Gridding monitoring point distribution method and system for urban drainage system
By conducting topological structure analysis and grid division of the monitoring area of the urban drainage system, the best monitoring points and indicators are determined, which solves the problems of unclear monitoring points and high cost in the existing technology, and improves the efficiency of drainage pipe network monitoring. Coverage and accuracy.
Patent Information
- Application Number
- CN202410839615.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-06-26
AI Technical Summary
The existing urban drainage system monitoring point layout technical path is unclear, the point selection is unclear, and the number of points is uneconomical, resulting in high costs, incomplete coverage, and difficulty in effectively diagnosing pipe network problems.
By determining the scope of the urban drainage system monitoring area, the topological structure analysis of the pipeline detection data information is carried out, the first, second and third level grid cells are drawn, and the best monitoring points and indicators are determined according to the grid area and terrain characteristics, and the selection Reasonable monitoring equipment.
It has realized a scientific and clear monitoring path, reduced monitoring costs, improved the coverage and monitoring accuracy of drainage pipe network problems, and met the needs of indicator stability and content.
Smart Images

Figure CN118775776A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of urban drainage, and in particular to a method and system for gridded monitoring of urban drainage systems. Background Art
[0002] The underground drainage network is an important public infrastructure in the city and an important basic element to ensure the safe and stable operation of the city. In the past few decades of rapid urban development and construction, the underground pipeline network has not received enough attention for a long time, and the quality of pipeline construction has been uneven, resulting in widespread problems such as combined sewer overflow pollution, misconnection of rainwater and sewage in the separate system, and damage to the pipeline network. This has led to frequent urban waterlogging, black and smelly water, and low treatment efficiency of sewage treatment facilities, which is also contrary to the concept of safe, green, and low-carbon development.
[0003] The traditional drainage network management solution is to first carry out pipeline inspection based on pipeline detection data, and use CCTV, QV and other detection methods to fully deploy. However, due to the wide distribution and large volume of urban drainage systems, the cost of conducting all pipeline inspections is too high and difficult for construction units to bear. At the same time, due to factors such as high water levels in the pipeline network, many areas cannot be inspected, which easily leads to "generalization". The key areas of the inspection are not detected, making it difficult to find out the bottom line of the pipeline network problems. Therefore, using monitoring data to grasp the overall status of the region, identify abnormal situations, and reduce the scope of verification has become an effective means of comprehensively diagnosing pipeline network problems. However, urban drainage pipelines have been laid underground for a long time, the connection relationship is intricate, and pipeline network problems are generally random and uncertain. Therefore, how to lock the area more quickly and find out more comprehensive pipeline network problems with less cost is the focus and difficulty in the current drainage network monitoring. Summary of the invention
[0004] The technical problem to be solved by the present invention is to address the deficiencies of the above-mentioned prior art and to provide a method and system for grid monitoring point layout for urban drainage systems, aiming to solve the problems of unclear technical path for monitoring point layout in existing drainage systems, unclear monitoring point selection, uneconomical number of points, unreasonable indicator content, etc.
[0005] The technical solution of the present invention to solve the above technical problem is as follows: A method for grid monitoring point layout for urban drainage system, comprising the following steps:
[0006] S1: Determine the monitoring area of the urban drainage system, and perform a regional drainage network topology analysis based on pipeline detection data information within the monitoring area of the urban drainage system to obtain a regional drainage network topology map and system map;
[0007] S2: Draw the first-level grid unit according to the regional drainage network topology map and system map, combined with the terrain and population distribution characteristics of the urban drainage system monitoring area, and calculate the optimal number of monitoring points according to the economic grid area;
[0008] S3: Based on the number of the optimal monitoring points, combined with the topography and population distribution characteristics of the urban drainage system monitoring area, draw the second-level grid cells and the third-level grid cells on the first-level grid cells according to the grid area equalization principle;
[0009] S4: Identify the drainage network outlets of the secondary grid unit and the tertiary grid unit as the best monitoring points, select corresponding monitoring indicators according to the levels of the grid units, and determine monitoring equipment information for guiding equipment installation and debugging based on the monitoring indicators.
[0010] The beneficial effects of the present invention are as follows: the grid monitoring point layout method for urban drainage systems of the present invention performs regional drainage network topology structure analysis on pipeline detection data information within the monitoring area of the urban drainage system to obtain a regional drainage network topology map and a system map, and then calculates the optimal number of monitoring points according to the economic grid area, draws grid units divided into different levels, and finally determines the optimal monitoring points and monitoring indicators, which facilitates the selection of reasonable monitoring equipment, converts complex drainage network monitoring problems into scientific and clear technical paths, and can effectively guide the design of monitoring point layout plans for urban drainage systems in various places, associates various facility nodes in the drainage system with grid levels, and determines the main monitoring indicators according to the grid levels, taking into account both indicator stability requirements and monitoring content requirements.
[0011] On the basis of the above technical solution, the present invention can also be improved as follows:
[0012] Further: In S1, the specific method for performing regional drainage network topology analysis based on pipeline detection data information within the monitoring area of the urban drainage system is:
[0013] S11: Identifying the spatial distribution and connection relationship of each node in the drainage network according to the pipeline detection data information within the monitoring area of the urban drainage system;
[0014] S12: Generate a regional drainage network topology map and a system map based on the spatial distribution and connection relationship of each node in the drainage network.
[0015] The beneficial effect of the above further scheme is that the pipeline detection data information within the monitoring area of the urban drainage system can accurately identify the spatial distribution and connection relationship of each node in the drainage network in the area, and automatically generate a regional drainage network topology map and system map, which is convenient for accurately determining important facility nodes based on the regional drainage network topology map and system map, and then calculating the optimal number of monitoring points.
[0016] Further: In S2, the step of calculating the optimal number of monitoring points according to the economic grid area specifically includes the following steps:
[0017] S21: Identify important facility nodes according to the regional drainage network topology map and system map, and trace upstream along the regional drainage network topology map and system map with the important facility nodes as the end until there are no other important facility nodes upstream, and a first-level grid unit is formed;
[0018] S22: according to the average density of the drainage pipe network within the monitoring area of the urban drainage system, the annual investment cost consisting of the construction and operation and maintenance costs of the required monitoring equipment and the pipe network problem investigation and detection costs is calculated according to the sizes of different grid areas, and the grid area corresponding to the lowest annual investment cost is determined as the economic grid area;
[0019] S23: Calculating the optimal number of monitoring points according to the area of the first-level grid unit and the economic grid area;
[0020] Among them, the important facility nodes include at least one or more of drainage outlets, pumping stations, sluice stations, and sewage treatment plants.
[0021] The beneficial effect of the above further scheme is: important facility nodes can be identified through the regional drainage network topology map and system map, and then the first-level grid units can be constructed in a targeted manner. The annual investment cost can be calculated in combination with the average density of the drainage network, so as to find the grid area corresponding to the lowest annual investment cost as the economic grid area, which serves as the basis for further division of the first-level grid units.
[0022] Further: in S23, when the area of the primary grid unit is smaller than the area of the economic grid, the optimal number of monitoring points is 1.
[0023] The beneficial effect of the above further scheme is: when the area of the first-level grid unit is smaller than the area of the economic grid, the optimal number of monitoring points is 1, which can ensure that all important nodes corresponding to the first-level grid unit can be monitored, thereby improving the accuracy and comprehensive coverage of monitoring points.
[0024] Further: In S3, drawing the secondary grid unit and the tertiary grid unit on the primary grid unit according to the grid area equalization principle specifically includes the following steps:
[0025] S31: Calculate the control area of the secondary grid unit according to the area of the primary grid unit and the number of optimal monitoring points;
[0026] S32: combining the terrain and population distribution characteristics within the primary grid unit, dividing the primary grid unit according to the control area of the secondary grid unit within the primary grid unit to generate secondary grid units;
[0027] S33: Calculating the control area of the third-level grid unit according to the control area of the second-level grid unit and the preset division coefficient;
[0028] S34: Based on the terrain and population distribution characteristics within the secondary grid unit, the secondary grid unit is divided according to the control area of the third-level grid unit within the secondary grid unit to generate third-level grid units.
[0029] The beneficial effect of the above further scheme is: the control area of the second-level grid unit is calculated by the area of the first-level grid unit and the number of optimal monitoring points, and then the first-level grid unit is further divided according to the terrain and population distribution characteristics within the first-level grid unit to obtain the second-level grid unit, and then the second-level grid unit is divided again according to the control area of the third-level grid unit determined by the preset division coefficient to obtain the third-level grid unit.
[0030] Further: In S31, the specific steps of calculating the control area of the secondary grid unit according to the area of the primary grid unit and the number of optimal monitoring points are:
[0031] The area of the first-level grid unit is divided by the number of optimal monitoring points, and the result is rounded off to the nearest integer to obtain the control area of the second-level grid unit.
[0032] The beneficial effect of the above further scheme is: the control area of the secondary grid unit is calculated by dividing the area of the primary grid unit by the number of optimal monitoring points, which is a value close to the economic grid area. At the same time, according to the actual connection relationship of the urban drainage network and the differences in terrain, population, and industrial distribution characteristics, the actual drawn secondary grid unit area and control area will be different in value. The rounding principle is used to round off, so that the scale should be kept consistent as much as possible during drawing, while taking into account both the coverage of important nodes and the cost.
[0033] Further: In S4, the step of identifying the outlets of the drainage pipe network of the secondary grid unit and the tertiary grid unit as the best monitoring points, and selecting corresponding monitoring indicators according to the levels of the grid units specifically includes the following steps:
[0034] S41: Identify the intersection points between the range lines of each level of grid units and the downstream drainage network in each level of grid units, find the inspection wells of the drainage pipes near the intersection points, and use them as the outlet ends of the drainage network of the grid units at this level, and use the outlet ends as the best monitoring points.
[0035] S42: Identify the levels of the grid units and the corresponding monitoring point distribution, and determine the monitoring indicators of the monitoring points corresponding to the grid units at each level.
[0036] The beneficial effect of the above further scheme is: by identifying the inspection wells of the drainage pipes near the intersection of the range lines of the grid units at each level and the drainage network downstream within the grid units at each level, it is convenient to accurately determine the best monitoring points, and then combine the level of the grid units and the distribution of monitoring points to determine the monitoring indicators of the corresponding monitoring points.
[0037] The present invention also provides a grid monitoring point distribution system for urban drainage systems, comprising a topological structure analysis module, a first drawing calculation module, a second drawing calculation module and an identification and selection module;
[0038] The topology analysis module is used to determine the monitoring area of the urban drainage system, and perform a regional drainage network topology analysis based on the pipeline detection data information within the monitoring area of the urban drainage system to obtain a regional drainage network topology map and system map;
[0039] The first drawing and calculation module is used to draw the first-level grid unit according to the regional drainage network topology map and system map, combined with the terrain and population distribution characteristics of the urban drainage system monitoring area, and calculate the optimal number of monitoring points according to the economic grid area;
[0040] The second drawing calculation module is used to draw the second-level grid cells and the third-level grid cells on the first-level grid cells according to the grid area equalization principle based on the number of the optimal monitoring points and the terrain and population distribution characteristics of the urban drainage system monitoring area;
[0041] The identification and selection module is used to identify the outlet ends of the drainage network of the secondary grid unit and the tertiary grid unit as the optimal monitoring points, select corresponding monitoring indicators according to the levels of the grid units, and determine the monitoring equipment information for guiding equipment installation and debugging based on the monitoring indicators.
[0042] The present invention also provides a computer-readable storage medium storing a computer program, and when the computer program is executed by a processor, the method for grid monitoring point layout for an urban drainage system is implemented.
[0043] The present invention also provides a grid monitoring point distribution device for urban drainage system, comprising a communication interface, a memory, a communication bus and a processor, wherein the processor, the communication interface and the memory communicate with each other through the communication bus;
[0044] The memory is used to store computer programs;
[0045] The processor is used to implement the steps of the method for grid-based monitoring and point distribution of urban drainage systems when executing the program stored in the memory. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 A flow chart of a method for grid monitoring and point distribution for an urban drainage system provided by an embodiment of the present invention;
[0047] Figure 2 A topological analysis diagram of a drainage network provided in an embodiment of the present invention, wherein (2a) is a generalized diagram of the network, and (2b) is a system diagram of the network;
[0048] Figure 3 A grid unit distribution diagram provided by an embodiment of the present invention, wherein (3a) is a primary grid unit distribution diagram, and (3b) is a secondary grid unit distribution diagram;
[0049] Figure 4 A graph showing the relationship between the grid area and the annual cost provided in one embodiment of the present invention;
[0050] Figure 5 A monitoring point layout diagram provided by an embodiment of the present invention, wherein (5a) is a grid unit monitoring point layout diagram, and (5b) is a city grid unit monitoring point distribution diagram;
[0051] Figure 6 A schematic diagram of the construction and installation of a monitoring device provided in one embodiment of the present invention;
[0052] Figure 7 A schematic diagram of the structure of a grid monitoring point distribution system for an urban drainage system provided in one embodiment of the present invention. DETAILED DESCRIPTION
[0053] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0054] like Figure 1As shown, a method for grid monitoring of urban drainage systems includes the following steps:
[0055] S1: Determine the monitoring area of the urban drainage system, and perform a regional drainage network topology analysis based on pipeline detection data information within the monitoring area of the urban drainage system to obtain a regional drainage network topology map and system map;
[0056] S2: Draw the first-level grid unit according to the regional drainage network topology map and system map, combined with the terrain and population distribution characteristics of the urban drainage system monitoring area, and calculate the optimal number of monitoring points according to the economic grid area;
[0057] S3: Based on the number of the optimal monitoring points, combined with the topography and population distribution characteristics of the urban drainage system monitoring area, draw the second-level grid cells and the third-level grid cells on the first-level grid cells according to the grid area equalization principle;
[0058] S4: Identify the drainage network outlets of the secondary grid unit and the tertiary grid unit as the best monitoring points, select corresponding monitoring indicators according to the levels of the grid units, and determine monitoring equipment information for guiding equipment installation and debugging based on the monitoring indicators.
[0059] The grid monitoring point layout method for urban drainage systems of the present invention performs regional drainage network topology structure analysis on pipeline detection data information within the monitoring area of the urban drainage system to obtain a regional drainage network topology map and a system map, and then calculates the number of optimal monitoring points according to the economic grid area, draws grid units divided into different levels, and finally determines the optimal monitoring points and monitoring indicators, which facilitates the selection of reasonable monitoring equipment, converts complex drainage network monitoring problems into scientific and clear technical paths, can effectively guide the design of monitoring point layout plans for urban drainage systems in various places, associates various types of facility nodes in the drainage system with grid levels, determines major monitoring indicators according to grid levels, and takes into account both indicator stability requirements and monitoring content requirements.
[0060] In one or more embodiments of the present invention, in S1, the specific method for performing regional drainage network topology analysis based on pipeline detection data information within the monitoring area of the urban drainage system is:
[0061] S11: Identifying the spatial distribution and connection relationship of each node in the drainage network according to the pipeline detection data information within the monitoring area of the urban drainage system;
[0062] S12: Generate a regional drainage network topology map and a system map based on the spatial distribution and connection relationship of each node in the drainage network.
[0063] Here, after determining the scope of the urban drainage system monitoring area, we can obtain pipeline detection data information for the area from public data or coordinate with relevant departments. Based on the pipeline detection data and combined with previous planning and design data in the area, we can conduct drainage network topology analysis, identify the spatial distribution and connection relationship of each node in the drainage network, and form a regional drainage network topology map and system map.
[0064] The pipeline detection data information within the monitoring area of the urban drainage system can be used to accurately identify the spatial distribution and connection relationship of each node in the drainage network in the area, and automatically generate a regional drainage network topology map and system map, so as to accurately determine the important facility nodes according to the regional drainage network topology map and system map, and then calculate the optimal number of monitoring points.
[0065] It should be noted that urban drainage pipes are laid underground all year round. Pipeline detection data is important information that objectively and truly reflects the basic properties and spatial location of underground pipes. It is also the basic information for carrying out various tasks such as drainage pipe inspection, diagnosis, repair and management. Generally, the competent industry departments in various regions will regularly organize survey units to carry out underground pipeline detection work in their jurisdiction.
[0066] In one or more of the examples, the topological structure of the drainage network is analyzed based on the pipeline detection data, and a drainage network generalization diagram and a system diagram are formed, such as Figure 2 As shown, it clearly reflects the location of important nodes, interconnection relationships and path directions of the drainage network in a certain urban area, among which Figure (2a) is a generalized diagram of the network, and Figure (2b) is a system diagram of the network.
[0067] In one or more embodiments of the present invention, in S2, calculating the optimal number of monitoring points according to the economic grid area specifically includes the following steps:
[0068] S21: Identify important facility nodes according to the regional drainage network topology map and system map, and trace upstream along the regional drainage network topology map and system map with the important facility nodes as the end until there are no other important facility nodes upstream, and a first-level grid unit is formed;
[0069] The important facility nodes include at least one or more of a drainage outlet, a pump station, a sluice station, and a sewage treatment plant;
[0070] It should be noted that urban drainage pipes are mainly divided into rainwater pipes and sewage pipes, which are used to collect and transmit surface runoff generated by rainfall and sewage discharged by urban residents' lives and production. Urban drainage pipes are generally arranged in a tree-like shape, from branches to trunks. As the area of the inflow area and the amount of water collected increase, the size of the drainage pipes also increases accordingly. Drainage outlets, pumping stations, sluice stations, and sewage treatment plants are generally located downstream of the drainage system, and rainwater and sewage in the upstream area will eventually flow into these facilities. Therefore, the systematic and regional nature of the pipe network is an important feature of the urban drainage system.
[0071] In one or more of the examples, the urban area is divided into 30 first-level grid units based on the distribution of important nodes and pipeline connections, such as Figure 3 As shown in Figure 3(a), rainwater or sewage generated in the same grid unit will eventually be discharged to the same node.
[0072] S22: according to the average density of the drainage pipe network within the monitoring area of the urban drainage system, the annual investment cost consisting of the construction and operation and maintenance costs of the required monitoring equipment and the pipe network problem investigation and detection costs is calculated according to the sizes of different grid areas, and the grid area corresponding to the lowest annual investment cost is determined as the economic grid area;
[0073] In practice, it is necessary to calculate the annual investment cost of the required monitoring equipment construction and operation costs as well as the pipeline problem investigation and detection costs according to the different grid area sizes. On this basis, draw the relationship curve between the grid area and the annual cost, and select the grid area corresponding to the lowest annual cost point, which is the economic grid area.
[0074] It should be noted that the location and diagnosis of urban drainage network problems is achieved through network inspection and testing, but the unit cost of the inspection work is too high, and it is often difficult to cover the entire urban area. Grid monitoring can effectively reduce the inspection area. The smaller the monitoring grid area, the lower the inspection area and the inspection cost, but small grids will lead to an increase in monitoring equipment, which will also increase the construction and operation and maintenance costs of monitoring equipment. Therefore, in theory, there is an optimal grid area that minimizes the sum of the inspection and testing costs and the equipment construction and operation and maintenance costs.
[0075] In one example, the average pipe density was calculated to be 5.2 km / km based on the monitoring area and the length of the drainage pipe network. 2 , change the grid area from 0.1-10.0km 2 By arranging them and combining the unit price of pipeline inspection work in the area and the unit price of monitoring equipment construction and operation and maintenance, it is calculated that the annual investment cost under different grid areas is between 7.18 million and 82.66 million. The relationship curve between grid area and annual cost is drawn as follows: Figure 4 As shown in Figure 2, the grid area corresponding to the lowest annual cost point is 2.5 km2 , which is the economic grid area of the region.
[0076] S23: Calculate the optimal number of monitoring points according to the area of the first-level grid unit and the economic grid area.
[0077] In one instance, the area was 4.8 km 2 The first-level grid cell is divided by 2.5km 2 The economic grid area is 2.2, that is, the optimal number of monitoring points for the first-level grid unit is 2.
[0078] Important facility nodes can be identified through the regional drainage network topology map and system map, and then the first-level grid units can be constructed in a targeted manner. The annual investment cost can be calculated in combination with the average density of the drainage network, so as to find the grid area corresponding to the lowest annual investment cost as the economic grid area, which serves as the basis for further division of the first-level grid units.
[0079] Optionally, in one or more embodiments of the present invention, in S23, when the area of the primary grid unit is smaller than the area of the economic grid, the optimal number of monitoring points is 1. When the area of the primary grid unit is smaller than the area of the economic grid, the optimal number of monitoring points is 1, which can ensure that all important nodes corresponding to the primary grid unit can be monitored, thereby improving the accuracy and comprehensive coverage of monitoring points.
[0080] In one or more embodiments of the present invention, in S3, drawing the secondary grid unit and the tertiary grid unit on the primary grid unit according to the grid area equalization principle specifically includes the following steps:
[0081] S31: Calculate the control area of the secondary grid unit according to the area of the primary grid unit and the number of optimal monitoring points;
[0082] In one instance, the area was 4.8 km 2 The first-level grid unit is divided by the optimal number of monitoring points, which is 2, and the control area of the second-level grid unit is 2.4km 2 , which is similar to the economic grid area. Combining pipeline connections and regional characteristics, the secondary grid unit is drawn at 4.8km 2 The area of the first-level grid unit is 2.5km 2 and 2.3km 2 The two second-level grid units of the city are further divided into 55 second-level grid units according to this method. Figure 3 As shown in Figure 3(b).
[0083] S32: combining the terrain and population distribution characteristics within the primary grid unit, dividing the primary grid unit according to the control area of the secondary grid unit within the primary grid unit to generate secondary grid units;
[0084] S33: Calculating the control area of the third-level grid unit according to the control area of the second-level grid unit and the preset division coefficient;
[0085] S34: Based on the terrain and population distribution characteristics within the secondary grid unit, the secondary grid unit is divided according to the control area of the third-level grid unit within the secondary grid unit to generate third-level grid units.
[0086] In one or more embodiments of the present invention, the preset division coefficient is 0.5, and the secondary grid unit is divided into third-level grid units according to the control area within the secondary grid unit, combined with the drainage network connection conditions, urban terrain trends, population distribution, and industrial distribution characteristics.
[0087] It should be noted that the third-level grid unit is a further encryption of the second-level grid unit. In step S31, the second-level grid unit has been equalized and controlled according to the economic grid area. Therefore, there is no need to further calculate the economic grid area of the third-level grid unit. Instead, it is considered to directly multiply the second-level unit area by the preset division coefficient to obtain the third-level grid unit control area in step S32.
[0088] In one instance, the area was 2.5 km 2 The second-level grid unit is divided by 2, and the control area of the third-level grid unit is 1.25km 2 Combining pipeline connections and regional characteristics, three-level grid cells are drawn, with a 2.5km 2 The area of the secondary grid unit is 1.37km 2 and 1.13km 2 The two third-level grid units were further divided into 110 third-level grid units based on this method.
[0089] The control area of the second-level grid unit is calculated by the area of the first-level grid unit and the number of optimal monitoring points, and then the first-level grid unit is further divided in combination with the terrain and population distribution characteristics within the first-level grid unit to obtain the second-level grid unit, and then the second-level grid unit is divided again in combination with the control area of the third-level grid unit determined by the preset division coefficient to obtain the third-level grid unit.
[0090] Optionally, in one or more embodiments of the present invention, in S31, the specific steps of calculating the control area of the secondary grid unit according to the area of the primary grid unit and the optimal number of monitoring points are:
[0091] The area of the first-level grid unit is divided by the number of optimal monitoring points, and the result is rounded off to the nearest integer to obtain the control area of the second-level grid unit.
[0092] The control area of the secondary grid unit is calculated by dividing the area of the primary grid unit by the number of optimal monitoring points. This is a value close to the economic grid area. At the same time, depending on the actual connection relationship of the urban drainage network and the differences in terrain, population, and industrial distribution characteristics, the actual drawn secondary grid unit area and control area will be different in value. The rounding principle can be used to keep the scale consistent as much as possible during drawing, while taking into account both the coverage of important nodes and the cost.
[0093] In one or more embodiments of the present invention, in S4, identifying the outlet ends of the drainage pipe network of the secondary grid unit and the tertiary grid unit as the best monitoring points, and selecting corresponding monitoring indicators according to the levels of the grid units specifically include the following steps:
[0094] S41: Identify the intersection points between the range lines of each level of grid units and the downstream drainage network in each level of grid units, find the inspection wells of the drainage pipes near the intersection points, and use them as the outlet ends of the drainage network of the grid units at this level, and use the outlet ends as the best monitoring points.
[0095] It should be noted that when there are two intersection points between the grid unit boundary line and the drainage network, the one located upstream is the inlet end of the drainage network of the grid unit, and the one located downstream is the outlet end. The inlet end of the grid unit is also the outlet end of its adjacent upstream grid unit.
[0096] In one example, the grid cell range line of a certain level intersects with a rainwater box culvert with a size of BH2.0*2.0m. The intersection is near the end outlet of the box culvert. Therefore, a monitoring point FY-119 is set at the outlet. Figure 5 5(a) in Figure 5. Further, all grid cells in a certain urban area are arranged with monitoring points according to this method, as shown in Figure 5(a). Figure 5 As shown in Figure 5(b).
[0097] S42: Identify the levels of the grid units and the corresponding monitoring point distribution, and determine the monitoring indicators of the monitoring points corresponding to the grid units at each level.
[0098] Specifically, the grid unit level and the distribution of monitoring points are identified, and the monitoring indicators of the corresponding points of the first-level grid unit are determined to be water quality, flow rate and liquid level, the monitoring indicators of the second-level grid unit are flow rate and liquid level, and the monitoring indicator of the third-level grid unit is liquid level.
[0099] It should be noted that there are many types of water quality monitoring indicators. Therefore, when determining the specific indicators, they should be determined in combination with the requirements of the local environmental protection department and water administration department.
[0100] In one example, a monitoring point numbered FY-119 monitors water quality indicators such as chemical oxygen demand, ammonia nitrogen, suspended solids, as well as instantaneous flow and instantaneous liquid level indicators.
[0101] Next, based on the determined monitoring indicators, combined with the location of the monitoring points and the installation environment, select stable and reliable monitoring equipment, and carry out the installation, commissioning and operation of the monitoring equipment.
[0102] It should be noted that before installing the equipment, it is necessary to review the on-site installation conditions and formulate a corresponding construction and installation plan. If the installation conditions cannot meet the requirements, suitable points can be found within a certain range for adjustment.
[0103] In one or more of the examples, the monitoring content of a monitoring point numbered FY-119 is water quality, flow, and liquid level, the node type is a drain outlet, and the installation location is a waterfront river bank. Based on the above factors, an integrated device consisting of measuring instruments such as a photoelectric water quality meter, a Doppler flow meter, and a pressure level meter is selected for construction and installation. Figure 6 As shown in the figure, debugging work was carried out after the installation to ensure normal transmission of monitoring data.
[0104] By identifying the inspection wells of the drainage pipes near the intersection of the range lines of the grid units at each level and the drainage network downstream of the grid units at each level, it is convenient to accurately determine the best monitoring points, and then combine the level of the grid units and the distribution of monitoring points to determine the monitoring indicators of the corresponding monitoring points.
[0105] like Figure 7 As shown, the present invention also provides a grid monitoring point distribution system for urban drainage systems, including a topological structure analysis module, a first drawing calculation module, a second drawing calculation module and an identification selection module;
[0106] The topology analysis module is used to determine the monitoring area of the urban drainage system, and perform a regional drainage network topology analysis based on the pipeline detection data information within the monitoring area of the urban drainage system to obtain a regional drainage network topology map and system map;
[0107] The first drawing and calculation module is used to draw the first-level grid unit according to the regional drainage network topology map and system map, combined with the terrain and population distribution characteristics of the urban drainage system monitoring area, and calculate the optimal number of monitoring points according to the economic grid area;
[0108] The second drawing calculation module is used to draw the second-level grid cells and the third-level grid cells on the first-level grid cells according to the grid area equalization principle based on the number of the optimal monitoring points and the terrain and population distribution characteristics of the urban drainage system monitoring area;
[0109] The identification and selection module is used to identify the outlet ends of the drainage network of the secondary grid unit and the tertiary grid unit as the optimal monitoring points, select corresponding monitoring indicators according to the levels of the grid units, and determine the monitoring equipment information for guiding equipment installation and debugging based on the monitoring indicators.
[0110] The present invention also provides a computer-readable storage medium storing a computer program, and when the computer program is executed by a processor, the method for grid monitoring point layout for an urban drainage system is implemented.
[0111] The present invention also provides a grid monitoring point distribution device for urban drainage system, comprising a communication interface, a memory, a communication bus and a processor, wherein the processor, the communication interface and the memory communicate with each other through the communication bus;
[0112] The memory is used to store computer programs;
[0113] The processor is used to implement the steps of the method for grid-based monitoring and point distribution of urban drainage systems when executing the program stored in the memory.
[0114] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for grid monitoring of urban drainage systems, characterized in that: The steps include: S1: Determine the monitoring area of the urban drainage system, and perform a regional drainage network topology analysis based on pipeline detection data information within the monitoring area of the urban drainage system to obtain a regional drainage network topology map and system map; S2: Draw the first-level grid unit according to the regional drainage network topology map and system map, combined with the terrain and population distribution characteristics of the urban drainage system monitoring area, and calculate the optimal number of monitoring points according to the economic grid area; S3: Based on the number of the optimal monitoring points, combined with the topography and population distribution characteristics of the urban drainage system monitoring area, draw the second-level grid cells and the third-level grid cells on the first-level grid cells according to the grid area equalization principle; S4: Identify the drainage network outlets of the secondary grid unit and the tertiary grid unit as the best monitoring points, select corresponding monitoring indicators according to the levels of the grid units, and determine monitoring equipment information for guiding equipment installation and debugging based on the monitoring indicators.
2. The method for grid monitoring of urban drainage system according to claim 1, characterized in that: In S1, the specific method for performing regional drainage network topology analysis based on pipeline detection data information within the monitoring area of the urban drainage system is: S11: Identifying the spatial distribution and connection relationship of each node in the drainage network according to the pipeline detection data information within the monitoring area of the urban drainage system; S12: Generate a regional drainage network topology map and a system map based on the spatial distribution and connection relationship of each node in the drainage network.
3. The method for grid monitoring of urban drainage system according to claim 1, characterized in that: In S2, calculating the optimal number of monitoring points according to the economic grid area specifically includes the following steps: S21: Identify important facility nodes according to the regional drainage network topology map and system map, and trace upstream along the regional drainage network topology map and system map with the important facility nodes as the end until there are no other important facility nodes upstream, and a first-level grid unit is formed; S22: according to the average density of the drainage pipe network within the monitoring area of the urban drainage system, the annual investment cost consisting of the construction and operation and maintenance costs of the required monitoring equipment and the pipe network problem investigation and detection costs is calculated according to the sizes of different grid areas, and the grid area corresponding to the lowest annual investment cost is determined as the economic grid area; S23: Calculating the optimal number of monitoring points according to the area of the first-level grid unit and the economic grid area; Among them, the important facility nodes include at least one or more of drainage outlets, pumping stations, sluice stations, and sewage treatment plants.
4. The method for grid monitoring of urban drainage system according to claim 3 is characterized in that: In S23, when the area of the primary grid unit is smaller than the area of the economic grid, the optimal number of monitoring points is 1.
5. The method for grid monitoring of urban drainage system according to claim 3 is characterized in that: In S3, drawing the secondary grid unit and the tertiary grid unit on the primary grid unit according to the grid area equalization principle specifically includes the following steps: S31: Calculate the control area of the secondary grid unit according to the area of the primary grid unit and the number of optimal monitoring points; S32: combining the terrain and population distribution characteristics within the primary grid unit, dividing the primary grid unit according to the control area of the secondary grid unit within the primary grid unit to generate secondary grid units; S33: Calculating the control area of the third-level grid unit according to the control area of the second-level grid unit and the preset division coefficient; S34: Based on the terrain and population distribution characteristics within the secondary grid unit, the secondary grid unit is divided according to the control area of the third-level grid unit within the secondary grid unit to generate third-level grid units.
6. The method for grid monitoring points for urban drainage system according to claim 5 is characterized in that: In S31, the specific steps of calculating the control area of the secondary grid unit according to the area of the primary grid unit and the number of optimal monitoring points are: The area of the first-level grid unit is divided by the number of optimal monitoring points, and the result is rounded off to the nearest integer to obtain the control area of the second-level grid unit.
7. The method for grid monitoring points for urban drainage system according to any one of claims 1 to 6, characterized in that: In S4, the step of identifying the outlets of the drainage pipe network of the secondary grid unit and the tertiary grid unit as the best monitoring points, and selecting corresponding monitoring indicators according to the levels of the grid units specifically includes the following steps: S41: Identify the intersection points between the range lines of each level of grid units and the downstream drainage network in each level of grid units, find the inspection wells of the drainage pipes near the intersection points, and use them as the outlet ends of the drainage network of the grid units at this level, and use the outlet ends as the best monitoring points. S42: Identify the levels of the grid units and the corresponding monitoring point distribution, and determine the monitoring indicators of the monitoring points corresponding to the grid units at each level.
8. A grid monitoring point distribution system for urban drainage system, characterized by: It includes a topological structure analysis module, a first drawing calculation module, a second drawing calculation module and an identification selection module; The topology structure analysis module is used to determine the scope of the urban drainage system monitoring area, and perform regional drainage network topology structure analysis based on pipeline detection data information within the urban drainage system monitoring area to obtain a regional drainage network topology map and system map; The first drawing and calculation module is used to draw the first-level grid unit according to the regional drainage network topology map and system map, combined with the terrain and population distribution characteristics of the urban drainage system monitoring area, and calculate the optimal number of monitoring points according to the economic grid area; The second drawing calculation module is used to draw the second-level grid cells and the third-level grid cells on the first-level grid cells according to the grid area equalization principle based on the number of the optimal monitoring points and the terrain and population distribution characteristics of the urban drainage system monitoring area; The identification and selection module is used to identify the outlet ends of the drainage network of the secondary grid unit and the tertiary grid unit as the optimal monitoring points, select corresponding monitoring indicators according to the levels of the grid units, and determine the monitoring equipment information for guiding equipment installation and debugging based on the monitoring indicators.
9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method for grid-based monitoring point layout for an urban drainage system as described in any one of claims 1 to 7 is implemented.
10. A grid monitoring point distribution device for urban drainage system, characterized by: It includes a communication interface, a memory, a communication bus and a processor, wherein the processor, the communication interface and the memory communicate with each other through the communication bus; The memory is used to store computer programs; The processor is used to execute the program stored in the memory to implement the steps of the method for grid monitoring point layout of urban drainage system described in any one of claims 1-7.
Citation Information
Patent Citations
Emergency treatment method based on city gas pipe network topological analysis
CN104317844A
Intelligent monitoring system for operation safety of municipal water supply and drainage pipe network based on big data
CN112361218A
Urban drainage pipe network intelligent diagnosis method based on drainage model
CN113701060A
Drainage pipe network monitoring point distribution method suitable for defective pipeline troubleshooting
CN113803646A
Pipe network monitoring and tracing method, system and equipment based on directed graph traversal and medium
CN113944887A