Power grid DC grounding electrode operation risk assessment method and device, and medium

By establishing a power grid DC loop model and a ground pole excitation current surface potential map, the DC ground pole operation risk is assessed, the DC bias problem is solved, and the security of the power grid and the reliability of the assessment are improved.

CN118780227AActive Publication Date: 2024-10-15SHANGHAI UNIVERSITY OF ELECTRIC POWER
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410752505.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-15
Estimated Expiration
2044-06-12

AI Technical Summary

Technical Problem

Existing Technology In high-voltage DC transmission, changes in surface potential caused by the DC ground pole lead to DC bias problems in the AC power grid, posing a threat to the safe and stable operation of the transformer. Moreover, the calculation method of surface potential distribution is complex and susceptible to climate influence, making it difficult to calculate it frequently. renew.

Method used

By establishing a power grid DC loop model, we screen substations with distance risks, calculate large current, quantity and average current risks, generate risk assessment results, and verify the impact of surface potential difference on the power grid based on the grounding electrode excitation current surface potential map to provide targeted adjustments and suppression measures.

Benefits of technology

It simplifies the power grid DC grounding electrode operation risk assessment, improves the reliability and accuracy of the assessment results, and helps technicians adjust working conditions or set up DC suppression measures to ensure the safe operation of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780227A_ABST
    Figure CN118780227A_ABST
Patent Text Reader

Abstract

The invention relates to a power grid DC grounding electrode operation risk assessment method and device, and a medium. The method comprises the following steps: obtaining the connection relation and distance of each transformer substation in a power grid and the single-phase grounding maximum current of the transformer substation; establishing a direct current loop model; taking a grounding point of the power grid as a center and a certain distance as a radius, screening out a transformer substation with a distance risk from the DC loop model, and taking the transformer substation as a first-stage risk assessment result; removing the transformer substations with distance risks, respectively measuring direct current and calculating average current under different working states of the remaining transformer substations in the power grid, and obtaining current data exceeding the maximum current and the number of the corresponding transformer substations; respectively calculating a large current risk, a quantity risk and an average current risk in each working state; and calculating to obtain a second-stage risk assessment result in each working state. Compared with the prior art, the method has the advantages of simple modeling parameters, high safety, high accuracy and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of transformer substations, and in particular to a method, a device and a medium for assessing the operating risk of a DC grounding electrode of a power grid. Background Art

[0002] When the high-voltage direct current transmission project is operated in a single-pole loop mode, the direct current load current of up to several thousand amperes flows into the earth through the direct current grounding electrode. The ground current will establish a constant current field in the ground. Due to the potential field characteristics of the current field, the distribution of direct current in the ground causes the change of the surface potential, resulting in the direct current bias problem of the AC power grid. The direct current bias phenomenon of the transformer brings a series of hazards to the safe and stable operation of the transformer. The generated direct current flux will cause serious saturation of the transformer core, causing serious distortion of the excitation current waveform, posing a threat to the safety of the equipment.

[0003] At present, the more common research method in China for the calculation of surface potential distribution is to approximately treat the soil as three soil models: horizontal stratification, vertical stratification and composite stratification, and to regard the solution of the surface potential caused by the DC grounding electrode as the problem of solving the potential of a point current source in the layered soil. Since the establishment of the soil model is affected by multiple factors such as the soil model and the terrain environment, the initial modeling workload is huge, and it is easily affected by the climate and needs to be updated frequently. Therefore, it is very necessary to propose a simpler method for assessing the operation risk of DC grounding electrodes in power grids. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a method, device and medium for evaluating the operation risk of a DC grounding electrode in a power grid.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] A method for evaluating the operation risk of a DC grounding electrode in a power grid comprises the following steps:

[0007] S1: Obtain the connection relationship, distance and maximum single-phase grounding current of each substation in the power grid;

[0008] S2: Establish a DC loop model of the power grid based on the connection relationship and distance of each substation in the power grid;

[0009] S3: Taking the grounding point of the power grid as the center and a certain distance as the radius, the substations with distance risks are screened out from the DC loop model as the first stage risk assessment result;

[0010] S4: Eliminate the substations with distance risks in the DC loop model, measure the DC current of each substation in the power grid under different working conditions of the remaining substations in the power grid, calculate the average current, and compare the current data exceeding the maximum single-phase grounding current of the substation and the corresponding number of substations;

[0011] S5: According to the current data exceeding the maximum current of single-phase grounding of the substation, the corresponding number of substations and the average current, the high current risk, quantity risk and average current risk in each working state are calculated respectively;

[0012] S6: The second stage risk assessment results for each working state are calculated based on the high current risk, quantity risk and average current risk under each working state.

[0013] Furthermore, the calculation formula for high current risk is:

[0014]

[0015] In the formula, R 1i is the high current risk in the ith working state, rx i is the high current risk factor, I i is the maximum absolute value of the current of each substation under the i-th working state, and max(I) is the maximum absolute value of the current of each substation under all working states.

[0016] Furthermore, the calculation formula for quantity risk is:

[0017]

[0018] In the formula, R 2i is the quantity risk in the i-th working state, r 2i is the quantity risk factor, N i is the number of substations whose current exceeds the threshold in the i-th working state, and max(N) is the maximum value of the number of substations whose current exceeds the threshold in all working states.

[0019] Furthermore, the calculation formula of the average current risk is:

[0020]

[0021] In the formula, R 3i is the average current risk in the ith working state, r 3i is the average current risk factor, A i is the average value of the absolute value of the current of each substation under the i-th working state, and max(A) is the maximum value of the average value of the absolute value of the current of each substation under all working states.

[0022] Furthermore, the second-stage risk assessment result is the sum of high current risk, quantity risk and average current risk.

[0023] Furthermore, a substation with distance risk is a substation that is less than 50 km away from a grounding point of the power grid.

[0024] Furthermore, the steps include:

[0025] S7: Obtain the potential of each substation, obtain the grounding electrode excitation current surface potential map, and verify the impact of the surface potential difference caused by the grounding electrode on the power grid based on the second-stage risk assessment results and the grounding electrode excitation current surface potential map.

[0026] Furthermore, the ground electrode excitation current surface potential diagram includes a potential diagram under a forward connection mode of the ground electrode and a potential diagram under a reverse connection mode of the ground electrode.

[0027] A second aspect of the present invention is a device for assessing the operating risks of a DC grounding electrode in a power grid, comprising a memory, a processor, and a program stored in the memory. When the processor executes the program, it implements any of the above methods for assessing the operating risks of a DC grounding electrode in a power grid.

[0028] A third aspect of the present invention is a storage medium having a program stored thereon, which, when executed, implements any of the above methods for assessing the operating risk of a DC grounding electrode in a power grid.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] 1) The present invention establishes a DC loop model to screen out substations with distance risks that are too close to the grounding point of the power grid, and obtains the first-stage evaluation results; the remaining substations are retained in the DC loop model, and the large current risk, quantity risk and average current risk of each substation under different working conditions are calculated respectively to obtain the second-stage risk assessment results. The risk assessment results obtained by the present invention can respectively reflect the main risk factors of each substation, and various assessment parameters are easy to obtain, which is conducive to technical personnel to adjust the working conditions of each substation or set DC suppression measures according to the evaluation results, so as to provide technical support for the safe operation of the power grid.

[0031] 2) The present invention can further combine the potentials of each transformer in the power grid to obtain a grounding electrode excitation current surface potential diagram. According to the second-stage risk assessment results and the grounding electrode excitation current surface potential diagram, the influence of the surface potential difference caused by the grounding electrode on the power grid can be verified, thereby improving the reliability of the assessment results. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of the method flow of the present invention.

[0033] Figure 2 This is a DC circuit model of an embodiment of the present invention.

[0034] Figure 3 : This is the ground potential diagram of the ground electrode excitation current of ground A in the embodiment.

[0035] Figure 4 : This is the ground potential diagram of the ground electrode excitation current of ground B in the embodiment.

[0036] Figure 5 : This is the surface potential diagram of the C ground electrode excitation current in the embodiment.

[0037] Figure 6 : This is the ground potential diagram of the A+B ground excitation current in the embodiment.

[0038] Figure 7 AB ground excitation current surface potential diagram in the embodiment.

[0039] Figure 8 : This is the ground potential diagram of the ground excitation current of the A+B+C ground in the embodiment.

[0040] Explanation of the markings in the figure: 1. 10 km away from the grounding electrode; 2. 50 km away from the grounding electrode. DETAILED DESCRIPTION

[0041] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0042] Example 1

[0043] The present invention is a method, device and medium for evaluating the operation risk of a DC grounding electrode in a power grid. Figure 1 As shown, the method comprises the following steps:

[0044] S1: Obtain the connection relationship, distance and maximum single-phase grounding current of each substation in the power grid;

[0045] S2: Establish a DC loop model of the power grid based on the connection relationship and distance of each substation in the power grid;

[0046] S3: Taking the grounding point of the power grid as the center and a certain distance as the radius, the substations with distance risks are screened out from the DC loop model as the first stage risk assessment result;

[0047] S4: Eliminate the substations with distance risks in the DC loop model, measure the DC current of each substation in the power grid under different working conditions of the remaining substations in the power grid, calculate the average current, and compare the current data exceeding the maximum single-phase grounding current of the substation and the corresponding number of substations;

[0048] S5: According to the current data exceeding the maximum current of single-phase grounding of the substation, the corresponding number of substations and the average current, the high current risk, quantity risk and average current risk of each working state are calculated respectively;

[0049] S6: The second stage risk assessment results for each working state are calculated based on the high current risk, quantity risk and average current risk under each working state.

[0050] Preferably, it also includes:

[0051] S7: Obtain the potential of each substation, obtain the grounding electrode excitation current surface potential map, and verify the impact of the surface potential difference caused by the grounding electrode on the power grid based on the second-stage risk assessment results and the grounding electrode excitation current surface potential map.

[0052] This embodiment is described by taking a power grid as an example:

[0053] like Figure 2 As shown in the figure, the DC loop model of the power grid is used. Three different grounding pole-transformer distances are set, which are <10km, 10-50km, and >50km, respectively, for DC bias magnetic risk identification:

[0054] 11) The distance is less than 10km, and the risk level is high risk;

[0055] 12) If the distance is greater than 10km and less than 50km, the risk level is medium risk;

[0056] 13) If the distance is greater than 50km, the risk level is low risk.

[0057] Among them, substations in high-risk and medium-risk areas are considered as substations with distance risks, as shown in Table 1.

[0058] Table 1A Risk assessment of substations near grounding electrodes

[0059]

[0060] According to the voltage level of different transformers, the maximum current of single-phase grounding in substations is specified as follows:

[0061] 21) When the voltage level of the substation is 220kV, the DC current flowing in cannot exceed 2A;

[0062] 22) When the substation voltage level is 500kV, the DC current flowing in cannot exceed 4A;

[0063] 23) When the substation voltage level is 1000kV, the DC current flowing in cannot exceed 2.3A.

[0064] The DC current statistics of each substation under different working conditions are shown in Table 2, where "normal" means that the data does not exceed the corresponding threshold.

[0065] Table 2 DC current under different operating modes

[0066]

[0067] Table 2 DC current under different operating modes

[0068]

[0069] Six operating modes are selected in Table 2, and risk assessment is performed on these six operating modes.

[0070] In view of the different impacts on substations under different grounding operation modes, this project will further conduct risk assessment from the aspects of the number of stations exceeding the standard, maximum current and average current. According to different influencing factors, the impact degree of each aspect will be evaluated to different degrees, with the number risk factor > large current risk factor > average current risk factor.

[0071] The calculation formula for high current risk is:

[0072]

[0073] In the formula, R 1i is the high current risk in the ith working state, r 1i is the high current risk factor, I i is the maximum absolute value of the current of each substation under the i-th working state, and max(I) is the maximum absolute value of the current of each substation under all working states.

[0074] The calculation formula for quantity risk is:

[0075]

[0076] In the formula, R 2i is the quantity risk in the i-th working state, r 2i is the quantity risk coefficient, Ni is the number of substations whose current exceeds the threshold in the i-th working state, and max(N) is the maximum value of the number of substations whose current exceeds the threshold in all working states.

[0077] The average current risk is calculated as:

[0078]

[0079] In the formula, R 3i is the average current risk in the ith working state, r 3i is the average current risk factor, A i is the average value of the absolute value of the current of each substation under the i-th working state, and max(A) is the maximum value of the average value of the absolute value of the current of each substation under all working states.

[0080] The results of the second phase risk assessment i The expression is:

[0081] R i =R 1i +R 2i +R 3i

[0082] The results of the second phase risk assessment are given below, as shown in Table 3:

[0083] Table 3A Substation risk criteria

[0084]

[0085] Table 3A Substation Risk Criteria

[0086]

[0087] According to the risk assessment results, this method also counted the surface potential of each operating condition and obtained the comprehensive assessment results:

[0088] like Figure 3 As shown in the figure, under the operation mode of 6250A grounding electrode excitation current, the surface potential of grounding electrode A is 42.863V. When the distance is far enough, the surface potential is 0, and the potential difference is 42.863V. Therefore, the surface potential difference caused by a single grounding electrode A has an impact on the local power grid. Under this operation mode, there are 1 1000kV substation and 5 220kV substations operating in a risky state.

[0089] like Figure 4 As shown in the figure, under the operation mode of 6250A grounding current of grounding electrode B, the surface potential of grounding electrode B is 29.177V. When the distance is far enough, the surface potential is 0, and the potential difference is 29.177V. Therefore, the surface potential difference caused by single grounding electrode B also has an impact on the local power grid, but it is relatively small. Under this operation mode, there are 1 1000kV substation and 1 220kV substation operating in a risky state.

[0090] like Figure 5As shown in the figure, under the operation mode of 3000A excitation current of ground electrode C, the surface potential of ground electrode C is 22.421V. When the distance is far enough, the surface potential is 0, and the potential difference is 22.421V. Therefore, the surface potential difference caused by a single ground electrode C also has an impact on the local power grid, but it is relatively small. Under this operation mode, there is a total of 1000kV substation operating in a risky state.

[0091] like Figure 6 As shown in the figure, under the operation mode of grounding electrode excitation current 6250A for A and grounding electrode excitation current -6250A for B, the surface potential of grounding electrode A is 41.144V, the surface potential of grounding electrode B is -27.459V, the surface potential difference between the two is 68.603V, and the straight-line distance between the two grounding electrodes is 177.713km, which is far away. Therefore, the surface potential difference caused by the two grounding electrodes has a greater impact on the power grid in a certain place. Under this operation mode, there are 2 1000kV substations and 9 220kV substations operating in a risky state.

[0092] like Figure 7 As shown in the figure, under the operation mode of grounding electrode excitation current 6250A for A and grounding electrode excitation current 6250A for B, the surface potential of grounding electrode A is 44.582V, the surface potential of grounding electrode B is 30.9V, the surface potential difference between the two is 13.682V, and the straight-line distance between the two grounding electrodes is 177.713km, which is far away. Therefore, the surface potential difference caused by the two grounding electrodes has a greater impact on the power grid in a certain place. Under this operation mode, there are 2 1000kV substations and 6 220kV substations operating in a risky state.

[0093] like Figure 8 As shown, under the operation mode of 6250A grounding current for grounding electrode in A, 6250A grounding current for grounding electrode in B, and 3000A grounding current for grounding electrode in C, the surface potential of grounding electrode in A is 45.465V, the surface potential of grounding electrode in B is 33.6V, and the surface potential of grounding electrode in C is 29.91V. The surface potential difference between ground A and ground B is 11.865V, and the straight-line distance is 177.713km. The surface potential difference between ground A and ground C is 15.555V, and the straight-line distance is 180.373km. The surface potential difference between ground B and ground C is 3.69V, and the straight-line distance is 20.6km. The distance between ground A and ground B and ground A and ground C is far, so the surface potential difference caused by the grounding electrode has a greater impact on the power grid in a certain place. Under this operation mode, there are 2 1000kV substations and 8 220kV substations operating in a risky state.

[0094] According to the evaluation results of the present invention, the risk judgment results of 220kV and above transformers in the whole network are given. According to different risk results, different transformer DC suppression measures can be selected to provide support for the safe operation of the power grid.

[0095] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.

[0096] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0097] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A method for assessing the operation risk of a DC grounding electrode in a power grid, characterized in that: The following steps are involved: S1: Obtain the connection relationship, distance and maximum single-phase grounding current of each substation in the power grid; S2: Establish a DC loop model of the power grid based on the connection relationship and distance of each substation in the power grid; S3: Taking the grounding point of the power grid as the center and a certain distance as the radius, the substations with distance risks are screened out from the DC loop model as the first stage risk assessment result; S4: Eliminate the substations with distance risks in the DC loop model, measure the DC current of each substation in the power grid under different working conditions of the remaining substations in the power grid, calculate the average current, and compare the current data exceeding the maximum single-phase grounding current of the substation and the corresponding number of substations; S5: According to the current data exceeding the maximum current of single-phase grounding of the substation, the corresponding number of substations and the average current, the high current risk, quantity risk and average current risk of each working state are calculated respectively; S6: The second stage risk assessment results for each working state are calculated based on the high current risk, quantity risk and average current risk under each working state.

2. A method for assessing the operation risk of a DC grounding electrode in a power grid according to claim 1, characterized in that: The calculation formula for the high current risk is: In the formula, R 1i is the high current risk in the i-th working state, r 1i is the high current risk factor, I i is the maximum absolute value of the current of each substation under the i-th working state, and max(I) is the maximum absolute value of the current of each substation under all working states.

3. A method for assessing the operation risk of a DC grounding electrode in a power grid according to claim 1, characterized in that: The calculation formula for the quantity risk is: In the formula, R 2i is the quantity risk in the i-th working state, r 2i is the quantity risk factor, N i is the number of substations whose current exceeds the threshold in the i-th working state, and max(N) is the maximum value of the number of substations whose current exceeds the threshold in all working states.

4. A method for assessing the operation risk of a DC grounding electrode in a power grid according to claim 1, characterized in that: The calculation formula of the average current risk is: In the formula, R 3i is the average current risk in the ith working state, r 3i is the average current risk factor, A i is the average value of the absolute value of the current of each substation under the i-th working state, and max(A) is the maximum value of the average value of the absolute value of the current of each substation under all working states.

5. A method for assessing the operation risk of a DC grounding electrode in a power grid according to claim 1, characterized in that: The second-stage risk assessment result is the sum of high current risk, quantity risk and average current risk.

6. A method for assessing the operation risk of a DC grounding electrode in a power grid according to claim 1, characterized in that: The substation with distance risk is a substation that is less than 50 km away from the grounding point of the power grid.

7. A method for assessing the operation risk of a DC grounding electrode in a power grid according to claim 1, characterized in that: The steps also include: S7: Obtain the potential of each substation, obtain the grounding electrode excitation current surface potential map, and verify the impact of the surface potential difference caused by the grounding electrode on the power grid based on the second-stage risk assessment results and the grounding electrode excitation current surface potential map.

8. A method for assessing the operation risk of a DC grounding electrode in a power grid according to claim 7, characterized in that: The ground electrode excitation current surface potential diagram includes a potential diagram in a forward connection mode of the ground electrode and a potential diagram in a reverse connection mode of the ground electrode.

9. A device for assessing the operation risk of a DC grounding electrode in a power grid, comprising a memory, a processor, and a program stored in the memory, characterized in that: When the processor executes the program, the method for assessing the operating risk of a DC grounding electrode in a power grid as described in any one of claims 1 to 8 is implemented.

10. A storage medium having a program stored thereon, characterized in that: When the program is executed, a method for assessing the operating risk of a DC grounding electrode in a power grid as described in any one of claims 1 to 8 is implemented.

Citation Information

Patent Citations

  • Interconnected direct-current path equivalent modeling method based on magnetic bias of transformer substation

    CN114221327A

  • Drawing and using method of direct current magnetic bias risk map

    CN115861474A

  • Earth potential distribution calculation method, device and system based on actual measurement of direct-current magnetic bias current of power grid and storage medium

    CN116805029A