Cable simulation method and system based on railway four-electric cable laying

By acquiring and processing the inventory information and topology information of the railway's four-power cables, establishing a virtual network and adjusting the laying path, the problems of low cable laying efficiency and untimely application on the construction site in the railway's four-power project are solved, achieving fast and accurate Cable simulation and laying plan generation.

CN118761185AInactive Publication Date: 2024-10-11中铁电气化局集团第一工程有限公司 +1

Patent Information

Application Number
CN202411208333.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the cable laying process of the railway four-power project, there are problems such as long cable model generation time, untimely application at the construction site, high technical requirements for modelers, and uneven levels of construction technicians, resulting in low construction efficiency and frequent rework.

Method used

Provide a cable simulation method based on the laying of railway four-wire cables. By obtaining cable inventory information, equipment location and topology information, establish a virtual network, adjust the laying path according to priority types and professional rules, and generate railway four-wire cables. Simulate lines to simplify the cable laying process.

Benefits of technology

It achieves fast cable simulation speed, simple operation, high accuracy and strong adaptability. It can quickly generate high-quality cable laying plans to adapt to the needs of the construction site and reduce rework.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761185A_ABST
    Figure CN118761185A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of railway four-electric cable laying. The invention discloses a cable simulation method based on railway four-electric cable laying. The cable simulation method comprises the following steps: acquiring cable inventory information, equipment positions and cable channel topology information in a project; according to the equipment position and the topological information of the cable channel, topological graph information is obtained, and the topological graph information corresponds to the cable inventory information; establishing a virtual network corresponding to the cable channel according to the topological graph information; according to priority types, each cable in the virtual network is traversed, path finding is started, a target laying path is obtained, and the priority types comprise power and power transformation professional cable area priorities or communication and signal professional cable type priorities; adjusting the target laying path according to preset power, power transformation, communication and signal rules to obtain a target path; and according to the target path, obtaining a cable simulation line of railway four-electric cable laying. The method has the advantages of high cable simulation generation speed, simple operation and high accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of railway four-electric cable laying, and in particular, relates to a cable simulation method and system based on railway four-electric cable laying. Background Art

[0002] In the context of the rapid development of intelligent construction, informatization, and BIM technology, how to use new technologies to improve the quality and efficiency of railway engineering construction is the focus of development. In the construction of the four power projects of railways (electricity, substation, communication and signal engineering), the cable laying plan is quickly formed and the cable model is quickly generated, so as to better guide the on-site construction, ensure the construction is done well at one time, improve the construction efficiency, and reduce the construction cost of cable laying. This problem needs to be solved urgently.

[0003] Although the existing technology has also introduced BIM technology to model the cable scheme and then conduct construction through three-dimensional visualization, it still has the following shortcomings: 1. Cable model generation takes a long time and has low efficiency. It usually takes half a month to generate a general cable solution. After the solution is verified and modified, it takes nearly a month for the final solution to be stable.

[0004] 2. During the construction of the four-power railway, the time from the production of the secondary cable drawings to the on-site construction is limited. The speed of establishing the cable BIM model solution often cannot keep up with the construction progress, resulting in the inability to be implemented on-site.

[0005] 3. Drawing the cable model manually or with the help of some simple tools requires a high level of technical skills from the modeler. The cable model must be refined to guide the construction accuracy, and the modeler must have rich on-site experience and technical skills. However, when BIM work is often carried out on the project, BIM engineers lack experience in the construction site, resulting in the cable model that is hard to draw not being applicable to the construction site.

[0006] 4. The technical skills of technicians at the construction site vary greatly. For projects with strong technical skills, the final effect of cable construction, including rework, can be controlled within a certain range. However, for projects with weak construction technical strength, it is very difficult to achieve a good first-time cable installation and avoid rework. Summary of the invention

[0007] Based on this, it is necessary to provide a method and system for cable simulation based on the laying of four-electric railway cables to address the above technical problems.

[0008] In a first aspect, the present application provides a cable simulation method based on the laying of railway four-electric cables, the method comprising: Obtain cable inventory information, equipment location, and cable channel topology information in the project; Obtaining topology map information according to the device location and the topology information of the cable channel, wherein the topology map information corresponds to the cable inventory information; According to the topology information, a virtual network corresponding to the cable channel is established; According to the priority type, traverse each cable in the virtual network and start path finding to obtain a target laying path, wherein the priority type includes the area priority of power and substation professional cables, or the type priority of communication and signal professional cables; According to preset power, substation, communication and signal rules, the target laying path is adjusted to obtain the target path; According to the target path, a cable simulation line for laying the four-electric railway cables is obtained.

[0009] In some practicable manners, the step of obtaining cable inventory information, equipment location, and cable channel topology information in the project includes: Obtaining the cable inventory information in the project, wherein the cable inventory information at least includes a laying starting point, a laying end point, a cable model, and a cable type information; Matching the cable inventory information with a preset cable database to determine the physical properties of the cable, wherein the cable database marks the cable holder in the railway four-electric cable laying process as a support and hanger, and controls the cable laying arrangement effect through built-in laying rules; The device location and the cable channel topology information are obtained, wherein the cable channel represents a model line generated by drawing the support and hanger and is generated in combination with the parameters of the support and hanger.

[0010] In some practicable manners, the step of obtaining topology information according to the device location and the topology information of the cable channel includes: Mapping the device position onto a virtual work surface, and assigning a coordinate point or a position identifier to each device position to obtain the device position information; A topological path is obtained according to the starting point, the end point, the turning point or the branch point in the middle of the cable channel, and the parameters of the support and hanger; The topology map information is obtained according to the topology path and the device location information.

[0011] In some practicable manners, the step of establishing a virtual network corresponding to the cable channel according to the topology information includes: Identify the starting point, the end point, and the turning point or branch point in the middle of the cable channel included in the topology map information to obtain a number of nodes corresponding to each cable channel; Mapping a number of nodes corresponding to each cable channel to a virtual environment to obtain a number of virtual nodes; According to the laying path of the cable channel and the connection logic corresponding to the cable inventory information, in the virtual environment, a connection relationship between the virtual nodes is formed, and a virtual network corresponding to the cable channel is established.

[0012] In some practicable methods, the step of traversing each cable in the virtual network according to the priority type and starting path finding to obtain the target laying path includes: determining the priority type; According to the priority type, traverse each cable in the virtual network and start path finding to obtain an initial laying path; Determine whether a priority path and / or a prohibited path rule intervenes, wherein the priority path and / or the prohibited path rule represents a rule with the highest priority; If the priority path and / or prohibited path rule exists, the initial laying path is adjusted by calculating the optimal path algorithm to obtain the target laying path; If the priority path and / or prohibited path rule does not exist, the initial laying path is adjusted by a shortest path algorithm to obtain a target laying path.

[0013] In some practicable manners, the step of adjusting the target laying path according to preset power, substation, communication and signal rules to obtain the target path includes: According to the professional rules of the power and the substation, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the power and the substation indicate that the cable path is laid evenly, and the uppermost layer of the cable support is the power cable, and the lower layer is the control cable; According to the professional rules of the communication, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the communication indicate that a cable fixer is introduced, and when laying the cables using the cable fixer, the cables must be neatly arranged in the horizontal and vertical directions. When the target laying path has an intersection, the cables are staggered at the intersection by one layer to ensure that the cables are neatly arranged in the horizontal and vertical directions. According to the professional rules of the signal, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the signal indicate that a cable fixer is introduced, and when the cable fixer is used for laying, the cables must be arranged neatly in the horizontal and vertical directions. When the target laying path has an intersection, the cables are staggered at the intersection by one layer to ensure that the cables are arranged neatly in the horizontal and vertical directions.

[0014] In some practicable methods, the step of obtaining a cable simulation line for laying four-electric railway cables according to the target path includes: According to the target path, a wiring table is obtained; According to the wiring table, wiring is performed line by line to obtain a virtual wiring model line; Generate a circular air duct and a soft air duct corresponding to the outer diameter of the cable according to the virtual wiring model line; According to the virtual wiring model line, the generated cable turning radius is checked to obtain a check result, and the check result is sent to the final cable inventory information, wherein the final cable inventory information indicates that on the basis of the cable inventory information, at least the cable length and path information of the target path are loaded; According to the virtual wiring model line, the total length information of the cables is obtained, and the total length information of the cables is pushed to the final cable inventory information; According to the virtual wiring model line, the circular air duct and the soft air duct of the corresponding cable outer diameter and the verification result, the cable simulation line of the four-electric cable laying of the railway is obtained.

[0015] In a second aspect, the present application provides a system for cable simulation based on the laying of four-electric railway cables, which is applied to the aforementioned method for cable simulation based on the laying of four-electric railway cables, and the system includes: The acquisition unit is used to obtain the cable inventory information, equipment location and cable channel topology information in the project; A topology unit, configured to obtain topology information according to the device location and the topology information of the cable channel, wherein the topology information corresponds to the cable inventory information; An establishing unit, configured to establish a virtual network corresponding to the cable channel according to the topology information; A path unit, used for traversing each cable in the virtual network according to a priority type, and starting path finding to obtain a target laying path, wherein the priority type includes a power and substation cable area priority, or a communication and signal cable type priority; The path unit is further used to adjust the target laying path according to preset power, substation, communication and signal rules to obtain the target path; The output unit is used to obtain a cable simulation line for laying the four-electric cable of the railway according to the target path.

[0016] In a third aspect, the present application provides a computer device including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the aforementioned cable simulation method based on the laying of four railway electric cables when executing the computer program.

[0017] In a fourth aspect, the present application provides a computer program, which, when executed by a processor, implements the steps of the aforementioned cable simulation method based on the laying of four-electric railway cables.

[0018] Beneficial Effects The present application provides a method for cable simulation based on the laying of four types of railway power cables, obtaining the cable inventory information, equipment location and cable channel topology information in the project; obtaining topology map information according to the equipment location and the topology information of the cable channel, wherein the topology map information corresponds to the cable inventory information; establishing a virtual network corresponding to the cable channel according to the topology map information; traversing each cable in the virtual network according to the priority type, and starting to find a path to obtain a target laying path, wherein the priority type includes the area priority of power and substation professional cables, or the priority of communication and signal professional cable types; adjusting the target laying path according to the preset power, substation, communication and signal rules to obtain the target path; obtaining the cable simulation line of the laying of four types of railway power cables according to the target path. Through the above method, the cable algorithm is formed by utilizing the power, substation, communication and signal professional cable laying rules of the four types of railway power engineering, and the cable simulation of a single project can be completed at one time through simple rule settings according to the actual situation of the project, which has the advantages of fast cable simulation generation speed, simple operation, high accuracy and strong adaptability. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the conventional technology, the drawings required for use in the embodiments or the conventional technology descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0020] Figure 1 It is a flow chart of a method for cable simulation based on the laying of railway four-electric cables in one embodiment; Figure 2 A flow chart of a path finding method when only a priority path exists in a method of cable simulation based on laying of four-electric railway cables in one embodiment; Figure 3A flow chart of a path finding method when only prohibited paths exist in a cable simulation method based on laying of four-electric railway cables in one embodiment; Figure 4 A flow chart of a path finding method when there are both a priority path and a prohibited path in a cable simulation method based on the laying of four-electric railway cables in one embodiment; Figure 5 A flow chart of a path finding method when there are no priority paths and prohibited paths in a method of cable simulation based on laying of four-electric railway cables in one embodiment; Figure 6 The present invention is a logic block diagram of a cable simulation method based on the laying of four-electric railway cables in one embodiment. DETAILED DESCRIPTION

[0021] In order to facilitate understanding of the present application, the present application will be described more fully below with reference to the relevant drawings. Embodiments of the present application are provided in the drawings. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive.

[0022] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application. The term "and / or" used herein includes any and all couplings of one or more related listed items.

[0023] It can be understood that the terms "first", "second", etc. used in the present application can be used in this article to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from another element.

[0024] Some terms involved in this application are explained below to facilitate understanding of this application: Cable inventory information refers to a detailed record that contains relevant information about all cables in a project.

[0025] Revit software is an industry-leading building information modeling (BIM) software developed by Autodesk, mainly used in architectural design, MEP (mechanical, electrical, plumbing) engineering and structural engineering. Revit software provides an integrated multi-dimensional model environment that supports project teams to collaborate in the planning, design, construction and operation of buildings and engineering.

[0026] Dijkstra, Dijkstra algorithm uses breadth-first search to solve the single-source shortest path problem of weighted directed or undirected graphs, and the algorithm finally obtains a shortest path tree. This algorithm is often used in routing algorithms as a submodule of other graph algorithms.

[0027] Floyd, Floyd's algorithm, also known as the insertion point method, is an algorithm that uses the idea of ​​dynamic programming to find the shortest path between multiple source points in a given weighted graph.

[0028] ACO, the ant colony algorithm, is a probabilistic algorithm used to find optimized paths, inspired by the behavior of ants in finding paths in the process of searching for food. This algorithm has the characteristics of distributed computing, positive feedback of information, and heuristic search. It is essentially a heuristic global optimization algorithm in evolutionary algorithms.

[0029] like Figure 1 As shown, the first aspect of the present application provides a cable simulation method based on the laying of four-wire railway cables, the method comprising S100, obtaining cable inventory information, equipment location, and cable channel topology information in the project.

[0030] Specifically, step S100 includes the following steps: Obtain the cable inventory information in the project.

[0031] The cable inventory information at least includes the laying starting point, laying end point, cable model and cable type information.

[0032] The cable inventory information is matched with a preset cable database to determine the physical properties of the cables.

[0033] Among them, the cable database marks the cable fixer in the railway four-electric cable laying process as a support and hanger, and controls the cable laying arrangement effect through built-in laying rules.

[0034] The device location and the cable channel topology information are obtained.

[0035] The cable channel represents a model line generated by drawing the support and hanger and is generated in combination with the parameters of the support and hanger.

[0036] It should be noted that a project refers to a specific engineering construction or construction project. In this project, before laying cables, cable simulation is required to help the project team achieve a more efficient, safe and economical construction process. For a project, cable inventory information is the basic data for laying cables. In this way, the cable inventory information can include information such as laying starting point, laying end point, cable model and cable type as needed, which is crucial for laying cables.

[0037] Match the cable inventory information corresponding to the project with the preset cable database to determine the physical properties such as the outer diameter of each cable, and provide data support for subsequent cable laying. In addition, the cable database can contain the railway four-electric power cables, control cables, signal cables, communication cables, optical cables and other cable information, as well as the types of supports and hangers, and general profile data information as needed. In addition, the wire fixer in the railway four-electric wire laying process is optimized as a support and hanger, and the cable laying arrangement effect is controlled by the built-in laying rules. In this way, the cable database can be matched and screened with the cable model and cable specification data of the imported railway four-electric construction cable list in the early stage of cable laying, so that after the cable database is matched with the cable inventory information in the program, the matching information in the cable database is automatically called to fill in the cable outer diameter, interface, current, voltage, resistance and other information.

[0038] It should also be noted that the process of importing the cable list into the cable database can be to import the cable list form, automatically match the data in the cable database, and fill in the relevant cable information. The format of the imported cable list can be adjusted as needed, as long as it can be recognized by the cable database. This application does not limit the format of the cable list. In the interface for importing the cable list, the corresponding relationship between the software data and the Excel table can be freely selected. For example, the software is Revit software, so that the relevant cable list information can be freely read.

[0039] In the cable database, when the cable holder in the laying process of the railway four-electric cable is marked as a type of support and hanger, the design process can be simplified and the representation and function of the support and hanger can be more consistent in the design. The support and hanger can be quickly applied to different scenarios as a standardized component, reducing the reduction in laying efficiency caused by the wide variety of cable holders. The use of the support and hanger can more effectively control the arrangement of cables according to the built-in laying rules, reduce cable crossing and confusion, improve the overall aesthetics and manageability, and facilitate future maintenance and upgrade work. In addition, after marking as a type of support and hanger, the cable laying arrangement effect is controlled by the built-in laying rules, which refers to a series of laying standards and specifications preset by the software, and these laying rules may include the laying path, spacing, bending radius, fixing method, etc. of the cable, such as the built-in laying rules in the Revit software. The built-in laying rules are used to control the cable laying arrangement effect, including the direction, distribution density, neatness, etc. of the cable. Through the control of the built-in rules, human operation errors can be reduced and the accuracy and consistency of laying can be improved.

[0040] The equipment location can be the location of equipment such as power equipment, signal equipment and control equipment. The equipment location can indicate the starting point or end point of the cable connection. Cable channel topology information refers to the path that the cable passes through during the laying process, including straight segments, turning points and branch points. These channels constitute the physical or logical path for cable laying. For example, in Revit software, a model of supports and hangers is drawn according to project requirements and equipment locations. Here, supports and hangers can be devices used to support and fix cables, and the layout of supports and hangers will affect the laying path of cables. When the supports and hangers are drawn, Revit software will generate model lines according to the positions of the supports and hangers. These model lines represent the specific direction of the cables in space. For the topological information of the cable channel, a structured representation of the cable channel is realized, including the connection relationship, laying order, path nodes, etc. of the cables.

[0041] Finally, it should be noted that in the process of drawing the topology map, for the drawing of cable supports and hangers and bridges, all cable supports and hangers used in the railway four-electric project are preset, including ground-mounted brackets, wall-mounted brackets, ceiling hangers, cable holders in bridges, cable holders in wiring racks and other types of supports and hangers. The relevant size parameters and material parameters of the supports and hangers can be freely combined according to the information of the cable database, so as to meet the drawing requirements of all supports and hangers in the railway four-electric project. In the process of drawing cable supports and hangers, the horizontal batch drawing of supports and hangers can be completed by setting the working plane, elevation parameters, and support and hanger spacing types in the Revit software, or a single drawing can be selected to supplement complex parts. In the communication signal profession, there is a need for vertical drawing, and the vertical plane support and hanger drawing position can be controlled by using the Revit software to draw the wall command.

[0042] S200: Obtain topology map information according to the device location and the topology information of the cable channel.

[0043] The topology map information corresponds to the cable inventory information, with the aim of ensuring the accuracy, efficiency and consistency of cable laying and reducing errors and rework during construction. The cable inventory information includes detailed parameters such as cable model, specification, length, etc., while the topology map shows the cable laying path. The correspondence between the two can ensure that the cable laying path matches the design requirements. Based on the corresponding topology map and cable inventory information, the construction team can have a clearer understanding of the laying path and connection points of each cable, thereby improving construction efficiency and quality.

[0044] Specifically, the steps of obtaining topology information include: The device positions are mapped onto a virtual work surface, and coordinate points or position identifiers are assigned to each of the device positions to obtain the device position information.

[0045] A topological path is obtained according to the starting point, the end point, the turning point or the branch point in the middle of the cable channel, and the parameters of the support bracket.

[0046] The topology map information is obtained according to the topology path and the device location information.

[0047] It should be noted that the virtual work surface can be an operation display page of the software, which is used to simulate the real construction environment. The equipment is assigned a coordinate point or position mark on the virtual work surface. In this way, each device has a certain position in the virtual space, usually represented by X, Y, and Z coordinates. According to the starting point, end point, and possible turning points or branching points in the middle of the cable channel, the Revit software can be used to calculate and generate the logical path for cable laying, that is, the topological path. In addition, the parameters of the support bracket, such as size, installation position, and load-bearing capacity, need to be considered to ensure that the cable can be correctly laid in the space according to these parameters. The resulting topological map can show the complete path of the cable from the starting point to the end point, including all necessary turning points and branches. It not only helps construction personnel to visualize the overall picture of cable laying in advance, but also serves as an important basis for the construction process.

[0048] It should also be noted that the topological path is mainly based on the model lines generated when the cable supports and hangers are drawn, and the relevant cable channels (topological diagrams) are generated in combination with the preset rules, dimensions, and attribute parameters of the relevant supports and hangers. After the supports and hangers are drawn, the Revit software can be used to automatically generate a topological diagram, and complex connections can be achieved at the three-way, four-way, and turning positions (not horizontal and vertical connections, but the generation of all cable channel directions). For the topological paths automatically generated by the Revit software, they can be manually modified and edited to meet the cable laying path control requirements. The automatic generation of the topological diagram will automatically retrieve the equipment (cabinets, cable starting points) in the project file to form an intelligent laying path system for equipment and topological paths, cable channels, and support and hanger cable laying.

[0049] S300: Establish a virtual network corresponding to the cable channel according to the topology information.

[0050] Specifically, establishing the virtual network corresponding to the cable channel includes the following steps: Identify the starting point, the end point, and the turning point or branch point in the middle of the cable channel included in the topology map information to obtain a number of nodes corresponding to each cable channel; Mapping a number of nodes corresponding to each cable channel to a virtual environment to obtain a number of virtual nodes; According to the laying path of the cable channel and the connection logic corresponding to the cable inventory information, in the virtual environment, a connection relationship between the virtual nodes is formed, and a virtual network corresponding to the cable channel is established.

[0051] It should be noted that the starting point, end point, and intermediate turning point or branch point of each cable channel are identified by using the topological map information, and these points are defined as the key nodes of the cable channel. Next, each identified key node is mapped to the virtual environment and converted into a virtual node. These virtual nodes represent the actual connection points or path points on the cable channel. Among them, in the virtual environment, each virtual node has specific attributes, such as location, connection capability, and possible path direction, which provide a basis for establishing a virtual network. Next, according to the actual laying path of the cable channel and the connection logic in the cable inventory information, the connection order and mode between the virtual nodes are determined. Then, in the virtual environment, according to the determined laying path and connection logic, the connection relationship between the virtual nodes is formed. These connection relationships constitute the virtual network corresponding to the cable channel. The established virtual network is a digital simulation of the actual cable laying network, which is used to predict, analyze and optimize the cable laying plan. The above method can convert complex cable laying projects into digital virtual models, and realize efficient and accurate project management and construction guidance.

[0052] S400, traverse each cable in the virtual network according to the priority type, and start path finding to obtain a target laying path.

[0053] Among them, the priority types include regional priorities for power and substation specialized cables, or priorities for communication and signal specialized cable types.

[0054] like Figure 3 Specifically, obtaining the target laying path includes the following steps: determining the priority type; According to the priority type, traverse each cable in the virtual network and start path finding to obtain an initial laying path; Determine whether a priority path and / or a prohibited path rule intervenes, wherein the priority path and / or the prohibited path rule represents a rule with the highest priority; If the priority path and / or prohibited path rule exists, the initial laying path is adjusted by calculating the optimal path algorithm to obtain the target laying path; If the priority path and / or prohibited path rule does not exist, the initial laying path is adjusted by a shortest path algorithm to obtain a target laying path.

[0055] It should be noted that for projects that cannot be met by built-in rules, or if you want to adjust the cable laying path according to project requirements. Priority paths and prohibited paths can be used to intervene in the intelligent cable laying algorithm, and the priority of this function is at the highest level. In this way, it is executed first under the intervention of the highest-level path rules. In addition, before obtaining the initial laying path, the priority type needs to be determined first. Specifically, the priority type includes the area priority of power and substation cables, or the priority of communication and signal cables. In these two priorities, it is necessary to first determine whether the priority type is divided by type or by function. Because the cable type of power substation is relatively fixed, the cable type of power substation will be fixed in the software program. For example, the power substation has built-in incoming line side, high-voltage room, control room, feeder measurement and other areas. It is necessary to manually classify the project equipment to control the regional priority of cable laying. The laying priority of power substation is control room> high-voltage room> incoming line side> feeder side> short-circuit cable in the same area. In this way, the priority and rules of cable laying can be better adapted. However, there are many categories of cables for communication signals, and the types corresponding to different projects are also diverse, so the concept of cable function is introduced here to control the priority and rules of laying cables for communication signals through custom cable functions. Therefore, since the communication signal profession cannot clearly define the relevant priority areas, a custom module is reserved, in which the equipment can be freely divided into areas and the priority can be specified from top to bottom.

[0056] Next, after determining the priority type, the cable channels will be sorted according to the regional priority based on the equipment area priority information corresponding to the priority type. The cables will then be sorted, and the order of cable laying will be controlled by setting the selected cable laying priority. In this way, based on the cable inventory, first select the cable laying adaptation rules and priorities, and then select the cables you want to lay, and the cable laying can be completed. After testing, about 300 cables in the entire substation can be generated within 3 minutes, and the generation effect is beautiful and practical.

[0057] It should also be noted that the initial laying path is obtained after traversing each cable in the network as needed.

[0058] When priority paths and / or prohibited paths rules intervene, the initial laying path needs to be adjusted. The intervention of priority paths and / or prohibited paths rules increases the difficulty of laying, and priority paths and / or prohibited paths rules have the highest priority, which means that these rules must be considered and applied first in the calculation of laying paths. Using the optimal path algorithm can ensure that these rules are met.

[0059] For example, the target laying path is obtained by using the optimal path algorithm of Floyd+ACO.

[0060] like Figure 2 As shown, specifically, when there is only a priority path, the path finding method is: Create a list to store the selected row paths and get the selected row set of the cable routing table.

[0061] Obtain all cable maps, wherein the cable maps are generated using topology maps.

[0062] Traverse the selected rows: If the selected row has a cable diagram that includes all sections of the priority path, then the starting point and the end point are found in the cable diagram to obtain the starting point and the end point of the cable diagram; Using the Floyd algorithm, the shortest path between vertices in the cable graph is calculated to obtain the Floyd table, which contains the shortest path lengths between all vertex pairs, that is, the distance matrix formed by the vertex pairs; using the Floyd table, the shortest path length between any two vertices in the cable graph is found; Initialize a certain number of ants and randomly distribute them on the vertices of the cable graph; Each ant starts from the current vertex and selects the next vertex based on the pheromone concentration and the heuristic factor until it completes the pathfinding of a path; the pheromone concentration represents the attractiveness of the path, and the heuristic factor represents the shortest path length calculated in the Floyd table; When an ant completes a path, it updates the pheromone concentration along the path based on the quality of the path. The quality refers to the length, priority level, etc. Shorter or better paths will receive higher pheromone rewards. Repeating the above process, after multiple iterations, the ants gradually tend to choose paths with higher pheromone concentrations, that is, better paths; in the process of path selection and pheromone update, the constraints of the priority path are considered. This shows that if there is a priority path rule, ants will prefer these paths when choosing paths; Through the iteration of the ant colony algorithm, an optimal path is finally found. The optimal path not only considers the shortest distance, but also other factors such as laying cost and safety.

[0063] If the selected row does not contain a cable diagram that includes all sections of the priority path, the nodes between the priority paths in the pop-up window are not connected to each other.

[0064] When there are still selected rows that have not been pathed, return to the step of traversing the selected rows and execute them.

[0065] When all selected rows are traversed, the selected rows and the corresponding paths are passed to the cable sorting, and the cable sorting process is executed to obtain the target laying path.

[0066] like Figure 3As shown, when there are only prohibited paths, the path finding method is: Get a cable map generated from a topology map, where a cable map is an undirected graph consisting of topology maps of the same cable type, used to show the detailed layout and path of cable laying.

[0067] Create a list to store the selected row paths and get the selected row set of the cable routing table.

[0068] and get the path of the selected row (such as Figure 2 As shown, jump to step 5, traverse all the correspondences between the starting point and the end point and the optimal cable channel path) The steps are basically the same. The only difference is that the path finding algorithm uses the Dijkstra algorithm. When using the Dijkstra algorithm to retrieve the shortest path, the prohibited path will be excluded to obtain the target laying path.

[0069] like Figure 4 As shown in the figure, when there are both priority paths and prohibited paths, the path finding method is: Get a cable map generated from a topology map, where a cable map is an undirected graph consisting of topology maps of the same cable type, used to show the detailed layout and path of cable laying.

[0070] Create a list to store the selected row paths and get the selected row set of the cable routing table.

[0071] Traverse the selected rows: If the selected row has a cable diagram that includes all sections of the priority path, then the starting point and the end point are found in the cable diagram to obtain the starting point and the end point of the cable diagram; Sets the distance between all forbidden path nodes to double.MaxValue, where double.MaxValue represents a very large value, close to the maximum value that the double type can represent. In the path search algorithm, this can be expressed as the distance between two nodes being "infinite", that is, there is no direct connection between them.

[0072] Using the Floyd algorithm, the shortest path between vertices in the cable graph is calculated to obtain the Floyd table, which contains the shortest path lengths between all vertex pairs, that is, the distance matrix formed by the vertex pairs; using the Floyd table, the shortest path length between any two vertices in the cable graph is found; Initialize a certain number of ants and randomly distribute them on the vertices of the cable graph; Each ant starts from the current vertex and selects the next vertex based on the pheromone concentration and the heuristic factor until it completes the pathfinding of a path; the pheromone concentration represents the attractiveness of the path, and the heuristic factor represents the shortest path length calculated in the Floyd table; When an ant completes a path, it updates the pheromone concentration along the path based on the quality of the path. The quality refers to the length, priority level, etc. Shorter or better paths will receive higher pheromone rewards. Repeating the above process, after multiple iterations, the ants gradually tend to choose paths with higher pheromone concentrations, that is, better paths; in the process of path selection and pheromone update, the constraints of the priority path are considered. This shows that if there is a priority path rule, ants will prefer these paths when choosing paths; Through the iteration of the ant colony algorithm, an optimal path is finally found; If the length of the optimal path is double.MaxValue, a conflict occurs between the pop-up priority path and the prohibited path; If the length of the optimal path is not double.MaxValue, there is no conflict between the preferred path and the forbidden path; When there are still selected rows that have not been pathed, return to the step of traversing the selected rows and execute them.

[0073] When all selected rows have completed path finding, the selected rows and the corresponding paths are passed to the cable sorting, and the cable sorting process is executed to obtain the target laying path. After obtaining the target laying path, the cable channels are grouped according to the upper, lower, left and right sides.

[0074] like Figure 5 As shown in the figure, when there is no priority path or prohibited path, the path finding method is: The process is the same as that of obtaining the path of the selected row (without adding the priority path and prohibited path), and will not be repeated here.

[0075] S500, adjusting the target laying path according to preset power, substation, communication and signal rules to obtain a target path.

[0076] Specifically, obtaining the target path includes the following steps: According to the professional rules of the power and the substation, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the power and the substation indicate that the cable path is laid evenly, and the uppermost layer of the cable support is the power cable, and the lower layer is the control cable; According to the professional rules of the communication, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the communication indicate that a cable fixer is introduced, and when laying the cables using the cable fixer, the cables must be neatly arranged in the horizontal and vertical directions. When the target laying path has an intersection, the cables are staggered at the intersection by one layer to ensure that the cables are neatly arranged in the horizontal and vertical directions. According to the professional rules of the signal, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the signal indicate that a cable fixer is introduced, and when the cable fixer is used for laying, the cables must be arranged neatly in the horizontal and vertical directions. When the target laying path has an intersection, the cables are staggered at the intersection by one layer to ensure that the cables are arranged neatly in the horizontal and vertical directions.

[0077] It should be noted that the laying priority and rule setting refer to the formation of cable laying algorithms with the help of computer language by summarizing the laying rules of the four railway power, substation, communication and signal. The mandatory provisions are set as unchangeable in the computer language, and the free control rules for cable laying of different projects are open for selection, so as to meet the laying requirements of all four railway power projects. The wiring rule setting can choose the laying principle from top to bottom or from bottom to top for wiring in cable trenches and bridges. The cable classification for communication and signaling is not limited to power cables, signal cables, and control cables. You can choose to use the cable function to control the effect of cable laying rules. In other words, the laying rules set in the Revit software can be used to determine which rules to use for power substation, communication, and signaling. When the priority is determined, the laying rules of the cables should be selected. The preset laying rules of each profession are algorithms formed by the requirements of process methods, mandatory requirements of specifications and standards, expert experience, and on-site laying experience. This application does not improve the algorithms formed by the requirements of process methods, mandatory requirements of specifications and standards, expert experience, and on-site laying experience.

[0078] Furthermore, the laying rules of power and substation are interfered with, and the cable paths are further distributed and sorted: the laying paths are sorted according to the laying rules of power substation to form a new cable arrangement table. Next, the cable path sorting results are analyzed to see whether the uniform laying logic is adopted: in power substation, the top layer of the cable bracket is usually the power cable, and the 2-3 layers below are the control cables. In order to achieve uniform arrangement of the cables on the cross arm of the control cable bracket, the uniform laying rules are set for control.

[0079] The communication professional laying rules interfere with the redistribution and sorting of cable paths: the laying paths are sorted according to the communication signal professional laying rules to form a new cable arrangement table. Next, the communication professional mandatory rules intervene (relative isolation and absolute isolation, cable crossing and staggered): the communication professional laying rules are different from those of the power substation professional. In terms of the setting of communication signal rules, the concept control related rules of cable tie-downs are introduced. When laying the tie-downs, cables are not allowed to cross, stagger, or undulate. Cables are required to be laid horizontally and vertically.

[0080] The signal professional laying rules interfere with the redistribution and sorting of cable paths: the laying paths are sorted according to the communication signal professional laying rules to form a new cable arrangement table. Next, the mandatory rules of the signal profession are included (relative isolation and absolute isolation, cables are staggered one layer): the communication professional laying rules are different from those of the power substation profession. In the setting of communication signal rules, the concept control related rules of cable wire binders are introduced. When laying wire binders, cables are not allowed to cross, stagger, or undulate. Cables are required to be laid horizontally and vertically.

[0081] S600: Obtain a cable simulation line for laying four-wire railway cables according to the target path.

[0082] Specifically, obtaining a cable simulation line for laying four-electric railway cables includes the following steps: According to the target path, a wiring table is obtained; According to the wiring table, wiring is performed line by line to obtain a virtual wiring model line; Generate a circular air duct and a soft air duct corresponding to the outer diameter of the cable according to the virtual wiring model line; According to the virtual wiring model line, the generated cable turning radius is checked to obtain a check result, and the check result is sent to the final cable inventory information, wherein the final cable inventory information indicates that on the basis of the cable inventory information, at least the cable length and path information of the target path are loaded; According to the virtual wiring model line, the total length information of the cables is obtained, and the total length information of the cables is pushed to the final cable inventory information; According to the virtual wiring model line, the circular air duct and the soft air duct of the corresponding cable outer diameter and the verification result, the cable simulation line of the four-electric cable laying of the railway is obtained.

[0083] It should be noted that the cable paths are screened and sorted according to all the above rule information to generate the final wiring table: after the relevant professional laying rules are run, a new cable arrangement table and wiring table are generated. According to the wiring table, wiring is started one by one until the last cable is completed, and a virtual wiring model line is generated. The purpose is to simulate the cable laying path in the form of model lines by Revit software before generating cables, and then optimize the intersection and unreasonable parts. According to the virtual cable model line, circular ducts and soft ducts corresponding to the outer diameter of the cable are generated. Among them, through practical tests, the generation efficiency of circular ducts and soft ducts to express cables is higher than that of wire tubes. It takes about 40 minutes to generate the wire tube model for the same project, but only 2 minutes to use ducts. The turning radius of the generated cable is checked, and the verification results are pushed to the final cable inventory. That is to say, in this link, the software will check according to the actual laying situation and the cable laying radius set in the inventory table, and those that do not meet the cable laying radius requirements will be marked. Finally, all line generation and laying are completed. That is, according to the virtual wiring model line, the circular air duct and the soft air duct of the corresponding cable outer diameter and the verification result, the cable simulation line for laying the four-electric cable of the railway is obtained.

[0084] After obtaining the cable simulation line of the four-electric cable laying of the railway, you can choose to output the results as needed. The results output includes two sub-functions: exporting the cable list and the cable section. On the one hand, the cable list export function can export the construction cable list containing path information and cable length information. This cable list can be used to guide construction. On the other hand, the cable section can use the profile function of the Revit software to quickly generate the cable section and automatically generate the cable section diagram.

[0085] like Figure 6 As shown above, in summary, the present application provides a cable simulation method based on the laying of four-electric railway cables, which includes the following steps: 1. Obtain the cable inventory information imported into the project; 2. Obtain the equipment location and cable channel topology information in the project; 3. Establish a virtual network corresponding to the cable channel; 4. Prioritize the prohibition of path rule intervention; 5. Traverse all the correspondence between the starting point and the end point and the optimal cable channel path; 6. Traverse all the correspondence between the starting point and the end point and the optimal cable channel path; 7. Determine the priority by specific area (power substation) or custom area (communication, signal) according to the software operation; 8. Obtain the regional priority information of the software-set device and sort the cable channels according to the regional priority; 9. Determine which rules to adopt for power substation, communication and signaling according to the laying rules set by the software; For power substation majors: 10. Interfere with the professional laying rules of power substations and redistribute and sort the cable paths; 11. Whether the uniform laying logic is adopted for the analysis of cable path sorting results; For Communications majors: 12. Interfere with the communication professional laying rules and redistribute and sort the cable paths; 13. Mandatory rules for communications professionals are introduced (relative isolation and absolute isolation, cables crossing and shifting upward by one layer); For signal majors: 14. Interfere with the signal professional laying rules and redistribute and sort the cable paths; 15. Signal mandatory rules intervene (relative isolation and absolute isolation, cable crossing offset upward by one layer); 16. Screen and sort the cable paths according to all the above rule information to form the final wiring table; 17. Start wiring one by one according to the wiring table until the last cable is wired and a virtual wiring model line is generated; 18. Generate circular ducts and soft ducts corresponding to the outer diameter of the cable according to the virtual cable model line; 19. Check the turning radius of the generated cables and push the check results to the final cable inventory; 20. Complete the generation and laying of all cables; In a second aspect, the present application provides a system for cable simulation based on the laying of four-electric railway cables, which is applied to the aforementioned method for cable simulation based on the laying of four-electric railway cables, and the system includes: The acquisition unit is used to obtain the cable inventory information, equipment location and cable channel topology information in the project; A topology unit, configured to obtain topology information according to the device location and the topology information of the cable channel, wherein the topology information corresponds to the cable inventory information; An establishing unit, configured to establish a virtual network corresponding to the cable channel according to the topology information; A path unit, used for traversing each cable in the virtual network according to a priority type, and starting path finding to obtain a target laying path, wherein the priority type includes a power and substation cable area priority, or a communication and signal cable type priority; The path unit is further used to adjust the target laying path according to preset power, substation, communication and signal rules to obtain the target path; The output unit is used to obtain a cable simulation line for laying the four-electric cable of the railway according to the target path.

[0086] In some embodiments, a cable simulation system based on the laying of four railway electric cables also has an account authority management module, which is connected to the server. The account authority management is deployed through the privatization of the server. Exemplarily, the account authority management module can control the system's use authorization. The system's use rights are divided into super administrators and ordinary employees. The super administrator can control and authorize the use rights and usage time of ordinary accounts, thereby ensuring the security of system use.

[0087] In a third aspect, the present application provides a computer device including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the aforementioned cable simulation method based on the laying of four railway electric cables when executing the computer program.

[0088] In a fourth aspect, the present application provides a computer program, which, when executed by a processor, implements the steps of the aforementioned cable simulation method based on the laying of four-electric railway cables.

[0089] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0090] The various embodiments in the present disclosure are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

[0091] The protection scope of the present disclosure is not limited to the above-mentioned embodiments. Obviously, those skilled in the art can make various changes and modifications to the present disclosure without departing from the scope and spirit of the present disclosure. If these changes and modifications fall within the scope of the claims of the present disclosure and their equivalents, the intention of the present disclosure also includes these changes and modifications.

Claims

1. A cable simulation method based on the laying of four-wire railway cables. It is characterized in that The method comprises: Obtain cable inventory information, equipment location, and cable channel topology information in the project; Obtaining topology map information according to the device location and the topology information of the cable channel, wherein the topology map information corresponds to the cable inventory information; According to the topology information, a virtual network corresponding to the cable channel is established; According to the priority type, traverse each cable in the virtual network and start path finding to obtain a target laying path, wherein the priority type includes the area priority of power and substation professional cables, or the type priority of communication and signal professional cables; According to preset power, substation, communication and signal rules, the target laying path is adjusted to obtain the target path; According to the target path, a cable simulation line for laying the four-electric railway cables is obtained.

2. The cable simulation method based on the laying of four-wire railway cables according to claim 1, It is characterized in that The step of obtaining cable inventory information, equipment location, and cable channel topology information in the project includes: Obtaining the cable inventory information in the project, wherein the cable inventory information at least includes a laying starting point, a laying end point, a cable model, and a cable type information; Matching the cable inventory information with a preset cable database to determine the physical properties of the cable, wherein the cable database marks the cable holder in the railway four-electric cable laying process as a support and hanger, and controls the cable laying arrangement effect through built-in laying rules; The device location and the cable channel topology information are obtained, wherein the cable channel represents a model line generated by drawing the support and hanger and is generated in combination with the parameters of the support and hanger.

3. The cable simulation method based on the laying of four-wire railway cables according to claim 2, It is characterized in that The step of obtaining topology information according to the device location and the topology information of the cable channel includes: Mapping the device position onto a virtual work surface, and assigning a coordinate point or a position identifier to each device position to obtain the device position information; A topological path is obtained according to the starting point, the end point, the turning point or the branch point in the middle of the cable channel, and the parameters of the support and hanger; The topology map information is obtained according to the topology path and the device location information.

4. The cable simulation method based on the laying of four-wire railway cables according to claim 1, It is characterized in that The step of establishing a virtual network corresponding to the cable channel according to the topology information includes: Identify the starting point, the end point, and the turning point or branch point in the middle of the cable channel included in the topology map information to obtain a number of nodes corresponding to each cable channel; Mapping a number of nodes corresponding to each cable channel to a virtual environment to obtain a number of virtual nodes; According to the laying path of the cable channel and the connection logic corresponding to the cable inventory information, in the virtual environment, a connection relationship between the virtual nodes is formed, and a virtual network corresponding to the cable channel is established.

5. The cable simulation method based on the laying of railway four-electric cable according to claim 1, It is characterized in that The step of traversing each cable in the virtual network according to the priority type and starting path finding to obtain the target laying path includes: determining the priority type; According to the priority type, traverse each cable in the virtual network and start path finding to obtain an initial laying path; Determine whether a priority path and / or a prohibited path rule intervenes, wherein the priority path and / or the prohibited path rule represents a rule with the highest priority; If the priority path and / or prohibited path rule exists, the initial laying path is adjusted by calculating the optimal path algorithm to obtain the target laying path; If the priority path and / or prohibited path rule does not exist, the initial laying path is adjusted by a shortest path algorithm to obtain a target laying path.

6. The cable simulation method based on the laying of railway four-electric cable according to claim 1, It is characterized in that The step of adjusting the target laying path according to the preset power, substation, communication and signal rules to obtain the target path includes: According to the professional rules of the power and the substation, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the power and the substation indicate that the cable path is laid evenly, and the uppermost layer of the cable support is the power cable, and the lower layer is the control cable; According to the professional rules of the communication, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the communication indicate that a cable fixer is introduced, and when laying the cables using the cable fixer, the cables must be neatly arranged in the horizontal and vertical directions. When the target laying path has an intersection, the cables are staggered at the intersection by one layer to ensure that the cables are neatly arranged in the horizontal and vertical directions. According to the professional rules of the signal, the target laying path is interfered and adjusted to obtain the target path, wherein the professional rules of the signal indicate that a cable fixer is introduced, and when the cable fixer is used for laying, the cables must be arranged neatly in the horizontal and vertical directions. When the target laying path has an intersection, the cables are staggered at the intersection by one layer to ensure that the cables are arranged neatly in the horizontal and vertical directions.

7. The cable simulation method based on the laying of railway four-electric cable according to claim 1, It is characterized in that The step of obtaining a cable simulation line for laying four-electric railway cables according to the target path includes: According to the target path, a wiring table is obtained; According to the wiring table, wiring is performed line by line to obtain a virtual wiring model line; Generate a circular air duct and a soft air duct corresponding to the outer diameter of the cable according to the virtual wiring model line; According to the virtual wiring model line, the generated cable turning radius is checked to obtain a check result, and the check result is sent to the final cable inventory information, wherein the final cable inventory information indicates that on the basis of the cable inventory information, at least the cable length and path information of the target path are loaded; According to the virtual wiring model line, the total length information of the cables is obtained, and the total length information of the cables is pushed to the final cable inventory information; According to the virtual wiring model line, the circular air duct and the soft air duct of the corresponding cable outer diameter and the verification result, the cable simulation line of the four-electric cable laying of the railway is obtained.

8. A cable simulation system based on the laying of four-electric railway cables, It is characterized in that A cable simulation method based on the laying of four-electric railway cables applied to any one of claims 1-7, the system comprising: The acquisition unit is used to obtain the cable inventory information, equipment location and cable channel topology information in the project; A topology unit, configured to obtain topology information according to the device location and the topology information of the cable channel, wherein the topology information corresponds to the cable inventory information; An establishing unit, configured to establish a virtual network corresponding to the cable channel according to the topology information; A path unit, used for traversing each cable in the virtual network according to a priority type, and starting path finding to obtain a target laying path, wherein the priority type includes a power and substation cable area priority, or a communication and signal cable type priority; The path unit is further used to adjust the target laying path according to preset power, substation, communication and signal rules to obtain the target path; The output unit is used to obtain a cable simulation line for laying the four-electric cable of the railway according to the target path.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the cable simulation method based on the laying of railway four-electric cables are implemented as described in any one of claims 1 to 7.

10. A computer program, It is characterized in that When the computer program is executed by a processor, the steps of the cable simulation method based on the laying of railway four-electric cables are implemented as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Web lightweight method for railway four-electric engineering BIM model

    CN111666433A

  • Railway signal indoor construction method

    CN111884130A

  • Subway power supply system cable laying method based on Revit platform

    CN115495861A

  • Automatic cable laying method of local dynamic domain search algorithm based on BIM (Building Information Modeling) technology

    CN116720294A

  • Railway signal indoor inter-cabinet wiring method and system based on BIM

    CN117407949A

Cited By

  • Cable line optimization method, device and equipment based on artificial intelligence reasoning model

    CN119598654A

  • Cable line optimization method, device and equipment based on artificial intelligence inference model

    CN119598654B

  • Intelligent design method and system for cable laying of rail transit substation and storage medium

    CN119849077A

  • Transformer station secondary cable intelligent wiring design and offline simulation verification system

    CN122113328A