Segmental splicing type bridge girder erection machine

Through the design of the lifting structure driven by the hydraulic cylinder and the driving wheel sliding bearing platform, the tedious and unstable problems of the segmented bridge erecting machine in adjusting the height of the support frame and moving the truss are solved, and the construction efficiency and stability are improved. .

CN118792970AInactive Publication Date: 2024-10-18HENAN LUGANG CRANE
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411228678.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing segmental spliced ​​bridge erecting machines are cumbersome, difficult and unstable when adjusting the height of the support frame and moving the trusses, resulting in extended construction period, increased risks and high maintenance costs.

Method used

The lifting structure and driving wheels driven by hydraulic cylinders are used to drive the bearing platform to slide. Combined with the filling structure and dampers, the flexible adjustment of the height of the bracket and the stable movement of the truss are achieved, reducing the disassembly and reassembly process of the equipment.

Benefits of technology

It achieves flexible adjustment of the bracket height and stable movement of the truss, reduces construction pause time and project costs, and improves construction efficiency and equipment stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118792970A_ABST
    Figure CN118792970A_ABST
Patent Text Reader

Abstract

The invention provides a segment splicing type bridge girder erection machine, which belongs to the technical field of bridge construction, and comprises a truss, a bracket, a bridge girder erection device, a bridge girder erection device and a bridge girder erection device, the lifting structure comprises a connecting plate fixed to the bottom end of the damper, a hydraulic cylinder installed at the bottom end of the connecting plate and penetrating through the fixing plate to be connected with the base, and a locking assembly arranged on one side of the supporting plate. According to the device, the hydraulic cylinder is contracted and stretched to drive the base, the front support or the front middle support to ascend and descend and adjust the height of the supports, fixing bolts penetrate through the movable plate to be rotationally inserted into bolt grooves, the pressure borne by the hydraulic cylinder is reduced, and therefore the height adjusting function of the device is achieved, and the height of the device can be adjusted according to specific conditions of a construction site and bridge design requirements. The height of the bridge girder erection machine is flexibly adjusted, equipment does not need to be replaced or transformed, the engineering cost is reduced, meanwhile, the pause time in the construction process is shortened, and the construction process is more continuous and efficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a segment-jointed bridge erecting machine. Background Art

[0002] In the process of large-scale bridge construction, in order to significantly improve construction efficiency, segmental splicing bridge erection machines have become an indispensable key equipment in the construction process. This equipment is suitable for the construction of large-span bridges. Its working principle is based on segmented assembly technology, which can assemble prefabricated bridge components segment by segment, significantly shortening the construction period and speeding up the construction of bridges. Compared with traditional construction methods, it can not only improve construction efficiency, but also reduce on-site operations and reduce the impact on the surrounding environment and traffic. In addition, since prefabrication production can be carried out in a factory environment, it can better control material consumption and construction quality, reducing construction costs.

[0003] The existing technology still has the following deficiencies in actual use: (1) The defect of inconvenience in adjusting the height of the support frame. Since the installation position of the device is frequently adjusted during use, the adjustment process requires the cooperation of a crane, which makes the adjustment process cumbersome and difficult, increases downtime, and leads to an extension of the construction period, which will directly affect the construction progress. At the same time, the device works in an unstable state, increasing the risk of overturning or collapse, and limiting the application of bridge erection machines in complex terrain or special bridge construction; (2) The defect of inconvenience in moving the truss. After the bridge erection machine completes the erection of a section of the bridge, it needs to be moved to a new location as a whole. However, the location of the truss is fixed, so it is necessary to use large lifting equipment to lift the entire truss and move it to a new location, which requires the truss to be disassembled and reassembled. Frequent disassembly and reassembly is not only time-consuming, but may also cause equipment damage, thereby increasing the cost of maintenance and replacement of parts. (3) The defect of unstable support. After the height of the device is adjusted, its bottom support frame only supports the weight of the device through bolts and cylinders. When lifting the bridge, the bolts and cylinders are easily deformed due to stress, making the device unstable and easily causing equipment damage or shutdown, which will further increase the repair time and cost. At the same time, it may cause the placement of bridge components to be inaccurate or uneven stress, thus affecting the overall quality and safety of the bridge.

[0004] Therefore, a segment splicing type bridge erecting machine is urgently needed to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to address the current defect that it is inconvenient to adjust the height of the support frame. Since the installation position of the device is frequently adjusted during use, the adjustment process requires the cooperation of a crane, which makes the adjustment process cumbersome and difficult, which will directly affect the construction progress, increase downtime, and lead to an extension of the construction period, which will directly affect the construction progress. At the same time, the device works in an unstable state, increasing the risk of overturning or collapse, and limiting the application of bridge-building machines in complex terrain or special bridge construction.

[0006] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions: A segment splicing bridge erecting machine comprises a truss, and further comprises: Mobile crane, installed on one side of the top of the truss; A crane trolley slides on the top of the truss, and a suspension frame is connected to the bottom end of the crane trolley; The second slideway is fixed to the bottom ends of both sides of the truss; A bracket is arranged at the bottom end of the truss, and the bracket is provided with four groups, and the bracket includes a driving wheel, a bearing platform, a lifting structure, a filling structure, a base, a damper, a supporting wheel, a connecting bolt, a front middle bracket and a front bracket; A bearing platform is installed at the bottom end of the truss, and two sets of supporting wheels are installed between the bearing platform and the truss, the supporting wheels are rotatably connected to both sides of the top of the bearing platform through a rotating shaft, and both sides of the top of the bearing platform are installed with driving wheels in contact with the second slideway, and the supporting wheels and the driving wheels cooperate with each other; The damper is installed on both sides of the bottom end of the bearing platform; A lifting structure is arranged at the bottom end of the damper, wherein the lifting structure includes a connecting plate fixed to the bottom end of the damper, supporting plates fixed to both sides of the bottom end of the connecting plate, a fixing plate fixed to the bottom end of the supporting plate, a hydraulic cylinder installed at the bottom end of the connecting plate and penetrating the fixing plate and connected to the base, and a locking assembly arranged on one side of the supporting plate; A base is arranged between the bottom ends of the two groups of lifting structures, and connecting bolts are inserted into the interior of both sides of the base, and the connecting bolts penetrate the fixing plate, wherein the base and the lifting structure are arranged in four groups, a front bracket is arranged at the bottom of the rightmost group of bases, and a front middle bracket is arranged on a group of bases adjacent to the rightmost group of bases; A filling structure is arranged on both sides of the top of the base and is used to support the gap between the lifting structure and the base; The driving structure is arranged at the bottom end of the truss and is used to drive the truss to move laterally.

[0007] Through the above technical scheme, the driving wheel can drive the bearing platform to slide at the bottom of the truss, move the front bracket and the front middle bracket to the position of the bridge pier, adjust the position of the front bracket and the front middle bracket through the lifting structure, make the front bracket and the front middle bracket contact with the bridge pier, support the weight of the device, use the lifting crane to lift the bridge components through the suspension frame, so as to facilitate the assembly and fixation of multiple groups of bridge components, use the driving structure to push the truss to move on the top of the bearing platform, so as to move the device forward, and at the same time, the supporting wheel reduces the friction between the truss and the bearing platform, and guides the movement of the driving wheel through the second slide.

[0008] As a preferred technical solution of the present application, the locking assembly includes guide rails fixed on both sides of the support plate, bolt grooves opened inside the guide rails, a movable plate sliding on the outside of the guide rails and connected to the base, and a fixing bolt inserted inside the movable plate and threadedly connected to the bolt groove.

[0009] Through the above technical solution, the hydraulic cylinder is retracted and extended to drive the base, front bracket or front middle bracket to rise and fall, adjust the height of the bracket, and rotate the fixing bolt through the movable plate and insert it into the bolt groove to reduce the pressure borne by the hydraulic cylinder.

[0010] As a preferred technical solution of the present application, several groups of bolt grooves are opened inside the guide rail, and the several groups of bolt grooves are evenly spaced inside the guide rail, and a sliding structure is formed between the fixed plate and the telescopic end of the hydraulic cylinder.

[0011] Through the above technical solution, multiple gears are provided through multiple sets of bolt grooves, so that workers can choose the appropriate height according to construction requirements, thereby ensuring that the equipment can operate with optimal performance.

[0012] As a preferred technical solution of the present application, a sliding structure is formed between the guide rail and the movable plate, and the guide rail is symmetrically distributed on the vertical center line of the support plate.

[0013] Through the above technical solution, the guide rail slides inside the movable plate to limit the moving direction of the base, so that the base is not easy to tilt or shake, and it is convenient to align the fixing bolt with the bolt groove.

[0014] As a preferred technical solution of the present application, the filling structure includes a plurality of filling blocks arranged between the base and the fixed plate, an installation groove opened inside the filling block and sliding on the outside of the connecting bolt, rubber buckle blocks fixed on both sides of the installation groove, an insert block fixed at the top of the filling block, and a slot opened at the bottom of the filling block.

[0015] Through the above technical solution, multiple groups of filling blocks are inserted into the gap between the base and the fixed plate to support the weight of the device, reduce the pressure on the hydraulic cylinder and the fixing bolts, and prevent them from deformation.

[0016] As a preferred technical solution of the present application, the thickness of the filling block is equal to the spacing between adjacent bolt slots, and a plug-in structure is formed between the plug-in block and the adjacent slots.

[0017] Through the above technical solution, since the thickness of the filling block is equal to the spacing between adjacent bolt slots, the number of filling blocks can be adjusted according to the hole position of the bolt slot movement, so that the filling blocks can be easily used to fill the gap between the base and the fixed plate. At the same time, by inserting the plug-in blocks into the slots, the filling blocks can be neatly arranged and not easily dislocated due to pressure.

[0018] As a preferred technical solution of the present application, the driving structure includes a first rotating seat installed on the top of the supporting platform, a hydraulic rod installed on one side of the first rotating seat, a second rotating seat installed on the output end of the hydraulic rod, a mounting seat installed on the top of the second rotating seat, a baffle rotatably connected to the inside of the mounting seat, movable wheels rotatably connected to both sides of the mounting seat, limit assemblies arranged on both sides of the baffle, a first slide fixed to the bottom end of the truss, and a protrusion installed at the bottom end of the first slide.

[0019] Through the above technical solution, by starting the second hydraulic telescopic rod and extending the first hydraulic telescopic rod, the fixing pin is inserted into the first fixing groove and the second fixing groove and fixed at the position of the baffle. Then the hydraulic rod is pushed and moved through the second rotating seat, so that the baffle pushes the truss to move at the top of the support wheel through the protrusion, thereby moving the position of the truss.

[0020] As a preferred technical solution of the present application, the limiting assembly includes guide rings fixed on both sides of the baffle, fixing pins sliding inside the guide rings, second fixing grooves opened inside both sides of the mounting seat, first fixing grooves opened inside both sides of the mounting seat, a first hydraulic telescopic rod fixed at the bottom end of one side of the baffle and connected to the fixing pin, and a second hydraulic telescopic rod fixed at the bottom end of the other side of the baffle and connected to the fixing pin.

[0021] Through the above technical solution, the first hydraulic telescopic rod and the second hydraulic telescopic rod drive the fixing pin to leave the first fixing groove and the second fixing groove, so that the baffle can be flipped inside the mounting seat. At the same time, the mounting seat prevents the baffle from pushing the truss to move through the protrusion during the movement. The second hydraulic telescopic rod and the first hydraulic telescopic rod are started to push the fixing pin into the first fixing groove and the second fixing groove, and lock it in the position of the baffle.

[0022] As a preferred technical solution of the present application, the fixing pin passes through the guide ring and extends to the inside of the first fixing groove or the second fixing groove. The guide ring and the baffle are welded into an integrated structure. The first slideway and the moving wheel form a sliding structure. The baffle and the protrusion cooperate with each other.

[0023] Through the above technical solution, the guide ring limits the moving direction and position of the fixing pin, so that the fixing pin is easy to insert into the first fixing groove, and at the same time reduces the reaction force exerted by the baffle on the first hydraulic telescopic rod through the fixing pin.

[0024] As a preferred technical solution of the present application, a rotating structure is formed between the blocking piece and the mounting seat, and the protrusions are distributed at equal intervals inside the first slideway.

[0025] With the above technical solution, since the blocking piece and the mounting seat are in rotational contact, when the mounting seat moves in the reverse direction, the blocking piece is not easy to drive the truss to move.

[0026] Compared with the prior art, the present invention has the following beneficial effects: In the scheme of this application: 1. The hydraulic cylinder is retracted and extended to drive the base, front bracket or front middle bracket to rise and fall, adjust the height of the bracket, and rotate the fixing bolt through the movable plate and insert it into the bolt slot to reduce the pressure on the hydraulic cylinder. This realizes the height adjustment function of the device. The height of the bridge erection machine can be flexibly adjusted according to the specific conditions of the construction site and the requirements of the bridge design. There is no need to replace or modify the equipment, which reduces the project cost and reduces the downtime during the construction process, making the construction process more continuous and efficient. 2. By starting the second hydraulic telescopic rod and extending the first hydraulic telescopic rod, the fixing pin is inserted into the first fixing groove and the second fixing groove and fixed at the position of the baffle. Then the hydraulic rod is pushed and moved by the second rotating seat, so that the baffle pushes the truss to move on the top of the supporting wheel through the protrusion, and the position of the truss is moved. Thus, the truss moving function of the device is realized, and the position of the truss is flexibly moved, so that the truss is convenient to cross the bridge pier, and the movement process is smooth and stable and not easy to shake. At the same time, there is no need to carry out complicated disassembly and reinstallation process, which greatly improves the construction efficiency and shortens the construction period; 3. By inserting multiple groups of filling blocks into the gap between the base and the fixed plate, the weight of the device is supported, the pressure on the hydraulic cylinder and the fixing bolts is reduced, and deformation is prevented. This realizes the supporting and stabilizing function of the device, which is convenient for supporting the cavity between the lifting structure and the base, so that the device is placed stably and the structure is not easily deformed. At the same time, multiple groups of iron filling blocks lower the center of gravity of the device, making the device more stably placed. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is one of the schematic diagrams of the overall structure of the present invention; Figure 2 This is the second schematic diagram of the overall structure of the present invention; Figure 3 A schematic diagram of the three-dimensional structure of the support frame provided by the present invention; Figure 4 Schematic diagram of the three-dimensional structure of the lifting structure provided by the present invention Figure 5 One of the three-dimensional structural schematic diagrams of the filling structure provided by the present invention; Figure 6 The second schematic diagram of the three-dimensional structure of the filling structure provided by the present invention; Figure 7 A schematic diagram of a three-dimensional cross-sectional structure of a driving structure provided by the present invention; Figure 8 One of the three-dimensional structural schematic diagrams of the driving structure provided by the present invention; Fig. 9 This is the second three-dimensional structural schematic diagram of the driving structure provided by the present invention.

[0028] Indications in the figure: 1. Truss; 2. Mobile crane; 3. Lifting crane; 4. Driving wheel; 5. Loading platform; 6. Lifting structure; 601. Connecting plate; 602. Support plate; 603. Guide rail; 604. Mobile plate; 605. Fixing bolt; 606. Hydraulic cylinder; 607. Fixing plate; 608. Bolt slot; 7. Front bracket; 8. Filling structure; 801. Filling block; 802. Rubber buckle block; 803. Insert block; 804. Mounting slot; 805. Slot; 9. Driving structure; 901. Hydraulic cylinder Pressure rod; 902, first rotating seat; 903, first slide; 904, bump; 905, baffle; 906, mounting seat; 907, second rotating seat; 908, moving wheel; 909, guide ring; 910, fixing pin; 911, first hydraulic telescopic rod; 912, first fixing groove; 913, second fixing groove; 914, second hydraulic telescopic rod; 10, front middle bracket; 11, second slide; 12, base; 13, damper; 14, support wheel; 15, connecting bolt; 16, suspension frame. DETAILED DESCRIPTION

[0029] To make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be described clearly and completely in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them.

[0030] like Figure 1-9 As shown, a segment splicing bridge erecting machine proposed in this embodiment includes a truss 1 and also includes: A mobile crane 2 is installed on one side of the top of the truss 1; A crane 3 slides on the top of the truss 1, and a suspension frame 16 is connected to the bottom of the crane 3; The second slideway 11 is fixed to the bottom ends of both sides of the truss 1; The bracket is arranged at the bottom end of the truss 1, and the bracket is provided with four groups, and the bracket includes a driving wheel 4, a bearing platform 5, a lifting structure 6, a filling structure 8, a base 12, a damper 13, a supporting wheel 14, a connecting bolt 15, a front middle bracket 10 and a front bracket 7; The bearing platform 5 is installed at the bottom end of the truss 1, and two sets of support wheels 14 are installed between the bearing platform 5 and the truss 1. The support wheels 14 are rotatably connected to both sides of the top of the bearing platform 5 through a rotating shaft. Both sides of the top of the bearing platform 5 are installed with driving wheels 4 in contact with the second slideway 11. The support wheels 14 and the driving wheels 4 cooperate with each other for use; The damper 13 is installed on both sides of the bottom end of the bearing platform 5; A lifting structure 6 is arranged at the bottom end of the damper 13, wherein the lifting structure 6 includes a connecting plate 601 fixed to the bottom end of the damper 13, supporting plates 602 fixed to both sides of the bottom end of the connecting plate 601, a fixing plate 607 fixed to the bottom end of the supporting plate 602, a hydraulic cylinder 606 installed at the bottom end of the connecting plate 601 and penetrating the fixing plate 607 and connected to the base 12, and a locking assembly arranged on one side of the supporting plate 602; The base 12 is arranged between the bottom ends of the two groups of lifting structures 6, and connecting bolts 15 are inserted into the interior of both sides of the base 12, and the connecting bolts 15 penetrate the fixing plate 607, wherein the base 12 and the lifting structure 6 are arranged in four groups, the bottom of the rightmost group of bases 12 is provided with a front bracket 7, and a group of bases 12 adjacent to the rightmost group of bases 12 is provided with a front middle bracket 10; The filling structure 8 is arranged on both sides of the top of the base 12 and is used to support the gap between the lifting structure 6 and the base 12; A driving structure 9 is provided at the bottom end of the truss 1 and is used to drive the truss 1 to move laterally; By transporting and assembling the device accessories to the construction site, using the lifting structure 6 to adjust the positions of the four groups of brackets, and using the filling structure 8 to fill the gaps, the device structure is not easily deformed by force, and the driving wheel 4 can drive the bearing platform 5 to slide at the bottom of the truss 1, and move the front bracket 7 and the front middle bracket 10 at the bottom of the two groups of bases 12 on the right side of the device to the pier position, and adjust the positions of the front bracket 7 and the front middle bracket 10 through the lifting structure 6 so that the front bracket 7 and the front middle bracket 10 are in contact with the pier to support the weight of the device, and the two groups of bases 12 on the left side of the device are in direct contact with the bridge deck to support the weight of the device, and the crane 3 is used to lift the bridge components through the suspension frame 16, so as to facilitate the assembly and fixation of multiple groups of bridge components. When the assembly is completed When the device needs to be moved, a set of lifting structures 6 is used to retract and drive the leftmost bracket to leave the bridge, and then the driving wheel 4 is used to drive a set of brackets to move at the bottom of the truss 1 and adjust the position at the same time. At the same time, the remaining three sets of brackets support the weight of the device, so that the device is placed firmly and not prone to shaking. Then the positions of the remaining three sets of brackets are moved from left to right in turn, and the positions of the brackets are adjusted. After the movement of the brackets is completed, the driving structure 9 is used to push the truss 1 to move on the top of the bearing platform 5 to move the device forward. At the same time, the supporting wheel 14 reduces the friction between the truss 1 and the bearing platform 5, so that the truss 1 moves smoothly, and the damper 13 is used to reduce the influence of vibration on the bracket during operation, and the movement of the driving wheel 4 is guided by the second slide 11.

[0031] like Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, as a preferred embodiment, on the basis of the above-mentioned method, further, the locking assembly includes guide rails 603 fixed on both sides of the support plate 602, bolt grooves 608 opened in the guide rails 603, a movable plate 604 sliding on the outside of the guide rails 603 and connected to the base 12, and a fixing bolt 605 inserted in the movable plate 604 and threadedly connected to the bolt grooves 608, a plurality of groups of bolt grooves 608 are opened in the guide rails 603, and a plurality of groups of bolt grooves 608 are evenly spaced and distributed in the guide rails 603, a sliding structure is formed between the fixed plate 607 and the telescopic end of the hydraulic cylinder 606, a sliding structure is formed between the guide rail 603 and the movable plate 604, and the guide rail 603 is at the vertical center line of the support plate 602 The brackets 602 and 602 are symmetrically distributed on the upper surface. The fixing bolts 605 are removed, the hydraulic cylinder 606 is started to retract, and the height of the bracket is locked, so that the bracket can be easily moved and adjusted at the bottom of the truss 1. The hydraulic cylinder 606 is started to extend, and the base 12, the front bracket 7 or the front middle bracket 10 are pushed to contact the bridge deck and the pier to support the weight of the device. At the same time, the guide rail 603 slides inside the movable plate 604 to limit the moving direction of the base 12, so that the base 12 is not easy to tilt or shake. The fixing bolts 605 pass through the movable plate 604 and are rotated to be inserted into the bolt groove 608, so that the support plate 602 is in close contact with the fixing bolts 605, which is convenient for supporting the pressure on the support plate 602, reducing the pressure borne by the hydraulic cylinder 606, and extending the service life of the hydraulic cylinder 606.

[0032] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6As shown, as a preferred embodiment, on the basis of the above method, further, the filling structure 8 includes a plurality of filling blocks 801 arranged between the base 12 and the fixing plate 607, a mounting groove 804 opened inside the filling block 801 and sliding on the outside of the connecting bolt 15, a rubber buckle block 802 fixed on both sides of the mounting groove 804, an insert block 803 fixed on the top of the filling block 801 and a slot 805 opened at the bottom of the filling block 801, the thickness of the filling block 801 is equal to the spacing between adjacent bolt grooves 608, and a plug-in structure is formed between the insert block 803 and the adjacent slot 805. During the process of adjusting the height of the bracket, the filling block 801 is inserted into the base 12 and the gap between the fixing plate 607, and at the same time, the connecting bolt 15 is inserted into the interior of the installation slot 804 through the fixing plate 607 to limit the position of the filling block 801. Since the thickness of the filling block 801 is equal to the spacing between the adjacent bolt slots 608, the number of the filling blocks 801 can be adjusted according to the hole position of the bolt slot 608, so that multiple groups of filling blocks 801 are arranged between the base 12 and the fixing plate 607 to support the weight of the device, reduce the pressure on the hydraulic cylinder 606 and the fixing bolt 605, and prevent them from being deformed. By inserting the insert block 803 into the interior of the slot 805, the filling blocks 801 are neatly placed and are not easily misplaced by pressure. like Figure 2 , Figure 3 , Figure 6 , Figure 8 and Fig. 9As shown, as a preferred embodiment, on the basis of the above-mentioned method, further, the driving structure 9 includes a first rotating seat 902 installed at the top of the supporting platform 5, a hydraulic rod 901 installed on one side of the first rotating seat 902, a second rotating seat 907 installed at the output end of the hydraulic rod 901, a mounting seat 906 installed at the top of the second rotating seat 907, a baffle 905 rotatably connected to the inside of the mounting seat 906, moving wheels 908 rotatably connected to both sides of the mounting seat 906, a limiting assembly arranged on both sides of the baffle 905, a first slideway 903 fixed at the bottom end of the truss 1, and a protrusion 904 installed at the bottom end of the first slideway 903, the limiting assembly includes guides fixed on both sides of the baffle 905, The guide ring 909, a fixing pin 910 sliding inside the guide ring 909, a second fixing groove 913 opened inside the two sides of the mounting seat 906, a first fixing groove 912 opened inside the two sides of the mounting seat 906, a first hydraulic telescopic rod 911 fixed to the bottom end of one side of the baffle 905 and connected to the fixing pin 910, and a second hydraulic telescopic rod 914 fixed to the bottom end of the other side of the baffle 905 and connected to the fixing pin 910, the fixing pin 910 passes through the guide ring 909 and extends to the inside of the first fixing groove 912 or the second fixing groove 913, the guide ring 909 and the baffle 905 are welded into an integrated structure, the first slideway 903 and the moving wheel 908 form a sliding structure, and the baffle 905 forms a sliding structure. 05 cooperates with the protrusion 904, and a rotating structure is formed between the baffle 905 and the mounting seat 906. The protrusions 904 are evenly spaced inside the first slide 903. When the truss 1 is moved, the second hydraulic telescopic rod 914 and the first hydraulic telescopic rod 911 are started to extend, so that the second hydraulic telescopic rod 914 and the first hydraulic telescopic rod 911 push the fixing pin 910 to insert into the first fixing groove 912 and the second fixing groove 913, and fix it at the position of the baffle 905. Then, the hydraulic rod 901 is started to extend, so that the hydraulic rod 901 pushes the moving wheel 908 to slide inside the first slide 903 through the second rotating seat 907. At the same time, since the position of the baffle 905 is fixed, the mounting seat 906 is The mounting seat 906 pushes the truss 1 to move on the top of the support wheel 14 through the baffle 905 and the protrusion 904, and moves the position of the truss 1. When the hydraulic rod 901 is extended to the maximum distance, the first hydraulic telescopic rod 911 and the second hydraulic telescopic rod 914 are started to contract, driving the fixing pin 910 to leave the first fixing groove 912 and the second fixing groove 913, so that the baffle 905 can be flipped inside the mounting seat 906, so that the hydraulic rod 901 is contracted and reset. At the same time, since the baffle 905 can be flipped inside the mounting seat 906, the baffle 905 will not push the truss 1 to move through the protrusion 904, and it moves at the bottom of the first slide 903 through the moving wheel 908 to limit the moving path of the mounting seat 906.

[0033] Specifically, when the segment-jointed bridge-building machine is in use: the device accessories are transported and assembled to the construction site, the height positions of the four groups of brackets are adjusted using the lifting structure 6, and the gaps are filled using the filling structure 8, so that the structure of the device is not easily deformed by force; the bearing platform 5 can be driven by the driving wheel 4 to slide on the bottom of the truss 1, and the front bracket 7 and the front middle bracket 10 at the bottom of the two groups of bases 12 on the right side of the device are moved to the position of the bridge pier; the positions of the front bracket 7 and the front middle bracket 10 are adjusted by the lifting structure 6, so that the front bracket 7 and the front middle bracket 10 are in contact with the bridge pier to support the weight of the device; the two groups of bases 12 on the left side of the device are in direct contact with the bridge deck to support the weight of the device; the crane 3 is used to support the bridge structure through the suspension frame 16 The parts are lifted to facilitate the assembly and fixation of multiple groups of bridge components. When the assembly is completed and the position of the device needs to be moved, a group of lifting structures 6 are used to retract and control a group of brackets to leave the bridge. Then, the driving wheel 4 is used to drive a group of brackets to move at the bottom of the truss 1 and adjust the position at the same time. At the same time, the remaining three groups of brackets support the weight of the device, so that the device is placed firmly and not prone to shaking. After the movement of the brackets is completed, the driving structure 9 is used to push the truss 1 to move on the top of the bearing platform 5 to move the device forward. At the same time, the supporting wheel 14 reduces the friction between the truss 1 and the bearing platform 5, so that the truss 1 moves smoothly. The damper 13 is used to reduce the influence of vibration on the bracket during operation, and the movement of the driving wheel 4 is guided by the second slide 11.

[0034] When adjusting the height of the bracket, the fixing bolt 605 is removed, the hydraulic cylinder 606 is started to retract, and the height of the bracket is locked, so that the bracket can be easily moved and adjusted at the bottom of the truss 1, and the hydraulic cylinder 606 is started to extend, pushing the base 12, the front bracket 7 or the front middle bracket 10 to contact the bridge deck and the bridge pier to support the weight of the device. At the same time, the guide rail 603 slides inside the movable plate 604 to limit the moving direction of the base 12, so that the base 12 is not easy to tilt and shake. The fixing bolt 605 passes through the movable plate 604 and is rotated and inserted into the bolt groove 608, so that the support plate 602 and the fixing bolt 605 are in close contact, which is convenient for supporting the pressure on the support plate 602, reducing the pressure borne by the hydraulic cylinder 606, and extending the service life of the hydraulic cylinder 606. The height adjustment of the device is completed, so that the device can flexibly adjust the height of the bridge erecting machine according to the specific conditions of the construction site and the design requirements of the bridge, without replacing or modifying the equipment, reducing the project cost, and reducing the pause time during the construction process, making the construction process more continuous and efficient; During the process of adjusting the height of the bracket, the filling block 801 is inserted into the gap between the base 12 and the fixed plate 607, and the connecting bolt 15 is inserted into the interior of the installation slot 804 through the fixed plate 607 to limit the position of the filling block 801. Since the thickness of the filling block 801 is equal to the spacing between adjacent bolt slots 608, the number of the filling blocks 801 can be adjusted according to the hole position of the bolt slot 608, so that multiple groups of filling blocks 801 are arranged between the base 12 and the fixed plate 607 to support the weight of the device, reduce the pressure on the hydraulic cylinder 606 and the fixing bolt 605, and prevent them from deformation. By inserting the insert block 803 into the interior of the slot 805, the filling blocks 801 are placed neatly and are not easily misplaced by pressure, which is convenient for supporting the cavity between the lifting structure 6 and the base 12, so that the device is placed stably and the structure is not easily deformed. At the same time, multiple groups of iron filling blocks 801 lower the center of gravity of the device, so that the device is placed more stably. When the truss 1 is moved, the second hydraulic telescopic rod 914 and the first hydraulic telescopic rod 911 are started to extend, so that the second hydraulic telescopic rod 914 and the first hydraulic telescopic rod 911 push the fixing pin 910 to be inserted into the first fixing groove 912 and the second fixing groove 913 and fixed at the position of the baffle 905. Then, the hydraulic rod 901 is started to extend, so that the hydraulic rod 901 pushes the moving wheel 908 to slide inside the first slideway 903 through the second rotating seat 907. At the same time, since the position of the baffle 905 is fixed, the mounting seat 906 pushes the truss 1 to move on the top of the supporting wheel 14 through the baffle 905 and the protrusion 904, and the position of the truss 1 is moved. When the hydraulic rod 901 is extended to the maximum distance, the first hydraulic telescopic rod 911 and the protrusion 904 are started. The second hydraulic telescopic rod 914 contracts, driving the fixing pin 910 to leave the first fixing groove 912 and the second fixing groove 913, so that the blocking piece 905 can be flipped inside the mounting seat 906, so that the hydraulic rod 901 contracts and resets. At the same time, because the blocking piece 905 can be flipped inside the mounting seat 906, the blocking piece 905 will not push the truss 1 to move through the protrusion 904. The mounting seat 906 moves at the bottom of the first slide 903 to limit the movement path of the mounting seat 906, and the movement of the truss 1 is completed. The position of the truss 1 is flexibly moved, so that the truss 1 is easy to cross the bridge pier, and the movement process is smooth and stable and not easy to shake. At the same time, there is no need to carry out complicated disassembly and reinstallation processes, which greatly improves construction efficiency and shortens the construction period.

[0035] The above embodiments are only used to illustrate the present invention and are not intended to limit the technical solutions described in the present invention. Although the present invention has been described in detail with reference to the above embodiments, the present invention is not limited to the above specific implementation methods. Therefore, any modification or equivalent replacement of the present invention; and all technical solutions and improvements thereof that do not depart from the spirit and scope of the invention are included in the scope of the claims of the present invention.

Claims

1. A segmented bridge erecting machine, comprising a truss (1), characterized in that: Also includes, A mobile crane (2) is installed on one side of the top of the truss (1); A crane (3) slides on the top of the truss (1), and a suspension frame (16) is connected to the bottom end of the crane (3); A second slideway (11) fixed to the bottom ends of both sides of the truss (1); A bracket is arranged at the bottom end of the truss (1), and the bracket is provided in four groups, and the bracket comprises a driving wheel (4), a bearing platform (5), a lifting structure (6), a filling structure (8), a base (12), a damper (13), a supporting wheel (14), a connecting bolt (15), a front middle bracket (10) and a front bracket (7); A bearing platform (5) is installed at the bottom end of the truss (1), and two groups of support wheels (14) are installed between the bearing platform (5) and the truss (1), and the support wheels (14) are rotatably connected to both sides of the top of the bearing platform (5) through a rotating shaft. Both sides of the top of the bearing platform (5) are installed with driving wheels (4) in contact with the second slideway (11), and the supporting wheels (14) and the driving wheels (4) are used in conjunction with each other; The damper (13) is mounted on both sides of the bottom end of the bearing platform (5); A lifting structure (6) is arranged at the bottom end of the damper (13), wherein the lifting structure (6) comprises a connecting plate (601) fixed to the bottom end of the damper (13), supporting plates (602) fixed to both sides of the bottom end of the connecting plate (601), a fixing plate (607) fixed to the bottom end of the supporting plate (602), a hydraulic cylinder (606) installed at the bottom end of the connecting plate (601) and penetrating the fixing plate (607) and connected to the base (12), and a locking assembly arranged on one side of the supporting plate (602); A base (12) is arranged between the bottom ends of the two groups of lifting structures (6), and connecting bolts (15) are inserted into the interior of both sides of the base (12), and the connecting bolts (15) pass through the fixing plate (607), wherein the base (12) and the lifting structure (6) are arranged in four groups, the bottom of the rightmost group of bases (12) is provided with a front bracket (7), and a group of bases (12) adjacent to the rightmost group of bases (12) is provided with a front middle bracket (10); A filling structure (8) is arranged on both sides of the top of the base (12) and is used to support the gap between the lifting structure (6) and the base (12); The driving structure (9) is arranged at the bottom end of the truss (1) and is used to drive the truss (1) to move laterally.

2. A segment splicing bridge erecting machine according to claim 1, characterized in that: The locking assembly comprises guide rails (603) fixed on both sides of the support plate (602), bolt grooves (608) provided inside the guide rails (603), a movable plate (604) sliding outside the guide rails (603) and connected to the base (12), and fixing bolts (605) inserted inside the movable plate (604) and threadedly connected to the bolt grooves (608).

3. A segment splicing bridge erecting machine according to claim 2, characterized in that: A plurality of groups of bolt grooves (608) are provided inside the guide rail (603), and the plurality of groups of bolt grooves (608) are distributed at equal intervals inside the guide rail (603). A sliding structure is formed between the fixed plate (607) and the telescopic end of the hydraulic cylinder (606).

4. The segment-jointed bridge erecting machine according to claim 2, characterized in that: A sliding structure is formed between the guide rail (603) and the movable plate (604), and the guide rail (603) is symmetrically distributed on the vertical center line of the support plate (602).

5. The segment-jointed bridge erecting machine according to claim 1, characterized in that: The filling structure (8) comprises a plurality of filling blocks (801) arranged between the base (12) and the fixing plate (607), a mounting groove (804) opened inside the filling block (801) and sliding on the outside of the connecting bolt (15), rubber buckle blocks (802) fixed on both sides of the inside of the mounting groove (804), an insert block (803) fixed on the top of the filling block (801), and a slot (805) opened at the bottom of the filling block (801).

6. The segment-jointed bridge erecting machine according to claim 5, characterized in that: The thickness of the filling block (801) is equal to the spacing between adjacent bolt slots (608), and a plug-in structure is formed between the insert block (803) and the adjacent slot (805).

7. The segment-jointed bridge erecting machine according to claim 1, characterized in that: The driving structure (9) comprises a first rotating seat (902) mounted on the top of the bearing platform (5), a hydraulic rod (901) mounted on one side of the first rotating seat (902), a second rotating seat (907) mounted on the output end of the hydraulic rod (901), a mounting seat (906) mounted on the top of the second rotating seat (907), a baffle (905) rotatably connected to the inside of the mounting seat (906), moving wheels (908) rotatably connected to both sides of the mounting seat (906), a limiting assembly arranged on both sides of the baffle (905), a first slideway (903) fixed to the bottom end of the truss (1), and a protrusion (904) mounted at the bottom end of the first slideway (903).

8. The segment-jointed bridge erecting machine according to claim 7, characterized in that: The limit assembly comprises a guide ring (909) fixed on both sides of the baffle (905), a fixing pin (910) sliding inside the guide ring (909), a second fixing groove (913) opened inside both sides of the mounting seat (906), a first fixing groove (912) opened inside both sides of the mounting seat (906), a first hydraulic telescopic rod (911) fixed at the bottom end of one side of the baffle (905) and connected to the fixing pin (910), and a second hydraulic telescopic rod (914) fixed at the bottom end of the other side of the baffle (905) and connected to the fixing pin (910).

9. The segment-jointed bridge erecting machine according to claim 8, characterized in that: The fixing pin (910) passes through the guide ring (909) and extends to the inside of the first fixing groove (912) or the second fixing groove (913); the guide ring (909) and the baffle (905) are welded into an integrated structure; the first slideway (903) and the moving wheel (908) form a sliding structure; and the baffle (905) and the protrusion (904) cooperate with each other.

10. The segment-jointed bridge erecting machine according to claim 7, characterized in that: A rotating structure is formed between the blocking piece (905) and the mounting seat (906), and the protrusions (904) are distributed at equal intervals inside the first slideway (903).

Citation Information

Patent Citations

  • Prefabricated and assembled bridge integrated rapid construction method

    CN109208478A

  • Segment assembling integrated bridge girder erection machine and construction method thereof

    CN112195798A

  • Automatic pin changing device for longitudinally-moving sliding shoe of section-spliced bridge girder erection machine and control method

    CN114837098A

  • Multi-angle movable bridge erecting machine for municipal bridge construction

    CN117403543A

  • Jacking device for bridge reinforcement and reinforcement method

    CN117758632A