Pipeline reinforcing device and method
By designing a detachable inner shell and outer shell structure and using grouting materials to clamp the pipes, the problem of the existing technology's high soil environment requirements and lack of reinforcement support is solved, and the pipes are firmly reinforced and their performance improved.
Patent Information
- Application Number
- CN202410984940.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-15
AI Technical Summary
Existing pipeline reinforcement technology has high requirements on the soil environment and lacks reinforcement support, which leads to a decline in the overall performance of the repaired pipeline and is prone to secondary damage. In addition, the cost of using reinforced materials is high, and it cannot meet the needs of large-area repair and reinforcement.
By designing a hollow inner shell and outer shell, the inner shell and the outer shell are connected to each other to form a ring structure. The inner shell is filled with grouting material and enters the cavity of the fixed block through the connecting pipe. The push block and clamping plate are pushed to clamp the pipe. Fixing to repair and reinforce the pipe surface and improve the compression and tension resistance.
The pipeline can be firmly clamped and reinforced without good soil conditions, preventing further cracking and leakage, and improving the overall performance and service life of the pipeline. At the same time, the device structure is detachable, making it easy to flexibly adapt to different environments and needs.
Smart Images

Figure CN118775680A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pipeline repair, and in particular relates to a pipeline reinforcement device and method. Background Art
[0002] As one of the five main ways of energy transportation, pipelines are the lowest-cost long-distance transportation tool for energy such as oil, natural gas and biofuels, and have an important impact on the development of the world economy. With the acceleration of the progress of municipal engineering in urban construction in my country, the relocation and reinforcement of pipelines have become an unavoidable topic, especially in old urban areas with dense underground pipelines. Pipelines often face problems such as corrosion, wear, and external force impact. These problems may lead to leakage, breakage and failure of pipelines, posing a serious threat to production safety and environmental protection.
[0003] At present, pipeline reinforcement technologies usually include grouting reinforcement, installation of reinforcement sleeves, bonding material reinforcement, reinforcement material reinforcement and installation support, among which grouting reinforcement is to directly grout the soil around the pipeline to achieve the purpose of reinforcing the pipeline, and has high requirements for the soil environment around the pipeline; the remaining repair technologies mostly use sealants or bonding materials to seal the damage, lack the role of reinforcement support, resulting in a decrease in the overall performance of the repaired pipeline and prone to secondary damage, while the use of reinforcement materials is costly and cannot meet the needs of large-area repair and reinforcement. For this reason, it is necessary to propose a pipeline reinforcement device and method. Summary of the invention
[0004] In order to solve the problem that the above-mentioned grouting reinforcement has high requirements on the soil environment and other repair technologies lack reinforcement support, the purpose of the present invention is to provide a pipeline reinforcement device and method. By grouting into the inner shell, the grouting material flows into the cavity while filling the inner shell, so that the push block and the clamping plate push the inner shell, and the inner shell wraps the pipeline and provides clamping fixation, so as to achieve reinforcement of the pipeline while repairing the pipeline surface, thereby improving the overall performance of the pipeline.
[0005] In order to achieve the above-mentioned object, the technical solution of the present invention is as follows: a pipeline reinforcement device comprises a plurality of hollow inner shells and outer shells, both of which are arc-shaped structures, and the plurality of inner shells and outer shells are connected to each other to form a circular ring structure, and adjacent inner shells and adjacent outer shells are detachably connected; A hollow fixed block is fixedly connected to the side wall of the outer shell close to the inner shell, and a push block is slidably connected inside the fixed block. One side wall of the push block and the fixed block form a cavity, and the side wall of the cavity is fixedly connected to a connecting pipe, and the other end of the connecting pipe is fixedly connected and communicated with the outer side wall of the inner shell. The cavity and the inner shell are communicated with each other through the connecting pipe. The push block extends to the outside of the fixed block, and the push block penetrates the side wall of the outer shell close to the inner shell and extends to the inside of the inner shell. An arc-shaped clamping plate is provided inside the inner shell, and the curvature of the clamping plate is the same as that of the inner shell. The clamping plate is fixedly connected to the push block, and grouting holes are opened at the top and bottom of the inner shell.
[0006] The principle of the basic scheme is: the inner wall of the inner shell is pressed against the surface of the pipeline to be repaired, and several inner shells and outer shells are joined and fixed around the pipeline, so that the device clamps the pipeline, and the grouting nozzle is installed through the grouting holes at the top and bottom of the inner shell for grouting reinforcement. While the grouting material fills the inner shell, it is poured into the cavity of the fixed block through the connecting pipe. The pressure in the cavity is enhanced, which pushes the push block to move toward the center of the pipeline, and then drives the clamping plate to clamp and fix the pipeline. Under the action of several arc-shaped clamping plates, the inner shell completely wraps the pipeline to prevent further cracking and leakage due to damage on the pipeline surface. When the grouting pressure reaches the threshold, stop grouting to achieve repair and reinforcement of the pipeline and improve the overall performance of the pipeline.
[0007] The beneficial effects of the basic scheme are: 1. By grouting the inner shell, the grouting material not only fills the inner shell, but also enters the cavity of the fixed block through the connecting pipe, and then pushes the push block and the clamping plate to clamp the pipeline, ensuring that the pipeline is firmly clamped and providing reinforcement support for the pipeline. Compared with the existing grouting reinforcement pipeline technology, the present invention does not require good soil conditions. The inner shell wraps the pipeline surface instead of the soil, which can improve the compressive and tensile performance of the pipeline and effectively prevent further cracking and leakage of damaged pipeline surface.
[0008] 2. The outer shell and the inner shell are detachable structures, which are easy to install. The pipeline can be reinforced and repaired when the pipeline is working normally, ensuring the continuity of production and life. At the same time, the number of outer shells and inner shells can be increased or reduced according to the diameter of the pipeline, so that the device can adapt to different environments and needs, increasing the flexibility and extensiveness of the device.
[0009] Furthermore, a chuck is provided at the bottom of the push block, the outer edge of the top of the chuck is fixedly connected to the bottom of the fixed block, adjacent chucks are detachably connected, a spiral groove is opened on the top of the chuck, and a protrusion that slides with the spiral groove is fixedly connected to the bottom of the push block.
[0010] The beneficial effects of the basic solution are: since the spiral groove on the chuck cooperates with the protrusion at the bottom of the push block, the push block can be driven to move toward the center of the pipe by rotating the chuck, so that the clamping plate drives the inner shell to clamp the pipe firmly; adjusting the clamping plate to clamp the pipe before grouting can avoid the problem of the push block falling off from the fixed block due to the large gap in the subsequent grouting. At the same time, double reinforcement can further enhance the structural strength of the pipe, improve its bearing capacity and extend its service life.
[0011] Furthermore, a rotating shaft is provided under the chuck, and a bevel gear is fixedly connected to the rotating shaft near the chuck. One end of the rotating shaft passes through the outer wall of the shell and is rotatably connected to the outer wall of the shell. A square hole is opened at the end of the rotating shaft passing through the shell, and the bottom of the chuck is fixedly connected with a tooth groove meshing with the bevel gear.
[0012] The beneficial effects of the basic solution are: inserting a wrench into the square hole and rotating it can drive the bevel gear and the chuck to rotate, and then the chuck drives the push block to move toward the center of the pipeline to complete the clamping of the pipeline; the design of the rotating shaft enables the staff to rotate the wrench outside the device to complete the clamping of the pipeline, thereby improving work efficiency. At the same time, the clamping condition of the inner shell can be observed during the rotation process to avoid damage to the pipeline due to over-tightening or over-loosening.
[0013] Furthermore, one side of the rotating shaft is rotatably connected to a fixed shaft, both ends of the fixed shaft are respectively fixedly connected to the top and bottom of the shell, and an annular groove is opened near the fixed shaft on the rotating shaft, and the annular groove is closely adjacent to the fixed shaft.
[0014] The beneficial effects of the basic scheme are: the design of the fixed shaft, on the one hand, can limit the position of the rotating shaft, and the annular groove on the fixed shaft can ensure the stability of the rotating shaft during rotation, thereby improving the transmission efficiency; on the other hand, the fixed shaft is fixedly connected to the outer shell to form a solid supporting structure, which can prevent the rotating shaft from shaking and deflecting during operation, thereby improving the reliability of the overall structure.
[0015] Furthermore, the inner shell material is made of thermoplastic polyurethane elastic composite material.
[0016] The beneficial effects of the basic solution are: the inner shell material is an elastic material, which can ensure that the inner shell will not be damaged during the movement of the clamping plate, and the elastic material can make the inner shell better fit and wrap the pipe surface to prevent the pipe from being damaged and leaking; the elastic material is made of thermoplastic polyurethane elastic composite material, which has high strength, high wear resistance and corrosion resistance, can withstand long-term use and severe weather conditions, and further enhance the practicality and durability of the device.
[0017] Furthermore, the inner side walls of the clamping plates are fixedly connected with elastic rubber pads.
[0018] The beneficial effects of the basic solution are: the elastic rubber pad on the inner side of the clamping plate has a buffering and shock-absorbing effect, which can absorb and disperse pressure during the clamping process, avoid rigid deformation of the pipeline, and reduce the direct friction between the clamping plate and the inner shell, thereby extending the service life of the device and achieving a more stable and long-term reinforcement and repair.
[0019] Furthermore, the pipeline reinforcement method comprises the following steps: Step 1: Expose the pipeline to be repaired: dig the foundation pit of the pipeline to be repaired, dig to the bottom of the pipeline and completely expose the pipeline, and clean the soil on the surface of the pipeline; Step 2, assembling the reinforcement device: placing the inner shell tightly against the damaged surface of the pipeline, and docking and fixing several inner shells with the outer shells respectively, and clamping the pipeline therebetween; Step 3: Clamp the pipe: insert the wrench into the square hole of the housing and turn the wrench until the clamping plate and the pipe are completely tight. Step 4: Grouting reinforcement: install grouting nozzles at the grouting holes at the top and bottom of the inner shell respectively, and use a high-pressure grouting machine to inject grouting materials into the grouting nozzles at both ends at the same time. Use a continuous injection method, observe the movement of the inner shell while grouting, and observe the rising changes of the pressure gauge of the grouting machine. When the grouting pressure reaches 0.1Mp, suspend grouting and observe the pressure changes of the pressure gauge. When the pressure reaches stability, seal the grouting holes and end the grouting construction; Step 5, maintenance work: After the grouting is completed, maintenance work is carried out to ensure that there is no groundwater seepage in the working face foundation pit. After 12 hours, the surface of the outer shell and the inner shell are dried, and anti-corrosion glue is applied, and dry maintenance is carried out for 24 hours.
[0020] Furthermore, in step 1, if the relative humidity of the on-site environment is greater than 85%, drying measures must be taken on the pipeline surface.
[0021] Furthermore, in step four, the grouting material is a polymer-based grouting material, and the grouting material must be configured at the grouting site, and the distance between the configuration area and the grouting work area is 40-50m.
[0022] Furthermore, the film thickness of the anti-corrosion glue is 1-1.5 mm.
[0023] The beneficial effects of the basic solution are: combining the technology of clamping the pipe and grouting reinforcement can significantly improve the structural strength and stability of the pipeline, prevent pipeline damage and ensure safe operation. At the same time, combining grouting reinforcement with anti-corrosion measures can effectively prevent corrosion and aging of the pipeline, thereby extending the service life of the pipeline, reducing the frequency of pipeline maintenance and replacement, and reducing maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 4 is a cross-sectional view of a pipeline reinforcement device in an embodiment of the present invention.
[0025] Figure 2 It is a top axonometric view of the pipeline reinforcement device in an embodiment of the present invention.
[0026] Figure 3 This is an axonometric view of the bottom end of the pipeline reinforcement device in an embodiment of the present invention.
[0027] Figure 4 The present invention is a flowchart of a pipeline reinforcement method according to an embodiment of the present invention. DETAILED DESCRIPTION
[0028] The following is further described in detail through specific implementation methods: The figure marks in the drawings of the specification include: outer shell 1, inner shell 2, grouting hole 3, fixed block 4, push block 5, cavity 6, connecting pipe 7, clamping plate 8, chuck 9, rotating shaft 10, bevel gear 11, square hole 12, tooth groove 13, fixed shaft 14, annular groove 15.
[0029] Example 1 The embodiment is basically as shown in the attached Figure 1-Figure 3 As shown: the pipeline reinforcement device includes a plurality of hollow inner shells 2 and outer shells 1, both of which are arc-shaped structures. The plurality of inner shells 2 and outer shells 1 are connected to each other to form a circular ring structure, and the adjacent inner shells 2 and adjacent outer shells 1 are detachably connected; the detachable structure is easy to install, and the staff can increase or reduce the number of outer shells 1 and inner shells 2 according to the diameter of the pipeline, thereby increasing the flexibility and extensiveness of the device.
[0030] The inner shell 2 is made of a thermo-polyurethane elastic composite material, which has high strength, high wear resistance and corrosion resistance, and can withstand long-term use and adverse weather conditions. At the same time, the elasticity of the thermo-polyurethane elastic composite material can ensure that the clamping plate 8 will not be damaged during the movement of the inner shell 2, and the pipeline surface will be better fitted and wrapped to prevent pipeline damage and leakage; grouting holes 3 are opened at the top and bottom ends of the inner shell 2.
[0031] A hollow fixed block 4 is welded on the side wall of the outer shell 1 close to the inner shell 2, and a push block 5 is slidably connected inside the fixed block 4. A side wall of the push block 5 and the fixed block 4 form a cavity 6. A connecting pipe 7 is welded on the side wall of the cavity 6. The other end of the connecting pipe 7 is welded to and connected with the outer wall of the inner shell 2. The cavity 6 and the inner shell 2 are connected to each other through the connecting pipe 7, so that when grouting is injected into the inner shell 2, the grouting material can enter the cavity 6 through the connecting pipe 7, pushing the push block 5 to move toward the center of the pipeline.
[0032] The push block 5 extends to the outside of the fixed block 4, and the push block 5 passes through the side wall of the outer shell 1 close to the inner shell 2 and extends to the inside of the inner shell 2. The inner shell 2 is provided with an arc-shaped clamping plate 8, and the curvature of the clamping plate 8 is the same as that of the inner shell 2. The clamping plate 8 is welded to the push block 5; the inner wall of the clamping plate 8 is bonded with an elastic rubber pad, which has a buffering and shock-absorbing effect, absorbs and disperses pressure during the clamping process, and avoids rigid deformation of the pipeline.
[0033] A chuck 9 is provided at the bottom of the push block 5, and the outer edge of the top of the chuck 9 is welded to the bottom of the fixed block 4. The adjacent chucks 9 are detachably connected. A spiral groove is opened on the top of the chuck 9, and a protrusion that slides with the spiral groove is welded at the bottom of the push block 5. The chuck 9 can be rotated to drive the push block 5 and the clamping plate 8 to move toward the center of the pipeline to clamp the pipeline. Combined with grouting reinforcement, multiple reinforcements can further enhance the structural strength of the pipeline and improve its carrying capacity.
[0034] A rotating shaft 10 is provided under the chuck 9, and a bevel gear 11 is welded to the rotating shaft 10 near the chuck 9. One end of the rotating shaft 10 passes through the outer wall of the shell 1 and is rotatably connected to the outer wall of the shell 1. A square hole 12 is provided at the end of the rotating shaft 10 passing through the shell 1, and a tooth groove 13 meshing with the bevel gear 11 is welded to the bottom of the chuck 9. By inserting a wrench into the square hole 12 and rotating it, the staff can complete the clamping of the pipeline by rotating the wrench outside the device, thereby improving work efficiency; a fixed shaft 14 is rotatably connected to one side of the rotating shaft 10, and both ends of the fixed shaft 14 are respectively welded to the top and bottom of the shell 1, and an annular groove 15 is provided near the fixed shaft 14 of the rotating shaft 10, and the annular groove 15 is closely adjacent to the fixed shaft 14, thereby ensuring the stability of the rotating shaft 10 during rotation and improving transmission efficiency.
[0035] The specific implementation process is as follows: the inner wall of the inner shell 2 is attached to the surface of the pipeline, and several inner shells 2 are connected and fixed to the outer shells 1 respectively to clamp the pipeline therein; a wrench is inserted into the square hole 12 of the rotating shaft 10 on the outer shell 1, and the wrench is rotated, so that the rotating shaft 10 drives the bevel gear 11 to rotate. Since the bevel gear 11 and the tooth groove 13 at the bottom of the chuck 9 are meshed with each other, the bevel gear 11 drives the chuck 9 to rotate, and since the spiral groove at the top of the chuck 9 and the protrusion at the bottom of the push block 5 cooperate with each other, the rotation of the chuck 9 will cause the protrusion to move along the spiral groove path, that is, the rotation of the chuck 9 drives the push block 5 to move toward the center of the pipeline, and then the clamping plates 8 all move toward the center of the pipeline, so that the inner shell 2 tightly wraps the pipeline surface, thereby achieving clamping, repairing and reinforcing the pipeline surface.
[0036] Then, grouting nozzles are installed in the grouting holes 3 at the top and bottom ends of the inner shell 2, and the grouting material is injected into the inner shell 2. While the grouting material fills the inner shell 2, it enters the cavity 6 of the fixing block 4 through the connecting pipe 7. The pressure in the cavity 6 is enhanced, thereby pushing the push block 5 to move toward the center of the pipeline, and the clamping plate 8 further clamps and fixes the pipeline; the inner shell 2, the grouting material and the clamping plate 8 form a double reinforcement for the pipeline, which realizes the reinforcement and clamping of the pipeline while repairing the pipeline surface, thereby improving the overall performance of the pipeline.
[0037] Example 2 The difference from the above embodiment is that the embodiment is basically as shown in the attached Figure 4 As shown: The pipeline reinforcement method includes the following steps: Step 1: Expose the pipeline to be repaired: excavate the foundation pit of the pipeline to be repaired, dig to the bottom of the pipeline and completely expose the pipeline, and clean the soil on the surface of the pipeline; if the relative humidity of the on-site environment is greater than 85%, it is necessary to take drying measures for the pipeline surface to prevent the inner shell 2 from poor contact with the pipeline surface in a humid environment, causing slipping.
[0038] Step 2, assembling the reinforcement device: placing the inner shell 2 close to the damaged surface of the pipeline, and docking and fixing several inner shells 2 and several outer shells 1 respectively, clamping the pipeline therebetween, and completing the assembly of the reinforcement device.
[0039] Step 3, clamp the pipe: insert the wrench into the square hole 12 of the outer shell 1, slowly turn the wrench, observe the movement of the inner shell 2 toward the center of the pipe to prevent damage to the surface of the pipe, until the clamping plate 8 is completely tight to the pipe.
[0040] Step 4, grouting reinforcement: install grouting nozzles at the grouting holes 3 at the top and bottom of the inner shell 2 respectively, and use a high-pressure grouting machine to inject grouting material into the grouting nozzles at both ends at the same time. The working pressure of the high-pressure grouting machine is selected to be 50MPa. The grouting material is a polymer-based grouting material. The grouting material must be configured at the grouting site. The distance between the configuration area and the grouting working area is 40-50m to ensure the bonding effect of the grouting material; adopt a continuous injection method, observe the movement of the inner shell 2 while grouting, and observe the rising changes of the grouting machine pressure gauge at the same time. When the grouting pressure reaches 0.2Mpa, suspend grouting and observe the pressure changes of the pressure gauge. When the pressure reaches stability, seal the grouting hole 3 and end the grouting construction.
[0041] Step 5, maintenance work: After the grouting is completed, maintenance work is carried out. During the period, ensure that there is no groundwater seepage in the foundation pit of the working surface to prevent groundwater from affecting the grouting effect; after 12 hours, dry the surface of the outer shell 1 and the inner shell 2, and apply anti-corrosion glue. The film thickness of the anti-corrosion glue is 1-1.5mm. Dry and maintain for 24 hours. The anti-corrosion glue film can effectively prevent corrosion and aging of the pipeline and extend the service life of the pipeline.
[0042] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0043] The above is only an embodiment of the present invention. The common sense such as the known specific structure and characteristics in the scheme is not described in detail here. The ordinary technicians in the relevant field know all the common technical knowledge in the technical field of the invention before the application date or priority date, can obtain all the existing technologies in the field, and have the ability to apply the conventional experimental means before that date. The ordinary technicians in the relevant field can improve and implement this scheme in combination with their own abilities under the enlightenment given by this application. Some typical known structures or known methods should not become obstacles for ordinary technicians in the relevant field to implement this application. It should be pointed out that for those skilled in the art, without departing from the structure of the present invention, several deformations and improvements can be made, which should also be regarded as the protection scope of the present invention, which will not affect the effect of the implementation of the present invention and the practicality of the patent. The protection scope required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A pipeline reinforcement device, characterized in that: It comprises a plurality of hollow inner shells and outer shells, both of which are arc-shaped structures, and the plurality of inner shells and outer shells are connected to each other to form a circular ring structure, and adjacent inner shells and adjacent outer shells are detachably connected; A hollow fixed block is fixedly connected to the side wall of the outer shell close to the inner shell, and a push block is slidably connected inside the fixed block. One side wall of the push block and the fixed block form a cavity, and the side wall of the cavity is fixedly connected to a connecting pipe, and the other end of the connecting pipe is fixedly connected and communicated with the outer side wall of the inner shell. The cavity and the inner shell are communicated with each other through the connecting pipe. The push block extends to the outside of the fixed block, and the push block penetrates the side wall of the outer shell close to the inner shell and extends to the inside of the inner shell. An arc-shaped clamping plate is provided inside the inner shell, and the curvature of the clamping plate is the same as that of the inner shell. The clamping plate is fixedly connected to the push block, and grouting holes are opened at the top and bottom of the inner shell.
2. The pipeline reinforcement device according to claim 1, characterized in that: A chuck is provided at the bottom of the push block, the outer edge of the top of the chuck is fixedly connected to the bottom of the fixed block, the adjacent chucks are detachably connected, a spiral groove is opened on the top of the chuck, and a protrusion that slides with the spiral groove is fixedly connected to the bottom of the push block.
3. The pipeline reinforcement device according to claim 2, characterized in that: A rotating shaft is provided under the chuck, and a bevel gear is fixedly connected to the rotating shaft near the chuck. One end of the rotating shaft passes through the outer wall of the shell and is rotatably connected to the outer wall of the shell. A square hole is opened at the end of the rotating shaft passing through the shell, and a tooth groove meshing with the bevel gear is fixedly connected to the bottom of the chuck.
4. The pipeline reinforcement device according to claim 3, characterized in that: One side of the rotating shaft is rotatably connected with a fixed shaft, and both ends of the fixed shaft are respectively fixedly connected to the top and bottom of the shell. An annular groove is opened near the fixed shaft of the rotating shaft, and the annular groove is closely adjacent to the fixed shaft.
5. The pipeline reinforcement device according to claim 4, characterized in that: The inner shell materials are all made of thermoplastic polyurethane elastic composite materials.
6. The pipeline reinforcement device according to claim 5, characterized in that: The inner side walls of the clamping plates are fixedly connected with elastic rubber pads.
7. A method for reinforcing a pipeline, characterized in that: The following steps are involved: Step 1: Expose the pipeline to be repaired: dig the foundation pit of the pipeline to be repaired, dig to the bottom of the pipeline and completely expose the pipeline, and clean the soil on the surface of the pipeline; Step 2, assembling the reinforcement device: placing the inner shell tightly against the damaged surface of the pipeline, and docking and fixing several inner shells with the outer shells respectively, clamping the pipeline therebetween, and completing the assembly of the reinforcement device; Step 3: Clamp the pipe: insert the wrench into the square hole of the outer shell, turn the wrench, and squeeze the inner shell toward the center of the pipe until the clamping plate and the pipe are completely tight. Step 4: Grouting reinforcement: install grouting nozzles at the grouting holes at the top and bottom of the inner shell respectively, and use a high-pressure grouting machine to inject grouting materials into the grouting nozzles at both ends at the same time. Use a continuous injection method, observe the movement of the inner shell while grouting, and observe the rising changes of the pressure gauge of the grouting machine. When the grouting pressure reaches 0.2Mp, suspend grouting and observe the pressure changes of the pressure gauge. When the pressure reaches stability, seal the grouting holes and end the grouting construction; Step 5, maintenance work: After the grouting is completed, maintenance work is carried out to ensure that there is no groundwater seepage in the working face foundation pit. After 12 hours, the surface of the outer shell and the inner shell are dried, and anti-corrosion glue is applied, and dry maintenance is carried out for 24 hours.
8. The pipeline reinforcement method according to claim 7, characterized in that: In step 1, if the relative humidity of the on-site environment is greater than 85%, drying measures must be taken on the pipeline surface.
9. The pipeline reinforcement method according to claim 8, characterized in that: In step 4, the grouting material is a polymer-based grouting material. The grouting material must be configured at the grouting site, and the distance between the configuration area and the grouting work area is 40-50m.
10. The pipeline reinforcement method according to claim 9, characterized in that: In step 5, the film thickness of the anti-corrosion glue is 1-1.5 mm.