Blood purification equipment data monitoring method and system
By calculating the standard deviation of patient sign data and operating data of the blood purification equipment, setting a personalized normal operating range of the equipment, and using the LSTM model for fault prediction, the problem of inaccurate monitoring in the existing technology is solved and the accuracy of fault prediction is improved. performance and device stability.
Patent Information
- Application Number
- CN202411237447.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-09-05
AI Technical Summary
Existing blood purification equipment monitoring methods ignore individual patient differences, resulting in inaccurate monitoring and inability to timely predict and respond to equipment failures caused by different blood characteristics.
By obtaining patient physical data and equipment operation data, the standard deviation is calculated to set a personalized normal operation range of the equipment, and fault prediction and preprocessing measures are performed. The LSTM model is used to predict faults of filters, pumps, conductivity measurement modules and flow control systems.
It improves the accuracy and timeliness of fault prediction, reduces the equipment failure rate, ensures the continuity and safety of treatment, dynamically adjusts the equipment operating range to adapt to patient sign fluctuations, and improves the flexibility and accuracy of monitoring.
Smart Images

Figure CN118762791A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of blood purification, and in particular to a method and system for monitoring data of blood purification equipment. Background Art
[0002] Blood purification equipment is an indispensable medical device for the treatment of renal failure and other blood-related diseases. These devices help maintain the patient's vital signs by removing waste and excess water from the blood. Blood purification equipment may encounter various faults during operation, such as filter blockage, pump failure, abnormal conductivity, etc. If these faults are not discovered and handled in time, they may affect the treatment effect and even pose a threat to the patient's health. However, the reliability of blood purification equipment is largely affected by individual differences in patients, especially blood characteristics. Differences in blood viscosity and composition between patients may cause certain parts of the equipment to wear faster or increase the risk of clogging. For example, high-viscosity blood may increase the probability of filter clogging, and abnormal concentrations of specific components in the blood may affect the conductivity of the dialysate, thereby affecting dialysis efficiency.
[0003] Existing blood purification equipment monitoring methods often ignore these individual differences and adopt uniform monitoring standards and failure thresholds, which may lead to inaccurate monitoring and inability to timely predict and respond to equipment failures caused by different patient blood characteristics. Summary of the Invention
[0004] The present invention provides a blood purification equipment data monitoring method and system to solve the technical problem of inaccurate blood purification equipment monitoring in the above background technology.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: In a first aspect, the present invention provides a method for monitoring data of a blood purification device, comprising: Acquire patient vital signs data and device operation data at the current monitoring time point. Patient vital signs data include blood pressure, heart rate, and blood viscosity; device operation data include filter element pressure difference, filter element flow, pump output flow, pump pressure, dialysate conductivity, dialysate flow, overall system pressure, and device temperature; The patient vital sign data obtained within the current preset time window of duration T are combined into a short-term vital sign data set, the standard deviation of the patient vital sign data in the current short-term vital sign data set is calculated, and the patient vital sign fluctuation level is obtained; based on the current patient vital sign fluctuation level, the normal operating range of the equipment at the current monitoring time point is set; it is determined whether the equipment operating data obtained at the current monitoring time point is within the preset normal operating range. If so, the fault prediction plan is executed; if not, an alarm is issued and alarm response measures are executed.
[0006] Preferably, based on the current fluctuation level of the patient's vital signs, the normal operating range of the device at the current monitoring time point is set to include: Set the normal operating range and set the standard deviation threshold and the maximum standard deviation ; If the standard deviation of the patient's vital signs data in the currently acquired short-term vital signs data set is Below or equal to the standard deviation threshold , then the normal operating range of the equipment at the current monitoring time point is the regular operating range; Set the increment range to , if the standard deviation of the patient's vital signs data in the currently acquired short-term vital signs data set is Above the standard deviation threshold , then use the formula Calculate the gain rate and the increase rate Applied to the normal operating range, obtain the normal operating range of the equipment at the current monitoring time point.
[0007] Preferably, executing the fault prediction scheme includes: Set an update cycle of 10T. At the beginning of any update cycle, combine the patient vital sign data acquired in the previous update cycle into a long-term vital sign data set; calculate the average value of the patient vital sign data in the acquired long-term vital sign data set to obtain the overall patient vital sign data of the current update cycle; Set blood pressure thresholds, heart rate thresholds, and blood viscosity thresholds, and compare the overall blood pressure value, heart rate value, and blood viscosity value in the patient's overall vital signs data with the blood pressure thresholds, heart rate thresholds, and blood viscosity thresholds; if the current patient's overall blood pressure value is higher than the blood pressure threshold, perform fault prediction operations on the filter element and pump; if the current patient's overall heart rate value is higher than the heart rate threshold, perform fault prediction operations on the pump and flow control system; if the current patient's overall blood viscosity value is higher than the blood viscosity threshold, perform fault prediction operations on the filter element, conductivity measurement module, and flow control system; Fault prediction operations in the fault prediction scheme include: Perform filter element fault prediction, compile the filter element pressure difference and filter element flow obtained at the current monitoring time point and the most recent N-1 monitoring time points into a filter element fault prediction set in chronological order, use the filter element fault prediction set as the input of the filter element fault prediction model, output the filter element pressure difference prediction value and filter element flow prediction value at the next monitoring time point, and determine whether the obtained filter element pressure difference prediction value and filter element flow prediction value are both within the normal operating range of the equipment. If so, no operation is performed; if not, perform fault pre-processing measures for the filter element; Predict pump failures by composing a pump failure prediction set based on the pump output flow and pump pressure obtained at the current monitoring time point and the most recent N-1 monitoring time points in chronological order. The pump failure prediction set is used as the input of a pump failure prediction model, and the pump output flow prediction value and pump pressure prediction value at the next monitoring time point are output. It is determined whether the obtained pump output flow prediction value and pump pressure prediction value are both within the normal operating range of the equipment. If so, no action is taken; if not, fault pre-processing measures are performed on the pump. Perform fault prediction on the conductivity measurement module. The dialysate conductivity obtained at the current monitoring time point and the most recent N-1 monitoring time points are chronologically organized into a conductivity fault prediction set. The conductivity fault prediction set is used as the input of the conductivity fault prediction model. The predicted dialysate conductivity value at the next monitoring time point is output. It is determined whether the obtained dialysate conductivity prediction value is within the normal operating range of the equipment. If so, no action is taken. If not, fault pre-processing measures are performed on the conductivity measurement module. Fault prediction is performed on the liquid flow control system. The dialysate flow obtained at the current monitoring time point and the most recent N-1 monitoring time points are organized into a flow fault prediction set in chronological order. The flow fault prediction set is used as the input of the flow fault prediction model. The dialysate flow prediction value at the next monitoring time point is output. It is determined whether the obtained dialysate flow prediction value is within the normal operating range of the equipment. If so, no operation is performed; if not, fault pre-processing measures are performed on the liquid flow control system.
[0008] Preferably, the filter element failure prediction model is established based on the LSTM model, including N filter element failure prediction LSTM units, a first fully connected layer and a first output layer, wherein the filter element failure prediction LSTM unit is used to extract the temporal features in the filter element failure prediction set; the first fully connected layer is used to extract features from the outputs of all filter element failure prediction LSTM units; the first output layer is used to output the filter element pressure difference prediction value and the filter element flow prediction value at the next monitoring time point; The training of the filter element failure prediction model includes: A plurality of filter element failure training samples are obtained, each of which stores N+1 filter element pressure differences and filter element flow rates sorted by time, and the first N filter element pressure differences and filter element flow rates in the filter element failure training samples are used as the input of the filter element failure prediction model, and the last filter element pressure difference and filter element flow rate in the filter element failure training samples are used as the output of the filter element failure prediction model; all filter element failure training samples are divided into a filter element failure training set and a filter element failure test set, and the filter element failure training set is sent to the filter element failure prediction model with initialized parameters for training, and then the filter element failure test set is input to the filter element failure prediction model to obtain a first test result; a first training condition is set, and it is judged whether the first test result meets the first training condition. If the first training condition is met, the trained filter element failure prediction model is output; otherwise, the filter element failure prediction model is continuously trained using the filter element failure training set.
[0009] Preferably, the pump fault prediction model is established based on an LSTM model, including N pump fault prediction LSTM units, one second fully connected layer, and one second output layer. The training of the pump fault prediction model includes: A number of pump fault training samples are obtained, each of which stores N+1 pump output flow rates and pump pressures sorted by time, and the first N pump output flow rates and pump pressures in the pump fault training samples are used as the input of the pump fault prediction model, and the last pump output flow rate and pump pressure in the pump fault training samples are used as the output of the pump fault prediction model; all pump fault training samples are divided into a pump fault training set and a pump fault test set, and the pump fault training set is sent to the pump fault prediction model with parameter initialization for training, and then the pump fault test set is input to the pump fault prediction model to obtain a second test result; a second training condition is set to determine whether the second test result meets the second training condition, and if so, the trained pump fault prediction model is output; otherwise, the pump fault prediction model is continued to be trained using the pump fault training set.
[0010] Preferably, the conductivity fault prediction model is established based on an LSTM model, including N conductivity fault prediction LSTM units, one third fully connected layer, and one third output layer. The training of the conductivity fault prediction model includes: A plurality of conductivity fault training samples are obtained, each of which stores N+1 dialysate conductivities sorted by time. The first N dialysate conductivities in the conductivity fault training samples are used as input to a conductivity fault prediction model, and the last dialysate conductivity in the conductivity fault training samples is used as output of the conductivity fault prediction model. All conductivity fault training samples are divided into a conductivity fault training set and a conductivity fault test set. The conductivity fault training set is fed into a parameter-initialized conductivity fault prediction model for training, and the conductivity fault test set is then fed into the conductivity fault prediction model to obtain a third test result. A third training condition is set, and it is determined whether the third test result satisfies the third training condition. If so, the trained conductivity fault prediction model is output; otherwise, the conductivity fault prediction model is continuously trained using the conductivity fault training set.
[0011] Preferably, the traffic fault prediction model is established based on an LSTM model, including N traffic fault prediction LSTM units, one fourth fully connected layer, and one fourth output layer. The training of the traffic fault prediction model includes: A number of flow fault training samples are obtained, each flow fault training sample stores N+1 dialysate flow rates sorted by time, the first N dialysate flow rates in the flow fault training sample are used as the input of the flow fault prediction model, and the last dialysate flow rate in the flow fault training sample is used as the output of the flow fault prediction model; all flow fault training samples are divided into a flow fault training set and a flow fault test set, the flow fault training set is sent to the parameter-initialized flow fault prediction model for training, and then the flow fault test set is input to the flow fault prediction model to obtain a fourth test result; a fourth training condition is set to determine whether the fourth test result meets the fourth training condition, and if so, the trained flow fault prediction model is output; otherwise, the flow fault prediction model is continued to be trained using the flow fault training set.
[0012] In a second aspect, the present invention provides a blood purification equipment data monitoring system, comprising: The patient vital sign data acquisition module is used to acquire patient vital sign data, and form a short-term vital sign data set with the patient vital sign data acquired within a preset time window of duration T, calculate the standard deviation of the patient vital sign data within the currently acquired short-term vital sign data set, and obtain the patient vital sign fluctuation level; based on the current patient sign fluctuation level, set the normal operating range of the device at the current monitoring time point; The operation data monitoring module is used to obtain the equipment operation data at the current monitoring time point, determine whether the equipment operation data obtained at the current monitoring time point is within the preset normal operating range, and if so, execute the fault prediction plan; if not, issue an alarm and execute the alarm response measures; The fault prediction module is used to compare the overall vital sign data of the patient in the current update cycle with the blood pressure threshold, heart rate threshold and blood viscosity threshold. If the overall blood pressure value of the current patient is higher than the blood pressure threshold, fault prediction operations are performed on the filter element and pump; if the overall heart rate value of the current patient is higher than the heart rate threshold, fault prediction operations are performed on the pump and flow control system; if the overall blood viscosity value of the current patient is higher than the blood viscosity threshold, fault prediction operations are performed on the filter element, conductivity measurement module and flow control system.
[0013] The present invention has the following advantages: The present invention obtains the patient's vital sign data and implements corresponding fault prediction schemes for different patient signs. This personalized approach can more accurately reflect the impact of individual patient differences on the operating status of the equipment, thereby improving the accuracy and timeliness of fault prediction. This targeted monitoring and prediction strategy helps to identify potential problems in advance, reduce equipment failure rates, and improve the continuity and safety of treatment. In addition, by automatically executing corresponding fault pre-processing measures when it is predicted that the equipment operating data may exceed the normal range, this response mechanism can quickly respond to predicted faults, reduce treatment interruptions or delays caused by equipment problems, and thus ensure the quality and safety of patient treatment. At the same time, it can dynamically adjust the normal operating range of the equipment according to the fluctuation level of the patient's vital signs, improving the flexibility and adaptability of monitoring, ensuring the accuracy of monitoring and the stable operation of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a structural diagram of a blood purification equipment data monitoring system used in an embodiment of the present invention. DETAILED DESCRIPTION
[0015] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0016] Embodiment 1 of the present invention is a method for monitoring data of a blood purification device, comprising: Acquire patient vital sign data and equipment operation data at the current monitoring time point. Patient vital sign data includes blood pressure, heart rate, and blood viscosity. Blood viscosity refers to the viscosity of blood and is an important factor affecting blood flow characteristics. The level of blood viscosity affects the flow rate of blood in blood vessels, thereby affecting the filtration efficiency and dialysis effect of blood purification equipment. Equipment operation data includes filter element pressure difference, filter element flow, pump output flow, pump pressure, dialysate conductivity, dialysate flow, overall system pressure, and equipment temperature. The patient vital sign data obtained within the current preset time window of duration T are combined into a short-term vital sign data set, the standard deviation of the patient vital sign data in the current short-term vital sign data set is calculated, and the patient vital sign fluctuation level is obtained; based on the current patient vital sign fluctuation level, the normal operating range of the equipment at the current monitoring time point is set; it is determined whether the equipment operating data obtained at the current monitoring time point is within the preset normal operating range. If so, the fault prediction plan is executed; if not, an alarm is issued and alarm response measures are executed.
[0017] Based on the current fluctuation level of the patient's vital signs, set the specific operation of the normal operating range of the equipment at the current monitoring time point: Set the normal operating range, which is the baseline state of the equipment operation, defines the basic parameter range that the equipment should follow under normal working conditions, and sets the standard deviation threshold and the maximum standard deviation ; Standard deviation threshold Used to determine whether the fluctuation of patient vital signs data is within an acceptable range; the highest standard deviation in historical patient data can be selected as the maximum standard deviation ; If the standard deviation of the patient's vital signs data in the currently acquired short-term vital signs data set is Below or equal to the standard deviation threshold , it means that the fluctuation of the patient's vital signs is within the normal range, and the equipment can operate within the normal operating range. The normal operating range of the equipment at the current monitoring time point is the normal operating range; Set the increment range to , if the standard deviation of the patient's vital signs data in the currently acquired short-term vital signs data set is Above the standard deviation threshold , then use the formula Calculate the gain rate and the increase rate Applied to the routine operating range, obtain the normal operating range of the equipment at the current monitoring time point to adapt to changes in patient vital signs and ensure that the equipment can still operate safely and effectively under the new level of vital sign fluctuations.
[0018] The reason for performing this step is that during the operation of the blood purification equipment, fluctuations in the patient's vital signs will indeed affect the equipment's various operating data (such as filter element pressure difference, filter element flow, pump output flow, etc.), so it is necessary to adjust the alarm threshold to adapt to the vital sign status of different patients.
[0019] Specific operations for executing the fault prediction solution include: Set an update cycle of 10T. At the beginning of any update cycle, combine the patient vital sign data acquired in the previous update cycle into a long-term vital sign data set; calculate the average value of the patient vital sign data in the acquired long-term vital sign data set to obtain the overall patient vital sign data of the current update cycle; A blood pressure threshold, a heart rate threshold, and a blood viscosity threshold are set, and the overall blood pressure value, the overall heart rate value, and the overall blood viscosity value in the patient's overall physical sign data are compared with the blood pressure threshold, the heart rate threshold, and the blood viscosity threshold.
[0020] If the patient's overall blood pressure is above the threshold, fault prediction will be performed on the filter and pump. This is because elevated blood pressure directly increases the filter's input pressure, burdening the filter and potentially increasing the pressure differential, increasing the probability of filter failure. High blood pressure also increases the pump's workload, as the pump must overcome higher pressures to maintain a stable flow output. Long-term high blood pressure can lead to increased pump wear and tear, increasing the pump's failure rate.
[0021] If the patient's overall heart rate is above the threshold, fault prediction operations are performed on the pump and flow control system. Large heart rate fluctuations can cause unstable blood flow, requiring the pump to constantly adjust its flow output to accommodate these changes. This frequent adjustment increases mechanical wear on the pump and the load on the control system, increasing the pump's failure rate. Blood flow fluctuations caused by heart rate changes can affect the accuracy of the flow control system, increasing the probability of control errors and potentially leading to unstable flow, impacting the stable operation of the entire system.
[0022] If the current patient's overall blood viscosity value is higher than the blood viscosity threshold, fault prediction operations will be performed on the filter element, conductivity measurement module and flow control system. This is because higher blood viscosity means higher concentrations of red blood cells, platelets and other components in the blood, which may increase the flow resistance of blood through the filter element, thereby accelerating the clogging of the filter element; high-viscosity blood may require a larger pressure difference to maintain the same flow rate, which will increase the risk of wear and damage to the filter element; this predictive maintenance helps reduce the occurrence of emergencies, improve equipment reliability and treatment effectiveness; at the same time, high-viscosity blood may require longer dialysis time or higher dialysis pressure to achieve the same purification effect; this requirement may affect the flow rate and pressure of the dialysate, and thus affect the stability of the dialysate conductivity. Conductivity directly affects the concentration and distribution of ions in the dialysate, and thus affects the efficiency of substance exchange during the dialysis process. Improper conductivity may cause complications in patients, such as electrolyte imbalance, posing a safety hazard to patients. The fault prediction operations in the fault prediction scheme specifically include: Perform filter element fault prediction, compile the filter element pressure difference and filter element flow obtained at the current monitoring time point and the most recent N-1 monitoring time points into a filter element fault prediction set in chronological order, use the filter element fault prediction set as the input of the filter element fault prediction model, output the filter element pressure difference prediction value and filter element flow prediction value at the next monitoring time point, and determine whether the obtained filter element pressure difference prediction value and filter element flow prediction value are both within the normal operating range of the equipment. If so, no operation is performed; if not, perform fault pre-processing measures for the filter element; Predict pump failures by composing a pump failure prediction set based on the pump output flow and pump pressure obtained at the current monitoring time point and the most recent N-1 monitoring time points in chronological order. The pump failure prediction set is used as the input of a pump failure prediction model, and the pump output flow prediction value and pump pressure prediction value at the next monitoring time point are output. It is determined whether the obtained pump output flow prediction value and pump pressure prediction value are both within the normal operating range of the equipment. If so, no action is taken; if not, fault pre-processing measures are performed on the pump. Perform fault prediction on the conductivity measurement module. The dialysate conductivity obtained at the current monitoring time point and the most recent N-1 monitoring time points are chronologically organized into a conductivity fault prediction set. The conductivity fault prediction set is used as the input of the conductivity fault prediction model. The predicted dialysate conductivity value at the next monitoring time point is output. It is determined whether the obtained dialysate conductivity prediction value is within the normal operating range of the equipment. If so, no action is taken. If not, fault pre-processing measures are performed on the conductivity measurement module. Fault prediction is performed on the liquid flow control system. The dialysate flow obtained at the current monitoring time point and the most recent N-1 monitoring time points are organized into a flow fault prediction set in chronological order. The flow fault prediction set is used as the input of the flow fault prediction model. The dialysate flow prediction value at the next monitoring time point is output. It is determined whether the obtained dialysate flow prediction value is within the normal operating range of the equipment. If so, no operation is performed; if not, fault pre-processing measures are performed on the liquid flow control system.
[0023] The filter element failure prediction model is built based on the LSTM model and includes N filter element failure prediction LSTM units, a first fully connected layer, and a first output layer. The filter element failure prediction LSTM unit is used to extract temporal features from the filter element failure prediction set; the first fully connected layer is used to extract features from the outputs of all filter element failure prediction LSTM units; and the first output layer is used to output the predicted filter element pressure difference and filter element flow rate at the next monitoring time point. Specific operations for training the filter element failure prediction model: A plurality of filter element failure training samples are obtained, each of which stores N+1 filter element pressure differences and filter element flow rates sorted by time, and the first N filter element pressure differences and filter element flow rates in the filter element failure training samples are used as the input of the filter element failure prediction model, and the last filter element pressure difference and filter element flow rate in the filter element failure training samples are used as the output of the filter element failure prediction model; all filter element failure training samples are divided into a filter element failure training set and a filter element failure test set, and the filter element failure training set is sent to the filter element failure prediction model with initialized parameters for training, and then the filter element failure test set is input to the filter element failure prediction model to obtain a first test result; a first training condition is set, and it is judged whether the first test result meets the first training condition. If the first training condition is met, the trained filter element failure prediction model is output; otherwise, the filter element failure prediction model is continuously trained using the filter element failure training set.
[0024] The pump fault prediction model is built based on the LSTM model, which includes N pump fault prediction LSTM units, one second fully connected layer, and one second output layer. The specific operations for training the pump fault prediction model are as follows: A number of pump fault training samples are obtained, each of which stores N+1 pump output flow rates and pump pressures sorted by time, and the first N pump output flow rates and pump pressures in the pump fault training samples are used as the input of the pump fault prediction model, and the last pump output flow rate and pump pressure in the pump fault training samples are used as the output of the pump fault prediction model; all pump fault training samples are divided into a pump fault training set and a pump fault test set, and the pump fault training set is sent to the pump fault prediction model with parameter initialization for training, and then the pump fault test set is input to the pump fault prediction model to obtain a second test result; a second training condition is set to determine whether the second test result meets the second training condition, and if so, the trained pump fault prediction model is output; otherwise, the pump fault prediction model is continued to be trained using the pump fault training set.
[0025] The conductivity fault prediction model is built based on the LSTM model, which includes N conductivity fault prediction LSTM units, one third fully connected layer, and one third output layer. The specific operations for training the conductivity fault prediction model are as follows: A plurality of conductivity fault training samples are obtained, each of which stores N+1 dialysate conductivities sorted by time. The first N dialysate conductivities in the conductivity fault training samples are used as input to a conductivity fault prediction model, and the last dialysate conductivity in the conductivity fault training samples is used as output of the conductivity fault prediction model. All conductivity fault training samples are divided into a conductivity fault training set and a conductivity fault test set. The conductivity fault training set is fed into a parameter-initialized conductivity fault prediction model for training, and the conductivity fault test set is then fed into the conductivity fault prediction model to obtain a third test result. A third training condition is set, and it is determined whether the third test result satisfies the third training condition. If so, the trained conductivity fault prediction model is output; otherwise, the conductivity fault prediction model is continuously trained using the conductivity fault training set.
[0026] The traffic fault prediction model is built based on the LSTM model, including N traffic fault prediction LSTM units, one fourth fully connected layer, and one fourth output layer. The specific operations for training the traffic fault prediction model are as follows: A number of flow fault training samples are obtained, each flow fault training sample stores N+1 dialysate flow rates sorted by time, the first N dialysate flow rates in the flow fault training sample are used as the input of the flow fault prediction model, and the last dialysate flow rate in the flow fault training sample is used as the output of the flow fault prediction model; all flow fault training samples are divided into a flow fault training set and a flow fault test set, the flow fault training set is sent to the parameter-initialized flow fault prediction model for training, and then the flow fault test set is input to the flow fault prediction model to obtain a fourth test result; a fourth training condition is set to determine whether the fourth test result meets the fourth training condition, and if so, the trained flow fault prediction model is output; otherwise, the flow fault prediction model is continued to be trained using the flow fault training set.
[0027] Embodiment 2 of the present invention is a blood purification equipment data monitoring system, such as Figure 1 Shown, including: The patient vital sign data acquisition module is used to acquire patient vital sign data, and form a short-term vital sign data set with the patient vital sign data acquired within a preset time window of duration T, calculate the standard deviation of the patient vital sign data within the currently acquired short-term vital sign data set, and obtain the patient vital sign fluctuation level; based on the current patient sign fluctuation level, set the normal operating range of the device at the current monitoring time point; The operation data monitoring module is used to obtain the equipment operation data at the current monitoring time point, determine whether the equipment operation data obtained at the current monitoring time point is within the preset normal operating range, and if so, execute the fault prediction plan; if not, issue an alarm and execute the alarm response measures; The fault prediction module is used to compare the overall vital sign data of the patient in the current update cycle with the blood pressure threshold, heart rate threshold and blood viscosity threshold. If the overall blood pressure value of the current patient is higher than the blood pressure threshold, fault prediction operations are performed on the filter element and pump; if the overall heart rate value of the current patient is higher than the heart rate threshold, fault prediction operations are performed on the pump and flow control system; if the overall blood viscosity value of the current patient is higher than the blood viscosity threshold, fault prediction operations are performed on the filter element, conductivity measurement module and flow control system.
[0028] It should be understood that those skilled in the art may make improvements or modifications based on the above description, and all such improvements and modifications shall fall within the scope of protection of the appended claims. Any portion of this specification not described in detail is prior art known to those skilled in the art.
Claims
1. A blood purification equipment data monitoring method, It is characterized in that include: Obtain patient vital signs data and equipment operation data at the current monitoring time point. Patient vital signs data include blood pressure, heart rate and blood viscosity; equipment operation data include filter element pressure difference, filter element flow, pump output flow, pump pressure, dialysate conductivity, dialysate flow, system overall pressure and equipment temperature; The patient vital sign data obtained within the current preset time window of duration T are combined into a short-term vital sign data set, the standard deviation of the patient vital sign data in the current short-term vital sign data set is calculated, and the patient vital sign fluctuation level is obtained; based on the current patient vital sign fluctuation level, the normal operating range of the equipment at the current monitoring time point is set; it is determined whether the equipment operation data obtained at the current monitoring time point is within the preset normal operating range, and if so, the fault prediction plan is executed; if not, an alarm is issued and alarm response measures are executed.
2. The blood purification equipment data monitoring method according to claim 1, It is characterized in that Based on the current fluctuation level of the patient's vital signs, the normal operating range of the device at the current monitoring time point is set to include: Set the normal operating range and also set the standard deviation threshold and the maximum standard deviation ; If the standard deviation of the patient's vital signs data in the currently acquired short-term vital signs data set is Below or equal to the standard deviation threshold , then the normal operating range of the equipment at the current monitoring time point is the regular operating range; Set the increment range to , if the standard deviation of the patient's vital signs data in the currently acquired short-term vital signs data set is Above standard deviation threshold , then use the formula Calculate the gain rate , and the increase rate Applied to the normal operating range, obtain the normal operating range of the equipment at the current monitoring time point.
3. The blood purification equipment data monitoring method according to claim 2, It is characterized in that Execution of the fault prediction solution includes: An update cycle of 10T is set. At the beginning of any update cycle, the patient vital sign data acquired in the previous update cycle are combined into a long-term vital sign data set; the average value of the patient vital sign data in the acquired long-term vital sign data set is calculated to acquire the overall patient vital sign data in the current update cycle; Set the blood pressure threshold, heart rate threshold and blood viscosity threshold, and compare the overall blood pressure value, heart rate value and blood viscosity value in the overall vital sign data of the patient with the blood pressure threshold, heart rate threshold and blood viscosity threshold; if the overall blood pressure value of the current patient is higher than the blood pressure threshold, perform fault prediction operations on the filter element and the pump; if the overall heart rate value of the current patient is higher than the heart rate threshold, perform fault prediction operations on the pump and the flow control system; if the overall blood viscosity value of the current patient is higher than the blood viscosity threshold, perform fault prediction operations on the filter element, conductivity measurement module and flow control system; The fault prediction operations in the fault prediction scheme include: Predict the fault of the filter element, and compose the filter element pressure difference and filter element flow obtained at the current monitoring time point and the most recent N-1 monitoring time points into a filter element fault prediction set in chronological order. Use the filter element fault prediction set as the input of the filter element fault prediction model, output the filter element pressure difference prediction value and filter element flow prediction value at the next monitoring time point, and judge whether the obtained filter element pressure difference prediction value and filter element flow prediction value are both within the normal operating range of the equipment. If so, no operation is performed; if not, perform fault pre-processing measures for the filter element; Predict pump failures, organize the pump output flow and pump pressure obtained at the current monitoring time point and the most recent N-1 monitoring time points into a pump failure prediction set in chronological order, use the pump failure prediction set as the input of the pump failure prediction model, output the pump output flow prediction value and pump pressure prediction value at the next monitoring time point, and determine whether the obtained pump output flow prediction value and pump pressure prediction value are both within the normal operating range of the equipment. If so, no operation is performed; if not, perform fault pre-processing measures for the pump; Perform fault prediction on the conductivity measurement module, organize the dialysis fluid conductivity obtained at the current monitoring time point and the most recent N-1 monitoring time points into a conductivity fault prediction set in chronological order, use the conductivity fault prediction set as the input of the conductivity fault prediction model, output the predicted value of the dialysis fluid conductivity at the next monitoring time point, and determine whether the obtained predicted value of the dialysis fluid conductivity is within the normal operating range of the equipment. If so, no operation is performed; if not, perform fault pre-processing measures for the conductivity measurement module; Fault prediction is performed on the liquid flow control system. The dialysate flow obtained at the current monitoring time point and the most recent N-1 monitoring time points are organized into a flow fault prediction set in chronological order. The flow fault prediction set is used as the input of the flow fault prediction model. The dialysate flow prediction value at the next monitoring time point is output. It is determined whether the obtained dialysate flow prediction value is within the normal operating range of the equipment. If so, no operation is performed; if not, fault pre-processing measures are performed on the liquid flow control system.
4. The blood purification equipment data monitoring method according to claim 3, It is characterized in that The filter element fault prediction model is established based on the LSTM model, including N filter element fault prediction LSTM units, 1 first fully connected layer and 1 first output layer. The filter element fault prediction LSTM unit is used to extract the temporal characteristics of the filter element fault prediction set; the first fully connected layer is used to extract features from the outputs of all filter element fault prediction LSTM units; the first output layer is used to output the filter element pressure difference prediction value and the filter element flow prediction value at the next monitoring time point; The training of the filter element failure prediction model includes: A plurality of filter element failure training samples are obtained, each of which stores N+1 filter element pressure differences and filter element flow rates sorted by time, and the first N filter element pressure differences and filter element flow rates in the filter element failure training samples are used as the input of the filter element failure prediction model, and the last filter element pressure difference and filter element flow rate in the filter element failure training samples are used as the output of the filter element failure prediction model; all filter element failure training samples are divided into a filter element failure training set and a filter element failure test set, and the filter element failure training set is sent to the filter element failure prediction model with parameter initialization for training, and then the filter element failure test set is input to the filter element failure prediction model to obtain a first test result; a first training condition is set to determine whether the first test result meets the first training condition, and if so, the trained filter element failure prediction model is output; otherwise, the filter element failure prediction model is continuously trained through the filter element failure training set.
5. The blood purification equipment data monitoring method according to claim 4, It is characterized in that The pump fault prediction model is established based on the LSTM model, including N pump fault prediction LSTM units, 1 second fully connected layer and 1 second output layer. The training of the pump fault prediction model includes: A plurality of pump fault training samples are obtained, each of which stores N+1 pump output flow rates and pump pressures sorted by time, and the first N pump output flow rates and pump pressures in the pump fault training samples are used as the input of the pump fault prediction model, and the last pump output flow rate and pump pressure in the pump fault training samples are used as the output of the pump fault prediction model; all pump fault training samples are divided into a pump fault training set and a pump fault test set, and the pump fault training set is sent to the pump fault prediction model with parameter initialization for training, and then the pump fault test set is input to the pump fault prediction model to obtain a second test result; a second training condition is set to determine whether the second test result meets the second training condition, and if so, the trained pump fault prediction model is output; otherwise, the pump fault prediction model is continuously trained using the pump fault training set.
6. The blood purification equipment data monitoring method according to claim 5, It is characterized in that The conductivity fault prediction model is established based on the LSTM model, including N conductivity fault prediction LSTM units, 1 third fully connected layer and 1 third output layer. The training of the conductivity fault prediction model includes: A plurality of conductivity fault training samples are obtained, each of which stores N+1 dialysis fluid conductivities sorted by time, and the first N dialysis fluid conductivities in the conductivity fault training samples are used as inputs of the conductivity fault prediction model, and the last dialysis fluid conductivity in the conductivity fault training samples is used as outputs of the conductivity fault prediction model; all conductivity fault training samples are divided into a conductivity fault training set and a conductivity fault test set, and the conductivity fault training set is sent to the conductivity fault prediction model with parameter initialization for training, and then the conductivity fault test set is input to the conductivity fault prediction model to obtain a third test result; a third training condition is set, and it is determined whether the third test result meets the third training condition. If the third training condition is met, the trained conductivity fault prediction model is output; otherwise, the conductivity fault prediction model is continuously trained through the conductivity fault training set.
7. The blood purification equipment data monitoring method according to claim 6, It is characterized in that The traffic fault prediction model is built based on the LSTM model, including N traffic fault prediction LSTM units, one fourth fully connected layer, and one fourth output layer. The training of the traffic fault prediction model includes: A plurality of flow fault training samples are obtained, each flow fault training sample stores N+1 dialysate flow rates sorted by time, the first N dialysate flow rates in the flow fault training sample are used as the input of the flow fault prediction model, and the last dialysate flow rate in the flow fault training sample is used as the output of the flow fault prediction model; all flow fault training samples are divided into a flow fault training set and a flow fault test set, the flow fault training set is sent to the parameter-initialized flow fault prediction model for training, and then the flow fault test set is input to the flow fault prediction model to obtain a fourth test result; a fourth training condition is set to determine whether the fourth test result meets the fourth training condition, and if so, the trained flow fault prediction model is output; otherwise, the flow fault prediction model is continuously trained using the flow fault training set.
8. A blood purification equipment data monitoring system, It is characterized in that The system is applied to the blood purification equipment data monitoring method according to any one of claims 1 to 7, comprising: The patient vital sign data acquisition module is used to acquire the patient vital sign data, and form the patient vital sign data acquired within the time window of the current preset duration T into a short-term vital sign data set, calculate the standard deviation of the patient vital sign data in the current acquired short-term vital sign data set, and acquire the patient vital sign fluctuation level; based on the current patient vital sign fluctuation level, set the normal operating range of the equipment at the current monitoring time point; The operation data monitoring module is used to obtain the equipment operation data at the current monitoring time point, determine whether the equipment operation data obtained at the current monitoring time point is within the preset normal operating range, and if so, execute the fault prediction plan; if not, issue an alarm and execute alarm response measures; The fault prediction module is used to compare the overall vital sign data of the patient in the current update cycle with the blood pressure threshold, heart rate threshold and blood viscosity threshold. If the overall blood pressure value of the current patient is higher than the blood pressure threshold, fault prediction operations are performed on the filter element and the pump; if the overall heart rate value of the current patient is higher than the heart rate threshold, fault prediction operations are performed on the pump and the flow control system; if the overall blood viscosity value of the current patient is higher than the blood viscosity threshold, fault prediction operations are performed on the filter element, conductivity measurement module and flow control system.
Citation Information
Patent Citations
Pressure calibration method of blood purification equipment, blood purification equipment and computer readable storage medium
CN115445013A
Energy facility fault prediction method and device based on deep learning, and electronic equipment
CN116956197A
Physiological parameter abnormity processing method and system and medical equipment
CN117038050A
Analysis and early warning system based on medical data
CN118352092A
System and Method for Determining the Degree of Abnormality of a Patient's Vital Signs
US20060259329A1
Cited By
Infusion flow rate control method and system, readable storage medium and computer
CN120053812A
Plasma exchange device based on intelligent monitoring of pipeline pressure
CN120939342A
Fault prediction method and system for continuous kidney replacement therapy equipment
CN122050756A
A method and system for predicting failures in continuous renal replacement therapy devices
CN122050756B
