The invention relates to the technical field of construction progress regulation and control, and discloses a construction progress regulation and
control system and method in
engineering construction based on an unmanned aerial vehicle. The method comprises the following steps: firstly, acquiring an inclined image of an
engineering construction site, extracting feature points by using a
light beam method and an SURF
algorithm, matching the feature points, and establishing an
engineering construction site live-
action model; secondly, clustering site clouds of the engineering construction site in combination with an engineering construction site real scene model, extracting a construction site building
point cloud set, performing deviation analysis, and adjusting the engineering construction progress; a BP neural network is trained, and the engineering construction
completion rate is predicted; and finally, according to the engineering construction
completion rate, the engineering construction progress plan is adjusted and optimized based on a
litsea rotundifolia optimization
algorithm, and engineering construction progress control is realized. The purpose of regulating and controlling the construction progress is achieved by adjusting and controlling the engineering construction progress, and the method is accurate and objective.