Drainage basin water rising risk calculation method under rainfall flood condition
By establishing a water rise risk research and judgment system based on basic information of the basin and historical hydrological data, the time and magnitude of water level rise are determined, which solves the problem in the existing technology that it is difficult to quickly obtain the distribution of rain and flood risks in the basin, and achieves accurate early warning of flood risks. and efficient flood control measures.
Patent Information
- Application Number
- CN202410710482.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-03
- Publication Date
- 2024-10-15
AI Technical Summary
It is difficult for the existing hydrological monitoring system to quickly and accurately obtain the distribution of rain and flood risks across the entire basin, which limits the accurate judgment of flood disaster risk levels and the activation of emergency plans, resulting in delayed flood prevention and disaster reduction measures.
Based on the basic watershed information and historical hydrological data of the target watershed, a water rise risk analysis and judgment system is established. The hourly water level data is used to determine the rising moment and level of the water level, and the hourly water level rise is calculated. The risk analysis and judgment system is used to determine the rise of rivers and sub-basins. Water risk level enables automated rolling calculation of risks within the basin.
It improves the accuracy and timeliness of flood risk early warning, ensures the timely reliability of early warning information, reduces the pressure on flood control work, and ensures flood control safety and social stability in the basin.
Smart Images

Figure CN118780633A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a method for calculating watershed flood risk under rain and flood conditions, which is applicable to the technical field of smart water conservancy flood prevention and disaster reduction. Background Art
[0002] In recent years, the combined impact of global climate change and human activities has become increasingly significant. Extreme weather has led to excessive loads, and large floods in river basins have frequently occurred, forming a disaster chain amplification effect. Therefore, it is particularly urgent and important to effectively respond to this challenge, strengthen the construction of disaster prevention and mitigation systems, accurately assess river basin flood risks, and improve risk warning capabilities.
[0003] At present, the assessment of real-time flood risk in the basin relies heavily on the hydrological monitoring stations set up along the river and their preset key water level indicators, such as warning water level and guaranteed water level, to make local risk judgments. These judgments can only reveal whether a specific station and its adjacent river sections have exceeded the safety threshold and there is a flood risk.
[0004] However, when a river basin faces flood events caused by large-scale rainfall, the existing monitoring system is unable to quickly and accurately obtain the risk distribution status of the entire river basin. This undoubtedly limits the relevant departments' timely and comprehensive understanding of the overall risk impact that the current rain and flood events may have, making it impossible to quickly and accurately grasp the risk level of flood disasters and their spatial distribution, and unable to quickly initiate corresponding emergency plans and take effective preventive measures based on the differences in risk levels in different regions. Summary of the invention
[0005] The technical problem to be solved by the present invention is: in view of the above-mentioned problems, a method for calculating the risk of watershed flooding under rain and flood conditions is provided.
[0006] The technical solution adopted by the present invention is: a method for calculating the risk of flooding in a watershed under rain and flood conditions, characterized in that it includes:
[0007] Based on the basic information of the target basin and historical hydrological data, a flood risk assessment system is established to form a corresponding relationship between the water level increase of each hydrological station in the target basin and the flood risk level of the corresponding river channel and sub-basin of the hydrological station;
[0008] Obtain hourly water level data Z of each hydrological station in the target basin t , determine the water level rising time and rising water level Z0 of each hydrological station;
[0009] Based on the rising water level Z0 of each hydrological station and the hourly water level data Z after the water level rises t , determine the hourly water level increase ΔZ of each hydrological station t ;
[0010] Based on the hourly water level increase ΔZ of each hydrological station at the same time t , judge whether the flooding has ended at that moment. If not, combine the flooding risk assessment system to determine the flooding risk level of each river channel and sub-basin in the target basin at that moment.
[0011] The hourly water level data Z of each hydrological station in the target basin is obtained. t , determine the water level rise time and rising water level Z0 of each hydrological station, including:
[0012] Based on the hourly water level data of the hydrological station a certain period of time before the current time, take the minimum value minZ i ;
[0013] Calculate the water level data of the hydrological station at the current time and the minZ corresponding to the current time i The difference between
[0014] When the difference reaches the water level increase corresponding to the lowest flood risk level in the flood risk assessment system, the current time is the water level rise time of the water level station, and the rising water level Z0 is the minZ corresponding to the current time. i .
[0015] The water level Z0 based on each hydrological station and the hourly water level data Z after the water level rises t , determine the hourly water level increase ΔZ of each hydrological station t ,include:
[0016] ΔZ t =Z t -Z0.
[0017] The hourly water level increase ΔZ based on each hydrological station at the same time t , determine whether the flood has ended at that moment. If not, combine the flood risk assessment system to determine the flood risk level of each river channel and sub-basin in the target basin at that moment, including:
[0018] When the hourly water level increase ΔZ of each hydrological station at the same time t , when the water level increase is lower than the water level increase corresponding to the lowest flood risk level in the flood risk assessment system, the flood is deemed to be over.
[0019] The hourly water level increase ΔZ based on each hydrological station at the same time t , determine whether the flood has ended at that moment. If not, combine the flood risk assessment system to determine the flood risk level of each river channel and sub-basin in the target basin at that moment, including:
[0020] The maximum water level increase of all hydrological stations associated with the mainstream of the sub-basin at the same time is preferentially taken as the hourly water level increase maxΔZ of the river and sub-basin.t ;
[0021] When some streams have no associated hydrological stations or the water levels of all hydrological stations associated with the main stream at that moment have not risen, the maximum water level increase of all hydrological stations associated with the tributaries in the sub-basin at that moment is taken as the hourly water level increase maxΔZ of the river and sub-basin t ;
[0022] Hourly water level increase maxΔZ based on rivers and sub-basins t , combined with the flood risk assessment system, determine the flood risk level of the rivers and sub-basins in the target basin at that moment.
[0023] A system for calculating watershed flood risk under rain and flood conditions, characterized by comprising:
[0024] The system construction module is used to establish a flood risk assessment system based on the basic basin information and historical hydrological data of the target basin, and form a corresponding relationship between the water level increase of each hydrological station in the target basin and the flood risk level of the corresponding river channel and sub-basin of the hydrological station;
[0025] The rise judgment module is used to obtain the hourly water level data Z of each hydrological station in the target basin. t , determine the water level rising time and rising water level Z0 of each hydrological station;
[0026] The water level rise calculation module is used to calculate the water level Z0 of each hydrological station and the hourly water level data Z after the water level rises. t , determine the hourly water level increase ΔZ of each hydrological station t ;
[0027] Risk determination module, used to determine the hourly water level increase ΔZ of each hydrological station at the same time t , judge whether the flooding has ended at that moment. If not, combine the flooding risk assessment system to determine the flooding risk level of each river channel and sub-basin in the target basin at that moment.
[0028] A storage medium stores a computer program that can be executed by a processor, characterized in that when the computer program is executed, the steps of the method for calculating the risk of watershed flooding under rain and flood conditions are implemented.
[0029] A device for calculating the risk of flooding in a watershed under rain and flood conditions, comprising a memory and a processor, wherein the memory stores a computer program that can be executed by the processor, and wherein the device is characterized in that when the computer program is executed, the steps of the method for calculating the risk of flooding in a watershed under rain and flood conditions are implemented.
[0030] The beneficial effects of the present invention are as follows: the present invention determines the time and level of water level rise at each hydrological station based on the hourly water level data of each hydrological station, and calculates the hourly water level increase of each hydrological station after the water level rises, and determines the hourly water level increase of rivers and sub-basins based on the hourly water level increase of each hydrological station, and then determines the flood risk level of rivers and sub-basins based on the hourly water level increase of rivers and sub-basins in combination with the flood risk assessment system.
[0031] The present invention not only helps to improve the accuracy and timeliness of flood risk warnings and ensure the timely and reliable release of warning information, but also greatly reduces the heavy and stressful work pressure of water conservancy and flood control workers during the flood season, and helps to carry out flood prevention and disaster reduction work more efficiently and orderly, thereby effectively ensuring flood control safety and social stability in the basin.
[0032] The present invention proposes an innovative quantitative method for automatically calculating the flood risk in a watershed, aiming to provide accurate theoretical data support for water conservancy-related departments during the flood season to meet the needs of issuing flood risk warnings in the watershed. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 A flowchart of an embodiment. DETAILED DESCRIPTION
[0034] Embodiment 1: This embodiment is a method for calculating the risk of flooding in a watershed under rain and flood conditions, which specifically includes the following steps:
[0035] S1. Based on the basic information of the target basin and historical hydrological data, a flood risk assessment system is established to form a corresponding relationship between the water level increase of each hydrological station in the target basin and the flood risk level of the corresponding river channel and sub-basin of the hydrological station.
[0036] Collect basic basin data such as river systems and DEM of the target basin, and quickly divide it into sub-basin watersheds (hereinafter referred to as "sub-basins") through geographic information systems; sort out the conditions of hydrological stations in sub-basins, and establish the relationship between sub-basins and hydrological (water level) stations of main and tributary rivers; set the river water level increase and define the flood risk level of rivers and sub-basins based on basic basin information, historical hydrological data and expert experience.
[0037] S2. Obtain hourly water level data Z of each hydrological station in the target basin t , determine the water level rise time and rising water level Z0 of each hydrological station.
[0038] When determining the rising water level, it is mainly based on the hourly water level data of the hydrological (water level) station within 24 hours before the current time, and the minimum value minZ is taken. i .
[0039] If the current water level of the hydrological (water level) station is ΔZ t , ΔZ t =Z t -minZ i , reaches the river water level increase corresponding to the minimum flood risk level of the sub-basin set in step S1, then the current time is the water level rise time of the hydrological (water level) station, and the rising water level Z0=minZ i .
[0040] S3, based on the rising water level Z0 of the hydrological station and the hourly water level data Z after the water level rises t , determine the hourly water level increase ΔZ at the hydrological station t .
[0041] The rising water level Z0 of the hydrological (water level) station determined in step S2 is used as the reference value to calculate the hourly water level increase ΔZ of a single hydrological (water level) station t =, ΔZ t =Z t -Z0.
[0042] S4, based on the hourly water level increase ΔZ of each hydrological station at the same time t , judge whether the flooding has ended at that moment. If not, combine the flooding risk assessment system to determine the flooding risk level of each river channel and sub-basin in the target basin at that moment.
[0043] In this embodiment, when judging that the sub-basin flooding process is over, if the maximum water level increase maxΔZ of all hydrological (water level) stations associated with the sub-basin at the same time t If the river water level rise is lower than the minimum flood risk level, the flood is considered to be over. After the flood is over, the flood risk level of the river or sub-basin will not be assessed until the next water level rise.
[0044] In this example, when judging the water level increase and corresponding risk level of a sub-basin, the maximum water level increase of all hydrological (water level) stations associated with the mainstream of the sub-basin at the same time is preferred as the hourly water level increase maxΔZ of the river and sub-basin. t ; When some streams have no associated hydrological (water level) stations or the water levels of all hydrological stations associated with the main stream at that moment have not risen, the maximum water level increase of all hydrological (water level) stations associated with the tributaries in the sub-basin at that moment is taken as the hourly water level increase maxΔZ of the river and sub-basin t .
[0045] In this embodiment, the hourly water level increase maxΔZ of the river and sub-basin is based on t , combined with the flood risk assessment system, determine the flood risk level of the rivers and sub-basins in the target basin at that moment.
[0046] Embodiment 2: This embodiment is a system for calculating watershed flood risk under rain and flood conditions, including: a system construction module, a rise judgment module, an increase calculation module and a risk determination module.
[0047] In this example, the system construction module is used to establish a flood risk assessment system based on the basic basin information and historical hydrological data of the target basin, forming a corresponding relationship between the water level increase of each hydrological station in the target basin and the flood risk level of the corresponding river and sub-basin of the hydrological station.
[0048] In this embodiment, the rise judgment module is used to obtain the hourly water level data Z of each hydrological station in the target basin. t , determine the water level rising time and rising water level Z0 of each hydrological station;
[0049] In this embodiment, the increase calculation module is used to calculate the water level based on the rising water level Z0 of each hydrological station and the hourly water level data Z after the water level rises. t , determine the hourly water level increase ΔZ of each hydrological station t ;
[0050] In this example, the risk determination module is used to determine the hourly water level increase ΔZ of each hydrological station at the same time. t , judge whether the flooding has ended at that moment. If not, combine the flooding risk assessment system to determine the flooding risk level of each river channel and sub-basin in the target basin at that moment.
[0051] Embodiment 3: This embodiment is a storage medium on which a computer program that can be executed by a processor is stored. When the computer program is executed, the steps of the method for calculating the risk of watershed flooding under rain and flood conditions in Embodiment 1 are implemented.
[0052] Example 4: This example is a device for calculating the risk of watershed flooding under rain and flood conditions, comprising a memory and a processor. The memory stores a computer program that can be executed by the processor. When the computer program is executed, the steps of the method for calculating the risk of watershed flooding under rain and flood conditions in Example 1 are implemented.
Claims
1. A method for calculating the risk of flooding in a watershed under rain and flood conditions, characterized in that: include: Based on the basic information of the target basin and historical hydrological data, a flood risk assessment system is established to form a corresponding relationship between the water level increase of each hydrological station in the target basin and the flood risk level of the corresponding river channel and sub-basin of the hydrological station; Obtain hourly water level data Z of each hydrological station in the target basin t , determine the water level rising time and rising water level Z0 of each hydrological station; Based on the rising water level Z0 of each hydrological station and the hourly water level data Z after the water level rises t , determine the hourly water level increase ΔZ of each hydrological station t ; Based on the hourly water level increase ΔZ of each hydrological station at the same time t , judge whether the flooding has ended at that moment. If not, combine the flooding risk assessment system to determine the flooding risk level of each river channel and sub-basin in the target basin at that moment.
2. The method for calculating watershed flood risk under rain and flood conditions according to claim 1 is characterized in that: The hourly water level data Z of each hydrological station in the target basin is obtained. t , determine the water level rise time and rising water level Z0 of each hydrological station, including: Based on the hourly water level data of the hydrological station a certain period of time before the current time, take the minimum value minZ i ; Calculate the water level data of the hydrological station at the current time and the minZ corresponding to the current time i The difference between When the difference reaches the water level increase corresponding to the lowest flood risk level in the flood risk assessment system, the current time is the water level rise time of the water level station, and the rising water level Z0 is the minZ corresponding to the current time. i .
3. The method for calculating watershed flood risk under rain and flood conditions according to claim 1 is characterized in that: The water level Z0 based on each hydrological station and the hourly water level data Z after the water level rises t , determine the hourly water level increase ΔZ of each hydrological station t ,include: ΔZ t =Z t -Z0。 4. The method for calculating watershed flood risk under rain and flood conditions according to claim 1 is characterized in that: The hourly water level increase ΔZ based on each hydrological station at the same time t , determine whether the flood has ended at that moment. If not, combine the flood risk assessment system to determine the flood risk level of each river channel and sub-basin in the target basin at that moment, including: When the hourly water level increase ΔZ of each hydrological station at the same time t , when the water level increase is lower than the water level increase corresponding to the lowest flood risk level in the flood risk assessment system, the flood is deemed to be over.
5. The method for calculating the risk of flooding in a watershed under rain and flood conditions according to claim 1 or 4, characterized in that: The hourly water level increase ΔZ based on each hydrological station at the same time t , determine whether the flood has ended at that moment. If not, combine the flood risk assessment system to determine the flood risk level of each river channel and sub-basin in the target basin at that moment, including: The maximum water level increase of all hydrological stations associated with the mainstream of the sub-basin at the same time is preferentially taken as the hourly water level increase maxΔZ of the river and sub-basin. t ; When some streams have no associated hydrological stations or the water levels of all hydrological stations associated with the main stream at that moment have not risen, the maximum water level increase of all hydrological stations associated with the tributaries in the sub-basin at that moment is taken as the hourly water level increase maxΔZ of the river and sub-basin t ; Hourly water level increase maxΔZ based on rivers and sub-basins t , combined with the flood risk assessment system, determine the flood risk level of the rivers and sub-basins in the target basin at that moment.
6. A system for calculating watershed flood risk under rain and flood conditions, characterized in that: include: The system construction module is used to establish a flood risk assessment system based on the basic basin information and historical hydrological data of the target basin, and form a corresponding relationship between the water level increase of each hydrological station in the target basin and the flood risk level of the corresponding river channel and sub-basin of the hydrological station; The rise judgment module is used to obtain the hourly water level data Z of each hydrological station in the target basin. t , determine the water level rising time and rising water level Z0 of each hydrological station; The water level rise calculation module is used to calculate the water level Z0 of each hydrological station and the hourly water level data Z after the water level rises. t , determine the hourly water level increase ΔZ of each hydrological station t ; Risk determination module, used to determine the hourly water level increase ΔZ of each hydrological station at the same time t , judge whether the flooding has ended at that moment. If not, combine the flooding risk assessment system to determine the flooding risk level of each river channel and sub-basin in the target basin at that moment.
7. A storage medium having stored thereon a computer program executable by a processor, characterized in that: When the computer program is executed, the steps of the method for calculating the risk of watershed flooding under rain and flood conditions described in any one of claims 1 to 5 are implemented.
8. A device for calculating the risk of flooding in a river basin under rain and flood conditions, comprising a memory and a processor, wherein the memory stores a computer program executable by the processor, and wherein: When the computer program is executed, the steps of the method for calculating the risk of watershed flooding under rain and flood conditions described in any one of claims 1 to 5 are implemented.