Load switch state identification method, system, device and medium for distribution network
By obtaining the topological and voltage measurement data of the distribution network, the load switching correlation coefficient is calculated using Pearson's correlation coefficient and Markov random field theory, and combined with topological update and power verification, the accuracy of load switching state recognition of the distribution network is solved. The problem of insufficient has achieved the economic operation of intelligent power systems and the development of the power industry.
Patent Information
- Application Number
- CN202411267403.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-09-11
AI Technical Summary
How to accurately identify the load switch status of the distribution network. As a key task in realizing smart grid operation, safety assessment and fault location, the existing technology has the problem of insufficient identification accuracy.
By obtaining the topological and voltage measurement data of the distribution network, the load switching correlation coefficient is calculated using Pearson's correlation coefficient and Markov random field theory, and combined with topological update and power verification, the load switching state is achieved accurately.
It improves the accuracy of load switch status identification, supports the economic operation of smart power systems and the sustainable development of the power industry.
Smart Images

Figure CN118783440B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power distribution network, and in particular to a method, system, equipment and medium for identifying the state of a load switch in a power distribution network. Background Art
[0002] With the continuous development of society and the continuous growth of electricity demand, the power system is undergoing profound changes, transforming from the traditional one-way power supply mode to the smart grid. The identification of the load switch status of the power grid switch station is a key task to accurately identify the current operating status of the distribution network, because accurate switch status information can be used to monitor topology changes, which is a prerequisite for advanced system analysis such as economic operation, safety assessment, network reconstruction and fault location.
[0003] It can be seen that how to accurately identify the load switch status of the distribution network has become a technical problem that technical personnel in this field need to solve urgently. Summary of the invention
[0004] The present invention provides a method, system, device and medium for identifying the state of a load switch of a distribution network, which solves the problem of how to accurately identify the state of a load switch of the distribution network.
[0005] In order to solve the above technical problems, the first aspect of the present invention provides a load switch state identification method for a distribution network, comprising:
[0006] Obtain grid topology and voltage measurement data of distribution networks;
[0007] Performing correlation calculation on the voltage measurement data to obtain a load switch state;
[0008] Updating the power grid topology according to the load switch state;
[0009] The power and loss of each load in the updated power grid topology are obtained, and the load switch state is verified to identify the load switch state.
[0010] As one of the preferred schemes, the power grid topology includes information on each switch station between distribution networks, information on load switches connected to each bus in each switch station, distribution transformers under each switch station, and connection relationships between feeders and the bus; the voltage measurement data is the voltage between distribution transformers under two adjacent switch stations.
[0011] As one preferred solution, performing correlation calculation on the voltage measurement data to obtain the load switch state includes:
[0012] Determine whether there is a ring network in the power grid topology;
[0013] If yes, then the voltage measurement data is correlated by using Markov random field theory to obtain a first load switch correlation coefficient, and the first load switch correlation coefficient is used as the load switch state;
[0014] If not, the voltage measurement data is correlated using a Pearson correlation coefficient calculation formula to obtain a second load switch correlation coefficient, and the second load switch correlation coefficient is used as the load switch state.
[0015] As one of the preferred solutions, after performing correlation calculation on the voltage measurement data by using the Pearson correlation coefficient calculation formula to obtain the second load switch correlation coefficient, the method includes:
[0016] Determining whether the accuracy of the correlation coefficient of the second load switch meets a preset accuracy condition;
[0017] If yes, then taking the second load switch correlation coefficient as the load switch state;
[0018] If not, correlation calculation is performed on the voltage measurement data using the Markov random field theory to obtain a first load switch correlation coefficient, so that the first load switch correlation coefficient is used as the load switch state.
[0019] As one of the preferred solutions, the correlation calculation of the voltage measurement data is performed by the Markov random field theory to obtain a first load switch correlation coefficient, and the first load switch correlation coefficient is used as the load switch state, including:
[0020] According to the Markov random field theory, the distribution network is constructed as a four-tuple distribution system model, and the four-tuple distribution system model includes a switch station node, a distribution transformer node and a connection node;
[0021] According to the Hammersley-Clifford theorem, the joint probability distribution is decomposed into the product of the potential function corresponding to each node, and the Markov random field model of the distribution transformer under the switch station is obtained;
[0022] Solving the Markov random field model to obtain a node correlation matrix between every two nodes in the four-tuple distribution system model, wherein each element in the node correlation matrix serves as a voltage correlation between two corresponding distribution transformer nodes;
[0023] The voltage correlation of the distribution transformers under two adjacent ring network switch stations is calculated according to the operating status of the ring network and the node correlation matrix to obtain a first load switch correlation coefficient, and the first load switch correlation coefficient is used as the load switch status.
[0024] As one of the preferred solutions, the Pearson correlation coefficient calculation formula is expressed by the following formula:
[0025]
[0026] Where r is the correlation coefficient of the second load switch between two distribution transformers under different switch stations; n is the number of elements in the voltage measurement data; u ui is the voltage measurement data of the ith distribution transformer under a switch station; u vi It is the i-th voltage measurement data of the distribution transformer under another adjacent switch station.
[0027] As one preferred solution, the obtaining of the updated power and loss of each load in the power grid topology and verifying the load switch state to identify the load switch state includes:
[0028] Acquire the measured sub-power of each distribution transformer under the feeder in the updated power grid topology and the measured total power of the head end of the feeder in the updated power grid topology;
[0029] Calculating the power loss of the line to which the feeder belongs, and summing the power loss with the measured sub-power to obtain the summed power of each distribution transformer under the feeder in the updated power grid topology;
[0030] The summed power is compared with the measured total power, and the load switch state identification result is determined according to the comparison result.
[0031] A second aspect of the present invention provides a load switch state identification system for a distribution network, comprising:
[0032] A data acquisition module, used to acquire the grid topology and voltage measurement data of the distribution network;
[0033] A correlation calculation module, used for performing correlation calculation on the voltage measurement data to obtain a load switch state;
[0034] A topology updating module, used for updating the power grid topology according to the load switch state;
[0035] The state identification module is used to obtain the power and loss of each load in the updated power grid topology and verify the load switch state to identify the load switch state.
[0036] A third aspect of the present invention provides an electronic device, comprising a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the load switch state identification method for a distribution network as described above is implemented.
[0037] A fourth aspect of the present invention provides a computer-readable storage medium, which includes a stored computer program, wherein when the device where the computer-readable storage medium is located executes the computer program, the load switch state identification method for the distribution network as described above is implemented.
[0038] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0039] The present invention relates to a load switch state identification method, system, equipment and medium for distribution network; by obtaining distribution network topology information and distribution transformer voltage measurement information, the connection relationship between busbars and feeders in the switch station is determined, and the voltage data of distribution transformers under adjacent switch stations are collected; according to whether there is a ring network in the distribution network, the voltage correlation between distribution transformers under adjacent switch stations is calculated by using Pearson correlation or introducing Markov random field; and when Pearson correlation cannot be determined, the voltage correlation between distribution transformers is accurately calculated by introducing Markov random field again; new distribution network topology information is generated according to the identified switch disconnection state, the power measurement at the head end of the feeder is compared with the power sum of all its subordinate distribution transformers for consistency, and the switch state identification accuracy is checked through power consistency to realize load switch state identification. It is helpful to realize the economic operation of new intelligent power systems and promote the further development of the power industry and the sustainable prosperity of society. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solution of the present invention, the drawings required for use in the implementation mode will be briefly introduced below. Obviously, the drawings described below are only some implementation modes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0041] Figure 1 It is a flow chart of a method for identifying the state of a load switch used in a distribution network provided by a certain embodiment of the present invention;
[0042] Figure 2 A schematic diagram of a feeder line topology with a tie line provided in an embodiment of the present invention
[0043] Figure 3 is a flowchart of step S2 provided by an embodiment of the present invention;
[0044] Figure 4It is a schematic diagram of the feeder line topology of a ring network provided by a certain embodiment of the present invention;
[0045] Figure 5 is a flowchart of step S212 provided by an embodiment of the present invention;
[0046] Figure 6 is a flowchart of step S4 provided by an embodiment of the present invention;
[0047] Figure 7 is a flow chart of a method for identifying a load switch state for a distribution network provided by another embodiment of the present invention;
[0048] Figure 8 is an accuracy comparison chart provided by a certain embodiment of the present invention;
[0049] Fig. 9 It is a structural diagram of a load switch state identification system for a distribution network provided by a certain embodiment of the present invention;
[0050] Fig.10 It is a structural diagram of an electronic device provided by a certain embodiment of the present invention. DETAILED DESCRIPTION
[0051] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings and embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. The purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] In the description of this application, the terms "first", "second", "third", etc. are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", etc. may explicitly or implicitly include one or more of the feature. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0053] In the description of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two components. The terms "vertical", "horizontal", "left", "right", "upper", "lower" and similar expressions used herein are for illustrative purposes only, and do not indicate or imply that the system or component referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0054] In the description of this application, it should be noted that, unless otherwise defined, all technical and scientific terms used in the present invention have the same meaning as those commonly understood by those skilled in the art. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood by specific circumstances.
[0055] In one embodiment, if Figure 1 As shown, the first aspect of the present invention provides a load switch state identification method for a distribution network, comprising:
[0056] S1. Obtain the grid topology and voltage measurement data of the distribution network.
[0057] In one embodiment, the power grid topology includes information about each switch station between distribution networks, information about load switches connected to each bus in each switch station, distribution transformers (also referred to as distribution transformers) under each switch station, and the connection relationship between the feeder and the bus; the voltage measurement data is the voltage between the distribution transformers under two adjacent switch stations.
[0058] Specifically, the topological information of the distribution network includes at least the information of each switch station between the feeders with tie lines, the information of the load switches connected to each bus in the switch station, and the connection relationship between the feeders and the bus is determined; wherein the topological diagram of the feeder line with tie lines is as follows Figure 2As shown, for each switch station, it is also necessary to determine all its subordinate distribution transformers, collect voltage measurement data of the distribution transformers under two adjacent switch stations, and perform data cleaning to remove duplicate values, fill in missing values, and convert the data into a specific format as input to calculate the correlation between the data and the distribution transformers. The processed voltage measurement data of the distribution transformers under different switch stations are expressed by the following formula:
[0059]
[0060]
[0061] In the formula, u ui is the voltage measurement data of the ith distribution transformer under a switch station; u vi It is the i-th voltage measurement data of the distribution transformer under another adjacent switch station.
[0062] S2. Perform correlation calculation on the voltage measurement data to obtain a load switch state.
[0063] In one embodiment, step S2 is as follows: Figure 3 As shown, including:
[0064] S21, determining whether there is a ring network in the power grid topology;
[0065] S212: If yes, perform correlation calculation on the voltage measurement data by using Markov random field theory to obtain a first load switch correlation coefficient, and use the first load switch correlation coefficient as the load switch state;
[0066] S222: If not, perform correlation calculation on the voltage measurement data using a Pearson correlation coefficient calculation formula to obtain a second load switch correlation coefficient, and use the second load switch correlation coefficient as the load switch state.
[0067] Specifically, for distribution transformers between different switch stations, the present application first selects the Pearson correlation coefficient calculation formula or introduces Markov random field theory to calculate the correlation coefficient between their voltages by judging whether there is a ring network in the power grid topology, and uses it as the load switch state between the distribution transformers.
[0068] When there is a ring network in the power grid topology, the ring network will disconnect one line from the ring network station in actual operation, so that the line runs radially. The feeder line topology diagram of the ring network is as follows: Figure 4As shown in the figure. Since the ring network is powered by the same feeder, the Pearson correlation calculation accuracy is not enough at this time, and it is difficult to determine the actual state of the load switch. It is necessary to introduce the Markov random field for more accurate voltage correlation calculation to more accurately describe the correlation between dependent voltage data to improve the calculation accuracy.
[0069] In one embodiment, step S212 is as follows: Figure 5 As shown, including:
[0070] S2121. According to the Markov random field theory, the distribution network is constructed as a four-tuple distribution system model, wherein the four-tuple distribution system model includes a switch station node, a distribution transformer node, and a connection node;
[0071] S2122. According to the Hammersley-Clifford theorem, the joint probability distribution is decomposed into the product of the potential function corresponding to each node, and a Markov random field model of the distribution transformer under the switch station is obtained;
[0072] S2123, solving the Markov random field model to obtain a node correlation matrix between every two nodes in the four-tuple distribution system model, wherein each element in the node correlation matrix serves as a voltage correlation between two corresponding distribution transformer nodes;
[0073] S2124. Calculate the voltage correlation of the distribution transformers under two adjacent ring network switch stations according to the operating status of the ring network and the node correlation matrix, obtain the first load switch correlation coefficient, and use the first load switch correlation coefficient as the load switch status.
[0074] Specifically, according to the Markov random field theory, the distribution network can be modeled as a four-tuple distribution system model , where (V, E) is an undirected graph on random variables, V represents a set of vertices, representing nodes in the distribution system, such as switch station nodes, distribution transformer nodes, connection nodes of different circuits, etc., and E represents a set of directed edges, representing the circuits connecting these nodes. and is the potential function in the probability graph, which is used to quantitatively describe the correlation between nodes and edge variables in the distribution system;
[0075]
[0076]
[0077]
[0078]
[0079] In the formula, Xu and X v are random variable vectors, representing the voltage information of the two distribution transformer nodes u and v after data processing; E(·) is the energy function; V u is the node weight matrix; W uv is the edge weight coefficient matrix.
[0080] In Markov random field theory, the joint probability distribution of multiple variables can be decomposed into the product of multiple potential functions. According to the Hammersley-Clifford theorem, the joint probability distribution is decomposed into the product of the potential function of each node, thereby establishing a Markov random field model for all distribution transformers under the two switch stations:
[0081]
[0082]
[0083] Where P(·) is the Markov random field model.
[0084] The gradient descent method is introduced to solve the Markov random field model to obtain the edge weight parameter matrix W, the correlation between the elements of the voltage vector in the matrix W. The weight of the correlation between nodes is defined by an exponential function, and its expression is:
[0085]
[0086] In the formula, is the correlation function between nodes.
[0087] According to the above formula, the node correlation matrix H of the physical connectivity between every two nodes in the distribution system can be obtained:
[0088] .
[0089] Among them, the matrix H is a symmetric matrix about the main diagonal line, and each element represents the voltage correlation between two distribution transformer nodes.
[0090] However, due to line loss and other reasons, when the ring network is operated in different operation modes, the voltage correlation between the distribution transformers under different ring network stations will also be different. Figure 4 When the middle ring network is in open loop operation at line ①, the three ring stations are in series operation. Figure 4 When the middle ring network is in open-loop operation at line ②, two of the three ring stations will be in parallel operation. When operating in series, the voltage correlation between the line end ring station and the head end ring station will be lower than that when operating in parallel. Based on this feature, select the subordinate distribution transformers of two adjacent ring stations, calculate their voltage correlation, and determine where the ring network is disconnected based on the calculation results, thereby determining the switch status.
[0091] When a ring network appears in the power grid topology, the present application calculates the voltage correlation between all distribution transformers under two different switch stations by introducing Markov random field theory. The Markov random field can better capture the high spatial dependence of power transmission and distribution caused by the ring network topology. By defining the probability relationship between adjacent nodes (such as distribution transformers), the propagation and change of voltage in space can be more accurately described. Through the Markov Random Field theory (Markov RandomField, MRF) model, the voltage correlation between different distribution transformers can be more accurately calculated based on the actual topological structure and operating parameters of the power grid, which helps to more accurately evaluate the operating status and potential voltage problems of the power grid. By calculating the voltage correlation between different distribution transformers, the operating status and potential problems of the power grid can be better understood, the operation of the power grid can be optimized, and the power supply reliability and stability of the power grid can be improved.
[0092] When there is no ring network in the power grid topology, the Pearson correlation coefficient calculation formula is used to calculate the load switch state between the distribution transformers. The Pearson correlation coefficient calculation formula is expressed by the following formula:
[0093]
[0094] Where r is the correlation coefficient of the second load switch between two distribution transformers under different switch stations; n is the number of elements in the voltage measurement data.
[0095] For a two-terminal power supply network, during normal operation, its subordinate distribution stations are all powered by one of the main transformers on both sides. The power supply voltage waveforms between different main transformers are quite different, which will lead to a large difference in the voltage waveforms of the feeders connected to different main transformers. Therefore, when the busbars in the two switch stations are powered by different feeders, the voltage correlation between the subordinate distribution transformers of the two switch stations should be low, that is, the value of r is small. By analyzing the value of r, the state of the load switch in the switch station can be judged; specifically: when r>0.85, it can be considered that the subordinate distribution transformers of the two busbars are powered by the same feeder, and the corresponding load switch is in a closed state; when r<0.6, it is considered that the subordinate distribution transformers of the two substations are powered by different feeders, and the corresponding load switch is in a disconnected state.
[0096] When there is no ring network in the power grid topology, the present application uses the Pearson correlation coefficient calculation formula to calculate the correlation between the voltages of all distribution transformers under two different switch stations, directly performs linear evaluation, and simplifies the calculation process; the result of the Pearson correlation coefficient is a value between -1 and 1, and the result is intuitive and easy to understand; not only can a quantitative indicator of the correlation be given, but also a statistical significance test can be combined to determine whether the correlation is statistically significant; the calculation formula is relatively simple and has high calculation efficiency, and is suitable for processing large-scale data sets.
[0097] In one embodiment, after performing correlation calculation on the voltage measurement data using the Pearson correlation coefficient calculation formula to obtain the second load switch correlation coefficient, the method includes:
[0098] Determining whether the accuracy of the correlation coefficient of the second load switch meets a preset accuracy condition;
[0099] If yes, then taking the second load switch correlation coefficient as the load switch state;
[0100] If not, correlation calculation is performed on the voltage measurement data using the Markov random field theory to obtain a first load switch correlation coefficient, so that the first load switch correlation coefficient is used as the load switch state.
[0101] Specifically, for lines that cannot be distinguished by the Pearson correlation, that is, when the distribution network is actually running, there will be voltage differences between buses powered by different feeders that are not significant enough. At this time, it is difficult to determine the actual state of the load switch using the Pearson correlation. For this situation, it is necessary to introduce a Markov random field to perform a more accurate voltage correlation calculation to determine whether the distribution transformers on both sides are powered by the same feeder, and then determine the state of the load switch. Among them, the preset accuracy conditions are obtained based on actual experience and are not specifically limited here. When the accuracy of the Pearson correlation coefficient is not enough, the present application uses a Markov random field instead, so that the dependencies in the model space can be naturally modeled, and the spatial dependencies in the complex calculation process are taken into account; complex relationships are captured, and multiple variables are analyzed to improve the accuracy of correlation calculations.
[0102] S3. Update the power grid topology according to the load switch state; specifically, after the load switch state is identified, generate a new line topology according to the switch state.
[0103] S4. Obtain the updated power and loss of each load in the power grid topology, and verify the load switch state to identify the load switch state.
[0104] In order to verify whether the load switch state obtained based on the voltage correlation method is accurate, it is necessary to verify the correctness of the identification with another parameter.
[0105] In one embodiment, step S4 is as follows: Figure 6 As shown, including:
[0106] S41, obtaining the measured sub-power of each distribution transformer under the feeder in the updated power grid topology and the measured total power of the head end of the feeder in the updated power grid topology;
[0107] S42, calculating the power loss of the line to which the feeder belongs, and summing the power loss with the measured sub-power to obtain the summed power of each distribution transformer under the feeder in the updated power grid topology;
[0108] S43, comparing the summed power with the measured total power, and determining the load switch state identification result according to the comparison result.
[0109] Specifically, for a normally operating distribution network, the output power at the head end of a feeder should be equal to the sum of the power of all the connected distribution transformers and the line loss. Then, by collecting the measured power P of all the distribution transformers under the feeder in the new topology, pd , and calculate the line loss P loss , and then sum the two, and the result is the same as the power P measured at the head end of the feeder fe If the comparison results are consistent, it means that the load switch state identification is correct, otherwise, it means that the load switch state identification is incorrect.
[0110] Another load switch state identification method for distribution network has the following process: Figure 7 As shown, the present application verifies the state of the load switch in the distribution network through power parameters, supplements and confirms the identification result of the load switch state from another dimension, and comprehensively considers information from multiple aspects to improve the accuracy of identification; in addition, the power parameters change in real time. By real-time monitoring of the changes in power parameters, the working state of the load switch and the load condition of the power grid can be instantly understood, and possible problems and failures of the load switch can be predicted, so as to carry out preventive maintenance and repair in advance to avoid the occurrence and expansion of failures; reasonable load distribution and optimization can also be carried out according to the actual load condition of the power grid, so as to improve the operating efficiency and economy of the power grid, so as to carry out refined management and enhance credibility.
[0111] This application identifies the switch status of a total of 353 load switches on 48 feeder lines with interconnection lines under 6 main transformers in a certain place, collects the measured data of the transformer distribution under the feeder for one month at 96 points per day, and verifies the scheme described in this application based on this data. The accuracy comparison is as follows: Figure 8 As shown, it can be seen that the method proposed in the present application can detect the state of the load switch more accurately and stably.
[0112] In the embodiment of the present application, based on the problem of how to accurately identify the load switch status of the distribution network, a load switch status identification method for the distribution network is designed, which realizes obtaining the grid topology and voltage measurement data of the distribution network; performing correlation calculation on the voltage measurement data to obtain the load switch status; updating the grid topology according to the load switch status; obtaining the power and loss of each load in the updated grid topology, and verifying the load switch status to identify the technical solution of the load switch status; the method has high identification accuracy, which helps to realize the economic operation of the new intelligent power system and promote the further development of the power industry.
[0113] It should be noted that although the steps in the above flowchart are shown in sequence according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders.
[0114] In another embodiment, if Fig. 9 As shown, the second aspect of the present invention provides a load switch state identification system for a distribution network, comprising:
[0115] A data acquisition module 10 is used to acquire the power distribution network topology and voltage measurement data;
[0116] A correlation calculation module 20, used for performing correlation calculation on the voltage measurement data to obtain a load switch state;
[0117] A topology updating module 30, configured to update the power grid topology according to the load switch state;
[0118] The state identification module 40 is used to obtain the power and loss of each load in the updated power grid topology and verify the load switch state to identify the load switch state.
[0119] It should be noted that the various modules in the above-mentioned load switch state identification system for distribution network can be fully or partially implemented by software, hardware and their combination. The above-mentioned modules can be embedded in or independent of the processor in the computer device in hardware form, or can be stored in the memory of the computer device in software form, so that the processor can call and execute the operations corresponding to the above modules. For the specific definition of a load switch state identification system for distribution network, please refer to the definition of a load switch state identification method for distribution network in the above text. The two have the same functions and effects, which will not be repeated here.
[0120] A third aspect of the present invention provides an electronic device, the electronic device comprising:
[0121] processor, memory, and bus;
[0122] The bus is used to connect the processor and the memory;
[0123] The memory is used to store operation instructions;
[0124] The processor is used to call the operation instruction, and the executable instruction enables the processor to perform operations corresponding to a load switch state identification method for a distribution network as shown in the first aspect of the present application.
[0125] In an alternative embodiment, an electronic device is provided, such as Fig.10 As shown, Fig.10 The electronic device 5000 shown includes: a processor 5001 and a memory 5003. The processor 5001 and the memory 5003 are connected, such as through a bus 5002. Optionally, the electronic device 5000 may also include a transceiver 5004. It should be noted that in actual applications, the transceiver 5004 is not limited to one, and the structure of the electronic device 5000 does not constitute a limitation on the embodiments of the present application.
[0126] Processor 5001 may be a CPU, a general-purpose processor, a DSP, an ASIC, an FPGA or other programmable logic device, a transistor logic device, a hardware component or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of this application. Processor 5001 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0127] The bus 5002 may include a path to transmit information between the above components. The bus 5002 may be a PCI bus or an EISA bus, etc. The bus 5002 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Fig.10 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0128] The memory 5003 may be a ROM or other type of static storage device that can store static information and instructions, a RAM or other type of dynamic storage device that can store information and instructions, or an EEPROM, a CD-ROM or other optical disk storage, an optical disk storage (including a compressed optical disk, a laser disk, an optical disk, a digital versatile disk, a Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited to these.
[0129] The memory 5003 is used to store application code for executing the solution of the present application, and the execution is controlled by the processor 5001. The processor 5001 is used to execute the application code stored in the memory 5003 to implement the content shown in any of the above method embodiments.
[0130] Among them, electronic devices include but are not limited to: mobile terminals such as mobile phones, laptops, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc.
[0131] The fourth aspect of the present invention provides a computer-readable storage medium, on which a computer program is stored. When the program is executed by a processor, a load switch state identification method for a distribution network shown in the first aspect of the present application is implemented.
[0132] Another embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored. When the computer-readable storage medium is run on a computer, the computer can execute the corresponding content in the aforementioned method embodiment.
[0133] In addition, an embodiment of the present invention further provides a computer-readable storage medium on which a computer program is stored, and when the program is executed by a processor, the steps of the above method are implemented.
[0134] In summary, the present invention relates to the technical field of distribution network, and discloses a method, system, device and medium for identifying the state of a load switch in a distribution network. The method comprises obtaining a grid topology and voltage measurement data of the distribution network; performing correlation calculation on the voltage measurement data to obtain the state of the load switch; updating the grid topology according to the state of the load switch; obtaining the power and loss of each load in the updated grid topology, and verifying the state of the load switch to identify the state of the load switch; the method has high identification accuracy, which helps to realize the economic operation of the new intelligent power system and promote the further development of the power industry.
[0135] Each embodiment in this specification is described in a progressive manner, and the same or similar parts of each embodiment can be directly referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. It should be noted that the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0136] The above-mentioned embodiments only express several preferred implementation modes of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in the technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention, and these improvements and substitutions should also be regarded as the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be based on the protection scope of the claims.
Claims
1. A method for identifying the state of a load switch in a distribution network, characterized in that: include: Obtain grid topology and voltage measurement data of distribution networks; Performing correlation calculation on the voltage measurement data to obtain a load switch state; Updating the power grid topology according to the load switch state; Obtaining the updated power and loss of each load in the power grid topology, and verifying the load switch state to identify the load switch state; The performing correlation calculation on the voltage measurement data to obtain the load switch state includes: Determine whether there is a ring network in the power grid topology; If yes, then the voltage measurement data is correlated by using Markov random field theory to obtain a first load switch correlation coefficient, and the first load switch correlation coefficient is used as the load switch state; If not, the voltage measurement data is correlated using a Pearson correlation coefficient calculation formula to obtain a second load switch correlation coefficient, and the second load switch correlation coefficient is used as the load switch state; After performing correlation calculation on the voltage measurement data by using the Pearson correlation coefficient calculation formula to obtain the second load switch correlation coefficient, the method includes: Determining whether the accuracy of the correlation coefficient of the second load switch meets a preset accuracy condition; If yes, then taking the second load switch correlation coefficient as the load switch state; If not, correlation calculation is performed on the voltage measurement data using the Markov random field theory to obtain a first load switch correlation coefficient, so that the first load switch correlation coefficient is used as the load switch state.
2. A method for identifying the state of a load switch for a distribution network according to claim 1, characterized in that: The power grid topology includes information about each switch station between distribution networks, information about load switches connected to each bus in each switch station, distribution transformers under each switch station, and the connection relationship between the feeder and the bus; the voltage measurement data is the voltage between distribution transformers under two adjacent switch stations.
3. A method for identifying the state of a load switch for a distribution network according to claim 2, characterized in that: The step of performing correlation calculation on the voltage measurement data by using the Markov random field theory to obtain a first load switch correlation coefficient, and using the first load switch correlation coefficient as the load switch state, includes: According to the Markov random field theory, the distribution network is constructed as a four-tuple distribution system model, and the four-tuple distribution system model includes a switch station node, a distribution transformer node and a connection node; According to the Hammersley-Clifford theorem, the joint probability distribution is decomposed into the product of the potential function corresponding to each node, and the Markov random field model of the distribution transformer under the switch station is obtained; Solving the Markov random field model to obtain a node correlation matrix between every two nodes in the four-tuple distribution system model, wherein each element in the node correlation matrix serves as a voltage correlation between two corresponding distribution transformer nodes; The voltage correlation of the distribution transformers under two adjacent ring network switch stations is calculated according to the operating status of the ring network and the node correlation matrix to obtain a first load switch correlation coefficient, and the first load switch correlation coefficient is used as the load switch status.
4. A method for identifying the state of a load switch for a distribution network according to claim 2, characterized in that: The Pearson correlation coefficient calculation formula is expressed by the following formula: Where r is the correlation coefficient of the second load switch between two distribution transformers under different switch stations; n is the number of elements in the voltage measurement data; u ui is the voltage measurement data of the ith distribution transformer under a switch station; u vi It is the i-th voltage measurement data of the distribution transformer under another adjacent switch station.
5. A method for identifying the state of a load switch for a distribution network according to claim 2, characterized in that: The obtaining of the updated power and loss of each load in the power grid topology and verifying the load switch state to identify the load switch state includes: Acquire the measured sub-power of each distribution transformer under the feeder in the updated power grid topology and the measured total power of the head end of the feeder in the updated power grid topology; Calculating the power loss of the line to which the feeder belongs, and summing the power loss with the measured sub-power to obtain the summed power of each distribution transformer under the feeder in the updated power grid topology; The summed power is compared with the measured total power, and the load switch state identification result is determined according to the comparison result.
6. A load switch state identification system for a distribution network, characterized in that: include: A data acquisition module, used to acquire the grid topology and voltage measurement data of the distribution network; A correlation calculation module, used for performing correlation calculation on the voltage measurement data to obtain a load switch state; A topology updating module, used for updating the power grid topology according to the load switch state; A state identification module, used to obtain the power and loss of each load in the updated power grid topology, and verify the load switch state to identify the load switch state; The performing correlation calculation on the voltage measurement data to obtain the load switch state includes: Determine whether there is a ring network in the power grid topology; If yes, then the voltage measurement data is correlated by using Markov random field theory to obtain a first load switch correlation coefficient, and the first load switch correlation coefficient is used as the load switch state; If not, the voltage measurement data is correlated using a Pearson correlation coefficient calculation formula to obtain a second load switch correlation coefficient, and the second load switch correlation coefficient is used as the load switch state; After performing correlation calculation on the voltage measurement data by using the Pearson correlation coefficient calculation formula to obtain the second load switch correlation coefficient, the method includes: Determining whether the accuracy of the correlation coefficient of the second load switch meets a preset accuracy condition; If yes, then taking the second load switch correlation coefficient as the load switch state; If not, correlation calculation is performed on the voltage measurement data using the Markov random field theory to obtain a first load switch correlation coefficient, so that the first load switch correlation coefficient is used as the load switch state.
7. An electronic device, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the method for identifying the state of a load switch for a distribution network as described in any one of claims 1 to 5 is implemented.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the device where the computer-readable storage medium is located executes the computer program, the load switch state identification method for a distribution network as described in any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Same-bus topology identification method based on Bayesian network and equipment
CN113725862A
Power distribution network line switch state identification method and system
CN115051474A
Power distribution network dynamic topology identification method, system and device and storage medium
CN116316637A
Joint estimation method and device for topological state of active power distribution network, medium and equipment
CN116522559A
Topology real-time identification method and system based on power distribution network
CN117421571A
