Ecological slope protection structure of TBS vegetation slope protection

Through the design of the diamond-shaped grid slope protection structure, water collection ditch, and water storage tank, the problems of water erosion and drought of the vegetation slope protection structure are solved, soil stability and water resource utilization efficiency are improved, and the restoration of the vegetation ecological environment and ecological balance are achieved.

CN118774145APending Publication Date: 2024-10-15CHINA METALLURGICAL ROAD & BRIDGE CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410911525.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

When the TBS vegetation slope protection structure faces the problems of water erosion and soil drought on the top of the slope, it lacks effective water collection ditches and water storage systems, which affects vegetation growth and soil stability, and requires frequent irrigation, which increases water usage.

Method used

Adopting a diamond grid slope protection structure, through prefabricated components and modular design, combined with water storage cylinders, drainage holes, hollow anchors and water collection ditches, the orderly flow and storage of rainwater can be achieved, and the water flow can be accurately controlled through the design of water valves and anchors. , reduce soil erosion and waterlogging.

Benefits of technology

It enhances soil stability, reduces the risk of rainwater erosion, improves water flow utilization efficiency, reduces the problem of frequent irrigation, and achieves ecological environment restoration and ecological balance of vegetation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774145A_ABST
    Figure CN118774145A_ABST
Patent Text Reader

Abstract

The ecological slope protection structure of the TBS vegetation slope protection comprises connecting piles, four concrete prefabricated slope protection strips distributed in an X shape can be connected to the periphery of each connecting pile, and the two ends of each slope protection strip can be connected into the connecting piles to form a rhombic grid slope protection structure; a water storage barrel is pre-buried in the soil layer below the connecting pile, the water storage barrel and the connecting pile are coaxial and communicated, and a drainage hole is formed in the upper portion of the connecting pile; horizontal hollow anchor rods penetrate through the connecting piles, and the anchor rods corresponding to the connecting piles in each layer penetrate into the water storage barrels corresponding to the connecting piles in the upper layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering, in particular to an ecological slope protection structure of a TBS vegetation slope protection. Background Art

[0002] Traditional slope protection technology usually uses materials such as mortar-laid rubble or concrete to form a stable slope structure. These structures are single in shape, mostly flat or inclined, lacking ecological and aesthetic qualities. At the same time, these materials are often out of touch with the natural environment and difficult to integrate with the surrounding vegetation, causing certain damage to the ecological environment. TBS vegetation slope protection technology enhances the stability of the slope by planting plants, while achieving the restoration and improvement of the ecological environment. The structure can not only effectively prevent the occurrence of geological disasters such as soil erosion and landslides, but also improve soil quality, increase biodiversity, and improve air quality. Therefore, the ecological slope protection structure of vegetation slope protection is of great significance for protecting the ecological environment and promoting ecological balance.

[0003] Although the technology of vegetation slope protection has made some progress, there are still some shortcomings. When facing the scouring of water flow on the top of the slope, if there is no effective drainage ditch or drainage system, the TBS vegetation slope protection structure may cause water flow to directly scour the slope surface, affecting vegetation growth and soil stability; the diamond grid in the slope protection structure may cause water accumulation inside the grid due to soil saturation and decreased permeability on rainy days; on sunny days, the slope protection structure is on the slope, and the moisture in the soil will decrease rapidly. If there is no effective water storage facility or water replenishment system, it may cause soil drought and affect the growth and recovery of vegetation; in order to maintain the ecological function and landscape effect of the TBS vegetation slope protection structure, it is necessary to irrigate and maintain the vegetation regularly, and frequent irrigation increases the use of water resources.

[0004] Therefore, it is necessary to provide an ecological slope protection structure of TBS vegetation slope protection, which realizes the organic combination of slope stability and ecology by combining knowledge of geotechnical engineering, botany, soil science, fertilizer science and other disciplines. The use of prefabricated components and modular design is simple, safe, reliable, and environmentally friendly, and can quickly restore vegetation and improve soil stability. Summary of the invention

[0005] To achieve the above object, the present invention provides the following technical solutions: an ecological slope protection structure of TBS vegetation slope protection, comprising connecting piles, each connecting pile can be connected with four prefabricated concrete slope protection strips distributed in an "X" shape, and both ends of each slope protection strip can be connected to the connecting pile to form a diamond grid slope protection structure;

[0006] A water storage cylinder is pre-buried in the soil layer under the connecting pile, the water storage cylinder is coaxial with and penetrates the connecting pile, and a drainage hole is opened on the upper part of the connecting pile;

[0007] Horizontal hollow anchor rods are passed through the connecting piles, and the anchor rods corresponding to each layer of connecting piles penetrate into the water storage cylinders corresponding to the connecting piles of the upper layer.

[0008] Furthermore, preferably, each diamond-shaped grid contains a slope base layer, which includes three parts from bottom to top: greening substrate, plant seeds, and non-woven fabric, wherein the greening substrate includes but is not limited to: organic matter, biological fertilizer, pH adjuster, full-price slow-release fertilizer, water-retaining agent, and disinfectant.

[0009] Furthermore, as a preference, a drainage ditch is provided at the top of the diamond grid slope protection, and the drainage ditch is connected to a row of connecting piles located at the top.

[0010] Further, as a preference, each anchor rod is provided with a water valve at one end close to the connecting pile.

[0011] Furthermore, preferably, the slope protection strip is a hollow structure that penetrates the connecting piles, and a plurality of water seepage holes are provided on the lower side wall of the slope protection strip.

[0012] Furthermore, preferably, an inclined partition plate is provided in the connecting pile, and the inclined partition plate divides the connecting pile into two spaces, one of which passes through the water storage cylinder and the diamond grid above, and the other space is connected to the anchor rod and the two slope protection strips below.

[0013] Furthermore, preferably, a drill bit is provided at one end of the anchor rod away from the connecting pile.

[0014] Further, as a preference, the drill bit is connected to a sealing inner rod, the sealing inner rod can seal the end of the anchor rod, and the torque is transmitted between the sealing inner rod and the anchor rod through the spline groove, and the sealing inner rod is connected to a guide inner rod, and the diameter of the guide inner rod is smaller than the inner diameter of the anchor rod.

[0015] Furthermore, as a preference, a spring is connected between the drill bit and the anchor rod, and the spring enables the inner blocking rod to be outside the anchor rod in a natural state.

[0016] Furthermore, preferably, the water storage cylinder is made of PVC material.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] Enhance soil stability: TBS vegetation slope protection structure enhances the overall stability of the soil by forming a diamond grid slope protection, which can effectively prevent the occurrence of geological disasters such as landslides and collapses.

[0019] Reduce rainwater erosion: The design of the drainage ditch and water storage cylinder allows rainwater to flow and store in an orderly manner, reducing the direct erosion of rainwater on the slope. It not only protects vegetation and soil, but also reduces the risk of geological disasters caused by rainwater erosion.

[0020] Improve water flow utilization efficiency: Through the design of water valves and anchor rods, this structure can achieve precise control and efficient use of water flow. It can not only provide sufficient water for vegetation growth, but also avoid waterlogging and loss caused by water accumulation at the bottom of the slope. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic diagram of an ecological slope protection structure of TBS vegetation slope protection;

[0022] Figure 2 It is a cross-sectional schematic diagram of the slope protection structure;

[0023] Figure 3 It is a schematic diagram of the structure of connecting piles and slope protection strips;

[0024] Figure 4 is a schematic diagram of the cross-sectional structure of the connecting pile;

[0025] Figure 5 is a structural schematic diagram of a drill bit;

[0026] In the figure: 1. connecting piles; 2. slope protection strips; 21. slope foundation layer; 22. seepage holes; 3. water storage cylinder; 4. anchor rods; 41. drill bit; 42. sealing inner rod; 43. guide inner rod; 44. spring; 5. water collection ditch; 6. water valve; 7. oblique partition plate. DETAILED DESCRIPTION

[0027] See also Figure 1 In an embodiment of the present invention, an ecological slope protection structure of a TBS vegetation slope protection includes a connecting pile 1, each connecting pile 1 can be connected with four prefabricated concrete slope protection strips 2 distributed in an "X" shape, and both ends of each slope protection strip 2 can be connected to the connecting pile 1 to form a diamond grid slope protection structure;

[0028] A water storage cylinder 3 is pre-buried in the soil layer under the connecting pile 1, the water storage cylinder 3 is coaxial with and penetrates the connecting pile 1, and a drainage hole is opened on the upper part of the connecting pile 1;

[0029] Horizontal hollow anchor rods 4 are passed through the connecting piles 1 , and the anchor rods 4 corresponding to each layer of connecting piles 1 penetrate into the water storage cylinders 3 corresponding to the connecting piles 1 of the previous layer.

[0030] That is to say, the water in each diamond grid can flow to the water storage cylinder 3 below through the drainage hole and be stored in the water storage cylinder 3. Since the anchor rod 4 corresponding to each layer of connecting piles 1 penetrates into the water storage cylinder 3 corresponding to the connecting piles 1 of the previous layer, the water in the water storage cylinder 3 can flow to the diamond grid of the next layer through the anchor rod 4, which can prevent water from accumulating at the bottom of the diamond grid to cause soil erosion and waterlogging on the slope, and improve the utilization efficiency of water flow.

[0031] In this embodiment, each diamond grid contains a slope foundation layer 21, which includes three parts from bottom to top: greening substrate, plant seeds, and non-woven fabrics, wherein the greening substrate includes but is not limited to: organic matter, biological fertilizer, pH value adjuster, full-price slow-release fertilizer, water-retaining agent, and disinfectant. The greening substrate provides a growth environment for plant seeds to ensure that vegetation can grow and take root quickly, and the non-woven fabric plays a role in protecting seeds or nascent vegetation and preventing soil erosion.

[0032] In this embodiment, a water collecting ditch 5 is provided at the top of the diamond grid slope protection, and the water collecting ditch 5 is connected to the top row of connecting piles 1. The water collecting ditch 5 can collect water flowing down from the top of the slope, and flow to each layer of diamond grids step by step and distribute to each water storage cylinder 3, so as to avoid water flow directly scouring the diamond grid slope protection, and water can be directly poured into the water collecting ditch 5 when watering is needed, so as to reduce the workload of maintaining greening.

[0033] See also Figure 2 In this embodiment, each anchor rod 4 is provided with a water valve 6 at one end close to the connecting pile 1. The water valve 6 can adjust the flow rate of water flowing from the upper water storage cylinder 3 to the diamond grid of this layer.

[0034] See also Figure 3 In this embodiment, the slope protection strip 2 is a hollow structure that penetrates the connecting pile 1, and a plurality of seepage holes 22 are provided on the lower side wall of the slope protection strip 2. The water flowing out of the connecting pile 1 enters the slope protection strips 2 on both sides below, and slowly seeps out through the seepage holes 22, so as to evenly irrigate the vegetation in the diamond grid.

[0035] See also Figure 4 In this embodiment, an inclined partition plate 7 is provided inside the connecting pile 1, and the inclined partition plate 7 divides the connecting pile 1 into two spaces, one of which passes through the water storage cylinder 3 and the diamond grid above, and the other space is connected to the anchor rod 4 and the two slope protection strips 2 below.

[0036] See also Figure 5 In this embodiment, a drill bit 41 is provided at one end of the anchor rod 4 away from the connecting pile 1. The anchor rod 4 is driven into the soil layer by a drilling rig, and the drill bit 41 enables the anchor rod 4 to have drilling capability.

[0037] In this embodiment, the drill bit 41 is connected to a blocking inner rod 42, and the blocking inner rod 42 can seal the end of the anchor rod 4, and the torque is transmitted between the blocking inner rod 42 and the anchor rod 4 through the spline groove. The blocking inner rod 42 is connected to a guide inner rod 43, and the diameter of the guide inner rod 43 is smaller than the inner diameter of the anchor rod 4.

[0038] In this embodiment, a spring 44 is connected between the drill bit 41 and the anchor rod 4 , and the spring 44 enables the blocking inner rod 42 to be outside the anchor rod 4 in a natural state.

[0039] That is to say, when the anchor rod 4 is in the process of drilling, the drill bit 41 is under pressure to compress the spring 44 so that the sealing inner rod 42 is inside the anchor rod 4. At this time, the torque of the anchor rod 4 can be transmitted to the drill bit 41 to drill into the soil layer, and the sealing inner rod 42 seals the inside of the anchor rod 4 to prevent soil from entering the anchor rod 4; and when the drill bit 41 drills into the water storage cylinder 3, the drill bit 41 loses pressure, the spring 44 pops the drill bit 41 out, the drill bit 41 loses its drilling effect, and at this time the inside of the anchor rod 4 is connected to the water storage cylinder 3.

[0040] In this embodiment, the water storage cylinder 3 is made of PVC material. The PVC water storage cylinder 3 is low in cost, has good airtightness and durability, and can be rotated and penetrated by the drill bit 41 without being easily cracked.

[0041] The specific implementation includes:

[0042] Survey the construction site, determine the layout of the connecting piles 1 and the anchor rods 4, and prepare the required materials, including the connecting piles 1, prefabricated concrete slope protection strips 2, water storage cylinders 3, hollow anchor rods 4, greening substrates, plant seeds, non-woven fabrics, etc.;

[0043] Dig a hole of appropriate depth at the preset position, implant the water storage cylinder 3 and the connecting pile 1 into the hole, and ensure that the connecting pile 1 is located on the ground;

[0044] Four prefabricated concrete slope protection strips 2 are installed in an "X" shape around the connecting pile 1, ensuring that both ends of each slope protection strip 2 are firmly connected to the connecting pile 1 to form a diamond grid slope protection structure;

[0045] Use a drilling rig to drive the hollow anchor rod 4 horizontally into the soil layer, ensuring that the anchor rod 4 penetrates into the water storage cylinder 3 corresponding to the upper layer of connecting piles 1;

[0046] A water valve 6 is installed at one end of the anchor rod 4 close to the connecting pile 1 to adjust the water flow;

[0047] Lay the slope foundation layer 21 in each rhombus grid, including greening substrate, plant seeds and non-woven fabrics. Ensure that the greening substrate is evenly laid to provide a good environment for vegetation growth;

[0048] A drainage ditch 5 is constructed at the top of the diamond grid slope protection to ensure that the drainage ditch 5 is connected to the top row of connecting piles 1. The drainage ditch 5 should be able to collect water flowing down from the top of the slope and flow step by step to each layer of diamond grid and be distributed to each water storage cylinder 3.

[0049] When it rains, the water collection ditch 5 collects the water flowing down from the top of the slope. During irrigation, water is directly released into the water collection ditch 5 with a water pipe, and the water flows step by step to each layer of the diamond grid; the water flows into the water storage cylinder 3 through the drainage hole of the connecting pile 1 and is stored; since the anchor rod 4 penetrates into the water storage cylinder 3 corresponding to the upper layer of the connecting pile 1, the water in the water storage cylinder 3 can flow to the next layer of the diamond grid through the anchor rod 4; the water flowing out of the connecting pile 1 enters the slope protection strips 2 on both sides below, and slowly seeps out through the seepage holes 22, evenly irrigating the vegetation in the diamond grid, and by adjusting the water valve 6, the water flow rate from the upper layer of the water storage cylinder 3 to the diamond grid of this layer can be controlled; the greening substrate provides a growth environment for plant seeds, ensuring that the vegetation can grow and take root quickly; the non-woven fabric plays a role in protecting seeds or nascent vegetation and preventing soil erosion; the diamond grid slope protection structure can prevent soil erosion and keep the soil stable; the growth of vegetation further enhances the stability of the soil and reduces the risk of landslides and erosion.

[0050] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An ecological slope protection structure of TBS vegetation slope protection, comprising a connecting pile (1), characterized in that: Four prefabricated concrete slope protection strips (2) arranged in an "X" shape can be connected around each connecting pile (1), and both ends of each slope protection strip (2) can be connected to the connecting pile (1) to form a diamond grid slope protection structure; A water storage cylinder (3) is pre-buried in the soil layer under the connecting pile (1); the water storage cylinder (3) is coaxial with and penetrates the connecting pile (1); and a drainage hole is provided on the upper part of the connecting pile (1); A horizontal hollow anchor rod (4) runs through the connecting piles (1), and the anchor rod (4) corresponding to each layer of connecting piles (1) penetrates into the water storage cylinder (3) corresponding to the connecting piles (1) of the previous layer.

2. The ecological slope protection structure of TBS vegetation slope protection according to claim 1 is characterized in that: Each rhombus grid contains a slope foundation layer (21), and the slope foundation layer (21) includes three parts from bottom to top: greening substrate, plant seeds, and non-woven fabric, wherein the greening substrate includes but is not limited to: organic matter, biological fertilizer, pH value adjuster, full-price slow-release fertilizer, water-retaining agent, and disinfectant.

3. The ecological slope protection structure of TBS vegetation slope protection according to claim 1 is characterized in that: A water collecting ditch (5) is provided at the top of the diamond-shaped grid slope protection, and the water collecting ditch (5) is connected to a row of connecting piles (1) located at the top.

4. The ecological slope protection structure of a TBS vegetation slope protection according to claim 1 is characterized in that: Each anchor rod (4) is provided with a water valve (6) at one end close to the connecting pile (1).

5. The ecological slope protection structure of TBS vegetation slope protection according to claim 1 is characterized in that: The slope protection strip (2) is a hollow structure that penetrates the connection pile (1), and a plurality of water seepage holes (22) are provided on the lower side wall of the slope protection strip (2).

6. The ecological slope protection structure of TBS vegetation slope protection according to claim 5 is characterized in that: An inclined partition plate (7) is provided inside the connecting pile (1), and the inclined partition plate (7) divides the connecting pile (1) into two spaces, one of which penetrates the water storage cylinder (3) and the diamond grid above, and the other space is connected to the anchor rod (4) and the two slope protection strips (2) below.

7. The ecological slope protection structure of TBS vegetation slope protection according to claim 1 is characterized in that: A drill bit (41) is provided at one end of the anchor rod (4) away from the connecting pile (1).

8. The ecological slope protection structure of TBS vegetation slope protection according to claim 7 is characterized in that: The drill bit (41) is connected to a blocking inner rod (42), the blocking inner rod (42) can seal the end of the anchor rod (4), and torque is transmitted between the blocking inner rod (42) and the anchor rod (4) via a spline groove. The blocking inner rod (42) is connected to a guide inner rod (43), and the diameter of the guide inner rod (43) is smaller than the inner diameter of the anchor rod (4).

9. The ecological slope protection structure of TBS vegetation slope protection according to claim 8 is characterized in that: A spring (44) is connected between the drill bit (41) and the anchor rod (4), and the spring (44) enables the blocking inner rod (42) to be located outside the anchor rod (4) in a natural state.

10. The ecological slope protection structure of TBS vegetation slope protection according to claim 1, characterized in that: The water storage cylinder (3) is made of PVC material.