Fastening structure and aluminum wiring material

By using pure aluminum or aluminum alloy in the fastening structure, the fastened parts are in direct contact with the metal fastening parts, and the aluminum in the protruding part forms a bond with the fastening parts, which solves the problem of complicated plating processing and high cost. Achieved aluminum contact resistance reduction and continuity maintenance without plating.

CN118786583APending Publication Date: 2024-10-15YAZAKI CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380011482.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-02-03
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing technology requires plating processing when reducing the contact resistance of aluminum. The process is complicated and costly, resulting in increased manufacturing costs, and it is difficult to reduce the contact resistance of aluminum without plating processing.

Method used

Adopt a fastening structure design, in which the fastened part containing pure aluminum or aluminum alloy is in direct contact with the metal fastening part through the protrusion. The aluminum or aluminum alloy of the protrusion forms a direct bond with the metal surface of the fastening part, thereby reducing the risk of Contact resistance.

Benefits of technology

Without plating processing, it can effectively reduce the contact resistance of aluminum, improve conductivity, and reduce plating processing costs, while maintaining high conductivity when temperature changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118786583A_ABST
    Figure CN118786583A_ABST
Patent Text Reader

Abstract

A fastening structure (10) is provided with: a first member to be fastened (20) comprising pure aluminum or an aluminum alloy; a second member to be fastened (30) containing a metal; and fastening members (40, 50) that fasten and fix the first member to be fastened (20) and the second member to be fastened (30) to each other. A protruding portion (22) that includes pure aluminum or an aluminum alloy and protrudes toward the second member to be fastened (30) is integrally formed on a surface (21) of the first member to be fastened (20) that faces the second member to be fastened (30). The pure aluminum or aluminum alloy in the protrusion (22) of the first member (20) to be fastened is in direct contact with the metal of the second member (30) to be fastened. The aluminum wiring material is provided with a fastening structure (10).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a fastening structure and an aluminum wiring material. Background Art

[0002] Aluminum is a lightweight metal with good conductivity and is relatively cheap, so it is often used for wires, busbars, electrodes, etc. However, aluminum is highly reactive with oxygen, so an oxide film with a thickness of about 10nm is formed on the surface of aluminum. Therefore, in the case of pressurized contact, except for precious metals such as gold and silver, the contact resistance of copper and nickel is generally about several μΩ to several 10μΩ. In contrast, the contact resistance of aluminum is known to be more than 100μΩ, which is more than an order of magnitude higher. Therefore, when using aluminum or aluminum alloy as a conductor, plating is usually performed to reduce the influence of the surface oxide film.

[0003] Specifically, when bolts are tightened, when an aluminum busbar is used as a fastened component, a surface treatment such as plating is performed to reduce the contact resistance of the aluminum. Patent document 1 discloses that a conductive component that is electrically connected to an aluminum or aluminum alloy electrical component by pressurized contact is subjected to a tin plating layer formed on the contact surface with the electrical component via a barrier metal or alloy layer, thereby reducing the contact resistance.

[0004] Prior art literature

[0005] Patent Literature

[0006] Patent Document 1: Japanese Patent Application Publication No. 2014-002977 Summary of the invention

[0007] Technical problem that the invention aims to solve

[0008] However, in the method of reducing the contact resistance of aluminum as in Patent Document 1, the plating process is complicated and there is a problem of increased production cost. Furthermore, from the viewpoint of recycling, it is preferable to use aluminum as a conductor without plating it.

[0009] The present invention has been made in view of the problems of the prior art. Another object of the present invention is to provide a fastening structure and an aluminum wiring material that can reduce the contact resistance of aluminum without plating even when aluminum is used as a fastened member.

[0010] Technical solutions to the problem

[0011] The fastening structure according to the first aspect of the present invention comprises: a first fastened member, which comprises pure aluminum or an aluminum alloy; a second fastened member, which comprises metal; and a fastening member, which fastens and fixes the first fastened member and the second fastened member to each other. A protrusion, which comprises pure aluminum or an aluminum alloy and protrudes toward the second fastened member, is integrally formed on a surface of the first fastened member that faces the second fastened member. Furthermore, the pure aluminum or aluminum alloy in the protrusion of the first fastened member is in direct contact with the metal of the second fastened member.

[0012] An aluminum wiring material according to a second aspect of the present invention includes the above-mentioned fastening structure.

[0013] Effects of the Invention

[0014] According to the present invention, even when aluminum is used as a fastened member, it is possible to provide a fastening structure and an aluminum wiring material capable of reducing the contact resistance of aluminum without performing plating. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram showing an example of a fastening structure.

[0016] Figure 2 The diagram shows a spring model of a bolt as a fastening member, and a bus bar and a terminal as fastened members.

[0017] Figure 3 This is a schematic diagram for explaining changes in the axial force, the repulsive force between the head of the bolt and the second fastened member, and the repulsive force between the first fastened member and the second fastened member when the fastening structure repeats between a high temperature state and a low temperature state.

[0018] Figure 4 This is a graph showing an example of changes in resistance between a terminal and a bus bar when the fastening torque is changed in a fastening structure using bolts and nuts as fastening members and using a terminal and a bus bar as fastened members.

[0019] Figure 5A It is a schematic cross-sectional view showing the state of the interface between the first fastened member and the second fastened member before the first fastened member and the second fastened member are fastened together in the fastening structure according to the present embodiment.

[0020] Figure 5B It is a schematic cross-sectional view showing the state of the interface between the first fastened member and the second fastened member after the first fastened member and the second fastened member are fastened together in the fastening structure according to the present embodiment.

[0021] Fig. 6AIt is a plan view schematically showing an example of an arrangement of protrusions in a first fastened member of the fastening structure according to the present embodiment.

[0022] Figure 6B It is a plan view schematically showing another example of the arrangement of the protrusions in the first fastened member of the fastening structure according to the present embodiment.

[0023] Figure 6C This is a plan view schematically showing still another example of the arrangement of the protrusions in the first fastened member of the fastening structure according to the present embodiment.

[0024] Figure 7 It is a plan view showing the shapes and dimensions of the terminals and bus bars used in the reference example.

[0025] Figure 8 These are a front view and a top view showing the shape and dimensions of a fastening structure composed of a terminal, a bus bar, a bolt, and a nut used in a reference example.

[0026] Fig. 9 It is a plan view showing a state where a power source and a voltmeter are connected to the fastening structure of the reference example.

[0027] Fig. 10A This is a graph showing the relationship between the resistance of the fastening structure, the temperature in the groove, and the test time when the heat shock test of 0 to 20 cycles was performed on Samples 1 and 2 of the reference example.

[0028] Fig. 10B This is a graph showing the relationship between the resistance of the fastening structure, the temperature in the groove, and the test time when the heat shock test of 180 to 200 cycles was performed on Samples 1 and 2 of the reference example.

[0029] Fig.11A This is a graph showing the relationship between the resistance of the fastening structure, the temperature in the groove, and the test time when the heat shock test of 0 to 20 cycles was performed on Samples 3 and 4 of the reference example.

[0030] Fig. 11B This is a graph showing the relationship between the resistance of the fastening structure, the temperature in the groove, and the test time when the heat shock test of 180 to 200 cycles was performed on Samples 3 and 4 of the reference example.

[0031] Fig.12 The photographs show the results of measuring the height of the irregularities on the front and back surfaces of the copper alloy terminals before the fastening structures were formed in Samples 1 and 2 of the reference examples.

[0032] Fig.13The photographs show the results of measuring the height of the unevenness on the surface of the copper alloy terminal after disassembling the fastening structure in reference example samples 1 and 2. The photographs also show the results of measuring the height of the unevenness on the surface of the copper alloy terminal after disassembling the fastening structure after the thermal shock test.

[0033] Fig.14 The photographs show the results of measuring the height of the irregularities on the surface of the aluminum alloy terminal before the fastening structure was formed in Samples 3 and 4 of the reference example.

[0034] Fig.15 The photographs show the results of measuring the height of the unevenness on the surface of the aluminum alloy terminal after the fastening structure was prepared and then disassembled in reference example samples 3 and 4. Furthermore, the photographs show the results of measuring the height of the unevenness on the surface of the aluminum alloy terminal after disassembling the fastening structure after the thermal shock test.

[0035] Fig.16 This is a schematic diagram for explaining the samples and test methods of the examples.

[0036] Fig.17A This is a graph showing the relationship between the contact load on the contact member and the contact resistance in Sample 5 of the Example.

[0037] Fig. 17B This is a graph showing the relationship between the contact load on the contact member and the contact resistance in Sample 6 of the Example.

[0038] Fig. 17C This is a graph showing the relationship between the contact load on the contact member and the contact resistance in Sample 7 of the Example.

[0039] Fig.18 The photographs show the results of observing the protrusions in Samples 5 and 6 of the Example using a scanning electron microscope-energy dispersive X-ray spectrometry (SEM-EDX).

[0040] Description of Reference Numerals

[0041] 10 Fastening structure

[0042] 20 First fastened component (bus bar)

[0043] 20a Hole

[0044] 22 protrusion

[0045] 23 Oxide coating

[0046] 30 Second fastened component (terminal)

[0047] 40, 50 Fastening parts (bolts, nuts) DETAILED DESCRIPTION

[0048] Hereinafter, the fastening structure and the aluminum wiring material having the fastening structure according to the present embodiment will be described in detail using the drawings. In addition, for the sake of convenience of description, the dimensional ratios in the drawings may be exaggerated and different from the actual ratios.

[0049] like Figure 1 As shown, the conventional fastening structure 1 includes: a first fastened member 2, a second fastened member 3, and a fastening member for fastening and fixing the first fastened member 2 and the second fastened member 3 to each other. A bus bar can be used as the first fastened member 2, a terminal can be used as the second fastened member 3, and a bolt 4 and a nut 5 can be used as the fastening member. Then, the first fastened member 2 and the second fastened member 3 are fastened and fixed by screwing the nut 5 into the threaded portion while the threaded portion of the bolt 4 is inserted into the hole portion provided in the first fastened member 2 and the second fastened member 3.

[0050] Here, the first fastened member 2, the second fastened member 3, and the fastening member are generally made of metal materials, but metal materials have the characteristics of expanding when the temperature rises and contracting when the temperature drops. Figure 2 As shown, by considering the bolt 4, the bus bar (first fastened member 2), and the terminal (second fastened member 3) as springs, the change in the axial force of the bolt caused by the difference in thermal expansion coefficients of the bolt, the bus bar, and the terminal can be calculated.

[0051] Specifically, the material of the bolt 4 and the nut 5 is set to aluminum alloy or steel, the material of the terminal 3 is set to aluminum alloy or copper alloy, and the material of the busbar 2 is set to aluminum alloy or copper alloy. It should be noted that the aluminum alloy is set to A6101-T6 standardized according to Japanese Industrial Standard JIS H4000, and the copper alloy is set to C1020-1 / 2H standardized according to JIS H3100. In addition, the plate thickness of the busbar is 2mm, the plate thickness of the copper terminal is 0.8mm, and the plate thickness of the aluminum terminal is 2mm. It should be noted that the busbar and the terminal are set to the condition where no plating treatment is performed. In addition, the bolt 4 uses an M6 bolt.

[0052] Then, for the fastening structure 1 in which the busbar 2 and the terminal 3 are fastened with the bolt 4 and the nut 5 at a tightening torque of 8 N·m, the axial force variation of the bolt 4 at 160°C and -40°C is calculated according to Formula 1. In addition, the axial force variation is the variation value of the axial force compared to that at 25°C. The materials of the bolts, nuts, terminals, and busbars, and the calculation results of the axial force variation at 160°C and -40°C are summarized in Table 1. In addition, when calculating the axial force variation, the linear expansion coefficient of iron (Fe) is 11.8×10 - 6K, the linear expansion coefficient of copper (Cu) is 17.1×10 -6 K, the linear expansion coefficient of aluminum (Al) is 25.6×10 -6 K.

[0053] [Mathematical formula 1]

[0054] ΔF th =ZΔλ th

[0055]

[0056] Δλ th =ΔT[α B l B -(α C1 l C1 +α C2 l C2 )]

[0057] ΔF th :Change in the axial force of the bolt, α B : Linear expansion coefficient of bolt material, α C1 : Linear expansion coefficient of busbar material, α C2 : Linear expansion coefficient of terminal material, l B : Bolt grip length, l C1 : busbar thickness, l C2 : Terminal thickness, K B : Spring constant of the bolt, K C1 : Spring constant of busbar, K C2 : Spring constant of the terminal

[0058] In addition, the spring constant K B , K C Calculated based on the Young's modulus of the material and the shapes of the bolts and busbars.

[0059] [Table 1]

[0060]

[0061] ※The plate thickness of 1A6101-T6 is 2.0mm.

[0062] As shown in Table 1, when the bolts, nuts, terminals, and busbars are all made of aluminum alloy, their linear expansion coefficients are the same, so even when the temperature changes from 160°C to -40°C, there is no axial force change. In contrast, when the bolts and nuts are made of steel and the terminals and busbars are made of copper alloy, the axial force at 160°C increases by 1157N and the axial force at -40°C decreases by 557N. Similarly, when the bolts and nuts are made of steel, the terminals are made of copper alloy, and the busbars are made of aluminum alloy, the axial force at 160°C also increases and the axial force at -40°C decreases. Moreover, when the bolts and nuts are made of steel and the terminals and busbars are made of aluminum alloy, the axial force at 160°C also increases and the axial force at -40°C decreases. In this way, when the materials of the fastening components (bolts and nuts) and the fastened components (terminals and busbars) are different, the axial force varies greatly due to the difference in thermal expansion of each material. Such a change in the axial force (fastening force) causes the bolt to loosen and the electrical resistance between the fastened parts to change.

[0063] As described above, when the use conditions of the fastening structure in which the materials of the fastening component and the fastened component are different are repeated between high temperature environment and low temperature environment, the axial force of the fastening component changes greatly due to the difference in thermal expansion of each material. Moreover, when the axial force of the fastening component is repeatedly changed, stress relaxation occurs in the fastened component, and the axial force, the repulsive force between the head of the bolt and the second fastened component 3, and the repulsive force between the first fastened component 2 and the second fastened component 3 are reduced. That is, if Figure 3 As shown, in the initial stage before the high temperature environment (160°C) and the low temperature environment (-40°C) are repeated, the axial force A1, the repulsive force B1 between the head of the bolt 4 and the second fastened component 3, and the repulsive force C1 between the first fastened component 2 and the second fastened component 3 are maintained at a high state. In contrast, when the high temperature environment and the low temperature environment are repeated, stress relaxation occurs, for example, in the second fastened component 3. Therefore, in order to obtain the balance of forces in the fastening structure, the axial force A2, the repulsive force B2 between the head of the bolt 4 and the second fastened component 3, and the repulsive force C2 between the first fastened component 2 and the second fastened component 3 are relaxed. As a result, the axial force (fastening force) of the bolt 4 relative to the first fastened component 2 and the second fastened component 3 is reduced. In addition, stress relaxation occurs not only between the head of the bolt 4 and the second fastened component 3, but also between the nut 5 and the first fastened component 2.

[0064] Here, Figure 4 The graph of FIG. 1 shows an example of the change in resistance between the terminal and the bus bar when the tightening torque is changed in a tightening structure using bolts and nuts as tightening components and using terminals and bus bars as tightened components. Figure 4 In the embodiment, steel or aluminum alloy is used as the material of bolts and nuts, copper alloy or aluminum alloy is used as the material of terminals, and copper alloy or aluminum alloy is used as the material of busbars. In addition, the aluminum alloy is set to A6101-T6, and the copper alloy is set to C1020-1 / 2H. In addition, the thickness of the busbar is 2 mm, the thickness of the copper terminal is 0.8 mm, and the thickness of the aluminum terminal is 2 mm.

[0065] like Figure 4 As shown, it can be seen that the fastening structure composed of steel bolts, copper alloy terminals and aluminum alloy busbars (FeC bolts / Cu terminals / Al busbars), the fastening structure composed of steel bolts, aluminum alloy terminals and aluminum alloy busbars (FeC bolts / Al terminals / Al busbars), and the fastening structure composed of aluminum alloy bolts, aluminum alloy terminals and aluminum alloy busbars (Al bolts / Al terminals / Al busbars) have a tendency to increase the resistance between the fastened parts as the tightening torque to the bolts decreases. In contrast, it can be seen that for the fastening structure composed of steel bolts, copper alloy terminals and copper alloy busbars (FeC bolts / Cu terminals / Cu busbars), even if the tightening torque is reduced, the resistance does not change significantly. That is, when pure aluminum or aluminum alloy is used as the fastened part, the resistance between the fastened parts tends to increase as the tightening torque to the bolts decreases.

[0066] In this way, when the materials of the fastening component and the fastened component are different, the fastening force (axial force) varies greatly due to the difference in thermal expansion of each material, and the stress relaxation of the fastened component also causes a reduction in the fastening force. In addition, when aluminum alloy is used as the fastened component, as the fastening force decreases, the resistance between the fastened components increases. Moreover, with respect to the resistance of the fastening structure, the resistance between the fastened components dominates the resistance between the fastening component and the fastened component. Therefore, even when the fastening force of the fastening component is reduced, it is important to reduce the resistance between the fastened components as much as possible in order to reduce the overall resistance of the fastening structure.

[0067] The fastening structure according to the embodiment of the present invention has a structure capable of reducing the electrical resistance between fastened members even when pure aluminum or an aluminum alloy is used as the fastened member.

[0068] like Figure 1 As shown, the fastening structure 10 according to the present embodiment comprises: a first fastened member 20 comprising pure aluminum or an aluminum alloy; a second fastened member 30 comprising metal; and a fastening member for fastening and fixing the first fastened member 20 and the second fastened member 30 to each other. Figure 5AAs shown, the fastening structure 10 has a protrusion 22 integrally formed on a surface 21 of the first fastened member 20 that faces the second fastened member 30. Then, in a state where the threaded portion of a bolt 40 as a fastening member is inserted through the holes provided in the first fastened member 2 and the second fastened member 30, the first fastened member 2 and the second fastened member 30 are fastened and fixed by screwing a nut 50 into the threaded portion.

[0069] The first fastened member 20 is a conductive member containing pure aluminum or an aluminum alloy as a main component. In addition, the first fastened member 20 may also be a member composed of pure aluminum or an aluminum alloy. The aluminum alloy may contain at least one element selected from the group consisting of Si, Fe, Cu, Mn, Mg, Cr, Zn and Ti in raw aluminum such as an aluminum ingot. The aluminum alloy may contain at least one element selected from the group consisting of Si, Fe, Cu, Mn, Mg, Cr, Zn and Ti, and the balance is aluminum and inevitable impurities.

[0070] As the aluminum ingot, it is preferred to use pure aluminum with a purity of 99.7% by mass or more. It should be noted that, as the aluminum ingot, there can be cited the type 1 aluminum ingot with a purity of 99.7% by mass, the special type 2 aluminum ingot with a purity of 99.85% by mass or more, and the special type 1 aluminum ingot with a purity of 99.90% by mass or more, among the pure aluminum ingots specified in JIS H2102:2011 (aluminum ingot). In the present embodiment, as the aluminum ingot, not only expensive and high-purity aluminum ingots such as special type 1 and special type 2 can be used, but also relatively cheap type 1 aluminum ingot can be used.

[0071] The aluminum alloy contains 0.1 mass % or more and less than 1.2 mass % Si, preferably 0.3 mass % to 0.7 mass % Si. The aluminum alloy contains 0.1 mass % or more and less than 1.7 mass % Fe, preferably 0.4 mass % to 0.7 mass % Fe.

[0072] The aluminum alloy contains 0.04 mass% to 7 mass% Cu, preferably 0.1 mass% to 2.6 mass% Cu. The aluminum alloy contains 0.03 mass% to 0.8 mass% Mn, preferably 0.03 mass% to 0.1 mass% Mn. The aluminum alloy contains 0.03 mass% to 4.5 mass% Mg, preferably 0.35 mass% to 0.8 mass% Mg. The aluminum alloy contains 0.03 mass% to 0.35 mass% Cr, preferably 0.03 mass% to 0.1 mass% Cr. The aluminum alloy contains 0.04 mass% to 7.0 mass% Zn, preferably 0.1 mass% to 0.25 mass% Zn. The aluminum alloy contains 0.00 to 0.2 mass% Ti, preferably 0.00 to 0.1 mass% Ti.

[0073] Aluminum may contain a very small amount of inevitable impurities. As inevitable impurities that may be contained in aluminum, there can be cited: nickel (Ni), rubidium (Rb), tin (Sn), vanadium (V), gallium (Ga), boron (B), sodium (Na), zirconium (Zr), etc. They are inevitably contained within a range that does not have a special impact on the characteristics of the aluminum alloy of the present embodiment without hindering the effect of the present embodiment. In addition, the elements previously contained in the aluminum ingot used are also included in the inevitable impurities. The amount of inevitable impurities is preferably less than 0.07% by mass in total in the aluminum alloy, and more preferably less than 0.05% by mass.

[0074] The shape of the first fastened member 20 is not particularly limited, and can be, for example, a flat plate shape. In addition, the first fastened member 20 is preferably a bus bar.

[0075] The second fastened member 30 is a conductive member containing a metal as a main component. In addition, the second fastened member 30 may also be a member made of the metal. The metal constituting the second fastened member 30 may be pure copper, a copper alloy, pure aluminum, or an aluminum alloy. In addition, the aluminum alloy may use the material described in the first fastened member 20.

[0076] The shape of the second fastened member 30 is not particularly limited, and can be, for example, a flat plate shape. In addition, the second fastened member 30 is preferably a bus bar or a terminal.

[0077] The fastening member is a member that can fasten the first fastened member 20 and the second fastened member 30 by applying an appropriate fastening force (compression force) to them. Figure 1 As shown, the bolts 40 and the nuts 50 can be used. However, as long as an appropriate fastening force can be applied to the first fastened member 20 and the second fastened member 30, members other than the bolts 40 and the nuts 50 may be used as the fastening members.

[0078] Here, in the fastening structure 10, a protrusion 22 that protrudes toward the second fastened member 30 is integrally formed on the surface 21 of the first fastened member 20 that faces the second fastened member 30. The protrusion 22 has the same metal composition as the first fastened member 20, and includes pure aluminum or an aluminum alloy. In addition, the pure aluminum or aluminum alloy in the protrusion 22 of the first fastened member 20 is in direct contact with the metal of the second fastened member 30. Therefore, the conductivity between the protrusion 22 of the first fastened member 20 and the second fastened member 30 can be improved.

[0079] Figure 5A The state of the interface between the first fastened member 20 and the second fastened member 30 before the first fastened member 20 and the second fastened member 30 are fastened by the fastening member is schematically shown. Figure 5B The state of the interface between the first fastened member 20 and the second fastened member 30 after the first fastened member 20 and the second fastened member 30 are fastened by the fastening member is schematically shown. Figure 5A As shown, before the first fastened member 20 and the second fastened member 30 are fastened by the fastening member, a plurality of protrusions 22 protruding toward the second fastened member 30 are provided on the surface 21 of the first fastened member 20. Here, the first fastened member 20 and the protrusions 22 are made of pure aluminum or aluminum alloy, and thus an oxide film 23 is formed on the surface.

[0080] When the first fastened member 20 and the second fastened member 30 are fastened by a fastening member to apply a compressive force, the protrusion 22 contacts the surface of the second fastened member 30 and the protrusion 22 is plastically deformed, so that the oxide film 23 on the surface of the protrusion 22 is destroyed. Figure 5B As shown, the pure aluminum or aluminum alloy inside the protrusion 22 is in direct contact with the metal of the second fastened member 30 and is bonded. That is, the protrusion 22 of the first fastened member 20 and the second fastened member 30 are in direct contact without the oxide film 23. Therefore, even if the fastening force varies greatly due to the difference in thermal expansion between the fastening member, the first fastened member 20, and the second fastened member 30, or the fastening force decreases due to stress relaxation, the protrusion 22 and the second fastened member 30 are bonded, so that conduction can be ensured. As a result, the conductivity between the first fastened member 20 and the second fastened member 30 can be maintained at a high state.

[0081] The height H of the protrusion 22 before the first fastened member 20 and the second fastened member 30 are fastened by the fastening member is not particularly limited as long as the protrusion 22 and the second fastened member 30 can be bonded. The lower limit of the height H of the protrusion 22 before fastening is preferably 5 μm, more preferably 20 μm, further preferably 50 μm, and particularly preferably 100 μm. The upper limit of the height H of the protrusion 22 before fastening is preferably 1 mm, more preferably 800 μm, further preferably 500 μm, and particularly preferably 200 μm.

[0082] The shape of the protrusion 22 before the first fastened member 20 and the second fastened member 30 are fastened by the fastening member is not particularly limited as long as the protrusion 22 and the second fastened member 30 can be bonded. The shape of the protrusion 22 before fastening can be, for example, hemispherical or columnar.

[0083] The position of the protrusion 22 of the first fastened member 20 is also not particularly limited. When the first fastened member 20 and the second fastened member 30 have holes through which the fastening member (bolt 40) is inserted, the protrusion 22 of the first fastened member 20 is preferably disposed around the hole 20a. FIG. 6A to FIG. 6C As shown, by positioning the protrusion 22 around the hole 20a, the compression force during fastening by the fastening member acts efficiently on the protrusion 22. Therefore, the oxide film 23 is easily destroyed and the aluminum of the protrusion 22 and the metal of the second fastened member 30 are easily bonded.

[0084] The number of the protrusions 22 of the first fastened member 20 is not particularly limited. Fig. 6A As shown, the number of the protrusion 22 can be one, such as Figure 6B and Figure 6C As shown, there may be a plurality of protrusions 22. By providing a plurality of protrusions 22, the conduction between the first fastened member 20 and the second fastened member 30 can be further improved.

[0085] Here, when viewed along the stacking direction of the first fastened member 20 and the second fastened member 30 (the long side direction of the threaded portion of the bolt), the hole portion 20a of the first fastened member and the second fastened member is substantially circular, and the plurality of protrusions 22 may be arranged to face each other across the center O of the hole portion. Figure 6B as well as Figure 6C As shown in FIG. 1 , when the plurality of protrusions 22 are arranged to face each other across the center O, the compressive force from the fastening member (bolt 40 and nut 50) acts substantially evenly on the periphery of the hole portions of the first fastened member 20 and the second fastened member 30. Thus, the fastening force is evenly applied to the first fastened member 20 and the second fastened member 30, thereby suppressing a decrease in the fastening force.

[0086] When viewed along the stacking direction of the first fastened member 20 and the second fastened member 30, the protrusion 22 of the first fastened member 20 is preferably located inside the outer periphery of the seat surface of the head of the bolt 40. As a result, the compressive force is easily applied to the protrusion 22, so that the oxide film 23 is easily destroyed and the aluminum of the protrusion 22 and the metal of the second fastened member 30 are easily bonded.

[0087] The protrusion 22 of the first fastened member 20 preferably satisfies the condition of the following mathematical formula 2.

[0088] [Mathematical formula 2]

[0089] σ y ≤F / x≤σ uts

[0090] In addition, in Mathematical Formula 2, σ y is the yield strength of the first fastened member 20 (N / mm 2 ), that is, the yield strength of the protrusion 22. F is the axial force (N) of the fastening member (bolt 40), x is the area (mm) of the initial contact point between the protrusion 22 and the second fastened member 30 2 The area of ​​the initial contact point can be estimated from the area of ​​the contact point of the protrusion 22 with the second fastened member 30 and the shape of the protrusion 22 measured after the fastening structure is assembled using the first fastened member 20, the second fastened member 30 and the fastening member and then disassembled. uts is the tensile strength of the first fastened member 20 (N / mm 2 ), that is, the tensile strength of the protrusion 22. By making F / x greater than or equal to the yield strength of the first fastened component 20 and the protrusion 22, the protrusion 22 is plastically deformed during compression, so that the oxide film 23 of the protrusion 22 is destroyed. Therefore, the aluminum inside the protrusion 22 can be in direct contact with the metal of the second fastened component 30 and bonded. In addition, by making F / x less than or equal to the tensile strength (maximum stress) of the first fastened component 20, it is possible to suppress the generation of cracks and other damage in the protrusion 22 and the first fastened component 20 during compression. It should be noted that the yield strength and tensile strength of the first fastened component 20 can be obtained in accordance with JIS Z2241 (Methods for tensile testing of metal materials).

[0091] As described above, the metal of the second fastened member 30 can be pure copper, copper alloy, pure aluminum, or aluminum alloy. Here, when the metal of the second fastened member 30 is pure aluminum or aluminum alloy, an oxide film is formed on the surface of the second fastened member 30. However, even if an oxide film exists on the surface of the second fastened member 30, when a compressive force is applied, the oxide film of the second fastened member 30 can be destroyed together with the oxide film 23 of the protrusion 22. Therefore, the aluminum of the protrusion 22 is bonded to the aluminum of the second fastened member 30, so that the conductivity between the first fastened member 20 and the second fastened member 30 can be improved.

[0092] Next, a method for manufacturing the fastening structure 10 of the present embodiment is described. When manufacturing the fastening structure 10, first, the first fastened member 20 having the protrusion 22, the second fastened member 30, and the fastening member are prepared. As described above, the bolt 40 and the nut 50 can be used as the fastening member.

[0093] There is no particular limitation on the method of forming the protrusion 22 on the first fastened member 20. For example, the protrusion 22 can be formed on the surface 21 by pressing a mold having a recess corresponding to the shape of the protrusion 22 against the surface 21 of the first fastened member 20. Alternatively, the protrusion 22 can be formed by roughening the surface 21 of the first fastened member 20.

[0094] Next, the first fastened member 20 and the second fastened member 30 are overlapped in such a manner that the protrusion 22 and the second fastened member 30 are opposed to each other, and then the threaded portion of the bolt 40 is inserted into the hole portions provided in the first fastened member 2 and the second fastened member 3, respectively. And, by screwing the nut 50 with the threaded portion, the first fastened member 2 and the second fastened member 30 are fastened and fixed. At this time, the tightening torque of the bolt 40 is preferably adjusted to satisfy the relationship of the above-mentioned mathematical formula 2. As a result, the aluminum inside the protrusion 22 can be directly in contact with the metal of the second fastened member 30 and bonded. In this way, the fastening structure 10 of the present embodiment can be obtained.

[0095] Thus, the fastening structure 10 of the present embodiment includes: the first fastened member 20, which is made of pure aluminum or aluminum alloy; the second fastened member 30, which is made of metal; and the fastening member, which fastens and fixes the first fastened member 20 and the second fastened member 30 to each other. The protrusion 22, which is made of pure aluminum or aluminum alloy and protrudes toward the second fastened member 30, is integrally formed on the surface 21 of the first fastened member 20 that faces the second fastened member 30. And the pure aluminum or aluminum alloy in the protrusion 22 of the first fastened member 20 is in direct contact with the metal of the second fastened member 30. According to such a structure, even if the fastening force greatly changes due to the difference in thermal expansion of the fastening member, the first fastened member 20, and the second fastened member 30, or the fastening force decreases due to stress relaxation, the protrusion 22 and the second fastened member 30 are bonded, so that conduction can be ensured. As a result, even when the temperature of the fastening structure 10 fluctuates significantly, the electrical conductivity between the first fastened member 20 and the second fastened member 30 can be maintained at a high state.

[0096] The aluminum wiring material of the present embodiment has the above-mentioned fastening structure. The wiring material is, for example, a component that is wired in a vehicle and electrically connects various devices. As such a wiring material, for example, a wiring harness can be cited. The fastening structure of the present embodiment can reduce the resistance without plating the surface of the fastened component, thereby suppressing the increase in the plating processing cost. In addition, even when the fastening structure is used in a heating part near the engine or battery of a car, high conductivity can be maintained, thereby ensuring reliability. Moreover, when the bolts 40 and nuts 50 are used as fastening components, the fastening components are easy to disassemble, so from the perspective of metal recycling, they are easy to classify.

[0097] The fastening structure 10 and the aluminum wiring material according to the present embodiment have been described above, but the present embodiment is not limited to the above-described embodiment. In the fastening structure 10 according to the present embodiment, at least the aluminum of the protrusion 22 of the first fastened member 20 is in direct contact with the metal of the second fastened member 30. However, the aluminum present inside the surface 21 of the first fastened member 20 may be in direct contact with the metal of the second fastened member 30. That is, the oxide film 23 covering the surface 21 of the first fastened member 20 may be destroyed, and the aluminum inside the surface 21 may be in direct contact with the metal of the second fastened member 30 without the oxide film 23. Thus, the conductivity between the first fastened member 20 and the second fastened member 30 can be further improved.

[0098] In the fastening structure 10 of the present embodiment, the protrusion 22 is formed at least on the first fastened member 20. However, in the fastening structure 10, a protrusion made of the same metal as the second fastened member 30 and protruding toward the first fastened member 20 may be integrally formed on the surface of the second fastened member 30 that faces the first fastened member 20. That is, in the present embodiment, the protrusion may also be formed on the surface of the second fastened member 30. Moreover, the metal of the protrusion of the second fastened member 30 may be in direct contact with the pure aluminum or aluminum alloy of the first fastened member 20. According to such a structure, even if the fastening force of the fastening member varies greatly or the fastening force decreases due to stress relaxation, the protrusion of the second fastened member 30 and the first fastened member 20 are bonded, so that the conductivity can be maintained in a high state.

[0099] In the fastening structure 10 of the present embodiment, a fastened component that is not plated can be used as the second fastened component 30. However, the second fastened component 30 may also be a fastened component with tin plating applied to the surface. By tin plating the surface of the second fastened component 30, the conductivity between the protrusion 22 of the first fastened component 20 and the second fastened component 30 can be further improved.

[0100] In this embodiment, a bus bar is used as the first fastened component 20, and a terminal is used as the second fastened component 30, but the present invention is not limited to this. For example, both the first fastened component 20 and the second fastened component 30 may be bus bars. That is, in this embodiment, at least one of the first fastened component 20 and the second fastened component may also be a bus bar.

[0101] In addition, as described above, the fastening structure 10 of the present embodiment can maintain high conductivity even when stress is relaxed. However, by using an aluminum-carbon nanotube composite material with excellent stress relaxation resistance and creep characteristics in a part of the fastening structure, for example, the conductivity can be further maintained even when the stress load increases in a high temperature environment. In addition, such a fastening structure has little change in physical properties at high temperatures, so it can be used in heat-generating areas near the engine and battery of a car, which can help to reduce the weight of the parts. Furthermore, at least one of the fastening component, the first fastened component 20, and the second fastened component 30 may also include a dispersion-strengthened aluminum-based composite metal in which particles such as inorganic substances are dispersed in pure aluminum or an aluminum alloy.

[0102] [Example]

[0103] Hereinafter, the present embodiment will be described in more detail with reference to Examples and Reference Examples, but the present embodiment is not limited to these Examples.

[0104] [Reference example]

[0105] Using the terminals, bus bars, bolts, and nuts made of the materials shown in Table 2, fastening structures of Samples 1 to 4 were produced.

[0106] Specifically, first, using the materials listed in Table 2, Figure 7 The terminals and bus bars had the dimensions shown in Table 3. It should be noted that the aluminum alloy was not plated. Furthermore, no protrusions were formed on the terminals and bus bars.

[0107] Furthermore, bolts and nuts made of steel and aluminum alloy were also prepared. As bolts and nuts made of steel, wire material SWRHN12 was used. It should be noted that the dimensions of the bolts made of steel and aluminum alloy are shown in Table 4, and the dimensions of the nuts made of steel and aluminum alloy are shown in Table 5.

[0108] Then, if Figure 8As shown in FIG. 1 , a portion of the terminal 3 is stacked on the upper surface of the busbar 2 so that the holes overlap each other. Then, after the threaded portion of the bolt 4 is inserted into the hole, the nut 5 is screwed into the threaded portion, thereby fastening and fixing the first fastened component 2 and the second fastened component 3. In addition, the tightening torque of the bolt is adjusted to 8.0 N·m using a direct-reading torque wrench. Next, as shown in FIG. Fig. 9 As shown, a DC power supply and a voltmeter are electrically connected to the fastening structure of each sample.

[0109] [Table 2]

[0110]

[0111] [Table 3]

[0112] Thickness(mm) Width(mm) Length(mm) Aperture(mm) Copper alloy terminals 0.8 20 40 6.4 Aluminum alloy terminal 2.0 20 40 6.4 Busbar 2.0 20 40 6.4

[0113] [Table 4]

[0114]

[0115] [Table 5]

[0116]

[0117] ※One side is a 9.8mm square nut

[0118] In this way, a thermal shock test was performed on the fastening structure of each sample formed by connecting a DC power supply and a voltmeter. Specifically, each sample was placed inside a temperature test tank, and then a process of maintaining the temperature in the tank at 160°C for 60 minutes and a process of maintaining it at -40°C for 60 minutes were repeated 200 times, and the resistance in between was continuously measured. In addition, regarding the measurement conditions of resistance, the direct current (DC) was set to 1.0A, the measurement distance was set to 40mm, the measurement accuracy was set to ±0.02mV, and the acquisition time was set to 1.0 minute. The measurement results of the resistance of sample 1 and sample 2 are shown in Fig. 10A and Fig. 10B The resistance measurement results of Sample 3 and Sample 4 are shown in Fig.11A and Fig. 11B .in addition, Fig. 10A and Fig.11A The change in resistance from the 0th to the 20th cycle is shown. Fig. 10B and Fig. 11B The change in resistance at the 180th to 200th cycles is shown. Table 2 also shows the resistance value before the heat shock test and the resistance value after the heat shock test of each sample.

[0119] like Figures 10A to 11BAs shown in Figure 1, in all samples, it can be confirmed that the resistance temporarily increases at high temperatures during the thermal shock test and temporarily decreases at low temperatures. This phenomenon is common for metals. Fig. 10A and Fig. 10B As shown in Table 2, it can be seen that even after the thermal shock test, the resistance of sample 1 could not be confirmed to increase. In contrast, the resistance of sample 2 increased by more than 3 times. In other words, it can be seen that the fastening structure composed of a combination of steel bolts, copper alloy terminals and aluminum alloy busbars has a significant increase in resistance after the test. Fig. 10A As shown, it can be confirmed that the resistance of Sample 2 increases when maintained at 160°C.

[0120] In addition, if Fig.11A and Fig. 11B As shown in Table 2, the resistance of sample 3 increased by nearly 1.5 times after the thermal shock test, while no resistance increase was confirmed for sample 4. In other words, it can be seen that the fastening structure composed of a combination of steel bolts, aluminum alloy terminals, and aluminum alloy bus bars has a significant increase in resistance after the test.

[0121] Next, the height of the unevenness on the terminal surface of each sample was measured before the fastening structure was made, after the fastening structure was made, and after the thermal shock test. Specifically, the unevenness height in the range of 15 mm in length and 15 mm in width was measured with the hole as the center using a shape analysis laser microscope VK-X1100 manufactured by KEYENCE Corporation.

[0122] Fig.12 2 shows the measurement results of the unevenness heights on the front and back surfaces of the copper alloy terminal before the fastening structure is produced, that is, before fastening with the fastening member. Fig.13 The results of measuring the height of the unevenness on the surface of the copper alloy terminal after the fastening structure was produced and then disassembled are shown. Fig.13 The results are shown in which the fastening structure after the thermal shock test was decomposed and the height of the unevenness on the surface of the copper alloy terminal was measured. Fig.13 Both show the results of measuring the height of the irregularities of the surface in contact with the seat surface of the bolt head in the copper alloy terminal.

[0123] according to Fig.12 and Fig.13 It can be confirmed that the surface of the copper alloy terminal of both sample 1 and sample 2 is concave along the shape of the seat surface after the thermal shock test. In particular, sample 2 can confirm a maximum concave of about 40μm. Generally, the yield strength (yield stress) of metal materials decreases at high temperatures compared to an atmosphere of 25°C. Moreover, in an atmosphere of 160°C during a thermal shock test, the metal expands due to linear expansion, resulting in an increase in the tightening force (axial force). Therefore, it is believed that the high temperature environment and the increase in axial force promote stress relaxation and plastic deformation occurs.

[0124] exist Fig.14 , the results of measuring the height of the irregularities on the surface of the aluminum alloy terminal before the fastening structure is produced, that is, before fastening with a fastening member are shown. Fig.15 The results of measuring the height of the unevenness on the surface of the aluminum alloy terminal after the fastening structure was produced and then disassembled are shown. Fig.15 The results of measuring the height of the unevenness on the surface of the aluminum alloy terminal by decomposing the fastening structure after the thermal shock test are shown. Fig.15 Both show the results of measuring the height of the irregularities of the surface of the aluminum alloy terminal after contact with the seat surface of the bolt head.

[0125] Depend on Fig.14 and Fig.15 It can be confirmed that in sample 3, the surface of the aluminum alloy terminal is concave along the shape of the seat surface after the thermal shock test. In this way, in the 160°C atmosphere during the thermal shock test, the metal expands due to linear expansion, resulting in an increase in the fastening force (axial force). In addition, it is believed that stress relaxation is promoted due to the high temperature environment and the increase in axial force, and plastic deformation occurs. In contrast, in sample 4, no concave can be confirmed on the surface of the aluminum alloy terminal even after the thermal shock test. In this way, it can be considered that when the materials of the bolts, terminals, and busbars are the same, stress relaxation is almost not generated in the aluminum alloy terminals.

[0126] Here, if Figure 4 As shown, in a fastening structure composed of steel bolts, copper alloy terminals and aluminum alloy busbars, as the tightening torque to the bolts decreases, the resistance between the fastened parts tends to increase. In addition, the fastening structure (sample 2) composed of a combination of steel bolts, copper alloy terminals and aluminum alloy busbars has a significant increase in resistance after the thermal shock test, resulting in a dent in the copper alloy terminal. Furthermore, in sample 2, the resistance increases when maintained at 160°C. Therefore, in the fastening structure composed of a combination of steel bolts, copper alloy terminals and aluminum alloy busbars, the axial force (tightening force) of the bolts is reduced due to stress relaxation at high temperatures, so it can be considered that the resistance between the terminal and the busbar increases.

[0127] Likewise, if Figure 4 As shown in the figure, in the fastening structure composed of steel bolts, aluminum alloy terminals and aluminum alloy busbars, as the tightening torque of the bolts decreases, the resistance between the fastened parts tends to increase. In addition, the fastening structure (sample 3) composed of a combination of steel bolts, aluminum alloy terminals and aluminum alloy busbars has a significant increase in resistance after the thermal shock test, and a dent is generated in the aluminum alloy terminal. It is believed that even in the fastening structure composed of a combination of steel bolts, aluminum alloy terminals and aluminum alloy busbars, the tightening force of the bolts is reduced due to stress relaxation, so the resistance between the terminal and the busbar increases.

[0128] [Example]

[0129] First, use the materials shown in Table 6 to make Fig.16 The contact member 60 and the contacted plate 70 of the samples 5 to 7 shown. The contact member 60 is a member having a hemispherical protrusion formed at the lower end of the concave portion 61 relative to the metal plate having the concave portion 61. In addition, the radius R of the protrusion is set to 1 mm. The contacted plate 70 is a member made of a metal plate and is arranged to face the protrusion of the contact member 60.

[0130] [Table 6]

[0131]

[0132] Next, one terminal of the DC power source and the voltmeter is electrically connected to the contact member 60 of the samples 5 and 6, and the other terminal of the DC power source and the voltmeter is electrically connected to the contacted plate 70. Fig.16 As shown in the figure, a predetermined load is applied to the contact member 60, the protrusion is brought into contact with the surface of the contacted plate 70, and the contact resistance between the contact member 60 and the contacted plate 70 is measured. Next, in a state where a predetermined load is applied to the contact member 60, the contact member 60 is slid relative to the contacted plate 70, and the contact resistance between the contact member 60 and the contacted plate 70 is measured. Next, the load on the contact member 60 is unloaded to a predetermined load, and the contact resistance between the contact member 60 and the contacted plate 70 is measured.

[0133] Specifically, first, the contact resistance under each load when a load of 2N, 4N, 6N, 8N, and 10N is applied to the contact component 60 of each sample. Next, the contact component 60 is slid 0.01mm with a load of 10N applied, and the contact resistance is measured. Finally, the contact resistance under each load when the load is unloaded to 8N, 6N, 4N, and 2N is measured. FIG17 shows the relationship between the load on the contact component 60 and the contact resistance in each sample. Fig.17A , Fig. 17B , Fig. 17C In FIG. 1 , the black marks show the contact resistance at each load when the load is applied, and the hollow marks show the contact resistance at each load when the load is unloaded.

[0134] In addition, for sample 7, the contact resistance at each load when a load of 2N, 4N, 6N, 8N, and 10N was applied to the contact member 60 was measured in the same manner as samples 5 and 6. Next, the contact resistance was measured when the load was unloaded to 8N, 6N, 4N, and 2N without sliding the contact member 60.

[0135] like Fig. 17CAs shown, in the sample 7 using copper alloy for the contact member 60 and the contacted plate 70, even if the load on the contact member 60 is unloaded, the contact resistance is still low. Figure 4 The results are related to the fastening structure consisting of steel bolts, copper alloy terminals and copper alloy bus bars.

[0136] like Fig.17A As shown, for sample 5 using a contact member 60 made of an aluminum alloy and a contacted plate 70 made of a tin-plated copper alloy, the contact resistance decreases as the load on the contact member 60 increases. When the contact member 60 is slid under a load of 10N, the contact resistance further decreases. Moreover, after sliding, the increase in contact resistance is small relative to the decrease in load. That is, it is believed that when the contact member 60 is slid while a load is applied to it, the aluminum oxide coating on the surface of the protrusion is destroyed, the actual contact area increases, and the aluminum alloy of the protrusion is bonded to the tin of the contacted plate 70. Moreover, by maintaining the bonding between the aluminum alloy of the protrusion and the tin of the contacted plate 70, the increase in contact resistance between the contact member 60 and the contacted plate 70 can be reduced even if the load is unloaded. In this way, by utilizing the protrusion to promote the bonding between the aluminum alloy and the tin of the contacted plate 70, a low contact resistance can be maintained even when the load changes.

[0137] In addition, to promote the bonding of the aluminum alloy, it is also possible not to plate tin on the contacted plate 70. Fig. 17B As shown, sample 6 using a contact member 60 made of an aluminum alloy and a contacted plate 70 made of a copper alloy also has a contact resistance that decreases as the load relative to the contact member 60 increases, similar to sample 5. When the contact member 60 is slid under a load of 10N, the contact resistance further decreases. Moreover, after sliding, although the increase in contact resistance is larger than that of sample 5 relative to the decrease in load, it remains lower than when the load is applied. This indicates that the aluminum alloy of the protrusion is bonded to the copper of the contacted plate 70. Moreover, it is believed that by maintaining the bonding between the aluminum alloy of the protrusion and the copper of the contacted plate 70, the contact resistance between the contact member 60 and the contacted plate 70 remains lower than when the load is applied even when the load is unloaded. In this way, by utilizing the protrusion to promote the bonding between the aluminum alloy and the copper of the contacted plate 70, a low contact resistance can be maintained even when the load changes.

[0138] Fig.18 The results of observing the protrusions after sliding in Samples 5 and 6 using scanning electron microscope-energy dispersive X-ray spectroscopy (SEM-EDX) are shown. Fig.18 2 also shows the results of observing the case where a predetermined load was applied to the contact member 60 and the contacted plate 70 without sliding the contact member 60 in Sample 5.

[0139] like Fig.18 As shown in FIG. 17 , in Sample 5, it can be confirmed that tin adheres to the surface of the protrusion made of the aluminum alloy. In addition, in Sample 5, by sliding the contact member 60, it can be confirmed that tin adheres more to the protrusion. It can be seen that by sliding the contact member 60 while applying a load, the aluminum alloy of the protrusion and the tin of the contacted plate 70 are fully bonded. And, according to FIG. 17 , since the contact resistance of Sample 5 is reduced, it is considered that the contact resistance is reduced due to the bonding of the aluminum alloy of the protrusion and the tin of the contacted plate 70.

[0140] Likewise, if Fig.18 As shown in FIG. 1 , in Sample 6, it can be confirmed that copper is attached to the surface of the protrusion made of aluminum alloy. This shows that the aluminum alloy of the protrusion is bonded to the copper of the contacted plate 70. Furthermore, by bonding, as shown in FIG. Fig. 17B As shown, the contact resistance of sample 6 when unloaded is lower than that when loaded. That is, it is considered that the contact resistance is reduced due to the bonding between the aluminum alloy of the protrusion and the copper of the contacted plate 70.

[0141] The entire contents of Japanese Tokugan Application No. 2021-195944 (filing date: December 2, 2021) and Japanese Tokugan Application No. 2021-199023 (filing date: December 8, 2021) are cited here.

[0142] Several embodiments of the present invention have been described above, but these embodiments are presented as examples and are not intended to limit the scope of protection of the claims. These new embodiments can be implemented in various other ways, and various omissions, substitutions, and changes can be made without departing from the scope of the subject matter of the invention. These embodiments and their variations are included in the scope of protection and subject matter of the claims, and are included in the invention described in the claims and the scope of their equivalents.

Claims

1. A fastening structure, It is characterized in that have: a first fastened component, wherein the first fastened component comprises pure aluminum or an aluminum alloy; a second fastened component, wherein the second fastened component comprises metal; as well as a fastening component, wherein the fastening component fastens and fixes the first fastened component and the second fastened component to each other, A protrusion made of pure aluminum or an aluminum alloy and protruding toward the second fastened member is integrally formed on a surface of the first fastened member that faces the second fastened member. The pure aluminum or aluminum alloy in the protruding portion of the first fastened member is in direct contact with the metal of the second fastened member.

2. The fastening structure according to claim 1, It is characterized in that The metal of the second fastened component is pure copper, copper alloy, pure aluminum or aluminum alloy.

3. The fastening structure according to claim 1 or 2, It is characterized in that The second fastened member is a fastened member having a surface plated with tin.

4. The fastening structure according to any one of claims 1 to 3, It is characterized in that The protrusion of the first fastened member is in contact with the second fastened member without an oxide film therebetween.

5. The fastening structure according to any one of claims 1 to 4, It is characterized in that The first fastened member and the second fastened member each have a hole through which the fastening member is inserted. A plurality of protrusions of the first fastened member are arranged around the hole.

6. The fastening structure according to claim 5, It is characterized in that When viewed along the stacking direction of the first fastened member and the second fastened member, the hole portions of the first fastened member and the second fastened member are substantially circular. The plurality of protrusions of the first fastened member are arranged to face each other across the center of the hole.

7. The fastening structure according to any one of claims 1 to 6, It is characterized in that The protrusion of the first fastened member satisfies the condition of the following mathematical formula 1. [Mathematical formula 1] s y ≤F / x≤σ uts (σ y is the yield strength of the first fastened component (N / mm 2 ), F is the axial force of the fastening component (N), and x is the area of ​​the initial contact point of the protrusion with the second fastened component (mm 2 ), σ uts is the tensile strength of the first fastened component (N / mm 2 ). ) 8. The fastening structure according to any one of claims 1 to 7, It is characterized in that At least one of the first fastened member and the second fastened member is a bus bar. 9 . An aluminum wiring material comprising the fastening structure according to claim 1 .