Adjacent-camping construction monitoring and early warning method and system based on cross-correlation imaging positioning algorithm
Through the method based on the cross-correlation imaging positioning algorithm, it solves the problem of non-real-time and inaccurate monitoring of the safety status of railway power supply facilities in the existing technology, achieves precise positioning and automated monitoring of large machinery, and provides quantitative analysis and timely warning capabilities. Ensure the safety of power supply facilities and improve the flexibility of monitoring systems.
Patent Information
- Application Number
- CN202411159702.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-10-15
AI Technical Summary
Existing technology is difficult to achieve 24-hour real-time monitoring when monitoring the safety conditions around railway power supply facilities. Manual monitoring is prone to fatigue and difficult to accurately locate the location of mechanical equipment and its impact on power supply facilities, and is affected by the environment and weather. The influence of factors is large and it is impossible to respond in time.
Using a method based on cross-correlation imaging positioning algorithm, by acquiring and preprocessing ground vibration signals, calculating the theoretical and actual travel time difference, using Manhattan, Euclidean or arctangent distance to calculate similarity, accurately positioning the position of large machinery, and The client performs visual display and alarm to realize automated monitoring and early warning.
It achieves precise positioning and automated monitoring of large machinery, reduces the need for manual participation, reduces the probability of human error, provides quantitative analysis capabilities, can analyze data in real time and notify relevant personnel in a timely manner, ensuring the safety of power supply facilities, and the observation system It has high flexibility and can be transferred at any time according to changes in the construction site.
Smart Images

Figure CN118778113A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of neighboring camp construction monitoring, and in particular to a neighboring camp construction monitoring and early warning method and system based on a cross-correlation imaging positioning algorithm. Background Art
[0002] With the rapid development of modern railway transportation, the safety of railway power supply facilities has become a vital issue. Especially in the process of urbanization, many construction sites are close to railway power supply facilities, and the driving routes of large construction machinery are short from the power supply facilities, which brings safety hazards to the power supply facilities. Therefore, the demand for neighboring construction monitoring has arisen, which can monitor the safety conditions around power supply facilities in real time to prevent large machinery from affecting railway power supply facilities.
[0003] There are currently the following ways to monitor the safety conditions around power supply facilities in real time:
[0004] 1. Use 24-hour all-weather monitoring probes to monitor the neighboring construction site. This solution requires professionals to monitor the video stream around the clock. If large machinery is found approaching facilities that need protection, professionals will report it in a timely manner and take relevant measures.
[0005] This solution requires a dedicated person to monitor the video stream for a long time, which makes it difficult to achieve 24-hour uninterrupted monitoring. In addition, manual monitoring is easily affected by factors such as fatigue and distraction, resulting in low monitoring efficiency. Video monitoring can only provide visual observation, and it is difficult to accurately quantify physical parameters such as mechanical vibration intensity and frequency, and it is not easy to accurately locate the specific location of mechanical equipment and its impact on power supply facilities. It is greatly affected by environmental factors, and the video quality decreases at night or in low light, affecting the monitoring effect. The real-time response capability is limited, and manual monitoring may miss key events and fail to respond immediately.
[0006] 2. Use drones for regular aerial inspections. Professionals operate drones to fly over neighboring construction sites for regular inspections and make judgments by viewing the video information collected by the drones.
[0007] This solution is greatly affected by the weather. Bad weather such as strong winds, heavy rain, and thunderstorms may affect the stability and safety of the drone, thereby affecting the quality and reliability of the monitoring data. It is greatly affected by signal interference. The drone communication link may be interfered by external signals, resulting in data loss or communication interruption. It is difficult to achieve 24-hour monitoring around the clock. Drones are currently unable to achieve fully automated operation and require professional personnel to operate, so it is difficult to achieve 24-hour monitoring.
[0008] 3. Use vibration sensors installed at key locations of the protected equipment to capture vibration signals and determine whether there are abnormal vibrations near the protected equipment, thereby achieving real-time monitoring.
[0009] This method uses vibration sensors and other solutions installed in key locations of the protected equipment. It has low flexibility and the sensors need to be installed at key locations of the protected equipment at all times. They are not easy to disassemble and reinstall and cannot be moved to follow changes in the location of neighboring construction sites. Summary of the invention
[0010] Based on the technical problems existing in the background technology, the present invention proposes a neighboring camp construction monitoring and early warning method and system based on a cross-correlation imaging positioning algorithm to achieve quantitative positioning monitoring and quantified vibration signals.
[0011] The neighboring camp construction monitoring and early warning method based on the cross-correlation imaging positioning algorithm proposed in the present invention comprises the following steps:
[0012] S1. Obtain and pre-process the ground vibration signal of the neighboring construction site uploaded by the equipment end;
[0013] S2. Divide the construction site into grids and use the center of each grid as the seismic source. Calculate the theoretical travel time between each seismic source and each seismograph on the equipment end. Use two random seismographs to form a seismograph pair and calculate the theoretical travel time difference between each seismic source and each seismograph pair.
[0014] S3, time-slicing the pre-processed vibration signal, and calculating the actual travel time difference of each seismograph for receiving the vibration signal in each time slice;
[0015] S4, calculating the similarity between the theoretical travel time difference and the actual travel time difference, taking the assumed source position corresponding to the similarity peak as the positioning result of the cross-correlation imaging positioning algorithm, and performing trajectory filtering on the positioning result to obtain the operation trajectory diagram of the large machinery;
[0016] S5. Send the running track diagram to the client for visual display, and report the real-time position of the large machinery on the client. When the real-time position is within the warning position range, an alarm is triggered.
[0017] Furthermore, an observation system is set up on the equipment side based on a 4G node-type three-component seismograph, and ground vibration signals of neighboring construction sites are collected through the 4G node-type three-component seismograph.
[0018] Furthermore, in step S1, the ground vibration signal is preprocessed as follows:
[0019] The min-max normalization method is used to normalize the ground vibration signal;
[0020] The normalized vibration signal is band-pass filtered to extract the vibration signal of the set frequency band generated by the large machinery as the pre-processed vibration signal.
[0021] Furthermore, in step S4, the similarity between the theoretical travel time difference and the actual travel time difference is calculated, and the similarity is calculated using Manhattan distance, Euclidean distance, and inverse tangent distance. The specific calculation process of the similarity is as follows:
[0022] When considering the distance of each dimension, Manhattan distance is used to calculate the similarity:
[0023]
[0024] Among them, Cityblock Distance is the Manhattan distance, x i and i are the theoretical travel time difference and the actual travel time difference in the i-th dimension, W i is the weight vector on the i-th dimension.
[0025] When the ground height difference is less than 1m, the Euclidean distance is used to calculate the similarity:
[0026]
[0027] Among them, Euclidean Distance is the Euclidean distance, x i and i are the values of theoretical travel time difference and actual travel time difference in the i-th dimension respectively;
[0028] When the vibration amplitudes of the ground collected when there is no large machinery passing by and when there is a large machinery passing by are very different, the inverse tangent distance is used to calculate the similarity:
[0029]
[0030] Among them, Arctan Distance is the inverse tangent distance, x i and i are the values of the theoretical travel time difference and the actual travel time difference in the i-th dimension respectively.
[0031] The neighboring camp construction monitoring and early warning system based on the cross-correlation imaging positioning algorithm includes a signal acquisition module, a theoretical travel time difference calculation module, an actual travel time difference calculation module, a positioning module, and a display and alarm module;
[0032] The signal acquisition module is used to acquire and pre-process the ground vibration signal of the neighboring construction site uploaded by the equipment end;
[0033] The theoretical travel time difference calculation module is used to divide the construction site into grids and use the center of each grid as the seismic source to calculate the theoretical travel time between each seismic source and each seismograph on the equipment end. Two random seismographs form a seismograph pair and the theoretical travel time difference between each seismic source and each seismograph pair is calculated.
[0034] The positioning module is used to time slice the pre-processed vibration signal and calculate the actual travel time difference of each seismograph to the received vibration signal in each time slice;
[0035] The actual travel time difference calculation module is used to calculate the similarity between the theoretical travel time difference and the actual travel time difference, and the assumed source position corresponding to the similarity peak is used as the positioning result of the cross-correlation imaging positioning algorithm. The positioning result is subjected to trajectory filtering to obtain the operation trajectory diagram of the large machinery;
[0036] The display and alarm module sends the running trajectory diagram to the client for visual display, and reports the real-time position of the large machinery on the client, and alarms when the real-time position is within the warning position range.
[0037] A computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned neighboring camp construction monitoring and early warning method when executing the computer program;
[0038] A computer-readable storage medium having a plurality of programs stored thereon, wherein the plurality of programs are used to be called by a processor and execute the neighboring camp construction monitoring and early warning method as described above.
[0039] The advantages of the neighboring construction monitoring and early warning method and system based on the cross-correlation imaging positioning algorithm provided by the present invention are: by collecting the ground vibration signals of large machinery and adopting the cross-correlation imaging positioning algorithm, the position of the mechanical equipment can be accurately located, solving the problem of difficult quantitative positioning; realizing automated monitoring, reducing the need for manual participation, and reducing the probability of human error; achieving real-time data analysis and early warning, once the mechanical equipment is found to enter the early warning range, the relevant personnel can be notified immediately; providing quantitative analysis capabilities, being able to monitor and quantify vibration signals, and providing a scientific basis for decision-making; high flexibility, and being able to transfer the observation system at any time according to changes in the neighboring construction site. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a structural schematic diagram of the present invention;
[0041] Figure 2 This is a flow chart of the neighboring camp construction monitoring and early warning method;
[0042] Figure 3 It is a flowchart of the cross-correlation imaging positioning algorithm;
[0043] Figure 4 It is a schematic diagram of the 6-station observation system;
[0044] Figure 5A schematic diagram of the cross-correlation imaging results obtained by the cross-correlation imaging positioning algorithm on the 6-station observation system;
[0045] Figure 6 Schematic diagram of the four-station observation system. DETAILED DESCRIPTION
[0046] Below, the technical solution of the present invention is described in detail through specific embodiments. Many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific implementation disclosed below.
[0047] like Figures 1 to 6 As shown, the neighboring camp construction monitoring and early warning method based on the cross-correlation imaging positioning algorithm proposed in the present invention includes the following steps:
[0048] S1. The server obtains and pre-processes the ground vibration signal of the neighboring construction site uploaded by the device;
[0049] This embodiment designs an observation system on the equipment side according to the actual situation of the neighboring construction site and the accuracy required for monitoring, that is, the number and placement of 4G node-type three-component seismometers at the neighboring construction site.
[0050] The design of the observation system is as follows: according to the soil conditions, terrain undulations and distance from large construction machinery at the neighboring construction site, the number and placement coordinates of 4G node-type three-component seismometers that need to be placed at the neighboring construction site are determined; and computer simulation experiments are carried out using artificially synthesized data to test the cross-correlation imaging effects of various observation systems, and the experimental results are compared. According to the severity of the artifacts, the optimal observation system is determined.
[0051] Observation system design examples:
[0052] (1) Six-station observation system set up in this embodiment
[0053] The 4G node-type three-component seismometers are placed as a 6-station observation system in a rectangular shape with a 5-meter interval between each station. Figure 4 The red dots shown are 4G node-type three-component seismometers.
[0054] This experiment uses measured data, totaling 375 seconds. The data is divided into 3s time slices. An example of the cross-correlation imaging results of the 6-station observation system and the corresponding photos of the experimental site are shown in Table 7-1. Based on the 6-station observation system set in step S1, this embodiment obtains the cross-correlation imaging results through the cross-correlation imaging positioning algorithm in steps S2 and S3. Figure 5In the cross-correlation imaging diagram shown, the red triangle mark indicates the position of the 4G node-type three-component seismograph; the green cross mark indicates the large mechanical positioning position within the time slice; the horizontal and vertical coordinates are in meters; north is upward.
[0055] (2) As a comparative example: Setting up a 4-station observation system
[0056] The 4G node-type three-component seismometers are placed as a 4-station observation system to form a square with a distance of 5 meters between each station. Figure 6 In the computer simulation experiment, the effect of this observation system was not ideal, so this solution was not selected later.
[0057] Then, after determining the observation system, a 4G node-type three-component seismograph is used to collect ground vibration signals from the neighboring construction site, and the vibration signals are transmitted back to the server through the 4G digital transmission function.
[0058] In addition, the preprocessing of the ground vibration signal is as follows: the ground vibration signal is normalized by using the min-max standardization method; the normalized vibration signal is band-pass filtered to extract the vibration signal of the set frequency band generated by the large machinery as the preprocessed vibration signal
[0059] S2. Divide the construction site into grids and use the center of each grid as the seismic source. Calculate the theoretical travel time between each seismic source and each seismograph on the equipment end. Use two random seismographs to form a seismograph pair and calculate the theoretical travel time difference between each seismic source and each seismograph pair.
[0060] The server determines the positioning result through the cross-correlation imaging positioning algorithm. This method estimates the time difference (travel time difference) of signal arrival by calculating the cross-correlation function between the vibration signals received by different seismic stations, specifically steps S2 and S3.
[0061] The construction site is divided into grids in order to assume different earthquake source locations. The center of each grid after grid division is determined, and the position of the seismograph is also determined after the observation system is determined, providing a position basis for the subsequent calculation of theoretical travel time and theoretical travel time difference.
[0062] S3, time-slicing the pre-processed vibration signal, and calculating the actual travel time difference of each seismograph for receiving the vibration signal in each time slice;
[0063] Each time slice is of equal length, so that the actual travel time difference calculated is the difference between time slices of the same length.
[0064] S4, calculating the similarity between the theoretical travel time difference and the actual travel time difference, taking the assumed source position corresponding to the similarity peak as the positioning result of the cross-correlation imaging positioning algorithm, and performing trajectory filtering on the positioning result to obtain the operation trajectory diagram of the large machinery;
[0065] This embodiment uses Manhattan distance, Euclidean distance, and inverse tangent distance to calculate similarity. The specific similarity calculation process is as follows (a1) to (a3):
[0066] (a1) When considering the distance of each dimension, Manhattan distance is used to calculate the similarity:
[0067]
[0068] Among them, Cityblock Distance is the Manhattan distance, x i and i are the theoretical travel time difference and the actual travel time difference in the i-th dimension, respectively, and w i is the weight vector on the i-th dimension, assigning different weights to different scenes and times.
[0069] Manhattan distance calculates the sum of the horizontal and vertical distances between two points, and is applicable to situations where the distance of each dimension needs to be considered. Manhattan distance has low calculation cost and fast calculation speed, and is suitable for fields with strong real-time performance. In the Manhattan distance used in this embodiment, a weight vector is used. The weight vector represents the importance of different features and may change over time. For example, although the observation system is monitored 24 hours a day, in large-scale machinery early warning, the normal working hours during the day contribute more to the Manhattan distance, so a larger weight can be assigned to this period to make the calculation more accurate.
[0070] (a2) When the ground is relatively flat, that is, when the ground height difference is less than 1m, the Euclidean distance is used to calculate the similarity:
[0071]
[0072] Among them, Euclidean Distance is the Euclidean distance, x i and i are the values of theoretical travel time difference and actual travel time difference in the i-th dimension respectively;
[0073] Euclidean distance calculates the straight-line distance between two points. If the ground is relatively flat, using Euclidean distance for calculation is more intuitive and easier to understand.
[0074] (a3) When the ground is collected without large machinery and with large machinery, the vibration amplitude generated is very different (for example, when there is no large machinery passing, the amplitude is almost a straight line, and when there is a large machinery passing, the amplitude is extremely extended, that is, when there is no large machinery passing and when there is a large machinery passing, there are almost two extreme amplitude states), the inverse tangent distance is used to calculate the similarity:
[0075]
[0076] Among them, Arctan Distance is the inverse tangent distance, x i and i are the values of the theoretical travel time difference and the actual travel time difference in the i-th dimension respectively.
[0077] The inverse tangent distance is a custom distance calculation method that uses a scaling strategy to ensure the stability of the value. The inverse tangent function is used to ensure that the distance value is within a controllable range and avoid the influence of extreme values. At the same time, the sensitivity of the distance calculation can be changed by adjusting the amplification factor to adapt to different application scenarios. For example, if the collected vibration data fluctuates very little, the amplification factor needs to be appropriately increased to make the observation system more sensitive to subtle changes.
[0078] The specific trajectory filtering is: using Savitzky-Golay filter to perform trajectory filtering on the positioning results. This method is based on the least squares method to fit a local polynomial to a continuous subset of the signal to achieve data smoothing. This method is a very effective data smoothing method, while keeping the basic shape and characteristics of the data unchanged.
[0079] S5. Send the running trajectory diagram to the client for visual display, and report the real-time position of the large machinery on the client. When the real-time position is within the warning position range, an alarm will be triggered. At the same time, the parameters of the 4G node-type three-component seismograph on the device side can be modified on the client.
[0080] Through steps S1 to S5, in actual application scenarios, first, the vibration signal near the power supply facilities is collected by a seismograph, and then the real-time data is remotely acquired through the 4G data transmission function. After being processed by the cross-correlation imaging positioning algorithm, the signals emitted by large construction machinery around the power supply facilities are identified, and when the large construction machinery enters the warning range, an alarm is issued to the operator through the visual operation interface.
[0081] By using this embodiment, operators can quickly deploy the observation system in the area to be monitored. During the monitoring period, operators can remotely monitor the vibration safety status near the power supply facilities, and contact the site in time to handle when large machinery enters the safety protection range, ensuring that the safety of the power supply facilities is not affected by temporary construction.
[0082] Therefore, this embodiment collects ground vibration signals of large machinery and adopts a cross-correlation imaging positioning algorithm to accurately locate the position of mechanical equipment, thereby solving the problem of difficult quantitative positioning; it realizes automated monitoring, reduces the need for manual participation, and reduces the probability of human error; it achieves real-time data analysis and early warning, and once the mechanical equipment is found to enter the early warning range, the relevant personnel can be notified immediately; it provides quantitative analysis capabilities, can monitor and quantify vibration signals, and provide a scientific basis for decision-making; it is highly flexible and can transfer the observation system at any time according to changes in neighboring construction sites.
[0083] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A neighboring camp construction monitoring and early warning method based on a cross-correlation imaging positioning algorithm is characterized by: The steps include: S1. Obtain and pre-process the ground vibration signal of the neighboring construction site uploaded by the equipment end; S2. Divide the construction site into grids and use the center of each grid as the seismic source. Calculate the theoretical travel time between each seismic source and each seismograph on the equipment end. Use two random seismographs to form a seismograph pair and calculate the theoretical travel time difference between each seismic source and each seismograph pair. S3, time-slicing the pre-processed vibration signal, and calculating the actual travel time difference of each seismograph for receiving the vibration signal in each time slice; S4, calculating the similarity between the theoretical travel time difference and the actual travel time difference, taking the assumed source position corresponding to the similarity peak as the positioning result of the cross-correlation imaging positioning algorithm, and performing trajectory filtering on the positioning result to obtain the operation trajectory diagram of the large machinery; S5. Send the running track diagram to the client for visual display, and report the real-time position of the large machinery on the client. When the real-time position is within the warning position range, an alarm is triggered.
2. The method for monitoring and early warning of neighboring camp construction based on cross-correlation imaging positioning algorithm according to claim 1 is characterized in that: An observation system is set up on the equipment side based on a 4G node-type three-component seismograph, and ground vibration signals from neighboring construction sites are collected through the 4G node-type three-component seismograph.
3. The method for monitoring and early warning of neighboring camp construction based on cross-correlation imaging positioning algorithm according to claim 1 is characterized in that: In step S1, the ground vibration signal is preprocessed as follows: The min-max normalization method is used to normalize the ground vibration signal; The normalized vibration signal is band-pass filtered to extract the vibration signal of the set frequency band generated by the large machinery as the pre-processed vibration signal.
4. The method for monitoring and early warning of neighboring camp construction based on cross-correlation imaging positioning algorithm according to claim 1 is characterized in that: In step S4, the similarity between the theoretical travel time difference and the actual travel time difference is calculated, and the similarity is calculated using Manhattan distance, Euclidean distance, and inverse tangent distance. The specific calculation process of the similarity is as follows: When considering the distance of each dimension, Manhattan distance is used to calculate the similarity: Among them, Cityblock Distance is the Manhattan distance, x i and i are the theoretical travel time difference and the actual travel time difference in the i-th dimension, respectively, and w i is the weight vector on the i-th dimension. When the ground height difference is less than 1m, the Euclidean distance is used to calculate the similarity: Among them, Euclidean Distance is the Euclidean distance, x i and i are the values of theoretical travel time difference and actual travel time difference in the i-th dimension respectively.
5. The neighboring camp construction monitoring and early warning system based on the cross-correlation imaging positioning algorithm is characterized by: It includes a signal acquisition module, a theoretical travel time difference calculation module, an actual travel time difference calculation module, a positioning module, and a display and alarm module; The signal acquisition module is used to acquire and pre-process the ground vibration signal of the neighboring construction site uploaded by the equipment end; The theoretical travel time difference calculation module is used to divide the construction site into grids and use the center of each grid as the seismic source to calculate the theoretical travel time between each seismic source and each seismograph on the equipment end. Two random seismographs form a seismograph pair and the theoretical travel time difference between each seismic source and each seismograph pair is calculated. The positioning module is used to time slice the pre-processed vibration signal and calculate the actual travel time difference of each seismograph to the received vibration signal in each time slice; The actual travel time difference calculation module is used to calculate the similarity between the theoretical travel time difference and the actual travel time difference, and the assumed source position corresponding to the similarity peak is used as the positioning result of the cross-correlation imaging positioning algorithm. The positioning result is subjected to trajectory filtering to obtain the operation trajectory diagram of the large machinery; The display and alarm module sends the running trajectory diagram to the client for visual display, and reports the real-time position of the large machinery on the client, and alarms when the real-time position is within the warning position range.
6. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the neighboring camp construction monitoring and early warning method as described in any one of claims 1 to 4 is implemented; 7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a plurality of programs, and the plurality of programs are used to be called by a processor and execute the neighboring camp construction monitoring and early warning method described in any one of claims 1-4.