Marine mud layer reinforcement treatment equipment and treatment method
By integrating the marine mud layer reinforcement processing equipment with the functions of traveling, drilling, piling and pouring, the problems of complicated and long construction time in the existing technology are solved, and the effect of accelerating the construction speed and simplifying the process is achieved.
Patent Information
- Application Number
- CN202410999297.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-10-15
AI Technical Summary
The existing marine mud layer reinforcement process requires the cooperation of a variety of different equipment, resulting in a complicated and long construction process.
Design a marine mud layer reinforcement treatment equipment that integrates a traveling mechanism, a working platform, a drilling mechanism and a pile pressing mechanism. The drilling mechanism drills pile holes on the ground and uses the pile pressing mechanism to press the hollow PHC pipe piles. It is inserted into the ground and combined with the transposition mechanism and the filling mechanism to achieve continuity and rapid switching of drilling, piling and filling functions.
The construction process is simplified, the number of equipment is reduced, the construction speed is increased, the construction time is shortened, and the stability and safety of the equipment are improved.
Smart Images

Figure CN118774191A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of stratum reinforcement, and in particular to a marine mud layer reinforcement treatment device and a treatment method. Background Art
[0002] Strata dominated by marine silt are common in coastal tidal flats. The soil of this type of strata has the characteristics of large porosity, low shear strength and bearing capacity. In the reinforcement treatment of this type of soft viscous sandy strata, pipe pile composite foundation treatment technology is widely used. By burying precast concrete pipe piles in the foundation, on the one hand, it can limit the flow and slippage of the underground soil layer, squeeze the soft soil layer to improve the density and bearing capacity of the foundation soil, and on the other hand, it can evenly transfer the upper load to the deep strata with strong bearing capacity.
[0003] In order to bury hollow PHC pipe piles (prestressed high-strength concrete pipe piles) in the above-mentioned foundation, there is a reinforcement treatment method, which includes the following steps: the first step is to drill a pile hole at a designated location by a down-the-hole drill; the second step is to insert the hollow PHC pipe pile into the corresponding pile hole by a static press and press the hollow PHC pipe pile into the soil; the third step is to inject solid crushed waste into the hollow PHC pipe pile. Burying multiple hollow PHC pipe piles in the foundation can effectively reinforce the marine mud layer and realize the recycling of solid crushed waste.
[0004] With regard to the above-mentioned related technologies, burying hollow PHC pipe piles in the foundation requires first using a down-the-hole drill to drill holes at all marked points on the ground, then using a static press to press the hollow PHC pipe piles into all pile holes, and finally pouring solid crushed waste into the hollow PHC pipe piles. This requires the use of a variety of different equipment to work in sequence during the entire construction process. Since a variety of different equipment needs to be used, the consistency of coordination between different equipment is poor, which makes the construction process more complicated and requires a long construction time. Summary of the invention
[0005] The present application provides a marine mud layer reinforcement treatment device and treatment method, the purpose of which is to simplify the construction process, speed up the construction speed, and reduce the required construction time.
[0006] In the first aspect, the present application provides a marine mud layer reinforcement treatment device adopts the following technical solution: A marine mud layer reinforcement processing equipment comprises a walking mechanism, a working platform, a drilling mechanism and a pile driving mechanism, wherein the walking mechanism is arranged at the lower side of the working platform, and the drilling mechanism and the pile driving mechanism are both arranged at the upper side of the working platform; the drilling mechanism comprises a drilling rig, which is arranged in a vertical direction, and the lower end of the drilling rig is connected to the working platform, a drill rod is arranged on the drilling rig, and the drill rod is arranged in a vertical direction, and the drilling rig is also provided with a rotary driving member for driving the drill rod to rotate and a propulsion driving member for driving the drill rod to rise and fall in a vertical direction; the pile driving mechanism comprises a pile driving support and a hoist, the hoist is arranged on the working platform, the pile driving support is arranged in a vertical direction, and the lower end of the pile driving support is connected to the working platform, the pile driving support is provided with a clamping member for clamping a hollow PHC pipe pile, and the pile driving support is also provided with a pile driving driving member for driving the clamping member to rise and fall in a vertical direction.
[0007] By adopting the above technical solution, the travel mechanism and the working platform are arranged in coordination, so that the entire reinforcement processing equipment can be moved on the ground. The drilling mechanism can drill pile holes on the ground through the coordination of the drill rod, the rotary drive member and the propulsion drive member, so as to facilitate the pressing of the hollow PHC pile. The pile pressing mechanism can place the hollow PHC pile into the pile pressing bracket through the coordination of the crane and the pile pressing bracket, and then, under the coordination of the clamping member on the pile pressing bracket and the pile pressing drive member, the hollow PHC pile can be clamped and pressed into the ground.
[0008] With the cooperation of the traveling mechanism, the drilling mechanism and the pile-pressing mechanism, after the drilling mechanism drills the pile hole on the ground, the traveling mechanism moves and makes the pile-pressing bracket face the corresponding pile hole in the vertical direction. At this time, with the cooperation of the hoist, the supporting parts and the pile-pressing driving parts, the hollow PHC pipe pile is pressed in. This enables the reinforcement equipment to realize the two construction steps of drilling and pile-pressing, which can reduce the number of equipment required for construction, and because the same equipment can complete drilling and pile-pressing, it can increase the continuity of drilling and pile-pressing operations at the same position on the ground, thereby simplifying the construction process, speeding up the construction speed, and reducing the required construction time.
[0009] Optionally, the drilling rig and the pile driving support are both movably connected to the working platform, and a transposition mechanism for driving the drilling rig and the pile driving support to exchange positions is provided between the drilling rig and the pile driving support.
[0010] By adopting the above technical solution, after the drilling mechanism completes the drilling, the drilling frame and the pile driving support are directly exchanged on the working platform through the transposition mechanism. At this time, the pile driving mechanism is in place and can directly drive the hollow PHC pile. The setting of the transposition mechanism enables the reinforcement treatment equipment to quickly switch from the drilling mode to the pile driving mode without repositioning or adjusting the equipment, which greatly shortens the construction time and speeds up the construction speed.
[0011] Optionally, the shifting mechanism includes a fixed frame, which is arranged in a vertical direction, and the lower end of the fixed frame is connected to the working platform; a rotating frame is provided on the outer side of the fixed frame, and the rotating frame is rotatably connected to the fixed frame; a shifting drive component is provided on the fixed frame to drive the rotating frame to rotate; the drilling frame and the pile driving bracket are both connected to the rotating frame.
[0012] By adopting the above technical solution, the fixed frame, the rotating frame and the transposition drive are arranged in coordination, so that the drilling frame and the pile driving support can be transposed by rotation, which can meet the function of the transposition mechanism.
[0013] Optionally, it also includes a filling mechanism, which includes a waste barrel, which is arranged on the rotating frame, and the waste barrel is arranged in a vertical direction. The upper end of the waste barrel is open, and the lower end of the waste barrel is connected to a discharge pipe, and the discharge pipe is arranged in a vertical direction. A discharge control component for closing or opening the discharge pipe is arranged in the discharge pipe.
[0014] By adopting the above technical solution, the filling mechanism can store solid crushed materials through the setting of the waste barrel, and the coordinated setting of the discharge pipe and the discharge control component can freely control the discharge of the solid crushed materials in the waste barrel. After the hollow PHC pile is pressed into the ground, the waste barrel can be switched to the top of the hollow PHC pile by rotating the rotating frame, so that the solid crushed materials can be injected into the hollow PHC pile. Through the setting of the filling mechanism, the reinforcement processing equipment of the present application integrates the three functions of drilling, pile pressing and filling, which can further speed up the construction speed. And under the action of the transposition mechanism, the reinforcement processing equipment can freely switch between the drilling mode, pile pressing mode and filling mode without repositioning or adjusting the equipment, which greatly shortens the construction time and speeds up the construction speed.
[0015] Optionally, an extension tube is coaxially inserted into the discharge tube, and the extension tube is slidably connected to the inner wall of the discharge tube along the vertical direction.
[0016] By adopting the above technical solution and setting the extension pipe, the discharge port of the extension pipe can be close to the upper end of the hollow PHC pile, which makes it easy to send the solid crushed materials in the waste barrel into the hollow PHC pile.
[0017] Optionally, a locking mechanism is arranged between the rotating frame and the working platform, the locking mechanism comprising a locking column, the locking column being arranged in a vertical direction, and the locking column being slidably connected to the rotating frame in a vertical direction, and a locking driving member being arranged on the rotating frame to drive the locking column to move in a vertical direction; the locking mechanism also comprises a locking ring, the locking ring being coaxially arranged with the rotating frame, the locking ring being located at the lower side of the rotating frame, and the locking ring being connected to the working platform, a plurality of locking holes being opened on the upper side of the locking ring, and the plurality of locking holes being arranged in sequence at intervals along the circumference of the locking ring; the locking holes are plugged in and matched with the locking column in the vertical direction.
[0018] By adopting the above technical solution, the locking column and the locking ring in the locking mechanism are matched, and when the rotating frame stops rotating, the locking drive member drives the locking column so that one end of the locking column is inserted into the corresponding locking hole. This can lock the rotating frame and make the reinforcement processing equipment more stable during the drilling or piling process.
[0019] Optionally, a plurality of locking columns are provided, and the plurality of locking columns are spaced apart in sequence along the circumference of the locking ring; the locking columns are provided in one-to-one correspondence with the locking holes, and the lower ends of the locking columns are plugged into and fitted with the corresponding locking holes.
[0020] By adopting the above technical solution, a plurality of locking columns are provided, and the coordination of the plurality of locking columns and the plurality of locking holes can further improve the stability of the reinforcement equipment during the drilling or pile driving process.
[0021] Optionally, an inner side wall of the locking hole is provided with an insertion groove, a plug-in rod is inserted in the insertion groove, the length direction of the plug-in rod is arranged along the depth direction of the insertion groove, the plug-in rod is slidingly connected to the inner side wall of the insertion groove along its own length direction, and a reinforcement driving part for driving the plug-in rod to move along its own length direction is arranged in the insertion groove; an insertion hole is provided on the side wall of the locking column; when the locking column is plugged into the corresponding locking hole, the insertion groove is connected with the corresponding insertion hole, and the plug-in rod is plugged into and matched with the insertion hole along its own length direction.
[0022] By adopting the above technical solution, the matching arrangement of the plug-in groove, the plug-in rod and the plug-in hole, after the locking column is inserted into the corresponding locking hole, the plug-in rod is under the action of the reinforcement driving member, with one end of the plug-in rod located in the plug-in groove and the other end inserted into the plug-in hole. This can further increase the stability of the connection between the locking ring and the locking column, and further improve the stability of the reinforcement processing equipment during the drilling or piling process.
[0023] Optionally, a working hole is penetrated through the working platform, and the working hole is arranged opposite to the drill rod in the vertical direction; and when the shifting mechanism drives the drilling frame and the pile driving bracket to exchange positions, the pile driving bracket and the working hole are arranged opposite to each other in the vertical direction.
[0024] By adopting the above technical solution and setting the working hole, the drilling rig and the pile driving bracket do not need to be installed to the edge of the working platform, so that the drilling rig and the pile driving bracket can directly perform drilling and pile driving operations in the middle of the working platform, which can improve the stability of the entire reinforcement processing equipment.
[0025] In the second aspect, the present application provides a method for strengthening a marine mud layer using the following technical solutions: A method for reinforcing a marine mud layer, using the above-mentioned marine mud layer reinforcement processing equipment to reinforce the marine mud layer, comprises the following steps: Carry out site leveling and excavation work on the surface of the marine mud layer where foundation reinforcement will be carried out; Determine the spacing of hollow PHC piles according to the engineering design requirements and use reinforcement equipment to drill the pile holes; Use reinforcement equipment to penetrate the hollow PHC pile into the pile hole; Solid waste crushed materials with a particle size of less than 50 mm are poured into the hollow PHC pipe piles, and finally the top of the pipe piles is covered with a reinforced concrete cover plate, and a plain concrete cushion layer is covered on the upper part to connect all the hollow PHC pipe piles into one.
[0026] By adopting the above technical solution, through the steps of drilling holes in the ground, pressing in hollow PHC pipe piles and pouring solid crushed materials, multiple hollow PHC pipe piles can be buried in the foundation to achieve reinforcement of the marine mud layer.
[0027] In summary, the present application includes at least one of the following beneficial technical effects: 1. The reinforcement equipment of the present application can perform drilling, pile driving and pouring functions in sequence at the same position on the ground through the cooperation of the drilling mechanism, pile driving mechanism and pouring mechanism, which can increase the continuity of the drilling, pile driving and pouring operations, thereby effectively simplifying the construction process, speeding up the construction speed and reducing the required construction time.
[0028] 2. This application uses the design of a transposition mechanism to set up reinforcement processing equipment that can quickly switch between the three operation modes of drilling, pile driving and pouring, without the need for repositioning or adjustment, greatly shortening the construction preparation time.
[0029] 3. The present application provides a locking mechanism so that the rotating frame can be locked when the reinforcement equipment is performing drilling, piling and pouring operations, thereby improving the stability and safety of the entire reinforcement equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the overall structure of the reinforcement processing equipment of this application.
[0031] Figure 2 It is a schematic diagram of the overall structure of the drilling mechanism, pile pressing mechanism, filling mechanism, transposition mechanism and locking mechanism of the present application.
[0032] Figure 3 It is a schematic diagram of the overall structure of the drilling mechanism of the present application.
[0033] Figure 4 It is a schematic diagram of the overall structure of the pile pressing mechanism of the present application.
[0034] Figure 5 It is a schematic cross-sectional view of the pile pressing mechanism of the present application.
[0035] Figure 6 It is a schematic diagram of the overall structure of the filling mechanism of this application.
[0036] Figure 7 yes Figure 6 Schematic diagram of the local enlarged structure of part A.
[0037] Figure 8 It is a schematic diagram of the overall structure of the transposition mechanism and the locking mechanism of the present application.
[0038] Fig. 9 It is a schematic diagram of the internal structure of the fixed frame and the rotating frame of the present application.
[0039] Fig.10 It is a schematic cross-sectional view of the locking ring of the present application.
[0040] Fig.11 yes Fig.10 Schematic diagram of the local enlarged structure of part B.
[0041] Fig.12 It is a schematic diagram of the explosion structure of the locking ring of the present application.
[0042] In the figure, 1, walking mechanism; 2, working platform; 21, working hole; 3, drilling mechanism; 31, drilling frame; 32, drilling rod; 33, mounting slide; 34, propulsion drive; 35, rotary drive; 4, pile pressing mechanism; 41, pile pressing bracket; 42, crane; 43, clamping member; 431, clamping ring; 432, clamping assembly; 4321, clamping cylinder; 4322, clamping plate; 44, pile pressing drive; 5, filling mechanism; 51, waste barrel; 52, discharge pipe; 53, discharge control member; 531, closing plate; 532, closing drive; 54, extension long tube; 55, extended drive member; 6, shifting mechanism; 61, fixed frame; 62, rotating frame; 63, shifting drive member; 631, hydraulic motor; 632, gear; 633, gear ring; 7, locking mechanism; 71, locking column; 711, plug-in hole; 72, slide rod; 721, slide groove; 722, locking drive member; 73, locking ring; 731, locking hole; 732, plug-in groove; 733, plug-in rod; 734, reinforcement drive member; 7341, drive ring; 7342, drive rod; 7343, push cylinder; 735, drive chamber; 736, drive long hole. DETAILED DESCRIPTION
[0043] The following is combined with Figure 1 -Attached Fig.12 , further details of this application are given.
[0044] A marine mud layer reinforcement treatment equipment, reference Figure 1 and Figure 2 , including a traveling mechanism 1, a working platform 2, a drilling mechanism 3, a pile pressing mechanism 4 and a filling mechanism 5, the working platform 2 is arranged on the upper side of the traveling mechanism 1, and the drilling mechanism 3, the pile pressing mechanism 4 and the filling mechanism 5 are all arranged on the upper side of the working platform 2. This enables the reinforcement processing equipment of the present application to perform three functions: drilling, pile pressing and filling.
[0045] In this embodiment, refer to Figure 1 The walking mechanism 1 adopts a crawler walking mechanism 1 or a wheeled walking mechanism 1, and the choice of the walking mechanism 1 is selected according to the ground conditions of the actual working environment.
[0046] Reference Figure 3 The drilling mechanism 3 includes a drill frame 31 and a drill rod 32, both of which are arranged in the vertical direction. A mounting slide 33 is arranged between the drill frame 31 and the drill rod 32, and the drill rod 32 is connected to the mounting slide 33. A plurality of linear slides are arranged on the drill frame 31, and the linear slides are arranged in the vertical direction. The mounting slide 33 is slidably connected to the plurality of linear slides in the vertical direction. The matching arrangement of the mounting slide 33 and the linear slide enables the drill rod 32 to be stably pushed in the vertical direction.
[0047] Reference Figure 3The drilling mechanism 3 further includes a propulsion drive 34, which is a ball screw linear module, a gear rack linear module, or a chain linear module, and is driven by an electric motor or a hydraulic motor. The propulsion drive 34 is arranged on the drilling frame 31, and the driving direction of the propulsion drive 34 is arranged along the vertical direction. The propulsion drive 34 is connected to the mounting slide 33. Under the drive of the propulsion drive 34, the mounting slide 33 can move along the vertical direction on the drilling frame 31, thereby enabling the drill rod 32 to be pushed along its own axial direction.
[0048] Reference Figure 3 The drilling mechanism 3 further includes a rotary drive member 35, which is a hydraulic motor or an electric motor. The rotary drive member 35 is disposed on the mounting slide 33, and a driving shaft of the rotary drive member 35 is coaxially connected to the upper end of the drill rod 32, and the drill rod 32 is rotatably connected to the mounting slide 33. The arrangement of the rotary drive member 35 can realize the rotation of the drill rod 32.
[0049] Through the cooperation of the propulsion drive member 34 and the rotary drive member 35, the rotary drilling function of the drill rod 32 can be realized, which makes it possible to drill holes on the ground.
[0050] Reference Figure 1 and Figure 4 The pile-pressing mechanism 4 includes a pile-pressing bracket 41 and a hoist 42. The pile-pressing bracket 41 and the hoist 42 are both arranged on the working platform 2. The pile-pressing bracket 41 is arranged in the vertical direction and is tubular. Such a structural arrangement enables the hoist 42 to lift the corresponding hollow PHC pile and vertically place it into the pile-pressing bracket 41.
[0051] Reference Figure 4 and Figure 5 The pile-pressing mechanism 4 further includes a clamping member 43, which includes a clamping ring 431. The clamping ring 431 is located in the pile-pressing bracket 41, and the clamping ring 431 is coaxially arranged with the pile-pressing bracket 41. The clamping ring 431 is slidably connected with the sliding inner wall of the pile-pressing bracket 41 in the vertical direction. A clamping assembly 432 is arranged in the clamping ring 431, and the clamping assembly 432 includes a plurality of clamping cylinders 4321, which are evenly spaced in sequence along the circumference of the clamping ring 431, and the length direction of the clamping cylinders 4321 is arranged along the radial direction corresponding to the clamping ring 431, and the clamping cylinders 4321 are connected to the inner wall of the clamping ring 431, and the driving end of the clamping cylinder 4321 is connected to the clamping plate 4322. When the hollow PHC pile is vertically placed in the pile driving bracket 41, the hollow PHC pile is simultaneously inserted into the corresponding clamping ring 431. After starting a plurality of clamping cylinders 4321, a plurality of clamping plates 4322 will abut against the outer wall of the hollow PHC pile, thereby realizing the clamping function of the hollow PHC pile.
[0052] Reference Figure 4 and Figure 5 The pile driving mechanism 4 further includes a pile driving member 44, which is a hydraulic cylinder. The pile driving member 44 is provided with a plurality of groups, and the plurality of groups of pile driving members 44 are all arranged on the inner side wall of the pile driving bracket 41, and the plurality of groups of pile driving members 44 are arranged in sequence and evenly spaced along the circumference of the clamping ring 431, and the pile driving member 44 is connected to the pile driving bracket 41, and the pile driving member 44 is arranged in the vertical direction, and the driving end of the pile driving member 44 is connected to the clamping ring 431. Under the drive of the plurality of pile driving members 44, the clamping ring 431 can be lifted and lowered in the vertical direction.
[0053] Through the cooperation of the clamping member 43 and the pile driving member 44, the hollow PHC pile can be clamped and pressed into the ground, so that the hollow PHC pile can be buried underground.
[0054] Reference Figure 6 and Figure 7 The filling mechanism 5 includes a waste barrel 51 , which is axially arranged in the vertical direction and has an upper end opening, so that solid crushed waste can be stored in the waste barrel 51 through the opening at the upper end of the waste barrel 51 .
[0055] Reference Figure 6 and Figure 7 The lower end of the waste barrel 51 is provided with a discharge pipe 52, which is arranged in a vertical direction, and the upper end of the discharge pipe 52 is connected to the bottom of the waste barrel 51. The solid crushed waste in the waste barrel 51 can be discharged through the discharge pipe 52.
[0056] Reference Figure 6 and Figure 7 A discharge control member 53 is provided in the discharge pipe 52. The discharge control member 53 includes a closing plate 531 and a closing drive member 532. The closing plate 531 is located in the discharge pipe 52. One side of the closing plate 531 is rotatably connected to the inner side wall corresponding to the discharge pipe 52. The closing drive member 532 adopts an oil cylinder. The closing drive member 532 is located at the lower side of the closing plate 531. A clearance hole is provided through the side wall of the discharge pipe 52. The clearance hole is located at the lower side of the closing plate 531 in the vertical direction. The closing drive member 532 passes through the clearance hole. One end of the closing drive member 532 is connected to the closing plate 531, and the other end is connected to the discharge pipe 52. The opening of the clearance hole provides clearance space for the installation of the closing drive member 532. Driven by the closed driving member 532, when the closed plate 531 rotates to a horizontal state, the closed plate 531 closes the discharge pipe 52, and the solid crushed material in the waste barrel 51 cannot be discharged; when the closed plate 531 rotates to a non-horizontal state, the closed plate 531 opens the discharge pipe 52, and the fixed crushed material in the waste barrel 51 can be discharged from the discharge pipe 52.
[0057] Reference Figure 6 and Figure 7 , an extension pipe 54 is inserted into the discharge pipe 52, the extension pipe 54 is coaxially connected with the discharge pipe 52, and the extension pipe 54 is slidably connected with the inner wall of the discharge pipe 52 in the vertical direction. The provision of the extension pipe 54 can extend the length of the discharge pipe 52. After the hollow PHC pile is buried underground, the extension pipe 54 extends from the discharge pipe 52, at which time the upper end of the extension pipe 54 is connected with the discharge pipe 52, and the lower end of the extension pipe 54 is inserted into the corresponding hollow PHC pile or close to the upper end of the corresponding hollow PHC pile, and the closed driving member 532 opens the discharge pipe 52, and the solid crushed material in the waste barrel 51 flows into the hollow PHC pile through the discharge pipe 52 and the extension pipe 54, which can increase the strength of the hollow PHC pile.
[0058] Reference Figure 6 and Figure 7 An extension drive member 55 is provided on the outer wall of the discharge pipe 52. The extension drive member 55 adopts a hydraulic cylinder. The extension drive member 55 is arranged along the axial direction of the discharge pipe 52, and the extension drive member 55 is connected to the discharge pipe 52. The driving end of the extension drive member 55 is connected to the outer wall of the extension pipe 54, which can realize that the extension pipe 54 can automatically extend out of the discharge pipe 52 or retract into the discharge pipe 52.
[0059] Reference Figure 1 and Figure 8 The work platform 2 is provided with a transposition mechanism 6, which includes a fixed frame 61, which is cylindrical and arranged in the vertical direction, and the lower end of which is fixedly connected to the work platform 2. A rotating frame 62 is sleeved outside the fixed frame 61, which is annular and rotatably connected to the fixed frame 61. The drilling frame 31, the pile support 41 and the waste barrel 51 are all fixed to the outer wall of the rotating frame 62. This enables the rotating frame 62 to drive the drilling frame 31, the pile support 41 and the waste barrel 51 to rotate.
[0060] Reference Figure 8 and Fig. 9, the transposition mechanism 6 also includes a transposition drive 63, which includes a hydraulic motor 631, a gear 632 and a gear ring 633. The gear ring 633 is located in the rotating frame 62, and the gear ring 633 is coaxially connected to the rotating frame 62, and the outer wall of the gear ring 633 is fixedly connected to the inner wall of the rotating frame 62. The inner wall of the gear ring 633 is spaced apart from the fixed frame 61. The hydraulic motor 631 is coaxially connected to the gear 632, and the hydraulic motor 631 and the gear 632 are both located in the fixed frame 61, and the gear 632 is meshed with the gear ring 633. In this embodiment, in order to ensure that the gear 632 and the gear ring 633 can be transmitted, a plurality of transmission gears can be set between the gear 632 and the gear ring 633 according to actual conditions. Then, when the hydraulic motor 631 drives the gear 632 to rotate, the gear 632 will drive the gear ring 633 to rotate, thereby realizing the rotation of the rotating frame 62.
[0061] Reference Figure 1 and Figure 8 A working hole 21 is provided on the working platform 2, and the working hole 21 vertically penetrates the working platform 2. During the rotation of the rotating frame 62, the drill rod 32, the pile support 41 and the discharge pipe 52 are all arranged in sequence opposite to the working hole 21 in the vertical direction.
[0062] During the process of reinforcing the marine mud layer, first, the drill rod 32 is arranged opposite to the working hole 21, and the drill rod 32 can pass through the working hole 21 to drill a pile hole on the ground; then, the rotating frame 62 rotates so that the lower end of the pile support 41 is coaxially connected to the working hole 21, and the hollow PHC pile can be inserted into the corresponding pile hole under the drive of the clamp 43 and the pile driving member 44; finally, the rotating frame 62 rotates so that the discharge pipe 52 is opposite to the hollow PHC pile, and the solid crushed material can be sent to the corresponding hollow PHC pile under the action of the discharge control member 53. Repeating the above operations can bury various hollow PHC piles in the foundation to achieve marine mud layer reinforcement.
[0063] Reference Figure 8 and Fig. 9A locking mechanism 7 is also provided between the rotating frame 62 and the working platform 2, and the locking mechanism 7 includes a plurality of locking columns 71. A plurality of slide bars 72 are provided on the outer wall of the rotating frame 62, and the plurality of slide bars 72 are all provided in the vertical direction. A slide groove 721 is provided on the outer wall of the slide bar 72, and the slide groove 721 penetrates the slide bar 72 in the vertical direction. The locking columns 71 are provided in a one-to-one correspondence with the slide groove 721, and the locking columns 71 are inserted into the corresponding slide groove 721, and the locking columns 71 are slidably connected with the inner wall of the corresponding slide groove 721 in the vertical direction. A locking driving member 722 is also provided on the slide bar 72, and the locking driving member 722 adopts an oil cylinder, and the locking driving member 722 is provided in the vertical direction, and the locking driving member 722 is connected with the corresponding slide bar 72, and the driving shaft of the locking driving member 722 is connected with the corresponding locking column 71. Driven by the locking driving member 722 , the locking column 71 can move in the corresponding sliding groove 721 along the vertical direction.
[0064] Reference Figure 1 and Figure 8 The locking mechanism 7 also includes a locking ring 73 , which is coaxially arranged with the rotating frame 62 , and is arranged on the upper side of the working platform 2 .
[0065] Reference Fig.10 and Fig.11 A plurality of locking holes 731 are provided on the upper side wall of the locking ring 73, and the plurality of locking holes 731 are evenly spaced in sequence along the circumference of the locking ring 73. The locking holes 731 are arranged one by one with the locking posts 71, and the locking posts 71 are plugged and matched with the corresponding locking holes 731 along the vertical direction. After the rotating frame 62 rotates into place, when the drilling mechanism 3 or the pile driving mechanism 4 or the filling mechanism 5 needs to perform corresponding work, the locking posts 71 are inserted into the corresponding locking holes 731, which can increase the stability of the connection between the rotating frame 62 and the working platform 2 and prevent the rotating frame 62 from self-rotating.
[0066] Reference Fig.11 and Fig.12 , the inner side wall of the locking hole 731 is provided with a plug-in groove 732, and a plug-in rod 733 is inserted in the plug-in groove 732. The length direction of the plug-in rod 733 is arranged along the depth direction of the corresponding plug-in groove 732, and the plug-in rod 733 is slidably connected with the inner side wall of the corresponding plug-in groove 732 along its own length direction. A plug-in hole 711 is provided through the side wall of the locking column 71. When the locking column 71 is plugged into the corresponding locking hole 731, the plug-in hole 711 is connected with the corresponding plug-in groove 732, and one end of the plug-in rod 733 is plugged into the corresponding plug-in hole 711 along its own length direction. At this time, the plug-in rod 733 can increase the connection between the locking ring 73 and the locking column 71.
[0067] Reference Fig.11 and Fig.12The locking ring 73 is also provided with a reinforcement driving member 734, which includes a driving ring 7341. A driving cavity 735 is provided in the locking ring 73. The driving ring 7341 is located in the driving cavity 735. The driving ring 7341 is coaxially arranged with the locking ring 73. The driving ring 7341 is slidably connected with the inner side wall of the driving cavity 735 along its own circumferential direction. The plurality of plug-in slots 732 are all connected with the driving cavity 735, and the length direction of the plug-in rod 733 and the depth direction of the plug-in slot 732 are both arranged along the circumferential direction of the locking ring 73. The end of the plug-in rod 733 away from the corresponding locking column 71 in the length direction is connected with the driving ring 7341. When the driving ring 7341 rotates along its own circumferential direction, the plurality of plug-in rods 733 can slide in the corresponding plug-in slots 732 along their own length direction.
[0068] Reference Fig.11 and Fig.12 A driving long hole 736 is provided on the outer wall of the locking ring 73. The length direction of the driving long hole 736 is arranged along the circumference of the locking ring 73, and the driving long hole 736 is connected to the driving cavity 735. A driving rod 7342 is inserted into the driving long hole 736. One end of the driving rod 7342 is connected to the outer wall of the driving ring 7341, and the other end extends out of the locking ring 73. The driving rod 7342 is slidably connected to the inner wall of the driving long hole 736 along the circumference of the locking ring 73. A pushing cylinder 7343 is provided on the working platform 2. One end of the pushing cylinder 7343 is rotatably connected to the working platform 2, and the other end is rotatably connected to the driving rod 7342. The pushing cylinder 7343 is slidably connected to the driving rod 7342 along the length direction of the driving rod 7342.
[0069] Under the push of the pushing cylinder 7343, the driving rod 7342 drives the driving ring 7341 to rotate along its own circumference in the driving cavity 735, which enables the plug-in rod 733 to retract into the corresponding plug-in groove 732 or extend from the corresponding plug-in groove 732 along its own length direction, which can meet the driving requirements of the plug-in rod 733.
[0070] The implementation principle of the embodiment of the present application is as follows: when reinforcing the marine mud layer, first, the reinforcement processing equipment is moved to the designated position by the walking mechanism 1, and it is ensured that the working hole 21 is facing the position of the pile hole to be drilled on the ground. Secondly, the rotating frame 62 rotates, and the drill rod 32 is coaxially arranged with the working hole 21. At this time, the drilling mechanism 3 is started, and the pile hole is drilled on the ground. Then, the rotating frame 62 rotates, so that the working hole 21 is coaxially connected with the pile driving support 41. At this time, the pile driving mechanism 4 is started, and the hollow PHC pipe pile is pressed into the pile hole. Finally, the rotating frame 62 rotates, so that the discharge pipe 52 is coaxially connected with the working hole 21. At this time, the filling mechanism 5 is started, which can inject solid crushed material into the hollow PHC pipe pile. Repeat the above operation, bury multiple hollow PHC pipe piles in the foundation, and realize the reinforcement of the marine mud layer.
[0071] This embodiment also discloses a method for reinforcing a marine mud layer, comprising the following steps: Step 1: Mechanically excavate the foundation surface of the upper topsoil layer, the middle marine silt layer, and the sand layer in the pressurized water below the silt layer, and replace the surface with a 1m thick sand and gravel cushion layer; Step 2: Level the gravel and soil cushion layer. The height difference of the ground after leveling should not exceed mm; Step 3: The leveled site is used as the construction site for the PHC pile soft foundation treatment. The compression modulus Es is used to estimate the main consolidation settlement. According to the engineering design and quality requirements, the diameter of the PHC pile used to reinforce the marine silt layer is determined to be 300-500mm, and the pile spacing can be appropriately increased compared to conventional PHC piles, which is 3.5-4.0m. Step 4: Use reinforcement equipment to drill pile holes on the construction work surface according to the pile arrangement parameters determined in step 3. The pile holes are vertical holes perpendicular to the horizontal plane, and the hole depth ensures that the PHC piles enter the sand layer containing pressurized water for no less than 2m; Step 5, preparing the PHC pipe pile, using the cementing material, aggregate, steel bar, concrete admixture and water as main components, and preparing the hollow PHC pipe pile based on the mass ratio of cementing material, fine aggregate, coarse aggregate, steel bar, admixture, water = 1: 1.25-1.45: 2.85-3.05: 0.46-0.50: 0.0053-0.0058: 0.30-0.32; Among them: the binder material can be silicate cement with a strength grade of not less than 42.5; the fine aggregate can be fine river sand with a specific surface area of 640-720m2 / kg or desalinated sea sand; the coarse aggregate can be solid waste crushed material with a particle size of 5-25mm and continuous grading8; the steel bar can be spiral groove steel rod for prestressed concrete, and its tensile strength is greater than 1420MPa; the concrete admixture can be conventional known admixture; the requirements for water for concrete mixing meet the requirements of JGJ 63.
[0072] Step 6: Perform a bending test on the prepared hollow PHC pile using a simply supported beam symmetrical loading device, and perform a uniaxial compression test on the compressive strength of the concrete.
[0073] Step 7: Use reinforcement equipment to insert the hollow PHC pile that meets the design requirements in step 6 into the pile hole in step 2.
[0074] Step 8: Pour solid waste crushed materials with a particle size of less than 50 mm into the hollow PHC piles through reinforcement processing equipment, and finally cover the top of the piles with reinforced concrete cover plates, and cover the upper part with a mm thick plain concrete cushion layer to connect all the hollow PHC piles into one.
[0075] The implementation principle of the embodiment of the present application is: through the steps of drilling holes in the ground, pressing in hollow PHC pipe piles and pouring solid crushed materials, multiple hollow PHC pipe piles can be buried in the foundation to achieve reinforcement of the marine mud layer.
[0076] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A marine mud layer reinforcement treatment equipment, characterized in that: include: A walking mechanism (1), a working platform (2), a drilling mechanism (3) and a pile-pressing mechanism (4), wherein the walking mechanism (1) is arranged on the lower side of the working platform (2), and the drilling mechanism (3) and the pile-pressing mechanism (4) are both arranged on the upper side of the working platform (2); The drilling mechanism (3) comprises a drilling frame (31), the drilling frame (31) is arranged in a vertical direction, and the lower end of the drilling frame (31) is connected to the working platform (2), a drilling rod (32) is arranged on the drilling frame (31), the drilling rod (32) is arranged in a vertical direction, and the drilling frame (31) is also provided with a rotary driving member (35) for driving the drilling rod (32) to rotate and a propulsion driving member (34) for driving the drilling rod (32) to rise and fall in a vertical direction; The pile-pressing mechanism (4) comprises a pile-pressing support (41) and a hoist (42); the hoist (42) is arranged on a working platform (2); the pile-pressing support (41) is arranged in a vertical direction, and the lower end of the pile-pressing support (41) is connected to the working platform (2); a clamping member (43) for clamping a hollow PHC pipe pile is arranged on the pile-pressing support (41); and a pile-pressing driving member (44) for driving the clamping member (43) to rise and fall in a vertical direction is also arranged on the pile-pressing support (41).
2. The marine mud layer reinforcement treatment equipment according to claim 1 is characterized in that: The drilling frame (31) and the pile driving support (41) are both movably connected to the working platform (2), and a transposition mechanism (6) is provided between the drilling frame (31) and the pile driving support (41) for driving the drilling frame (31) and the pile driving support (41) to exchange positions.
3. The marine mud layer reinforcement treatment equipment according to claim 2 is characterized in that: The shifting mechanism (6) comprises a fixed frame (61), the fixed frame (61) is arranged in a vertical direction, and the lower end of the fixed frame (61) is connected to the working platform (2); a rotating frame (62) is sleeved on the outer side of the fixed frame (61), and the rotating frame (62) is rotatably connected to the fixed frame (61); a shifting driving member (63) for driving the rotating frame (62) to rotate is arranged on the fixed frame (61); and the drilling frame (31) and the pile driving bracket (41) are both connected to the rotating frame (62).
4. The marine mud layer reinforcement treatment equipment according to claim 3 is characterized in that: The invention also comprises a filling mechanism (5), wherein the filling mechanism (5) comprises a waste barrel (51), wherein the waste barrel (51) is arranged on the rotating frame (62), wherein the waste barrel (51) is arranged in a vertical direction, wherein the upper end of the waste barrel (51) is open, and the lower end of the waste barrel (51) is connected to a discharge pipe (52), wherein the discharge pipe (52) is arranged in a vertical direction, and wherein a discharge control component (53) for closing or opening the discharge pipe (52) is arranged in the discharge pipe (52).
5. The marine mud layer reinforcement treatment equipment according to claim 4 is characterized in that: An extension tube (54) is coaxially inserted into the discharge tube (52), and the extension tube (54) is slidably connected to the inner wall of the discharge tube (52) in a vertical direction.
6. The marine mud layer reinforcement treatment equipment according to claim 3 is characterized in that: A locking mechanism (7) is provided between the rotating frame (62) and the working platform (2), the locking mechanism (7) comprising a locking column (71), the locking column (71) being provided in a vertical direction, and the locking column (71) being slidably connected to the rotating frame (62) in a vertical direction, and a locking driving member (722) for driving the locking column (71) to move in a vertical direction is provided on the rotating frame (62); The locking mechanism (7) further comprises a locking ring (73), the locking ring (73) being coaxially arranged with the rotating frame (62), the locking ring (73) being located at the lower side of the rotating frame (62), and the locking ring (73) being connected to the working platform (2), and a plurality of locking holes (731) being formed on the upper side of the locking ring (73), and the plurality of locking holes (731) being sequentially spaced along the circumference of the locking ring (73); The locking hole (731) is plugged into and matched with the locking column (71) in a vertical direction.
7. The marine mud layer reinforcement treatment equipment according to claim 6 is characterized in that: A plurality of the locking columns (71) are provided, and the plurality of the locking columns (71) are sequentially spaced apart along the circumference of the locking ring (73); The locking columns (71) and the locking holes (731) are arranged in a one-to-one correspondence, and the lower ends of the locking columns (71) are plugged into and matched with the corresponding locking holes (731).
8. The marine mud layer reinforcement treatment equipment according to claim 6, characterized in that: The inner side wall of the locking hole (731) is provided with an insertion groove (732), a plug rod (733) is inserted into the insertion groove (732), the length direction of the plug rod (733) is arranged along the depth direction of the plug groove (732), the plug rod (733) is slidably connected to the inner side wall of the plug groove (732) along its own length direction, and a reinforcement driving member (734) is arranged in the insertion groove (732) for driving the plug rod (733) to move along its own length direction; A plug-in hole (711) is provided on the side wall of the locking column (71); When the locking column (71) is plugged into the corresponding locking hole (731), the plugging groove (732) is communicated with the corresponding plugging hole (711), and the plugging rod (733) is plugged into and matched with the plugging hole (711) along its length direction.
9. The marine mud layer reinforcement treatment equipment according to claim 2, characterized in that: A working hole (21) is formed through the working platform (2), and the working hole (21) and the drill rod (32) are arranged opposite to each other in the vertical direction; and when the position change mechanism (6) drives the drill frame (31) and the pile driving support (41) to exchange positions, the pile driving support (41) and the working hole (21) are arranged opposite to each other in the vertical direction.
10. A method for reinforcing a marine mud layer, using a marine mud layer reinforcement treatment device as described in any one of claims 1 to 9 to reinforce a marine mud layer, characterized in that: The following steps are involved: Carry out site leveling and excavation work on the surface of the marine mud layer where foundation reinforcement will be carried out; Determine the spacing of hollow PHC piles according to the engineering design requirements and use reinforcement equipment to drill the pile holes; Use reinforcement equipment to penetrate the hollow PHC pile into the pile hole; Solid waste crushed materials with a particle size of less than 50 mm are poured into the hollow PHC pipe piles, and finally the top of the pipe piles is covered with a reinforced concrete cover plate, and a plain concrete cushion layer is covered on the upper part to connect all the hollow PHC pipe piles into one.
