High-safety coal mining roadway jacking device and jacking method thereof
By designing a high-security coal mining tunnel jacking device, the problem of loose jacking structures is solved by using embedded connections and anti-pull-out structures, achieving stable support and real-time monitoring of the tunnel, ensuring the safety of the coal mining tunnel.
Patent Information
- Application Number
- CN202411014519.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-15
AI Technical Summary
In the existing coal mine mining tunnels, the jacking structure is easy to loosen during the jacking process, resulting in poor stability and safety hazards. In addition, there is a lack of effective jacking monitoring structure, making it difficult to identify and troubleshoot potential safety hazards in a timely manner.
A high-security coal mining tunnel jacking device is designed, which includes vertical brace components, underpass components, horizontal brace components and pressure change monitoring components. The inner wall, bottom surface and top surface of the tunnel are realized through embedded connections and anti-pull-out structures. Stable support, and infrared sensors are used for real-time monitoring and step-by-step early warning.
The inner wall, bottom surface and top surface of the tunnel are closely connected, which improves the stability of the vertical support and the safety of the side support. Through real-time monitoring and early warning functions, it ensures that staff can conduct timely inspection and maintenance, ensuring the safety of the tunnel. sex.
Smart Images

Figure CN118774907A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining tunnels, and in particular to a high-safety coal mining tunnel top supporting device and a top supporting method thereof. Background Art
[0002] Coal mining tunnels are underground passages used for transportation, ventilation and drainage in underground coal mining. Coal mining tunnels are an indispensable part of the coal mining process, and their layout and construction have a direct impact on the safe production and efficiency of coal mines. From the perspective of mine safety and economic benefits, tunnel support is a key technology to maintain tunnel stability and prevent surrounding rock deformation and collapse. Tunnel support is achieved through a support system, and its design and implementation need to consider multiple factors such as surrounding rock properties, support mechanical properties, installation density and timing. Reasonable support design can play an active reinforcement role before the surrounding rock is deformed, thereby improving the self-bearing capacity of the surrounding rock and reducing maintenance costs.
[0003] At present, the existing coal mining tunnels have the problem that the top support structure is easy to loosen during the top support process, resulting in poor stability of the coal mining tunnels during use and serious safety hazards. At the same time, the coal mining tunnels also lack top support monitoring structures, resulting in the load-bearing safety hazards of the coal mining tunnels cannot be identified in time, which makes it difficult to timely check and maintain the safety hazards of the coal mining tunnels; therefore, it is necessary to design a high-safety coal mining tunnel top support device and a top support method. Summary of the invention
[0004] The main purpose of the present invention is to solve the problem that the top support structure of the existing coal mining tunnels is easy to loosen during the top support process, which leads to poor stability of the coal mining tunnels during use and serious safety hazards. At the same time, the coal mining tunnels also lack a top support monitoring structure, which leads to the load-bearing safety hazards of the coal mining tunnels cannot be identified in time, which makes it difficult to timely check and maintain the safety hazards of the coal mining tunnels; the present invention provides a high-safety coal mining tunnel top support device and a top support method thereof, which realizes the function of being tightly connected with the inner side wall of the coal mining tunnel, and also realizes the function of being connected to the inner wall of the bottom surface of the coal mining tunnel in an embedded manner, and the anti-pull-out structure adopted by the underpass component also makes the vertical support of the top support device more stable and not easy to tip over, and also realizes the function of real-time monitoring of the deformation of the cross plate support, and adopts a tiered manner for safety warning, which not only enables the staff to conduct timely inspection and maintenance, but also ensures the support safety of the device.
[0005] To achieve the above object, the technical solution adopted by the present invention is: A high-safety coal mining tunnel top support device, comprising a vertical support assembly, wherein the lower end of the vertical support assembly is detachably connected to a down-through assembly, and the upper end of the vertical support assembly is detachably connected to a cross-bracing assembly, wherein the outer side wall of the vertical support assembly is detachably connected to a side plug assembly, the outer side wall of the down-through assembly is detachably connected to an auxiliary assembly, and the outer bottom wall of the cross-bracing assembly is provided with a pressure change monitoring assembly; The vertical support assembly is used to connect and support the horizontal support assembly, the horizontal support assembly is used to support the inner wall of the top surface of the coal mining tunnel, the pressure change monitoring assembly is used to monitor the bending curvature of the horizontal support assembly after bearing pressure in real time, the underpass assembly is used to pass under the inner wall of the bottom surface of the coal mining tunnel and support the vertical support assembly, the auxiliary assembly is used to connect the underpass assemblies, and the side insertion assembly is used to connect the vertical support assembly to the inner side wall of the coal mining tunnel.
[0006] The aforementioned high-safety coal mine mining tunnel top support device, the vertical support assembly includes a support column, the outer wall of the support column is provided with a groove, and the inner wall of the groove is provided with a slide groove, wherein the inner wall of the groove is also provided with a first plug hole and a first connecting hole, and the outer wall of the support column is provided with a side hole.
[0007] The above-mentioned high-safety coal mining tunnel top support device, the underpass assembly includes a slide plate, the outer wall of the slide plate is provided with a first protrusion, and the outer wall of the first protrusion and the inner wall of the slide groove are mutually wedged, and the outer wall of the slide plate is provided with a second connecting hole, wherein the second connecting hole and the first connecting hole are detachably connected by a fastener; The lower end of the slide plate is provided with one end of the vertical plate, and the other end of the vertical plate is provided with a pointed block, the outer wall of the vertical plate is rotatably connected with a rotating plate, and the outer wall of the rotating plate is provided with a sliding hole, wherein the outer wall of the rotating plate away from the vertical plate is provided with a convex tooth, and the lower end of the vertical plate is provided with a sliding rod, and the outer wall of the sliding rod is slidably connected with the inner wall of the sliding hole; The upper surface of the slide plate is provided with a through hole, and the inner side wall of the through hole is slidably connected with a vertical rod, the outer side wall of the vertical rod is provided with a first limiting hole, and the outer side wall of the slide plate is provided with a second limiting hole, wherein the first limiting hole and the second limiting hole are detachably connected by an external connecting piece; The outer side wall of the slide plate is provided with a side plate, and the upper surface of the side plate is provided with a first vertical hole.
[0008] The above-mentioned high-safety coal mining tunnel top support device, the side plug assembly includes a plug rod, the outer wall of the plug rod and the inner wall of the side hole are wedged with each other, the outer wall of the plug rod is provided with an adjustment hole, and the inner wall of the adjustment hole is rotatably connected with a rotating rod, wherein the outer wall of the rotating rod away from the adjustment hole is provided with side teeth; The inner side wall of the adjusting hole is provided with a thread groove, and a screw rod is threadedly connected to the inner side wall of the thread groove, a slider is rotatably connected to one end of the screw rod, and a plum blossom groove is provided at the other end of the screw rod; The outer wall of the plug rod is provided with a stopper, one end of the plug rod is provided with an inserting tip, and the other end of the plug rod is provided with a limiting groove, the outer wall of the plug rod is provided with a thread line, and the inner wall of the thread line is threadedly connected with a nut.
[0009] The above-mentioned high-safety coal mining tunnel top support device, the cross bracing assembly includes a cross plate, the outer wall of the bottom surface of the cross plate is provided with two plug plates, the outer wall of the plug plate is provided with a second plug hole, the second plug hole and the first plug hole are detachably connected by an external connecting piece, the outer wall of the plug plate is provided with a second protrusion, and the second protrusion is mutually wedged with the inner wall of the slide groove; A clamping block is arranged on the upper surface of the horizontal plate, and a monitoring plate is arranged on the outer wall of the bottom surface of the horizontal plate.
[0010] The aforementioned high-safety coal mining tunnel top support device, the pressure change monitoring component includes a first infrared transmitter, a second infrared transmitter, a first infrared receiver and a second infrared receiver, the first infrared transmitter, the second infrared transmitter, the first infrared receiver and the second infrared receiver are symmetrically arranged on the outer side wall of the plug plate, the first infrared receiver can receive infrared rays emitted by the first infrared transmitter, the second infrared receiver can receive infrared rays emitted by the second infrared transmitter, and the first infrared transmitter is located above the second infrared transmitter; The outer side wall of the plugboard is also provided with a first warning buzzer and a second warning buzzer, the first warning buzzer is electrically connected to the first infrared receiver, and the second warning buzzer is electrically connected to the second infrared receiver.
[0011] The aforementioned high-safety coal mining tunnel top support device, the auxiliary connection assembly includes a connecting plate, the outer wall of the connecting plate is provided with a card slot, and the inner wall of the card slot is provided with a second vertical hole, and the second vertical hole is detachably connected to the first vertical hole by an external connecting piece; A positioning groove is formed on the outer wall of the opening end of the slot, and the inner wall of the positioning groove and the outer wall of the first protrusion are wedged with each other; The number of the connecting plates is two, and the outer side walls of the connecting plates are also provided with side connection holes, and the side connection holes are used to cooperate with external connecting pieces to connect the two connecting plates.
[0012] In the aforementioned high-safety coal mining tunnel top support device, the number of the side insertion components and the side holes are both multiple, and the multiple side holes are linearly and evenly enclosed on the outer side wall of the support column.
[0013] In the aforementioned high-safety coal mining tunnel top support device, the number of the auxiliary connection components and the number of the underpass components are both two, and the two auxiliary connection components are symmetrically distributed in the middle position of the underpass component.
[0014] Preferably, the method comprises the following steps: Step 1: Connect the side plug assembly to the inner wall of the coal mining tunnel, move the plug rod and align the plug tip with the reserved hole on the inner wall of the coal mining tunnel, and then rotate the screw along the thread groove with the external rotating device along the plum blossom groove, and then drive the slider to slide linearly along the adjustment hole under the rotation between the screw and the slider, and then push the rotating rod to rotate away from the adjustment hole and penetrate into the soil on both sides under the action of the slider and the side teeth; Step 2: Wedging the vertical support assembly and the lower through assembly to form a combined body, moving the slide plate and aligning the first protrusion with the slide groove so that the slide plate can be slid into the groove, and then the slide plate and the support column can be preliminarily wedged; Step three, connect the assembly and the side plug assembly, move the assembly and align the side hole with the plug rod so that the outer wall of the plug rod and the inner wall of the side hole can be wedged with each other, and then the stopper can be pressed against the outer wall of one side of the support column to fit with the support column, and then rotate the nut along the thread line so that the nut can be pressed against the outer wall of one side of the support column to fit with the inner wall of the groove, thereby connecting the plug rod and the support column, and at the same time limiting the screw rod in the limiting groove; Step 4: Lower the underpass component to the position below the inner wall of the bottom surface of the coal mining tunnel and fix it, slide the slide plate downward along the groove so that the vertical plate can be deeply inserted into the reserved hole of the inner wall of the bottom surface of the coal mining tunnel under the action of the tip block, and then slide the vertical rod along the through hole so that the rotating plate and the convex teeth can be driven to expand outward and embed into the soil under the action of the sliding rod sliding along the sliding hole, and then cooperate with the external connecting piece along the second limiting hole and the first limiting hole in turn to connect the vertical rod and the slide plate; Step 5, connecting the lower through assembly and the vertical support assembly, rotating the fastener along the first connection hole and the second connection hole in sequence to connect the slide plate and the support column, thereby connecting the lower through assembly and the vertical support assembly; Step 6: Connect the horizontal support assembly with the vertical support assembly, move the horizontal support assembly and align the plug plate and the second protrusion with the groove and the slide slot respectively and slide them in so that the plug plate and the support column can be preliminarily engaged and connected, and then the external connection piece is matched along the first socket and the second socket in sequence so that the plug plate and the support column can be connected, thereby connecting the horizontal plate and the support column; Step 7, connect the auxiliary assembly with the vertical support assembly, move the connecting plate and engage the card slot with the side plate and the positioning slot with the first protrusion so as to initially engage and connect the connecting plate with the side plate, then match the external connecting piece along the second vertical hole and the first vertical hole so as to connect the connecting plate with the side plate, and then connect the connecting plate with the slide plate, then match the side connection hole with the external connecting piece so as to connect the two connecting plates, and then clamp the slide plate in the middle of the two connecting plates; Step eight, use the pressure change monitoring component to monitor the cross brace component in real time and issue an early warning. The cross plate and the card block can support the inner wall of the top surface of the coal mine mining tunnel. The infrared rays emitted by the first infrared transmitter and the second infrared transmitter can be received by the first infrared receiver and the second infrared receiver respectively. If the cross plate is deformed and the monitoring board blocks the infrared rays, if the first infrared receiver cannot receive the infrared rays, an electrical signal will be sent to the first early warning buzzer for early warning. If the second infrared receiver cannot receive the infrared rays, an electrical signal will be sent to the second early warning buzzer for early warning.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. First, move the plug rod and align the plug tip with the reserved hole on the inner wall of the coal mining tunnel, then rotate the screw along the threaded groove with the external rotating device along the plum blossom groove, and then drive the slider to slide linearly along the adjustment hole under the rotation between the screw rod and the slider, and then push the rotating rod to rotate away from the adjustment hole and penetrate into the soil on both sides under the action of the slider and the side teeth, then move the slide plate and align the first protrusion with the slide groove so that the slide plate can slide along the groove, and then the slide plate and the support column can be preliminarily wedged and combined to form a combination, and then move the combination and align the side hole with the plug rod so that the outer wall of the plug rod can be The nut is then rotated along the thread line so that the nut can be fitted against an outer wall of one side of the support column and the inner wall of the groove, thereby connecting the insertion rod and the support column. At the same time, the screw is limited inside the limiting groove, effectively realizing the function of the device to be tightly connected with the inner wall of the coal mining tunnel, and the pull-out resistance structure of the side insertion assembly makes the side wall support of the top support device more stable, thereby ensuring the support safety of the side of the coal mining tunnel. The device has a simple structure and a good side support effect.
[0016] 2. First, slide the slide plate downward along the groove so that the vertical plate can be pushed into the reserved hole on the inner wall of the bottom surface of the coal mining tunnel under the action of the pointed block, and then slide the vertical rod along the through hole so that the rotating plate and the convex teeth can be driven to expand outward and embed into the soil under the action of the sliding rod sliding along the sliding hole. Then, the external connecting piece is matched along the second limiting hole and the first limiting hole in turn to connect the vertical rod and the slide plate, and then the lower through assembly and the vertical support assembly are connected. The fasteners are rotated along the first connecting hole and the second connecting hole in turn to connect the slide plate and the support column, and then the lower through assembly and the vertical support assembly are connected. Then, the cross support assembly is moved and the plug plate is inserted. The first and second protrusions are aligned with the grooves and the slide slots respectively and slide in to make a preliminary snap-in connection between the plug plate and the support column, and then the external connecting parts are matched along the first and second holes in turn to connect the plug plate and the support column, and then the cross plate and the support column are connected, effectively realizing the function of the device to be connected to the inner wall of the bottom surface of the coal mining tunnel in an embedded manner, and the anti-pull-out structure adopted by the down-through component also makes the vertical support of the top support device more stable and not easy to tip over, and the snap-in structure on the upper surface of the cross plate also makes the upper surface of the cross plate have a strong lateral tipping resistance, thereby ensuring the top surface support stability of the top support device.
[0017] 3. First, move the connecting plate and engage the card slot with the side plate and the positioning slot with the first protrusion so that the connecting plate and the side plate can be preliminarily engaged and connected. Then, the second vertical hole and the first vertical hole are matched with the external connecting piece to connect the connecting plate and the side plate, and then the connecting plate and the slide plate are connected. Then, the side connection hole is matched with the external connecting piece to connect the two connecting plates, and then the slide plate is clamped in the middle of the two connecting plates. Then, the pressure change monitoring component is used to monitor the cross brace component in real time and issue an early warning. The cross plate and the card block can support the inner wall of the top surface of the coal mining tunnel. Infrared rays emitted by the first infrared transmitter and the second infrared transmitter can be received by the first infrared receiver and the second infrared receiver respectively. If the transverse plate is deformed and the monitoring plate blocks the infrared rays, the infrared rays that cannot be received by the first infrared receiver will send an electrical signal to the first early warning buzzer for early warning. If the second infrared receiver cannot receive the infrared rays, an electrical signal will be sent to the second early warning buzzer for early warning. This effectively realizes the function of the device to monitor the deformation degree of the transverse plate support in real time, and adopts a graded manner for safety early warning, which not only enables the staff to conduct timely inspection and maintenance, but also ensures the support safety of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the structure of the vertical support assembly of the present invention; Figure 3 It is a schematic diagram of the structure of the underpass assembly of the present invention; Figure 4 It is a schematic diagram of the vertical rod structure of the present invention; Figure 5 It is a schematic diagram of the structure of the side plug assembly of the present invention; Figure 6 It is a schematic diagram of the thread groove structure of the present invention; Figure 7 It is a schematic diagram of the structure of the cross brace assembly of the present invention; Figure 8 It is a schematic diagram of the structure of the pressure change monitoring assembly of the present invention; Fig. 9 It is a schematic diagram of the auxiliary component structure of the present invention.
[0019] In the figure: 1, vertical support assembly; 101, support column; 102, groove; 103, slide; 104, first connecting hole; 105, first plug hole; 106, fastener; 107, side hole; 2, lower through assembly; 201, slide plate; 202, first protrusion; 203, second connecting hole; 204, side plate; 205, first vertical hole; 206, vertical plate; 207, tip block; 208, rotating plate; 209, convex tooth; 2010, through hole; 2011, vertical rod; 2012, slide hole; 2013, slide rod; 2014, first limiting hole; 2015, second limiting hole; 3, side plug assembly; 301, plug rod; 302, stopper; 303, plug tip; 304, adjustment hole; 305, screw rod; 306 , slider; 307, rotating rod; 308, side teeth; 309, thread line; 3010, hexagonal groove; 3011, nut; 3012, thread groove; 3013, limit groove; 4, cross brace assembly; 401, cross plate; 402, plug plate; 403, block; 404, second plug hole; 405, second protrusion; 406, monitoring board; 5, pressure change monitoring assembly; 501, first infrared transmitter; 502, second infrared transmitter; 503, first infrared receiver; 504, second infrared receiver; 505, first warning buzzer; 506, second warning buzzer; 6, auxiliary connection assembly; 601, connecting plate; 602, slot; 603, positioning slot; 604, second vertical hole; 605, side connection hole. DETAILED DESCRIPTION
[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0021] like Figure 1-9As shown, a high-safety top support device for a coal mining tunnel comprises a vertical support assembly 1, wherein the lower end of the vertical support assembly 1 is detachably connected to a down-through assembly 2, and the upper end of the vertical support assembly 1 is detachably connected to a cross-support assembly 4, wherein the outer wall of the vertical support assembly 1 is detachably connected to a side-insertion assembly 3, the outer wall of the down-through assembly 2 is detachably connected to an auxiliary assembly 6, and the outer wall of the bottom surface of the cross-support assembly 4 is provided with a pressure change monitoring assembly 5; the vertical support assembly 1 is used to connect and support the cross-support assembly 4, the cross-support assembly 4 is used to perform top support operations on the inner wall of the top surface of the coal mining tunnel, the pressure change monitoring assembly 5 is used to perform real-time monitoring of the bending curvature of the cross-support assembly 4 after bearing pressure, and the down-through assembly 2 is used to pass under the bottom of the coal mining tunnel The inner wall of the surface is supported and the vertical support component 1 is supported. The auxiliary component 6 is used to connect the under-passing components 2, and the side-insertion component 3 is used to connect the vertical support component 1 with the inner wall of the coal mining tunnel. The present invention realizes the function of being tightly connected with the inner wall of the coal mining tunnel, and also realizes the function of being connected with the inner wall of the bottom surface of the coal mining tunnel in an embedded manner. The anti-pull-out structure adopted by the under-passing component 2 also makes the vertical support of the top support device more stable and not easy to tip over. It also realizes the function of real-time monitoring of the support deformation of the horizontal plate 401, and adopts a tiered manner for safety warning, which not only enables the staff to conduct timely inspection and maintenance, but also ensures the support safety of the device.
[0022] Specifically, the vertical support assembly 1 includes a support column 101, the outer wall of the support column 101 is provided with a groove 102, and the inner wall of the groove 102 is provided with a slide groove 103, wherein the inner wall of the groove 102 is also provided with a first plug hole 105 and a first connecting hole 104, and the outer wall of the support column 101 is provided with a side hole 107, by moving the skateboard 201 and aligning the first protrusion 202 with the slide groove 103, the skateboard 201 can be slid into the groove 102, and then the skateboard 201 and the support column 101 can be preliminarily wedged.
[0023] Specifically, the underpass component 2 includes a slide plate 201, the outer wall of the slide plate 201 is provided with a first protrusion 202, and the outer wall of the first protrusion 202 and the inner wall of the slide groove 103 are mutually wedged, and the outer wall of the slide plate 201 is provided with a second connecting hole 203, wherein the second connecting hole 203 and the first connecting hole 104 are detachably connected by a fastener 106; the lower end of the slide plate 201 is provided with one end of a vertical plate 206, and the vertical plate 206 A pointed block 207 is provided at the other end, and a rotating plate 208 is rotatably connected to the outer wall of the vertical plate 206, and a sliding hole 2012 is provided on the outer wall of the rotating plate 208, wherein a convex tooth 209 is provided on the outer wall of the rotating plate 208 away from the vertical plate 206, and a sliding rod 2013 is provided at the lower end of the vertical plate 206, and the outer wall of the sliding rod 2013 is slidably connected with the inner wall of the sliding hole 2012; a through hole 2010 is provided on the upper surface of the slide plate 201, and the through hole 2010 The inner wall is slidably connected with a vertical rod 2011, and the outer wall of the vertical rod 2011 is provided with a first limiting hole 2014, and the outer wall of the slide plate 201 is provided with a second limiting hole 2015, wherein the first limiting hole 2014 and the second limiting hole 2015 are detachably connected by an external connecting piece; the outer wall of the slide plate 201 is provided with a side plate 204, and the upper surface of the side plate 204 is provided with a first vertical hole 205, by sliding the slide plate 201 downward along the groove 102 Thus, under the action of the pointed block 207, the vertical plate 206 can be pushed into the reserved hole of the inner wall of the bottom surface of the coal mining tunnel, and then the vertical rod 2011 can be slid along the through hole 2010, so that the sliding rod 2013 can slide along the sliding hole 2012 to drive the rotating plate 208 and the protruding teeth 209 to expand outward and embed into the soil, and then the external connecting piece can be matched along the second limiting hole 2015 and the first limiting hole 2014 in sequence to connect the vertical rod 2011 and the sliding plate 201.
[0024] Specifically, the side plug assembly 3 includes an insertion rod 301, the outer wall of the insertion rod 301 and the inner wall of the side hole 107 are wedged with each other, the outer wall of the insertion rod 301 is provided with an adjustment hole 304, and the inner wall of the adjustment hole 304 is rotatably connected with a rotating rod 307, wherein the outer wall of the rotating rod 307 away from the adjustment hole 304 is provided with a side tooth 308; the inner wall of the adjustment hole 304 is provided with a thread groove 3012, and the inner wall of the thread groove 3012 is threadedly connected with a screw rod 305, one end of the screw rod 305 is rotatably connected with a slider 306, and the other end of the screw rod 305 is provided with a plum blossom groove 3010; the outer wall of the insertion rod 301 is provided with a stopper 302, and one end of the insertion rod 301 is provided with a A plug tip 303 is provided, and a limiting groove 3013 is provided at the other end of the plug rod 301, a thread line 309 is provided on the outer wall of the plug rod 301, and a nut 3011 is threadedly connected to the inner wall of the thread line 309. By moving the plug rod 301 and aligning the plug tip 303 with the reserved hole on the inner wall of the coal mining tunnel, and then cooperating with an external rotating device along the plum blossom groove 3010, the screw rod 305 can be rotated along the thread groove 3012, and then under the rotation action between the screw rod 305 and the slider 306, the slider 306 can be driven to slide linearly along the adjustment hole 304, and then under the action of the slider 306 and the side teeth 308, the rotating rod 307 can be pushed to rotate in the direction away from the adjustment hole 304 and penetrate into the soil on both sides.
[0025] Specifically, the cross brace assembly 4 includes a cross plate 401, and two plug plates 402 are arranged on the outer wall of the bottom surface of the cross plate 401. A second plug hole 404 is opened on the outer wall of the plug plate 402. The second plug hole 404 and the first plug hole 105 are detachably connected by an external connector. A second protrusion 405 is arranged on the outer wall of the plug plate 402, and the second protrusion 405 is wedged with the inner wall of the slide groove 103; a block 403 is arranged on the upper surface of the cross plate 401, and the cross plate A monitoring plate 406 is provided on the outer wall of the bottom surface of 401. By moving the cross brace assembly 4 and aligning the plug plate 402 and the second protrusion 405 with the groove 102 and the slide groove 103 respectively and sliding them in, the plug plate 402 can be initially snap-connected with the support column 101, and then the external connecting parts are matched along the first hole 105 and the second hole 404 in turn to connect the plug plate 402 with the support column 101, thereby connecting the cross plate 401 with the support column 101.
[0026] Specifically, the pressure change monitoring component 5 includes a first infrared transmitter 501, a second infrared transmitter 502, a first infrared receiver 503 and a second infrared receiver 504. The first infrared transmitter 501, the second infrared transmitter 502, the first infrared receiver 503 and the second infrared receiver 504 are symmetrically arranged on the outer wall of the plugboard 402, respectively. The first infrared receiver 503 can receive infrared rays emitted by the first infrared transmitter 501, and the second infrared receiver 504 can receive infrared rays emitted by the second infrared transmitter 502. The first infrared transmitter 501 is located above the second infrared transmitter 502. The outer wall of the plugboard 402 is also provided with a first warning buzzer 505 and a second warning buzzer 506. A warning buzzer 505 is electrically connected to the first infrared receiver 503, and the second warning buzzer 506 is electrically connected to the second infrared receiver 504. The inner wall of the top surface of the coal mining tunnel can be supported through the horizontal plate 401 and the block 403. The infrared rays emitted by the first infrared transmitter 501 and the second infrared transmitter 502 can be received by the first infrared receiver 503 and the second infrared receiver 504 respectively. If the horizontal plate 401 is deformed and the monitoring plate 406 blocks the infrared rays, if the first infrared receiver 503 cannot receive the infrared rays, an electrical signal will be sent to the first warning buzzer 505 for warning operation. If the second infrared receiver 504 cannot receive the infrared rays, an electrical signal will be sent to the second warning buzzer 506 for warning operation.
[0027] Specifically, the auxiliary connection component 6 includes a connecting plate 601, the outer wall of the connecting plate 601 is provided with a slot 602, and the inner wall of the slot 602 is provided with a second vertical hole 604, and the second vertical hole 604 is detachably connected to the first vertical hole 205 by an external connecting piece; the outer wall of the opening end of the slot 602 is provided with a positioning groove 603, and the inner wall of the positioning groove 603 is wedged with the outer wall of the first protrusion 202; the number of the connecting plates 601 is two, and the outer wall of the connecting plate 601 is also provided with a side hole 605, and the side hole 605 is used to cooperate with the external connecting piece to connect the two connecting plates 601 The connection is achieved by moving the connecting plate 601 and engaging the card slot 602 with the side plate 204 and the positioning slot 603 with the first protrusion 202, so that the connecting plate 601 and the side plate 204 can be preliminarily engaged and connected, and then the connecting plate 601 and the side plate 204 are connected by cooperating with the external connecting piece along the second vertical hole 604 and the first vertical hole 205, thereby connecting the connecting plate 601 and the side plate 204, and then connecting the connecting plate 601 and the slide plate 201, and then connecting the side connection hole 605 with the external connecting piece to connect the two connecting plates 601, thereby clamping the slide plate 201 in the middle position between the two connecting plates 601.
[0028] Specifically, the number of the side plug-in components 3 and the side holes 107 are both multiple, and the multiple side holes 107 are linearly and evenly enclosed on the outer wall of the support column 101. The lateral support of the side plug-in components 3 is more stable due to the multiple number of the side plug-in components 3 and the side holes 107.
[0029] Specifically, the number of the auxiliary connection components 6 and the number of the down-passing components 2 are both two, and the two auxiliary connection components 6 are symmetrically distributed in the middle position of the down-passing component 2. By having the number of the auxiliary connection components 6 and the number of the down-passing components 2 both being two, the down-passing component 2 can better support the vertical support component 1.
[0030] Specifically, the steps include: Step 1: Connect the side plug assembly 3 to the inner wall of the coal mining tunnel, move the plug rod 301 and align the plug tip 303 with the reserved hole on the inner wall of the coal mining tunnel, and then rotate the screw rod 305 along the hexagram groove 3010 in conjunction with the external rotating device along the thread groove 3012, and then drive the slider 306 to slide linearly along the adjustment hole 304 under the rotation between the screw rod 305 and the slider 306, and then push the rotating rod 307 to rotate away from the adjustment hole 304 and penetrate into the soil on both sides under the action of the slider 306 and the side teeth 308, so that the present invention has the function of being tightly connected with the inner wall of the coal mining tunnel; Step 2: The vertical support component 1 and the lower through component 2 are wedged together to form a combination, the slide plate 201 is moved and the first protrusion 202 is aligned with the slide groove 103 so that the slide plate 201 can be slid into the groove 102, and then the slide plate 201 and the support column 101 can be preliminarily wedged together, that is, the vertical support component 1 and the lower through component 2 are wedged together to form a combination; Step 3, connect the assembly and the side plug assembly 3, move the assembly and align the side hole 107 with the plug rod 301 so that the outer wall of the plug rod 301 and the inner wall of the side hole 107 can be wedged with each other, and then the stopper 302 can be pressed against the outer wall of one side of the support column 101 and fit with the support column 101, then rotate the nut 3011 along the thread line 309 so that the nut 3011 can be pressed against the outer wall of one side of the support column 101 and fit with the inner wall of the groove 102, and then the plug rod 301 and the support column 101 are connected, and at the same time, the screw 305 is limited in the limiting groove 3013, that is, the present invention has the function of connecting the assembly and the side plug assembly 3; Step 4: Partially pass the underpass component 2 down to the position below the inner wall of the bottom surface of the coal mining tunnel and fix it, slide the slide plate 201 downward along the groove 102 so that the vertical plate 206 can be deeply inserted into the reserved hole of the inner wall of the bottom surface of the coal mining tunnel under the action of the pointed block 207, and then slide the vertical rod 2011 along the through hole 2010 so that the rotating plate 208 and the protruding teeth 209 can be driven to expand outward and embed into the soil under the action of the sliding rod 2013 sliding along the sliding hole 2012, and then the second limiting hole 215 and the first limiting hole 214 are matched with the external connecting piece in turn so that the vertical rod 2011 can be connected with the slide plate 201, so that the present invention has the function of connecting with the inner wall of the bottom surface of the coal mining tunnel in an embedded manner; Step 5, connect the lower through component 2 and the vertical support component 1, rotate the fastener 106 along the first connection hole 104 and the second connection hole 203 in sequence to connect the slide plate 201 and the support column 101, and then connect the lower through component 2 and the vertical support component 1, that is, the present invention has the function of connecting the lower through component 2 and the vertical support component 1; Step 6, connect the horizontal support assembly 4 with the vertical support assembly 1, move the horizontal support assembly 4 and align the plug plate 402 and the second protrusion 405 with the groove 102 and the slide groove 103 respectively and slide them in, so that the plug plate 402 can be preliminarily engaged with the support column 101, and then the external connection piece is matched along the first plug hole 105 and the second plug hole 404 in sequence, so that the plug plate 402 can be connected with the support column 101, and then the horizontal plate 401 is connected with the support column 101, that is, the present invention has the function of connecting the horizontal support assembly 4 with the vertical support assembly 1; Step 7, connect the auxiliary component 6 with the vertical support component 1, move the connecting plate 601 and engage the card slot 602 with the side plate 204 and the positioning slot 603 with the first protrusion 202, so that the connecting plate 601 and the side plate 204 can be preliminarily engaged and connected, and then the second vertical hole 604 and the first vertical hole 205 are matched with the external connecting piece to connect the connecting plate 601 with the side plate 204, and then the connecting plate 601 and the slide plate 201 are connected, and then the side connection hole 605 is connected with the external connecting piece to connect the two connecting plates 601, and then the slide plate 201 is clamped in the middle position of the two connecting plates 601, so that the present invention has the function of connecting the auxiliary component 6 and the vertical support component 1; Step eight, using the pressure change monitoring component 5 to carry out real-time monitoring and early warning of the cross bracing component 4, the cross plate 401 and the block 403 can support the inner wall of the top surface of the coal mine mining tunnel, and the infrared rays emitted by the first infrared transmitter 501 and the second infrared transmitter 502 can be received by the first infrared receiver 503 and the second infrared receiver 504 respectively. If the cross plate 401 is deformed and the monitoring plate 406 blocks the infrared rays, if the first infrared receiver 503 cannot receive the infrared rays, an electrical signal will be sent to the first early warning buzzer 505 for early warning operation, and if the second infrared receiver 504 cannot receive the infrared rays, an electrical signal will be sent to the second early warning buzzer 506 for early warning operation, so that the present invention has the function of real-time monitoring of the support deformation degree of the cross plate 401.
[0031] The electronic components used in the present invention are all universal standard parts or components known to those skilled in the art, and their structures and principles can be known to those skilled in the art through technical manuals or conventional experimental methods.
[0032] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A high-safety coal mining tunnel top support device, comprising a vertical support assembly (1), characterized in that: The lower end of the vertical support assembly (1) is detachably connected to a lower through assembly (2), and the upper end of the vertical support assembly (1) is detachably connected to a horizontal support assembly (4), wherein the outer side wall of the vertical support assembly (1) is detachably connected to a side plug assembly (3), the outer side wall of the lower through assembly (2) is detachably connected to an auxiliary connection assembly (6), and a pressure change monitoring assembly (5) is provided on the outer side wall of the bottom surface of the horizontal support assembly (4); The vertical support assembly (1) is used to connect and support the horizontal support assembly (4); the horizontal support assembly (4) is used to support the inner wall of the top surface of the coal mining tunnel; the pressure change monitoring assembly (5) is used to monitor the bending curvature of the horizontal support assembly (4) after bearing pressure in real time; the underpass assembly (2) is used to underpass the inner wall of the bottom surface of the coal mining tunnel and support the vertical support assembly (1); the auxiliary connection assembly (6) is used to connect the underpass assemblies (2); and the side insertion assembly (3) is used to connect the vertical support assembly (1) to the inner wall of the coal mining tunnel.
2. A high-safety coal mining tunnel top support device according to claim 1, characterized in that: The vertical support assembly (1) comprises a support column (101), the outer wall of the support column (101) is provided with a groove (102), and the inner wall of the groove (102) is provided with a slide groove (103), wherein the inner wall of the groove (102) is further provided with a first insertion hole (105) and a first connecting hole (104), and the outer wall of the support column (101) is provided with a side hole (107).
3. A high-safety coal mining tunnel support device according to claim 2, characterized in that: The underpass component (2) comprises a slide plate (201), the outer wall of the slide plate (201) is provided with a first protrusion (202), and the outer wall of the first protrusion (202) and the inner wall of the slide groove (103) are wedged with each other, and the outer wall of the slide plate (201) is provided with a second connecting hole (203), wherein the second connecting hole (203) and the first connecting hole (104) are detachably connected by a fastener (106); The lower end of the slide plate (201) is provided with one end of a vertical plate (206), and the other end of the vertical plate (206) is provided with a pointed block (207), the outer wall of the vertical plate (206) is rotatably connected with a rotating plate (208), and the outer wall of the rotating plate (208) is provided with a sliding hole (2012), wherein the outer wall of the rotating plate (208) away from the vertical plate (206) is provided with a convex tooth (209), and the lower end of the vertical plate (206) is provided with a sliding rod (2013), and the outer wall of the sliding rod (2013) is slidably connected with the inner wall of the sliding hole (2012); The upper surface of the slide plate (201) is provided with a through hole (2010), and the inner side wall of the through hole (2010) is slidably connected to a vertical rod (211), the outer side wall of the vertical rod (2011) is provided with a first limiting hole (2014), and the outer side wall of the slide plate (201) is provided with a second limiting hole (2015), wherein the first limiting hole (2014) and the second limiting hole (2015) are detachably connected by an external connecting piece; The outer side wall of the slide plate (201) is provided with a side plate (204), and the upper surface of the side plate (204) is provided with a first vertical hole (205).
4. A high-safety coal mining tunnel top support device according to claim 2, characterized in that: The side insertion assembly (3) comprises an insertion rod (301), the outer wall of the insertion rod (301) and the inner wall of the side hole (107) being wedged with each other, an adjustment hole (304) being provided on the outer wall of the insertion rod (301), and a rotating rod (307) being rotatably connected to the inner wall of the adjustment hole (304), wherein a side tooth (308) is provided on the outer wall of the rotating rod (307) away from the adjustment hole (304); The inner wall of the adjustment hole (304) is provided with a threaded groove (3012), and the inner wall of the threaded groove (3012) is threadedly connected to a screw rod (305), one end of the screw rod (305) is rotatably connected to a slider (306), and the other end of the screw rod (305) is provided with a plum blossom groove (3010); The outer wall of the insertion rod (301) is provided with a stopper (302), one end of the insertion rod (301) is provided with an insertion tip (303), and the other end of the insertion rod (301) is provided with a limiting groove (3013), the outer wall of the insertion rod (301) is provided with a thread line (309), and the inner wall of the thread line (309) is threadedly connected with a nut (3011).
5. A high-safety coal mining tunnel top support device according to claim 2, characterized in that: The cross brace assembly (4) comprises a cross plate (401), the bottom outer wall of the cross plate (401) is provided with two plug plates (402), the outer side wall of the plug plate (402) is provided with a second plug hole (404), the second plug hole (404) and the first plug hole (105) are detachably connected by an external connecting piece, the outer side wall of the plug plate (402) is provided with a second protrusion (405), and the second protrusion (405) is mutually wedged with the inner side wall of the slide groove (103); A clamping block (403) is provided on the upper surface of the transverse plate (401), and a monitoring plate (406) is provided on the outer wall of the bottom surface of the transverse plate (401).
6. A high-safety coal mining tunnel top support device according to claim 5, characterized in that: The pressure change monitoring component (5) comprises a first infrared transmitter (501), a second infrared transmitter (502), a first infrared receiver (503) and a second infrared receiver (504); the first infrared transmitter (501), the second infrared transmitter (502), the first infrared receiver (503) and the second infrared receiver (504) are symmetrically arranged on the outer side wall of the plugboard (402), respectively; the first infrared receiver (503) can receive infrared rays emitted by the first infrared transmitter (501), the second infrared receiver (504) can receive infrared rays emitted by the second infrared transmitter (502); the first infrared transmitter (501) is located above the second infrared transmitter (502); The outer wall of the plug board (402) is also provided with a first warning buzzer (505) and a second warning buzzer (506); the first warning buzzer (505) is electrically connected to the first infrared receiver (503), and the second warning buzzer (506) is electrically connected to the second infrared receiver (504).
7. A high-safety coal mining tunnel top support device according to claim 3, characterized in that: The auxiliary connection component (6) comprises a connection plate (601), an outer wall of the connection plate (601) is provided with a slot (602), and an inner wall of the slot (602) is provided with a second vertical hole (604), and the second vertical hole (604) is detachably connected to the first vertical hole (205) by using an external connection piece; A positioning groove (603) is provided on the outer wall of the opening end of the clamping groove (602), and the inner wall of the positioning groove (603) and the outer wall of the first protrusion (202) are wedged with each other; The number of the connecting plates (601) is two, and the outer side walls of the connecting plates (601) are also provided with side connection holes (605), and the side connection holes (605) are used to cooperate with external connecting pieces to connect the two connecting plates (601).
8. A high-safety coal mining tunnel top support device according to claim 4, characterized in that: The number of the side plug components (3) and the number of the side holes (107) are both multiple, and the multiple side holes (107) are linearly and evenly enclosed on the outer side wall of the support column (101).
9. A high-safety coal mining tunnel top support device according to claim 7, characterized in that: The number of the auxiliary connection components (6) and the number of the underpass components (2) are both two, and the two auxiliary connection components (6) are symmetrically distributed in the middle position of the underpass component (2).
10. A method for supporting a high-safety coal mining tunnel support device according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1, connecting the side plug assembly (3) to the inner wall of the coal mining tunnel, moving the plug rod (301) and aligning the plug tip (303) with the reserved hole on the inner wall of the coal mining tunnel, and then rotating the screw rod (305) along the plum blossom groove (3010) in cooperation with an external rotating device along the thread groove (3012), and then driving the slider (306) to slide linearly along the adjustment hole (304) under the rotation between the screw rod (305) and the slider (306), and then pushing the rotating rod (307) to rotate in a direction away from the adjustment hole (304) and penetrate into the soil on both sides under the action of the slider (306) and the side teeth (308); Step 2, wedging the vertical support assembly (1) and the lower through assembly (2) to form a combined body, moving the slide plate (201) and aligning the first protrusion (202) with the slide groove (103) so that the slide plate (201) can be slid into the groove (102), and then the slide plate (201) and the support column (101) can be preliminarily wedged; Step three, connecting the assembly and the side plug assembly (3), moving the assembly and aligning the side hole (107) with the plug rod (301) so that the outer wall of the plug rod (301) and the inner wall of the side hole (107) can be wedged with each other, and then the stopper (302) can be moved toward the outer wall of one side of the support column (101) to fit with the support column (101), and then the nut (3011) is rotated along the thread line (309) so that the nut (3011) can be moved toward the outer wall of one side of the support column (101) to fit with the inner wall of the groove (102), thereby connecting the plug rod (301) and the support column (101), and at the same time limiting the screw rod (305) in the limiting groove (3013); Step 4, partially pass the underpass component (2) down to the position below the inner wall of the bottom surface of the coal mining tunnel and fix it, slide the slide plate (201) downward along the groove (102), so that the vertical plate (206) can be deeply inserted into the reserved hole of the inner wall of the bottom surface of the coal mining tunnel under the action of the pointed block (207), and then slide the vertical rod (2011) along the through hole (2010), so that the rotating plate (208) and the protruding teeth (209) can be driven to expand outward and embed into the soil under the action of the sliding rod (213) sliding along the sliding hole (212), and then cooperate with the external connecting piece along the second limiting hole (215) and the first limiting hole (214) in turn to connect the vertical rod (2011) and the slide plate (201); Step 5, connecting the lower through component (2) and the vertical support component (1), rotating the fastener (106) along the first connection hole (104) and the second connection hole (203) in sequence, so as to connect the slide plate (201) and the support column (101), and further connect the lower through component (2) and the vertical support component (1); Step 6, connecting the horizontal support assembly (4) with the vertical support assembly (1), moving the horizontal support assembly (4) and aligning the plug plate (402) and the second protrusion (405) with the groove (102) and the slide groove (103) respectively and sliding them in, so that the plug plate (402) and the support column (101) can be preliminarily engaged and connected, and then the external connecting piece is matched along the first plug hole (105) and the second plug hole (404) in sequence, so that the plug plate (402) and the support column (101) can be connected, and then the horizontal plate (401) and the support column (101) are connected; Step seven, connecting the auxiliary assembly (6) and the vertical support assembly (1), moving the connecting plate (601) and engaging the card slot (602) and the side plate (204) and the positioning slot (603) and the first protrusion (202) so as to preliminarily engage and connect the connecting plate (601) and the side plate (204), and then connecting the connecting plate (601) and the side plate (204) with an external connecting piece along the second vertical hole (604) and the first vertical hole (205), thereby connecting the connecting plate (601) and the side plate (204), and then connecting the connecting plate (601) and the slide plate (201), and then connecting the side connection hole (605) with an external connecting piece so as to connect the two connecting plates (601), thereby clamping the slide plate (201) in the middle of the two connecting plates (601); Step eight, using the pressure change monitoring component (5) to monitor the cross bracing component (4) in real time and issue an early warning, the cross plate (401) and the block (403) can support the inner wall of the top surface of the coal mining tunnel, and the infrared rays emitted by the first infrared transmitter (501) and the second infrared transmitter (502) can be received by the first infrared receiver (503) and the second infrared receiver (504) respectively. If the cross plate (401) is deformed and the monitoring plate (406) blocks the infrared rays, if the first infrared receiver (503) cannot receive the infrared rays, an electrical signal will be sent to the first early warning buzzer (505) to issue an early warning operation, and if the second infrared receiver (504) cannot receive the infrared rays, an electrical signal will be sent to the second early warning buzzer (506) to issue an early warning operation.
Citation Information
Patent Citations
Temporary reinforcing and supporting device for coal mine tunnel in coal mining tunneling
CN117328910A
Community intelligent access control system
CN209570986U
Roadway two-side wall caving prevention supporting device
CN212614796U
Roadway supporting device for narrow coal pillar tunneling
CN216950428U
Supporting device for box culvert incremental launching construction
CN217872850U