Risk management method for optimizing and dividing island of radial power distribution network
Through the relative distance measurement interval algorithm and MILP model, combined with the minimum risk standard, the problem of failure to effectively consider renewable energy and load uncertainty in the existing technology is solved, achieving more accurate and reliable island division, and reducing computational complexity. performance and disruption costs.
Patent Information
- Application Number
- CN202410853657.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-11
AI Technical Summary
Existing islanding schemes fail to effectively consider the high variability and unpredictability of renewable energy sources, as well as the uncertainty of load forecasting, resulting in high computational complexity and approximate solutions.
The relative distance measurement interval algorithm (RDM) is used to model the uncertainty of load and power generation, combined with the minimum risk standard and mixed integer linear programming (MILP) model, to create an optimal island division scheme through remote control switches to ensure load and The range combination of power generation satisfies the operating constraints.
It reduces computational complexity, provides a more accurate islanding scheme, reduces outage costs, and improves the reliability of distribution networks.
Smart Images

Figure CN118761627A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network island optimization division, and in particular to a risk management method for radial distribution network island optimization division. Background Art
[0002] A highly reliable distribution network can significantly improve customer satisfaction, therefore, maintaining and improving service reliability has become a major concern for distribution utilities. Network automation through automatic switches is one of the most effective strategies to improve reliability, and intentional islanding can also increase the reliability of radial networks. Islands are created using remotely controlled switches, and islanding is successful if the local generator can supply power to the local load without violating the technical constraints within the island; if any of the limiting constraints are violated, the islanding scheme is considered unsuccessful.
[0003] There are many schemes in the existing technology to achieve the optimal island division, such as finding the optimal island division scheme in the distribution network under fault conditions based on the ion group optimization method, obtaining the optimal island division scheme through the two-stage method of the branch and bound algorithm, achieving the optimal sequential island division by defining the MILP formula, using the mixed integer nonlinear programming algorithm through scenarios to generate the optimal sequential island division scheme, and achieving the optimal sequential island partition scheme in the radial distribution network with soft opening points by adopting the MINLP method.
[0004] However, the existing island partitioning schemes are not perfect. For example, when defining the MILP formula to achieve the optimal sequential island partitioning, the uncertainty associated with the highly variable and unpredictable production of renewable DG (wind and solar power generation) and the load forecast during island operation are not taken into account; the use of a mixed integer nonlinear programming algorithm over scenarios to generate the optimal sequential island partitioning scheme is highly computationally intensive and can only provide an approximate solution; when using the MINLP method to achieve the optimal sequential island partitioning scenario in a radial distribution network with soft opening points, load uncertainty is not taken into account.
[0005] Based on this, the existing island division scheme needs to be improved. Summary of the invention
[0006] Technical purpose: In order to overcome the shortcomings of the prior art, the present invention provides a risk management method for island optimization of radial distribution networks, taking into full account the highly variable and unpredictable output of renewable energy and the uncertainty associated with load forecasting during island operation.
[0007] Technical solution: To achieve the above purpose, the present invention discloses a risk management method for optimizing the partitioning of radial distribution network islands, comprising the following steps:
[0008] (S1) initialization, inputting data of active and reactive power consumption and generation of the distribution network;
[0009] (S2) Modeling the uncertainty of power generation and load through a relative distance measurement interval algorithm;
[0010] According to the RDM algorithm, the uncertainty of the load in node n is defined as
[0011]
[0012] According to the RDM algorithm, the uncertainty of power generation in node n is defined as
[0013]
[0014] In the above formula, L L (n) is the number of intervals The lower bound of L R (n) is the number of intervals The upper bound of α L (n) The interval fluctuation coefficient of G L (n) is the number of intervals The lower bound of G R (n) is the number of intervals The upper bound of α G(n) for The range fluctuation coefficient of
[0015] (S3) obtaining the best island division situation by adopting the risk measurement of the minimum risk standard, and establishing the optimal island division method based on risk;
[0016] The optimal island partitioning scenario is determined by:
[0017]
[0018] In the above formula, NIS is the number of island partitioning scenarios, M is the set of possible outcomes (natural states), CInt α (is) is the disruption cost in the island partition scenario is and the natural state (outcome) α, is the minimum disruption cost of the natural state (outcome) α in all island partitioning scenarios;
[0019] (S4) defining an MILP model of island partitioning to obtain interval load and interval generation of combined values under radial network fault conditions of optimal island partitioning;
[0020] Combined with the RDM algorithm, the target number with interval coefficients is defined as follows:
[0021]
[0022] ΔPL(j)=PL R (j)-PL L (j),ΔPG(l)=PG R (l)-PG L (l)
[0023] α L(j) ∈[0,1],α G(l) ∈[0,1],l∈NGL(f),j∈NLL(f)
[0024] In the above formula, wd(j,f) is a binary variable describing the possibility of load reduction in node j; Tr(f) represents the fault repair duration; C(j) represents the long-term interruption cost of consumers at node j; CG(l) represents the long-term interruption cost of DG at node l; xpg(l,f) represents the generation level variable of active power of DG in node j; NGL(f) and NLL(f) represent a set of loads and a set of DGs downstream of fault f;
[0025] Establish power balance constraints in the local area network, branch capacity constraints in the local network, capacity constraints of distributed power sources in the local network, voltage limit constraints of the local power grid, and load reduction constraints in the local network respectively;
[0026] (S5) Output the optimal island division scheme and the corresponding interval load and interval current values.
[0027] Preferably, in step (S4), the power balance constraint in the local area network is:
[0028]
[0029] ΔQL(j)=QL R (j)-QL L (j),ΔQG(j)=QG R (j)-QG L (j)
[0030] The above constraints ensure active and reactive power balance in each node in the LN respectively
[0031] xpg(j,f)≤wdg(j,f),
[0032] xqg(j,f)≤wdg(j,f),
[0033] j∈NGL(f)∪NLL(f),T(j)∧F(j)∈A(f)
[0034] The above defines the maximum active and reactive power production capacity of DG expressed in relative units. In the above formula, p(a,f) and p(a′,f) represent the variables of active power flowing through branches a and a′ respectively; q(a,f) and q(a′,f) represent the variables of reactive power flowing through branches a and a′ respectively; xpg(j,f) and xqg(j,f) represent the variables of active power and reactive power generation levels of DG in node j respectively; wdg(j,f) is a binary variable describing the state of DG in node j (generation / non-generation); F(j) and T(j) represent the branch set with node j as the initial node and the branch set with node j as the terminal node respectively.
[0035] Preferably, in step (S4), the branch capacity constraint in the local network is:
[0036]
[0037] q(a,f)≤wt(a,f)·S max (a)
[0038] q(a′,f)≤wt(a,f)·S max (a)
[0039]
[0040] In the above formula, wt(a,f) is an auxiliary binary variable; S max (a) represents the maximum capacity of branch a; NSP is the number of linear segments (polygonal edges) used for branch current limiting linearization; pg ns represents the length of the segment (polygon side) ns used in the branch current limiting linearization; Q ns , P ns They represent the active power and reactive power of the segment (polygon side) ns used in the branch current limiting linearization; w(s) is a binary variable that takes the value 0 if the recloser at position s is disconnected, otherwise it takes the value 1.
[0041] Preferably, in step (S4), the capacity constraint of the local network distributed power source is:
[0042]
[0043] Preferably, in step (S5), the local power grid voltage limit constraint is:
[0044]
[0045] v ns ·w ns ≤vn′ ns ≤vn ns ·w ns-1,ns=1,…,NSV+1,w ns=0 =1
[0046]
[0047] In the above formula, V l Re (f) V l Im (f) respectively represent the real and imaginary parts of the voltage at node l; R a , X a Respectively represent the resistance and reactance of branch a; V min 、V max Respectively represent the minimum voltage limit and the maximum voltage limit; V nom Indicates the reference voltage; vn ns is the length of the segment (polygon side) ns used in the linearization for minimum voltage limitation; vx ns is the length of the segment (polygon side) ns used in the linearization of the maximum voltage limit; NSV is the number of linear segments (polygon sides) used for the voltage limit linearization.
[0048] Preferably, in step (S6), the load reduction of the local network is:
[0049]
[0050] Preferably, the process for obtaining a set of island partitions is:
[0051] (A1) Using the correlation equation and correlation coefficient (r L (·))between;
[0052] (A2) By using the correlation equation and the correlation coefficient (r G (·)), calculate α for each pair of DG G(n) The set of valid combinations of values;
[0053] (A3) Using the correlation equation and correlation coefficient (r LG (·)) Calculate α for each pair of load and DG G(n) Value and α L(n) between the valid combinations of values);
[0054] (A4) Select α for each load and DG downstream of the fault from the values obtained in steps (A1)-(A3) L(n) and α G(n) The value of
[0055] (A5) Using α in (A4) L(n) and α G(n)The uncertain modeling formulas of load and renewable energy generation are used to obtain the precise values of interval load and interval generation from the interval numbers;
[0056] (A6) For the clarity values obtained in (A5), define the optimal islanding scheme for the considered fault. In this case, it is determined that the interval number MILP model is used. The MILP model uses automatic switches (reclosers and section switches), which are already present in the network, to create islands and shed loads so that the interruption cost to the user is considered to be the combination of interval load and interval generation is minimized;
[0057] (A7) Select α from the set of values defined in steps (A1)-(A3) L(n) and α G(n) Repeat steps (A5) and (A6);
[0058] (A8) Repeat step (A7) until α is exhausted. L(n) and α G(n) All possible combinations of
[0059] (A9) Through steps (A1)-(A8), several possible island partitioning scenarios (NIS) are obtained for the considered fault.
[0060] The risk management method for optimizing the partitioning of radial distribution network islands disclosed in the present invention has the following technical benefits:
[0061] The uncertainty of load and generation is analyzed in this invention, and the concept of interval number is adopted to describe the uncertainty of load and generation. The values of load and generation are converted into interval numbers, and then the correlation between them is considered. The possible values of interval numbers are determined by introducing the relative distance measurement (RDM) interval algorithm. A mixed integer linear programming (MILP) model based on the interval RDM algorithm is proposed, and the optimal island partitioning scheme created in the distribution network for each allowed interval load and interval generation combination is determined by adopting the remote control switch already installed in the distribution network. In this way, the considered faults can be obtained in the case of many different island partitions. In some cases, due to the uncertainty of load and generation, some islands may violate the operating limits (voltage limits and capacity limits). These results are in the case of each island partition and for each allowed combination of interval load and interval generation. The island partitioning scenarios are evaluated along the results, and the best scenario is selected by adopting the minimum risk (Minimax) criterion to measure the risk, which improves the conservatism of the interval calculation and reduces the computational complexity. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 A schematic diagram of the risk management method provided by the present invention;
[0063] Figure 2 This is a node testing system in a specific implementation manner of the present invention. DETAILED DESCRIPTION
[0064] The following is combined with Figure 1 To Attachment Figure 2 The principles and features of the present invention are described, and the examples given are only used to explain the present invention, not to limit the scope of the present invention.
[0065] A risk management method for optimizing the partitioning of radial distribution power grid islands comprises the following steps:
[0066] (S1) Initialization, inputting data of active and reactive power consumption and generation of the distribution network.
[0067] (S2) The relative distance measurement interval algorithm (RDM) is introduced to model the uncertainty of power generation and load.
[0068] Load and renewable energy generation in distribution networks are usually not deterministically forecastable due to the lack of complete and precise information. In the presence of such uncertainty, interval arithmetic and fuzzy set-based methods (using interval arithmetic to operate on fuzzy numbers) have been shown to be less computationally complex than probabilistic methods and more effective in providing good insights into the problem. Therefore, interval numbers are introduced here to describe the uncertainty of generation and load (i.e., the data mentioned in the first step).
[0069] The relative distance measurement interval algorithm is:
[0070] (1) Assume that there is an uncertain value F, expressed as an interval number: The number of this interval is completely determined by the left value (lower limit) F L and the right side value (upper limit) F R definition, The number of intervals used to construct the uncertain inputs (load, generation) can be obtained from historical measurement data.
[0071] (2) The principle of the interval RDM algorithm is that if the exact value of the data x is unknown, but the decision maker knows that it is in the interval In the RDM model, the following represents all possible values of the quantity that may occur: ps :x ps =x L +α x ·(x R -x L ),α x ∈[0,1]. In the above formula, the set X ps Contains x ps For all possible values of RDM parameter αx Defines the selected value of the quantity x in the interval [x L ,x R ], x L is the left value of the interval number, x R is the right value of the interval number. All possible values of any arithmetic operation * on interval numbers (z ps ) is represented by the following formula: ps :z ps =x ps (α x )*y ps (α y ),α x ,α y ∈[0,1]; Let’s take an example to illustrate. Assume and In terms of RDM arithmetic, this multiplication is described by the following equation:
[0072] Z ps :z ps =x ps (α x )·y ps (α y ),α x ,α y ∈[0,1]]
[0073] x ps (α x )=1+2·α x ,y ps (α y )=2+3·α y
[0074] z ps =(1+2·α x )·(2+3·α y )=2+3·α y +4·α x +6·α x α y
[0075] By varying α in the range [0, 1] x and α y The value of z will be generated ps All possible values of will be generated by the relationship Define all possible system states.
[0076] Span s(Z ps ), that is, the left-hand side and right-hand side values of arithmetic operations on interval numbers are defined as follows:
[0077]
[0078] Based on the above, the uncertainty of the load in node (n) (which is represented by the interval number Description), according to the RDM algorithm is defined as follows:
[0079]
[0080] In a similar way, the uncertainty of power generation from renewable energy generators is evaluated. Therefore, according to the interval RDM algorithm, the uncertainty of power generation from renewable generators in node (n) is described as follows:
[0081]
[0082] The above equations are used to describe the uncertainty of active power and reactive power of load and DG respectively. In the above equations, L L (n) is the number of intervals The lower bound of L R (n) is the number of intervals The upper bound of α L (n) The interval fluctuation coefficient of G L (n) is the number of intervals The lower bound of G R (n) is the number of intervals The upper bound of α G(n) for The range fluctuation coefficient.
[0083] (3) Consider the correlation between interval numbers
[0084] The results of standard arithmetic operations on intervals may overestimate, mainly due to the assumption that the quantities considered may vary independently within a given interval. If this assumption does not hold, i.e. if there is any correlation (dependency) between the quantities considered, not all combinations of values within a given interval are valid. In this case, the numerical results may be much tighter than those obtained by applying interval arithmetic without considering the correlations. The number of calculations required for interval RDM arithmetic may be significantly lower than when no correlations are considered.
[0085] Correlation between interval numbers is defined as any restriction on the possible pairings of interval numbers. Consider two interval numbers x ps =x L +α x ·(x R -x L ) and y ps =y L +α x ·(y R -y L). The interval correlation D is defined as the unit square U = [0,1] × [1,0] = {(α x ,α y ):α x ∈[0,1],α y ∈[0,1]}, so that for α x and α y For every value of x ,α y ). If a correlation is all of U, it is called a full pairwise correlation, and the number of intervals with this relationship can be said to be independent. If for each α x ∈[0,1] has only one pair of values (α x ,α y ), for each α y ∈[0,1] has only one pair (α x ,α y ), it is called a one-to-one correlation. When the number of intervals is a completely positive (identical) relationship:
[0086] I={(α x ,α y ):α x =α y α x ∈[0,1],α y ∈[0,1]}
[0087] In this case, for every positive increase in one interval quantity, there is also a positive increase in the other interval quantity, that is, low values of one interval number are perfectly paired with low values of the other interval number, and high values of one interval number are paired with high values of the other interval number. When the interval quantities are in a completely negative (opposite) relationship:
[0088] O={(α x ,α y ):1-α x =α y α x ∈[0,1],α y ∈[0,1]}
[0089] In this case, for a positive increase in one interval quantity, the other interval quantity decreases.
[0090] Any mapping from [-1, +1] to D such that R(-1) = O, R(0) = U, and R(1) = I is called a complete model of the correlation R. The present invention uses the correlation D(r) described by the following formula.
[0091] D(r)={(α x ,α y ):max(0,-α x-r,α x -1+r)≤α y ≤
[0092] min(1,α x +1-r,-α x +2+r),α x ∈[0,1]α y ∈[0,1]}
[0093] According to the above formula, there is a dependency for each value of the correlation coefficient r belonging to [-1, +1]. Based on engineering judgment, empirical evidence and statistical analysis of existing data, the correlation coefficients between loads and between DGs, as well as the correlation coefficients between DGs and loads can be obtained.
[0094] For example, suppose two of the interval quantities and The correlation coefficients are as follows: r = 1, r = -1, r = 0.5, r = 0.7, r = 0. Here we assume that α x and α y Can have the following values: x ,α y ={0,0.1,0.2,0.3,...,1}. By applying the above formula, the following results are obtained: for r = 1 (identity relationship) and r = -1 (opposition relationship), the number of valid combinations of the considered interval quantities will be 11, for r = 0.7, the number of valid combinations will be 65, for r = 0.5, this number will be 91, and for r = 0, the number of valid combinations will be 121. Therefore, the degree of dependence between intervals can significantly affect the number of valid combinations of interval values, and thus affect the computational complexity of interval analysis.
[0095] (S3) The optimal island division is obtained by adopting the risk measurement of the minimum risk standard, and an optimal island division method based on risk is established.
[0096] If a sustained fault occurs on a feeder, and a DG with appropriate capacity is present, an intentional island can be created downstream of the fault. Islanding is done by using remote-controlled reclosers and remote-controlled section switches at load nodes (substations), already present in the network. The number and location of these automatic switches are determined during the network automation planning phase.
[0097] Specifically, the process for obtaining a set of island partitions is:
[0098] (A1) Using the correlation equation and correlation coefficient (r L (·))between;
[0099] (A2) By using the correlation equation and the correlation coefficient (r G(·)), calculate α for each pair of DG G(n) The set of valid combinations of values;
[0100] (A3) Using the correlation equation and correlation coefficient (r LG (·)) Calculate α for each pair of load and DG G(n) Value and α L(n) between the valid combinations of values);
[0101] (A4) Select α for each load and DG downstream of the fault from the values obtained in steps (A1)-(A3) L(n) and α G(n) The value of
[0102] (A5) Using α in (A4) L(n) and α G(n) The uncertain modeling formulas of load and renewable energy generation are used to obtain the precise values of interval load and interval generation from the interval numbers;
[0103] (A6) For the clarity values obtained in (A5), define the optimal islanding scheme for the considered fault. In this case, it is determined that the interval number MILP model is used. The MILP model uses automatic switches (reclosers and section switches), which are already present in the network, to create islands and shed loads so that the interruption cost to the user is considered to be the combination of interval load and interval generation is minimized;
[0104] (A7) Select α from the set of values defined in steps (A1)-(A3) L(n) and α G(n) Repeat steps (A5) and (A6);
[0105] (A8) Repeat step (A7) until α is exhausted. L(n) and α G(n) All possible combinations of
[0106] (A9) Through steps (A1)-(A8), several possible island partitioning scenarios (NIS) are obtained for the considered fault.
[0107] The selection of the optimal island partitioning scenario is performed by applying the minimum risk (Minimax) criterion. This criterion favors decisions with small negative gains over decisions with a very substantial loss, even at very low probabilities. According to this criterion, the optimal island partitioning scenario (d(IS opt )) Determined by:
[0108]
[0109] Where NIS is the number of island partition scenarios, M is the set of possible outcomes (natural states), and CIntα (is) is the disruption cost in the island partitioning scenario is and the natural state (outcome) α. is the minimum interruption cost of the natural state (outcome) α in all islanding scenarios. Here, the natural state corresponds to a possible combination of clear values (α values) of interval load and interval generation. A natural state corresponds to a combination of clear values of interval-valued quantities, which are obtained according to the method proposed in step 5) of (1). The user interruption cost of the islanding scenario is CInt α (is), the natural state α considered is shown in the fourth step.
[0110] (S4) An island-partitioned MILP model is defined to obtain the interval load and interval generation of the combined value in the event of a fault in the optimal island-partitioned radial network.
[0111] Combined with the RDM algorithm, the target number with interval coefficients is defined as follows:
[0112]
[0113] ΔPL(j)=PL R (j)-PL L (j),ΔPG(l)=PG R (l)-PG L (l)
[0114] α L(j) ∈[0,1],α G(l) ∈[0,1],l∈NGL(f),j∈NLL(f)
[0115] In the above formula, wd(j,f) is a binary variable describing the possibility of load reduction in node j; Tr(f) represents the fault repair duration; C(j) represents the long-term interruption cost of consumers at node j; CG(l) represents the long-term interruption cost of DG at node l; xpg(l,f) represents the generation level variable of active power of DG in node j; NGL(f) and NLL(f) represent a set of loads and a set of DG downstream of fault f.
[0116] According to the above formula, the goal is to have a parameter α in the case of a fault (f). L(j) and α G(l) The specific combination of is used to obtain the island partitioning scenario that minimizes the interruption cost of load and DG.
[0117] In case of a fault (f), a local network (LN) is created, which consists of the DG and loads downstream of the fault (f). The optimal island within the LN is obtained by using the following formula.
[0118] Then, the power balance constraint in the local area network, the branch capacity constraint in the local network, the capacity constraint of the distributed power source in the local network, the voltage limit constraint of the local power grid, and the load reduction constraint of the local network are established respectively.
[0119] Among them, the power balance constraint in the LAN is
[0120]
[0121] ΔQL(j)=QL R (j)-QL L (j),ΔQG(j)=QG R (j)-QG L (j)
[0122] The above constraints ensure active and reactive power balance in each node in the LN respectively
[0123] xpg(j,f)≤wdg(j,f),
[0124] xqg(j,f)≤wdg(j,f),
[0125] j∈NGL(f)∪NLL(f),T(j)∧F(j)∈A(f)
[0126] The above defines the maximum active and reactive power production capacity of DG in relative units. In the above formula, p(a,f) and p(a′,f) represent the variables of active power flowing through branches a and a′, respectively; q(a,f) and q(a′,f) represent the variables of reactive power flowing through branches a and a′, respectively; xpg(j,f) and xqg(j,f) represent the variables of active power and reactive power generation level of DG in node j, respectively; wdg(j,f) is a binary variable describing the state of DG in node j (generation / non-generation); F(j) and T(j) represent the branch set with node j as the initial node and the branch set with node j as the terminal node, respectively.
[0127] Among them, the branch capacity constraint in the local network is:
[0128] Branch flow limitations and other quadratic limitations (DG capacity curves, voltage limitations) appear in the load flow analysis in rectangular coordinates as circles. The circular area can be linearized by a polygonal area formed by a set of straight line segments. The present invention takes advantage of the operating conditions in the distribution network (e.g., high P / Q ratios in branch and DG production, high V Re / V Im ratio) to define linear segments of different (variable) lengths in different regions of the circle, thereby reducing the number of constraints and variables in the linearization of the quadratic term without sacrificing accuracy. The following is the definition of the linear segment:
[0129]
[0130] q(a,f)≤wt(a,f)·S max (a)
[0131] q(a′,f)≤wt(a,f)·S max (a)
[0132]
[0133] In the above formula, wt(a,f) is an auxiliary binary variable; S max (a) represents the maximum capacity of branch a; NSP is the number of linear segments (polygonal edges) used for branch current limiting linearization; pg ns represents the length of the segment (polygon side) ns used in the branch current limiting linearization; Q ns , P ns They represent the active power and reactive power of the segment (polygon side) ns used in the branch current limiting linearization; w(s) is a binary variable that takes the value 0 if the recloser at position s is disconnected, otherwise it takes the value 1.
[0134] The constraint above defines the maximum branch capacity. The recloser state (open / closed) at the branch ends.
[0135] Among them, the capacity constraint of the local network distributed power supply is:
[0136]
[0137] The above constraint defines the maximum output of DG, that is, it describes the capacity curve of DG.
[0138] Among them, the local power grid voltage limit constraint is:
[0139]
[0140] v ns ·w ns ≤vn′ ns ≤vn ns ·w ns-1 ,ns=1,…,NSV+1,w ns=0 =1
[0141]
[0142] The above constraints ensure that the voltage limit is not violated within the island. In the distribution network, the maximum voltage phase deviation relative to the relaxed bus is usually less than 10°. Therefore, the real component of the voltage will be significantly higher than the imaginary part. Therefore, the number of segments used in the voltage limit linearization can be very small. The present invention uses a single segment (polygon edge) for voltage limit linearization. In this way, the number of constraints and continuous variables will be reduced, so the model becomes less complex computationally.
[0143] Among them, the load reduction constraint of the local network is:
[0144]
[0145] The above constraints define the load shedding within the islands created in the LN.
[0146] (S5) Output the optimal island division scheme and the corresponding interval load and interval current values.
[0147] As Figure 2 The modified IEEE 33-bus system shown is taken as an example, which consists of 32 loads (underlined numbers) and 4 wind turbines (shaded numbers). The highest voltage in the network is assumed to be 10.5kV, while the maximum voltage is 11.5kV. The number and location of reclosers and section switches (RCS) are represented by (R) and (S), respectively. These automatic switches are used for islanding in the event of a fault. It is also assumed that the repair duration of the fault (Tr(f)) is 4 hours and the correlation coefficient between each pair of bay loads is 1 (r L (·))=1), the correlation coefficient between each pair of intervals is 1 (r G (·))=1), the correlation coefficient between interval generation and interval load is 0 (r L (·))=0), and (α L (n),α G (n))∈{0,0.1,0.2,0.3,...,1}. The number of linear segments (polygon edges) used for branch flow restriction and DG capacity curve linearization is as follows: NSP=10 and NSG=10. The present invention considers island partitioning after a branch between nodes 1 and 2 fails.
[0148] Based on the above, the following valid combinations of uncertain parameters (load and generation) are considered, namely: In this case, the following calculations are performed: 11 (α L (n))×11(α G (n)) = 121. Through these calculations, 30 different island division schemes are obtained. Five typical cases (IS1-IS 5) are discussed and the results are shown in Table 1.
[0149] IS1 represents the optimal island partitioning scheme determined by using the minimum-maximum criterion proposed in step 3. Table 1 shows the status of the automatic switches turned on to ensure the optimal island partitioning and the status of the DGs used in the island. This scheme ensures the minimum loss among the 30 obtained island partitioning schemes. Therefore, during the island operation, regardless of the power generation and load, the loss of selecting scenario IS1 will be the minimum.
[0150] Cases IS2 to IS5 describe the island partitioning schemes obtained for characteristic combinations of interval generation and interval loads that are usually used in calculations based on explicit values. Here, IS2 corresponds to the (maximum generation, minimum load) combination, that is, it corresponds to (GR, LL), IS3 corresponds to (GR, LR), IS4 corresponds to (GL, LR), and IS5 corresponds to (GL, LL). Neither of the considered cases provides an optimal solution. As can be seen in Table 1, the maximum loss in each of these scenarios is higher compared to the optimal scenario IS1.
[0151] Table 1 Test results of 33-node feeder
[0152]
[0153] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A risk management method for optimizing the partitioning of radial distribution network islands, characterized in that: The following steps are involved: (S1) initialization, inputting data of active and reactive power consumption and generation of the distribution network; (S2) Modeling the uncertainty of power generation and load through a relative distance measurement interval algorithm; According to the RDM algorithm, the uncertainty of the load in node n is defined as According to the RDM algorithm, the uncertainty of power generation in node n is defined as In the above formula, L L (n) is the number of intervals The lower bound of L R (n) is the number of intervals The upper bound of α L(n) for The interval fluctuation coefficient of G L (n) is the number of intervals The lower bound of G R (n) is the number of intervals The upper bound of α G(n) for The range fluctuation coefficient of (S3) obtaining the best island division situation by adopting the risk measurement of the minimum risk standard, and establishing the optimal island division method based on risk; The optimal island partitioning scenario is determined by: In the above formula, NIS is the number of island partitioning scenarios, M is the set of possible outcomes (natural states), CInt α (is) is the disruption cost in the island partition scenario is and the natural state (outcome) α, is the minimum disruption cost of the natural state (outcome) α in all island partitioning scenarios; (S4) defining an MILP model of island partitioning to obtain interval load and interval generation of combined values under radial network fault conditions of optimal island partitioning; Combined with the RDM algorithm, the target number with interval coefficients is defined as follows: In the above formula, wd(j,f) is a binary variable describing the possibility of load reduction in node j; Tr(f) represents the fault repair duration; C(j) represents the long-term interruption cost of consumers at node j; CG(l) represents the long-term interruption cost of DG at node l; xpg(l,f) represents the generation level variable of active power of DG in node j; NGL(f) and NLL(f) represent a set of loads and a set of DGs downstream of fault f; Establish power balance constraints in the local area network, branch capacity constraints in the local network, capacity constraints of distributed power sources in the local network, voltage limit constraints of the local power grid, and load reduction constraints in the local network respectively; (S5) Output the optimal island division scheme and the corresponding interval load and interval current values.
2. The risk management method for optimizing the partitioning of radial distribution network islands according to claim 1 is characterized in that: In step (S4), the power balance constraint in the local area network is: In the above formula, p(a,f) and p(a′,f) represent the variables of the active power flowing through branches a and a′ respectively; q(a,f) and q(a′,f) represent the variables of the reactive power flowing through branches a and a′ respectively; xpg(j,f) and xqg(j,f) represent the variables of the active power and reactive power generation levels of the DG in node j respectively; wdg(j,f) is a binary variable describing the state of the DG in node j (generated / not generated); F(j) and T(j) represent the branch set with node j as the initial node and the branch set with node j as the terminal node respectively.
3. The risk management method for optimizing the partitioning of radial distribution network islands according to claim 1 is characterized in that: In step (S4), the branch capacity constraint in the local network is: In the above formula, wt(a,f) is an auxiliary binary variable; S max (a) represents the maximum capacity of branch a; NSP is the number of linear segments (polygonal edges) used for branch current limiting linearization; pg ns represents the length of the segment (polygon side) ns used in the branch current limiting linearization; Q ns , P ns They represent the active power and reactive power of the segment (polygon side) ns used in the branch current limiting linearization; w(s) is a binary variable that takes the value 0 if the recloser at position s is disconnected, otherwise it takes the value 1.
4. The risk management method for optimizing the partitioning of radial distribution network islands according to claim 1 is characterized in that: In step (S4), the capacity constraints of the local network distributed power sources are:
5. The risk management method for optimizing the partitioning of radial distribution network islands according to claim 1 is characterized in that: In step (S5), the local power grid voltage limit constraint is: In the above formula, V l Re (f) V l Im (f) represent the real and imaginary parts of the voltage at node l, respectively; R a , X a Respectively represent the resistance and reactance of branch a; V min 、V max Respectively represent the minimum voltage limit and the maximum voltage limit; V nom Indicates the reference voltage; vn ns is the length of the segment (polygon side) ns used in the linearization for minimum voltage limitation; vx ns is the length of the segment (polygon side) ns used in the linearization of the maximum voltage limit; NSV is the number of linear segments (polygon sides) used for the voltage limit linearization.
6. The risk management method for optimizing the partitioning of radial distribution network islands according to claim 1, characterized in that: In step (S6), the load of the local network is reduced:
7. The risk management method for optimizing the partitioning of radial distribution network islands according to claim 1 is characterized in that: The procedure used to obtain a set of island partitions is: (A1) Using the correlation equation and correlation coefficient (r L (·))between; (A2) By using the correlation equation and the correlation coefficient (r G (·)), calculate α for each pair of DG G(n) The set of valid combinations of values; (A3) Using the correlation equation and correlation coefficient (r LG (·)) Calculate α for each pair of load and DG G(n) Value and α L(n) between the valid combinations of values); (A4) Select α for each load and DG downstream of the fault from the values obtained in steps (A1)-(A3) L(n) and α G(n) The value of (A5) Using α in (A4) L(n) and α G(n) The uncertain modeling formulas of load and renewable energy generation are used to obtain the precise values of interval load and interval generation from the interval numbers; (A6) defining the optimal islanding scheme for the considered fault for the clarity values obtained in (A5), in this case determining the adoption of an interval number MILP model, the MILP model employing automatic switches (reclosers and sectioning switches), already present in the network, to create islands and to shed loads such that the interruption cost to the user is considered to be minimized by the combination of interval load and interval generation; (A7) Select α from the set of values defined in steps (A1)-(A3) L(n) and α G(n) Repeat steps (A5) and (A6) for the new combination of (A8) Repeat step (A7) until α is exhausted. L(n) and α G(n) All possible combinations of (A9) Through steps (A1)-(A8), several possible island partitioning scenarios (NIS) are obtained for the considered fault.