Aviation product production capacity assessment method and system based on production data
Through the artificial immune algorithm and evolutionary routing algorithm, aviation product production nodes and material transportation paths are dynamically evaluated, which solves the problems of fixed evaluation indicators and insufficient path optimization strategies in the existing technology, and achieves more accurate production capacity evaluation and optimization effects.
Patent Information
- Application Number
- CN202411239070.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-09-05
AI Technical Summary
The existing aviation product production capacity evaluation method based on production data has the problem of fixed evaluation indicators, is difficult to adapt to dynamic changes, ignores the interaction between production nodes, and the optimization path strategy lacks dynamic adaptability, resulting in inaccurate evaluation results and optimization effects. Not ideal.
The artificial immune algorithm and evolutionary routing algorithm are used to automatically extract key evaluation indicators, dynamically adjust weights, and evaluate production nodes and material transportation paths by simulating biological immune systems and natural evolutionary mechanisms, taking into account the mutual influence between nodes and real-time production status.
It achieves more accurate and reliable production capacity assessment, can adapt to production changes, improve the accuracy and robustness of assessment, optimize production paths, and improve production efficiency and product quality.
Smart Images

Figure CN118761680A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing, and in particular to a method and system for evaluating the production capacity of aviation products based on production data. Background Art
[0002] With the rapid development of the aviation industry, the production scale of aviation products continues to expand, and the production process is becoming increasingly complex. In order to ensure the quality and performance of aviation products, enterprises need to conduct a comprehensive assessment of production capacity. Traditional production capacity assessment methods mainly rely on manual experience and qualitative analysis. By observing and recording the production process, key production links are identified and optimization suggestions are put forward. Although this method can reflect the status of production capacity to a certain extent, it has the problems of strong subjectivity, low evaluation efficiency and insufficient optimization targeting. With the accumulation of aviation product production data and the improvement of information level, data-based production capacity assessment methods have gradually attracted attention. By collecting and analyzing various data in the production process, such as quality inspection data, equipment operating parameters and material consumption records, these methods can more objectively and comprehensively reflect the level of production capacity and provide data support for optimizing production management. However, the existing data assessment methods still have some shortcomings, making it difficult to give full play to the value of production data and meet the needs of aviation product production capacity assessment.
[0003] The existing evaluation methods based on production data have the following shortcomings in practical applications: First, these methods usually use fixed evaluation indicators and weights, which are difficult to adapt to the dynamic changes and diversity of aviation product production. Since aviation product production involves multiple processes and links, there are differences in the key quality characteristics and efficiency indicators corresponding to products of different models and batches. The use of a unified evaluation standard can easily lead to evaluation results that are inconsistent with actual production capacity, affecting the accuracy and reliability of the evaluation; second, when evaluating production nodes, existing methods lack consideration of the mutual influence and constraint relationship between nodes. Aviation product production is a complex network system. There are interactions such as material flow and information transmission between various quality control nodes. Ignoring the correlation effect between nodes makes it difficult to comprehensively evaluate the capacity level of the entire production system; finally, in terms of production path optimization, existing methods often use fixed path selection strategies, such as the shortest path, the minimum cost path, etc., which lack the ability to dynamically adapt to real-time production status. The aviation product production environment is complex and changeable. Random factors such as material supply, equipment failure and personnel adjustment will affect the selection of production paths. Fixed path optimization strategies are difficult to cope with these changes, resulting in unsatisfactory optimization results.
[0004] These problems directly affect the accuracy and reliability of the aviation product production capacity assessment, and cannot fully reflect the capacity level of the entire production system. They may lead to deviations in the company's identification of production bottlenecks and problems, misconfiguration of production resources, affecting production efficiency and product quality, and even delaying the resolution of production problems, thereby increasing production costs and risks. Therefore, there is an urgent need for an aviation product production capacity assessment technology that can make full use of production data, automatically extract key evaluation indicators and dynamically adjust weights, while taking into account the mutual influence between production nodes, so as to address the obvious deficiencies of existing technologies in evaluation indicator selection, node correlation analysis and path optimization strategies.
[0005] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention
[0006] In response to the problems in the related technology, the present invention proposes an aviation product production capacity evaluation method and system based on production data, which has the advantages of making full use of production data, automatically extracting key evaluation indicators and dynamically adjusting weights, while considering the mutual influence between production nodes, thereby solving the obvious deficiencies in the existing technology in the selection of evaluation indicators, node correlation analysis and path optimization strategies.
[0007] To this end, the specific technical solution adopted by the present invention is as follows: According to one aspect of the present invention, a method for evaluating the production capacity of aviation products based on production data is provided, and the method for evaluating the production capacity of aviation products based on production data comprises the following steps: S1. Based on the quality requirements of aviation products, determine the quality control nodes in the production process, collect and pre-process the original data of each quality control node; S2. Extract key quality indicators and key efficiency indicators from the preprocessed data, evaluate the key quality indicators and key efficiency indicators using an artificial immune algorithm, and obtain production node evaluation results; S3. Based on the evolutionary routing algorithm, the material transportation paths between the quality control nodes are evaluated to obtain the production path evaluation results; S4. Comprehensively evaluate the overall production capacity of aviation products based on the production node assessment results and production path assessment results.
[0008] Furthermore, extracting key quality indicators and key efficiency indicators from the preprocessed data, evaluating the key quality indicators and key efficiency indicators using an artificial immune algorithm, and obtaining the production node evaluation results include the following steps: S21, extracting key quality indicators and key efficiency indicators from the preprocessed data, and constructing a node indicator vector and an initial evaluation vector group; S22, based on the initial evaluation vector group, calculating the affinity of the node index vector, and iterating the initial evaluation vector group to obtain the optimal evaluation vector group; S23. Calculate the comprehensive evaluation value of each quality control node according to the optimal evaluation vector group, and sort them to obtain the production node evaluation results.
[0009] Furthermore, extracting quality key indicators and efficiency key indicators from the preprocessed data and constructing node indicator vectors and initial evaluation vector groups include the following steps: S211, extracting key quality indicators and key efficiency indicators from the preprocessed data, constructing an indicator vector, and normalizing the vector to obtain a node indicator vector; S212, setting the initial evaluation vector group size, and randomly generating a number of weight vectors; S213. Normalize all weight vectors to obtain evaluation vectors, and form an initial evaluation vector group.
[0010] Further, based on the initial evaluation vector group, the affinity of the node index vector is calculated, and the initial evaluation vector group is iterated to obtain the optimal evaluation vector group, which includes the following steps: S221, based on the initial evaluation vector group, calculating the affinity between the node index vector and the evaluation vector, and selecting a number of memory vectors according to the calculation results; S222, randomly select a number of evaluation vectors to perform crossover and mutation operations to generate new evaluation vectors; S223, using the new evaluation vector and the memory vector to replace all evaluation vectors in the initial evaluation vector group; S224. Repeat steps S221 to S223 until the maximum number of iterations is reached, and output the current initial evaluation vector group as the optimal evaluation vector group.
[0011] Further, calculating the comprehensive evaluation value of each quality control node according to the optimal evaluation vector group and sorting the production node evaluation results includes the following steps: S231, selecting an evaluation vector with the highest affinity from the optimal evaluation vector group as the optimal weight vector; S232, using the optimal weight vector and the node index vector, calculating the comprehensive evaluation value of each quality control node; S233. Sort the quality control nodes from high to low according to the comprehensive evaluation values to obtain the production node evaluation results.
[0012] Furthermore, based on the evolutionary routing algorithm, the material transportation paths between the quality control nodes are evaluated, and the production path evaluation results are obtained, including the following steps: S31, constructing a quality control node material transportation network topology diagram and generating an initial material transportation path; S32, using the evolutionary routing algorithm to update the node strategy probability of the initial material transportation path to obtain the optimal material transportation path; S33. Calculate the change in efficiency value between the initial material transportation path and the optimal material transportation path to obtain a production path evaluation result.
[0013] Furthermore, constructing a quality control node material transportation network topology diagram and generating an initial material transportation path includes the following steps: S311. Construct a material transportation network topology diagram of quality control nodes according to the location distribution and transportation paths between quality control nodes; S312, according to the production process and material requirements, determine the source node and target node of each material transportation task in the material transportation network topology diagram of the quality control node; S313, marking the material transportation path between the source node and the target node as the global key material transportation path, initializing the strategy probabilities of the internal and external nodes of the global key material transportation path, and obtaining the initial material transportation path.
[0014] Furthermore, the node strategy probability of the initial material transportation path is updated by using the evolutionary routing algorithm, and the optimal material transportation path is obtained, which includes the following steps: S321, defining nodes in the initial material transportation path as intermediate nodes, and defining quality control nodes adjacent to the intermediate nodes as neighboring nodes; S322, identifying a neighboring node that is closer to the target node in the initial material transportation path, and updating the strategy probability of the intermediate node to the maximum value of the strategy probability among the neighboring nodes; S323. According to the updated strategy probability, the material is transferred or temporarily stored to generate the optimal material transportation path.
[0015] Furthermore, calculating the change in transportation efficiency between the initial material transportation path and the optimal material transportation path to obtain the production path evaluation result includes the following steps: S331, calculating the transportation efficiency of the initial material transportation path; S332, calculating the transportation efficiency of the optimal material transportation path; S333. Calculate the difference between the transportation efficiency of the optimal material transportation path and the transportation efficiency of the initial material transportation path to obtain a comprehensive evaluation result of the production path optimization.
[0016] According to another aspect of the present invention, there is also provided an aviation product production capacity evaluation system based on production data, the aviation product production capacity evaluation system based on production data comprising: The production data acquisition module is used to determine the quality control nodes in the production process based on the quality requirements of aviation products, collect the original data of each quality control node and pre-process it; The production node evaluation module is used to extract the key quality indicators and key efficiency indicators from the preprocessed data, and use the artificial immune algorithm to evaluate the key quality indicators and key efficiency indicators to obtain the production node evaluation results; The production path evaluation module is used to evaluate the material transportation path between each quality control node based on the evolutionary routing algorithm to obtain the production path evaluation result; The production capacity assessment module is used to comprehensively assess the overall production capacity of aviation products based on the production node assessment results and the production path assessment results; Among them, the production data collection module is connected to the production node evaluation module, and the production node evaluation module is connected to the production capacity evaluation module through the production path evaluation module.
[0017] The beneficial effects of the present invention are: (1) The present invention uses an artificial immune algorithm and an evolutionary routing algorithm to comprehensively evaluate production nodes and production paths. In terms of production node evaluation, the present invention extracts key quality indicators and key efficiency indicators from preprocessed data, constructs node indicator vectors and initial evaluation vector groups, and obtains the optimal evaluation vector group through affinity calculation and iterative optimization. Finally, the quality control nodes are sorted according to the comprehensive evaluation value. In terms of production path evaluation, the present invention constructs a material transportation network topology diagram of quality control nodes, generates an initial material transportation path, and uses an evolutionary routing algorithm to update the node strategy probability to obtain the optimal material transportation path. By calculating the changes in transportation efficiency between the initial path and the optimal path, the effect of production path optimization can be quantitatively evaluated. The present invention can make full use of production data, objectively reflect the production capacity of aviation products, and provide strong support for the production management and decision-making of enterprises.
[0018] (2) The present invention realizes the comprehensive evaluation of quality control nodes by simulating the antigen recognition and antibody optimization mechanism of the biological immune system. The key quality indicators and key efficiency indicators are used as node indicator vectors. The initial antibody group is randomly generated and its affinity with the node indicator vector is calculated to simulate the immune system's recognition process of the antigen. At the same time, in the iterative optimization process, the present invention retains high-affinity antibodies through memory cells, generates new antibodies through cross-mutation operations, and continuously improves the matching degree between the antibody group and the antigen. Finally, the optimal evaluation vector group is obtained, which can adaptively adjust the evaluation rules, dynamically adapt to the changes in production nodes, and improve the accuracy and robustness of the evaluation.
[0019] (3) The present invention simulates the mechanism of biological evolution and route selection in nature, first constructs a material transportation network topology diagram of quality control nodes, and determines the source node and the target node according to the production process and material demand, and generates an initial material transportation path; at the same time, in the process of path optimization, the present invention defines intermediate nodes and neighboring nodes, introduces a node strategy probability update mechanism, simulates the dynamic flow of materials in the production path, updates the strategy probability of the intermediate node by identifying the neighboring node closer to the target node, and executes the transfer or temporary storage of materials according to the updated strategy probability, compares the efficiency difference between the initial path and the optimal path, and provides an intuitive reference for evaluating production capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 is a flow chart of a method for evaluating aviation product production capacity based on production data according to an embodiment of the present invention; Figure 2 A principle block diagram of an aviation product production capability assessment system based on production data according to an embodiment of the present invention. DETAILED DESCRIPTION
[0022] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments and can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementations and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.
[0023] According to an embodiment of the present invention, a method and system for evaluating aviation product production capacity based on production data are provided.
[0024] The present invention is further described with reference to the accompanying drawings and specific embodiments. Figure 1 As shown, according to one embodiment of the present invention, a method for evaluating the production capacity of aviation products based on production data is provided, and the method for evaluating the production capacity of aviation products based on production data includes the following steps: S1. Based on the quality requirements of aviation products, determine the quality control nodes in the production process, collect and pre-process the original data of each quality control node; Specifically, the quality control nodes include raw material inspection nodes, parts processing quality inspection nodes, assembly quality inspection nodes, integrated test nodes, static test nodes, fatigue test nodes and flight test nodes; Among them, the raw material inspection node is used to conduct strict quality inspection on the purchased raw materials of aviation products to ensure that they meet technical specifications and quality standards; The parts processing quality inspection node is used to conduct quality inspection after the aviation product parts are processed to ensure that the processing accuracy and surface quality meet the requirements; The assembly quality inspection node is used to inspect the quality of aviation products during the product assembly process to ensure assembly accuracy and quality; The integration test node is used to perform integration testing after product assembly is completed to verify whether the functions and performance meet the design requirements; Static test nodes are used to conduct static tests on aviation products to verify whether the structural strength meets the design requirements; The fatigue test node is used to conduct fatigue tests on aviation products to evaluate the structural reliability and life in long-term use; Flight test nodes are used to conduct flight tests before the delivery of aviation products to verify whether the performance, handling qualities and functions meet the design requirements and airworthiness specifications.
[0025] S2. Extract key quality indicators and key efficiency indicators from the preprocessed data, evaluate the key quality indicators and key efficiency indicators using an artificial immune algorithm, and obtain production node evaluation results; S3. Based on the evolutionary routing algorithm, the material transportation paths between the quality control nodes are evaluated to obtain the production path evaluation results; S4. Comprehensively evaluate the overall production capacity of aviation products based on the production node assessment results and production path assessment results.
[0026] Specifically, according to the comprehensive evaluation value Ek of K quality control nodes and the evaluation result R of the production path, the overall production capacity of aviation products is comprehensively evaluated by calculating the comprehensive evaluation value P. The calculation formula of the comprehensive evaluation value P is: P%=(∑(Ek / K)+R) / 2×100%, where ∑(Ek / K) represents the average value of the comprehensive evaluation values of K quality control nodes, reflecting the comprehensive performance level of the production nodes, and R represents the optimization level of the production path, which is the weighted average of the time efficiency improvement rate RT and the cost efficiency improvement rate RC. The meaning of P value is the degree of achievement of aviation product production capacity in the two dimensions of production node performance and production path optimization, that is, the ratio of actual production capacity to optimal production capacity. The closer the P value is to 100, the closer the overall production capacity is to the optimal state. When P%≥90%, the overall production capacity is excellent; when 80%≤P%<90%, the overall production capacity is good; when 70%≤P%<80%, the overall production capacity is medium; and when P%<70%, the overall production capacity is unqualified. The overall production capacity of aviation products is finally judged.
[0027] In one embodiment, extracting key quality indicators and key efficiency indicators from preprocessed data, evaluating the key quality indicators and key efficiency indicators using an artificial immune algorithm, and obtaining a production node evaluation result includes the following steps: S21, extracting key quality indicators and key efficiency indicators from the preprocessed data, and constructing a node indicator vector and an initial evaluation vector group; S22, based on the initial evaluation vector group, calculating the affinity of the node index vector, and iterating the initial evaluation vector group to obtain the optimal evaluation vector group; S23. Calculate the comprehensive evaluation value of each quality control node according to the optimal evaluation vector group, and sort them to obtain the production node evaluation results.
[0028] In one embodiment, extracting quality key indicators and efficiency key indicators from preprocessed data and constructing node indicator vectors and initial evaluation vector groups include the following steps: S211, extracting key quality indicators and key efficiency indicators from the preprocessed data, constructing an indicator vector, and normalizing the vector to obtain a node indicator vector; Specifically, the key quality indicators include: raw material quality pass rate, parts processing pass rate, product one-time assembly pass rate, integration test first-round pass rate, static test pass rate, fatigue test pass rate and flight test first-round pass rate; Among them, the raw material quality qualification rate is used to reflect the ability of the raw material inspection node to control the quality of raw materials and control the quality of subsequent products; The qualified rate of parts processing is used to reflect the ability of the parts processing quality inspection node to control the processing quality and test whether the parts can be assembled; The product one-time assembly pass rate is used to reflect the ability of the assembly quality inspection node to discover and prevent assembly quality defects, reflecting the overall quality of the product; The first-round pass rate of the integration test is used to reflect the ability of the integration test node to verify product functions and performance, and to reflect the design quality and production quality; The static test pass rate is used to reflect the ability of static test nodes to confirm the product structural strength and ensure the safety and reliability of aviation products; The fatigue test pass rate is used to reflect the ability of fatigue test nodes to evaluate the product service life and control the durability and maintenance cost of aviation products; The first-round pass rate of flight tests is used to reflect the ability of the flight test node to verify the comprehensive performance of the product and ensure that aviation products meet user needs and airworthiness requirements.
[0029] Specifically, the key efficiency indicators include: raw material inspection cycle, parts processing beat, assembly efficiency, integrated test efficiency, static test cycle, fatigue test cycle and flight test efficiency; Among them, the raw material inspection cycle is used to reflect the work efficiency of the raw material inspection node and ensure the production plan and delivery cycle; The parts processing rhythm is used to reflect the production efficiency of the parts processing quality inspection node and control the product manufacturing cost; Assembly efficiency is used to reflect the work efficiency of assembly quality inspection nodes and ensure product production cycle; Integration test efficiency is used to reflect the work efficiency of integration test nodes and ensure product delivery cycle; The static test cycle is used to reflect the work efficiency of the static test nodes and control the cost and progress of the static test; The fatigue test cycle is used to reflect the work efficiency of fatigue test nodes and control the cost and progress of fatigue tests; Flight test efficiency is used to reflect the work efficiency of flight test nodes and control the cost and progress of flight tests.
[0030] Specifically, n key quality indicators and key efficiency indicators are extracted to form an indicator vector v=(v1, v2, ..., v n ), v is dimensionlessly processed to obtain the normalized index vector v'=(v1',v2',...,v n '), and v' is used as the node indicator vector Ag.
[0031] S212, setting the initial evaluation vector group size, and randomly generating a number of weight vectors; Specifically, the initial antibody population size N is set, and N n-dimensional weight vectors w are randomly generated i =(w i1 ,w i2,...,w in ), where i=1,2,...,N.
[0032] S213. Normalize all weight vectors to obtain evaluation vectors, and form an initial evaluation vector group.
[0033] Specifically, for w i Normalization is performed to ensure that ∑w i =1, w i As the evaluation vector Ab i ,{Ab1,Ab2,...,Ab N} constitute the initial evaluation vector group.
[0034] In one embodiment, based on the initial evaluation vector group, the affinity of the node index vector is calculated, and the initial evaluation vector group is iterated to obtain the optimal evaluation vector group, which includes the following steps: S221, based on the initial evaluation vector group, calculating the affinity between the node index vector and the evaluation vector, and selecting a number of memory vectors according to the calculation results; Specifically, the cosine similarity is used to calculate the node index vector Ag and each evaluation vector Ab i The affinity of the initial evaluation vector group is sorted by affinity, and the m evaluation vectors with the highest affinity are selected as the memory vector MC s ={MC1,MC2,...,MC m}, where s=1,2,…,m.
[0035] S222, randomly select a number of evaluation vectors to perform crossover and mutation operations to generate new evaluation vectors; Specifically, Nm evaluation vectors are randomly selected from the initial evaluation vector group as the parent vector P j , where j=1,2,...,Nm, randomly select two vectors P from the parent vector j1 and P j2 , perform a cross operation on them to generate a cross vector C j =(c j1 ,c j2 ,...,c jn ), where the formula for the crossover operation is: jk =α×p j1 k+(1-α)×p j2 k, where k=1,2,...,n, and α is a randomly generated real number between (0,1).
[0036] Specifically, the probability pm is used for the cross vector C j Perform mutation operation, which is to randomly select one-dimensional c jk, and replace it with a randomly generated value in the range (0,1) to obtain the mutation vector M j Then repeat the above crossover and mutation operations Nm times to obtain Nm new evaluation vectors NAb j ={NAb1,NAb2,...,NAb N-m}.
[0037] S223, using the new evaluation vector and the memory vector to replace all evaluation vectors in the initial evaluation vector group; Specifically, m memory vectors MC s and Nm new evaluation vectors NAb j Combined into a new evaluation vector group {MC1, MC2, ..., MC m ,NAb1,NAb2,...,NAb N-m}, replace all evaluation vectors in the initial evaluation vector group as the starting point of a new round of iteration.
[0038] S224. Repeat steps S221 to S223 until the maximum number of iterations is reached, and output the current initial evaluation vector group as the optimal evaluation vector group.
[0039] Specifically, set the maximum number of iterations T max , repeat steps S221-S223 until the number of iterations reaches T max , take the evaluation vector group at this time as the optimal evaluation vector group AG s Output.
[0040] In one embodiment, calculating the comprehensive evaluation value of each quality control node according to the optimal evaluation vector group and sorting the production node evaluation results includes the following steps: S231, selecting an evaluation vector with the highest affinity from the optimal evaluation vector group as the optimal weight vector; Specifically, the cosine similarity is used to calculate the node index vector Ag and each evaluation vector Ab i The affinity f i , the calculation formula is f i =cos(Ag,Ab i ), select the evaluation vector with the highest affinity as the optimal weight vector w * =(w1 * ,w2 * ,...,w n * ).
[0041] S232, using the optimal weight vector and the node index vector, calculating the comprehensive evaluation value of each quality control node; Specifically, let the index vector corresponding to the kth quality control node be vk=(vk1,vk2,...,vk n ), where k=1,2,...,K, K is the total number of quality control nodes, and then vk is also normalized to obtain the normalized index vector vk'=(vk1',vk2',...,vk n '), substitute vk' into the optimal weight vector w*, and calculate the comprehensive evaluation value Ek of the kth node. The calculation formula is Ek=w⋅vk'=∑(w i ⋅vk i '), where i=1,2,...,n.
[0042] S233. Sort the quality control nodes from high to low according to the comprehensive evaluation values to obtain the production node evaluation results.
[0043] Specifically, the K quality control nodes are sorted from high to low according to the comprehensive evaluation value Ek to obtain the production node evaluation result. The nodes at the top of the sort have high comprehensive performance and higher priority, while the nodes at the bottom of the sort have low comprehensive performance and need to be optimized.
[0044] In one embodiment, based on the evolutionary routing algorithm, evaluating the material transportation path between each quality control node and obtaining the production path evaluation result includes the following steps: S31, constructing a quality control node material transportation network topology diagram and generating an initial material transportation path; S32, using the evolutionary routing algorithm to update the node strategy probability of the initial material transportation path to obtain the optimal material transportation path; S33. Calculate the change in efficiency value between the initial material transportation path and the optimal material transportation path to obtain a production path evaluation result.
[0045] In one embodiment, constructing a quality control node material transportation network topology diagram and generating an initial material transportation path includes the following steps: S311. Construct a material transportation network topology diagram of quality control nodes according to the location distribution and transportation paths between quality control nodes; Specifically, each quality control node is abstracted as a node in the network topology graph, the connection between nodes represents the material transportation path, and the weight of the connection represents the transportation cost, thereby constructing an undirected weighted network topology graph G(V,E), where V is the node set and E is the connection set; S312, according to the production process and material requirements, determine the source node and target node of each material transportation task in the material transportation network topology diagram of the quality control node; Specifically, for each material transportation task, the starting point (source node) and the end point (target node) of the task are determined according to the production process and the material requirement table, and the source node vs and the target node vt are identified in the network topology graph G(V,E); S313, marking the material transportation path between the source node and the target node as the global key material transportation path, initializing the strategy probabilities of the internal and external nodes of the global key material transportation path, and obtaining the initial material transportation path.
[0046] Specifically, the shortest path algorithm (Dijkstra algorithm) is used to search for the shortest path from the source node vs to the target node vt in the network topology graph G(V,E), and the path is marked as the global critical material transportation path GSR. The node strategy probability within the global critical material transportation path is initialized to 1, and the node strategy probability outside the global critical material transportation path is initialized to 0 to form an initial material transportation path.
[0047] In one embodiment, the node strategy probability of the initial material transportation path is updated by using the evolutionary routing algorithm to obtain the optimal material transportation path, including the following steps: S321. Define nodes in the global key material transportation path as intermediate nodes, and define quality control nodes adjacent to the intermediate nodes as neighboring nodes; Specifically, all nodes in the global key material transportation path GSR are defined as intermediate nodes Inter={Inter1,Inter2,...,Inter x}, where x is the number of intermediate nodes. For each intermediate node, find the quality control nodes directly connected to it in the network topology graph G(V,E), and define these nodes as the neighbor nodes of the intermediate node Neigh={Neigh1,Neigh2,...,Neigh y}, where y is the number of neighboring nodes.
[0048] S322, identifying neighboring nodes closer to the target node in the global key material transportation path, and updating the strategy probability of the intermediate node to the maximum value of the strategy probability among the neighboring nodes; Specifically, for each neighboring node of the intermediate node, the shortest path length to the target node vt is calculated respectively, and it is determined whether it is less than the shortest path length from the intermediate node to the target node vt. If it is determined that such a neighboring node exists, the current node replaces its own probability value with the probability value of the neighboring node with the largest strategy probability.
[0049] S323. According to the updated strategy probability, the material is transferred or temporarily stored to generate the optimal material transportation path.
[0050] Specifically, a decision threshold λ (0<λ<1) is set. For the intermediate node, a number r between (0,1) is randomly generated according to its updated strategy probability. The strategy is selected by comparing r with λ: if r≤λ, the strategy is 1, and the material is transferred from the intermediate node to the neighboring node with the largest strategy probability; if r>λ, the strategy is 0, and the material is temporarily stored at the intermediate node; the above strategy selection is repeated until the material is transferred from the source node vs to the target node vt, forming a complete material transportation path, and finally obtaining the optimal material transportation path.
[0051] Specifically, if the strategy selection is 1, the current node transfers the material to the neighboring node with the maximum strategy probability and updates the strategy history; if the strategy selection is 0, the current node performs temporary storage of the material and updates the strategy history.
[0052] In one embodiment, calculating the change in transportation efficiency between the initial material transportation path and the optimal material transportation path to obtain the production path evaluation result includes the following steps: S331, calculating the transportation efficiency of the initial material transportation path; Specifically, according to the initial material transportation path, the material transportation time T and the transportation cost C from the source node vs to the target node vt are calculated, and the time efficiency ET=1 / T and the cost efficiency EC=1 / C of the initial material transportation path are obtained.
[0053] S332, calculating the transportation efficiency of the optimal material transportation path; Specifically, according to the optimal material transportation path, the optimized material transportation time T* and transportation cost C* from the source node vs to the target node vt are calculated to obtain the time efficiency ET*=1 / T* and cost efficiency EC*=1 / C* of the optimal material transportation path.
[0054] S333. Calculate the rate of change of transportation efficiency and obtain the evaluation result of the production path.
[0055] Specifically, for time efficiency and cost efficiency, the change rates are calculated respectively, and the time efficiency can be improved RT=(ET*-ET) / ET×100%, and the cost efficiency can be improved RC=(EC*-EC) / EC×100%. The time efficiency RT and the cost efficiency RC of the production path can be obtained. RT and RC are weighted averaged to obtain the evaluation result R of the production path. The weighted average formula is R=αt×RT+αc×RC, where αt and αc are the weight coefficients of time efficiency and cost efficiency, respectively, satisfying αt+αc=1. In this embodiment, αt takes a value of 0.6 and αc takes a value of 0.4.
[0056] In order to facilitate understanding of the above technical scheme of the present invention, a certain aircraft engine manufacturing enterprise is taken as an example for specific description as follows: the enterprise produces a certain type of turbofan engine, involving 3 main production workshops and 7 quality control nodes. By collecting production data of each node within 3 months, the overall production capacity of the engine of this type is evaluated. First, according to the engine quality requirements, 7 quality control nodes are determined, including key processes such as raw material inspection, component processing quality inspection, integration test, and static test. Data acquisition equipment is arranged at each node to record production data such as processing time, first-time qualified rate, rework rate and output. The collected massive data is cleaned, integrated, normalized and other pre-processed to obtain a structured node production data set; then, 2 key quality indicators (product hardness and dimensional accuracy) and 2 key efficiency indicators (processing time and unqualified rate) are extracted from the node data set, a 4-dimensional node indicator vector is constructed, the initial antibody group size is set to 50, iterates 120 times, and uses an artificial immune algorithm to learn and identify antigens to obtain a comprehensive evaluation value and ranking of each node. The results show that there is a large room for optimization in the casting hardness of the foundry and the product production rhythm of the assembly workshop; then Based on the workshop layout and logistics routes, a material transportation network topology diagram of 7 quality control nodes is constructed. For the transportation tasks of 5 key materials, the evolutionary routing algorithm is used to optimize the transportation path. After 50 iterations, the optimal material transportation plan is obtained. The results show that by optimizing the transportation path of the blanks after heat treatment, the turnover time of the blanks between manufacturing workshops can be shortened by 15%, the backlog of work-in-progress can be reduced, and the production efficiency can be improved. Finally, the production node weight is set to 0.7, the production path weight is set to 0.3, and the weighted average of each evaluation result is taken. The comprehensive evaluation value of the overall production capacity of this model engine is 82.5, and the corresponding production capacity level is "good". According to the final evaluation results, the casting process is the bottleneck restricting the improvement of the overall production capacity of the engine. It is necessary to give priority to process optimization and management improvement. Reasonable planning of the material transportation path of the assembly workshop can improve the assembly efficiency while ensuring the quality of aviation products and shorten the product production cycle. The present invention makes full use of various production data generated in the aviation manufacturing process to conduct a comprehensive and objective evaluation of the product production capacity, thereby identifying the key factors affecting product quality and production efficiency, and providing strong support for the production and manufacturing of aviation products.
[0057] like Figure 2 As shown, according to another embodiment of the present invention, there is also provided an aviation product production capacity evaluation system based on production data, the aviation product production capacity evaluation system based on production data includes:
[0058] The production data acquisition module 1 is used to determine the quality control nodes in the production process based on the quality requirements of aviation products, collect the original data of each quality control node and pre-process it; The production node evaluation module 2 is used to extract the key quality indicators and the key efficiency indicators from the preprocessed data, and use the artificial immune algorithm to evaluate the key quality indicators and the key efficiency indicators to obtain the production node evaluation results; The production path evaluation module 3 is used to evaluate the material transportation path between each quality control node based on the evolutionary routing algorithm to obtain the production path evaluation result; Production capacity evaluation module 4, used to comprehensively evaluate the overall production capacity of aviation products based on the production node evaluation results and the production path evaluation results; Among them, the production data collection module 1 is connected to the production node evaluation module 2, and the production node evaluation module 2 is connected to the production capacity evaluation module 4 through the production path evaluation module 3.
[0059] In order to facilitate understanding of the above technical solutions of the present invention, the working principle or operation mode of the present invention in the actual process is described in detail below.
[0060] In summary, with the aid of the above technical scheme of the present invention, a comprehensive evaluation of production nodes and production paths is carried out by comprehensively using artificial immune algorithms and evolutionary routing algorithms. In terms of production node evaluation, the present invention extracts key quality indicators and key efficiency indicators from preprocessed data, constructs node indicator vectors and initial evaluation vector groups, and obtains the optimal evaluation vector group through affinity calculation and iterative optimization. Finally, the quality control nodes are sorted according to the comprehensive evaluation value. In terms of production path evaluation, the present invention constructs a material transportation network topology diagram of quality control nodes, generates an initial material transportation path, and uses an evolutionary routing algorithm to update the node strategy probability to obtain the optimal material transportation path. By calculating the changes in transportation efficiency between the initial path and the optimal path, the effect of production path optimization can be quantitatively evaluated. The present invention can make full use of production data, objectively reflect the production capacity of aviation products, and provide strong support for the production management and decision-making of enterprises. The present invention realizes the comprehensive evaluation of quality control nodes by simulating the antigen recognition and antibody optimization mechanism of the biological immune system, and uses key quality indicators and key efficiency indicators as node indicator vectors. , by randomly generating an initial antibody group and calculating its affinity with the node index vector, the immune system's recognition process of the antigen is simulated. At the same time, in the process of iterative optimization, the present invention retains antibodies with high affinity through memory cells, generates new antibodies through cross-mutation operations, continuously improves the matching degree between the antibody group and the antigen, and finally obtains the optimal evaluation vector group, which can adaptively adjust the evaluation rules, dynamically adapt to the changes of production nodes, and improve the accuracy and robustness of the evaluation; the present invention constructs a material transportation network topology diagram of the quality control node by simulating the mechanism of biological evolution and route selection in nature, and determines the source node and the target node according to the production process and material demand to generate the initial material transportation path. In addition, in the process of path optimization, the present invention introduces an update mechanism of node strategy probability by defining intermediate nodes and neighboring nodes, simulates the dynamic flow of materials in the production path, updates the strategy probability of the intermediate node by identifying the neighboring node closer to the target node, and executes the transportation or temporary storage of materials according to the updated strategy probability, compares the efficiency difference between the initial path and the optimal path, and provides an intuitive reference for evaluating production capacity.
[0061] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for evaluating the production capacity of aviation products based on production data, characterized in that: The aviation product production capacity assessment method based on production data includes the following steps: S1. Based on the quality requirements of aviation products, determine the quality control nodes in the production process, collect and pre-process the original data of each quality control node; S2. Extract key quality indicators and key efficiency indicators from the preprocessed data, evaluate the key quality indicators and key efficiency indicators using an artificial immune algorithm, and obtain production node evaluation results; S3. Based on the evolutionary routing algorithm, the material transportation paths between the quality control nodes are evaluated to obtain the production path evaluation results; S4. Comprehensively evaluate the overall production capacity of aviation products based on the production node assessment results and production path assessment results.
2. The method for evaluating the production capacity of aviation products based on production data according to claim 1, characterized in that: The extracting of key quality indicators and key efficiency indicators from the preprocessed data, evaluating the key quality indicators and key efficiency indicators using an artificial immune algorithm, and obtaining the production node evaluation result comprises the following steps: S21, extracting key quality indicators and key efficiency indicators from the preprocessed data, and constructing a node indicator vector and an initial evaluation vector group; S22, based on the initial evaluation vector group, calculating the affinity of the node index vector, and iterating the initial evaluation vector group to obtain the optimal evaluation vector group; S23. Calculate the comprehensive evaluation value of each quality control node according to the optimal evaluation vector group, and sort them to obtain the production node evaluation results.
3. The method for evaluating the production capacity of aviation products based on production data according to claim 2, characterized in that: The method of extracting key quality indicators and key efficiency indicators from the preprocessed data and constructing a node indicator vector and an initial evaluation vector group includes the following steps: S211, extracting key quality indicators and key efficiency indicators from the preprocessed data, constructing an indicator vector, and normalizing the vector to obtain a node indicator vector; S212, setting the initial evaluation vector group size, and randomly generating a number of weight vectors; S213. Normalize all weight vectors to obtain evaluation vectors, and form an initial evaluation vector group.
4. The method for evaluating the production capacity of aviation products based on production data according to claim 3, characterized in that: The process of calculating the affinity of the node index vector based on the initial evaluation vector group and iterating the initial evaluation vector group to obtain the optimal evaluation vector group includes the following steps: S221, based on the initial evaluation vector group, calculating the affinity between the node index vector and the evaluation vector, and selecting a number of memory vectors according to the calculation results; S222, randomly select a number of evaluation vectors to perform crossover and mutation operations to generate new evaluation vectors; S223, using the new evaluation vector and the memory vector to replace all evaluation vectors in the initial evaluation vector group; S224. Repeat steps S221 to S223 until the maximum number of iterations is reached, and output the current initial evaluation vector group as the optimal evaluation vector group.
5. The method for evaluating the production capacity of aviation products based on production data according to claim 4, characterized in that: The step of calculating the comprehensive evaluation value of each quality control node according to the optimal evaluation vector group and sorting the production node evaluation results comprises the following steps: S231, selecting an evaluation vector with the highest affinity from the optimal evaluation vector group as the optimal weight vector; S232, using the optimal weight vector and the node index vector, calculating the comprehensive evaluation value of each quality control node; S233. Sort the quality control nodes from high to low according to the comprehensive evaluation values to obtain the production node evaluation results.
6. The method for evaluating the production capacity of aviation products based on production data according to claim 5, characterized in that: The method of evaluating the material transportation paths between the quality control nodes based on the evolutionary routing algorithm to obtain the production path evaluation result includes the following steps: S31, constructing a material transportation network topology diagram of a quality control node and generating an initial material transportation path; S32, using the evolutionary routing algorithm to update the node strategy probability of the initial material transportation path to obtain the optimal material transportation path; S33. Calculate the change in efficiency value between the initial material transportation path and the optimal material transportation path to obtain a production path evaluation result.
7. The method for evaluating the production capacity of aviation products based on production data according to claim 6, characterized in that: The construction of the quality control node material transportation network topology diagram and the generation of the initial material transportation path include the following steps: S311. Construct a material transportation network topology diagram of quality control nodes according to the location distribution and transportation paths between quality control nodes; S312, according to the production process and material requirements, determine the source node and target node of each material transportation task in the material transportation network topology diagram of the quality control node; S313, marking the material transportation path between the source node and the target node as the global key material transportation path, initializing the strategy probabilities of the internal and external nodes of the global key material transportation path, and obtaining the initial material transportation path.
8. The method for evaluating the production capacity of aviation products based on production data according to claim 7, characterized in that: The method of using the evolutionary routing algorithm to update the node strategy probability of the initial material transportation path to obtain the optimal material transportation path includes the following steps: S321, defining nodes in the initial material transportation path as intermediate nodes, and defining quality control nodes adjacent to the intermediate nodes as neighboring nodes; S322, identifying a neighboring node that is closer to the target node in the initial material transportation path, and updating the strategy probability of the intermediate node to the maximum value of the strategy probability among the neighboring nodes; S323. According to the updated strategy probability, the material is transferred or temporarily stored to generate the optimal material transportation path.
9. The method for evaluating the production capacity of aviation products based on production data according to claim 8, characterized in that: The calculation of the transportation efficiency change between the initial material transportation path and the optimal material transportation path to obtain the production path evaluation result comprises the following steps: S331, calculating the transportation efficiency of the initial material transportation path; S332, calculating the transportation efficiency of the optimal material transportation path; S333. Calculate the difference between the transportation efficiency of the optimal material transportation path and the transportation efficiency of the initial material transportation path to obtain a comprehensive evaluation result of the production path optimization.
10. An aviation product production capacity evaluation system based on production data, used to implement the aviation product production capacity evaluation method based on production data according to any one of claims 1 to 9, characterized in that: The aviation product production capacity assessment system based on production data includes: The production data acquisition module is used to determine the quality control nodes in the production process based on the quality requirements of aviation products, collect the original data of each quality control node and pre-process it; The production node evaluation module is used to extract the key quality indicators and key efficiency indicators from the preprocessed data, and use the artificial immune algorithm to evaluate the key quality indicators and key efficiency indicators to obtain the production node evaluation results; The production path evaluation module is used to evaluate the material transportation path between each quality control node based on the evolutionary routing algorithm to obtain the production path evaluation result; The production capacity assessment module is used to comprehensively assess the overall production capacity of aviation products based on the production node assessment results and the production path assessment results; Among them, the production data acquisition module is connected to the production node evaluation module, and the production node evaluation module is connected to the production capacity evaluation module through the production path evaluation module.
Citation Information
Patent Citations
Electricity price prediction method based on quantum immune optimization BP neural network algorithm
CN112036651A
Smart energy building comprehensive information physical fusion method based on heterogeneous data
CN113869571A
Battery swap station operation method based on photovoltaic power generation
CN117473680A
Household supply chain data processing method and device, equipment and storage medium
CN118469405A
Cited By
Performance analysis method and device of multi-process assembly system, medium and product
CN119225317A
Heat treatment workshop productivity evaluation method considering capacity constraint
CN119398565A
