Self-adaptive global analysis method for complex cross-road operation capability of rail transit

Through the adaptive global analysis method, the analysis of the operation capacity of complex intersections is optimized, the multiple factors in the intersection plan are considered, the defects that cannot be comprehensively analyzed by the existing methods are solved, and the train operation chart that maximizes the operation capacity of the signaling equipment is realized. Preparation and timetable generation improve the efficiency of operation chart preparation and transportation capacity.

CN118770320APending Publication Date: 2024-10-15SHANGHAI SHENTONG METRO
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202310348206.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-03
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing complex intersection operation capacity analysis method fails to fully consider the operation capacity indicators such as branch intervals, merging intervals, and main line and vehicle base connection station operation intervals in the intersection plan, and fails to effectively analyze the maximum operation capacity and train movement. Sequence optimization cannot meet the transportation needs of uneven passenger flow.

Method used

Provide an adaptive global analysis method for the operation capacity of complex rail transit intersections. By determining the operation plan, calculating the train operation diagram and timetable that maximizes the operation capacity of the signaling equipment, and counting the relevant indicators of the operation capacity, including return intervals, tracking Intervals, bifurcation intervals, merging intervals, operation intervals between main lines and vehicle base stations, etc., to optimize the preparation of train operation diagrams and the generation of timetables.

Benefits of technology

It realizes the preparation of train operation plans for complex intersections based on maximizing the operating capabilities of signaling equipment, improves the efficiency of operation chart preparation, reduces the work intensity of dispatchers, and provides an efficient means of analyzing the operation capabilities of complex intersections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118770320A_ABST
    Figure CN118770320A_ABST
Patent Text Reader

Abstract

The invention provides a self-adaptive global analysis method for rail transit complex road-crossing operation capability, which comprises the following steps of: S1, determining an operation road-crossing scheme, namely determining an operation form, an operation proportion and an operation sequence of an operation road-crossing; s2, solving a train working diagram and a train timetable of an operation routing scheme based on maximum application of the operation capability of the signal equipment; the operation capability is a general name of a turn-back interval, a tracking interval, a bifurcation interval, a convergence interval, an operation interval of a main line and a vehicle base connection station, an intersection operation capability and the like; s3, according to the train timetable of the running route-crossing scheme, carrying out statistics on running capability related indexes; the running capability related indexes comprise the traveling speed, the traveling time, the minimum running interval, the average running interval, the maximum running interval and the train application number of various running routes in the running route scheme.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of rail transit train operation control systems and operation organization, and in particular to an adaptive global analysis method for complex rail transit route operation capacity. Background Art

[0002] The operating capacity is a general term for the reversing interval, tracking interval, bifurcating interval, merging interval, the operating interval between the main line and the vehicle base, and the route operating capacity. The route operating capacity refers to the maximum number of trains that can pass through any station of various operating routes in the operating route plan in the upward or downward direction within a unit time. The unit is trains / h. If the maximum number of trains that can pass through the upward and downward directions is the same, the unit is pairs / h. It is a global operating capacity formed by balanced matching based on the operating ratio and order of the operating routes, combined with the tracking interval, reversing capacity, bifurcating interval, merging interval, and the operating interval between the main line and the vehicle base of the train operation control system (i.e., signal system). The analysis of route operating capacity can be achieved with the help of a train operation diagram or timetable, and the train operation diagram is the embodiment of the operating route plan, which contains a series of train operation lines.

[0003] For a single line, its passenger flow distribution is often uneven, which poses a challenge to the allocation of train operating capacity. In response to this, many cities have introduced complex routes (mainly large and small routes) into the operation route plan to avoid problems such as low train turnover, large number of trains in use, high operating energy consumption, poor passenger experience, and large vehicle base scale caused by the operation of a single route on the entire line. At present, there are existing literatures that have conducted research and analysis on the compilation of train operation diagrams considering complex routes. The "Method and System for Generating Urban Rail Train Operation Diagrams for Complex Operation Routes" with publication number CN113954926A proposes a method and system for generating urban rail train operation diagrams for complex operation routes. The "Method and System for Automatically Compiling Multi-Route Multi-Period All-Day Train Operation Diagrams" with publication number CN114179873A proposes a method and system for automatically compiling multi-route multi-period all-day train operation diagrams with the help of a single-period multi-route train operation diagram laying method, a vehicle bottom connection optimization model, a train entry and exit optimization model, and a branch and bound optimization algorithm. The publication number CN103279669A, “A simulation calculation method and system for urban rail transit network transport capacity”, evaluates the transport capacity of urban rail transit network through stress testing of passenger flow loading and service level calculation based on network data and train operation diagram. The publication number CN101916423A, “A verification and evaluation method for rail transit line transport capacity”, evaluates and verifies line transport capacity through simulation analysis based on line data and train operation diagram. Although the above-mentioned literature contents all carry out operation route plan preparation and operation capacity evaluation through train operation diagram, they do not comprehensively consider the operation capacity indicators such as bifurcation interval, merging interval, and operation interval of main line and vehicle base connection station that may affect the operation capacity of route plans, and do not involve the overall operation capacity of the line, train operation sequence optimization, main line and vehicle base operation capacity connection matching, local addition of congestion paths to meet the uneven passenger flow transportation needs, and cannot comprehensively and effectively analyze the maximum operation capacity of route plans. There is no literature report on the global analysis of the operation capacity of complex routes.

[0004] The analysis of route operation capacity needs to focus on the precise fulfillment and implementation conditions of the route operation plan, that is, under the conditions of undisturbed operation of the front and rear trains, safe tracking, smooth train control, and precise parking, combined with passenger flow transportation demand, station wiring design, train running intervals and other factors, through comprehensive analysis and deployment, determine the complex route operation plan and train control operation effect. However, due to the technical gap between multiple disciplines, previous studies have not comprehensively considered these multiple factors, and there is no mature and universal complex route operation capacity analysis method. Summary of the invention

[0005] The purpose of the present invention is to focus on the analysis method of the operating capacity of complex routes, and on the premise of considering accurate fulfillment, adaptively obtain the complex route train operation plan and operating capacity related indicators based on the maximization of the operating capacity of signal equipment, so as to provide key decision-making quantitative support and prediction of use effect for the preparation of train operation plans, the formulation of train procurement plans, the design of power supply zoning capacity, etc.

[0006] To achieve the above object, the present invention provides an adaptive global analysis method for complex rail transit route operation capacity, comprising:

[0007] Step S1, determining the operation route plan, wherein determining the operation route plan includes determining the operation form, operation ratio and operation order of the operation route;

[0008] Step S2, obtaining a train operation diagram and train schedule of an operation route scheme based on maximizing the operation capacity of signal equipment; the operation capacity includes: return interval, tracking interval, bifurcation interval, merging interval, operation interval between the main line and the vehicle base connection station, and route operation capacity; the route operation capacity refers to the maximum number of trains that can pass through any station of each type of operation route in the operation route scheme in the up direction or down direction within a unit time, and the unit is trains / h. If the maximum number of trains that can pass through the up direction and the down direction is the same, the unit is pairs / h; and

[0009] Step S3, counting the operating capacity-related indicators according to the train timetable of the operating route plan; the operating capacity-related indicators include the travel speed, travel time, minimum operating interval, average operating interval, maximum operating interval and number of train operations of various operating routes in the operating route plan, and the operating capacity-related indicators are obtained by counting the train operating interval, inter-station operating time and stop time of each station according to the train timetable.

[0010] In one embodiment, in step S1, the specific steps of determining the operation mode, operation ratio and operation order of the operation route are as follows:

[0011] According to the passenger flow transportation demand or passenger flow forecast results of the station and the passenger capacity standards of different train models, it is converted into the train operation demand per hour for each station;

[0012] Combined with the station layout with conditions for turning back, storing spare vehicles, and connecting the main line with the vehicle base, determine the starting station, terminal station and hourly train demand for each operation route / traffic jam path in the operation route plan, and integrate them to form the operation form and operation ratio of the operation route;

[0013] According to the running pattern and running ratio of the running routes, the set units and scattered units are analyzed to determine the running sequence of the running routes, which is used as the reference sequence for drawing the train operation diagram;

[0014] Among them, the set unit is a combination of multiple single routes that can be cyclically operated in the hourly operation route plan; the scattered unit is the remaining operation route plan after removing the set unit from the hourly operation route plan.

[0015] In one embodiment, step S2 specifically includes:

[0016] Step S201, calculating all running intervals and running times of the shared sections and the dedicated sections of the running routes in the up and down directions;

[0017] The common section of the running routes is a track section commonly used by different running routes;

[0018] The operating route exclusive section is a track section used exclusively by a single operating route;

[0019] The running interval includes the tracking interval between stations in the upward and downward directions, the diverging interval and merging interval of different running routes, the turning interval of all turning stations of the running routes, and the running interval between the main line and the vehicle base connection station;

[0020] The running time includes the inter-station running time in the uplink direction and the downlink direction;

[0021] Step S202, determining the initial lay-out interval of the operation route plan according to the independent processing mode of the uplink and downlink directions;

[0022] Step S203, determining the stop time adjustment margin of each station according to the initial layout interval of the up and down direction operation route plan;

[0023] The stop time includes the stop time of the physical station and the virtual platform, and the virtual platform includes the return track and the transfer track;

[0024] Step S204, laying out the fixed side running line;

[0025] Step S205, connecting the return running line of the fixed-side single-type running route / traffic jam route;

[0026] Step S206, laying out the non-fixed side running line;

[0027] Step S207, connecting the remaining return running lines on the fixed side;

[0028] Step S208, route conflict check and adjustment; at all the turnaround stations, according to the requirements of the turnaround interval, bifurcation interval, merging interval, tracking interval, and the running interval between the main line and the vehicle base connection station of the key stations, check in turn whether there is a route conflict in the running layout. If there is a conflict, return to step S207 for readjustment; if there is no conflict, keep the layout interval and go to step S209;

[0029] Step S209, cyclically laying out the running paths and running lines; and

[0030] Step S210, outputting the train operation diagram and train timetable of the operation route plan.

[0031] In one embodiment, in step S202, Max represents taking the maximum value in the set, and the data to be considered for calculation according to the actual situation include:

[0032] The initial laying interval of the first common section of the running intersection = Max{the tracking interval of two adjacent common sections of the running intersection in the upward or downward direction, the bifurcation interval of two adjacent common sections of the running intersection in the upward or downward direction, the merging interval of two adjacent common sections of the running intersection in the upward or downward direction, and the reentry interval of two adjacent common sections of the running intersection in the upward or downward direction};

[0033] The initial paving interval of the second running route common section = Max{the tracking interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the divergence interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the merging interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the reversing interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the running interval between the main line and the vehicle base connection station};

[0034] The initial layout interval of the third operation route common section = Max{the tracking interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the divergence interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the merging interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the reentry interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, and the operation interval between the main line and the vehicle base connection station};

[0035] Initial laying interval of the exclusive running route section = Max{the tracking interval of two adjacent exclusive running route sections in the upward or downward direction, the diverging interval of two adjacent exclusive running route sections in the upward or downward direction, the merging interval of two adjacent exclusive running route sections in the upward or downward direction, the reentry interval of two adjacent exclusive running route sections in the upward or downward direction};

[0036] The initial map laying interval of the running route set unit = Max{the sum of the initial map laying intervals between all running routes and traffic jam paths in the running route set unit in the upward or downward direction};

[0037] The operating interval between the main line and the vehicle base connection station is used when there is a traffic jam from the vehicle base to the main line and the train withdraws from the main line to the vehicle base.

[0038] In one embodiment, the method for judging whether the initial mapping interval of the exclusive section of the running route is effective is as follows:

[0039] If the initial map-laying interval of the exclusive section of the running route is less than the sum of the initial map-laying intervals of all the common sections of the running routes between two adjacent exclusive sections of the running route in the upward or downward direction, the initial map-laying interval of the exclusive section of the running route is invalid;

[0040] If the initial mapping interval of the exclusive section of the operating route is ≥ the sum of the initial mapping intervals of all the common sections of the operating route between two adjacent exclusive sections of the operating route in the upward or downward direction, the initial mapping interval of the exclusive section of the operating route is valid; if there is time margin allocation, the time margin will be evenly distributed to the initial mapping interval of each common section of the operating route.

[0041] In one embodiment, step S204 specifically includes:

[0042] Determine the turnaround station that is preferentially connected to the turnaround line; among the stations with higher operating capacity requirements, give priority to the turnaround station of the single-type operating route / traffic jam path with higher turnaround capacity requirements, or the turnaround station of the operating route / traffic jam path specified by the user, then the train running direction of the receiving platform of the turnaround station is the fixed side, and the train running direction of the departure platform is the non-fixed side;

[0043] According to the operation mode, operation order, default stop time, inter-station operation time and initial map laying interval of the operation route plan, the fixed-side operation line of all departure trains of the fixed-side starting station return track within one hour is laid out first. The fixed-side operation line corresponds to the departure time of the return track at the starting station to the arrival time of the return track at the terminal station in the train operation direction.

[0044] In one embodiment, step S205 specifically includes:

[0045] According to the fixed-side running line, in the station with higher running capacity requirements, the reversing running line of the reversing station of the single-type running route / traffic jam path with higher reversing capacity requirements is preferentially connected, or the reversing running line of the reversing station of the running route / traffic jam path specified by the user is preferentially connected;

[0046] In the process of connecting the reversing running line, the reversing running line is from the arrival time of the reversing track at the fixed side terminal station to the departure time of the reversing track; if it is a reversal after the station, the reversing track at the reversing station takes the default end change time, and the fixed side reversing running line is laid; if it is a reversal before the station, the reversing track and the stop track are considered to be the same track, specifically:

[0047] If the reversing rail end-changing time at the reversing station is ≥ the default stop time, the fixed-side reversing running line shall be laid out according to the reversing rail end-changing time;

[0048] If the reversing track end change time at the reversing station is less than the default stop time, the fixed-side reversing running line will be laid out according to the stop time.

[0049] In one embodiment, step S206 specifically includes:

[0050] According to the operation mode, operation sequence, route mode, default stop time, inter-station operation time and initial map laying interval of the operation route, first lay out the non-fixed side operation line of all departure trains of the non-fixed side starting station return rail within one hour; the non-fixed side operation line is from the departure time of the return rail at the starting station to the arrival time of the return rail at the terminal station in the operation direction;

[0051] Determine the starting point of the first non-fixed side running line according to the departure time of the turnaround track connected to the first fixed side, the running order of the running route, and the initial map laying interval;

[0052] According to the initial map-laying intervals and the order of operation between all the running lines of the running intersection, the running lines in the non-fixed side direction are laid out in sequence, and the preceding non-fixed side running lines of the first non-fixed side running line are supplemented.

[0053] In one embodiment, after step S207 is completed, all train operation lines with a one-hour operation route plan have been laid out, and step S207 is specifically as follows:

[0054] Step S70, starting from the first single intersection / traffic jam path connected to the fixed-side reversing line, find the arrival time T1 of the reversing rail at the terminal station of the fixed-side single intersection / traffic jam path adjacent to both sides of the single intersection / traffic jam path and not connected to the reversing line, and the departure time T2 of the reversing rail at the starting station of the non-fixed-side single intersection / traffic jam path closest to T1 and not connected to the reversing line, and T2>T1;

[0055] Step S71, if T2-T1=return track change end time, directly connect and end;

[0056] Step S72, if T2-T1>return rail end change time, and T2-T1-default return rail end change time ≤ return rail parking time adjustment margin, directly connect and end;

[0057] Step S73: If T2-T1> the time for switching the return rail ends, and T2-T1-default time for switching the return rail ends> the margin for adjusting the stop time of the return rail, then the stop time is adjusted. The stop time is adjusted in accordance with the principle of decreasing priority. The order of decreasing priority is: increasing the stop time of the return station, increasing the stop time of the exclusive section of the running route, increasing the stop time of the shared section of the running route, and increasing the initial map laying interval. The stop time adjustment specifically includes:

[0058] Step S731, after using up the adjustment margin of the stop time of the reversing rail at the current reversing station, according to the adjustment margin and step length of the stop time of the reversing station, the stop time of the current pick-up station and the departure station is synchronously increased until T2-T1-the adjusted reversing rail end-changing time ≤ 0, and the process ends; if after using up the adjustment margin of the stop time of the pick-up station and the departure station, T2-T1-the adjusted reversing rail end-changing time > 0, the process proceeds to step S732;

[0059] Step S732, according to the adjustment margin and step length of the stop time of the station for the exclusive use of the running route section, the stop time of the station for the exclusive use of the running route section on the fixed side and the station for the exclusive use of the running route section on the non-fixed side is increased as synchronously as possible, until T2-T1-adjusted turnaround track end change time ≤ 0, and then the process ends; if the adjustment margin of the station for the exclusive use of the running route section is fully used, T2-T1-adjusted turnaround track end change time> 0, then the process goes to step S733;

[0060] Step S733, according to the adjustment margin and step size of the stop time at the common section station of the running route, the stop time at the fixed side and the non-fixed side of the common section station of the running route is increased synchronously, until T2-T1-adjusted turnaround rail end change time ≤ 0, and then the process ends; if the adjustment margin of the common section station of the running route is fully used, T2-T1-adjusted turnaround rail end change time> 0, then the process goes to step S734;

[0061] Step S734, adjust the step size according to the initial laying interval, increase the fixed side and non-fixed side laying intervals synchronously, re-analyze and adjust until T2-T1-adjusted return track end change time ≤ 0, and end;

[0062] Step S74, if T2-T1<return track change end time, the specific steps include:

[0063] Step S741, find the departure time T3 of the return track of the starting station of the non-fixed side single intersection / traffic jam path which is the second closest to T1 and not connected to the return line. If T3-T1<the return track end-changing time, find the departure time T4 of the non-fixed side return track which is the third closest to T1 and not connected to the return line, and repeat until Tn-T1≥the return track end-changing time, and then go to step S742;

[0064] Step S742, if Tn-T1=return track change end time, go to step S71;

[0065] Step S743: if Tn-T1>return rail end change time, and Tn-T1-default return rail end change time≤return rail parking time adjustment margin, go to step S72;

[0066] Step S744: if Tn-T1>return rail end change time, and Tn-T1-default return rail end change time>return rail parking time adjustment margin, go to step S73.

[0067] In one embodiment, step S209, based on actual demand and the mapping interval adjusted in step S208, each time the train turnover from the fixed side to the non-fixed side is one hour, all the running lines on the fixed side and the non-fixed side are cyclically mapped, and referring to the methods of steps S205 to S208, all the return running lines between the fixed side and the non-fixed side, and between the non-fixed side and the fixed side are connected, and the relevant mapping data is saved.

[0068] The present invention provides an adaptive global analysis method for the operating capacity of complex rail transit routes, which can quickly obtain a train operation diagram / timetable based on the maximum use of the operating capacity of signal equipment according to the operation route plan, providing an efficient means for complex route operation capacity analysis. At the same time, the present invention can also serve the preparation of train operation plans, greatly improve the efficiency of operation diagram preparation, and reduce the workload of dispatchers. BRIEF DESCRIPTION OF THE DRAWINGS

[0069] Figure 1 A schematic flow chart of an adaptive global analysis method for complex rail transit route operation capacity according to an embodiment of the present invention;

[0070] Figure 2 Schematic diagram of a method for calibrating intervals of initial map laying of a train running line according to an embodiment of the present invention; wherein A, B, C, D, E and F represent stations;

[0071] Figure 3 It is a schematic diagram of a fixed side calibration method 1 for laying out a train running line according to an embodiment of the present invention; wherein X15 represents a large route of 15 pairs / h, and Y15 represents a small route of 15 pairs / h;

[0072] Figure 4 Schematic diagram of a second method for marking the fixed side of a train running line according to an embodiment of the present invention; wherein X10 represents a large route of 10 pairs / h, and Y20 represents a small route of 20 pairs / h;

[0073] Figure 5 It is a schematic diagram of a third method for marking the fixed side of a train running line according to an embodiment of the present invention; wherein X15 represents a large route of 15 pairs / h, and Y15 represents a small route of 15 pairs / h;

[0074] Figure 6 Schematic diagram of a fourth method for marking the fixed side of a train running line according to an embodiment of the present invention; wherein X15 represents 15 pairs / h of a large route, Y15 represents 15 pairs / h of a small route, and Z11 represents 11 trains / h of a congested route;

[0075] Figure 7 A schematic diagram of a train line connection method according to an embodiment of the present invention; and

[0076] Figure 8 This is a schematic diagram of the planning results of a train operation plan for maximizing the operating capacity of signal equipment in a complex route according to an embodiment of the present invention; wherein L represents a turnaround line, K represents a vehicle base, M represents a train on a congested path, and N represents a train returning to the depot. DETAILED DESCRIPTION

[0077] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the invention and are not used to limit the invention.

[0078] An adaptive global analysis method for the operating capacity of complex rail transit routes of the present invention involves station tracking intervals, bifurcation intervals, merging intervals, return intervals, default stop times, default return track end switching time, station operation time, and operation intervals between the main line and the vehicle base connection station. The stop time and the step size of the laying interval adjustment are both taken as small as possible and are set in advance according to the application scenario.

[0079] like Figure 1 As shown, an adaptive global analysis method for complex rail transit route operation capacity according to an embodiment of the present invention includes:

[0080] Step S1, determining the operation route plan, wherein determining the operation route plan includes determining the operation form, operation ratio and operation order of the operation route;

[0081] Step S2, obtaining a train operation diagram and train schedule of an operation route scheme based on maximizing the operation capacity of signal equipment; wherein the operation capacity is a general term for the return interval, tracking interval, bifurcation interval, merging interval, operation interval between the main line and the vehicle base connection station, route operation capacity, etc.; the route operation capacity refers to the maximum number of trains that can pass through any station of various types of operation routes in the operation route scheme in the up direction or down direction within a unit time, and the unit is trains / h. If the maximum number of trains that can pass through the up direction and the down direction is the same, the unit is pairs / h;

[0082] Step S3, counting the operating capacity related indicators according to the train timetable of the operating route plan; wherein the operating capacity related indicators include the travel speed, travel time, minimum operating interval, average operating interval, maximum operating interval and number of trains used for various operating routes in the operating route plan, and the operating capacity related indicators are obtained by counting the train operating interval, inter-station operating time and stop time of each station according to the train timetable.

[0083] The following describes in detail the steps of the adaptive global analysis method for complex rail transit route operating capacity according to an embodiment of the present invention described above.

[0084] In step S1, the specific steps for determining the operation form, operation ratio and operation order of the operation route are as follows: according to the station passenger flow transportation demand or passenger flow forecast results, the passenger capacity standards of different train models are converted into the hourly train operation demand of each station, and combined with the station layout with the conditions of turnaround, spare vehicle storage, and connection between the main line and the vehicle base, the starting station, terminal station and hourly train operation demand of each operation route / traffic congestion path in the operation route plan are determined, and the operation form and operation ratio of the operation route plan are formed by integration.

[0085] In determining the running order, it is necessary to first analyze the set units and scattered units, and then determine the running order of the routes as the order for drawing the train operation diagram. Among them, the set unit is a combination of multiple single routes that can be cyclically operated in the hourly running route plan; the scattered unit is the running route plan remaining after removing the set unit from the hourly running route plan.

[0086] For example: if the operation mode is a mixed operation of large and small routes, and the ratio of large routes to small routes within 1 hour is 15:15, then there are 15 sets of units within 1 hour, and the operation order of each set of units is large route and small route trains, and there are no scattered units. If the ratio of large route: small route: congestion path within 1 hour is 7:15:7, considering the best possible balance of waiting to improve the travel experience of passengers, and to reduce the continuous return of trains at the reversing station of the common section of the running route as much as possible, and reduce the pressure on the train operation guarantee of the reversing station, then there are 7 identical sets of units and 1 scattered unit within 1 hour. The operation order of the set of units is small route, large route, small route, large route congestion path train, and the scattered unit is 1 small route train.

[0087] Step S2 specifically includes:

[0088] Step S201: Calculate all running intervals and running times of the shared sections and dedicated sections of the running routes in the up and down directions.

[0089] Among them, the common section of the running route is the track section used by different running routes, and the exclusive section of the running route is the track section used by a single running route. The running intervals and running times involved mainly include the tracking intervals between stations in the up and down directions, the running time between stations, the divergence intervals and merging intervals of different running routes, the turning intervals of all turning stations of the running route, and the running intervals between the main line and the vehicle base connection station.

[0090] Step S202: Determine the initial mapping interval of the operation route plan according to the independent processing mode of the uplink and downlink directions.

[0091] In step S202, Max represents taking the maximum value in the set, and the data to be calculated according to the actual situation include:

[0092] (1) The initial laying interval of the first common section of the running intersection = Max{the tracking interval of two adjacent common sections of the running intersection in the upward or downward direction, the diverging interval of two adjacent common sections of the running intersection in the upward or downward direction, the merging interval of two adjacent common sections of the running intersection in the upward or downward direction, and the turning interval of two adjacent common sections of the running intersection in the upward or downward direction};

[0093] (2) The initial paving interval of the second running route common section = Max{the tracking interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the divergence interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the merging interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the reversing interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, and the running interval between the main line and the vehicle base connection station};

[0094] (3) The initial laying interval of the third running route common section = Max{the tracking interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the divergence interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the merging interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the reentry interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, and the running interval between the mainline and the vehicle base connection station};

[0095] (4) Initial lay-out interval of the exclusive running route segment = Max{the tracking interval of two adjacent exclusive running route segments in the upward or downward direction, the diverging interval of two adjacent exclusive running route segments in the upward or downward direction, the merging interval of two adjacent exclusive running route segments in the upward or downward direction, and the reentry interval of two adjacent exclusive running route segments in the upward or downward direction};

[0096] The operating interval between the main line and the vehicle base connection station is used when there is a traffic jam from the vehicle base to the main line and the train withdraws from the main line to the vehicle base.

[0097] The specific method for judging whether the initial mapping interval of the exclusive section of the running route is effective is as follows:

[0098] ① If the initial map-laying interval of the exclusive section of the running route is less than the sum of the initial map-laying intervals of all the common sections of the running route between two adjacent exclusive sections of the running route in the upward or downward direction, the initial map-laying interval of the exclusive section of the running route is invalid;

[0099] ② If the initial mapping interval of the exclusive section of the operating route is ≥ the sum of the initial mapping intervals of all the common sections of the operating route between two adjacent exclusive sections of the operating route in the upward or downward direction, the initial mapping interval of the exclusive section of the operating route is valid; if there is time margin allocation, the time margin will be evenly distributed to the initial mapping interval of each common section of the operating route.

[0100] (5) Initial mapping interval of the operating route set unit = Max{the sum of the initial mapping intervals between all operating routes and traffic jam paths in the operating route set unit in the upward or downward direction}.

[0101] For example, Figure 2 As shown, the operation route consists of large and small routes and congested routes. The operation route set unit is large route 1, small route 1, and congested route. Taking the uplink direction as an example, the operation order is large route 1 (station A to D), small route 1 (station B to C), and congested route (station E to F). Taking the initial layout interval of the uplink direction as an example, it is necessary to consider:

[0102] The initial layout interval t1 of the common section (stations B to C) in the upward direction of the operation route of the large route 1 and the small route 1;

[0103] The initial layout interval t2 of the common section (stations B to C) in the upward direction of the running route of the small route 1 and the traffic jam route;

[0104] The initial layout interval t3 of the common section (stations E to F) between the traffic jam route and the operating route of the major route 1 in the upward direction;

[0105] The initial layout interval of the exclusive section (stations A to E) in the up direction of the operation route between major route 1 and major route 1 is t4;

[0106] The initial mapping interval of the exclusive section (station F to D) in the upward direction of the operating route between major route 1 and major route 1 is t5.

[0107] ① If Max{t4,t5}≤t1+t2+t3, the initial mapping interval in the upward direction of the running route set unit is the sum of t1, t2 and t3.

[0108] ② If Max{t4,t5}>t1+t2+t3, the initial mapping interval of the uplink direction of the running route set unit is MAX{t4,t5}. Due to the existence of time margin allocation, the effective values ​​of t1, t2 and t3 are:

[0109] t1 effective value = t1 + (Max{t4, t5} - t1 - t2) / 3;

[0110] t2 effective value = t2 + (Max{t4, t5} - t1 - t2) / 3;

[0111] The effective value of t3 = t3 + (Max{t4, t5} - t1 - t2) / 3.

[0112] Similarly, referring to the processing method in the upward direction, the initial laying interval in the downward direction can be obtained.

[0113] Step S203: Determine the stop time adjustment margin for each station according to the initial layout interval of the up and down direction operation route plan. According to the difference in parking positions, the stop time includes the stop time of the physical station and the virtual platform (return rail, transfer rail, etc.).

[0114] For example, assume that the initial mapping intervals for up and down routes between different operating routes and congested routes are both 120 seconds.

[0115] (1) A station only involves a tracking interval of 90 seconds, so the adjustment margin for the stop time of the station is 30 seconds.

[0116] (2) A station only involves the reversing interval after the station, where the receiving interval is 120s, the reversing operation interval is 110s, and the departure interval is 100s. In this case, the adjustment margin for the stop time at the receiving platform of the station is 0s, the adjustment margin for the stop time at the reversing track is 10s, and the adjustment margin for the stop time at the departure platform of the station is 20s.

[0117] (3) A station only involves the reversing interval before the station, of which the reversing interval is 115 seconds. Generally, since the receiving platform, reversing track and departure platform of this station are the same platform, the adjustment margin of the stop time is 5 seconds.

[0118] Step S204: Laying out the fixed side running line.

[0119] Determine the turnaround station that preferentially connects the turnaround line. Among the stations with higher operating capacity requirements, the turnaround station with higher turnaround capacity requirements for a single type of operating route / traffic jam path (usually the common section of the operating route) is preferred, or the turnaround station for the operating route / traffic jam path is specified by the user. Then the train running direction of the receiving platform of the turnaround station is the fixed side, and the train running direction of the departure platform is the non-fixed side.

[0120] For example, Figure 3 The corresponding fixed side is the upward direction, and the turnaround station that is preferentially connected to the turnaround line is the small route terminal turnaround station C. Figure 4 The corresponding fixed side is the upward direction, and the turnaround station that is preferentially connected to the turnaround line is the small route terminal turnaround station D. Figure 5 The corresponding fixed side is the upward direction, and the turnaround station that is preferentially connected to the turnaround line is the terminal turnaround station D of the small route or large route. Figure 6 In the case where the user gives priority to guaranteeing the operating capacity of the congested path, the fixed side is the upward direction, and the turnaround station that is preferentially connected to the turnaround line is the turnaround station D at the terminal of the congested path.

[0121] According to the operation mode, operation sequence, default stop time, inter-station operation time, and initial layout interval of the operation route plan, the fixed side operation line of all departure trains of the fixed side starting station return track within one hour is laid out first. The fixed side operation line corresponds to the departure time of the return track of the starting station to the arrival time of the return track of the terminal station in the operation direction.

[0122] Step S205: Connect the return running line of the fixed-side single-type running route / traffic jam route.

[0123] According to the fixed-side operating line, in stations with higher operating capacity requirements, priority is given to connecting the reversing operating line of the reversing station of the single-type operating route / traffic congestion path with higher reversing capacity requirements, or priority is given to connecting the reversing operating line of the reversing station of the operating route / traffic congestion path specified by the user.

[0124] In the process of connecting the reversing running line, the reversing running line is from the arrival time of the reversing track at the fixed side terminal station to the departure time of the reversing track. If it is a reversal after the station, the reversing track at the reversing station will take the default end change time, and the fixed side reversing running line will be laid; if it is a reversal before the station, the reversing track and the stop track are considered to be the same track, specifically:

[0125] ① If the reversing rail end-changing time at the reversing station is ≥ the default stop time, the fixed-side reversing running line shall be laid out according to the reversing rail end-changing time;

[0126] ② If the reversing track end change time at the reversing station is less than the default stop time, the fixed-side reversing running line shall be laid out according to the stop time.

[0127] Step S206: Laying out the non-fixed side running line.

[0128] According to the operation mode, operation sequence, route mode, default stop time, inter-station operation time and initial map laying interval of the operation route, first lay out the non-fixed side operation line of all departure trains of the non-fixed side starting station return track within one hour; the non-fixed side operation line is from the departure time of the return track at the starting station to the arrival time of the return track at the terminal station in the operation direction;

[0129] Determine the starting point of the first non-fixed side running line according to the departure time of the turnaround track connected to the first fixed side, the running order of the running route, and the initial map laying interval;

[0130] According to the initial map-laying intervals and the order of operation between all the running lines of the running intersection, the running lines in the non-fixed side direction are laid out in sequence, and the preceding non-fixed side running lines of the first non-fixed side running line are supplemented.

[0131] Step S207: Connect the remaining return running lines on the fixed side.

[0132] After step S207 is completed, all train operation lines with a one-hour turnaround in the operation route plan have been laid out. Step S207 is specifically as follows:

[0133] Step S70, as Figure 7 As shown, starting from the first single intersection / traffic jam path connected with the fixed-side reversing running line, the arrival time T1 of the reversing rail at the terminal station of the fixed-side single intersection / traffic jam path adjacent to both sides of the single intersection / traffic jam path and not connected with the reversing running line, and the departure time T2 of the reversing rail at the starting station of the non-fixed-side single intersection / traffic jam path closest to T1 and not connected with the reversing running line are found in order from far to near, and T2>T1.

[0134] Step S71, if T2-T1=return track change end time, directly connect and end;

[0135] Step S72, if T2-T1>return rail end change time, and T2-T1-default return rail end change time ≤ return rail parking time adjustment margin, directly connect and end;

[0136] Step S73: If T2-T1> the time for switching the return track, and T2-T1-default time for switching the return track> the margin for adjusting the stop time of the return track, then the stop time is adjusted; the stop time is adjusted in accordance with the principle of decreasing priority, and the order of decreasing priority is: increasing the stop time of the return station, increasing the stop time of the exclusive section of the running route, increasing the stop time of the shared section of the running route, and increasing the initial map laying interval. In this embodiment, the stop time adjustment specifically includes:

[0137] Step S731, after using up the adjustment margin of the stop time of the reversing rail at the current reversing station, according to the adjustment margin and step length of the stop time of the reversing station, the stop time of the current pick-up station and the departure station is synchronously increased until T2-T1-the adjusted reversing rail end-changing time ≤ 0, and the process ends; if after using up the adjustment margin of the stop time of the pick-up station and the departure station, T2-T1-the adjusted reversing rail end-changing time > 0, the process proceeds to step S732;

[0138] Step S732, according to the adjustment margin and step length of the stop time of the station for the exclusive use of the running route section, the stop time of the station for the exclusive use of the running route section on the fixed side and the non-fixed side is increased as synchronously as possible, until T2-T1-adjusted turnaround track change time ≤ 0, and then the end is completed; if the adjustment margin of the station for the exclusive use of the running route section is fully used, T2-T1-adjusted turnaround track change time> 0, then go to step S733;

[0139] Step S733, according to the adjustment margin and step size of the stop time at the common section station of the running route, the stop time at the fixed side and the non-fixed side of the common section station of the running route is increased synchronously, until T2-T1-adjusted turnaround rail end change time ≤ 0, and then the process ends; if the adjustment margin of the common section station of the running route is fully used, T2-T1-adjusted turnaround rail end change time> 0, then the process goes to step S734;

[0140] Step S734, adjust the step size according to the initial laying interval, increase the fixed side and non-fixed side laying intervals synchronously, re-analyze and adjust until T2-T1-adjusted return track end change time ≤ 0, and end;

[0141] Step S74, if T2-T1<return track change end time, the specific steps include:

[0142] Step S741, find the departure time T3 of the return track of the starting station of the non-fixed side single intersection / traffic jam path which is the second closest to T1 and not connected to the return line. If T3-T1<the return track end-changing time, find the departure time T4 of the non-fixed side return track which is the third closest to T1 and not connected to the return line, and repeat until Tn-T1≥the return track end-changing time, and then go to step S742;

[0143] Step S742, if Tn-T1=return track change end time, go to step S71;

[0144] Step S743: if Tn-T1>return rail end change time, and Tn-T1-default return rail end change time≤return rail parking time adjustment margin, go to step S72;

[0145] Step S744: if Tn-T1>return rail end change time, and Tn-T1-default return rail end change time>return rail parking time adjustment margin, go to step S73.

[0146] Step S208: route conflict check and adjustment.

[0147] At all the turning stations, based on the turning interval, bifurcation interval, merging interval, tracking interval, and operating interval between the main line and the vehicle base connection station of the key stations, check in turn whether there are any route conflicts in the running map. If there is a conflict, return to step S207 for readjustment; if there is no conflict, maintain the map-laying interval and go to step S209.

[0148] Step S209: Circularly lay out the running paths and running lines.

[0149] According to actual needs and the mapping interval adjusted in step S208, all the running lines on the fixed side and the non-fixed side are mapped cyclically, with the train turnover from the fixed side to the non-fixed side being one hour each time. Referring to the methods of steps S205 to S208, all the return running lines between the fixed side and the non-fixed side, and between the non-fixed side and the fixed side are connected, and the relevant mapping data is saved.

[0150] Step S210: Output the train operation diagram and train timetable of the operation route plan.

[0151] According to the arrival and departure time data on each running line, the train operation diagram and corresponding train schedule data of the running route plan are output. Under the preset running form, running ratio and running order, the running route plan obtained is a plan that maximizes the operating capacity of the signal equipment.

[0152] Step S3: Calculate the operation capacity related indicators according to the train timetable of the operation route plan.

[0153] According to the obtained train timetable, the train running interval, inter-station running time and stop time of each station are counted, and the travel speed, travel time, minimum running interval, average running interval, maximum running interval, number of trains used and other operation capacity-related indicators of various operating routes in the complex route operation plan are statistically obtained as a reference for the preparation of planned operation route plans.

[0154] The present invention conducts simulation analysis of application effects in conjunction with specific calculation examples. The simulated route intersection form is a mixed operation of large and small intersections and congested paths, with the downlink direction as the fixed side, and a total of 4 return lines are used. The minimum operating interval of the shared section is 87.8s (that is, the minimum tracking interval is 87.8s), and the order of paving large and small intersections is to lay out large intersections and small intersections in turn, and the congested (inserted) path operation line (including the return operation line) is considered. After automatic analysis, the demand for large intersections is 15 pairs / h, the small intersection is 15 pairs / h, and the congested path is 11 trains / h, which results in 11 sets of set units and 4 sets of scattered units. The set units are large intersections, congested paths, and small intersections, and the scattered units are large intersections and small intersections. After further analysis, it is obtained Figure 8 The train operation plan shown here maximizes the operating capacity of the signal equipment. To simplify the display, the operating lines between all return lines are represented by straight lines, but the operating time is the same as the actual or simulated value.

[0155] After inspection, the result meets the train running interval requirements and there is no route conflict. According to the timetable corresponding to the scheme, it is easy to obtain the travel speed, travel time, minimum running interval, average running interval, maximum running interval, number of trains and other operating capacity related indicators of various operating routes in the complex route operation scheme.

[0156] The present invention provides an adaptive global analysis method for the operating capacity of complex rail transit routes, which can quickly obtain a train operation diagram / timetable based on the maximum use of the operating capacity of signal equipment according to the operation route plan, providing an efficient means for complex route operation capacity analysis. At the same time, the present invention can also serve the preparation of train operation plans, greatly improve the efficiency of operation diagram preparation, and reduce the workload of dispatchers.

[0157] The above-described embodiments are only further explanations of the present invention, and are not intended to limit the present invention in other forms. The present invention may also have other various embodiments. Without departing from the spirit and essence of the present invention, those skilled in the art may make various corresponding modifications and changes according to the present invention, but these corresponding modifications and changes should all fall within the protection scope of the present invention.

Claims

1. An adaptive global analysis method for the operating capacity of complex rail transit routes. It is characterized in that include: Step S1, determining the operation route plan, wherein determining the operation route plan includes determining the operation form, operation ratio and operation order of the operation route; Step S2, obtaining a train operation diagram and train schedule of an operation route scheme based on maximizing the operation capacity of signal equipment; the operation capacity includes: return interval, tracking interval, bifurcation interval, merging interval, operation interval between the main line and the vehicle base connection station, and route operation capacity; the route operation capacity refers to the maximum number of trains that can pass through any station of each type of operation route in the operation route scheme in the up direction or down direction within a unit time, and the unit is trains / h. If the maximum number of trains that can pass through the up direction and the down direction is the same, the unit is pairs / h; and Step S3, counting the operating capacity-related indicators according to the train timetable of the operating route plan; the operating capacity-related indicators include the travel speed, travel time, minimum operating interval, average operating interval, maximum operating interval and number of train operations of various operating routes in the operating route plan, and the operating capacity-related indicators are obtained by counting the train operating interval, inter-station operating time and stop time of each station according to the train timetable.

2. The adaptive global analysis method for complex rail transit route operation capacity according to claim 1, It is characterized in that In step S1, the specific steps of determining the operation mode, operation ratio and operation order of the operation route are as follows: According to the passenger flow transportation demand or passenger flow forecast results of the station and the passenger capacity standards of different train models, it is converted into the train operation demand per hour for each station; Combined with the station layout with conditions for turning back, storing spare vehicles, and connecting the main line with the vehicle base, determine the starting station, terminal station and hourly train demand for each operation route / traffic jam path in the operation route plan, and integrate them to form the operation form and operation ratio of the operation route; According to the running pattern and running ratio of the running routes, the set units and scattered units are analyzed to determine the running sequence of the running routes, which is used as the reference sequence for drawing the train operation diagram; Among them, the set unit is a combination of multiple single routes that can be cyclically operated in the hourly operation route plan; the scattered unit is the remaining operation route plan after removing the set unit from the hourly operation route plan.

3. The adaptive global analysis method for complex rail transit route operation capacity according to claim 2, It is characterized in that Step S2 specifically includes: Step S201, calculating all running intervals and running times of the shared sections and the dedicated sections of the running routes in the up and down directions; The common section of the running routes is a track section commonly used by different running routes; The operating route exclusive section is a track section used exclusively by a single operating route; The running interval includes the tracking interval between stations in the upward and downward directions, the diverging interval and merging interval of different running routes, the turning interval of all turning stations of the running routes, and the running interval between the main line and the vehicle base connection station; The running time includes the inter-station running time in the uplink direction and the downlink direction; Step S202, determining the initial lay-out interval of the operation route plan according to the independent processing mode of the uplink and downlink directions; Step S203, determining the stop time adjustment margin of each station according to the initial layout interval of the up and down direction operation route plan; The stop time includes the stop time of the physical station and the virtual platform, and the virtual platform includes the return track and the transfer track; Step S204, laying out the fixed side running line; Step S205, connecting the return running line of the fixed-side single-type running route / traffic jam route; Step S206, laying out the non-fixed side running line; Step S207, connecting the remaining return running lines on the fixed side; Step S208, route conflict check and adjustment; at all the turnaround stations, according to the requirements of the turnaround interval, bifurcation interval, merging interval, tracking interval, and the running interval between the main line and the vehicle base connection station of the key stations, check in turn whether there is a route conflict in the running layout. If there is a conflict, return to step S207 for readjustment; if there is no conflict, keep the layout interval and go to step S209; Step S209, cyclically laying out the running paths and running lines; and Step S210, outputting the train operation diagram and train timetable of the operation route plan.

4. The adaptive global analysis method for complex rail transit route operation capacity according to claim 3, It is characterized in that In step S202, Max represents taking the maximum value in the set, and the data to be considered for calculation according to the actual situation include: The initial laying interval of the first common section of the running intersection = Max{the tracking interval of two adjacent common sections of the running intersection in the upward or downward direction, the bifurcation interval of two adjacent common sections of the running intersection in the upward or downward direction, the merging interval of two adjacent common sections of the running intersection in the upward or downward direction, and the reentry interval of two adjacent common sections of the running intersection in the upward or downward direction}; The initial paving interval of the second running route common section = Max{the tracking interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the divergence interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the merging interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the reversing interval between the traffic jam path in the upward or downward direction and the previous or subsequent adjacent running route common section, the running interval between the main line and the vehicle base connection station}; The initial layout interval of the third operation route common section = Max{the tracking interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the divergence interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the merging interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, the reentry interval of the common sections of two adjacent traffic jam paths in the upward or downward direction, and the operation interval between the main line and the vehicle base connection station}; Initial laying interval of the exclusive running route section = Max{the tracking interval of two adjacent exclusive running route sections in the upward or downward direction, the diverging interval of two adjacent exclusive running route sections in the upward or downward direction, the merging interval of two adjacent exclusive running route sections in the upward or downward direction, the reentry interval of two adjacent exclusive running route sections in the upward or downward direction}; The initial map laying interval of the running route set unit = Max {the sum of the initial map laying intervals between all running routes and traffic jam paths in the running route set unit in the upward or downward direction}; The operating interval between the main line and the vehicle base connection station is used when there is a traffic jam from the vehicle base to the main line and the train withdraws from the main line to the vehicle base.

5. The adaptive global analysis method for complex rail transit route operation capacity according to claim 4, It is characterized in that The specific method for judging whether the initial mapping interval of the exclusive section of the running route is effective is as follows: If the initial map-laying interval of the exclusive section of the running route is less than the sum of the initial map-laying intervals of all the common sections of the running routes between two adjacent exclusive sections of the running route in the upward or downward direction, the initial map-laying interval of the exclusive section of the running route is invalid; If the initial mapping interval of the exclusive section of the operating route is ≥ the sum of the initial mapping intervals of all the common sections of the operating route between two adjacent exclusive sections of the operating route in the upward or downward direction, the initial mapping interval of the exclusive section of the operating route is valid; if there is time margin allocation, the time margin will be evenly distributed to the initial mapping interval of each common section of the operating route.

6. The adaptive global analysis method for complex rail transit route operation capacity according to claim 3, It is characterized in that The step S204 specifically includes: Determine the turnaround station that is preferentially connected to the turnaround line; among the stations with higher operating capacity requirements, give priority to the turnaround station of the single-type operating route / traffic jam path with higher turnaround capacity requirements, or the turnaround station of the operating route / traffic jam path specified by the user, then the train running direction of the receiving platform of the turnaround station is the fixed side, and the train running direction of the departure platform is the non-fixed side; According to the operation mode, operation order, default stop time, inter-station operation time and initial map laying interval of the operation route plan, the fixed-side operation line of all departure trains of the fixed-side starting station return track within one hour is laid out first. The fixed-side operation line corresponds to the departure time of the return track at the starting station to the arrival time of the return track at the terminal station in the train operation direction.

7. The adaptive global analysis method for complex rail transit route operation capacity according to claim 6, It is characterized in that The step S205 specifically includes: According to the fixed-side running line, in the station with higher running capacity requirements, the reversing running line of the reversing station of the single-type running route / traffic jam path with higher reversing capacity requirements is preferentially connected, or the reversing running line of the reversing station of the running route / traffic jam path specified by the user is preferentially connected; In the process of connecting the reversing running line, the reversing running line is from the arrival time of the reversing track at the fixed side terminal station to the departure time of the reversing track; if it is a reversal after the station, the reversing track at the reversing station takes the default end change time, and the fixed side reversing running line is laid; if it is a reversal before the station, the reversing track and the stop track are considered to be the same track, specifically: If the reversing rail end-changing time at the reversing station is ≥ the default stop time, the fixed-side reversing running line shall be laid out according to the reversing rail end-changing time; If the reversing track end change time at the reversing station is less than the default stop time, the fixed-side reversing running line will be laid out according to the stop time.

8. The adaptive global analysis method for complex rail transit route operation capacity according to claim 7, It is characterized in that Step S206 specifically includes: According to the operation mode, operation sequence, route mode, default stop time, inter-station operation time and initial map laying interval of the operation route, first lay out the non-fixed side operation line of all departure trains of the non-fixed side starting station return rail within one hour; the non-fixed side operation line is from the departure time of the return rail at the starting station to the arrival time of the return rail at the terminal station in the operation direction; Determine the starting point of the first non-fixed side running line according to the departure time of the turnaround track connected to the first fixed side, the running order of the running route, and the initial map laying interval; According to the initial map-laying intervals and the order of operation between all the running lines of the running intersection, the running lines in the non-fixed side direction are laid out in sequence, and the preceding non-fixed side running lines of the first non-fixed side running line are supplemented.

9. The adaptive global analysis method for complex rail transit route operation capacity according to claim 8, It is characterized in that After the step S207 is completed, all train operation lines with a one-hour operation route plan have been laid out. The step S207 is specifically as follows: Step S70, starting from the first single intersection / traffic jam path connected to the fixed-side reversing line, find the arrival time T1 of the reversing rail at the terminal station of the fixed-side single intersection / traffic jam path adjacent to both sides of the single intersection / traffic jam path and not connected to the reversing line, and the departure time T2 of the reversing rail at the starting station of the non-fixed-side single intersection / traffic jam path closest to T1 and not connected to the reversing line, and T2>T1; Step S71, if T2-T1=return track change end time, directly connect and end; Step S72, if T2-T1>return rail end change time, and T2-T1-default return rail end change time ≤ return rail parking time adjustment margin, directly connect and end; Step S73: If T2-T1> the time for switching the return rail ends, and T2-T1-default time for switching the return rail ends> the margin for adjusting the stop time of the return rail, then the stop time is adjusted. The stop time is adjusted in accordance with the principle of decreasing priority. The order of decreasing priority is: increasing the stop time of the return station, increasing the stop time of the exclusive section of the running route, increasing the stop time of the shared section of the running route, and increasing the initial map laying interval. The stop time adjustment specifically includes: Step S731, after using up the adjustment margin of the stop time of the reversing rail at the current reversing station, according to the adjustment margin and step length of the stop time of the reversing station, the stop time of the current pick-up station and the departure station is synchronously increased until T2-T1-the adjusted reversing rail end-changing time ≤ 0, and the process ends; if after using up the adjustment margin of the stop time of the pick-up station and the departure station, T2-T1-the adjusted reversing rail end-changing time > 0, the process proceeds to step S732; Step S732, according to the adjustment margin and step length of the stop time of the station for the exclusive use of the running route section, the stop time of the station for the exclusive use of the running route section on the fixed side and the non-fixed side is increased as synchronously as possible, until T2-T1-adjusted turnaround track change time ≤ 0, and then the end is completed; if the adjustment margin of the station for the exclusive use of the running route section is fully used, T2-T1-adjusted turnaround track change time> 0, then go to step S733; Step S733, according to the adjustment margin and step size of the stop time at the common section station of the running route, the stop time at the fixed side and the non-fixed side of the common section station of the running route is increased synchronously, until T2-T1-adjusted turnaround rail end change time ≤ 0, and then the process ends; if the adjustment margin of the common section station of the running route is fully used, T2-T1-adjusted turnaround rail end change time> 0, then the process goes to step S734; Step S734, adjust the step size according to the initial laying interval, increase the fixed side and non-fixed side laying intervals synchronously, re-analyze and adjust until T2-T1-adjusted return track end change time ≤ 0, and end; Step S74, if T2-T1<return track change end time, the specific steps include: Step S741, find the departure time T3 of the return track of the starting station of the non-fixed side single intersection / traffic jam path which is the second closest to T1 and not connected to the return line. If T3-T1<the return track end-changing time, find the departure time T4 of the non-fixed side return track which is the third closest to T1 and not connected to the return line, and repeat until Tn-T1≥the return track end-changing time, and then go to step S742; Step S742, if Tn-T1=return track change end time, go to step S71; Step S743: if Tn-T1>return rail end change time, and Tn-T1-default return rail end change time≤return rail parking time adjustment margin, go to step S72; Step S744: if Tn-T1>return rail end change time, and Tn-T1-default return rail end change time>return rail parking time adjustment margin, go to step S73.

10. The adaptive global analysis method for complex rail transit route operation capacity according to claim 9, It is characterized in that Step S209, based on actual demand and the mapping interval adjusted in step S208, each time the train turnover from the fixed side to the non-fixed side is one hour, all the running lines on the fixed side and the non-fixed side are cyclically mapped, and referring to the methods of steps S205 to S208, all the return running lines between the fixed side and the non-fixed side, and between the non-fixed side and the fixed side are connected, and the relevant mapping data is saved.

Citation Information

Patent Citations

  • Verification and assessment method of rail transport network transport capacity

    CN101916423A

  • Method and system for simulating calculation of transport capacity of urban rail transit network

    CN103279669A

  • Urban rail train working diagram generation method and system for complex operation route

    CN113954926A

  • Method and system for automatically compiling multi-route multi-period all-day train working diagram

    CN114179873A