: The busbar power controller simulator subsystem includes a control power module, a main control board and a signal conditioning board.
4. The universal busbar power controller simulation system according to claim 2, characterized in that: The interface adapter module is connected to the real-time simulation subsystem or the real power distribution subsystem by using CAN bus and / or Ethernet.
5. The universal busbar power controller simulation system according to claim 1, characterized in that: The interface adapter module includes a signal interface, an interface circuit component and a signal selection circuit. The signal interface is used to connect the real-time simulation subsystem, the real distribution subsystem and the bus power controller simulator subsystem; the signal selection circuit is used to select the real-time simulation subsystem or the real distribution subsystem; the interface circuit component is used to implement signal conditioning.
6. The universal busbar power controller simulation system according to claim 5, characterized in that: The interface circuit assembly uses sampling resistors with different resistance values, and the sampling resistors are connected in series or in parallel.
7. The universal busbar power controller simulation system according to claim 6, characterized in that: The interface circuit assembly includes an analog quantity input board, a digital quantity input board and a digital quantity output board.
8. The universal busbar power controller simulation system according to claim 1, characterized in that: The output signal includes a voltage signal, a current signal and a contactor signal.
9. The universal busbar power controller simulation system according to claim 3, characterized in that: The main control board adopts a central processing unit, and the central processing unit adopts automatic code generation technology to work.
10. A method for testing a universal busbar power controller simulation system, characterized in that: The method is implemented by using the system according to any one of claims 1 to 9, including: The method is implemented by using the system, including: S1. Before the development of the real power distribution system is completed, the busbar power controller simulator is connected to the interface adapter and the real-time simulation system, and the resistors and switches in the interface adapter are matched and switched to realize the joint debugging of the busbar power controller simulator and the real-time simulation system; S2. After the development of the real power distribution system is completed, the busbar power controller simulator is connected to the interface adapter and the real power distribution system, and the resistors and switches in the interface adapter are matched and switched to realize the joint debugging of the busbar power controller simulator and the real power distribution system; S3. When the busbar power controller simulator is co-adjusted with the real-time simulation system, the interface adapter collects the narrow range small signals of the real-time simulation system through the combination of sampling resistors, and realizes data exchange and control protection function verification with the real-time model of the distribution system in the real-time simulation system; S4. When the busbar power controller simulator is coordinated with the real distribution system, the interface adapter device collects the wide range and large signals of the real distribution system through a combination of sampling resistors, and realizes data exchange and control and protection function verification with the real distribution system.