Resource joint optimization method based on data demand driving under high-speed rail train-ground communication

By constructing a high-speed rail train-to-ground communication model and a millimeter-wave transmission channel model in high-speed rail train-to-ground communication, the alternating optimization solution of time and power is performed, and combined with the green communication problem, the joint optimization problem of resource allocation in high-speed train train-to-ground communication is solved, achieving Efficient, real-time resource allocation and energy consumption minimization are achieved.

CN118764959AActive Publication Date: 2024-10-11JILIN UNIVERSITY

Patent Information

Application Number
CN202410749576.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-11
Estimated Expiration
2044-06-12

AI Technical Summary

Technical Problem

In high-speed rail train-to-ground communications, existing technologies are difficult to effectively solve the joint optimization problem of resource allocation. In particular, there are challenges in avoiding resource waste and improving real-time performance while meeting high data rate requirements and green communications.

Method used

Using a resource joint optimization method driven by data demand, by constructing a high-speed rail train-to-ground communication model and a millimeter-wave transmission channel model, the time and power are alternately optimized and solved, and forced equalization steps are introduced to ensure that the necessary conditions for the optimal solution are established. Combined with Green communication problems are solved iteratively to achieve reasonable allocation of resources.

Benefits of technology

It improves the real-time nature of information transmission and the efficiency of data transmission, reduces algorithm complexity, avoids waste of resources, and minimizes energy consumption within the specified delay.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118764959A_ABST
    Figure CN118764959A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of wireless communication, in particular to a data demand-driven resource joint optimization method under high-speed rail train-ground communication, which comprises the following steps of: S1, constructing a traveling high-speed rail train-ground communication model according to data demands of equipment and users in a carriage; s2, constructing a millimeter wave transmission channel model, and establishing an overall optimization problem by taking minimization of a transmission time slot as a target; s3, performing equivalent transformation on the overall optimization problem to reduce the dimension of the problem; s4, the problem after equivalent transformation is disassembled into a time planning sub-problem and a power control optimization sub-problem for alternative optimization solution, and a forced step is introduced in the alternative optimization solution process, so that necessary conditions of an optimal solution of the problem after alternative optimization are met, and a time slot planning strategy and a power distribution strategy are obtained; and S5, expanding and considering the resource allocation strategy meeting the green communication requirement. According to the invention, the time and the power can be allocated according to user requirements, so that the purposes of minimizing the transmission time and green communication are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of wireless communication technology, and more specifically to a data demand-driven resource joint optimization method in high-speed rail vehicle-ground communication. Background Art

[0002] The rapid development of high-speed railways in recent years has highlighted their key role in modern transportation networks. This mode of transportation is widely favored for its low energy consumption, efficient carrying capacity, comfortable travel experience and excellent safety standards. With the iterative upgrade of high-speed railways, there is an increasing urgent need for high-quality, low-latency broadband wireless access services to support various applications, such as high-data application services, low-latency online conference access, reliable transmission of train control signals and railway Internet of Things.

[0003] Although various mature broadband wireless access technologies already exist, their transmission rates are far below the order of magnitude required for future high-speed rail communications. Therefore, millimeter wave technology, with its large bandwidth advantage, is seen as a key solution to achieve high data rate transmission and support future communication needs. Considering that millimeter waves will cause serious penetration loss due to the metal shell of the carriage, in order to solve this problem, MR (Mobile Relay) was introduced and installed on the top of each train carriage to provide communication between the base station and the equipment in the carriage.

[0004] In order to achieve efficient resource transmission, spatial multiplexing is used for transmission, which results in stronger interference under the same-frequency signal. This means that efficient resource allocation is also the key to meeting the quality of service (QoS) requirements of users or devices, thereby avoiding network congestion and degradation of communication quality. Better resource allocation algorithms usually require more computing resources and time to complete. In wireless communication systems, complex algorithms may take more time to generate results, which will increase the response time of the communication system. The power optimization problem alone is an NP-hard problem, and the time slot allocation algorithm is an integer programming problem. How to reduce the complexity of the algorithm and improve the feasibility of the solution is also a key issue.

[0005] Furthermore, the objective function setting and constraints of the problem also need to be considered. Through reasonable settings, the effect of guiding resource allocation can be achieved without wasting resources. Most of the existing algorithms maximize the system throughput while meeting the minimum user demand. However, this optimization may cause throughput overflow, so that some nodes with good channel conditions may have too many communication resources, while some nodes with poor channel conditions can only meet the minimum communication requirements and do not make good use of communication resources, resulting in waste. However, at present, in D2D situations such as the proposed high-speed rail scenario, there are few solutions at home and abroad that combine time and power optimization algorithms to strictly meet user demand constraints, and no consideration is given to green communication.

[0006] Therefore, in the case of resource shortage, how to efficiently solve the joint optimization problem of resource allocation and meet the real-time data needs of future high-speed rail and the concept of green energy has become a technical problem that technical personnel in this field urgently need to solve. Summary of the invention

[0007] In view of this, the present invention provides a resource joint optimization method based on data demand driven in high-speed rail train-to-ground communication, which can allocate time and power on demand according to user needs to achieve the purpose of minimizing transmission time and green communication.

[0008] In order to achieve the above object, the present invention adopts the following technical solution:

[0009] A resource joint optimization method based on data demand driven in high-speed rail vehicle-ground communication comprises the following steps:

[0010] S1. According to the data requirements of the equipment and users in the carriage, a high-speed rail vehicle-ground communication model is constructed; in the high-speed rail vehicle-ground communication model, each carriage has a mobile relay on the top, and the base station is deployed with multiple millimeter wave directional antennas to interact with each mobile relay for data;

[0011] S2. Construct a millimeter wave transmission channel model, analyze the impact of mutual interference of links on transmission performance, and establish an overall optimization problem with the goal of minimizing the transmission time slot;

[0012] S3, performing equivalent transformation on the overall optimization problem to reduce the dimension of the problem;

[0013] S4, decomposing the problem after equivalent transformation into a time planning subproblem and a power control optimization subproblem, performing alternating optimization to solve the two subproblems, and introducing a forcing step in the alternating optimization solution process to ensure that the necessary conditions for the optimal solution of the problem are met after the alternating optimization is completed, and obtaining the time slot planning strategy and the power allocation strategy;

[0014] S5. Establish a green communication problem, substitute the solution obtained in S4 as an initial value into the green communication problem, perform iterative solution, and obtain a resource allocation strategy that meets the green communication requirements.

[0015] Furthermore, in S1, in the high-speed rail train-to-ground communication model, the equipment in any car is connected to the mobile relay on the top of the car through the access points distributed inside the car. Each mobile relay communicates with the base station on behalf of the equipment in its own car and obtains data resources from the base station through the superframe transmission protocol.

[0016] Furthermore, when the superframe transmission protocol is used for resource allocation, the entire superframe includes three phases: a beacon phase, a request phase, and a transmission phase;

[0017] During the beacon phase, each mobile relay synchronizes with the base station to receive control information from the base station;

[0018] In the request phase, each mobile relay sends a request for the required data to the base station;

[0019] In the transmission phase, a superframe consists of hundreds or thousands of time slots. In each time slot, multiple mobile relays can simultaneously access the base station for spatial multiplexing, and each mobile relay can select multiple time slots for data transmission;

[0020] In the request phase, the base station collects data requests from each mobile relay and allocates time slots and power resources based on meeting the data requirements of each mobile relay. In the next beacon phase, the base station notifies the corresponding mobile relay of the control message and the result of resource allocation, so that the data request from the previous superframe is transmitted by the subsequent superframe.

[0021] Further, in S2, the millimeter wave transmission channel model is expressed as:

[0022] The link transmitted by the base station to the jth mobile relay is link j, and the channel gain G caused by the jth link to the mth mobile relay is mj It is expressed as:

[0023]

[0024] Where k represents the constant attenuation factor, which is related to the wavelength of the millimeter wave; G t (j,m) represents the transmit antenna gain of link j to the mth mobile relay, G r (j,m) represents the receiving antenna gain of the mth mobile relay for link j, represents the distance between the base station and the mth mobile relay, and γ represents the exponential decay factor;

[0025] According to Shannon's formula, the rate of the mth mobile relay in the sth time slot is It is expressed as:

[0026]

[0027] in, in, represents the signal-to-interference-noise ratio of the mth mobile relay in the sth time slot; G mm represents the channel gain caused by the m-th link to the m-th mobile relay; represents the transmission power of the base station link m to the mth mobile relay in the sth time slot; P j s represents the transmission power of link j of the base station to the jth mobile relay in the sth time slot; It indicates the multiple of the difference from Shannon's formula caused by the actual situation, W indicates the channel bandwidth, N 0 Represents the power spectral density of Gaussian white noise.

[0028] Furthermore, the overall optimization problem P1 established in S2 is expressed as:

[0029]

[0030]

[0031]

[0032] C3:S≤S max ,S∈N

[0033] Among them, L slot represents the time length of each time slot; S represents the number of time slots used in the superframe, which is a natural number;

[0034] represents the data demand of the mth mobile relay; the constraint C1 in problem P1 means that the data transmitted to each mobile relay is greater than To meet the data requirements of the carriage represented by the mobile relay; M represents the total number of carriages;

[0035] Constraint C2 in problem P1 represents the transmission power of link m corresponding to the mth mobile relay in the sth time slot. Less than P max ; S represents the time slot set of the entire superframe; when When it is equal to 0, that is, there is no transmit power, it means that the link is not planned in this time slot;

[0036] Constraint C3 in problem P1 guarantees that the number of time slots does not exceed the maximum number of time slots S. max , N is represented by a natural number.

[0037] Furthermore, S3 includes:

[0038] S31, the overall optimization problem P1 is equivalent to problem P2, and problem P2 is expressed as:

[0039]

[0040]

[0041]

[0042]

[0043]

[0044] Where N means that the time is divided into N time periods, and the value of N is equal to M; t n Indicates the nth time period; represents the data transmission rate of the mth mobile relay corresponding to time period n; represents the nth time period t n When , the power of the mth mobile relay;

[0045] Constraint C1 in problem P2 ensures that the sum of data obtained by the mth mobile relay in all time periods is greater than its target data demand; where the time vector is represented by t n Composition, expressed as t = [t 1 ,t n ,…,t N ] T , when transformed into the original problem P1, each time period t n The number of time slots that need to be converted into corresponding duration S n To meet the transmission requirements, the calculation formula is: symbol It is rounded up, and the mth mobile relay has S n The transmission power of a time slot is

[0046] Constraint C2 in problem P2 represents the power of the mth mobile relay in time period n. Less than P max ;

[0047] Constraint C3 in problem P2 means that for each time period t n The length of is greater than or equal to 0;

[0048] S32. Convert problem P2 to problem P3. Problem P3 is expressed as:

[0049]

[0050]

[0051]

[0052]

[0053] The necessary condition for the optimal solution of problem P3 is that the equality of constraint C1 holds.

[0054] Furthermore, in S4, the time planning sub-problem is split from problem P3 and expressed as:

[0055]

[0056]

[0057]

[0058] Use the interior point method to solve problem P4.

[0059] Furthermore, in S4, the power control optimization subproblem is solved by using successive convex approximation. In each iteration, the problem is transformed into a convex function, and the final result of the problem is obtained by successive iterations. In each iteration, the power control optimization subproblem is decomposed from problem P3 and expressed as:

[0060]

[0061]

[0062]

[0063] in, It represents the data transmission rate of the mth mobile relay in the nth time period, and its expression is:

[0064]

[0065] in, Depend on composition, The value of By solving The value of gets the power P of the mobile relay, that is, the power allocation strategy; and All are expressed as the conversion coefficient of the mth mobile relay in the nth time period; express

[0066] In each iteration, the values ​​of α and β are as follows:

[0067]

[0068]

[0069] represents the signal-to-interference-and-noise ratio of the mobile relay in the sth time slot;

[0070] Through continuous iterative solving, the convergent solutions of P, α and β are finally obtained.

[0071] Furthermore, in S4, the process of alternately optimizing and solving the two sub-problems includes:

[0072] For the time planning sub-problem, fix the power P and minimize the objective by scheduling the time t;

[0073] For the power control optimization sub-problem, with fixed time t, the objective function is maximized by optimizing the power P of different mobile relays in different time periods;

[0074] Add a forcing step. When the time planning subproblem and the power control optimization subproblem cannot be optimized further, determine whether the necessary conditions of the problem are met. If not, update P through the forcing step, and bring the updated results into the time planning subproblem and the power control optimization subproblem for further iterative loop solving until the two subproblems converge and cannot be optimized further and the necessary conditions are met.

[0075] The process of incorporating the forcing step into the alternating optimization for joint optimization includes:

[0076] use Denotes the data transmission rate matrix before the forced equalization step, which is represented by composition; use Represents the data transmission rate matrix after the forced equalization step, which is represented by composition;

[0077] Before conversion, define a reference data rate matrix For reference conversion, each element is calculated as follows:

[0078]

[0079] Construct the necessary conditions for subproblem P6:

[0080]

[0081]

[0082]

[0083] Using feasibility checks and nUse the binary method to find the solution to problem P6 and get the value of each time period t n The multiplication factor ξ n , and get each updated time period t n Corresponding power Finally, the updated P is obtained through the algorithm.

[0084] The updated results are brought into the time planning sub-problem and the power control optimization sub-problem for further iterative loop solving to make the necessary conditions meet.

[0085] Furthermore, in S5, the expression of the green communication problem P7 is:

[0086]

[0087]

[0088]

[0089]

[0090]

[0091] The objective function in the green communication problem is to minimize the energy required to transmit all data; the constraint C1 in problem P7 indicates that the number of time slots required for transmission cannot exceed the specified number. The (S max -N)*L slot Ensure that when problem P7 is converted into the solution of the original problem P1, the number of time slots used is still less than S max and satisfy the constraints;

[0092] The values ​​P and t obtained from problem P3 are brought into problem P7, and problem P7 is further divided into a power control optimization subproblem and a time planning subproblem based on problem P7 for iterative solution. The solution method of the power control optimization subproblem and the time planning subproblem of problem P7 is the same as that of the power control optimization subproblem and the time planning subproblem of problem P3, and finally the specified time slot S is obtained. max Resource allocation strategy within quantity.

[0093] It can be seen from the above technical solution that compared with the prior art, the present invention has the following beneficial effects:

[0094] In view of the shortage of downlink resources and the interference between links in high-speed railways, the present invention proposes to support the system by relying on millimeter waves and efficient space-time resource optimization algorithms. This method combines time and power control to perform reasonable resource allocation based on the space-time division multiple access protocol, thereby avoiding ineffective waste of resources and ultimately improving the real-time nature of information transmission and the efficiency of data transmission.

[0095] In order to solve the problem of high computational complexity of the system, equivalent transformation is used to reduce the complexity of the algorithm. At the same time, in order to ensure the effectiveness of the algorithm, a forced step is introduced in the alternating optimization to ensure that the necessary conditions for the optimal solution of the problem are met.

[0096] In addition, considering the requirements of future green communication, the solution of the original problem is brought into the constructed green communication problem model without considering the problem of infeasibility of the initial point, thereby minimizing the energy consumption within the specified delay effect. The present invention can be applied not only to the downlink communication scenario of high-speed rail, but also to communication scenarios similar to D2D. BRIEF DESCRIPTION OF THE DRAWINGS

[0097] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0098] Figure 1 A flow chart of a resource joint optimization method based on data demand driven in high-speed rail train-to-ground communication provided by the present invention;

[0099] Figure 2 A schematic diagram of a system model for millimeter wave vehicle underground downlink multi-link communication under the coverage of multiple base stations provided by the present invention;

[0100] Figure 3 A schematic diagram of the spatial time division multiple access protocol provided by the present invention;

[0101] Figure 4 This is a flow chart of the joint optimization algorithm for solving problem P3 provided by the present invention. DETAILED DESCRIPTION

[0102] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0103] like Figure 1 As shown, an embodiment of the present invention discloses a resource joint optimization method based on data demand driven in high-speed rail vehicle-ground communication, comprising the following steps:

[0104] S1. Build a high-speed rail vehicle-ground communication model in motion based on the data needs of the equipment and users in the carriage. In the high-speed rail vehicle-ground communication model, there is a mobile relay on the top of each carriage, and the base station is deployed with multiple millimeter-wave directional antennas to interact with each mobile relay for data.

[0105] S2. Construct a millimeter wave transmission channel model, analyze the impact of mutual interference of links on transmission performance, and establish an overall optimization problem with the goal of minimizing the transmission time slot;

[0106] S3, perform equivalent transformation on the overall optimization problem to reduce the dimension of the problem;

[0107] S4, decomposing the problem after equivalent transformation into a time planning subproblem and a power control optimization subproblem, performing alternating optimization to solve the two subproblems, and introducing a forcing step in the alternating optimization solution process to ensure that the necessary conditions for the optimal solution of the problem are met after the alternating optimization is completed, and obtaining the time slot planning strategy and the power allocation strategy;

[0108] S5. Expand the consideration of the green communication problem, substitute the solution obtained in S4 as the initial value into the green communication problem, perform iterative solution, and obtain the resource allocation strategy that meets the green communication requirements.

[0109] The above steps are further described below.

[0110] S1. Based on the high-speed train-to-ground downlink communication scenario, a high-speed train-to-ground communication model with millimeter-wave directional antennas is constructed according to the data requirements of the equipment and users in the carriage to achieve the minimum latency requirement under the data requirements; the high-speed train-to-ground communication model is as follows: Figure 2 As shown, a high-speed rail is in motion, the high-speed rail has M carriages, each of which has a mobile relay MR on the top, the set of mobile relays is represented by M=={1,2,...,M}, and each mobile relay is represented by MR 1, MR 2,...,MR M. The base station is deployed with multiple millimeter wave directional antennas for data transmission and information reception with MR, and uses a superframe data transmission protocol to improve space-time utilization efficiency.

[0111] Considering the communication model in the scenario of millimeter wave base station coverage area, each car is equipped with MR on the top to facilitate the connection of the device to the base station through it. The device in any car is connected to the mobile relay on the top of the car through the access point (AP, Access Point) distributed inside the car, and the required data demand is informed to the corresponding mobile relay. Each mobile relay communicates with the base station on behalf of the device in its own car and obtains data resources from the base station through the superframe transmission protocol.

[0112] Specifically, when the present invention adopts the superframe transmission protocol for resource allocation, based on the spatial time division multiple access protocol (STDMA), the entire superframe includes three stages: a beacon stage, a request stage, and a transmission stage. Figure 3 As shown;

[0113] During the beacon phase, each mobile relay synchronizes with the base station to receive control information from the base station;

[0114] In the request phase, each mobile relay sends a request for the required data to the base station;

[0115] In the transmission phase, the time slot set is represented as S=={1,2,...,S}, which is a micro-time slot. A superframe consists of hundreds or thousands of time slots s (s∈S). In each time slot, multiple mobile relays can access the base station at the same time for spatial multiplexing, and each mobile relay can select multiple time slots for data transmission;

[0116] The base station collects data requests from each mobile relay in the request phase and allocates time slots and power resources based on meeting the data requirements of each mobile relay. In the next beacon phase, the base station notifies the corresponding mobile relay of the control message and the result of resource allocation. Therefore, the data request from the previous superframe is transmitted by the subsequent superframe.

[0117] The number of time slots in the transmission phase cannot exceed S max At the same time, it cannot be less than S min On the one hand, too many time slots will increase the transmission delay; on the other hand, too few time slots may not provide the base station with enough time to calculate the subsequent resource allocation strategy.

[0118] S2. Construct a millimeter wave transmission channel model, analyze the impact of mutual interference of links on transmission performance, and establish an overall optimization problem with the goal of minimizing the transmission time slot.

[0119] The calculation formula of the antenna's transmit and receive gain is as follows:

[0120]

[0121] Among them, G0 Indicates the maximum antenna gain, G sl represents the sidelobe gain, θ -3dB represents the half-power beamwidth, θ ml =2.6·θ -3db It represents the main lobe width.

[0122] The link transmitted by the base station to the jth mobile relay is link j, and the channel gain G caused by the jth link to the mth mobile relay is mj , the gain is determined by the transmit antenna gain, the receive antenna gain and the path loss distance, which can be expressed as:

[0123]

[0124] Where k represents the constant attenuation factor, which is related to the wavelength of the millimeter wave; G t (j,m) represents the transmit antenna gain of link j to the mth mobile relay, G r (j,m) represents the receiving antenna gain of the mth mobile relay for link j, represents the distance between the base station and the mth mobile relay, and γ represents the exponential decay factor;

[0125] According to Shannon's formula, the rate of the mth mobile relay in the sth time slot is It is expressed as:

[0126]

[0127] in, represents the signal-to-interference-noise ratio of the mth mobile relay in the sth time slot; G mm represents the channel gain caused by the m-th link to the m-th mobile relay; represents the transmission power of link m of the base station to the mth mobile relay in the sth time slot; represents the transmission power of link j of the base station to the jth mobile relay in the sth time slot; It indicates the multiple of the difference from Shannon's formula caused by the actual situation, W indicates the channel bandwidth, N 0 Represents the power spectral density of Gaussian white noise.

[0128] Finally, according to the above formula, an optimization problem with the minimum transmission delay as the goal is formed, that is, minimizing the number of transmission time slots in the superframe to improve the real-time performance of transmission.

[0129] The final overall optimization problem P1 is expressed as:

[0130]

[0131]

[0132]

[0133] C3:S≤S max ,S∈N

[0134] Among them, L slot represents the time length of each time slot; S represents the number of time slots used in the superframe, which is a natural number;

[0135] represents the data demand of the mth mobile relay; the constraint C1 in problem P1 means that the data transmitted to each mobile relay is greater than To meet the data requirements of the carriage represented by the mobile relay; M represents the total number of carriages;

[0136] Constraint C2 in problem P1 represents the transmission power of link m corresponding to the mth mobile relay in the sth time slot. Less than P max ; S represents the time slot set of the entire superframe; when When it is equal to 0, that is, there is no transmit power, it means that the link is not planned in this time slot;

[0137] Constraint C3 in problem P1 guarantees that the number of time slots does not exceed the maximum number of time slots S. max , N in C3 is represented as a natural number, indicating that the number of time slots S is a natural number.

[0138] S3, the overall optimization problem P1 is transformed into two equivalent steps to reduce the dimension of the problem so that the problem can be solved more easily and obtain better calculation results.

[0139] Based on equivalent transformation, problem P1 is converted into the following P2 form. Solving problem P1 is equivalent to solving problem P2. This transmission method does not cause much loss in accuracy, but can reduce the dimension of the problem and improve the speed of solving the problem. Specifically, it includes:

[0140] S31, the overall optimization problem P1 is equivalent to problem P2, and problem P2 is expressed as:

[0141]

[0142]

[0143]

[0144]

[0145]

[0146] Where N means that the time is divided into N time periods, and the value of N is equal to M; t n Indicates the nth time period; represents the data transmission rate of the mth mobile relay corresponding to time period n; represents the nth time period t n When , the power of the mth mobile relay;

[0147] Constraint C1 in problem P2 ensures that the sum of data obtained by the mth mobile relay in all time periods is greater than its target data demand; where the time vector is represented by t n Composition, expressed as t = [t 1 ,t n ,…,t N ] T , when transformed into the original problem P1, each time period t n The number of time slots that need to be converted into corresponding duration S n To meet the transmission requirements, the calculation formula is: symbol It is rounded up, and the mth mobile relay has S n The transmission power of a time slot is

[0148] Constraint C2 in problem P2 represents the power of the mth mobile relay in time period n. Less than P max ;

[0149] Constraint C3 in problem P2 means that for each time period t n The length of is greater than or equal to 0;

[0150] S32, convert problem P2 into problem P3, to provide support for the subsequent alternating optimization solution. Solving problem P3 is equivalent to solving problem P2, which is further equivalent to solving problem P1. Problem P3 is expressed as:

[0151]

[0152]

[0153]

[0154]

[0155] The constraints of P3 are the same as those of problem P2, and only the objective function is modified. The necessary condition for the optimal solution of problem P3 is that the equality of constraint C1 holds.

[0156] S4. Based on the joint optimization algorithm, problem P3 is solved, and problem P3 is split into a time planning sub-problem and a power control optimization sub-problem for alternate optimization and solution. Specifically, on the basis of the traditional alternate optimization solution algorithm, a forced equality step is introduced to make constraint C1 of problem P3 obtain an equality sign, that is, to meet the necessary conditions for the optimal solution of the problem. The specific processing flow for solving problem P3 is as follows: Figure 4 The joint optimization algorithm includes the following steps and repeats them repeatedly until the problem converges and cannot be optimized further and the necessary conditions are met. Specifically:

[0157] (1) The time planning sub-problem is decomposed from problem P3 into the following representation:

[0158]

[0159]

[0160]

[0161] The problem is modeled as a linear programming problem, so mature algorithms such as the interior point method can be used to solve it.

[0162] (2) The power control subproblem is decomposed from problem P3 into the following representation. The power control optimization subproblem is solved by successive convex approximation. In each iteration, the problem is transformed into a convex function and solved iteratively to obtain the final result of the problem. In each iteration, the power control optimization subproblem is expressed as:

[0163]

[0164]

[0165]

[0166] in, It represents the data transmission rate of the mth mobile relay in the nth time period, and its expression is:

[0167]

[0168] in, Depend on composition, The value of By solving The value of gets the power P of the mobile relay, that is, the power allocation strategy; and All are expressed as the conversion coefficient of the mth mobile relay in the nth time period; express

[0169] In each iteration, the values ​​of α and β are as follows:

[0170]

[0171]

[0172] represents the signal-to-interference-and-noise ratio of the mobile relay in the sth time slot;

[0173] Through continuous iterative solving, the convergent solutions of P, α and β are finally obtained.

[0174] Through the above transformation, the original non-convex problem is converted into a convex problem, and the convex problem is solved iteratively in each iteration by using successive convex approximation.

[0175] (3) Necessary conditions for the establishment of sub-problems:

[0176] For the time planning sub-problem, fix the power P and minimize the objective by scheduling the time t;

[0177] For the power control optimization sub-problem, with fixed time t, the objective function is maximized by optimizing the power P of different mobile relays in different time periods;

[0178] Since the necessary conditions for the optimal solution of problem P 3 cannot be guaranteed by relying solely on the alternating optimization of the time planning subproblem and power control, a forcing step is added to solve this type of problem. The optimization solution process using the forcing step includes:

[0179] Adding the forcing step: When the time planning subproblem and the power control optimization subproblem can no longer be optimized, determine whether the necessary conditions of the problem are met. If not, update P through the forcing step, and then bring the updated results into the time planning subproblem and the power control optimization subproblem for further iterative loop solving until the two subproblems converge and cannot be further optimized and the necessary conditions are met;

[0180] Specifically, the process of incorporating the forcing step into the alternating optimization for joint optimization includes:

[0181] use Denotes the data transmission rate matrix before the forced equalization step, which is represented by composition; use Represents the data transmission rate matrix after the forced equalization step, which is represented by composition;

[0182] Before conversion, define a reference data rate matrix For reference conversion, each element is calculated as follows:

[0183]

[0184] Construct the necessary conditions for subproblem P6:

[0185]

[0186]

[0187]

[0188] Using feasibility checks and n Use the binary method to find the solution to problem P6, so that each time period t n The multiplication factor ξ n , we can further get each updated time period t n Corresponding power Finally, the updated P is obtained through the algorithm.

[0189] The updated results are brought into the time planning sub-problem and the power control optimization sub-problem for further iterative loop solving to make the necessary conditions meet.

[0190] S5. The number of time slots of the solution to the problem may be less than S max , in order to achieve the purpose of low latency, but in some cases where real-time performance is not pursued, considering green communication, the target is changed to the number of time slots S max Within the constraints of the transmission, the energy consumed to complete the task is minimal.

[0191] The solution of problem P3 is used as the initial value and substituted into problem P7 as the initial value to solve, thus avoiding the problem that the initial point of the problem is infeasible. The expression of green communication problem P7 is:

[0192]

[0193]

[0194]

[0195]

[0196]

[0197] The objective function in the green communication problem is to minimize the energy required to transmit all data; the constraint C1 in problem P7 indicates that the number of time slots required for transmission cannot exceed the specified number. The (S max -N)*L slotEnsure that when problem P7 is converted into the solution of the original problem P1, the number of time slots used is still less than S max and satisfy the constraints;

[0198] The values ​​P and t obtained from problem P3 are brought into problem P7, and problem P7 is further divided into a power control optimization subproblem and a time planning subproblem based on problem P7 for iterative solution. The solution method of the power control optimization subproblem and the time planning subproblem of problem P7 is the same as that of problem P3, and finally the specified time slot S is obtained. max Resource allocation strategy within quantity.

[0199] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0200] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication, characterized in that: The following steps are involved: S1. According to the data requirements of the equipment and users in the carriage, a high-speed rail vehicle-ground communication model is constructed; in the high-speed rail vehicle-ground communication model, each carriage has a mobile relay on the top, and the base station is deployed with multiple millimeter wave directional antennas to interact with each mobile relay for data; S2. Construct a millimeter wave transmission channel model, analyze the impact of mutual interference of links on transmission performance, and establish an overall optimization problem with the goal of minimizing the transmission time slot; S3, performing equivalent transformation on the overall optimization problem to reduce the dimension of the problem; S4, decomposing the problem after equivalent transformation into a time planning subproblem and a power control optimization subproblem, performing alternating optimization to solve the two subproblems, and introducing a forcing step in the alternating optimization solution process, so that the necessary conditions for the optimal solution of the problem are met after the alternating optimization is completed, and obtaining the time slot planning strategy and the power allocation strategy; S5. Establish a green communication problem, substitute the solution obtained in S4 as an initial value into the green communication problem, perform iterative solution, and obtain a resource allocation strategy that meets the green communication requirements.

2. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 1 is characterized in that: In S1, in the high-speed rail train-to-ground communication model, the equipment in any car is connected to the mobile relay on the top of the car through the access points distributed inside the car. Each mobile relay communicates with the base station on behalf of the equipment in its own car and obtains data resources from the base station through the superframe transmission protocol.

3. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 2 is characterized in that: When the superframe transmission protocol is used for resource allocation, the entire superframe includes three phases: a beacon phase, a request phase, and a transmission phase; During the beacon phase, each mobile relay synchronizes with the base station to receive control information from the base station; In the request phase, each mobile relay sends a request for the required data to the base station; In the transmission phase, a superframe consists of hundreds or thousands of time slots. In each time slot, multiple mobile relays can simultaneously access the base station for spatial multiplexing, and each mobile relay can select multiple time slots for data transmission; In the request phase, the base station collects data requests from each mobile relay and allocates time slots and power resources based on meeting the data requirements of each mobile relay. In the next beacon phase, the base station notifies the corresponding mobile relay of the control message and the result of resource allocation, so that the data request from the previous superframe is transmitted by the subsequent superframe.

4. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 1 is characterized in that: In S2, the millimeter wave transmission channel model is expressed as: The link transmitted by the base station to the jth mobile relay is link j, and the channel gain G caused by the jth link to the mth mobile relay is mj It is expressed as: Where k represents the constant attenuation factor, which is related to the wavelength of the millimeter wave; G t (j,m) represents the transmit antenna gain of link j to the mth mobile relay, G r (j,m) represents the receiving antenna gain of the mth mobile relay for link j, represents the distance between the base station and the mth mobile relay, and γ represents the exponential decay factor; According to Shannon's formula, the rate of the mth mobile relay in the sth time slot is It is expressed as: in, represents the signal-to-interference-noise ratio of the mth mobile relay in the sth time slot; G mm represents the channel gain caused by the m-th link to the m-th mobile relay; represents the transmission power of the base station link m to the mth mobile relay in the sth time slot; P j s represents the transmission power of link j of the base station to the jth mobile relay in the sth time slot; It represents the multiple of the difference from Shannon's formula due to the actual situation, W represents the channel bandwidth, and N0 represents the power spectral density of Gaussian white noise.

5. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 4 is characterized in that: The overall optimization problem P1 established in S2 is expressed as: P 1: s.t.C1: C2: C3:S≤S max ,S∈N Among them, L slot represents the time length of each time slot; S represents the number of time slots used in the superframe, which is a natural number; represents the data demand of the mth mobile relay; the constraint C1 in problem P1 means that the data transmitted to each mobile relay is greater than To meet the data requirements of the carriage represented by the mobile relay; M represents the total number of carriages; Constraint C2 in problem P1 represents the transmission power of link m corresponding to the mth mobile relay in the sth time slot. Less than P max ; S represents the time slot set of the entire superframe; when When it is equal to 0, that is, there is no transmit power, it means that the link is not planned in this time slot; Constraint C3 in problem P1 guarantees that the number of time slots does not exceed the maximum number of time slots S. max , N is represented by a natural number.

6. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 1 is characterized in that S3 include: S31, the overall optimization problem P1 is equivalent to problem P2, and problem P2 is expressed as: P 2: s.t.C1: C2: C3: Where N means that the time is divided into N time periods, and the value of N is equal to M; t n Indicates the nth time period; represents the data transmission rate of the mth mobile relay corresponding to time period n; represents the nth time period t n When , the power of the mth mobile relay; Constraint C1 in problem P2 ensures that the sum of data obtained by the mth mobile relay in all time periods is greater than its target data demand; where the time vector is represented by t n Composition, expressed as t=[t1,t n ,…,t N ] T , when transformed into the original problem P1, each time period t n The number of time slots that need to be converted into corresponding duration S n To meet the transmission requirements, the calculation formula is: symbol It is rounded up, and the mth mobile relay has S n The transmission power of a time slot is Constraint C2 in problem P2 represents the power of the mth mobile relay in time period n. Less than P max ; Constraint C3 in problem P2 means that for each time period t n The length of is greater than or equal to 0; S32. Convert problem P2 to problem P3. Problem P3 is expressed as: P 3: s.t.C1: C2: C3: The necessary condition for the optimal solution of problem P3 is that the equality of constraint C1 holds.

7. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 6 is characterized in that: In S4, the time planning sub-problem is split from problem P3 and is expressed as: P 4: s.t.C1: C2: Use the interior point method to solve problem P4.

8. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 6 is characterized in that: In S4, the power control optimization subproblem is solved by successive convex approximation. In each iteration, the problem is transformed into a convex function and solved iteratively to obtain the final result of the problem. In each iteration, the power control optimization subproblem is decomposed from problem P3 and expressed as: P 5: s.t.C1: C2: in, It represents the data transmission rate of the mth mobile relay in the nth time period, and its expression is: in, Depend on composition, The value of By solving The value of gets the power P of the mobile relay, that is, the power allocation strategy; and All are expressed as the conversion coefficient of the mth mobile relay in the nth time period; express In each iteration, the values ​​of α and β are as follows: represents the signal to interference and noise ratio of the mth mobile relay in the sth time slot; Through continuous iterative solving, the convergent solutions of P, α and β are finally obtained.

9. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 6 is characterized in that: In S4, the process of alternately optimizing and solving the two sub-problems includes: For the time planning sub-problem, fix the power P and minimize the objective by scheduling the time t; For the power control optimization sub-problem, with fixed time t, the objective function is maximized by optimizing the power P of different mobile relays in different time periods; Add a forcing step. When the time planning subproblem and the power control optimization subproblem cannot be optimized any further, determine whether the necessary conditions of the problem are met. If not, use the forcing step to update P, and bring the updated results into the time planning subproblem and the power control optimization subproblem for further iterative loop solving until the two subproblems converge and the necessary conditions are met. The process of incorporating the forcing step into the alternating optimization for joint optimization includes: use Denotes the data transmission rate matrix before the forced equalization step, which is represented by composition; use Represents the data transmission rate matrix after the forced equalization step, which is represented by composition; Before conversion, define a reference data rate matrix For reference conversion, each element is calculated as follows: Construct the necessary conditions for subproblem P6: P 6: s.t.C 1: C2: Using feasibility checks and n Use the binary method to find the solution to problem P6 and get the value of each time period t n The multiplication factor ξ n , and get each updated time period t n Corresponding power Finally, the updated P is obtained through the algorithm; The updated results are brought into the time planning sub-problem and the power control optimization sub-problem for further iterative loop solving to make the necessary conditions meet.

10. The resource joint optimization method based on data demand driven in high-speed railway vehicle-ground communication according to claim 6 is characterized in that: In S5, the expression of the green communication problem P7 is: P 7: s.t.C1: C2: C3: C4: The objective function in the green communication problem is to minimize the energy required to transmit all data; the constraint C1 in problem P7 indicates that the number of time slots required for transmission cannot exceed the specified number. The (S max -N)*L slot Ensure that when problem P7 is converted into the solution of the original problem P1, the number of time slots used is still less than S max and satisfy the constraints; The values ​​P and t obtained from problem P3 are brought into problem P7, and problem P7 is further divided into a power control optimization subproblem and a time planning subproblem based on problem P7 for iterative solution. The solution method of the power control optimization subproblem and the time planning subproblem of problem P7 is the same as that of the power control optimization subproblem and the time planning subproblem of problem P3, and finally the specified time slot S is obtained. max Resource allocation strategy within quantity.

Citation Information

Patent Citations

  • Beamforming and power distributing method for service quality guarantee of high-speed rail cars

    CN109462426A

  • V2V communication resource allocation method based on Lyapunov optimization in Internet of Vehicles

    CN113795013A

  • Cognitive Internet of Vehicles resource allocation method with energy capture

    CN117979434A

  • Method and system for efficiently dispatching service vehicles

    US7788121B1

Cited By

  • Mobile cell resource minimization slice resource configuration method and system

    CN120568504A