Movable type split hanging basket suitable for bridge construction and using method of movable type split hanging basket
By designing a mobile split gondola and using multiple gondola units to slide and connect and drive components to achieve synchronous movement, the problems of unsuitable span and low construction efficiency of traditional gondolas are solved, the efficiency and accuracy of bridge construction are improved, and the cost is reduced cost.
Patent Information
- Application Number
- CN202411150693.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The span of traditional hanging baskets is not suitable for the construction of prestressed concrete T-beam bridges. Installation and disassembly are time-consuming and laborious, taking up a lot of construction period. They are large and require large-scale driving devices to assist in movement. The construction efficiency is low, especially during enclosure maintenance and frequent movement. High cost of use.
Design a mobile split gondola. Multiple gondola units are set at intervals. Each unit is slidingly connected to the T-shaped beam. Adjacent units can be connected by opening the hatch door. Drive components and controllers are used to achieve synchronization of individual or multiple units. Movement, connectors and displacement sensors ensure precise positioning, and the suspension ladder is easy for construction crews to operate.
It improves the efficiency and accuracy of bridge construction, reduces construction costs, simplifies the movement and connection process of the hanging basket, and enhances the flexibility and stability of construction.
Smart Images

Figure CN118792968A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a mobile split hanging basket suitable for bridge construction and a use method thereof. Background Art
[0002] The deck of a prestressed concrete T-beam bridge is composed of multiple T-beams. When performing bottom construction such as connecting the T-beam diaphragms, it is necessary to use a hanging basket to carry out construction at the bottom of the T-beam. Since the width of the prestressed concrete T-beam bridge is large, the span of the traditional hanging basket needs to be adapted to it. The installation and removal of the traditional hanging basket is time-consuming and labor-intensive, and takes up a lot of construction time. At the same time, due to the large size of the traditional hanging basket, a large drive device is required to assist the movement of the traditional hanging basket, especially when carrying out enclosure inspections at various points at the bottom of each T-beam, it is necessary to frequently control the movement of the traditional hanging basket, which is extremely costly and has low construction efficiency. Summary of the invention
[0003] The purpose of the present invention is to overcome the defects of the prior art and provide a mobile split hanging basket suitable for bridge construction and a method of using the same. According to the construction requirements, multiple hanging basket units, either individually or relatively close to each other, can be selected for synchronous movement, thereby facilitating synchronous construction of multiple points at the bottom of the bridge and improving construction efficiency.
[0004] To achieve the above object, the technical solution adopted by the present invention is a mobile split hanging basket suitable for bridge construction, the bridge includes a plurality of T-beams arranged at intervals, and the split hanging basket includes:
[0005] A plurality of hanging basket units are arranged corresponding to the plurality of T-shaped beams, each of the hanging basket units is slidably connected to the T-shaped beam, and two adjacent hanging basket units are connected to two relatively close sides with openable doors to achieve communication between the two adjacent hanging basket units;
[0006] A plurality of driving assemblies for driving a plurality of the hanging basket units to slide along the corresponding T-beams;
[0007] A plurality of connecting members, wherein the connecting members are detachably connected between adjacent hanging basket units;
[0008] A controller for controlling the movement of each of the hanging basket units, wherein the controller is connected to the plurality of drive assemblies.
[0009] The mobile split hanging basket applicable to bridge construction of the present invention is further improved in that the hanging basket unit comprises:
[0010] A sliding seat slidably connected to the top of the corresponding T-beam;
[0011] a working platform located below the T-beam;
[0012] A plurality of connecting rods are provided, wherein the connecting rods pass through the gap between two adjacent T-shaped beams and are connected between the working platform and the sliding seat.
[0013] A further improvement of the mobile split hanging platform applicable to bridge construction of the present invention is that baffles are connected around the working platform, and the hatch is opened on the baffles.
[0014] A further improvement of the mobile split hanging platform applicable to bridge construction of the present invention is that the connecting member is a bolt, and connecting holes for the bolts to pass through are provided on two adjacent working platforms.
[0015] A further improvement of the mobile split hanging basket suitable for bridge construction of the present invention is that a sliding block is connected to the bottom of the sliding seat, and a guide sliding groove for sliding connection of the sliding block is connected to the top of the T-beam.
[0016] A further improvement of the mobile split hanging basket suitable for bridge construction of the present invention is that the driving assembly includes a reaction seat connected in the guide slide groove and a jack connected between the reaction seat and the slider, and the jack is connected to the controller.
[0017] A further improvement of the mobile split hanging basket applicable to bridge construction of the present invention is that a displacement sensor for monitoring the moving distance of the corresponding hanging basket unit is connected to the top of each sliding seat, and the displacement sensor is connected to the controller.
[0018] A further improvement of the mobile split hanging basket suitable for bridge construction of the present invention is that the relative outer sides of the two outermost hanging basket units are connected with suspension ladders for construction workers to enter the working platform.
[0019] A method for using a mobile split hanging basket suitable for bridge construction comprises the following steps:
[0020] Step 1: providing a mobile split hanging platform suitable for bridge construction as claimed in claim 1;
[0021] Step 2: According to the construction requirements, the controller is used to selectively control the driving assembly to drive a single or at least two consecutive hanging basket units to move synchronously to the designed position.
[0022] A further improvement in the method for using the mobile split hanging basket suitable for bridge construction of the present invention is that after controlling at least two continuous hanging basket units to move synchronously to the designed positions, the hatches between the adjacent hanging basket units are opened and the at least two continuous hanging basket units are connected to form a whole using a connecting piece.
[0023] Compared with the prior art, the advantages of the present invention are:
[0024] By setting up multiple hanging basket units, a single hanging basket unit or at least two consecutive hanging basket units can be controlled to move synchronously to the construction position for construction according to construction requirements, which facilitates construction at multiple points at the same time and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0026] Figure 1 This is a front view of the use status of the mobile split hanging basket suitable for bridge construction of the present invention.
[0027] Figure 2 The present invention is a side view of a mobile split hanging basket suitable for bridge construction.
[0028] Figure 3 It is a front view of the use state of the mobile split hanging basket suitable for bridge construction of the present invention.
[0029] In the figure: 1. T-beam; 2. sliding seat; 3. working platform; 4. suspension ladder; 5. slider; 6. guide slide; 7. connecting rod. DETAILED DESCRIPTION
[0030] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.
[0031] The mobile split hanging basket suitable for bridge construction and the use method thereof of the present invention are further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0032] See also Figure 1 to Figure 3 As shown, a mobile split hanging basket suitable for bridge construction, the bridge includes a plurality of T-beams 1 arranged at intervals, and the split hanging basket includes:
[0033] A plurality of hanging basket units are arranged corresponding to the plurality of T-beams 1, each of the hanging basket units is slidably connected to the T-beam 1, and two adjacent hanging basket units are connected to two relatively close sides with openable hatches to achieve communication between the two adjacent hanging basket units;
[0034] A plurality of driving components for driving the plurality of hanging basket units to slide along the corresponding T-beam 1;
[0035] A plurality of connecting members, which are detachably connected between adjacent hanging basket units;
[0036] A controller for controlling the movement of each of the hanging basket units is connected to a plurality of the driving assemblies.
[0037] Preferably, the hanging basket unit comprises:
[0038] A sliding seat 2 slidably connected to the top of the corresponding T-beam 1;
[0039] A working platform 3 located below the T-beam 1;
[0040] A plurality of connecting rods 7 pass through the gap between two adjacent T-beams 1 and are connected between the working platform 3 and the sliding seat 2 .
[0041] Specifically, the connecting rod 7 is located in the wet joint of the two T-beams 1 .
[0042] Preferably, baffles are connected around the working platform 3, and the hatch is opened on the baffles.
[0043] By providing the hatch, when controlling at least two continuous hanging basket units to work, it is convenient to connect the at least two hanging basket units, and it is convenient for construction workers to walk freely in the at least two hanging basket units.
[0044] Preferably, the connecting member is a bolt, and two adjacent working platforms 3 are provided with connecting holes for the bolt to pass through.
[0045] Specifically, by providing the connecting piece, at least two of the hanging basket units are connected to form a whole, thereby improving the overall stability.
[0046] Preferably, a slider 5 is connected to the bottom of the sliding seat 2, and a guide slot 6 for sliding connection of the slider 5 is connected to the top of the T-beam 1.
[0047] Preferably, the driving assembly includes a reaction seat connected in the guide slot 6 and a jack connected between the reaction seat and the slider 5, and the jack is connected to the controller.
[0048] The controller controls the extension of the jack to push the hanging basket unit to move along the guide slot 6. After the hanging basket unit moves to the designed position, the jack also plays a limiting role to prevent the hanging basket unit from shaking and affecting the construction.
[0049] Specifically, a wheel set is connected to the bottom of the sliding seat 2, a guide rail for the wheel set to roll is connected to the top of the T-beam 1, a driving motor for driving the wheel set to rotate is connected to the sliding seat 2, a braking assembly for limiting the rotation of the wheel set is connected to the wheel set, and the driving motor and the braking assembly are both connected to the controller.
[0050] By arranging the driving motor to drive the wheel set to rotate, the hanging basket unit can be controlled to move to the designed position more quickly.
[0051] Preferably, a displacement sensor for monitoring the moving distance of the corresponding hanging basket unit is connected to the top of each sliding seat 2, and the displacement sensor is connected to the controller.
[0052] By arranging the displacement sensor on each of the sliding seats 2, the controller can control the corresponding hanging basket unit to move accurately to the designed position according to the construction requirements, thereby improving the construction efficiency and construction accuracy.
[0053] Preferably, the relative outer sides of the two outermost hanging basket units are connected with a suspension ladder 4 for construction workers to enter the working platform 3.
[0054] By providing the suspension ladder 4 , it is convenient for construction workers to travel back and forth between the T-beam 1 and the working platform 3 .
[0055] A method for using a mobile split hanging basket suitable for bridge construction comprises the following steps:
[0056] Step 1: providing a mobile split hanging platform suitable for bridge construction as claimed in claim 1;
[0057] Step 2: According to the construction requirements, the controller is used to selectively control the driving assembly to drive a single or at least two consecutive hanging basket units to move synchronously to the designed position.
[0058] Preferably, after controlling at least two continuous hanging basket units to move synchronously to the designed positions, the doors between the adjacent hanging basket units are opened and the at least two continuous hanging basket units are connected to form a whole by using connecting pieces.
[0059] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportion relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.
[0060] The above is only a preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modifications to equivalent embodiments of equivalent changes using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.
Claims
1. A mobile split hanging platform suitable for bridge construction, characterized in that: The bridge comprises a plurality of T-beams arranged at intervals, and the split hanging basket comprises: A plurality of hanging basket units are arranged corresponding to the plurality of T-shaped beams, each of the hanging basket units is slidably connected to the T-shaped beam, and two adjacent hanging basket units are connected to two relatively close sides with openable doors to achieve communication between the two adjacent hanging basket units; A plurality of driving assemblies for driving a plurality of the hanging basket units to slide along the corresponding T-beams; A plurality of connecting members, wherein the connecting members are detachably connected between adjacent hanging basket units; A controller for controlling the movement of each of the hanging basket units, wherein the controller is connected to the plurality of drive assemblies.
2. The mobile split hanging platform suitable for bridge construction as claimed in claim 1, characterized in that: The hanging basket unit comprises: A sliding seat slidably connected to the top of the corresponding T-beam; a working platform located below the T-beam; A plurality of connecting rods are provided, wherein the connecting rods pass through the gap between two adjacent T-shaped beams and are connected between the working platform and the sliding seat.
3. The mobile split hanging platform suitable for bridge construction as claimed in claim 2, characterized in that: Baffles are connected around the working platform, and the hatch is opened on the baffles.
4. The mobile split hanging platform suitable for bridge construction as claimed in claim 2, characterized in that: The connecting piece is a bolt, and two adjacent working platforms are provided with connecting holes for the bolts to pass through.
5. The mobile split hanging platform suitable for bridge construction as claimed in claim 2, characterized in that: The bottom of the sliding seat is connected with a sliding block, and the top of the T-beam is connected with a guide sliding groove for the sliding block to be slidably connected.
6. The mobile split hanging platform suitable for bridge construction as claimed in claim 5, characterized in that: The driving assembly includes a reaction seat connected in the guide slide groove and a jack connected between the reaction seat and the sliding block, and the jack is connected to the controller.
7. The mobile split hanging platform suitable for bridge construction as claimed in claim 2, characterized in that: The top of each sliding seat is connected to a displacement sensor for monitoring the moving distance of the corresponding hanging basket unit, and the displacement sensor is connected to the controller.
8. The mobile split hanging platform suitable for bridge construction as claimed in claim 2, characterized in that: The relatively outer sides of the two outermost hanging basket units are connected with suspension ladders for construction workers to enter the working platform.
9. A method for using a mobile split hanging platform suitable for bridge construction, characterized in that: Includes steps: Step 1: providing a mobile split hanging platform suitable for bridge construction as claimed in claim 1; Step 2: According to the construction requirements, the controller is used to selectively control the driving assembly to drive a single or at least two consecutive hanging basket units to move synchronously to the designed position.
10. The method for using the mobile split hanging platform suitable for bridge construction as claimed in claim 9, characterized in that: After controlling at least two continuous hanging basket units to move synchronously to the designed positions, the hatches between the adjacent hanging basket units are opened and the at least two continuous hanging basket units are connected to form a whole by using a connecting piece.
Citation Information
Patent Citations
Existing bridge side face newly increased pipeline suspension construction method
CN111573577A
Bridge construction hanging basket
CN117604927A
Hanging bracket for bridge construction
CN213328706U
Bridge side cable construction platform for energy storage power station
CN216340804U
Hanging basket for bridge construction
CN216360648U