Mixed connection troubleshooting method and device for drainage subareas
Through zoning and data analysis of the drainage system, the origin point of mixed rainwater and sewage connections is determined, which solves the problem of low efficiency in checking rainwater and sewage mixed connections in the existing technology, and achieves more efficient sewage management and operation of sewage treatment facilities.
Patent Information
- Application Number
- CN202410781874.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-15
AI Technical Summary
Existing technology is difficult to efficiently troubleshoot and solve the phenomenon of mixed rainwater and sewage, resulting in sewage not entering the sewage treatment facilities, causing environmental and health threats, and the operation efficiency of the sewage plant is low.
By dividing the target investigation area into multiple drainage management and control zones, setting up main pipes, branch pipes and source monitoring points, obtaining and analyzing drainage data, investigating layer by layer to determine the origin of the mixing phenomenon, and using the rainwater and sewage system model to generate a treatment plan.
It improves the accuracy and efficiency of the investigation, reduces the waste of resources, can solve the problem of mixed rainwater and sewage in a targeted manner, and improves the operating efficiency and environmental quality of sewage treatment facilities.
Smart Images

Figure CN118780422A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of drainage systems, and in particular to a method and device for checking mixed connections in drainage zones. Background Art
[0002] Mixed rainwater and sewage refers to the phenomenon that sewage is discharged into the rainwater system or rainwater enters the sewage system due to aging, damage, construction errors and other reasons of drainage pipes. On the one hand, the mixing of sewage into rainwater pipes will damage the ecosystem that relies on rainwater resources and pose a potential threat to the environment and human health. On the other hand, if part of the sewage does not enter the sewage treatment facilities, it will lead to a low urban sewage collection rate, insufficient operating load of the sewage plant, and low operating efficiency. Therefore, how to efficiently check the phenomenon of mixed rainwater and sewage has become a problem that needs to be solved urgently. Summary of the invention
[0003] The present disclosure provides a method and device for checking mixed connections in drainage zones, so as to at least solve the above technical problems existing in the prior art.
[0004] According to a first aspect of the present disclosure, a method for checking mixed connections in drainage zones is provided, the method comprising: dividing a target checking area to determine a plurality of drainage control zones; each drainage control zone comprises a main pipe monitoring point, a branch pipe monitoring point and a source monitoring point of each drainage control zone; obtaining drainage data of the main pipe monitoring point, drainage data of the branch pipe monitoring point and drainage data of the source monitoring point in each drainage control zone; based on the drainage data of the main pipe monitoring point in each drainage control zone, determining a target drainage control zone from all drainage control zones in the target checking area; the target drainage control zone is a drainage control zone where mixed connections exist; based on the drainage data of the branch pipe monitoring point and the drainage data of the source monitoring point in the target drainage control zone, determining the location of the origin point where the mixed connection occurs in the target drainage control zone.
[0005] In one possible implementation, the method of determining the location of the origin point of the mixed connection phenomenon in the target drainage control zone based on the drainage data of the branch pipe monitoring points and the drainage data of the source monitoring points in the target drainage control zone includes: determining a first inspection result of the target drainage control zone based on the drainage data of each branch pipe monitoring point in the target drainage control zone, the first inspection result being whether the origin point of the mixed connection phenomenon in the target drainage control zone is located in the branch pipe network of the target drainage control zone; determining a second inspection result of the target drainage control zone based on the first inspection result and the drainage data of each source monitoring point in the target drainage control zone, the second inspection result being whether the origin point of the mixed connection phenomenon in the target drainage control zone is located at the source of the target drainage control zone.
[0006] In one possible implementation, the second inspection result of the target drainage control zone is determined based on the first inspection result and the drainage data of each source monitoring point in the target drainage control zone, the second inspection result being whether the origin point of the mixing phenomenon in the target drainage control zone is located at the source of the target drainage control zone, including: in response to the first inspection result that the origin point of the mixing phenomenon in the target drainage control zone is not located in the branch pipe network, based on the drainage data of each source monitoring point in the key drainage control zone, determining the source mixing amount of the target drainage control zone; based on whether the source mixing amount meets the source drainage conditions, determining the second inspection result of the target drainage control zone is whether the origin point of the mixing phenomenon in the target drainage control zone is located at the source of the target drainage control zone.
[0007] In one possible implementation, the dividing of the target investigation area to determine multiple drainage control zones includes: obtaining a survey data set and a field data set of the target investigation area; dividing the target investigation area according to the survey data set and the field data set to obtain multiple drainage control zones.
[0008] In one possible implementation, the target drainage control zone is determined from all drainage control zones in the target inspection area based on the drainage data of the trunk pipe monitoring points within each drainage control zone, including: judging whether the drainage of the drainage control zone meets the trunk pipe drainage conditions based on the drainage data of the trunk pipe monitoring points within each drainage control zone; and determining the drainage control zone whose drainage data of the trunk pipe monitoring points does not meet the trunk pipe drainage conditions as the target drainage control zone.
[0009] In one possible implementation, the first inspection result of the target drainage control zone is determined based on the drainage data of each branch monitoring point within the target drainage control zone, including: determining the water quantity analysis result and water quality analysis result of each branch monitoring point based on the drainage data of each branch monitoring point within the target drainage control zone; if the water quantity analysis results between the branch monitoring points are inconsistent, and / or the water quality analysis results are inconsistent, then it is determined that the first inspection result is that the origin point of the mixed connection phenomenon occurring in the target drainage control zone is located in the branch pipe network; if the water quantity analysis results between the branch monitoring points are consistent, and the water quality analysis results between the branch monitoring points are consistent, then it is determined that the first inspection result is that the origin point of the mixed connection phenomenon occurring in the target drainage control zone is not located in the branch pipe network.
[0010] In one possible implementation, if the first inspection result is that the origin point of the mixing phenomenon occurring within the target drainage control area is located in the branch pipe network, the method also includes: obtaining visualization data of the branch pipe network; and determining the problem pipe network in the branch pipe network based on the visualization data.
[0011] In one possible implementation, if the second inspection result is that the origin point of the mixed connection phenomenon within the target drainage control zone is located at the source, the method further includes: based on the drainage data of multiple source monitoring points within the target drainage control zone, determining the change data of the drainage at each source monitoring point, the change data characterizing the change law of drainage; according to the change data of the drainage at each source monitoring point, obtaining reference data characterizing the cause of the mixed connection phenomenon; based on the reference data, screening out the source of the problem from all sources within the target drainage control zone.
[0012] In one possible implementation, the method further includes: based on the first inspection result and the second inspection result, dynamically simulating the target drainage control zone through a rainwater and sewage system model, and generating evaluation information of the treatment plan for the target drainage control zone.
[0013] According to a second aspect of the present disclosure, a device for checking mixed connections in drainage zones is provided, the device comprising: an area division module, used to divide a target checking area and determine a plurality of drainage control zones; each drainage control zone comprises a main pipe monitoring point, a branch pipe monitoring point and a source monitoring point of each drainage control zone; a data acquisition module, used to obtain drainage data of the main pipe monitoring point, drainage data of the branch pipe monitoring point and drainage data of the source monitoring point in each drainage control zone; a checking module, used to determine a target drainage control zone from all drainage control zones in the target checking area based on the drainage data of the main pipe monitoring point in each drainage control zone; the target drainage control zone is a drainage control zone where mixed connections exist; the checking module is further used to determine the location of the origin point where the mixed connection phenomenon occurs in the target drainage control zone based on the drainage data of the branch pipe monitoring point and the drainage data of the source monitoring point in the target drainage control zone.
[0014] The disclosed method and device for checking the mixed connection of drainage partitions, the solution of the present application, divides the target inspection area to obtain multiple drainage control partitions, and then checks the high-risk partitions layer by layer, and finally determines the location of the origin point of the mixed connection phenomenon. The accuracy and efficiency of the inspection are improved. This targeted inspection method can solve the problem more effectively and reduce unnecessary waste of resources.
[0015] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present disclosure, nor is it intended to limit the scope of the present disclosure. Other features of the present disclosure will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The above and other objects, features and advantages of the exemplary embodiments of the present disclosure will become readily understood by reading the detailed description below with reference to the accompanying drawings. In the accompanying drawings, several embodiments of the present disclosure are shown in an exemplary and non-limiting manner, in which:
[0017] In the drawings, the same or corresponding reference numerals represent the same or corresponding parts.
[0018] Figure 1 A schematic diagram of the implementation process of a mixed connection troubleshooting method for drainage partitions according to an embodiment of the present disclosure is shown;
[0019] Figure 2 A schematic diagram showing monitoring points according to an embodiment of the present disclosure is shown;
[0020] Figure 3 A schematic diagram of the structure of a mixed connection inspection device for drainage partitions according to an embodiment of the present disclosure is shown;
[0021] Figure 4 A schematic diagram of the structure of an electronic device according to an embodiment of the present disclosure is shown. DETAILED DESCRIPTION
[0022] In order to make the purpose, features, and advantages of the present disclosure more obvious and easy to understand, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present disclosure.
[0023] Figure 1 FIG. 1 shows a schematic diagram of an implementation flow of a method for checking mixed connection of drainage partitions according to an embodiment of the present disclosure, such as Figure 1 As shown, according to a first aspect of an embodiment of the present disclosure, a method for checking mixed connection of drainage partitions is provided, and the method includes:
[0024] Step 101, divide the target investigation area and determine multiple drainage control zones; each drainage control zone includes the main pipe monitoring points, branch pipe monitoring points and source monitoring points of each drainage control zone.
[0025] First, obtain basic information on the target investigation area from the database, such as pipe network maps, topographic maps, urban planning maps, etc. Then divide the target investigation area based on the basic data to obtain multiple different drainage control zones. Specifically, areas with similar drainage characteristics or needs can be divided into the same drainage control zone based on the following points: 1. Functional characteristics of the drainage system, such as rainwater discharge, sewage collection, etc. 2. Geographical characteristics, including geographical factors such as topography, landform, and water system distribution. For example, the drainage needs of mountainous areas and plains are different, and different drainage control zones can be set. 3. Drainage system, including combined system and separate system. 4. Urban planning, including land use type, road layout, green space setting, etc.
[0026] By dividing the target inspection area into multiple drainage control zones for inspection, the drainage system can be managed in a refined manner. On the one hand, each zone has a clear management scope and objectives, which helps with inspection efficiency. On the other hand, it helps to quickly identify and solve problems in the drainage system. Once a problem occurs in a zone, it can help staff quickly locate it and take appropriate measures to repair or improve it.
[0027] Each drainage control zone includes the main pipe monitoring points, branch pipe monitoring points and source monitoring points of each drainage control zone. Among them, the source refers to the place where the drainage system starts, that is, the starting point of the water flow. In the rainwater drainage system, the source may be a roof, green space, etc. In the sewage drainage system, the source may be a domestic sewage outlet, a factory wastewater outlet, etc. The branch pipe refers to a series of interconnected pipes and facilities in the pipe network drainage system, which are used to transport water generated from the source to the main pipe. The main pipe is the main pipe in the drainage system, which is used to collect the water flow in the branch pipe and transport it to the downstream sewage treatment facilities or outlets. The main pipe monitoring points, branch pipe monitoring points and source monitoring points are monitoring points located at the main pipe, branch pipe and source respectively. There can be one or more monitoring points at each level, and the specific number of control points can be determined according to actual needs. Figure 2 A schematic diagram of monitoring points according to an embodiment of the present disclosure is shown. Figure 2 As shown, C represents the main pipe monitoring point, F represents the branch pipe monitoring point, and O represents the source monitoring point.
[0028] This step is to monitor and manage each drainage zone at different levels after zoning the target inspection area. The trunk pipe monitoring points, branch pipe monitoring points and source monitoring points in each drainage control zone together constitute a drainage system monitoring network to achieve a comprehensive understanding and effective management of the drainage conditions in the area.
[0029] Step 102, obtaining drainage data of the main pipe monitoring points, drainage data of the branch pipe monitoring points and drainage data of the source monitoring points in each drainage control zone.
[0030] The drainage data of each monitoring point includes water quality, water volume, and liquid level, etc. Specifically, it can be obtained by deploying online monitoring equipment such as liquid level meters, flow meters, and water quality meters at each monitoring point. During the implementation of this method, the drainage data obtained by the corresponding monitoring equipment is directly obtained online according to the needs.
[0031] Step 103, based on the drainage data of the main pipe monitoring points in each drainage control zone, determine the target drainage control zone from all the drainage control zones in the target inspection area; the target drainage control zone is the drainage control zone where the mixed connection phenomenon exists.
[0032] Specifically, the drainage data of the main pipe monitoring points in each drainage control zone can be analyzed for different periods (such as rainy season and dry season) to identify abnormal data. For example, in the rainy season, the flow rate of the main pipe monitoring point of a sewage system increases abnormally, and the increase is far greater than the level in the dry season. This indicates that there may be a mixture of rainwater and sewage in this zone. For another example, in the dry season, the main pipe monitoring point of a certain zone is located upstream of the sewage treatment plant. The drainage data of the main pipe monitoring point is analyzed, and the chemical oxygen demand (COD) data of the flowing water input into the sewage treatment plant is much lower than the daily data. This indicates that there may be external water leakage in this zone. According to the drainage data of the main pipe monitoring points in each drainage control zone, the drainage zones where there may be mixed connection are determined as the key monitoring objects, that is, the target drainage control zones.
[0033] Step 104, based on the drainage data of the branch monitoring points in the target drainage control zone and the drainage data of the source monitoring points, determine the location of the origin point of the mixed connection phenomenon in the target drainage control zone.
[0034] After determining the target drainage control zone, further problem diagnosis is performed through the drainage data of the branch monitoring points and the source monitoring points. Through the water flow, water quality and other data of each branch monitoring point and the source monitoring point, it is determined whether there is abnormal data, so as to judge whether the origin of the mixed connection phenomenon is located in the pipe network or the source. For example, in the rainy season, if the COD value in the drainage data of a branch monitoring point in the sewage drainage system is low, and the COD data in the drainage data of the source monitoring point is normal. This means that the pipe network may have problems such as damage and wrong connection, causing rainwater to infiltrate into the sewage pipe. Therefore, it can be obtained that the origin of the mixed connection phenomenon is located in the pipe network.
[0035] This method can accurately determine the origin of the mixed connection phenomenon through gradual and in-depth investigation and data analysis. Once the origin of the mixed connection phenomenon is determined, targeted corrective measures can be taken immediately to improve the treatment efficiency. This investigation process can be carried out continuously to monitor the operation of the drainage system and timely detect and deal with the mixed connection phenomenon.
[0036] The solution of this application divides the target inspection area into multiple drainage control zones, and then conducts a level-by-level inspection of the high-risk zones, and finally determines the location of the origin of the mixed connection phenomenon, thereby improving the accuracy and efficiency of the inspection. This targeted inspection method can solve the problem more effectively and reduce unnecessary waste of resources.
[0037] In one embodiment of the present disclosure, the determination of the location of the origin point of the mixed connection phenomenon in the target drainage control zone based on the drainage data of the branch monitoring points and the drainage data of the source monitoring points in the target drainage control zone can be specifically achieved through the following technical means: based on the drainage data of each branch monitoring point in the target drainage control zone, a first investigation result of the target drainage control zone is determined, and the first investigation result is whether the origin point of the mixed connection phenomenon in the target drainage control zone is located in the branch pipe network of the target drainage control zone; based on the first investigation result and the drainage data of each source monitoring point in the target drainage control zone, a second investigation result of the target drainage control zone is determined, and the second investigation result is whether the origin point of the mixed connection phenomenon in the target drainage control zone is located at the source of the target drainage control zone.
[0038] First, the drainage data of the branch pipe monitoring point is used to determine the first investigation result, that is, to determine whether the origin of the mixed connection phenomenon is located in the branch pipe network. If the first investigation result cannot determine the problem, it is preliminarily determined that the origin of the mixed connection phenomenon is not in the branch pipe network. Then, the drainage data of the source monitoring point is further used for a second investigation to determine whether the origin of the mixed connection phenomenon is located at the source. This hierarchical investigation method has clear logic, can gradually narrow the scope of investigation, and improve the efficiency of investigation.
[0039] In one embodiment of the present disclosure, the second screening result of the target drainage control zone is determined based on the first screening result and the drainage data of each source monitoring point in the target drainage control zone, the second screening result being whether the origin point of the mixing phenomenon in the target drainage control zone is located at the source of the target drainage control zone, which can be specifically achieved by the following technical means: in response to the first screening result that the origin point of the mixing phenomenon in the target drainage control zone is not located in the branch pipe network, the source mixing amount of the target drainage control zone is determined based on the drainage data of each source monitoring point in the key drainage control zone; based on whether the source mixing amount meets the source drainage conditions, the second screening result of the target drainage control zone is determined to be whether the origin point of the mixing phenomenon in the target drainage control zone is located at the source of the target drainage control zone.
[0040] When it is determined that the cause of the mixing phenomenon is not in the branch pipe network, the source is further investigated based on the drainage data of the source monitoring point. First, determine the source mixing amount of each source. The source mixing amount is the amount of mixing produced per millimeter of non-sewage. The mixing amount can characterize the severity of the mixing phenomenon in the area. Then compare the source mixing amount with the preset source drainage conditions. If the source mixing amount exceeds the range allowed by the source drainage conditions, then it can be determined that the origin of the mixing phenomenon in the target drainage control area is located at the source.
[0041] For example, a source monitoring point is a residential rainwater connection well. Assuming that based on the drainage data of this point, the source mixing volume is determined to be 26.2m 3 / mm, which does not meet the preset drainage conditions of the point that only rainwater can be discharged. And the mixing amount at the source is almost the same as the mixing amount measured at the main pipe monitoring point. It is determined that the rainwater connection well in the community is the origin of the mixing phenomenon. There may be a problem of direct discharge of community sewage into the rainwater pipe.
[0042] In one embodiment of the present disclosure, the target investigation area is divided to determine a plurality of drainage control zones, which can be specifically achieved by the following technical means: obtaining a survey data set and a field data set of the target investigation area; dividing the target investigation area according to the survey data set and the field data set to obtain a plurality of drainage control zones.
[0043] Survey data sets usually include historical data, planning documents, geographic information system data (GIS), topographic maps, land use maps, etc. related to the target investigation area. These data provide basic information about the target area, such as topography, soil type, rainfall, drainage facility layout, etc. It can also include previous hydrological analysis, water quality monitoring data, and possible pollution source information.
[0044] Field data sets are data obtained through field surveys, measurements and monitoring. They may include detailed layout, pipe diameter, material, flow direction, slope, etc. of the pipeline network; on-site water level, flow, and water quality monitoring data; and records of any possible illegal discharge, leakage or mixing.
[0045] First, the survey data set and the field data set are integrated to form a comprehensive and accurate database of target inspection areas. Then, the target area can be preliminarily divided based on factors such as topography and drainage facility layout to form several preliminary drainage control zones. Based on management needs, pollution source distribution and other reasons, the results of the preliminary division are optimized to ultimately determine multiple drainage control areas.
[0046] This method directly obtains the survey data set and the field data set in the database. By dividing the entire target investigation area into smaller, manageable areas through the survey data set and the field data set, problems such as mixed connections and leaks can be more effectively identified, located, and handled. In addition, zoning management also helps optimize resource allocation and improve maintenance efficiency.
[0047] In one embodiment of the present disclosure, the target drainage control zone is determined from all drainage control zones in the target inspection area based on the drainage data of the trunk pipe monitoring points within each drainage control zone. This can be specifically achieved through the following technical means: judging whether the drainage of the drainage control zone meets the trunk pipe drainage conditions based on the drainage data of the trunk pipe monitoring points within each drainage control zone; and determining the drainage control zone whose drainage data of the trunk pipe monitoring points does not meet the trunk pipe drainage conditions as the target drainage control zone.
[0048] The main pipe in the drainage system is the main channel connecting each branch pipe and the source, and its operating status directly reflects the health of the entire drainage system. By setting monitoring points on the main pipe, drainage data such as flow, flow rate, water quality, etc. can be obtained in real time. The pre-set main pipe drainage conditions can be set according to actual conditions, for example, whether the flow and flow rate are within the normal range; whether the water quality meets the relevant standards, such as turbidity, pH value, pollutant concentration, etc.; whether there are abnormal fluctuations or peaks, etc.
[0049] If the drainage data of the main pipe monitoring point in a drainage control zone does not meet the main pipe drainage conditions, it can be preliminarily determined that there is a mixed connection or other abnormal conditions in the zone. These zones need to be further monitored and further investigated, so these zones are identified as target drainage control zones.
[0050] Taking rainy days as an example, firstly, the dry season flow data, the single rainfall R, and the total flow Q through the pipeline during the rainfall period are obtained through the pre-controlled rain gauges, liquid level meters, flow meters and other equipment. 总, rainfall duration T and other drainage data. The dry season refers to a period of relatively little or no rainfall. During this period, the flow in the pipeline is mainly generated by sewage discharge. Obtain the flow data for all days in the dry season, and then take the average to obtain the average daily flow rate Q of the pipeline 旱 The rainy season refers to the period with more rainfall. Get the rainfall of each rainfall in the rainy season, that is, the single rainfall R, the total flow through the pipeline during the rainfall period Q 总 And the duration of the rainfall event T. The rainwater inflow and infiltration are calculated using the above data The amount of rainwater inflow and infiltration indicates how much additional flow is generated in the pipe per millimeter of rainfall. Then, the area with large rainwater inflow and infiltration can be determined as the target drainage control zone.
[0051] For example, the multiple drainage control zones identified include: drainage zones where the water inflow to the pumping station increases on rainy days, drainage zones where sewage overflows occur in the rainy season, drainage zones where sewage is directly discharged into the drainage outlets on sunny days, drainage zones where the sewage network operates at a higher water level, drainage zones where pumping stations with obviously abnormal inlet water quality concentrations are located, and drainage zones supported by other investigation results (such as CCTV detection, manual inspection, etc.).
[0052] In one embodiment of the present disclosure, the first inspection result of the target drainage control zone is determined based on the drainage data of each branch monitoring point within the target drainage control zone, including: determining the water quantity analysis result and water quality analysis result of each branch monitoring point based on the drainage data of each branch monitoring point within the target drainage control zone; if the water quantity analysis results between the branch monitoring points are inconsistent, and / or the water quality analysis results are inconsistent, then it is determined that the first inspection result is that the origin point of the mixed connection phenomenon occurring in the target drainage control zone is located in the branch pipe network; if the water quantity analysis results between the branch monitoring points are consistent, and the water quality analysis results between the branch monitoring points are consistent, then it is determined that the first inspection result is that the origin point of the mixed connection phenomenon occurring in the target drainage control zone is not located in the branch pipe network.
[0053] First, it is necessary to obtain the drainage data of each branch monitoring point within the target drainage control area. These data include at least water quality data and water volume data. Water volume data can reflect the flow velocity and flow rate of the pipeline; water quality data include turbidity, pH value, pollutant concentration, etc. The specific acquisition method is the same as that of obtaining the drainage data of the main pipeline monitoring point, that is, to deploy monitoring equipment at each branch monitoring point. When implementing this investigation method, the corresponding drainage data can be directly obtained from each monitoring device. Then compare the water volume data of each branch monitoring point to check whether there are obvious inconsistencies or anomalies. Inconsistency may be manifested as the water volume at some points being significantly higher or lower than other points, and anomalies may be manifested as excessive fluctuations in water volume or abnormal peaks.
[0054] For example, through the drainage data of two branch pipe monitoring points located upstream and downstream, it was found that the downstream flow of the same pipe was lost by 6,000 cubic meters per day compared with the upstream. It can be preliminarily judged that there may be problems in the branch pipe network. For example, there is a wrong connection in the pipe network, which causes sewage to be discharged directly after flowing upstream without passing through the downstream of the pipe.
[0055] Similarly, the water quality data of each branch pipe monitoring point is compared and analyzed. Check whether the water quality data of each point is consistent, including whether key indicators such as pollutant concentration, turbidity, and pH value are within the normal range. For example, by analyzing the water quality data, it is known that the COD concentration of water quality in a certain area on a dry day is only 30.5 mg / L. It can be preliminarily judged that there may be problems in the branch pipe network, such as infiltration points in the pipeline, causing external water to flow into the sewage pipe, resulting in a decrease in the COD concentration of the water quality in the sewage pipe.
[0056] If the water volume analysis results and water quality analysis results between the branch pipe monitoring points are consistent, it can be preliminarily determined that the origin of the mixing phenomenon in the target drainage area is not in the branch pipe network. This means that the problem may be located at the source or other unmonitored areas.
[0057] Through this data-based analysis method, the origin point of the mixed connection phenomenon can be determined more accurately, providing strong support for subsequent rectification work.
[0058] In one embodiment of the present disclosure, if the first inspection result is that the origin point of the mixed connection phenomenon occurring within the target drainage control area is located in the branch pipe network, the method also includes: obtaining visualization data of the branch pipe network; and determining the problem pipe network in the branch pipe network based on the visualization data.
[0059] If it is initially determined that the origin of the mixed connection phenomenon is located in the branch pipe network, the visual data in the branch pipe network, including high-definition images, video images, etc., can be obtained through underground pipeline detection equipment, CCTV (closed-circuit television), pipeline inspection robots and other equipment. Then, image processing, pattern recognition and other technologies can be used to detect abnormal points in the visual data, such as pipeline damage, leakage, illegal access, etc. Once the abnormal point is identified, the problematic pipe network can be accurately located. In this way, the mixed connection problem in the branch pipe network can be quickly and accurately found, providing strong support for subsequent maintenance and renovation work.
[0060] In one embodiment of the present disclosure, if the second inspection result is that the origin point of the mixed connection phenomenon generated in the target drainage control zone is located at the source, the method further includes: based on the drainage data of multiple source monitoring points in the target drainage control zone, determining the change data of the drainage at each source monitoring point, the change data characterizing the change law of drainage; according to the change data of the drainage at each source monitoring point, obtaining reference data characterizing the cause of the mixed connection phenomenon; based on the reference data, screening out the source of the problem from all sources in the target drainage control zone.
[0061] By analyzing the drainage data of each source monitoring point, the change data of their respective drainage can be determined. The change data can characterize the change pattern of drainage. These changes may include seasonal changes, diurnal changes, periodic changes (such as the periodicity of industrial emissions), etc. According to the change pattern, reference data characterizing the cause of the mixing phenomenon is obtained, such as abnormal flow changes, the time of change and flow value; abnormal changes in water quality indicators, the time of change and water quality indicator data.
[0062] For example, if the change data indicates that the drainage shows the pattern of domestic water use, and it is assumed that a peak value appears accurately every half hour, the reference data obtained indicates that the source of the problem may appear in the community's tap water tank. Upon inspection, it was found that the float valve of the tap water tank overflows and discharges regularly every half an hour. If the change data indicates that the drainage volume in the sewage pipe suddenly increases at night, the reference data obtained indicates that it may be caused by merchants secretly discharging sewage at night, and the source of the problem can be located in the merchant. For example, merchants in industries such as catering and car washing that consume a lot of water or discharge water of special quality.
[0063] Through this method, the origin of the mixing phenomenon can be located more accurately, allowing pipeline managers to take targeted measures to solve the problem, thereby improving the operating efficiency and environmental quality of the drainage system.
[0064] In one embodiment of the present disclosure, the method further includes: based on the first inspection result and the second inspection result, dynamically simulating the target drainage control zone through a rainwater and sewage system model, and generating evaluation information of the treatment plan for the target drainage control zone.
[0065] The rainwater and sewage system is a simulation tool based on mathematical and physical principles, which is used to simulate and analyze the operation of urban drainage systems. It can comprehensively consider factors such as rainfall, sewage discharge, pipe network layout, topography, etc. to predict and evaluate the performance of the drainage system. Then, the first inspection results, the second inspection results, and the drainage data of each monitoring point, including real-time or historical data, are used as the input of the model. The model dynamically simulates the target drainage control zone and simulates the operation of the drainage system under different working conditions. During the simulation process, the focus is on the drainage of the problem pipe network or the source of the problem to determine whether there is a mixed connection phenomenon and its impact on the entire drainage system. Through the simulation results, the specific causes and manifestations of the mixed connection phenomenon in the target drainage control zone are obtained. Determine the specific location, impact degree, and severity of the problem pipe network or the source of the problem. Based on the simulation results and diagnostic information, put forward governance suggestions for the target drainage control zone, which may include repairing the problem pipe network, strengthening source management, optimizing the design of the drainage system, etc. After the governance suggestions are obtained, the model can be used for simulation evaluation to obtain evaluation information for each governance measure, including the effect and cost-effectiveness after the implementation of the governance measure. It helps to verify the feasibility and effectiveness of the governance plan.
[0066] Dynamically simulating the target drainage control zone through the rainwater and sewage system model can more accurately diagnose the problems in the drainage system and generate evaluation information for targeted governance solutions. This method combines actual data and simulation analysis to provide strong support for the management and optimization of the drainage system.
[0067] Figure 3 A schematic diagram of the composition structure of a mixed connection troubleshooting device for drainage partitions according to an embodiment of the present disclosure is shown. According to another aspect of the present disclosure, a mixed connection troubleshooting device for drainage partitions is provided, and the device includes:
[0068] The area division module 301 is used to divide the target inspection area and determine multiple drainage control zones; each drainage control zone includes the main pipe monitoring points, branch pipe monitoring points and source monitoring points of each drainage control zone; the data acquisition module 302 is used to obtain the drainage data of the main pipe monitoring points, the drainage data of the branch pipe monitoring points and the drainage data of the source monitoring points in each drainage control zone; the inspection module 303 is used to determine the target drainage control zone from all the drainage control zones in the target inspection area based on the drainage data of the main pipe monitoring points in each drainage control zone; the target drainage control zone is a drainage control zone with mixed connection phenomenon; the inspection module 303 is also used to determine the location of the origin point of the mixed connection phenomenon in the target drainage control zone based on the drainage data of the branch pipe monitoring points and the drainage data of the source monitoring points in the target drainage control zone.
[0069] In one embodiment of the present disclosure, the investigation module 303 is also used to determine a first investigation result of the target drainage control zone based on the drainage data of each branch monitoring point within the target drainage control zone, the first investigation result being whether the origin point of the mixing phenomenon within the target drainage control zone is located in the branch pipe network of the target drainage control zone; based on the first investigation result and the drainage data of each source monitoring point within the target drainage control zone, determine a second investigation result of the target drainage control zone, the second investigation result being whether the origin point of the mixing phenomenon within the target drainage control zone is located at the source of the target drainage control zone.
[0070] In one embodiment of the present disclosure, the investigation module 303 is also used to respond to the first investigation result that the origin point of the mixing phenomenon in the target drainage control zone is not located in the branch pipe network, and determine the source mixing amount of the target drainage control zone based on the drainage data of each source monitoring point in the key drainage control zone; based on whether the source mixing amount meets the source drainage conditions, determine that the second investigation result of the target drainage control zone is whether the origin point of the mixing phenomenon in the target drainage control zone is located at the source of the target drainage control zone.
[0071] In one embodiment of the present disclosure, the area division module 301 is also used to obtain a survey data set and a field data set of a target investigation area; based on the survey data set and the field data set, the target investigation area is divided into regions to obtain multiple drainage control zones.
[0072] In one embodiment of the present disclosure, the inspection module 303 is also used to determine whether the drainage of the drainage control zone meets the main pipe drainage conditions based on the drainage data of the main pipe monitoring points within each drainage control zone; and the drainage control zone whose drainage data of the main pipe monitoring points does not meet the main pipe drainage conditions is determined as the target drainage control zone.
[0073] In one embodiment of the present disclosure, the investigation module 303 is also used to determine the water quantity analysis result and water quality analysis result of each branch monitoring point based on the drainage data of each branch monitoring point in the target drainage control zone; if the water quantity analysis results between the branch monitoring points are inconsistent, and / or the water quality analysis results are inconsistent, then it is determined that the first investigation result is that the origin point of the mixed connection phenomenon occurring in the target drainage control zone is located in the branch pipe network; if the water quantity analysis results between the branch monitoring points are consistent, and the water quality analysis results between the branch monitoring points are consistent, then it is determined that the first investigation result is that the origin point of the mixed connection phenomenon occurring in the target drainage control zone is not located in the branch pipe network.
[0074] In one embodiment of the present disclosure, the device further includes a problem point determination module (not shown in the figure) for acquiring visualization data of the branch pipe network; and determining the problem pipe network in the branch pipe network based on the visualization data.
[0075] In one embodiment of the present disclosure, a problem point determination module (not shown in the figure) is also used to determine the change data of the drainage at each source monitoring point based on the drainage data of multiple source monitoring points within the target drainage control zone, and the change data characterizes the change law of drainage; based on the change data of the drainage at each source monitoring point, reference data characterizing the cause of the mixing phenomenon is obtained; based on the reference data, the problem source is screened out from all sources within the target drainage control zone.
[0076] In one embodiment of the present disclosure, the device also includes a simulation module (not shown in the figure), which is used to dynamically simulate the target drainage control zone through a rainwater and sewage system model based on the first inspection result and the second inspection result, and generate evaluation information of the treatment plan for the target drainage control zone.
[0077] According to an embodiment of the present disclosure, the present disclosure also provides an electronic device and a readable storage medium.
[0078] Figure 4 A schematic block diagram of an example electronic device 400 that can be used to implement an embodiment of the present disclosure is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or required herein.
[0079] like Figure 4 As shown, the device 400 includes a computing unit 401, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 402 or a computer program loaded from a storage unit 408 into a random access memory (RAM) 403. In the RAM 403, various programs and data required for the operation of the device 400 can also be stored. The computing unit 401, the ROM 402, and the RAM 403 are connected to each other via a bus 404. An input / output (I / O) interface 405 is also connected to the bus 404.
[0080] A number of components in the device 400 are connected to the I / O interface 405, including: an input unit 406, such as a keyboard, a mouse, etc.; an output unit 407, such as various types of displays, speakers, etc.; a storage unit 408, such as a disk, an optical disk, etc.; and a communication unit 409, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 409 allows the device 400 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0081] The computing unit 401 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 401 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 401 performs the various methods and processes described above, such as a mixed connection troubleshooting method for drainage partitions. For example, in some embodiments, a mixed connection troubleshooting method for drainage partitions may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit 408. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 400 via the ROM 402 and / or the communication unit 409. When the computer program is loaded into the RAM 403 and executed by the computing unit 401, one or more steps of a mixed connection troubleshooting method for drainage partitions described above may be performed. Alternatively, in other embodiments, the computing unit 401 may be configured to execute a mixed connection troubleshooting method for drainage partitions in any other appropriate manner (for example, by means of firmware).
[0082] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0083] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0084] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0085] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0086] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0087] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.
[0088] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.
[0089] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present disclosure, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0090] The above is only a specific embodiment of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A method for checking mixed connection of drainage zones, characterized in that: The method comprises: Divide the target investigation area and determine multiple drainage control zones; each drainage control zone includes the main pipeline monitoring points, branch pipeline monitoring points and source monitoring points of each drainage control zone; Obtain drainage data from trunk pipe monitoring points, branch pipe monitoring points, and source monitoring points in each drainage control zone; Based on the drainage data of the main pipe monitoring points in each drainage control zone, a target drainage control zone is determined from all the drainage control zones in the target investigation area; the target drainage control zone is a drainage control zone where a mixed connection phenomenon exists; Based on the drainage data of the branch pipe monitoring points within the target drainage control zone and the drainage data of the source monitoring points, the location of the origin point of the mixing phenomenon in the target drainage control zone is determined.
2. The method according to claim 1, characterized in that The determining of the location of the origin point of the mixed connection phenomenon in the target drainage control zone based on the drainage data of the branch pipe monitoring points and the drainage data of the source monitoring points in the target drainage control zone includes: Based on the drainage data of each branch pipe monitoring point in the target drainage control zone, determine the first investigation result of the target drainage control zone, the first investigation result is whether the origin point of the mixed connection phenomenon in the target drainage control zone is located in the branch pipe network of the target drainage control zone; Based on the first inspection result and the drainage data of each source monitoring point within the target drainage control zone, the second inspection result of the target drainage control zone is determined. The second inspection result is whether the origin point of the mixed connection phenomenon in the target drainage control zone is located at the source of the target drainage control zone.
3. The method according to claim 2, characterized in that The second investigation result of the target drainage control zone is determined based on the first investigation result and the drainage data of each source monitoring point in the target drainage control zone, wherein the second investigation result is whether the origin point of the mixed connection phenomenon in the target drainage control zone is located at the source of the target drainage control zone, including: In response to a first inspection result that the origin of the mixed connection phenomenon in the target drainage control zone is not located in the branch pipe network, the source mixed connection amount of the target drainage control zone is determined based on the drainage data of each source monitoring point in the key drainage control zone; Based on whether the source mixing amount meets the source drainage conditions, the second inspection result of the target drainage control zone is determined to be whether the origin point of the mixing phenomenon in the target drainage control zone is located at the source of the target drainage control zone.
4. The method according to claim 1, characterized in that: The target investigation area is divided to determine multiple drainage control zones, including: Obtain survey data sets and field data sets for the target investigation area; The target investigation area is divided into regions according to the survey data set and the field data set to obtain a plurality of drainage control zones.
5. The method according to claim 1, characterized in that The target drainage control zone is determined from all drainage control zones in the target investigation area based on the drainage data of the main pipe monitoring points in each drainage control zone, including: According to the drainage data of the main pipe monitoring points in each drainage control zone, it is judged whether the drainage of the drainage control zone meets the main pipe drainage conditions; The drainage control zone where the drainage data of the main pipeline monitoring point does not meet the main pipeline drainage conditions shall be determined as the target drainage control zone.
6. The method according to claim 2 or 3, characterized in that: The first investigation result of the target drainage control zone is determined based on the drainage data of each branch pipe monitoring point in the target drainage control zone, including: Based on the drainage data of each branch pipe monitoring point within the target drainage control area, determine the water quantity analysis results and water quality analysis results of each branch pipe monitoring point; If the water volume analysis results between the branch pipe monitoring points are inconsistent, and / or the water quality analysis results are inconsistent, then it is determined that the first investigation result is that the origin of the mixed connection phenomenon in the target drainage control area is located in the branch pipe network; If the water volume analysis results between the branch pipe monitoring points are consistent, and the water quality analysis results between the branch pipe monitoring points are consistent, then the first investigation result is determined to be that the origin point of the mixing phenomenon in the target drainage control area is not located in the branch pipe network.
7. The method according to claim 2 or 3, characterized in that: If the first investigation result is that the origin of the mixed connection phenomenon occurs in the target drainage control zone and is located in the branch pipe network, the method further includes: Obtaining visualization data of the branch pipe network; Based on the visualization data, problematic pipe networks in the branch pipe network are determined.
8. The method according to claim 1, characterized in that If the second investigation result is that the origin point of the mixed connection phenomenon is located at the source in the target drainage control zone, the method further includes: Based on the drainage data of multiple source monitoring points within the target drainage control zone, determining the change data of the drainage at each source monitoring point, wherein the change data represents the change law of the drainage; Based on the change data of drainage at each source monitoring point, reference data representing the cause of the mixing phenomenon is obtained; Based on the reference data, the problem sources are screened out from all sources within the target drainage control area.
9. The method according to claim 2, characterized in that: The method further comprises: Based on the first inspection result and the second inspection result, the target drainage control zone is dynamically simulated through the rainwater and sewage system model to generate evaluation information of the treatment plan for the target drainage control zone.
10. A mixed connection inspection device for drainage partitions, characterized in that: The device comprises: The area division module is used to divide the target investigation area and determine multiple drainage control zones; each drainage control zone includes the main pipe monitoring points, branch pipe monitoring points and source monitoring points of each drainage control zone; The data acquisition module is used to obtain the drainage data of the main pipe monitoring points, the drainage data of the branch pipe monitoring points and the drainage data of the source monitoring points in each drainage control zone; A screening module is used to determine a target drainage control zone from all drainage control zones in the target screening area based on drainage data of the main pipe monitoring points in each drainage control zone; the target drainage control zone is a drainage control zone where a mixed connection phenomenon exists; The investigation module is also used to determine the location of the origin point of the mixing phenomenon in the target drainage control zone based on the drainage data of the branch monitoring points in the target drainage control zone and the drainage data of the source monitoring points.