Vibration reduction and load reduction launching platform and launching device for high-speed catapult-into-water test

By designing a steel truss and multi-directional vibration isolation structure on a high-speed water ejection test platform, and combining embedded parts to connect with the pool, the problem of being unable to buffer transient impacts in all directions in the existing technology has been solved, and effective vibration reduction at multiple angles has been achieved. The load reduction effect improves the stability of the experiment and the service life of the equipment.

CN118790423APending Publication Date: 2024-10-18HARBIN ENG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411021197.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

In the existing technology, the vibration-absorbing bases of large-scale equipment mainly isolate vibrations in the height direction and cannot achieve all-round buffering of transient impacts. Especially in medium- and large-scale model high-speed water entry and launch experiments, they cannot effectively cope with transient strong impacts. dynamic load.

Method used

A high-speed water ejection test vibration-absorbing and load-reducing launch platform including steel trusses, embedded parts, platform supports and load-reducing systems is designed. Spring damping isolators are set in multiple directions through horizontal and vertical vibration isolation structures. , combined with the upper and lower chord horizontal support systems, achieves multi-angle and all-round buffering, and is connected to the side wall of the pool through embedded parts to ensure that the launcher can effectively absorb impact loads when it enters the water.

Benefits of technology

It effectively reduces the vibration frequency response of the high-speed water entry launcher to the launch platform, avoids resonance problems, improves launch accuracy and equipment service life, and can achieve effective buffering and isolation at multiple angles and under different water entry conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118790423A_ABST
    Figure CN118790423A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of underwater launching technical equipment of navigation bodies, in particular to a vibration and load reduction launching platform and launching device for a high-speed catapult-into-water test. The launching platform comprises a steel truss, the steel truss is provided with a plurality of embedded parts, and the embedded parts are inserted into the side wall of a pool; the platform support is arranged on the side wall of the pool and connected with the embedded part; the mounting platform is arranged at the bottom of the steel truss and connected with the multiple embedded parts, a load reduction system is arranged on the mounting platform, and the load reduction system comprises a horizontal vibration isolation structure and a vertical vibration isolation structure; and the high-speed underwater launching device is arranged on the mounting platform, and a preset angle is formed between the high-speed underwater launching device and the load reduction system. According to the vibration reduction and load reduction launching platform for the high-speed water-entry catapult test, the load reduction system is reinforced through the steel truss, the structural rigidity is increased, the vibration frequency response is improved, transient strong impact dynamic load components in all directions generated by a high-speed water-entry launching device in the high-speed water-entry catapult test can be dealt with, and multi-angle and all-directional effective buffering is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of underwater launching technical equipment for navigation bodies, and in particular to a vibration-reducing and load-reducing launching platform and a launching device for a high-speed water-entry ejection test. Background Art

[0003] In order to ensure the stable, reliable and safe implementation of the high-speed water entry test of the navigation body, it is urgent to establish a vibration-reducing and load-reducing launch platform that can withstand transient strong impact dynamic loads. The patent with publication number CN116280250A discloses a UAV water entry launch test system, which can conduct UAV cross-medium water entry launch experiments, and can then be extended to water entry launch experiments of various types of navigation bodies. However, this patent cannot solve the impact problem of the launch device on the launch platform in medium and large-scale model experiments; the patent with publication number CN220891482U discloses a vibration-reducing base for large equipment, which can meet the needs of placing large equipment on the floor to prevent the basic vibration of large equipment from being transmitted to surrounding buildings and instruments, but it mainly completes vibration isolation in the height direction, and does not take into account the vibration components in other directions, and cannot achieve all-round buffering of transient impacts.

[0004] Therefore, in order to adapt to the actual needs of the development of marine equipment and promote the development of high-speed water entry test technology in the laboratory, it is necessary to develop a vibration reduction and load reduction launching platform that can bear large recoil and transient strong impact dynamic loads, achieve multi-angle and all-round effective buffering, and have a low buffering oscillation frequency, and meet the buffering and vibration isolation needs of high-speed water entry ejection tests of various scales and various water entry angles. Summary of the invention

[0005] Therefore, the technical problem to be solved by the present invention is to overcome the problem that the vibration-damping base of large equipment in the prior art mainly completes vibration isolation in the height direction, does not take into account the vibration components in other directions, and cannot achieve all-round buffering of transient impacts, thereby providing a vibration-damping and load-reducing launch platform and launch device for high-speed water-entry ejection tests.

[0006] In order to solve the above technical problems, the present invention provides a vibration-reducing and load-reducing launching platform for high-speed water-entry ejection tests, comprising: a steel truss, the steel truss having a plurality of embedded parts, and the plurality of embedded parts being inserted into the side walls of a water pool; a platform support, arranged on the side walls of the water pool and connected to the embedded parts; an installing platform, arranged at the bottom of the steel truss and connected to the plurality of embedded parts, a load-reduction system being provided on the installing platform, the load-reduction system comprising a horizontal vibration isolation structure and a vertical vibration isolation structure; a high-speed water-entry launching device, arranged on the installing platform and arranged at a preset angle to the load-reduction system.

[0007] Furthermore, the horizontal vibration isolation structure includes two horizontal spring damping vibration isolators, and the two horizontal spring damping vibration isolators are arranged at one side of the installation platform at intervals.

[0008] Furthermore, the vertical vibration isolation structure includes two vertical spring isolators and two vertical spring damping isolators, the two vertical spring isolators are spaced apart in the middle of the mounting platform, and the two vertical spring damping isolators are spaced apart on the other side of the mounting platform.

[0009] Furthermore, the horizontal spring damping isolator and the vertical spring isolator are located on the same straight line.

[0010] Furthermore, the steel truss includes an upper chord horizontal support system, a lower chord horizontal support system, and a cross support, the upper chord horizontal support system and the lower chord horizontal support system are connected by the cross support, and the installation platform is arranged on the upper chord horizontal support system.

[0011] Furthermore, the upper chord horizontal support system and the lower chord horizontal support system both include a plurality of support rods, horizontal supports, and diagonal supports.

[0012] Furthermore, the embedded parts include steel bars, mounting steel plates, and reinforcing bolts. There are multiple steel bars, and the multiple steel bars are inserted into the side walls of the pool. The mounting steel plate is arranged at one end of the multiple steel bars. The reinforcing bolts are arranged on the mounting steel plate, and the reinforcing bolts are connected to the steel truss.

[0013] Furthermore, there are four platform supports, which are symmetrically arranged at the bottom of the steel truss.

[0014] The present invention also provides a vibration reduction and load reduction launching device for a high-speed water entry ejection test, comprising the vibration reduction and load reduction launching platform for a high-speed water entry ejection test.

[0015] Furthermore, it also includes a water pool, and the embedded parts of the steel truss are inserted into the side walls of the water pool.

[0016] The technical solution of the present invention has the following advantages:

[0017] The vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test provided by the present invention comprises: a steel truss, wherein the steel truss has a plurality of embedded parts, and the plurality of embedded parts are inserted into the side wall of a water pool; a platform support, which is arranged on the side wall of the water pool and connected to the embedded parts; an installation platform, which is arranged at the bottom of the steel truss and connected to the plurality of embedded parts, and a load-reduction system is provided on the installation platform, and the load-reduction system comprises a horizontal vibration isolation structure and a vertical vibration isolation structure; a high-speed water-entry launching device, which is arranged on the installation platform and is arranged at a preset angle to the load-reduction system.

[0018] A plurality of embedded parts are arranged on the steel truss, that is, the steel truss is inserted into the side wall of the pool through the embedded parts, and at the same time, a platform support is arranged on the steel truss, so as to realize the connection between the steel truss and the pool. An installation platform is arranged on the steel truss, and a load reduction system is arranged on the installation platform. A high-speed water entry launch device is installed on the support of the load reduction system, and the high-speed water entry launch device and the load reduction system are arranged at an angle, and the angle can be adjusted according to actual conditions. When the high-speed water entry launch device is installed on the load reduction system for water entry launch, the recoil force of the high-speed water entry launch device will act on the load reduction system. The impact load is converted into an exponentially attenuated vibration load by the horizontal vibration isolation structure and the vertical vibration isolation structure, and then the steel truss performs dynamic vibration absorption to achieve the purpose of vibration reduction and load reduction of high-speed water entry launch.

[0019] The high-speed water-entry launch device can realize the water-entry launch of the navigation body at different angles and different motion parameters. The impact load is first transmitted from the high-speed water-entry launch device to the load reduction system. A load reduction system is added at the connection between the high-speed water-entry launch device and the steel truss to convert the large-amplitude pulse load generated by the high-speed water-entry launch device into a small-amplitude low-frequency periodic attenuation load, which acts on the steel truss. By setting up the horizontal vibration isolation structure and the vertical vibration isolation structure, it is ensured that the installation frequency of the high-speed water-entry launch device and the frequency of the launch platform are staggered by more than 20% in both the vertical and horizontal directions to avoid resonance problems. It is also necessary to ensure that the load reduction system will not affect the launch, that is, within half a cycle of vibration of the high-speed water-entry launch device, the launch has been completed and the projectile has been out of the tube, so that the vibration of the launch device will not cause the interaction between the tube and the projectile to affect the launch accuracy.

[0020] The vibration-reducing and load-reducing launching platform for the high-speed water-entry ejection test has a load-reduction system that is reinforced with steel trusses. The structural stiffness is increased and the vibration frequency response is improved. It can cope with the transient strong impact dynamic load components in all directions generated by the high-speed water-entry launching device in the high-speed water-entry ejection test, and achieve effective buffering in all directions and at multiple angles.

[0021] After the steel truss is reinforced, the vertical displacement, lateral displacement and stress of the steel truss can be greatly reduced compared with before the reinforcement. At the same time, the natural period of the high-speed water-entry launch device is much longer than the launch time, and the gap between the first three natural periods of the steel truss and the launch time is increased. By the seventh-order vibration mode, the amplitude of the steel truss in the axial, horizontal, and vertical directions of the water surface has decayed to a negligible level. Testing of the ninth-order vibration mode with a resonance risk found that its amplitude is also much smaller than the low-order transient impact response, and the amplitude is safe, without the risk of resonance damage.

[0022] The vibration-reducing and load-reducing launch platform for the high-speed water-entry ejection test has been designed to effectively avoid the launch cycle and the vibration cycle, ensuring that the launch is completed within half a vibration cycle of the high-speed water-entry launch device, and has better control over angle control, model initial state, accuracy, etc. It can effectively avoid the influence of platform vibration on the model water-entry trajectory and the accuracy of related test equipment during the launch process.

[0023] The steel truss structure of the vibration-reducing and load-reducing launch platform for the high-speed water-entry ejection test can effectively consume the energy of impact vibration, preventing this part of energy from being transferred to the pool wall and causing the pool wall to collapse. It also effectively avoids the impact and fatigue of the pool wall, effectively improving its service life, and therefore can better match the pool test environment.

[0024] The load reduction system can not only be used in the field of high-speed water entry model experiments, but the related design can also provide reference for other high-speed launch hydrodynamics experimental systems and experimental fields, and has high practical engineering significance.

[0025] This Summary is provided to introduce a selection of concepts in a simplified form that are further described below in the Detailed Description. This Summary is not intended to identify key features or essential features of the disclosure, nor is it intended to limit the scope of the disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 A schematic diagram of the structure of a vibration-reducing and load-reducing launching platform for a high-speed water-entry ejection test provided by the present invention;

[0028] Figure 2 A schematic diagram of the load reduction system structure of the vibration reduction and load reduction launch platform for the high-speed water-entry ejection test provided by the present invention;

[0029] Figure 3 A top view of the load reduction system of the vibration reduction and load reduction launching platform for the high-speed water entry ejection test provided by the present invention;

[0030] Figure 4 A schematic diagram of the structure of a steel truss of a vibration-reducing and load-reducing launching platform for a high-speed water-entry ejection test provided by the present invention;

[0031] Figure 5 A schematic structural diagram of the embedded parts of the vibration reduction and load reduction launching platform for the high-speed water entry ejection test provided by the present invention;

[0032] Figure 6 A top view of the embedded parts of the vibration reduction and load reduction launching platform for the high-speed water entry ejection test provided by the present invention.

[0033] Description of reference numerals:

[0034] 1. Steel truss; 2. Embedded parts; 3. Water pool; 4. Platform support; 5. Installation platform; 6. Load reduction system; 7. Horizontal vibration isolation structure; 8. Vertical vibration isolation structure; 9. High-speed water launch device; 10. Horizontal spring damping isolator; 11. Vertical spring damping isolator; 12. Vertical spring damping isolator; 13. Upper chord horizontal support system; 14. Lower chord horizontal support system; 15. Cross support; 16. Diagonal support; 17. Horizontal support; 18. Steel bars; 19. Installation steel plate; 20. Strengthening bolts; 21. Upper chord support rod; 22. Lower chord support rod. DETAILED DESCRIPTION

[0035] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present disclosure. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0036] In the description of the present disclosure, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present disclosure. In addition, the terms "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present disclosure, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0037] In the description of the present disclosure, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or can communicate with each other; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to specific circumstances.

[0038] In the present disclosure, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply means that the first feature is lower in level than the second feature.

[0039] The disclosure below provides many different embodiments or examples to realize different structures of the present disclosure. In order to simplify the disclosure of the present disclosure, the parts and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the present disclosure. In addition, the present disclosure can repeat reference numbers and / or reference letters in different examples, and this repetition is for the purpose of simplicity and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. In addition, the present disclosure provides various specific examples of processes and materials, but those of ordinary skill in the art can be aware of the application of other processes and / or the use of other materials.

[0040] The preferred embodiments of the present disclosure are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present disclosure, and are not used to limit the present disclosure.

[0041] See also Figures 1 to 6As shown, the present invention provides a vibration reduction and load reduction launching platform for high-speed water entry ejection test, comprising: a steel truss 1, wherein the steel truss 1 has a plurality of embedded parts 2, and the plurality of embedded parts 2 are inserted into the side wall of a water pool 3; a platform support 4, which is arranged on the side wall of the water pool 3 and connected to the embedded parts 2; an installation platform 5, which is arranged at the bottom of the steel truss 1 and connected to the plurality of embedded parts 2, and a load reduction system 6 is provided on the installation platform 5, and the load reduction system 6 includes a horizontal vibration isolation structure 7 and a vertical vibration isolation structure 8; a high-speed water entry launching device 9, which is arranged on the installation platform 5 and is arranged at a preset angle to the load reduction system 6.

[0042] A plurality of embedded parts 2 are arranged on the steel truss 1, that is, the steel truss 1 is inserted into the side wall of the pool 3 through the embedded parts 2, and at the same time, a platform support 4 is arranged on the steel truss 1, so as to realize the connection between the steel truss 1 and the pool 3. An installation platform 5 is arranged on the steel truss 1, and a load reduction system 6 is arranged on the installation platform 5. The high-speed water-entry launching device 9 is supported and installed on the load reduction system 6, and the high-speed water-entry launching device 9 is arranged at an angle with the load reduction system 6, and the angle can be adjusted according to the actual situation. When the high-speed water-entry launching device 9 is installed on the load reduction system 6 for water-entry launching, the recoil force of the high-speed water-entry launching device 9 will act on the load reduction system 6. The impact load is converted into an exponentially attenuated vibration load by the horizontal vibration isolation structure 7 and the vertical vibration isolation structure 8, and then the steel truss 1 performs dynamic vibration absorption to achieve the purpose of vibration reduction and load reduction of high-speed water-entry launching.

[0043] The high-speed water-entry launching device 9 can realize the water-entry launching of the navigation body at different angles and different motion parameters. The impact load is first transmitted from the high-speed water-entry launching device 9 to the load reduction system 6. The load reduction system 6 is added at the connection between the high-speed water-entry launching device 9 and the steel truss 1 to convert the large-amplitude pulse load generated by the high-speed water-entry launching device 9 into a small-amplitude low-frequency periodic attenuation load, which acts on the steel truss 1. By setting the horizontal vibration isolation structure 7 and the vertical vibration isolation structure 8, it is ensured that the installation frequency of the high-speed water-entry launching device 9 is staggered by more than 20% from the frequency of the launch platform in both the vertical and horizontal directions to avoid resonance problems. It is necessary to ensure that the load reduction system 6 will not affect the launch, that is, within half a cycle of vibration of the high-speed water-entry launching device 9, the launch has been completed and the projectile has been out of the tube, so that the vibration of the launching device will not cause the interaction between the tube and the projectile to affect the launch accuracy.

[0044] The load reduction system 6 of the vibration-reducing and load-reducing launching platform for the high-speed water-entry ejection test is reinforced with a steel truss 1, and has an increased structural stiffness and an improved vibration frequency response. It can cope with the transient strong impact dynamic load components in all directions generated by the high-speed water-entry launching device 9 in the high-speed water-entry ejection test, and achieve effective buffering in all directions and at multiple angles.

[0045] After the reinforcement, the vertical displacement, lateral displacement and stress of the steel truss 1 can be greatly reduced compared with those before the reinforcement. At the same time, the natural period of the high-speed water-entry launching device 9 is much longer than the launch time, and the gap between the first three natural periods of the steel truss 1 and the launch time is increased. By the seventh-order vibration mode, the amplitude of the axial, horizontal, and vertical directions of the steel truss 1 has decayed to a negligible level. The ninth-order vibration mode with resonance risk was tested and found that its amplitude was also much smaller than the low-order transient impact response. The amplitude was safe and there was no risk of resonance damage.

[0046] The vibration reduction and load reduction launch platform of the high-speed water entry ejection test has been designed to effectively avoid the launch cycle and the vibration cycle, ensuring that the launch is completed within half a vibration cycle of the high-speed water entry launch device 9, and has better control over angle control, model initial state, accuracy, etc. It can effectively avoid the influence of platform vibration on the model water entry trajectory and the accuracy of related test equipment during the launch process.

[0047] The vibration reduction and load reduction launching platform of the high-speed water entry ejection test, the steel truss 1 structure can effectively consume the energy of impact vibration, avoid this part of energy being transferred to the wall of the pool 3 to cause the collapse of the pool wall, and also effectively avoid the impact and fatigue of the pool wall, effectively improve the service life, so it can better match the experimental environment of the pool 3.

[0048] The load reduction system 6 can not only be applied to the field of high-speed water entry model experiments, but the related design can also provide reference for other high-speed launch hydrodynamic experimental systems and experimental fields, and has high practical engineering significance.

[0049] In some optional embodiments, the horizontal vibration isolation structure 7 includes two horizontal spring damping isolators 10, and the two horizontal spring damping isolators 10 are spaced apart on one side of the mounting platform 5. The vertical vibration isolation structure 8 includes two vertical spring isolators 11 and two vertical spring damping isolators 12, and the two vertical spring isolators 11 are spaced apart in the middle of the mounting platform 5, and the two vertical spring damping isolators 12 are spaced apart on the other side of the mounting platform 5.

[0050] Among them, the horizontal spring damping vibration isolator 10 is installed in the opposite direction of the launching direction to withstand the horizontal recoil force of small-angle oblique entry into the water. The hinge point between the high-speed water entry launching device 9 and the mounting platform 5 is placed between the vertical spring vibration isolator 11 and the vertical spring damping vibration isolator 12 to withstand the longitudinal impact of vertical entry into the water or large-angle entry into the water. After buffering, each vibration isolator transmits the vibration load to each vibration isolator and is connected by four bolts.

[0051] In this embodiment, the horizontal spring damping isolator 10 and the vertical spring isolator 11 are located on the same straight line.

[0052] In some optional embodiments, the steel truss 1 includes an upper chord horizontal support system 13, a lower chord horizontal support system 14, and a cross support 15, the upper chord horizontal support system 13 and the lower chord horizontal support system 14 are connected by the cross support 15, and the installation platform 5 is arranged on the upper chord horizontal support system 13.

[0053] The upper chord horizontal support system 13 and the lower chord horizontal support system 14 both include a plurality of support rods, horizontal supports 17 , and diagonal supports 16 .

[0054] Specifically, the upper chord horizontal support system 13 includes two upper chord struts 21, fourteen diagonal struts 16, and twelve horizontal struts 17. The two upper chord struts 21, fourteen diagonal struts 16, and twelve horizontal struts 17 are all made of channel steel, so that a strong structural system is formed between the two upper chord struts, increasing the overall rigidity of the upper chord plane periphery of the structure. The load reduction system 6 and the high-speed water-entry launch device 9 are installed at the center of the steel truss 1, and 45° cross supports 15 are respectively set between the two upper chord struts 21 and the two lower chord struts 22 along the length symmetry plane, wherein the upper chord strut 21 part is welded with the installation platform 5 to install the vibration isolation system and bear its weight.

[0055] The lower chord horizontal support system 14 is provided with four lower chord braces 22, eight diagonal braces 16, and eleven horizontal braces 17. The main arrangement is the same as that of the upper chord horizontal support. At the installation platform 5, the 45° cross brace 15 at the upper chord horizontal support is replaced with a horizontal brace 17 along the length direction of the steel truss 1 to bear the tensile stress of the impact. An upper chord brace 21 and a lower chord brace 22 are respectively provided at the platform supports 4 at four locations, with a total of four upper chord braces 21 and four lower chord braces 22, all of which are made of channel steel. The internal force of the lower chord brace 22 is directly transmitted to the platform support 4, reducing the force on the upper chord brace 21.

[0056] In order to improve the torsional rigidity of the structure, a group of cross supports 15 is provided between two adjacent lower chord struts 22, and six cross supports 15 are added between the upper chord strut 21 and the lower chord strut 22, for a total of eight cross vertical supports.

[0057] Each of the platform supports 4 is provided with an additional diagonal brace 16, a total of four diagonal braces 16, all made of channel steel, to increase the horizontal rigidity of the vertex and reduce the displacement of the vertex under load.

[0058] By setting horizontal diagonal braces 16 and vertical braces, the horizontal stiffness and torsional stiffness of the structure are increased. A chord is added at the internode of the platform support 4 to directly transfer the axial force of the lower chord brace 22 to the platform support 4, reducing the load effect of the upper chord. An inclined support is added at the platform support 4 to increase the horizontal stiffness of the platform support 4 to achieve buffering and vibration reduction of the steel truss 1 in all directions. In order to ensure the stiffness of the connection node of the steel truss 1, reinforcing ribs are added to the connection of the steel truss 1 through welding technology to prevent the node from being damaged before the overall structure of the steel truss 1 under a certain frequency load.

[0059] In some optional embodiments, the embedded parts 2 include steel bars 18, mounting steel plates 19, and reinforcing bolts 20. The steel bars 18 are multiple, and the multiple steel bars 18 are inserted into the side walls of the pool 3. The mounting steel plate 19 is arranged at one end of the multiple steel bars 18. The reinforcing bolts 20 are arranged on the mounting steel plate 19, and the reinforcing bolts 20 are connected to the steel truss 1.

[0060] By providing the steel bars 18 , the mounting steel plates 19 , and the reinforcing bolts 20 , the connection between the steel truss 1 and the pool wall of the pool 3 is achieved, thereby ensuring the stability of the connection between the steel truss 1 and the pool 3 .

[0061] The steel truss 1 is connected to the pool 3 through the ground steel bars 18 foundation, and the foundations at both ends of the steel truss 1 are respectively placed on the top floor of the compartment structure on the north and south sides of the pool 3. The four platform supports 4 are connected to the side walls of the pool 3 by using steel bars 18 to set embedded parts 2. Each platform support 4 is implanted into the concrete pool wall ground through nine steel bars 18. The steel bars 18 are plug-welded to the installation steel plate 19, and the installation steel plate 19 is plug-welded to the platform support 4 through four reinforcing bolts 20, thereby achieving connection with the steel truss 1.

[0062] Specifically, there are four platform supports 4 , and the four platform supports 4 are symmetrically arranged at the bottom of the steel truss 1 .

[0063] The first three vibration periods of the high-speed water-entry launching device 9 are 0.09s-0.18s. For high-speed water-entry launching, the model has been launched within one vibration period, that is, the load reduction system 6 will not affect the water-entry trajectory. In this implementation case, the model enters the water at a speed of 100m / s and a water entry angle of 30 degrees. After the load reduction system 6 is applied, the vertical amplitude is reduced by 67%, the lateral amplitude is reduced by 66%, and the stress on the side wall of the pool 3 is reduced by 59%.

[0064] The present invention also provides a vibration reduction and load reduction launching device for a high-speed water entry ejection test, including the vibration reduction and load reduction launching platform for a high-speed water entry ejection test, and also includes a water pool 3, and the embedded parts 2 of the steel truss 1 are inserted into the side walls of the water pool 3.

[0065] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test, characterized in that: include: A steel truss (1), wherein the steel truss (1) has a plurality of embedded parts (2), and the plurality of embedded parts (2) are inserted into the side wall of a pool (3); A platform support (4) is arranged on the side wall of the pool (3) and connected to the embedded part (2); An installation platform (5) is arranged at the bottom of the steel truss (1) and is connected to a plurality of embedded parts (2); a load reduction system (6) is arranged on the installation platform (5); the load reduction system (6) comprises a horizontal vibration isolation structure (7) and a vertical vibration isolation structure (8); The high-speed water-entry launching device (9) is arranged on the installation platform (5) and is arranged at a preset angle with the load-reducing system (6).

2. A vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test according to claim 1, characterized in that: The horizontal vibration isolation structure (7) comprises two horizontal spring damping vibration isolators (10), and the two horizontal spring damping vibration isolators (10) are arranged at a distance from each other on one side of the installation platform (5).

3. A vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test according to claim 2, characterized in that: The vertical vibration isolation structure (8) comprises two vertical spring vibration isolators (11) and two vertical spring damping vibration isolators (12), wherein the two vertical spring vibration isolators (11) are arranged at intervals in the middle of the mounting platform (5), and the two vertical spring damping vibration isolators (12) are arranged at intervals on the other side of the mounting platform (5).

4. A vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test according to claim 3, characterized in that: The horizontal spring damping vibration isolator (10) and the vertical spring vibration isolator (11) are located on the same straight line.

5. A vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test according to any one of claims 1 to 4, characterized in that: The steel truss (1) comprises an upper chord horizontal support system (13), a lower chord horizontal support system (14), and a cross support (15); the upper chord horizontal support system (13) and the lower chord horizontal support system (14) are connected via the cross support (15), and the mounting platform (5) is arranged on the upper chord horizontal support system (13).

6. The vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test according to claim 5 is characterized in that: The upper chord horizontal support system (13) and the lower chord horizontal support system (14) are both composed of a plurality of support rods, a horizontal support (17), and a diagonal support (16).

7. A vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test according to claim 6, characterized in that: The embedded part (2) comprises a steel bar (18), a mounting steel plate (19), and a reinforcing bolt (20); the steel bar (18) is provided in plurality, the plurality of steel bars (18) are inserted into the side wall of the pool (3); the mounting steel plate (19) is provided at one end of the plurality of steel bars (18); the reinforcing bolt (20) is provided on the mounting steel plate (19), and the reinforcing bolt (20) is connected to the steel truss (1).

8. The vibration-reducing and load-reducing launching platform for high-speed water-entry ejection test according to claim 7 is characterized in that: There are four platform supports (4), and the four platform supports (4) are symmetrically arranged at the bottom of the steel truss (1).

9. A vibration-reducing and load-reducing launching device for high-speed water-entry ejection test, characterized in that: A vibration-reducing and load-reducing launching platform for a high-speed water-entry ejection test comprising any one of claims 1-8.

10. The vibration reduction and load reduction launching device for high-speed water entry ejection test according to claim 9, characterized in that: It also comprises a water pool (3), wherein the embedded parts (2) of the steel truss (1) are inserted into the side wall of the water pool (3).