Power generation and transmission maintenance determination method and system based on Stackelberg game

Through the Stackelberg game and feasible region parallel search algorithm, the double-layer mixed integer programming problem is solved, the collaborative optimization of power generation and transmission maintenance is realized, the decision-making of power generators and the security of the grid are reflected, and the economy of the power system is improved. and reliability.

CN118761485APending Publication Date: 2024-10-11GUIZHOU POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410625102.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing technology is difficult to efficiently solve the two-layer mixed integer programming problem, cannot achieve collaborative optimization of power generation and transmission maintenance, and fails to reflect the coupling characteristics between hydrothermal power unit maintenance and transmission line maintenance.

Method used

A method based on the Stackelberg game is adopted, with the power generator as the leader of the game, deciding the unit maintenance period to maximize profits, and the dispatching agency as the follower to arrange the transmission line maintenance, using the reconstruction decomposition algorithm of parallel search in the feasible region Solve the Stackelberg game model to determine the optimal maintenance period for units and transmission lines.

Benefits of technology

It realizes the reflection of the interests and proactive decision-making of power generators, improves the safe and reliable operation of the power grid, coordinates the optimization of transmission line maintenance and unit maintenance, and improves the solution efficiency and the stability of the results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761485A_ABST
    Figure CN118761485A_ABST
Patent Text Reader

Abstract

The invention discloses a Stackelberg game-based power generation and transmission maintenance determination method and system, and the method comprises the steps: enabling a power generator to serve as a game leader, enabling a dispatching mechanism to serve as a follower, and carrying out the arrangement of power transmission line maintenance and the arrangement of an annual power generation plan according to a unit maintenance time period declared by the power generator; the power generator adjusts and repeats the decision of unit maintenance according to the feedback of the scheduling mechanism until the decision process is ended at the equilibrium point of the game, and establishes a Stackelberg game model; and solving the Stackelberg game model by using a reconstruction decomposition algorithm based on feasible region parallel search, and determining an optimal unit and power transmission line maintenance time period. According to the Stackelberg game model for power transmission maintenance, the roles and positions of a power generator and a power dispatching mechanism are better embodied, collaborative optimization of hydro-thermal power generating unit maintenance and power transmission line maintenance is achieved, and the algorithm has good convergence performance and solving efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of generator set maintenance, and in particular to a method and system for determining power generation and transmission maintenance based on Stackelberg game. Background Art

[0002] As the generator sets are put into operation, there will be phenomena such as wear and deformation of parts, reduced equipment tightness and shortened material service life. These problems will affect the safety and economy of the generator set operation. Therefore, regular and planned preventive maintenance of the generator sets can timely check, discover and eliminate the defects of the equipment and eliminate potential accident causes. At present, the formulation of preventive unit maintenance plans is mainly carried out around hydro-thermal power units. The preventive maintenance of hydro-thermal power units is as short as 5-10 days and as long as 40-60 days or more. During the maintenance period, the units cannot generate electricity, so that the system load can only be borne by the unmaintained units. At the same time, the preventive maintenance of transmission lines is also an important maintenance task, which has an important coupling relationship with the unit maintenance. Specifically, all generator sets are connected to a node in the system, and the node is also connected to other nodes through transmission lines, and the transmission of system power is inseparable from the normal operation of generator sets and transmission lines. Therefore, how to coordinate the maintenance periods of many hydro-thermal power units and transmission lines in the system is particularly important for the safe and economical operation of the system.

[0003] In my country, the provincial power grid dispatching and control center usually formulates a preventive maintenance plan for all hydropower units and transmission lines in the provincial power grid, and the time scale for formulating the maintenance plan is "one year", that is, the dispatching center must formulate a preventive maintenance plan for power generation and transmission for the next year at the end of the previous year. As one of the important planning tasks of the power dispatching organization in the medium and long term time scale, power generation and transmission maintenance involves two main parties, the dispatching organization and the power generator. Different maintenance plans have a very significant impact on the interests of the power generator and the dispatching organization. At this time, how to construct a reasonable power generation and transmission maintenance optimization model and propose an efficient solution algorithm has become an important research topic.

[0004] In terms of modeling, there are three main models for the formulation of the existing power generation and transmission preventive maintenance plan. In the first model, the interests of the power generator are not taken into account, and the optimization objectives are to maximize the system operation reliability and minimize the system operation cost, which are of concern to the power dispatching agency. The constraints include unit maintenance constraints, unit operation constraints, transmission line maintenance constraints, and system operation constraints. In the second model, the optimization objective further considers the benefits and costs of the power generator, making the formulation of the power generation and transmission maintenance plan a multi-objective planning problem. In the third model, the dispatching agency first gives an initial power generation and transmission maintenance plan, and the power generator makes its own unit maintenance period adjustment declaration on this basis. After receiving it, the dispatching agency further adjusts the power generation and transmission maintenance plan until all power generators accept it.

[0005] In terms of solution methods, since 0-1 integer variables are used to indicate whether the generator set and the transmission line are in maintenance status, the power generation and transmission maintenance optimization problem is a mixed integer programming problem. Its solution methods mainly include: mathematical optimization method and heuristic method. Mathematical optimization methods mainly include using branch and bound method, Benders decomposition method or directly calling solvers such as GUROBI and CPLEX for solution. Heuristic methods mainly include particle swarm optimization algorithm, simulated annealing algorithm and genetic algorithm.

[0006] For the existing research on the optimization of preventive maintenance of power generation and transmission, in terms of modeling, the first model does not take into account the interests of the main body of the power generator. With the deepening of the reform of the power system, the initiative of the power generator to participate in the operation of the power system has been greatly improved, and the unit maintenance period itself is the subjective choice of the power generator, which makes it difficult for the first model to adapt to the transformation of the maintenance plan mode. Although the second model takes into account the interests of the main body of the power generator, since the interest targets from the power generator and the dispatching agency usually have different unit measurements, when using multi-objective planning, the setting of the weights of the two main body targets may affect the objectivity of the optimization, that is, the optimization results may have a certain bias towards the interest targets of the power generator or the interest targets of the dispatching agency in order to pursue the overall optimality of the system. The third model gives the power generator the power to independently declare and adjust the unit maintenance plan, but it can only declare and adjust based on the initial plan given by the dispatching agency, and the active decision-making of the power generator is still limited.

[0007] In terms of solution methods, existing algorithms can only solve single-layer mixed integer programming problems, that is, optimization problems that only contain a single objective function and multiple constraints. When considering the interests of power generators, decisions need to be split according to different subjects, that is, the optimization of unit maintenance is solved by the power generator, and the optimization of transmission line maintenance is solved by the power dispatching agency. The two-layer mixed integer programming problem formed in this way is difficult to solve efficiently with existing technologies; moreover, it is impossible to achieve the coordinated optimization of transmission line maintenance and unit maintenance, and it is impossible to reflect the coupling characteristics between hydropower unit maintenance and transmission line maintenance. Summary of the invention

[0008] In view of the above-mentioned problems, the present invention is proposed.

[0009] Therefore, the technical problem solved by the present invention is: how to solve the technical problems that in the prior art, the solution of unit maintenance optimization is completed by the power generator, and the solution of transmission line maintenance optimization is completed by the power dispatching organization, thus forming a double-layer mixed integer programming problem, which is difficult to solve efficiently with the prior art, and the coordinated optimization of transmission line maintenance and unit maintenance cannot be achieved, and the coupling characteristics between the maintenance of hydro-thermal power units and the maintenance of transmission lines cannot be reflected.

[0010] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for determining power generation and transmission maintenance based on Stackelberg game, comprising: taking the power generator as the game leader, making decisions on the unit maintenance period with the goal of maximizing benefits; taking the dispatching agency as the follower, arranging the transmission line maintenance and the annual power generation plan according to the unit maintenance period reported by the power generator;

[0011] The power generator adjusts the decision of unit maintenance according to the feedback of the dispatching organization and repeats the process until the decision-making process ends at the equilibrium point of the game, and a Stackelberg game model is established;

[0012] The Stackelberg game model is solved using a reconstruction decomposition algorithm based on parallel search of the feasible domain to determine the optimal maintenance period for the units and transmission lines.

[0013] As a preferred solution of the method for determining power generation and transmission maintenance based on Stackelberg game described in the present invention, wherein: the Stackelberg game model includes an annual unit maintenance plan compilation model for the leader power generator and a transmission line maintenance and annual power generation arrangement model for the follower power dispatching organization;

[0014] The leader power company's annual unit maintenance plan compilation model includes the power company's goal of maximizing the annual net profit, and the objective function is:

[0015]

[0016] Where T means the total period is 365 days, Δt means the step length is 1 day; N Th Indicates the number of thermal power units, N Hy Indicates the number of hydropower units; represents the output of thermal power unit i in time period t; represents the output of hydropower unit j in time period t; represents the thermal power price, Indicates the price of water and electricity; represents the maintenance variable of thermal power unit i in period t; represents the maintenance variable of hydropower unit j in period t; It represents the maintenance cost coefficient of thermal power unit i in period t, which is proportional to the system load; represents the maintenance cost coefficient of hydropower unit j in period t, which is proportional to the natural water flow; a i 、b i and c i represents the power generation cost coefficient of thermal power unit i;

[0017] The transmission line maintenance and annual generation arrangement model of the follower power dispatching organization includes that the dispatching organization takes minimizing the system power purchase cost and line maintenance cost as the goal, and the objective function is:

[0018]

[0019] Among them, N D represents the number of system nodes, mn means that the transmission line starts from node m and ends at node n; Indicates the maintenance status of line mn in time period t, which is a 0-1 integer variable, 1 means maintenance, 0 means no maintenance; represents the maintenance cost of line mn in period t; Φ m Represents the set of nodes connected to node m.

[0020] As a preferred solution of the method for determining power generation and transmission maintenance based on Stackelberg game described in the present invention, the constraint conditions of the annual unit maintenance plan compilation model of the leader power generator include unit maintenance duration constraint:

[0021] in, It represents the maintenance duration of unit i, and the superscript symbol * represents the superscript Th of thermal power unit type and the superscript Hy of hydropower unit type;

[0022] Unit maintenance continuity constraints:

[0023]

[0024] It is ensured that once the unit starts maintenance, the maintenance variable will be kept at 1 continuously until the maintenance is completed.

[0025] As a preferred solution of the method for determining power generation and transmission maintenance based on Stackelberg game described in the present invention, the annual unit maintenance plan compilation model of the leading power generator also includes a compact mathematical model, the formula is:

[0026]

[0027] sth j (x)≥0j=1,…,N J

[0028] Where X represents the maintenance decision variable of the generator, which is a 0-1 integer variable; p represents the continuous decision variable of the dispatching organization in the follower problem, F represents the profit function of the generator, and N J represents the number of constraints on the generator, h j (x)≥0 represents the jth constraint of the generator.

[0029] As a preferred solution of the method for determining power generation and transmission maintenance based on Stackelberg game described in the present invention, the constraint conditions of the transmission line maintenance and annual power generation arrangement model of the follower power dispatching organization include line maintenance duration constraint:

[0030]

[0031] in, Indicates the maintenance time of line mn;

[0032] Line maintenance continuity constraints:

[0033]

[0034] Ensure that once the line starts maintenance, the maintenance variable will be kept at 1 continuously until the maintenance is completed;

[0035] Line maintenance mutually exclusive constraints:

[0036]

[0037] Ensure that line mn and line m′n′ cannot be under maintenance at the same time;

[0038] Line maintenance also constrains:

[0039]

[0040] Ensure that line mn and line m′n′ must be under maintenance at the same time;

[0041] Upper and lower limits of unit output:

[0042]

[0043] in, and Respectively represent the maximum and minimum technical output of unit i;

[0044] Output characteristics of hydropower units:

[0045]

[0046] Among them, q j,t represents the power generation flow of generator group j in time period t; η j represents the power conversion coefficient of hydropower unit j;

[0047] Reservoir outflow equation:

[0048]

[0049] Among them, q k,t represents the outflow of reservoir k in period t; Ω k represents the set of hydropower unit numbers belonging to reservoir k;

[0050] Upper and lower limits of reservoir outflow:

[0051] q k,min ≤q k,t ≤q k,max

[0052] Among them, q k,max and q k,min denote the maximum and minimum outflow of reservoir k respectively;

[0053] Reservoir capacity balance equation:

[0054] v k,t =v k,t-1 +q k-1,t +n k,t -q k,t ×Δt

[0055] Among them, v k,t represents the storage capacity of reservoir k in time period t; n k,t represents the natural water inflow of reservoir k in period t;

[0056] Node power balance equation:

[0057]

[0058] Among them, m represents the set of generator nodes connected to node m, D m,trepresents the load of node m in time period t, represents the transmission capacity of line mn in time period t;

[0059] System backup constraints:

[0060]

[0061] Among them, r represents the system reserve rate;

[0062] Line transmission capacity constraints:

[0063]

[0064]

[0065] θ m,min ≤θ m,t ≤θ m,max

[0066] in, represents the maximum transmission capacity of line mn; θ m,t represents the phase angle of node m in time period t; x mn represents the reactance of line mn; θ m,min and θ m,max Respectively represent the minimum and maximum phase angles of node m;

[0067] Coupling constraints between maintenance of hydro-thermal power units and transmission line maintenance:

[0068]

[0069] When all the lines connected to the node m are in a maintenance state, the hydro-thermal power generation units connected to the node m are also in a maintenance state.

[0070] As a preferred solution of the method for determining power generation and transmission maintenance based on Stackelberg game described in the present invention, wherein: the transmission line maintenance and annual power generation arrangement model of the follower power dispatching organization also includes a compact mathematical model, the formula is:

[0071]

[0072] swt k (X,Y,p)≥0k=1,…,N k

[0073] Where Y represents the transmission maintenance decision variable of the dispatching organization, which is a 0-1 integer variable; f represents the objective function of the dispatching organization; N k represents the number of scheduling mechanism constraints; w k (X,Y,p)≥0 represents the kth constraint of the scheduling agency.

[0074] As a preferred solution of the method for determining power generation and transmission maintenance based on Stackelberg game described in the present invention, wherein: solving the Stackelberg game model includes reconstructing the problem into a main problem and sub-problems, solving the local optimal solution of the upper problem and the feasible solution of the lower problem through the main problem, and optimizing the optimality of the solution of the lower problem through the sub-problems until the optimal solution of the original two-layer problem is obtained;

[0075] The objective function of the main problem is the objective function of the upper-level problem. The constraints include the constraints of the upper-level and lower-level problems, which can be expressed as:

[0076]

[0077] sth j (X)≥0j=1,…,N J

[0078] w k X,Y,p≥0k=1,…,N K

[0079] Solve the main problem to get candidate solutions to the two-level problem and in is the local optimal solution of the upper problem; and is a feasible solution to the underlying problem;

[0080] The objective function of the sub-problem is the objective function of the lower-level problem, and the constraints are the constraints of the lower-level problem, expressed as:

[0081]

[0082]

[0083] Fixed local optimal solution of the upper problem Solving the subproblem to obtain the local optimal solution of the underlying problem and

[0084]

[0085] The constraints of the parallel search of the feasible domain are:

[0086]

[0087] d s ≤H l ≤d e

[0088] Among them, X o Indicates the oth position in the sequence of 0-1 integer variable X to be found. Indicates the intermediate solution obtained The oth position in the sequence; H l Represents the variable X to be determined and the intermediate solution The Hamming distance between s With d e Indicates the limit of distance;

[0089] Construct the upper problem and solve it in the middle The feasible domain outside the feasible domain is added to the main problem, and the local optimal solution of the upper problem in the feasible domain is obtained;

[0090] By setting the Hamming distance parameter, multiple target feasible regions are generated, and the local optimal solutions of multiple upper-level problems and feasible solutions of lower-level problems can be obtained from the main problem.

[0091] Define the convergence index S during the search process l , expressed as:

[0092]

[0093] Among them, S l It represents the gap between the objective functions of the local optimal solution and the feasible solution of the lower-level problem obtained by the sub-problem and the main problem respectively.

[0094] A system for determining power generation and transmission maintenance based on Stackelberg game, characterized in that: it includes:

[0095] Game establishment module: The power generator is regarded as the game leader, and the decision on the unit maintenance period is made with the goal of maximizing profits; the dispatching agency is regarded as the follower, and the transmission line maintenance and the annual power generation plan are arranged according to the unit maintenance period reported by the power generator;

[0096] Game adjustment and optimization module: the power generator adjusts the decision of unit maintenance according to the feedback of the dispatching organization and repeats it until the decision-making process ends at the equilibrium point of the game, and the Stackelberg game model is established;

[0097] Game solving module: uses a reconstruction decomposition algorithm based on feasible domain parallel search to solve the Stackelberg game model and determine the optimal maintenance period for the units and transmission lines.

[0098] A computer device comprises: a memory and a processor; the memory stores a computer program, wherein: the processor implements the steps of any one of the methods of the present invention when executing the computer program.

[0099] A computer-readable storage medium stores a computer program, wherein: when the computer program is executed by a processor, the steps of any one of the methods of the present invention are implemented.

[0100] Beneficial effects of the invention: The Stackelberg game model for power generation and transmission maintenance of hydro-thermal power systems proposed in the invention not only reflects the role of the power dispatching organization in ensuring the safe and reliable operation of the power grid, but also better reflects the interests and active decision-making position of power generators, and can achieve coordinated optimization of transmission line maintenance and unit maintenance.

[0101] In terms of solution algorithm, the reconstruction decomposition algorithm based on parallel search of feasible domain can solve the local optimal solution of the upper problem and the feasible solution of the lower problem through the main problem, and improve the optimality of the solution of the lower problem through sub-problems on this basis until the optimal solution of the original two-layer problem is obtained. Compared with the traditional upper and lower layer interactive iteration method, the proposed method has better convergence, higher solution efficiency, is insensitive to the initial point of iteration, and has more stable solution results.

[0102] The Stackelberg game model for power generation and transmission maintenance of hydro-thermal power systems established by the present invention is different from the unit maintenance compilation under the traditional power dispatching agency-led mode. The model better reflects the interests and active decision-making status of power generators, and also reflects the role of power dispatching agencies in ensuring the safe and reliable operation of power grids. The model can be used to achieve the coordinated optimization of transmission line maintenance and unit maintenance, and can reflect the coupling characteristics between hydro-thermal power unit maintenance and transmission line maintenance.

[0103] The reconstruction decomposition algorithm based on parallel search of feasible domain proposed in the present invention converts the complex two-level mixed integer programming problem into the solution of the main problem and sub-problems through reconstruction decomposition, and can divide the feasible domain and then solve it in parallel to improve the solution efficiency. The proposed method has good convergence, is insensitive to the initial point of iteration, has stable solution results, and the algorithm is easy to implement, and has high engineering value. BRIEF DESCRIPTION OF THE DRAWINGS

[0104] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0105] Figure 1 A flowchart of a method for determining power generation and transmission maintenance based on Stackelberg game provided in the first embodiment of the present invention;

[0106] Figure 2A Stackelberg game framework of a method for determining power generation and transmission maintenance based on Stackelberg game provided in a first embodiment of the present invention;

[0107] Figure 3 A flowchart of a double-layer mixed integer reconstruction decomposition algorithm based on feasible domain parallel search for a method for determining power generation and transmission maintenance based on Stackelberg game provided in the first embodiment of the present invention;

[0108] Figure 4 A schematic diagram of a 6-machine 30-node hydro-thermal power system including cascade hydropower, according to a method for determining power generation and transmission maintenance based on Stackelberg game provided in a second embodiment of the present invention;

[0109] Figure 5 A schematic diagram of annual load and natural water inflow curves of a method for determining power generation and transmission maintenance based on Stackelberg game provided in a second embodiment of the present invention;

[0110] Figure 6 A schematic diagram of the maintenance period arrangement of the units in a 6-machine 30-node system of a method for determining power generation and transmission maintenance based on Stackelberg game provided in the second embodiment of the present invention;

[0111] Figure 7 A schematic diagram of the maintenance period arrangement of a power transmission line in a 6-machine 30-node system according to a method for determining power generation and transmission maintenance based on Stackelberg game provided in a second embodiment of the present invention;

[0112] Figure 8 A schematic diagram of convergence indicators of three iterations in eight feasible domain intervals of a method for determining power generation and transmission maintenance based on Stackelberg game provided in a second embodiment of the present invention;

[0113] Fig. 9 A schematic diagram of the effect of the number of feasible domain intervals on the number of iteration rounds of a method for determining power generation and transmission maintenance based on Stackelberg game provided in the second embodiment of the present invention. DETAILED DESCRIPTION

[0114] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0115] Example 1

[0116] Reference Figures 1 to 3, which is an embodiment of the present invention, provides a method for determining power generation and transmission maintenance based on Stackelberg game, comprising:

[0117] S1: The power generator is regarded as the game leader, and the decision on the unit maintenance period is made with the goal of maximizing profits; the dispatching agency is regarded as the follower, and the transmission line maintenance and the annual power generation plan are arranged according to the unit maintenance period declared by the power generator.

[0118] The annual unit maintenance plan preparation model of the leader power company includes the goal of maximizing the annual net profit of the power company, and the objective function is:

[0119]

[0120] Where T means the total period is 365 days, Δt means the step length is 1 day; N Th Indicates the number of thermal power units, N Hy Indicates the number of hydropower units; represents the output of thermal power unit i in time period t; represents the output of hydropower unit j in time period t; represents the thermal power price, Indicates the price of water and electricity; represents the maintenance variable of thermal power unit i in period t; represents the maintenance variable of hydropower unit j in period t; It represents the maintenance cost coefficient of thermal power unit i in period t, which is proportional to the system load; represents the maintenance cost coefficient of hydropower unit j in period t, which is proportional to the natural water flow; a i 、b i and c i Represents the power generation cost coefficient of thermal power unit i.

[0121] The constraints of the leader power company's annual unit maintenance plan compilation model include unit maintenance duration constraints:

[0122] in, It represents the maintenance duration of unit i. The superscript symbol * represents the superscript Th of thermal power unit type and the superscript Hy of hydropower unit type.

[0123] Unit maintenance continuity constraints:

[0124]

[0125] It is ensured that once the unit starts maintenance, the maintenance variable will be kept at 1 continuously until the maintenance is completed.

[0126] Compact mathematical model, the formula is:

[0127]

[0128] sth j (x)≥0j=1,…,N J

[0129] Where X represents the maintenance decision variable of the generator, which is a 0-1 integer variable; p represents the continuous decision variable of the dispatching organization in the follower problem, F represents the profit function of the generator, and N J represents the number of constraints on the generator, h j (x)≥0 represents the jth constraint of the generator.

[0130] The transmission line maintenance and annual generation arrangement model of the follower power dispatching organization includes that the dispatching organization aims to minimize the system power purchase cost and line maintenance cost, and the objective function is:

[0131]

[0132] Among them, N D represents the number of system nodes, mn means the transmission line starts from node m and ends at node n; Indicates the maintenance status of line mn in time period t, which is a 0-1 integer variable, 1 means maintenance, 0 means no maintenance; represents the maintenance cost of line mn in period t; Φ m Represents the set of nodes connected to node m.

[0133] The constraints of the transmission line maintenance and annual generation scheduling model of the follower power dispatching organization include the line maintenance duration constraint:

[0134]

[0135] in, Indicates the maintenance duration of line mn.

[0136] Line maintenance continuity constraints:

[0137]

[0138] It is ensured that once the line starts maintenance, the maintenance variable will be kept at 1 continuously until the maintenance is completed.

[0139] Line maintenance mutually exclusive constraints:

[0140]

[0141] Ensure that line mn and line m′n′ cannot be under maintenance at the same time.

[0142] Line maintenance also constrains:

[0143]

[0144] Ensure that line mn and line m′n′ are under maintenance at the same time.

[0145] Upper and lower limits of unit output:

[0146]

[0147] in, and Respectively represent the maximum and minimum technical output of unit i.

[0148] Output characteristics of hydropower units:

[0149]

[0150] Among them, q j,t represents the power generation flow of generator group j in time period t; η j Represents the power conversion coefficient of hydropower unit j.

[0151] Reservoir outflow equation:

[0152]

[0153] Among them, q k,t represents the outflow of reservoir k in period t; Ω k Represents the set of hydropower unit numbers belonging to reservoir k.

[0154] Upper and lower limits of reservoir outflow:

[0155] q k,min ≤q k,t ≤q k,max

[0156] Among them, q k,max and q k,min They represent the maximum and minimum outflow of reservoir k respectively.

[0157] Reservoir capacity balance equation:

[0158] v k,t =v k,t-1 +q k-1,t +n k,t -q k,t ×Δt

[0159] Among them, v k,t represents the storage capacity of reservoir k in time period t; n k,t represents the natural water inflow of reservoir k in period t;

[0160] Node power balance equation:

[0161]

[0162] Among them, m represents the set of generator nodes connected to node m, D m,t represents the load of node m in time period t, represents the transmission capacity of line mn in time period t.

[0163] System backup constraints:

[0164]

[0165] Where r represents the system backup rate.

[0166] Line transmission capacity constraints:

[0167]

[0168]

[0169] θ m,min ≤θ m,t ≤θ m,max

[0170] in, represents the maximum transmission capacity of line mn; θ m,t represents the phase angle of node m in time period t; x mn represents the reactance of line mn; θ m,min and θ m,max Represent the minimum and maximum phase angles of node m respectively.

[0171] Coupling constraints between maintenance of hydro-thermal power units and transmission line maintenance:

[0172]

[0173] When all the lines connected to the node m are in a maintenance state, the hydro-thermal power generation units connected to the node m are also in a maintenance state.

[0174] The transmission line maintenance and annual generation arrangement model of the follower power dispatching organization also includes a compact mathematical model, the formula is:

[0175]

[0176] swt k (X,Y,p)≥0k=1,…,N k

[0177] Where Y represents the transmission maintenance decision variable of the dispatching organization, which is a 0-1 integer variable; f represents the objective function of the dispatching organization; Nk represents the number of scheduling mechanism constraints; w k (X,Y,p)≥0 represents the kth constraint of the scheduling agency.

[0178] It should be noted that setting the generator as the game leader allows it to make decisions with the goal of maximizing revenue and optimizing the maintenance period of the unit. This design not only increases the flexibility of the generator's response to the market, but also can significantly reduce the risk of operational interruption caused by maintenance by fine-tuning the maintenance plan, and enhance the stability of system operation. In addition, as a follower, the dispatching agency arranges the maintenance of the transmission line according to the decision of the generator. This subordinate relationship ensures the coordination and consistency of the entire power system, making the dispatch more efficient, thereby reducing the overall operating cost of the system.

[0179] In addition, the compact mathematical model of the power generator not only includes the duration and continuity constraints of the unit maintenance, but also considers the combined impact of maintenance costs and power generation costs. This comprehensive economic model design enables the power generator to optimize resource allocation and maintenance plans while ensuring economic benefits, further improving the economy and reliability of the power system.

[0180] S2: The power generator adjusts the decision on unit maintenance based on the feedback from the dispatching agency and repeats the process until the decision-making process ends at the equilibrium point of the game, thus establishing a Stackelberg game model.

[0181] Generators receive feedback from dispatch agencies, including transmission line maintenance arrangements and annual power generation plans based on preliminary unit maintenance plans. Generators use this information to adjust their unit maintenance decisions, and this process is iterative. That is, the decisions of generators and dispatch agencies are made alternately, and each time they are updated based on the latest feedback from the other party.

[0182] This iterative process continues until the decisions of both parties reach a game equilibrium point, that is, neither party has a better strategy to adopt, thus ending the decision-making process. This equilibrium point is a key concept in Stackelberg game theory, which refers to the optimal response strategy made by the leader and follower based on the other party's strategy.

[0183] Furthermore, this iterative feedback process allows power generators to continuously adjust maintenance plans to adapt to the dispatching agency's consideration of grid stability and economy based on a global perspective. This mechanism not only enhances the flexibility of power system operation, but also improves the ability to respond to emergencies or market changes. By updating maintenance strategies in real time, production costs and market demand can be more effectively balanced, thereby maximizing economic returns while ensuring grid security. In terms of technical implementation, this step achieves optimization in a complex decision-making environment by establishing mathematical models and algorithms to process real-time data. This model is able to handle a large number of dynamic inputs, such as market prices, power demand forecasts, and equipment status, making the decision-making process both scientific and predictive.

[0184] It should be noted that the Stackelberg game model was proposed by German economist Stackelberg in the 1930s. The subjects in the model have a clear order of decision-making. The party that makes the decision first is called the "leader" and the party that makes the decision later is called the "follower". Therefore, this model is also called the "master-slave game model". When considering the coordination between power generators and power dispatching agencies, there is a clear order of decision-making between power generators and dispatching agencies, that is, power generators are leaders and dispatching agencies are followers.

[0185] The Stackelberg game framework for power generation and transmission maintenance of hydro-thermal power systems proposed in this invention is as follows: Figure 2 As shown in the figure, the actual physical process corresponding to the framework is: the power generator as the leader formulates the unit maintenance plan with the goal of maximizing the annual net profit as the overall goal; the dispatching agency as the follower arranges the transmission line maintenance and annual power generation plan based on the maintenance period reported by the power generator; the power generator then calculates the annual net profit according to the transmission maintenance plan and unit output arranged by the dispatching agency, and then further adjusts its own maintenance period, and repeats this process until the final annual unit maintenance and transmission maintenance plan is obtained.

[0186] S3: Solve the Stackelberg game model using a reconstruction decomposition algorithm based on feasible domain parallel search to determine the optimal maintenance period for the units and transmission lines.

[0187] Reconstruct the problem into a main problem and sub-problems. Use the main problem to solve the local optimal solution of the upper-level problem and the feasible solution of the lower-level problem. Use the sub-problems to optimize the optimality of the solution to the lower-level problem until the optimal solution to the original two-level problem is obtained.

[0188] The objective function of the main problem is the objective function of the upper-level problem. The constraints include the constraints of the upper-level and lower-level problems, which can be expressed as:

[0189]

[0190] sth j(X)≥0j=1,…,N J

[0191] w k X,Y,p≥0k=1,…,N K

[0192] Solve the main problem to get candidate solutions to the two-level problem and in is the local optimal solution of the upper problem; and is a feasible solution to the underlying problem.

[0193] The objective function of the sub-problem is the objective function of the lower-level problem, and the constraints are the constraints of the lower-level problem, expressed as:

[0194]

[0195]

[0196] Fixed local optimal solution of the upper problem Solving the subproblem to obtain the local optimal solution of the underlying problem and

[0197]

[0198] Furthermore, the optimal solution to the original two-level problem should satisfy the optimality conditions of both the upper-level problem and the lower-level problem, and the reconstructed main problem can obtain the local optimal solution of the upper-level problem and the feasible solution of the lower-level problem. The sub-problem can obtain the local optimal solution of the lower-level problem. In order to achieve the optimality of the upper and lower-level problems at the same time, it is necessary to evolve the feasible solution of the lower-level problem in the main problem towards the optimal solution, while ensuring the optimality of the solution to the upper-level problem in the main problem.

[0199] To this end, enough local optimal solutions of the upper-level problems and feasible solutions of the lower-level problems are generated in the main problem. The solution set must contain the local optimal solutions of the lower-level problems. In order to realize this idea, the feasible domain search technology is adopted, and its specific constraints are as follows:

[0200]

[0201] d s ≤H l ≤d e

[0202] Among them, X o Indicates the oth position in the sequence of 0-1 integer variable X to be found. Indicates the intermediate solution obtained The oth position in the sequence; H lRepresents the variable X to be determined and the intermediate solution The Hamming distance between s With d e Indicates the distance limit.

[0203] With this constraint, we can construct the upper problem in the middle solution By adding the constraint to the main problem, the local optimal solution of the upper-level problem in the feasible domain can be obtained. By systematically setting the Hamming distance parameter, multiple target feasible domains can be generated, and the local optimal solutions of multiple upper-level problems and feasible solutions of the lower-level problems can be obtained from the main problem. Since the multiple feasible domain problems are independent of each other, parallel computing methods can be used to further improve the solution efficiency.

[0204] At the same time, define the convergence index S in the search process l , expressed as:

[0205]

[0206] Among them, S l It represents the difference between the local optimal solution and the feasible solution objective function of the lower-level problem obtained by the sub-problem and the main problem respectively. S l The smaller it is, the more optimal the feasible solution of the lower-level problem obtained from the main problem is.

[0207] Figure 3 The process of the two-layer mixed integer reconstruction decomposition algorithm based on parallel search of the feasible domain is given. Where i represents the number of iterations, j represents the jth problem solved in parallel in each iteration, and I max is the maximum number of iterations, J is the number of problems to be solved in parallel, and ε is a smaller number. In the algorithm flow, the main problem is solved first, and the solution of its upper problem is used as the initial point of the known intermediate solution. The feasible domain is initially divided by setting multiple distance limits between the point to be solved and the initial point. On this basis, the main problem and sub-problems are solved in multiple feasible domains in parallel. After each feasible domain is solved in this round of iteration, the degree of proximity between the feasible solution of the lower problem of the main problem and the local optimal solution of the lower problem of the sub-problem is judged to determine the optimality of the solution to the main problem. If the solutions of the upper and lower problems in the main problem are both optimal at the same time, the optimal solution of the original two-level problem is obtained; otherwise, the upper solution of the main problem in this round of iteration is retained in the intermediate solution set in turn. In the next round of iteration, the information of these intermediate solutions is excluded from the feasible domain through constraints. If the maximum number of iterations is reached and there is still no solution that meets the optimality condition, then in the known set of intermediate solutions, the approximate optimal solution is found based on the minimum difference between the feasible solution of the lower level problem of the main problem and the local optimal solution of the subproblem.

[0208] It should be noted that the algorithm design of the present invention makes each decision iteration move towards the global optimal solution, while ensuring real-time updating and optimization of the solution. This method is particularly important for the operation of power systems, because power systems need to make fast and accurate decisions in a constantly changing market and technical environment to maintain system stability and economic efficiency.

[0209] The above embodiment also includes a power generation and transmission maintenance determination system based on Stackelberg game.

[0210] include:

[0211] Game establishment module: the power generator is regarded as the game leader, and the decision on the unit maintenance period is made with the goal of maximizing profits; the dispatching agency is regarded as the follower, and the transmission line maintenance and the annual power generation plan are arranged according to the unit maintenance period declared by the power generator.

[0212] Game adjustment and optimization module: The power generator adjusts the decision of unit maintenance according to the feedback of the dispatching organization and repeats it until the decision-making process ends at the equilibrium point of the game, and the Stackelberg game model is established.

[0213] Game solving module: uses a reconstruction decomposition algorithm based on feasible domain parallel search to solve the Stackelberg game model and determine the optimal maintenance period for the units and transmission lines.

[0214] The computer device may be a server. The computer device includes a processor, a memory, an input / output interface (I / O for short) and a communication interface. The processor, the memory and the input / output interface are connected via a system bus, and the communication interface is connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data cluster data of the power monitoring system. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, a method for determining power generation and transmission maintenance based on Stackelberg game is implemented.

[0215] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory may include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory may include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0216] Example 2

[0217] Reference Figures 4 to 9 ,The following is an embodiment of the present invention, which provides a ,method for determining power generation and transmission maintenance based on Stackelberg ,game.,In order to verify the beneficial effects of the present invention, ,scientific demonstration is carried out through simulation experiments.

[0218] The proposed method is applied to a modified IEEE 6-machine 30-node hydro-thermal power system. All calculations in this section are completed on a Dell computer with the following configurations: Intel Xeon E3 processor, 3.4 GHz, 32 GB memory. The calculation software is GAMS 24.3.3, and the mixed integer linear programming problem proposed in this invention is solved by the GUROBI solver.

[0219] The topology of a 6-unit 30-node hydro-thermal power system with cascade hydropower is as follows: Figure 4 The system consists of 41 transmission lines, 2 thermal power units and 4 hydropower units. The 4 hydropower units are distributed in 3 cascade hydropower stations. The cascade relationship is as follows: Figure 4 The total installed capacity of the system is 335MW, including 160MW thermal power units and 175MW hydropower units. Figure 5 The annual load curve and natural water inflow curve of the system are composed of 365 points. The system load peak is 305.9MW. Table 1 lists the unit parameters in the system, and Table 2 lists the transmission line parameters in the system.

[0220] Table 16 Unit parameters of the 30-node system

[0221]

[0222] Table 26 Transmission line parameters of machine 30 node system

[0223]

[0224]

[0225] Figure 6 The maintenance schedule of the six units is given. Among them, for thermal power units, G1 and G2 are both overhauled during the low-load period before the 150th day, and the two units are not overhauled at the same time to ensure sufficient system backup power, playing the role of "bottom line" for thermal power units; for hydropower units, GH2 is overhauled during the low-load period at the end of the year, and the other three hydropower units are overhauled during the low-load and low natural water inflow period before the 150th day to ensure full utilization of water resources during the flood season.

[0226] Figure 7 The maintenance period arrangement of some transmission lines is given. First, the maintenance of the transmission lines related to the nodes connected to the generator sets is paid attention to. Line 1 and Line 2 both use Node 1 as the starting node, and their maintenance periods are from the 94th to the 103rd day and from the 94th to the 104th day, respectively. Generator G1 is connected to Node 1, and its maintenance period is from the 67th to the 111th day. It can be seen that the maintenance period of Lines 1 and 2 is completely within the maintenance period of G1. Line 3 and Line 6 both use Node 2 as the starting node, and their maintenance periods are from the 35th to the 39th day and from the 34th to the 36th day, respectively. Generator G2 is connected to Node 2, and its maintenance period is from the 12th to the 66th day. It can be seen that the maintenance period of Lines 3 and 6 is completely within the maintenance period of G1. Such maintenance arrangement can ensure that when the units G1 and G2 are in operation, the transmission lines connected to Nodes 1 and 2 are also in normal state, reducing the number of power outages.

[0227] Secondly, pay attention to the maintenance of the transmission lines related to the load node 12 in the system. As a load node, node 12 is connected to the unit GH1 through line 16, which is also the only power transmission channel of the unit; at the same time, node 12 is connected to the load nodes 14-16 through lines 17-19 respectively. From the maintenance situation, it can be seen that the maintenance periods of lines 16-19 are staggered and there is no overlap, thus meeting the power supply needs of these load nodes.

[0228] The upper and lower interactive iteration method (both the upper and lower problems are solved by GUROBI solver) and the method proposed in this invention are tested on a 6-machine 30-node system. The solution process of the upper and lower interactive iteration method is: given the initial point of the iteration, fix the solution of the lower problem, and solve the upper problem; fix the solution of the upper problem, and solve the lower problem, and iterate until the solution between two iterations is consistent, that is, convergence. The comparison of the objective function value, number of iterations and calculation time of the two methods is shown in Table 3.

[0229] Table 3 Performance comparison of the proposed method and the upper and lower layer interactive iteration method

[0230]

[0231] It can be seen from Table 3 that the upper and lower layer targets of the solution results of the two methods are completely consistent, which reflects the accuracy of the method proposed in the present invention. However, the upper and lower layer interactive iterative method requires 31 rounds of iterations to converge, while the proposed method only needs 3 rounds of iterations to converge, and the calculation time is only 1 / 4.78 of the former, which reflects the good acceleration performance of the method proposed in the present invention. At the same time, during the algorithm debugging process, we also found that the upper and lower layer interactive iterative method is more sensitive to the selection of the starting point. If the starting point is not selected appropriately, it will lead to no solution in the subsequent solution or increase the number of subsequent iterations. In order to reflect the fairness of the comparison, we selected the best iteration rounds and calculation time in the debugging process of the upper and lower layer interactive iterative method for comparison with the proposed method. Compared with the sensitive requirements of the upper and lower layer interactive iterative method on the initial point, the advantage of the proposed method is that there is no need to give an initial point, and the solution result is relatively stable.

[0232] When the algorithm proposed in the present invention is applied to a 6-machine 30-node system, the feasible region is divided into 8 intervals for parallel search. The convergence index S1 of the 8 intervals during 3 iterations is as follows: Figure 8As shown. It can be seen that in interval 3, the convergence index decreases with iteration, indicating that in interval 3, while the main problem ensures the optimality of the upper problem, the optimality of the lower problem is gradually enhanced, and after 3 iterations, the convergence index meets the set requirements, the optimality of the subproblem to the lower problem is also guaranteed, and the optimal solution of the entire problem is obtained. In addition, it can be seen that in the 8 subintervals, not every interval has a convergence index that decreases with iteration. For example, in interval 7, the convergence index increases with iteration, which means that in this interval, the optimality of the lower problem does not increase with iteration, because the interval itself is not the interval where the optimal solution is distributed. This also reflects the advantage of parallel computing after interval division, that is, the search in the subinterval is more efficient than the search in the entire feasible domain, especially in the subinterval where the optimal solution is distributed, the optimal solution can be quickly obtained, avoiding the inefficient search in the complete feasible domain interval in the serial search mode.

[0233] In addition, the present invention also pays attention to the influence of the number of feasible domain division intervals on the solution process. The number of iteration rounds under different numbers of feasible domain division intervals is as follows: Fig. 9 As shown. It can be seen that the number of iterations decreases with the increase in the number of feasible domain intervals, and when the number of intervals is more than 8, the gain of reducing the number of iterations brought by the increase in the number of intervals will decrease. When the number of intervals increases from 8 to 12, the number of iterations decreases from 3 to 2. Theoretically speaking, the more feasible domain intervals are divided, the easier it is for the interval where the optimal solution exists to be divided into an independent interval. At this time, it is easier to quickly obtain the optimal solution through fewer iterations. This also shows the scalability of the algorithm of the present invention, especially its potential for application in large-scale complex systems.

[0234] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for determining power generation and transmission maintenance based on Stackelberg game, characterized in that: include: The power generator is regarded as the game leader, and the decision on the unit maintenance period is made with the goal of maximizing revenue; The dispatching organization is regarded as a follower, and the arrangement of the transmission line maintenance and the annual power generation plan is carried out according to the unit maintenance period reported by the power generator; The power generator adjusts the decision of unit maintenance according to the feedback of the dispatching organization and repeats the process until the decision-making process ends at the equilibrium point of the game, and a Stackelberg game model is established; The Stackelberg game model is solved using a reconstruction decomposition algorithm based on parallel search of the feasible domain to determine the optimal maintenance period for the units and transmission lines.

2. The method for determining power generation and transmission maintenance based on Stackelberg game as claimed in claim 1, characterized in that: The Stackelberg game model includes a leader power producer's annual unit maintenance plan compilation model and a follower power dispatching agency's transmission line maintenance and annual power generation arrangement model; The leader power company's annual unit maintenance plan compilation model includes the power company's goal of maximizing the annual net profit, and the objective function is: Where T means the total period is 365 days, Δt means the step length is 1 day; N Th Indicates the number of thermal power units, N Hy Indicates the number of hydropower units; represents the output of thermal power unit i in time period t; represents the output of hydropower unit j in time period t; represents the thermal power price, Indicates the price of water and electricity; represents the maintenance variable of thermal power unit i in period t; represents the maintenance variable of hydropower unit j in period t; It represents the maintenance cost coefficient of thermal power unit i in period t, which is proportional to the system load; represents the maintenance cost coefficient of hydropower unit j in period t, which is proportional to the natural water flow; a i , b i and c i represents the power generation cost coefficient of thermal power unit i; The transmission line maintenance and annual generation arrangement model of the follower power dispatching organization includes that the dispatching organization takes minimizing the system power purchase cost and line maintenance cost as the goal, and the objective function is: Among them, N D represents the number of system nodes, mn means the transmission line starts from node m and ends at node n; Indicates the maintenance status of line mn in time period t, which is a 0-1 integer variable, 1 means maintenance, 0 means no maintenance; represents the maintenance cost of line mn in period t; Φ m Represents the set of nodes connected to node m.

3. The method for determining power generation and transmission maintenance based on Stackelberg game as claimed in claim 2, characterized in that: The constraints of the annual unit maintenance plan compilation model of the leading power generator include the unit maintenance duration constraint: in, It represents the maintenance duration of unit i, and the superscript symbol * represents the superscript Th of thermal power unit type and the superscript Hy of hydropower unit type; Unit maintenance continuity constraints: It is ensured that once the unit starts maintenance, the maintenance variable will be kept at 1 continuously until the maintenance is completed.

4. The method for determining power generation and transmission maintenance based on Stackelberg game as claimed in claim 3, characterized in that: The leader power generator annual unit maintenance plan compilation model also includes a compact mathematical model, the formula is: s.t.h j (x)≥0j=1,…,N J Among them, X represents the maintenance decision variable of the generator, which is a 0-1 integer variable; p represents the continuous decision variable of the dispatching organization in the follower problem, F represents the profit function of the generator, and N J represents the number of constraints on the generator, h j (x)≥0 represents the jth constraint of the generator.

5. The method for determining power generation and transmission maintenance based on Stackelberg game as claimed in claim 4, characterized in that: The constraints of the transmission line maintenance and annual power generation arrangement model of the follower power dispatching organization include line maintenance duration constraints: in, Indicates the maintenance time of line mn; Line maintenance continuity constraints: Ensure that once the line starts maintenance, the maintenance variable will be kept at 1 continuously until the maintenance is completed; Line maintenance mutually exclusive constraints: Ensure that line mn and line m′n′ cannot be under maintenance at the same time; Line maintenance also constrains: Ensure that line mn and line m′n′ must be under maintenance at the same time; Upper and lower limits of unit output: in, and Respectively represent the maximum and minimum technical output of unit i; Output characteristics of hydropower units: Among them, q j,t represents the power generation flow of generator group j in time period t; η j represents the power conversion coefficient of hydropower unit j; Reservoir outflow equation: Among them, q k,t represents the outflow of reservoir k in period t; Ω k represents the set of hydropower unit numbers belonging to reservoir k; Upper and lower limits of reservoir outflow: q k,min ≤q k,t ≤q k,max Among them, q k,max and q k,min denote the maximum and minimum outflow of reservoir k respectively; Reservoir capacity balance equation: v k,t =v k,t-1 +(q k-1,t +n k,t -q k,t )×Δt Among them, v k,t represents the storage capacity of reservoir k in time period t; n k,t represents the natural water inflow of reservoir k in period t; Node power balance equation: Among them, m represents the set of generator nodes connected to node m, D m,t represents the load of node m in time period t, represents the transmission capacity of line mn in time period t; System backup constraints: Among them, r represents the system reserve rate; Line transmission capacity constraints: i m,min ≤θ m,t ≤θ m,max in, represents the maximum transmission capacity of line mn; θ m,t represents the phase angle of node m in time period t; x mn represents the reactance of line mn; θ m,min and θ m,max Respectively represent the minimum and maximum phase angles of node m; Coupling constraints between maintenance of hydro-thermal power units and transmission line maintenance: When all the lines connected to the node m are in a maintenance state, the hydro-thermal power generation units connected to the node m are also in a maintenance state.

6. The method for determining power generation and transmission maintenance based on Stackelberg game as claimed in claim 5, characterized in that: The transmission line maintenance and annual generation arrangement model of the follower power dispatching organization also includes a compact mathematical model, the formula of which is: s.t.w k (X,Y,p)≥0 k=1,…,N k Where Y represents the transmission maintenance decision variable of the dispatching organization, which is a 0-1 integer variable; f represents the objective function of the dispatching organization; N k represents the number of scheduling mechanism constraints; w k (X,Y,p)≥0 represents the kth constraint of the scheduling agency.

7. The method for determining power generation and transmission maintenance based on Stackelberg game as claimed in claim 6, characterized in that: Solving the Stackelberg game model includes reconstructing the problem into a main problem and sub-problems, solving the local optimal solution of the upper-level problem and the feasible solution of the lower-level problem through the main problem, and optimizing the optimality of the solution of the lower-level problem through the sub-problems until the optimal solution of the original two-level problem is obtained; The objective function of the main problem is the objective function of the upper-level problem. The constraints include the constraints of the upper-level and lower-level problems, which can be expressed as: s.t.h j (X)≥0 j=1,…,N J w k (X,Y,p)≥0 k=1,…,N K Solve the main problem to get candidate solutions to the two-level problem and in It is the local optimal solution to the upper problem; The candidate solution and is a feasible solution to the underlying problem; The objective function of the sub-problem is the objective function of the lower-level problem, and the constraints are the constraints of the lower-level problem, expressed as: Fixed local optimal solution of the upper problem Solving the subproblem to obtain the local optimal solution of the underlying problem and The constraints of the parallel search of the feasible domain are: d s ≤H l ≤d e Among them, X o Indicates the oth position in the sequence of 0-1 integer variable X to be found. Indicates the intermediate solution obtained The oth position in the sequence; H l Represents the variable X to be determined and the intermediate solution The Hamming distance between s With d e Indicates the limit of distance; Construct the upper problem and solve it in the middle The feasible domain outside the feasible domain is added to the main problem, and the local optimal solution of the upper problem in the feasible domain is obtained; By setting the Hamming distance parameter, multiple target feasible regions are generated, and the local optimal solutions of multiple upper-level problems and feasible solutions of lower-level problems can be obtained from the main problem. Define the convergence index S during the search process l , expressed as: Among them, S l It represents the gap between the objective functions of the local optimal solution and the feasible solution of the lower-level problem obtained by the sub-problem and the main problem respectively.

8. A system for determining power generation and transmission maintenance based on Stackelberg game using the method according to any one of claims 1 to 7, characterized in that: Game establishment module: The power generator is regarded as the game leader, and the decision on the unit maintenance period is made with the goal of maximizing profits; the dispatching agency is regarded as the follower, and the transmission line maintenance and the annual power generation plan are arranged according to the unit maintenance period reported by the power generator; Game adjustment and optimization module: the power generator adjusts the decision of unit maintenance according to the feedback of the dispatching organization and repeats it until the decision-making process ends at the equilibrium point of the game, and the Stackelberg game model is established; Game solving module: uses a reconstruction decomposition algorithm based on feasible domain parallel search to solve the Stackelberg game model and determine the optimal maintenance period for the units and transmission lines.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.