Reinforcing method for overall preservation of historical building wall
By pouring foundation rafts and concrete walls in the historical building, dismantling the prefabricated floor slabs in batches and installing steel supports, reinforcing and planting reinforcement layer by layer, the problem of structural instability of the historical building was solved and the overall preservation of the wall was achieved. and improved seismic performance, maintaining historical and cultural value and reducing construction costs.
Patent Information
- Application Number
- CN202410995237.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Due to weathering, the structural safety and stability of historical buildings have deteriorated. Demolition and reconstruction will cause the loss of historical traceability and high construction costs.
The overall reinforcement method is adopted, including pouring foundation rafts inside the historical building, pouring concrete walls on the outside and inside, dismantling the prefabricated floor slabs in batches and installing steel supports, strengthening layer by layer, and connecting the concrete walls with the history by planting reinforcements and hanging nets. The building walls were tied, and the concrete walls were poured in two steps to improve seismic performance.
It effectively retains the wall structure of historical buildings, enhances earthquake resistance, maintains historical and cultural value, and is environmentally friendly and economical.
Smart Images

Figure CN118774440A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a reinforcement method for integrally retaining a wall of a historical building. Background Art
[0002] Historical buildings reflect cultural heritage, and with the accumulation of time, we can trace the historical footprints of the past. However, due to weathering, the structural safety and stability have deteriorated and are no longer suitable for residential or commercial use. If the historical buildings are demolished and rebuilt, the historical traceability of the past will be lost.
[0003] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention
[0004] In order to overcome the defects of the prior art, a reinforcement method for the overall preservation of the walls of historical buildings is provided to solve the problems of high construction cost and loss of historical traceability in the demolition and reconstruction of historical buildings.
[0005] To achieve the above purpose, a reinforcement method for the overall preservation of the wall of a historical building is provided, comprising the following steps:
[0006] a. Casting a foundation raft slab inside the historic building, with the outer edge of the foundation raft slab pressed against the enlarged foot of the foundation of the wall of the historic building;
[0007] b. Casting concrete walls on the inner side of the outer wall and on opposite sides of the inner wall of the historic building, respectively, so that the concrete walls are supported on the precast floor slab of the historic building, wherein the historic building has a plurality of rooms;
[0008] c. dismantling the prefabricated floor slabs of the plurality of rooms in two batches, and dismantling the prefabricated floor slabs of the plurality of rooms in intervals when dismantling the prefabricated floor slabs of the first batch;
[0009] d. After the prefabricated floor panels of the first batch of rooms are removed, steel supports are installed in the first batch of rooms, wherein the steel supports are supported between the walls on opposite sides of the first batch of rooms;
[0010] e. pouring concrete floors in the first batch of rooms;
[0011] f. Remove the precast floor slabs of the second batch of rooms and pour the concrete floor slabs;
[0012] g. Repeat steps b to f to reinforce the historic building layer by layer from bottom to top.
[0013] Furthermore, the foundation of the wall is cast on a cushion layer, and the space between the foundation raft slab and the cushion layer is filled with concrete.
[0014] Furthermore, the concrete wall is connected to the wall of the historical building by embedded reinforcement.
[0015] Furthermore, the concrete walls are cast in two steps: first, the concrete walls in the first batch of rooms are cast, and then the precast floor slabs of the first batch of rooms are removed. When the concrete floor slabs of the first batch of rooms are cast, the concrete walls in the second batch of rooms are cast.
[0016] The beneficial effect of the present invention is that the reinforcement method of the historical building wall of the present invention retains the whole body. In order to ensure the earthquake resistance of the historical building after reinforcement, the prefabricated floor slab of the historical building needs to be demolished because of too little reinforcement. The walls of the historical building are retained and reinforced from the foundation. The walls of the historical building are reinforced by adding reinforced concrete shear walls. Concrete walls are added on both sides of the inner wall as the support of the new concrete floor slab. The reinforced concrete shear wall is added only on the inner side of the outer wall, and the style of the historical building is retained on the outer side. The newly added concrete wall is effectively tied and fixed to the wall of the historical building and the newly added concrete wall by planting steel bars and hanging meshes. The newly added concrete wall is poured with concrete twice to prevent the lateral pressure of the concrete pouring from causing the collapse of the wall of the historical building. After the concrete strength of the first pouring of the newly added concrete wall reaches 80%, the second section of the wall is constructed. After the second concrete strength of the concrete wall reaches 80%, the original precast floor slab is removed to avoid instability of the wall after the removal of the precast floor slab. Steel supports are used as horizontal supports at the position of the precast slab. The steel supports are arranged at intervals of one precast slab, and then the formwork is supported and the floor slab steel bars are tied to pour the floor slab concrete.
[0017] The reinforcement method for retaining the walls of historical buildings as a whole of the present invention can effectively retain the walls of historical buildings as a whole, and the newly added concrete walls and floor slabs can achieve the structural earthquake resistance requirements. The walls of the historical buildings and the newly added concrete walls are also effectively tied together by planting steel bars, and the wall stability is good, achieving the purpose of retaining historical culture. The method is environmentally friendly, has good earthquake resistance, and is economical. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0019] Figure 1 A schematic plan view of a room on one floor of a historic building with its wall preserved as a whole according to an embodiment of the present invention.
[0020] Figure 2 It is a schematic plan view of the foundation and ground reinforcement of a historical building according to an embodiment of the present invention.
[0021] Figure 3 for Figure 2 Cross-sectional view at 1-1 in FIG.
[0022] Figure 4 for Figure 2 Cross-sectional view at 2-2 in FIG.
[0023] Figure 5 It is a plan view schematic diagram of the wall reinforcement according to an embodiment of the present invention.
[0024] Figure 6 It is a cross-sectional view of the reinforcement of the wall according to an embodiment of the present invention.
[0025] Figure 7 It is a schematic plan view of the dismantling of the prefabricated floor slabs of the wall of a historical building according to an embodiment of the present invention.
[0026] Figure 8 This is a schematic diagram of a reinforced state of a historical building wall that is retained as a whole according to an embodiment of the present invention. DETAILED DESCRIPTION
[0027] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant invention, rather than to limit the invention. It is also necessary to explain that, for ease of description, only the parts related to the invention are shown in the accompanying drawings.
[0028] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0029] Reference Figures 1 to 8 As shown, the present invention provides a reinforcement method for retaining the entire wall of a historical building, comprising the following steps:
[0030] a. A foundation raft 1 is cast inside the historical building A, and the outer edge of the foundation raft 1 is pressed against the enlarged foot 11 of the foundation of the wall of the historical building A.
[0031] Specifically, the interior decorative layers of historical buildings will be removed and cleaned up, all interior decorative surfaces of historical buildings will be removed, and construction waste will be cleaned up.
[0032] When excavating the foundation manually with a jackhammer, the excavation must be carried out to the bottom of the original foundation and the original foundation must not be damaged. The earth must be cleared away in a timely manner and must not be piled inside the building.
[0033] After the foundation is excavated in place, the raft cushion layer is poured, the raft steel bars are tied, and the raft concrete is poured.
[0034] As a preferred embodiment, the foundation of the wall is cast on the cushion layer. Concrete 13 is filled between the foundation raft 1 and the cushion layer 12 .
[0035] In this embodiment, the foundation cushion layer and the raft cushion layer of the wall are filled with reinforced concrete 13.
[0036] The raft slab of the historical building adopts a 400-thick raft slab, which is connected to the strip foundation of the original building. The end of the raft foundation is pressed on the enlarged foot of the strip foundation, and the gap between the raft cushion layer and the cushion layer of the original wall foundation is filled with C30 concrete.
[0037] b. Concrete walls 2 are cast on the inner side of the outer wall 14 and on opposite sides of the inner wall 15 of the historical building A, so that the concrete walls 2 are supported on the prefabricated floor slab 3 of the historical building A, and the historical building A has multiple rooms.
[0038] The concrete wall is based on the raft slab. The concrete wall 2 is connected to the wall of the historical building A through the embedded steel bars 21.
[0039] The walls of the historic building include the exterior wall and the interior wall. The walls of the historic building are reinforced by planting steel bars to effectively connect the walls of the historic building with the newly added concrete (shear) wall. The spacing between the steel bars is 600mm. The concrete (shear) wall uses C30 self-compacting concrete to avoid vibration.
[0040] c. The prefabricated floor slabs 3 of the multiple rooms are dismantled in two batches. When the prefabricated floor slabs 3 of the first batch are dismantled, the prefabricated floor slabs 3 of the multiple rooms are dismantled in intervals.
[0041] See also Figure 7 The construction sequence of floor demolition is interval construction, that is, first construct room ① / ③ / ⑤, and then construct room ② / ④.
[0042] d. After the prefabricated floor slabs 3 of the first batch of rooms are removed, steel supports are installed in the first batch of rooms. The steel supports are supported between the walls on opposite sides of the first batch of rooms.
[0043] After the prefabricated floor slab is removed, steel supports (such as channel steels) are used for temporary support reinforcement. The spacing between the channel steels is arranged according to the spacing between prefabricated slabs.
[0044] e. Pour concrete floor slab 4 in the first batch of rooms.
[0045] In this embodiment, the concrete wall 2 is poured in two steps. First, the concrete wall 2 in the first batch of rooms is poured, and then the precast floor slabs 3 in the first batch of rooms are removed. When the concrete floor slabs 4 in the first batch of rooms are poured, the concrete walls 2 in the second batch of rooms are poured.
[0046] Specifically, the construction sequence of floor slab demolition is interval construction, that is, first construct spans ① / ③ / ⑤, and then construct spans ② / ④. After the concrete construction of the foundation and the first section of the wall is completed, the precast floor slabs of spans 1 / 3 / 5 are demolished, and then the second section of the wall and floor slab are constructed. After the concrete in this area reaches 80% strength, the precast panels of spans 2 / 4 are demolished, and then the second section of the wall and floor slabs of spans 2 / 4 are constructed.
[0047] f. Remove the prefabricated floor slabs 3 of the second batch of rooms and pour the concrete floor slabs 4.
[0048] The steel bars of concrete floor 4 are HRB400 steel bars and C30 self-compacting concrete. The thickness of the newly added concrete (shear) wall is 100-140mm. The floor thickness is 100mm.
[0049] The pouring of concrete slabs is done by erecting formwork support frames, laying formwork, tying steel bars and pouring concrete. The concrete of the concrete slab is C30 self-compacting concrete.
[0050] g. Repeat steps b to f, reinforcing the historical building A layer by layer from bottom to top.
[0051] Repeat the steps of adding new walls and removing floor slabs to reinforce the upper wall.
[0052] The reinforcement method for retaining the walls of historical buildings as a whole of the present invention, in order to ensure the earthquake resistance of the historical buildings after reinforcement, the prefabricated floor slabs of the historical buildings need to be demolished because of too little reinforcement, and the walls of the historical buildings are retained and reinforced from the foundation. The walls of the historical buildings are reinforced by adding reinforced concrete shear walls, and concrete walls are added on both sides of the inner walls as the support of the new concrete floor slabs. The reinforced concrete shear walls are only added on the inner side of the outer wall, and the style of the historical building is retained on the outer side. The newly added concrete wall is effectively tied and fixed to the wall of the historical building and the newly added concrete wall by planting steel bars and hanging meshes. The newly added concrete wall is poured with concrete twice to prevent the lateral pressure of the concrete pouring from causing the collapse of the wall of the historical building. After the concrete strength of the first pouring of the newly added concrete wall reaches 80%, the second section of the wall is constructed. After the second concrete strength of the concrete wall reaches 80%, the original precast floor slab is removed to avoid instability of the wall after the removal of the precast floor slab. Steel supports are used as horizontal supports at the position of the precast slab. The steel supports are arranged at intervals of one precast slab, and then the formwork is supported and the floor slab steel bars are tied to pour the floor slab concrete.
[0053] The reinforcement method for retaining the walls of historical buildings as a whole of the present invention can effectively retain the walls of historical buildings as a whole, and the newly added concrete walls and floor slabs can achieve the structural earthquake resistance requirements. The walls of the historical buildings and the newly added concrete walls are also effectively tied together by planting steel bars, and the wall stability is good, achieving the purpose of retaining historical culture. The method is environmentally friendly, has good earthquake resistance, and is economical.
[0054] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.
Claims
1. A reinforcement method for retaining the entire wall of a historical building, characterized in that: The following steps are involved: a. Casting a foundation raft slab inside the historic building, with the outer edge of the foundation raft slab pressed against the enlarged foot of the foundation of the wall of the historic building; b. Casting concrete walls on the inner side of the outer wall and on opposite sides of the inner wall of the historic building, respectively, so that the concrete walls are supported on the precast floor slab of the historic building, wherein the historic building has a plurality of rooms; c. dismantling the prefabricated floor slabs of the plurality of rooms in two batches, and dismantling the prefabricated floor slabs of the plurality of rooms in intervals when dismantling the prefabricated floor slabs of the first batch; d. After the prefabricated floor panels of the first batch of rooms are removed, steel supports are installed in the first batch of rooms, wherein the steel supports are supported between the walls on opposite sides of the first batch of rooms; e. pouring concrete floors in the first batch of rooms; f. Remove the precast floor slabs of the second batch of rooms and pour the concrete floor slabs; g. Repeat steps b to f to reinforce the historic building layer by layer from bottom to top.
2. The method for reinforcing the entire wall of a historical building according to claim 1, characterized in that: The foundation of the wall is cast on the cushion layer, and the space between the foundation raft slab and the cushion layer is filled with concrete.
3. The method for reinforcing the entire wall of a historical building according to claim 1, characterized in that: The concrete wall is connected to the wall of the historical building by anchoring reinforcement.
4. The method for reinforcing the entire wall of a historical building according to claim 1, characterized in that: The concrete walls are poured in two steps. First, the concrete walls in the first batch of rooms are poured, and then the prefabricated floor slabs of the first batch of rooms are removed. When the concrete floor slabs of the first batch of rooms are poured, the concrete walls in the second batch of rooms are poured.
Citation Information
Patent Citations
Integral reinforcing type construction process for complex structure of old building
CN106382016A
Method by underpinning brick-concrete structure of building to frame structure
CN109441134A
Historical building black brick wall reinforcing structure and construction method thereof
CN117166803A
Reinforced concrete foundation reinforcing structure of brick wall
CN217399752U