Drilling and grouting integrated device

By using the elastic cover and holder structure in the drilling and grouting integrated device, the existing problems of hole wall damage and increased difficulty during drilling are solved, and more stable and efficient drilling construction is achieved.

CN118793399APending Publication Date: 2024-10-18HUBEI WANGXIN CONSTR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410724888.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The existing borehole bridging device can easily damage the hole wall structure during the drilling process, which increases the difficulty of drilling and construction risks.

Method used

An integrated drilling and grouting device is designed, which adopts an elastic cover and holder structure. The elastic cover is retracted to avoid contact with the hole wall when drilling, and automatically expands to assist bridging when drilling back, and reduces friction through springs and sealing rings. and destruction.

Benefits of technology

It can effectively prevent hole wall damage, reduce drilling difficulty, improve bridge erection stability and construction efficiency, and reduce construction risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793399A_ABST
    Figure CN118793399A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of drilling and grouting, and provides a drilling and grouting integrated device which comprises a bridge erecting device, a first connector capable of being fixed to a drill rod is slidably arranged on the inner side of the top of the bridge erecting device, and a second connector capable of being fixed to a drill bit is slidably arranged on the inner side of the bottom of the bridge erecting device; the elastic cover and the clamping devices are arranged on the outer side of the bridging device, the elastic cover is contracted inwards under the pressing of the multiple clamping devices when the bridging device drills downwards and goes deep, the elastic cover and the clamping devices cannot make contact with the hole wall, on one hand, damage to a hole wall structure layer is prevented, and on the other hand, friction between the elastic cover and the clamping devices and the hole wall can be reduced; the bridge erecting device is simple in structure and convenient to operate, drilling is easier, a plurality of clamping devices are lifted when the bridge erecting device drills back to enable the elastic cover to expand outwards, automatic expansion can be achieved when a bridge is erected, and the problems that in the prior art, a bridge erecting part and an iron gauze are prone to damaging a hole wall structure layer in the drilling process, and the drilling difficulty is increased are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drilling and grouting, and in particular to an integrated drilling and grouting device. Background Art

[0002] At present, in the process of drilling construction, the drill core is often broken, which causes the upper rock mass far away from the bottom of the hole to fall off or collapse due to the construction disturbance, resulting in drill jamming and drill burial accidents, affecting the rotation speed, and even causing waste holes. Considering that the falling block is far away from the bottom of the hole, it is necessary to build a bridge in the hole. In the current bridge construction operation, bamboo strips, spring barbs or wooden plugs are mostly used, but they need to rely on the rich experience of the drilling workers. Under the premise of insufficient experience, it is easy to have a weak bridge and a long bridge construction time, which indirectly affects the construction efficiency.

[0003] After searching, the announcement number CN220203865U discloses a drilling bridge and grouting integrated device, which is installed on the drill rod, including: a bridge part, which is a hollow structure and is connected from top to bottom to form a grouting channel, and the outer surface of the bridge part is inwardly recessed to form an installation area for installing wire mesh; a connecting part, which is arranged on the top of the bridge part and is used to connect the bridge part to the drill rod. The drilling personnel use the drill rod to move the bridge part to the part below the block drop and above the bottom of the hole, and quickly build the bridge body formed by the wire mesh and the tough filling material below the block drop, which reduces the need for operating experience, and the bridge above the bottom of the hole can also reduce the grouting amount, thereby saving costs; after the bridge is completed, the cement slurry is injected into the bridge part through the grouting channel to complete the plugging of the bridge part, which effectively reduces the risk of core breakage and block drop or hole collapse during the drilling construction process, thereby reducing the occurrence of accidents such as stuck drill, buried drill and waste hole.

[0004] However, the above device still has the following problems: in order to ensure the positioning of the gravel required for bridge construction, the shapes of the bridging part and the wire mesh must be consistent with the size of the hole wall. Due to the increase in drilling depth, the hole wall structure is easily deformed, and the bridging part and the wire mesh are easy to damage the hole wall structure layer during the drilling process. In addition, the friction between the bridging part and the wire mesh and the hole wall also increases the difficulty of drilling. Summary of the invention

[0005] The present invention provides an integrated drilling and grouting device, which solves the problem in the prior art that a bridging part and a wire mesh are prone to damage the hole wall structure layer during the drilling process and increase the difficulty of drilling.

[0006] The technical solution of the present invention is as follows: A drilling and grouting integrated device comprises a bridge builder, a first connector which can be fixed to a drill rod is slidably provided on the inner side of the top of the bridge builder, a second connector which can be fixed to a drill bit is slidably provided on the inner side of the bottom of the bridge builder, the bridge builder and the second connector are elastically connected by a spring, a plurality of annularly distributed metal spring sheets are fixed on the outer side of the second connector, an elastic cover and a plurality of holders which are annularly distributed on the outer side of the elastic cover are provided on the outer side of the bridge builder, the elastic cover is contracted inwardly by the pressure of the plurality of holders when the bridge builder drills deeper, and the elastic cover is expanded outwardly by the upward lifting of the plurality of holders when the bridge builder drills back.

[0007] Preferably, the bridge builder is in the shape of a tube column, and is provided with a first convex ring, a second convex ring, a third convex ring and a fourth convex ring in sequence from top to bottom inside, and sealing rings are fixedly embedded on the inner ring walls of the second convex ring and the third convex ring, and a first guide hole, a first movable groove located above the first guide hole, and a second movable groove located below the first guide hole are opened on the tube wall of the bridge builder, and the first guide hole is located between the second convex ring and the third convex ring.

[0008] Preferably, the first connector comprises a hollow tube, the top of the hollow tube is provided with a first connecting portion threadedly connected to the drill rod, a stop ring is fixed to the outer side of the top of the hollow tube, the stop ring abuts against the first convex ring from top to bottom, a plurality of equidistantly distributed discs are fixed to the outer side of the bottom of the hollow tube, and a plurality of second guide holes are radially opened on the tube wall of the hollow tube.

[0009] Preferably, the second connector includes a rod body, a second connecting portion threadedly connected to the drill bit is provided at the bottom of the rod body, a spline rod slidably connected to the hollow tube is fixed to the top of the rod body, a contraction groove is provided on the inner side of the bottom of the hollow tube, a limit plate slidingly limited in the contraction groove is fixed to the top of the spline rod, and a compression ring with a diameter smaller than the diameter of the contraction groove is fixed to the outer side of the top of the rod body.

[0010] Preferably, the spring is a conical structure with a diameter that gradually decreases from top to bottom, one end of the spring abuts against the contraction groove, and the other end of the spring abuts against the pressure ring.

[0011] Preferably, the bottom end of the first convex ring extends into the contraction groove at the bottom of the hollow tube, and the diameter of the pressure ring is equal to the outer diameter of the hollow tube.

[0012] Preferably, the holder includes an arc-shaped tube segment, a row of cone spikes are fixed on the outer arc surface of the arc-shaped tube segment, and two hinge seats distributed up and down are fixed on the inner arc surface of the arc-shaped tube segment, the upper hinge seat is hinged with a first movable rod, and the lower hinge seat is hinged with a second movable rod, the end of the first movable rod away from the hinge seat is hinged at the first movable groove, the end of the second movable rod away from the hinge seat is hinged at the second movable groove, and fan-shaped teeth are fixed at the hinge, and the fan-shaped teeth are engaged with the disc on the outside of the hollow tube.

[0013] Preferably, the elastic cover comprises a conical cover body, the bottom of which is fixed to the outer surface of the bridge erector, the top of which is provided with a convex edge, and a clamping seat for clamping the convex edge is fixed on the inner arc surface of the arc-shaped tube segment.

[0014] The beneficial effects of the present invention are:

[0015] 1. In the present invention, an elastic cover and a plurality of holders annularly distributed on the outside of the elastic cover are arranged on the outside of the bridge erector. When the bridge erector is drilled deep, the plurality of holders shrink the elastic cover inwardly, so that the elastic cover and the holders will not contact the hole wall. On the one hand, damage to the hole wall structure layer is prevented, and on the other hand, friction between the two and the hole wall can be reduced, making drilling easier. When the bridge erector is lifted up during drilling back, the plurality of holders expand the elastic cover outward, and can automatically expand when erecting a bridge to assist the bridge erector in the bridging operation, thereby solving the problem in the prior art that the bridging part and the wire mesh are prone to damage the hole wall structure layer during drilling and increase the difficulty of drilling.

[0016] 2. In the present invention, when it is necessary to build a bridge, the drill rod can be rotated to lift the first connector upward. During this process, the discs on the outer side of the hollow tube are engaged with the fan-shaped teeth on each holder one by one, so that the second movable rod is turned outward, and then, with the synchronous push of the first movable rod, each arc-shaped tube segment can be expanded toward the hole wall, and then the cone thorns on the outer arc surface of the arc-shaped tube segment pierce into the hole wall until the arc-shaped tube segment conflicts with the hole wall. Under the movement of the arc-shaped tube segment, the conical cover can also be expanded. The oppositely inclined support of the first movable rod and the second movable rod can prevent the bridge erector from being displaced due to the lifting of the first connector, thereby ensuring the stability of the bridge erection.

[0017] 3. In the present invention, the bridge builder is acted upon by a spring so that the first convex ring contacts the stop ring outside the hollow tube. The overall conical structure of the spring means that only the bottom ring of the spring will restrict the second connector, thus facilitating the separation of the bridge builder from the first connector and the second connector. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0019] Figure 1 This is a structural schematic diagram of a drilling and grouting integrated device proposed by the present invention;

[0020] Figure 2 A schematic cross-sectional structure diagram of a drilling and grouting integrated device proposed by the present invention;

[0021] Figure 3 for Figure 2 The enlarged structural diagram at A in the middle;

[0022] Figure 4 A schematic diagram of a half-section structure of the bridge builder proposed by the present invention;

[0023] Figure 5 This is a schematic diagram of the structure of the first connector proposed by the present invention;

[0024] Figure 6 This is a schematic diagram of the structure of the second connector proposed by the present invention;

[0025] Figure 7 This is a schematic diagram of the structure of the card holder proposed by the present invention;

[0026] Figure 8 This is a schematic structural diagram of the card holder proposed by the present invention from another viewing angle;

[0027] Fig. 9 This is a schematic diagram of the elastic cover structure proposed by the present invention;

[0028] In the figure: 1. bridge builder; 11. first convex ring; 12. second convex ring; 13. third convex ring; 14. fourth convex ring; 15. sealing ring; 16. first movable groove; 17. second movable groove; 18. first guide hole; 2. first connector; 21. hollow tube; 22. first connecting part; 23. stop ring; 24. disc; 25. second guide hole; 3. second connector; 31. rod body; 32. spline rod; 33. limit plate; 34. pressure ring; 35. second connecting part; 4. metal spring; 5. holder; 51. arc-shaped tube segment; 52. cone thorn; 53. hinge seat; 54. first movable rod; 55. second movable rod; 56. sector tooth; 57. clamp seat; 6. elastic cover; 61. conical cover body; 62. convex edge; 7. spring. DETAILED DESCRIPTION

[0029] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] See also Figure 1 , Figure 2 and Figure 3 The present invention provides a technical solution: a drilling and grouting integrated device, comprising a bridge builder 1, a first connector 2 that can be fixed to a drill rod is slidably provided on the inner side of the top of the bridge builder 1, a second connector 3 that can be fixed to a drill bit is slidably provided on the inner side of the bottom of the bridge builder 1, the bridge builder 1 and the second connector 3 are elastically connected by a spring 7, a plurality of annularly distributed metal spring pieces 4 are fixed on the outer side of the second connector 3, an elastic cover 6 and a plurality of annularly distributed holders 5 on the outer side of the elastic cover 6 are provided on the outer side of the bridge builder 1, and the plurality of holders 5 shrink the elastic cover 6 inwardly under the pressure of the bridge builder 1 when drilling deep, so that the elastic cover 6 and the holders 5 will not contact the hole wall, which can prevent the damage to the hole wall structure layer on the one hand, and on the other hand can It is able to reduce the friction between the two and the hole wall, making it easier to drill down. When the bridge erector 1 is lifted up during back drilling, the elastic cover 6 is expanded outward by a plurality of holders 5, and can automatically expand when bridging is being erected to assist the bridging operation of the bridge erector 1. After the bridging is completed, the first connector 2 continues to rotate and rise, and the bottom of the bridge erector 1 begins to contact with the metal spring sheet 4, and squeezes the metal spring sheet 4 to deform the metal spring sheet 4, thereby separating the bridge erector 1 from the first connector 2 and the second connector 3. The metal spring sheet 4 is L-shaped as a whole, and the upper part of the metal spring sheet 4 is fan-shaped, and the outer diameter is consistent with the outer diameter of the bridge erector 1, while the lower part of the metal spring sheet 4 is an arc-shaped sheet structure, and this part is provided with a through hole for the bolt to pass through, and a screw hole for fixing with the bolt is provided on the outside of the first connector 2.

[0031] See also Figure 4 The bridge builder 1 is in the shape of a tube column, and is provided with a first convex ring 11, a second convex ring 12, a third convex ring 13 and a fourth convex ring 14 from top to bottom. A sealing ring 15 is fixedly embedded on the inner ring wall of the second convex ring 12 and the third convex ring 13. A first guide hole 18, a first movable groove 16 located above the first guide hole 18, and a second movable groove 17 located below the first guide hole 18 are opened on the tube wall of the bridge builder 1. The first guide hole 18 is between the second convex ring 12 and the third convex ring 13. In the initial state, the tube wall of the first connector 2 The second guide hole 25 on the upper surface is located at a height position below the third convex ring 13. After the arc-shaped tube segment 51 contacts the hole wall, the second guide hole 25 rises to between the second convex ring 12 and the third convex ring 13. The second guide hole 25 can be sealed by the sealing ring 15 on the inner ring wall of the second convex ring 12 and the third convex ring 13 to prevent slurry leakage. Grouting is performed through the inner cavity of the first connector 2, so that the slurry can be injected into the gravel above the elastic cover 6 through the second guide hole 25 and the first guide hole 18, and a bridge supporting the hole wall is formed after solidification.

[0032] See also Figure 5The first connector 2 includes a hollow tube 21, a first connecting portion 22 threadedly connected to the drill pipe is provided at the top of the hollow tube 21, a stop ring 23 is fixed to the outside of the top of the hollow tube 21, the stop ring 23 abuts against the first convex ring 11 from top to bottom, a plurality of equally spaced discs 24 are fixed to the outside of the bottom of the hollow tube 21, and a plurality of second guide holes 25 are radially opened on the wall of the hollow tube 21 for the slurry to be led out.

[0033] See also Figure 6 The second connector 3 includes a rod body 31, a second connecting portion 35 threadedly connected to the drill bit is provided at the bottom of the rod body 31, a spline rod 32 slidably connected to the hollow tube 21 is fixed to the top of the rod body 31, a contraction groove is provided on the inner side of the bottom of the hollow tube 21, a limit plate 33 slidingly limited in the contraction groove is fixed to the top of the spline rod 32, and a pressure ring 34 with a diameter smaller than the diameter of the contraction groove is fixed to the outer side of the top of the rod body 31.

[0034] See also Figure 2 The spring 7 is a conical structure with a diameter that gradually decreases from top to bottom. One end of the spring 7 abuts against the contraction groove, and the other end of the spring 7 abuts against the pressure ring 34. During the drilling process, the bridge builder 1 is acted upon by the spring 7 so that the first convex ring 11 abuts against the stop ring 23 outside the hollow tube 21. Due to the overall conical structure design of the spring 7, only the bottom ring of the spring 7 will restrict the second connector 3, thereby facilitating the separation of the bridge builder 1 from the first connector 2 and the second connector 3.

[0035] It should be noted that the bottom end of the first convex ring 11 extends into the contraction groove at the bottom of the hollow tube 21, and the diameter of the pressure ring 34 is equal to the outer diameter of the hollow tube 21, so that the second connector 3 can pass through the inside of the bridge builder 1 to achieve the separation of the two.

[0036] See also Figure 7 and Figure 8The holder 5 includes an arc-shaped tube segment 51, a row of cone spikes 52 are fixed on the outer arc surface of the arc-shaped tube segment 51, and two hinge seats 53 distributed up and down are fixed on the inner arc surface of the arc-shaped tube segment 51. The upper hinge seat 53 is hinged with a first movable rod 54, and the lower hinge seat 53 is hinged with a second movable rod 55. The end of the first movable rod 54 away from the hinge seat 53 is hinged at the first movable groove 16, and the end of the second movable rod 55 away from the hinge seat 53 is hinged at the second movable groove 17, and a fan-shaped tooth 56 is fixed at the hinge. The teeth 56 engage with the discs 24 on the outside of the hollow tube 21. When a bridge needs to be built, the drill rod can be rotated to lift the first connector 2 upward. During this process, the discs 24 on the outside of the hollow tube 21 engage with the fan-shaped teeth 56 on each holder 5 one by one, causing the second movable rod 55 to flip outward, and then, with the synchronous push of the first movable rod 54, each arc-shaped tube segment 51 can be expanded toward the hole wall, and then the cone thorns 52 on the outer arc surface of the arc-shaped tube segment 51 penetrate into the hole wall until the arc-shaped tube segment 51 conflicts with the hole wall.

[0037] See also Fig. 9 The elastic cover 6 includes a conical cover body 61, the bottom of which is fixed to the outer surface of the bridge erector 1, a convex edge 62 is provided on the top of the conical cover body 61, a clamping seat 57 for clamping the convex edge 62 is fixed on the inner arc surface of the arc segment 51, the arc segment 51 is expanded toward the hole wall, and then the cone thorn 52 on the outer arc surface of the arc segment 51 penetrates into the hole wall, and in the process of the arc segment 51 expanding and contacting with the hole wall, the convex edge 62 on the upper part of the conical cover body 61 is fixed to the clamping seat 57 on the inner arc surface of the arc segment 51, and the bottom of the conical cover body 61 is fixed to the outer surface of the bridge erector 1, so that the conical cover body 61 can be expanded under the movement of the arc segment 51, and then gravel is filled into the borehole.

[0038] The working principle and use process of the present invention are as follows: During the drilling process, the bridge erector 1 is acted upon by the spring 7 so that the first convex ring 11 contacts the stop ring 23 outside the hollow tube 21, and the sector teeth 56 engage with the uppermost disc 24 outside the hollow tube 21. At this time, the elastic cover 6 and the holder 5 are Figure 2 The retracted state shown, and thus the elastic cover 6 and the holder 5 do not contact the hole wall during the drilling process;

[0039] When it is necessary to build a bridge, the drill rod can be rotated to lift the first connector 2 upward. During this process, the discs 24 on the outside of the hollow tube 21 engage with the fan-shaped teeth 56 on each holder 5 one by one, so that the second movable rod 55 is turned outward, and then, with the synchronous push of the first movable rod 54, each arc-shaped tube segment 51 can be expanded toward the hole wall, and then the cone thorns 52 on the outer arc surface of the arc-shaped tube segment 51 pierce into the hole wall until the arc-shaped tube segment 51 conflicts with the hole wall. Since the convex edge 62 on the upper part of the conical cover body 61 is fixed on the clamping seat 57 on the inner arc surface of the arc-shaped tube segment 51, and the bottom of the conical cover body 61 is fixed to the outer surface of the bridge builder 1, the conical cover body 61 can be expanded under the movement of the arc-shaped tube segment 51, and then gravel is filled into the borehole;

[0040] In the initial state, the second guide hole 25 on the pipe wall of the first connector 2 is at a height position below the third convex ring 13. After the arc-shaped pipe segment 51 contacts the hole wall, the second guide hole 25 rises to between the second convex ring 12 and the third convex ring 13. Grouting is performed through the inner cavity of the first connector 2, so that the slurry can be injected into the gravel above the elastic cover 6 through the second guide hole 25 and the first guide hole 18, and after solidification, a bridge supporting the hole wall is formed.

[0041] The first connector 2 continues to rotate and rise, and the bottom of the bridge builder 1 begins to contact the metal spring sheet 4 and squeeze the metal spring sheet 4 to deform it, thereby separating the bridge builder 1 from the first connector 2 and the second connector 3 .

[0042] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A drilling and grouting integrated device, comprising a bridge erector (1), characterized in that: A first connector (2) capable of being fixed to a drill pipe is slidably provided on the inner side of the top of the bridge builder (1), and a second connector (3) capable of being fixed to a drill bit is slidably provided on the inner side of the bottom of the bridge builder (1). The bridge builder (1) and the second connector (3) are elastically connected via a spring (7), and a plurality of annularly distributed metal spring sheets (4) are fixed to the outer side of the second connector (3). An elastic cover (6) and a plurality of annularly distributed holders (5) are provided on the outer side of the bridge builder (1), and the elastic cover (6) is contracted inwardly by the pressing of the plurality of holders (5) when the bridge builder (1) is drilled deeper, and the elastic cover (6) is expanded outwardly by the lifting of the plurality of holders (5) when the bridge builder (1) is drilled back.

2. The integrated drilling and grouting device according to claim 1, characterized in that: The bridge builder (1) is in the shape of a tube column, and is provided with a first convex ring (11), a second convex ring (12), a third convex ring (13) and a fourth convex ring (14) in sequence from top to bottom. A sealing ring (15) is fixedly embedded on the inner ring wall of the second convex ring (12) and the third convex ring (13). A first guide hole (18), a first movable groove (16) located above the first guide hole (18), and a second movable groove (17) located below the first guide hole (18) are opened on the tube wall of the bridge builder (1). The first guide hole (18) is located between the second convex ring (12) and the third convex ring (13).

3. The integrated drilling and grouting device according to claim 2, characterized in that: The first connector (2) comprises a hollow tube (21), the top of the hollow tube (21) is provided with a first connecting portion (22) threadedly connected to a drill rod, a stop ring (23) is fixed to the outside of the top of the hollow tube (21), the stop ring (23) abuts against the first convex ring (11) from top to bottom, a plurality of equally spaced discs (24) are fixed to the outside of the bottom of the hollow tube (21), and a plurality of second guide holes (25) are radially opened on the tube wall of the hollow tube (21).

4. The integrated drilling and grouting device according to claim 3, characterized in that: The second connector (3) comprises a rod body (31), the bottom of the rod body (31) is provided with a second connection portion (35) threadedly connected to the drill bit, the top of the rod body (31) is fixed with a spline rod (32) slidably connected to the hollow tube (21), the bottom inner side of the hollow tube (21) is provided with a contraction groove, the top of the spline rod (32) is fixed with a limit plate (33) slidably limited in the contraction groove, and the top outer side of the rod body (31) is fixed with a pressure ring (34) having a diameter smaller than the diameter of the contraction groove.

5. The integrated drilling and grouting device according to claim 4, characterized in that: The spring (7) is a conical structure with a diameter that gradually decreases from top to bottom. One end of the spring (7) abuts against the contraction groove, and the other end of the spring (7) abuts against the pressure ring (34).

6. The integrated drilling and grouting device according to claim 5, characterized in that: The bottom end of the first convex ring (11) extends into the contraction groove at the bottom of the hollow tube (21), and the diameter of the pressure ring (34) is equal to the outer diameter of the hollow tube (21).

7. The integrated drilling and grouting device according to claim 3, characterized in that: The holder (5) comprises an arc-shaped tube segment (51), a row of cone spikes (52) is fixed on the outer arc surface of the arc-shaped tube segment (51), two hinge seats (53) distributed up and down are fixed on the inner arc surface of the arc-shaped tube segment (51), the hinge seat (53) located at the upper part is hinged with a first movable rod (54), and the hinge seat (53) located at the lower part is hinged with a second movable rod (55), one end of the first movable rod (54) away from the hinge seat (53) is hinged to the first movable groove (16), and one end of the second movable rod (55) away from the hinge seat (53) is hinged to the second movable groove (17), and a fan-shaped tooth (56) is fixed at the hinge, and the fan-shaped tooth (56) is engaged with the disc (24) on the outer side of the hollow tube (21).

8. The integrated drilling and grouting device according to claim 7, characterized in that: The elastic cover (6) comprises a conical cover body (61), the bottom of the conical cover body (61) is fixed to the outer surface of the bridge erector (1), the top of the conical cover body (61) is provided with a convex edge (62), and a clamping seat (57) for clamping the convex edge (62) is fixed on the inner arc surface of the arc-shaped pipe segment (51).

Citation Information

Patent Citations

  • Drilling bridging and grouting integrated device

    CN220203865U