Typhoon-driven multi-model coupling flood forecasting method, equipment, medium and program
Through the typhoon-driven multi-model coupling flood forecasting method, combined with meteorological, hydrological and hydrodynamic models, real-time monitoring and forecasting of flood areas solves the problem of low flood forecast accuracy in the existing technology and achieves more accurate flood hazard warnings.
Patent Information
- Application Number
- CN202410764453.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-15
AI Technical Summary
Existing flood forecasting technology has low accuracy and relies mainly on meteorological forecasts, which cannot accurately predict flood areas and flood hazards.
A typhoon-driven multi-model coupling flood forecasting method is adopted. By obtaining the typhoon position in the typhoon report, meteorological data is obtained, the meteorological forecast model is used to determine the rainfall, the hydrological model is used to determine the flood flow, and the hydrodynamic model is used to determine the flood area. It combines remote sensing images and automatic Water monitoring system for real-time flood forecasting.
It improves the accuracy of flood forecasting, reduces flood hazards, and enables real-time monitoring and early warning of flooded areas.
Smart Images

Figure CN118778151A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of flood forecasting, and in particular to a typhoon-driven multi-model coupled flood forecasting method, device, medium and program. Background Art
[0003] At present, flood forecasts mainly rely on weather forecasts, obtain rainfall from weather forecasts, determine which areas may experience floods based on rainfall, and focus on whether areas near typhoons will experience floods. However, from actual forecasts, it can be seen that the accuracy of the above flood forecasts is low. Summary of the invention
[0004] The present application provides a typhoon-driven multi-model coupled flood forecasting method, device, medium and program to solve the problems in the above-mentioned background technology.
[0005] In a first aspect, the present application provides a typhoon-driven multi-model coupled flood forecasting method, comprising:
[0006] Obtaining a typhoon report at a predetermined interval, wherein the typhoon report carries the typhoon location;
[0007] Acquiring meteorological data of a target area centered on the typhoon position;
[0008] Sending the meteorological data to a meteorological forecast model so that the meteorological forecast model determines the rainfall in the target area based on the meteorological data;
[0009] sending the rainfall to a hydrological model so that the hydrological model determines a flood flow in the target area based on the rainfall;
[0010] The flood flow is sent to a hydrodynamic model so that the hydrodynamic model determines a flood area based on the flood flow.
[0011] Optionally, the meteorological data includes radar predicted precipitation data and real-time observation data from a meteorological station, the radar predicted precipitation data being the sub-areas in the target area where rainfall exists and the corresponding rainfall intensity and rainfall amount calculated by the meteorological radar echo intensity, and the meteorological station observation data being the sub-areas in the target area where rainfall exists and the corresponding rainfall amount monitored in real time by the meteorological station.
[0012] Optionally, the hydrological model determines the flood flow of the target area based on the rainfall, including:
[0013] receiving the rainfall amount;
[0014] Determine the direct runoff, surface runoff and underground runoff of each sub-area of the target area based on the rainfall;
[0015] The flood flow is determined based on the direct runoff, surface soil flow and underground runoff through the topographic instantaneous unit line.
[0016] Optionally, the hydrodynamic model determines the flood area based on the flood flow, comprising:
[0017] Acquire digital elevation model data, and establish a terrain file of a hydrodynamic model of the target area based on the digital elevation model data;
[0018] determining an upstream location of the target area based on the terrain file;
[0019] At predetermined intervals, obtaining the upstream flow of the upstream location;
[0020] The hydrodynamic model determines a flood area included in the target area based on the upstream flow.
[0021] Optionally, after acquiring the meteorological data of the target area centered on the typhoon position, the method further includes:
[0022] Acquiring remote sensing images and coordinate information of the target area;
[0023] The remote sensing image and the coordinate information of the target area are sent to an automatic water monitoring system so that the automatic water detection system outputs a flood image of the target area. The flood image is a water body image after the automatic water detection system marks the location of the water body in the target area from the remote sensing image.
[0024] Optionally, before sending the meteorological data to a meteorological forecast model so that the meteorological forecast model determines the rainfall in the target area based on the meteorological data, the method further includes:
[0025] The radar data and the weather station data are assimilated to obtain new weather data, wherein the assimilation includes deleting outliers.
[0026] Optionally, the hydrological model is a variable infiltration capacity model, a dynamic precipitation-runoff simulation model, a distributed hydrological model or a Chinese mountain flood hydrological model.
[0027] In a second aspect, an embodiment of the present application provides a computer electronic device, including:
[0028] One or more processors;
[0029] A memory for storing one or more instructions;
[0030] When one or more instructions are executed by one or more processors, the one or more processors are enabled to execute the method for implementing the above-mentioned first aspect.
[0031] In a third aspect, an embodiment of the present application provides a computer-readable storage medium on which a computer program is stored, and the computer program is used to implement the method of the first aspect above.
[0032] In a fourth aspect, an embodiment of the present application provides a computer program product, including a computer program, which implements the method of the first aspect when executed by a processor.
[0033] The typhoon-driven multi-model coupling flood forecasting method provided by the present application performs flood forecasting through a meteorological forecasting model, a hydrological model and a hydrodynamic model. When a typhoon report is received, the typhoon position is obtained from the typhoon report; meteorological data of a target area centered on the typhoon position is obtained; the meteorological data is sent to the meteorological forecasting model so that the meteorological forecasting model determines the rainfall in the target area based on the meteorological data; the rainfall is sent to the hydrological model so that the hydrological model determines the flood flow in the target area based on the rainfall; the flood flow is sent to the hydrodynamic model so that the hydrodynamic model determines the flood area based on the flood flow; and real-time flood forecasting is achieved; whereas for the prior art, the flood area is generally forecasted based on meteorological forecasts; therefore, compared with the prior art, the present application improves the accuracy of flood forecasting and reduces flood hazards. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0035] Figure 1 An implementation environment architecture diagram of a typhoon-driven multi-model coupled flood forecasting method provided in an embodiment of the present application;
[0036] Figure 2 A flow chart of a typhoon-driven multi-model coupling flood forecasting method provided in an embodiment of the present application;
[0037] Figure 3 A flowchart of another typhoon-driven multi-model coupling flood forecasting method provided in an embodiment of the present application;
[0038] Figure 4 A schematic diagram of a weather forecast model provided in an embodiment of the present application;
[0039] Figure 5A flow chart of a method for determining flood flow provided in an embodiment of the present application;
[0040] Figure 6 A schematic diagram of a hydrological model provided in an embodiment of the present application;
[0041] Figure 7 A small watershed division map and confluence time distribution map provided in an embodiment of the present application;
[0042] Figure 8 A schematic diagram of a small watershed unit line provided in an embodiment of the present application;
[0043] Fig. 9 A flow chart of a method for determining a flood area provided in an embodiment of the present application;
[0044] Fig.10 A flowchart of another typhoon-driven multi-model coupling flood forecasting method provided in an embodiment of the present application;
[0045] Fig.11 It is a structural diagram of a computer system according to an embodiment of the present application. DETAILED DESCRIPTION
[0046] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application is clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work also belong to the scope of protection of the present application. In addition, it should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other in the absence of conflict. The present application will be described in detail below with reference to the drawings and in combination with the embodiments.
[0047] Figure 1 1 is a diagram of an implementation environment of a typhoon-driven multi-model coupled flood forecasting method according to an embodiment of the present application. Figure 1 As shown, the implementation environment architecture includes: a terminal and a server.
[0048] The hardware structure of the terminal includes a processor, a memory and a display device, and the software structure includes a program product installed on the terminal.
[0049] The above-mentioned program product can be an independent software, for example, an APP deployed on a terminal as a client (for example, a typhoon-driven multi-model coupling flood forecasting method client); of course, the above-mentioned program product can also be a component of the terminal's operating system or an application, a mini program, etc., for example, it can be a mini program (Mini Program) in WeChat or an H5 (html5) web page, etc. It should be noted that a "mini program" is an application that can be used without downloading and installing.
[0050] The above-mentioned program product can call the hardware on the terminal (such as one or more of the display screen and communication modules, etc.) to implement the technical solution provided in this application.
[0051] Taking the program product as an application client deployed on a terminal as an example, when the application client is started, an application interface can be displayed on the terminal display screen, through which the user input query request can be obtained, for example, querying the forecasted flood area, and sending the input query request to the server by calling the communication module, or receiving one or more messages sent by the server and displaying them on the terminal display screen.
[0052] The types of terminals include, but are not limited to, smart phones, tablet computers, televisions, laptop computers, desktop computers, etc., which are not specifically limited in the embodiments of the present application.
[0053] The server is equipped with a meteorological forecast model, a hydrological model, a hydrodynamic model and an automatic water monitoring system. The server is used to receive typhoon reports to trigger the use of meteorological forecast models, hydrological models and hydrodynamic models to forecast flood areas. Furthermore, when the flood area is determined, the server can also send the determined flood area to the terminal, and the terminal can display it through a display so that the user can know the flood area.
[0054] The server can be a single server, a server cluster consisting of multiple servers, or a cloud computing service center.
[0055] The terminal establishes a communication connection with the server through a wired or wireless network.
[0056] In addition to the above terminal + server mode, the above typhoon-driven multi-model coupling flood forecasting method can also be completed by a separate electronic device, for example, it can be independently completed by a smart phone, a tablet computer, a television, a laptop computer, a desktop computer, etc. Then the above meteorological forecast model, hydrological model, hydrodynamic model and automatic water monitoring system can be installed in the above separate electronic device.
[0057] The above-mentioned terminals and servers can be high performance computing (HPC) devices to improve computing efficiency and improve flood forecasting efficiency.
[0058] Figure 2 It is a flow chart of a typhoon-driven multi-model coupled flood forecasting method according to an embodiment of the present application. Figure 2 The method shown can be Figure 1 The server execution in Figure 2 As shown, combined with Figure 3 , the method comprising:
[0059] Step 201, obtaining a typhoon report at a predetermined time interval, wherein the typhoon report carries the typhoon position.
[0060] The typhoon report is real-time and true, not a forecast. The typhoon report can be sent to the server by a typhoon reporting platform on the Internet. The typhoon report carries basic information about the typhoon, such as the location, moving speed, and moving direction of the typhoon, so as to better understand the situation of the typhoon.
[0061] After obtaining the typhoon report, the position of the typhoon can be obtained from the typhoon report. If the typhoon position has changed compared with the typhoon position at the previous time, the target area centered on the typhoon position is re-determined.
[0062] Step 202, obtaining meteorological data of a target area centered on the typhoon position.
[0063] The target area is the area for flood forecasting, which is generally a land area within a predetermined range centered on the typhoon position. Since areas close to the typhoon are prone to flooding, it is sufficient to obtain meteorological data within the target area centered on the typhoon.
[0064] Furthermore, since flood forecasting is generally conducted based on provinces, urban areas, river basins, etc., the target area can be divided into multiple sub-areas based on provinces, urban areas, river basins, etc., and forecasts can be conducted based on the divided sub-areas.
[0065] Furthermore, the target area can be determined based on information such as the typhoon's intensity, moving speed, and moving direction. For example, if the typhoon's intensity is strong and its moving speed is fast, the target area will be larger. If the typhoon's intensity is weak and its moving speed is slow, the target area will be smaller. Furthermore, a larger range can be set on one side along the moving direction, and a smaller range can be set on the side opposite to the moving direction, so as to improve the accuracy of typhoon range determination and improve flood prediction accuracy.
[0066] Optionally, the meteorological data in step 202 includes radar predicted precipitation data and real-time observation data from a meteorological station, wherein the radar predicted precipitation data is the sub-area in the target area where rainfall exists and the corresponding rainfall intensity and rainfall amount calculated by the meteorological radar echo intensity, and the meteorological station observation data is the sub-area in the target area where rainfall exists and the corresponding rainfall amount monitored in real time by the meteorological station.
[0067] Among them, the real-time observation data of the meteorological station can be a 0.5°×0.5° grid observation dataset of daily precipitation on the Chinese surface.
[0068] In addition, it should be noted that even if the position of the typhoon does not change, the meteorological data may change, so step 201 and step 202 need to be executed once every predetermined time interval.
[0069] Step 203: sending the meteorological data to a meteorological forecast model, so that the meteorological forecast model determines the rainfall in the target area based on the meteorological data.
[0070] The rainfall in the target area is the rainfall in each sub-area included in the target area.
[0071] Precipitation is one of the important factors that affect whether a flood will occur in a region and the size of the flood. The precipitation in the target area can be simulated by an atmospheric numerical model, such as the above-mentioned Weather Research and Forecasting (WRF), which is used for weather research and forecasting and is a state-of-the-art mesoscale numerical weather forecasting system. The model serves a wide range of meteorological applications from tens of meters to thousands of kilometers. Caldwell et al. believe that the WRF model predicts rainfall and its spatial distribution very well.
[0072] See also Figure 4 The main control equations of the WRF model include the energy conservation equation and the momentum conservation equation. The WRF model system includes the WRF pre-processing system (WRF Pre-Processing System; WPS), the dynamic solver (Advanced Research WRF; ARW) and the post-processing module. Among them, the function of WPS is to define the simulation area and provide data for the WRF main program; the dynamic solver is the core component of the WRF model, which is responsible for converting the data processed by WPS into initial conditions, and then performing calculations based on a reasonable parameterization scheme; the post-processing module mainly processes the output data of the WRF model. In addition, in order to obtain an initial state close to the actual state, the WRF model needs to be preheated to improve the simulation accuracy.
[0073] In the present application, only the precipitation in the WRF model needs to be sent to the hydrological model in step 204, and other output results do not need to be sent to the hydrological model.
[0074] Furthermore, in this application, it can be used to provide rainfall forecast within 48 hours.
[0075] In addition, for other relevant contents of the weather forecast model, please refer to the prior art, and this application will not elaborate on them here.
[0076] Step 204: Send the rainfall to a hydrological model, so that the hydrological model determines the flood flow of the target area based on the rainfall.
[0077] Among them, the hydrological model can be a variable infiltration capacity model (VIC), a dynamic precipitation-runoff simulation model (Storm Water Management Model; SWMM) or a distributed hydrological model, or it can be a China Flash Flood Hydrological Model (CNFF). CNNF is used as an example for description in this application.
[0078] Among them, the target area can be divided into multiple sub-areas, and the flood flow corresponding to each sub-area is determined.
[0079] Alternatively, see Figure 5 The hydrological model determines the flood flow of the target area based on the rainfall, which is achieved through the following steps 2041 to 2043:
[0080] Step 2041, receiving the rainfall.
[0081] Step 2042, determining the direct runoff, surface runoff and underground runoff of each sub-area of the target area based on the rainfall;
[0082] Step 2043, determining the flood flow based on the direct runoff, surface soil flow and underground runoff through the instantaneous unit line of the topography.
[0083] The hydrological model has greatly improved the flood forecasting capability by taking into account the uneven spatial distribution of the underlying surface, such as the basin's topography, land use, and vegetation cover.
[0084] Further, see Figure 6-Figure 8, the distributed flood forecasting model CNFF is applied, in which each module plays a different role. The runoff module adopts the mixed runoff calculation principle to obtain the surface runoff and groundwater runoff of each small watershed, and calibrates 14 soil parameters; the evaporation module uses the Penman Monteith Equation to calculate the evaporation value; the confluence module uses the topographic instantaneous response unit line to calculate the confluence, calibrates two confluence parameters, and finally obtains the flow process of all small watershed outlets in the basin.
[0085] The flow generation module calculates the contents including surface runoff, soil water storage and underground runoff.
[0086] Furthermore, surface runoff, soil water storage and groundwater runoff were calculated by the following method:
[0087] Calculation of surface runoff, which includes direct runoff and surface runoff;
[0088] The soil is divided into three parts: surface soil, subsoil and deep groundwater storage layer; S is the water storage capacity of the surface soil; U represents the water storage capacity of the middle soil; D is the water storage capacity of the deep groundwater; and the super-infiltration flow is used to simulate the soil infiltration process. The infiltration capacity is expressed by Horton's infiltration formula:
[0089] f(t)=(f0-f c ) -βt +f c (1)
[0090] According to Horton's infiltration formula, the cumulative infiltration curve can be deduced:
[0091]
[0092] The confluence module is calculated as follows:
[0093] like Figure 7 As shown in the figure, the speed of confluence depends on the speed of water flow on the slope. In addition to being related to the size of the terrain slope, it is also related to the amount of water. Referring to the Manning formula, the following flow velocity calculation formula that takes into account the influence of slope and rainfall intensity is used to calculate the speed V of water flow at a certain point in the basin:
[0094] V=KS 0.5 i 0.4 (3)
[0095] Where: V is the water velocity (m / s); S is the slope along the water flow direction at a certain point in the basin; K is the velocity coefficient (m / s), which is the main empirical parameter reflecting the influence of land use characteristics on flow friction; i is a dimensionless factor reflecting the net rainfall intensity. In order to calculate the slope velocity using the SCS formula V = KS 0.5The K value in the above formula is consistent with that in the above formula. i in the above formula is a dimensionless factor. The slope flow velocity is related to the net rainfall intensity. SCS uses the formula V = KS 0.5 The value of i in the above formula is 1 for medium net rain intensity, greater than 1 for large net rain intensity, and less than 1 for small net rain intensity.
[0096] i is taken as the ratio of net rainfall intensity to a fixed reference rainfall (taking medium rainfall intensity).
[0097] SCS (1986) recommends V = KS 0.5 The slope velocity coefficient values corresponding to different land use types in the calculation of the unit line of the small watershed are usually assumed to be uniformly distributed in the space of net rain. Therefore, in order to calculate the water flow velocity in each grid of the DEM, it is necessary to obtain the terrain slope and velocity coefficient of each grid. When dividing and extracting features of the small watershed, the slope of the grid has been extracted, so the velocity coefficient K value of each grid must also be obtained. The land use information is rasterized to obtain a digital velocity coefficient model with the same size as the DEM grid. Using the above velocity calculation formula, the water flow velocity in each DEM grid is calculated.
[0098] The confluence time depends on that any point in the small watershed has a fixed confluence path to its outlet. In DEM, the runoff in a grid flows along the direction of maximum slope to the adjacent grids around it. According to this method, the path of the runoff in the grid to the outlet can be obtained. According to the size of the grid and the water flow velocity in the grid, the residence time of the runoff in each grid can be calculated by the following formula.
[0099] Δτ=L / V (4)
[0100] Where: Δτ is the runoff time within the grid; L is the side length of the grid. Along the confluence path, the confluence time of each grid to the basin outlet can be calculated by the following formula:
[0101]
[0102] Where:
[0103] τ is the confluence time of a certain grid reaching the outlet of the small watershed; m is the number of grids on the runoff path, calculated as unit lines.
[0104] like Figure 8As shown in the figure, the confluence time is statistically calculated to obtain the probability density distribution of the unit line of the small watershed or the confluence time of the small watershed. The horizontal axis is the confluence time, and the vertical axis is the ratio of the outflow area in the calculation period to the period. The bottom width of the probability density distribution of the confluence time is taken as the confluence time of the small watershed. After the unit conversion and linear reservoir regulation of the probability density distribution of the confluence time, the unit line of the small watershed is obtained. The above unit line calculation method takes into account the shape, area and spatial distribution of land use of the small watershed when calculating the confluence time of each point in the watershed. Therefore, the calculated unit line fully considers the influence of the geometric shape, topography and underlying surface factors of the small watershed. On the other hand, by introducing the rainfall intensity factor into the flow velocity calculation formula, the influence of rainfall characteristics on the unit line and the nonlinear problems in the unit line calculation and confluence calculation are considered. With the increase of rainfall intensity, the peak value of the corresponding unit line increases, and the peak time is advanced.
[0105] According to the calculation method of heavy rain for small watershed design, after calculating the rainfall in each time period (10 minutes, 30 minutes, 60 minutes) and each recurrence period (2 years, 5 years, 20 years, 50 years, 100 years), the calculated rainfall is taken as the net rain, and the net rain intensity is calculated. Using the above method, the unit lines corresponding to net rain intensities of different magnitudes are calculated.
[0106] The evaporation is calculated using the Penman formula; specifically as follows:
[0107]
[0108] The formula takes day as the step length, in which ET0 is the reference evapotranspiration, mm / day; Rn is the net radiation on the crop surface, MJ / (m2day); G is the soil heat flux, MJ / (m2day); T is the average daily temperature at a height of 2 meters, ℃; u2 is the wind speed at a height of 2 meters, m / s; es is the saturated water vapor pressure, kPa; ea is the actual water vapor pressure, kPa; es-ea is the saturated water vapor pressure difference, kPa; Δ is the slope of the saturated water vapor pressure curve, and r is the hygrometer constant, kPa / ℃.
[0109] For other contents related to the hydrological model, please refer to the relevant description of the prior art, and this application will not elaborate on it here.
[0110] Step 205: Send the flood flow to a hydrodynamic model, so that the hydrodynamic model determines a flood area based on the flood flow.
[0111] Among them, the hydrodynamic model can adopt the telemac-2D model. The main purpose of the telemac-2D model is to simulate the flow dynamics in the water body, wherein the water body can be a river, an estuary or a water body in a coastal area, etc. The flood flow is sent to the hydrodynamic model by solving the shallow water equation (SWE), so that the hydrodynamic model determines the flood area based on the flood flow to determine the flood area.
[0112] Furthermore, the shallow water equation includes:
[0113]
[0114]
[0115] Where, u and v are the flow velocities in the x and y directions respectively; t is time; h is water depth; z is free water level elevation; g is gravitational acceleration;
[0116] This equation mainly adopts the finite volume method, which is a vertex center method based on "double grid". The entire calculation domain (the target area in this application) is divided into n sub-areas associated with vertex i, which are called control volumes K i Specifically, by connecting the triangles T around vertex i i The dual unit is obtained by integrating the control volume based on the above definition and using Gauss’s theorem.
[0117]
[0118] In the formula, is the solution at time t n The average spatial integral of n =nΔt, Δt is the time step; m i is the number of common boundaries in the cell; L ij is the control unit (K i and K j ), when node i is located on the grid line, L i represents the length of their common boundary; F(U i , U j , n ij ) and F(U i , U e , n i ) is the normal vector estimate of the flux F(U); U i and U j is the state vector at nodes i and j, U e is a virtual state vector with a weakly imposed boundary; n ijis the outward unit perpendicular to the common boundary; when i is on a grid line, use n i Indicates; S i is the volume-integrated average of the source terms.
[0119] The solution at time t n The average spatial integral expression of
[0120]
[0121] Where: U(x,t n ) is a surface vector in xt space.
[0122] The volume-integrated average value of the source term is expressed as
[0123]
[0124] Where: is the source term at time t n The average spatial integral of i (xt) is the x~t space S(U I (x,t)) is the volume vector of the source term in the x~t space.
[0125] The shallow water equation is the basic principle of the two-dimensional hydrodynamic model, but other contents related to the shallow water equation can be found in the relevant contents of the prior art, and this application will not elaborate on them here.
[0126] Alternatively, see Fig. 9 , the flood flow includes the upstream flow and the downstream flow of the target area; then the hydrodynamic model determines the flood area based on the flood flow, which is completed through the following steps 2051-2054:
[0127] Step 2051: Acquire digital elevation model data, and establish a terrain file of the hydrodynamic model of the target area based on the digital elevation model data.
[0128] The digital model elevation data can be downloaded from relevant platforms on the Internet, such as from a geospatial data cloud platform.
[0129] The relevant contents of the terrain file for establishing the hydrodynamic model of the target area based on the digital elevation model data are prior art, and reference may be made to the relevant contents of the prior art, which will not be described in detail in this application.
[0130] Step 2052: Determine the upstream location of the target area based on the terrain file.
[0131] Among them, the upstream can be understood as: the location immediately following the source of the river, where the river valley is narrow, the gradient is large, the water flow velocity is high, the water volume is small, the erosion is severe, the longitudinal section is stepped, and there are many rapids and waterfalls.
[0132] Among them, the downstream can be understood as: the river valley is wide, the river channel is winding, the river flow rate is slow but the flow is large, the siltation effect is significant, and shallows and sandbars can be seen everywhere.
[0133] Step 2053: Obtain the upstream flow of the upstream location at every predetermined time interval.
[0134] The scheduled duration may be determined based on actual conditions, for example, the scheduled duration may be set to 1 hour.
[0135] Among them, the upstream flow is the flood flow at the upstream location, and the downstream flow is the flood flow at the downstream location.
[0136] Since the flow rate of each sub-area can be determined in step 204, after step 204 is executed, the flow rate at the upstream position and the flow rate at the downstream position can be directly queried to obtain the upstream flow rate and the downstream flow rate.
[0137] In addition, the upstream flow does not refer to the upstream flow of one sub-area, but can also refer to the upstream flow of multiple sub-areas. As long as it is in the upstream position and has flood flow, it is considered as one upstream flow.
[0138] Step 2054: The hydrodynamic model determines the flood area included in the target area based on the upstream flow.
[0139] In addition, it should be noted that since the position of the typhoon is mobile, when the position of the typhoon changes, the flooded area will also change. Therefore, it is necessary to obtain the position of the typhoon in real time, for example, update the position of the typhoon every hour, and execute the above steps 201 to 205 again based on the acquired new position to update the flooded area.
[0140] When the position of a typhoon changes, the meteorological forecast model updates the rainfall every hour according to the position of the typhoon, continuously predicts and corrects the real-time rainfall, and improves the accuracy of rainfall forecasts; it also inputs high-precision rainfall data into the hydrological model, and updates the output of the hydrodynamic model once an hour to obtain the latest flood area, thereby improving the accuracy of flood forecasts.
[0141] Alternatively, see Fig.10 After step 202, or after determining the target area, the method further includes steps 206 and 207:
[0142] Step 206, obtaining the remote sensing image and the coordinate information of the target area.
[0143] Step 207, sending the remote sensing image and the coordinate information of the target area to the automatic water monitoring system, so that the automatic water detection system outputs a flood image of the target area, and the flood image is a water image after the automatic water detection system marks the location of the water body in the target area from the remote sensing image.
[0144] Since the position of the typhoon changes in real time, the target area also changes, so the water body image also changes in real time. Therefore, when the position of the typhoon changes, the above steps 206 and 207 are re-executed to update the water body image in real time.
[0145] In addition, it should be noted that the automatic water detection system is not a forecast of flooded areas, but is used to detect flooded areas in real time so that users can know the actual situation of the flood at the current time.
[0146] Furthermore, the flood image can be sent to a display and displayed on the display so that the user can learn about the flood situation in a timely manner.
[0147] In the process of implementing step 207, the automatic water monitoring system involves different image processing technologies, such as clustering, edge filtering, automatic thresholding and region growing, and also uses change detection based on remote sensing data. The relevant content can refer to the relevant existing technology, and this application will not elaborate here.
[0148] Alternatively, see Fig.10 Before step 203, the method further includes the following step 208:
[0149] Step 208, performing assimilation processing on the radar data and the weather station data to obtain new weather data, wherein the assimilation processing includes deleting outliers.
[0150] After step 208, the meteorological data in step 203 is the assimilated meteorological data.
[0151] Assimilation processing is used to improve the accuracy of data input into meteorological forecast models, thereby improving the accuracy of flood forecasts.
[0152] In addition, it should be noted that the meteorological forecast model, hydrological model, hydrodynamic model and automatic water detection system mentioned in this application are all pre-trained or calibrated, and the relevant training or calibration process is the same as the existing model training or calibration method, which will not be elaborated in this application.
[0153] Fig.11It is a structural diagram of an electronic device or computer system 900 shown in an embodiment of the present application, and the computer system includes a central processing unit (CPU) 901, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 902 or the program loaded from the storage part to the random access memory (RAM) 903. In RAM903, various programs and data required for system operation are also stored. CPU901, ROM902 and RAM903 are connected to each other through a bus 904. An input / output (I / O) interface 905 is also connected to the bus 904.
[0154] The following components are connected to the I / O interface 905: an input section 906 including a keyboard, a mouse, etc.; an output section 907 including a cathode ray tube (CRT), a liquid crystal display (LCD), and a speaker, etc.; a storage section 908 including a hard disk, etc.; and a communication section 909 including a network interface card such as a LAN card, a modem, etc. The communication section 909 performs communication processing via a network such as the Internet. A drive is also connected to the I / O interface 905 as needed. A removable medium 911, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 910 as needed, so that a computer program read therefrom is installed into the storage section 908 as needed.
[0155] In particular, the processes described in the flowcharts of the embodiments of the present application can be implemented as computer software programs. For example, the method embodiments of the present application include a computer program product, which includes a computer program carried on a computer readable medium, and the computer program includes program code for executing the method shown in the flowchart.
[0156] As another aspect, the present application further provides a computer-readable medium, which may be included in the electronic device described in the above embodiment; or may exist independently without being assembled into the electronic device. The above computer-readable medium carries one or more programs, and when the above one or more programs are executed by an electronic device, the electronic device implements the method described in the embodiment of the present application.
[0157] It should be noted that the computer-readable medium shown in the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two.
[0158] The units involved in the embodiments described in the present application may be implemented by software or hardware, and the units described may also be set in a processor. The names of these units do not constitute limitations on the units themselves in some cases. The units or modules described may also be set in a processor. The names of these units or modules do not constitute limitations on the units or modules themselves in some cases.
[0159] In addition, it should be noted that the scope of this application includes feasible technical solutions formed by specific combinations of the above-mentioned technical features, and should also cover other feasible technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned application concept.
[0160] Finally, it should be noted that all contents not described in the technical solution of this application can be implemented using existing technologies. In addition, the above embodiments are only used to illustrate the technical solution of this application, rather than to limit it; although the application is described in detail with reference to the above embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the above embodiments, or replace some or all of the technical features therein with equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of this application.
Claims
1. A typhoon-driven multi-model coupling flood forecasting method, characterized in that: include: Obtaining a typhoon report at a predetermined interval, wherein the typhoon report carries the typhoon location; Acquiring meteorological data of a target area centered on the typhoon position; Sending the meteorological data to a meteorological forecast model so that the meteorological forecast model determines the rainfall in the target area based on the meteorological data; sending the rainfall to a hydrological model so that the hydrological model determines a flood flow in the target area based on the rainfall; The flood flow is sent to a hydrodynamic model so that the hydrodynamic model determines a flood area based on the flood flow.
2. The flood forecasting method according to claim 1, characterized in that: The meteorological data includes radar predicted precipitation data and real-time observation data from a meteorological station. The radar predicted precipitation data is the sub-area with rainfall in the target area and the corresponding rainfall intensity and rainfall amount calculated by the meteorological radar echo intensity. The meteorological station observation data is the sub-area with rainfall in the target area and the corresponding rainfall amount monitored in real time by the meteorological station.
3. The flood forecasting method according to claim 1, characterized in that: The hydrological model determines the flood flow of the target area based on the rainfall, including: receiving the rainfall amount; Determine the direct runoff, surface runoff and underground runoff of each sub-area of the target area based on the rainfall; The flood flow is determined based on the direct runoff, surface soil flow and underground runoff through the topographic instantaneous unit line.
4. The flood forecasting method according to claim 1, characterized in that: The hydrodynamic model determines the flood area based on the flood flow, including: Acquire digital elevation model data, and establish a terrain file of a hydrodynamic model of the target area based on the digital elevation model data; determining an upstream location of the target area based on the terrain file; At predetermined intervals, obtaining the upstream flow of the upstream location; The hydrodynamic model determines a flood area included in the target area based on the upstream flow.
5. The flood forecasting method according to claim 1, characterized in that: After acquiring the meteorological data of the target area centered on the typhoon position, the method further includes: Acquiring remote sensing images and coordinate information of the target area; The remote sensing image and the coordinate information of the target area are sent to an automatic water monitoring system so that the automatic water detection system outputs a flood image of the target area. The flood image is a water body image after the automatic water detection system marks the location of the water body in the target area from the remote sensing image.
6. The flood forecasting method according to claim 5, characterized in that: Before sending the meteorological data to a meteorological forecast model so that the meteorological forecast model determines the rainfall in the target area based on the meteorological data, the method further includes: The radar data and the weather station data are assimilated to obtain new weather data, wherein the assimilation includes deleting outliers.
7. The flood forecasting method according to any one of claims 1 to 6, characterized in that: The hydrological model is a variable infiltration capacity model, a dynamic precipitation-runoff simulation model, a distributed hydrological model or a Chinese mountain flood hydrological model.
8. A computer electronic device, characterized in that: The device comprises: A memory for storing one or more instructions; One or more processors, configured to execute the one or more instructions; When the one or more instructions are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 7.
9. A computer-readable storage medium, characterized in that: A computer program is stored thereon, the computer program being used to: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
10. A computer program product, characterized in that The method comprises a computer program, wherein when the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Cited By
Flood inundation area prediction method based on land survey data
CN119228147A
